Vous êtes sur la page 1sur 1

12 11 10 9 8 7 6 5 4 3 2 1

S
NOTES:-- T
R
1. SBC TAKEN -200 KN/ Sq.m . U
C
2. THE STRUCTURE HAS BEEN DESIGNED FOR - G+1 T
U
3. GRADE OF CONCRETE & STEEL SHALL BE USED FOR VARIOUS ELEMENTS . R
A
GRADE MIX RATIO STRUCTURE HYSD BARS L
M-10 1: 4 : 8 PCC Work.
M-25 1: 1 : 2 Footing,Column,Watertank. Confirm at
IS-1786:2008
M-25 1: 1 : 2 Beams,Slabs,Staircase.

4. THE CRANKING OF BARS TO BE DONE AT 1/4 SPAN AT AN ANGLE


OF 45 UNLESS SPECIFIED IN SLABS.
5.REMOVAL OF FORMWORK : AS PER CLAUSE 11.3.1, IS 456:2000.
I A) VERTICAL SIDE SHUTTERING OF
- 24HOURS d) PROPS TO SLABS : I
COLUMNS,WALLS & BEAMS i. SPANNING UPTO 4.5 M - 7 DAYS
B) BOTTOM SHUTTERING OF SLABS ii. SPANNING OVER 4.5 M - 14 DAYS
- 3 DAYS E) PROPS TO BEAMS & ARCHES :
(KEEPING THE PROPS)
i. SPANNING UPTO 6 M - 14 DAYS
C) BOTTOM SHUTTERING OF BEAMS
- 7 DAYS ii. SPANNING OVER 6 M - 21 DAYS
(KEEPING THE PROPS)

6. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE :

a).Pile - 50mm . e).Column - 40mm . i).Staircase - 20mm . Water retaining structure


b).Pile cap - 50mm . f).Beam - 25mm . j).Lintel - 20mm . a).Base slab - 40mm .
H b).Side wall - 30mm . H
c).Footing - 50mm . g).Slab - 20mm . k).Sunshade - 20mm
d).Raft slab - 75mm. h).Ret. wall - 40mm. l).Rc wall - 20mm. c).Cover slab - 25mm .

7. NO LAPS SHALL BE ALLOWED IN FOOTING REINFORCEMENT.


8. COLUMN REINFORCEMENT LAPPING SHALL BE "Ld" IN TENSION AND
LAPPING ALLOWED AT MIDWAY BETWEEN TWO FLOOR
(i.e. NOT MORE THAN 50% OF REINFORCEMENT SHALL BE LAPPED AT ONE LOCATION.)

9. SPACER BAR TO BE PROVIDED IN BETWEEN TWO LAYERS OF


REINFORCEMENT OF SAME DIA @ EVERY 1000 MM C/C.
10. LAPPING OF REINFORCEMENT IN BEAMS SHALL NOT BE ALLOWED
IN TENSION (T) ZONE.
G G
11.DEVELOPEMENT LENGTH (Ld) -FOR ALL STRUCTURAL MEMBERS
Concrete Developement Length 'Ld ' for Tension(T) Concrete Developement Length 'Ld ' for Compression(C)
Grade 250 415 500 Grade 250 415 500
M-20 M-20
M-25 M-25
M-30 M-30
M-35 M-35
M-40 M-40

12. SLAB FIRST MAIN RODS STARTS 50 MM FROM THE SUPPORT.


13. FIRST STIRRUPS IN THE BEAM IS 50mm AWAY FROM FACE OF SUPPORT.
F
14.CURTAILEMENT DISTANCE FROM SUPPORT IS 1/3rd OF CLEAR SPAN
15. WELDING OF BARS SHALL BE DONE AS A STITCH WELD FOR 5 TIMES
F DIAMETER OF BAR AND A GAP OF 5TIMES OF BAR AND AGAIN WELDING
FOR ANOTHER 5 TIMES DIAMETER OF BAR USING ARC WELDING
16. FOR SLABS,CHAIR SHALL BE PROVIDED TO KEEP TOP Reft. IN PLACE.
17. IN CASE OF ANY DISCREPANCY BEING NOTED IT SHALL BE
IMMEDIATELY BROUGHT TO THE CONSULTANT.

D
D

B B

DATE SCALE SIZE REV. SHEET DATE REV.NO. DESCRIPTION CHKD APPVD
DES. NAME 07.01.2019 NTS A3 R0 1/1

DRAWN

DESIGNED
R.V

R.V
PROJECT :

G +1 BUILDING @ PERAMBALUR

CLIENT :
GORKY
STRUCTURAL CONSULTANT
A RELEASED FOR: A
ARCHITECH :
CHKD. R.V
NIL DESIGN ADVANCE COPY CONSTRUCTION INFORMATION APPROVEL
TITLE : DRG. No.
Er.V. RAGHUL. 3, A. Narshimachari Street , Chennai -1.
APRVD. - FIRST FLOOR BEAM/SLAB LAYOUT & RC DETAILS
G C - 1 8 - S T R - 0 1 3 - W D 004 M.Tech,(Str.Engg) Cell -9688236937 E-mail : raghul.avp@gmail.com
12 11 9 8 7 6 4 3 2 1
LAST SAVED BY: RAGHUL | FILE LOCATION: MY COMPUTER \E:\GORKY\NIL DESIGN\ JOB NO :013 RESIDENTIAL (PERAMBALUR)

Vous aimerez peut-être aussi