LMSMA 2nd Eéltion. 2012 | Department of Inigation and Drainage Malaysis
control BMPs simply because trapping efficiency in check dams are relatively low, and high flows could
potentially re-suspend settled sediment. Maintenance is therefore required to remove trapped sediment and to
check for structural stability on regular basis. Check dams should only be placed in small open channels, and
never ona flowing river or natural stream.
() Design Criteria
(matt camace wen Sea
|
Figure 12.13: Check Dams
‘Table 12.14: Design Criteria of Check Dam.
Parameter
‘Requirement
Design Storm
Overspill
Flood Protection
Dimension
Intervals
Gootextile
Scour Protection
2-year ARI unless specified ctherwise by Authorities
All flow greater than 2 year ARI shall safely bypass the crossing,
Ensure upstream/ downstream flooding condition not aggravated
A series of check dams can be placed such that the height of each subsequent
check dam must be equal or lower than the base of the check dam before it
Chock dam with height moze than 450 mun ahall be laid with geotextile to
avoid seepage and structural failue
Height (centre) of dam shall not exceed 1m.
Forrock check dam:
~ Upstream slope: 2(H):1(V) or flatter
= Downstream slope: 4(H):1(V) or flatter
Centres of the dam shall be notched to centre to promote concentrated
flow (approx. 0.15 m)
Outer sides of dam shall be at least 0.5 m higher than centre to avoid
undermining,
‘Spill crest shall be of at Least 100 mm in width parallel to flow
Structure shall withstand the shear force induced by a 2-year ARI flow.
‘Materials (rocks, earth, and gabion) must be selected to meet this
requirement
Additional scour protection downstream of check dam shall be provided
if deemed necessary
1220
Erosion and Sediment Control