1. INPUT DATA
1.2. CONCRETE
Page 1 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output
1.3. SOIL
1.4. REBAR
2. ANALYSIS
SOIL
Soil volume Vsoil = h1 * i * Lf= 1.9 m3
Soil weight W1 = gs * Vsoil= 33.3 kN
Moment arm of soil weight Armsoil = 1.4 m
Moment resistance from soil reaction Mr1 = W1 * Armsoil = 45.0 kNm
CONCRETE COLUMN
Column volume Vcol = J * t * Lc= 4.1 m3
Column weight W2 = gc * Vcol= 97.3 kN
Moment arm of column Armcol = 0.6 m
Moment resistance from concrete column Mr2 = W2 * Armcol = 53.5 kNm
FOOTING FOUNDATION
Footing volume Vfoot = D * B * Lf= 1.6 m3
Footing weight W3 = gc * Vfoot= 38.4 kN
Moment arm of footing Armfoot = 0.8 m
Moment resistance from footing Mr3 = W3 * Armfoot = 30.7 kNm
MONORAIL CRANE FORCE
Vertical force of the monorail crane reaction PV = 260.0 kN
Page 2 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output
Moment arm ArmV = 0.6 m
Moment resistance from crane reaction MrV = PV * ArmV = 143.0 kNm
TOTAL MOMENT CAPACITY
MR = Mr1 + Mr2 + Mr3 + MrV = 272.2 kNm
TOS
PH1
FOOTING
PH2
BS
Page 3 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output
PH £ m * PV
84 kN < 279 kN ® (OK)
Page 4 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output
Page 5 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output
Page 6 of 6