Vous êtes sur la page 1sur 3

no internal pressure. Estimate the tensile stress No. of Printed Pages : 06 Roll No. .......................

in the steel tape when it is being wound to


ensure that when the cylinder is subjected to D-71
an internal pressure of 3.5 MN/m2 the tensile
hoop stress in the cylinder will not exceed 35 B. Tech. EXAMINATION, May 2018
MN/m2. For copper, Poisson's ratio µ = 0.3 (Fourth Semester)
and E = 100 GN/m2; for steel, E = 200 GN/
(B. Scheme) (Main & Re-appear)
m2.
(CE)
Unit III
CE202B
5. Draw ILD for forces in membes AB, BC and
STRUCTURAL ANALYSIS-I
DF. Angle E and A are 30 and 60 degree
respectively and AB = BC = CD = DE = 4m. Time : 3 Hours] [Maximum Marks : 75

Before answering the question-paper candidates


I G
F should ensure that they have been supplied to correct
and complete question-paper. No complaint, in this
regard, will be entertained after the examination.

Note : Attempt Five questions in all, selecting at


6. What do you understand by influence line least one question from each Unit. All
diagram ? Determine maximum possible shear questions carry equal marks.
force and bending moment at point C of the

M-D-71 4 (2-36/16) M-D-71 P.T.O.


Unit I slope of 1 in 4. Calculate maximum and
minimum stresses at the base. Take Unit weight
1. A crane structure shown in figure is lifting a
of the concrete dam = 25 kN/m3 and that of
load W at joint F. Find the horizontal and
water = 10 kN/m3. 15
vertical deflection of joint F. The length of
AD is 2L and cross sectional area is 2a. The Unit II
length and cross sectional area of all other
members is L and a respectively. 15 3. Find the horizontal deflection and slope at
free end C of the frame shown in figure : 15

3 kN

6 m

2. A trapezoidal gravity dam is 20 m high and 4. A closed thin copper cylinder of 150 mm
2 m wide at the top. It retains water up to a
internal diameter having a wall thickness of
level of 3 m below the top of the dam. The
4 mm is closely wound with a single layer of
water side of the dam is inclined at a slope of steel tape having a thickness of 1.5 mm, the
1 in 10 and the other side is inclined at a
tape being wound on when the cylinder has
M-D-71 2 (2-36/17) M-D-71 3 P.T.O.
Find the SF and BM in the girder at a section beam shown below due to a train of loads
20 m from the left hand hinge if a concentrated moving from left to right. Also find absolute
live load of 100 kN is placed at 10 m from maximum bending moment anywhere in the
the left end, also find the maximum tension in beam. 15
the cable. 15

B
C

Unit IV

7. Draw BM diagram for a three hinged parabolic


arch with span 75 m and rise 6 m if it carries
a udl of 10 kN/m over left half of the span
and a point load of 20 kN acting at 20 m from
the right hand support. Also calculate axial
thrust in the arch at 25 m from left support.
15

8. A suspension cable with 80 m span and 5 m


dip is stiffened by a three hinged girder. The
dead load of the girder and deck is 7.5 kN/m.
M-D-71 6 900 (2-36/18) M-D-71 5 P.T.O.

Vous aimerez peut-être aussi