Académique Documents
Professionnel Documents
Culture Documents
Product Application to
Field Drilling Conditions
2015
Basic Drilling Fluids Workshop
Vertical Applications
Leiden, NL
Issues to Consider
1
Product Application to 6/4/2015
Field Drilling Conditions
Effective Pre-Planning
Influence of Geology
▌ Sand/Gravel
Design of Drilling Fluid System
Borehole Stability
Erosion
Problems getting casing/screen to depth
▌ Clay
Design of Drilling Fluid System
Boot Formation
Excessive Mud Weight Development
Problems getting casing/screen to depth
▌ Rock
Effective Hole Cleaning
Penetration Rate
2
Product Application to 6/4/2015
Field Drilling Conditions
3
Product Application to 6/4/2015
Field Drilling Conditions
▌ Soda Ash
Calcium Removal - Primary Function
pH Control - Secondary Function
▌ QUIK-GEL
Mixes & Fully Hydrates in a short time
Produces a Low-Solids system
Filtercake Development (Initial Mechanism for Filtration Control)
4
Product Application to 6/4/2015
Field Drilling Conditions
Product Application
5
Product Application to 6/4/2015
Field Drilling Conditions
Geologic Scenario #1
Glacial Till w/Reactive Clay & Sand
Topsoil
Reactive Clay
Coarse Sand
(Production Zone)
6
Product Application to 6/4/2015
Field Drilling Conditions
Geologic Scenario #2
Moderate Clay with Sand & Gravel
Topsoil
Sandy Clay
Coarse Sand
7
Product Application to 6/4/2015
Field Drilling Conditions
8
Product Application to 6/4/2015
Field Drilling Conditions
Geologic Scenario #3
Overburden
Fractured Rock
Geologic Scenario #3
Overburden
Fractured Rock
9
Product Application to 6/4/2015
Field Drilling Conditions
Geologic Scenario #3
(Work Through The Problem)
10
Product Application to 6/4/2015
Field Drilling Conditions
11