Installation Instruction
EPP-0797-11/02
Refer to the kit label and the title of the installation instruction.
Components or working steps may have been improved since you last installed this
product.
General Instructions
Use a propane (preferred) or butane gas torch.
Adjust the torch to obtain a soft blue flame with a yellow tip.
Keep the torch aimed in the shrink direction to preheat the material.
Clean and degrease all parts that will come into contact with adhesive.
Tubing should be cut smoothly with a sharp knife leaving no jagged edges.
Ensure that the tubing is shrunk smoothly all around before continuing along the cable.
Tubing should be smooth and wrinkle free with inner components clearly defined.
The Information contained in these installation instructions is for use only by installers trained to
make electrical power installations and is intended to describe the correct method of installation
for this product. However, Tyco Electronics has no control over the field conditions which
influence product installation.
It is the user's responsibility to determine the suitability of the installation method in the user's field
conditions. Tyco Electronics' only obligations are those in Tyco Electronics' standard Conditions of
Sale for this product and in no case will Tyco Electronics be liable for any other incidental, indirect
or consequential damages arising from the use or misuse of the products.
Raychem is a trade mark.
12 kV 17.5 kV 24 kV
Clean
L* = min. core length required. 100
The actual length will be determined by the overall geometry of the equipment.
A1
Cut the cable and remove the
oversheath to the required length,
leaving enough length to set the
cores into their final position.
Degrease and clean the end of the
oversheath for about 100 mm.
Note: The minimum core length L
is given in Table 1.
Wrap one layer of sealant tape (red) Remove any fillers up to the end of the Mark the core screen 40 mm below
with slight tension around the end of oversheath. Bend and shape the the screen cut.
the oversheath for 80 mm. cores into their final position. Measure the distance c of each
Bend the shielding wires back onto Cut the cores to the required length. individual core and cut the
the oversheath. Thoroughly remove the core screen conductive tubing accordingly.
Avoid crossing individual wires. according to dimension a
Temporarily fix the shielding wires to (see Table 1). Continue with step 5.
the oversheath. The surface of the insulation should
be free from all traces of conductive
material. Smooth out any irregularities.
Note: Do not nick the insulation.
A2 A3 A4
a
40
80
12 kV 17.5 kV 24 kV
80
*L = min. core length required.
The actual length will be determined by the overall geometry of the equipment.
B1
Cut the cable and remove the
oversheath to the required length,
leaving enough length to set the
cores into the final position.
Degrease and clean the end of the
oversheath for about 100 mm.
Note: The mimimum core length L is
given in Table 2.
Position the end of the earth lead onto
the metal tape shield of each core Wrap one layer of sealant tape (red)
about 100 mm from the end of the round the oversheath end for 80 mm.
oversheath.
Starting at the opposite side of the Bend and shape the cores into their
core, wrap the roll spring twice over final position. Cut the cores to the
the earth lead in direction of the metal required length. Remove the metal
tape shield wrap. Fold the earth lead
back over the roll spring. Wrap the tape shield according to dimension b
remaining roll spring around the earth (see Table 2). Fix the metal tape
lead. Carefully slide the roll spring and temporarely in place.
earth lead down into the crutch until it Thoroughly remove the core screen to Measure the distance c of each
is about 10 mm from the end of the 40 mm above the metal tape shield individual core and cut the
oversheath. Tighten the roll spring cut. The surface of the insulation conductive tubing accordingly.
with twisting action and fix it into place should be free from all traces of
with two layers of PVC tape. Place the
moisture block in the centre of the red conductive material. Continue with step 5.
sealant tape. Smooth out any irregularities.
Note: Do not nick the insulation.
B2 B3 B4
40
roll spring
earth braid
c
moisture block
max.
40
110 K + 5 mm
mm
4
1
2
3
5 6 7
Pull the breakout down the crutch as Cut back the insulation according to
Position the conductive tubing over far as possible. Shrink the breakout K = depth of cable lug barrel hole
the cores 40 mm below the end of into place starting at the centre. Work
the core screen. + 5 mm.
first towards the lower end and then
Shrink each tubing into place by shrink the turrets onto the cores. The Install the cable lug. Remove any
starting on top and continue numbers in the drawing indicate the sharp edges. Degrease and clean
shrinking them down towards the shrinking sequence. the lug and the insulation.
cable oversheath. Note: Do not use cable lugs with
Allow the tubing to cool before barrel holes deeper than 110 mm.
continuing.
Remove the release paper and wrap Shim the cable lug barrel: Preheat the cable lug slightly before
the void filling strip (yellow) around Use additional red sealant tape to placing the tubing over the core so
the end of the core screen. Stretch shim the cable lug barrel for the that the top of the tubing covers the
the strip to half of its original width to following voltage levels and cross crimping area of the cable lug. Shrink
achieve a fine, thin edge onto the sections. the tubing down starting at the screen
insulation. Cover 20 mm of the core 12 kV: 10 to 25 mm2 cut using a soft yellow flame. Heat
screen and continue onto the 17,5 kV: 16 to 25 mm2 the area well but avoid scorching of
insulation for 10 mm. 24 kV: 10 to 25 mm2 surface. Continue shrinking towards
the cable lug. Finally shrink down the
bottom end of the tubing. The
numbers in the drawing indicate the
shrinking sequence.
8 9 10
10
2
20
1
3
Note: After installation the termination Shrink the skirts into place at the
must be post-heated as well as the position shown in the drawings on
palm of the cable lug until a bead of the next page. Start with the first
sealant (green) appears around the skirt on the lowest position.
top of the tubing.
Allow the termination to cool before
applying any mechanical strain.
60
Number of skirts per core
60
kV Indoor Outdoor
60
12 0 1
180
17.5 0 1
24 0 3
180
60
60
60
2136_1a-4S 2135_1-4S
d a
D r
2136_1-4S