Specification report to accompany the estimate for the work of Construction of waiting

Shed at Thaneerpanthanpatty burial ground in E.Chithoor Panchayat.

Estimate Amount : Rs. 1.50 Lakhs

It is proposed to Construction of waiting Shed at Thaneerpanthanpatty burial ground in


E.Chithoor Panchayat. Under the scheme of THAI for the year 2014-15

Necessary administrative sanction has been obtained from District Collector, Dindigul in Roc.
No.

The estimate has been prepared based on the type design communicated by the D.R.D.A
Chennai, which consist of plinth area

FOUNDATION & BASEMENT :

Earth work for foundation of column has to taken to a depth of 1.00 and to a width of
0.90m x 0.9 m and cement concrete for foundation in 1:5:10 mix using 40mm ISS metal has to
be laid to a depth of 0.10m.

The column footing of size 0.90 x 0.90 x 0.15m, Terpizoidel footing of size 0.75 x 0.3 m x
0.3 column of size 0.23m x 0.23m in RCC 1:2:4.

SUPER STRUCTURE :
Cremation platform wall in brick work CM 1:5 using country bricks to a height 0.6m
from
SAND FILLING :
Cremation platform inner portion will be filled with good river sand
ROOF BEAM :
Roof load bearing beam will be laid in RCC 1:1.5:3 mix using 20mm ISSn HBG metal to a
size of 0.23m x 0.30m.
ROOF SLAB :

Roof slab will be laid in RCC 1:1.5:3 mix using 20mm IS HBG metal to a size of 0.1m.

PLASTERING :
Roof ceiling and Projections will be plastered in CM 1:3 mix to 10mm thick.

Inner & Outer exposed brick walls will plastered in CM 1:5 mix to 12mm thick.
FLOORING :

Flooring will be laid in CC 1:5:10 mix using 40mm ISS HBG metal to a thickness of
0.10m and the top will be finished with Granolithic Pattern Floor finish in CC 1:2:4 mix using
10 - 20mm ISS metal to 0.025 thick.

WHITE WASHING AND COLOUR WASHING :


The inner ceiling eara will be white washed in two coats and outer surface area will be
colour washed in two coats.
CC PAVEMENT :
Cement concrete pavement of length 13m and with 3m will be laid from the cremation
yard to approach road.
LUMPSUM PROVISION :
Necessary provisions have been made for chimny arrangements, Name Board & Photo
Graphic charges.
FLOORING :

This estimate is prepared based on the current schedule of rates for the year 2013-14. The
work on sanction will be carried out as per standard specifications and time to time
instructions given by higher suthorities.
ABSTRACT ESTIMATE

Name of work : Construction of waiting Shed at Thaneerpanthanpatty burial ground in


E.Chithoor Panchayat.

Name of Union :Vedasandur Scheme : THAI-2014-15

Estimate Amount : Rs.1.50 lakhs

Sl. No Quantity Description of work Rate Per Amount

Earthwork excavation for foundation in


all clauses of soils and subsoils to full
depth as may be directed except in hard
1 5.07 rock requiring blasting but inclusive of 83.70 Cum 424
shoring, struting and bailing out water
wherever necessary and refilling the
sides of foundation.

Supplying and filling in foundation and


basement with filling sand in layers of
not more than 15cm thick well rammed,
2 1.30 watered and compacted including cost 13.00 Cum 17
& conveyance of sand and all labour
charges etc., complete as per std.
specifications.

Cement Concrete 1:4:8 mix using 40mm


ISS HBG metal for foundation including
watering whenever necessary and laid
3 3.44 2332.41 Cum 8023
in layers not more than 15 cm thick
compacting etc., complete complying
with std. specifications and as directed.

Cement Concrete 1:2:4 mix using 20mm


ISS HBG metal for foundation including
watering whenever necessary and laid
4 1.05 3343.23 Cum 3510
in layers not more than 15 cm thick
compacting etc., complete complying
with std. specifications and as directed.
Sl. No Quantity Description of work Rate Per Amount

Brickwork in C.M. 1:5 mix using country


bricks ground moulded of size 23x11x7
5 4.86 3367.13 Cum 16364
cu.cm including cost and conveyance of
all materials and all labor charges etc.,

Supplying and erecting centering for


sides and soffits including support and
strutting up to 3.29m high for plane
surface such as using mild steel sheets
of size 90 x 40 cm and BG 10 stiffened
with welded mild steel angle of size
6 59.90 398.00 sqm 23842
25x25x3mm for boarding laid over silver
oak (country wood) joists of size
10x6.50cm spaced at about 90 centre to
centre and supported by casaurina
props of 10 - 13cm dia spaced at 75cm
c/c etc. complete.

Supplying, fabricating and placing of


mild steel or ribbed for steel rods and all
RCC works as per the design given
7 0.750 #N/A MT #N/A
including cost steel and binding wire in
all floors etc., & convayence of steel as
per std. specification and directed.

RCC 1:1.5:3 mix using 20 mm ISS HBG


metal including cost & conveyance of all
8 6.48 4452.96 Cum 28855
materials to site and all labour charges
etc., complete.

Plastering with cement morter 1:3 mix to


10mm thick including cost and
9 43.04 108.75 Sqm 4681
convayense of all materials and labour
charges etc..,
Sl. No Quantity Description of work Rate Per Amount

Plastering with C.M. 1:5 mix using


12mm thick including curing, cost and
10 34.38 96.78 Sqm 3327
conveyance of all materials and all labor
charges etc., complete

Finishing the top of roof with one course


of machine pressed tiles of size
20cmx20cmx20mm of approved quality
laid in cement mortar 1:3 mix to 12mm
thick mixed with water proofing
11 12.96 549.86 Sqm 7126
compound confirming to ISS by 2%
weightof cement used and the joint
pointed neatly to full depth of tiles with
same mortar as per std., specifications
etc., complete.

Providing Granolithic pattern floor


finish with C.C. 1:2:4 mix using 10 to
12 12.96 12mm ISS metal including cost & 79.02 Sqm 1024
convayance of all materials to site and
all labour charges etc., complete

White washing two coats with shell lime


including cost & convayance of all
13 16.48 12.74 Sqm 210
materials to site and all labour charges
etc., complete

Plastic emulsion painting two coats


with approved colour including cost &
14 66.63 124.00 Sqm 8262
convayance of all materials to site and
all labour charges etc., complete

15 L.S Provision for Name Board L.S 500

16 L.S Provision for photographic charges L.S 200

Contingencies and unforeseen items


17 L.S L.S 737
etc.,

Total #N/A
DETAILED ESTIMATE

Name of work : Construction of waiting Shed at Thaneerpanthanpatty burial ground in E.Chithoor


Panchayat.

Name of Union : Vedasandur Scheme : THAI-2014-15

Estimate Amount : Rs.1.50 lakhs


Sl. Measurement in Metres
Description of the Work Nos. Quantity
No L B D

Earthwork excavation for foundation in all clauses of soils and subsoils to full depth as may be
directed except in hard rock requiring blasting but inclusive of shoring, struting and bailing out
water wherever necessary and refilling the sides of foundation.

1 RCC column Foundation 1 x 4 0.90 0.90 1.00 3.24


Main wall alround 1 x 1 15.32 0.30 0.30 1.38
D/F COLUMN -1 x 4 0.90 0.30 0.30 0.32
Steps 1 x 1 1.30 0.50 0.20 0.13
Total Quantity 5.07

Supplying and filling in foundation and basement with filling sand in layers of not more than
15cm thick well rammed, watered and compacted including cost & conveyance of sand and all
2 labour charges etc., complete as per std. specifications.

Basement inner 1 x 1 3.60 3.60 0.10 1.30


Total Quantity 1.30
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering
whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete
complying with std. specifications and as directed.

Main wall alround 1 x 1 15.32 0.30 0.10 0.46

For Pillars 1 x 4 0.90 0.90 0.10 0.32


3
D/F COLUMN 1 x 4 0.90 0.30 0.10 0.11

Steps 1 x 1 1.30 0.50 0.10 0.07

Floor 1 x 1 3.60 3.60 0.10 1.30

CC Pavement 1 x 1 7.00 2.00 0.10 1.40


Total Quantity 3.44
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including watering
whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete
complying with std. specifications and as directed.
4
CC Pavement 1 x 1 7.00 2.00 0.075 1.05
Total Quantity 1.05
Brickwork in C.M. 1:5 mix using country bricks ground moulded of size 23x11x7 cu.cm including
cost and conveyance of all materials and all labor charges etc.,
Main wall alround 1 x 1 15.32 0.23 0.60 2.11
D/F COLUMN -1 x 4 0.23 0.23 0.60 0.13
5 Steps 1 x 1 1.30 0.50 0.20 0.13
5
Steps 1 x 1 1.30 0.30 0.20 0.08
Walls allround 1 x 1 14.40 0.23 0.60 1.99
Gable 1 x 2 1/2(4.06) 0.23 0.45 0.42
Total Quantity 4.86

Supplying and erecting centering for sides and soffits including support and strutting up to
3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10
stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak
(country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by
casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.

Pillars 1 x 4 0.92 3.30 12.14


6 Grade beam 1 x 2 15.32 0.30 9.19
D/F COLUMN -2 x 4 0.23 0.30 0.55
Roof Beam 1 x 2 14.40 0.30 8.64
Beam bottom 1 x 1 14.40 0.23 3.31
Roof bottom 1 x 1 3.60 3.60 12.96
Roof sides 1 x 1 19.20 0.10 1.92
Sunshade 1 x 4 4.66 0.60 11.18
Total Quantity 59.90
Supplying, fabricating and placing of mild steel or ribbed for steel rods and all RCC works as
7 per the design given including cost steel and binding wire in all floors etc., & convayence of steel
as per std. specification and directed.
0.75
RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site
8
and all labour charges etc., complete.
Pillars 1 x 4 0.23 0.23 3.30 0.70
Footing 1 x 4 0.90 0.90 0.15 0.49
trapezoidal Portion 1 x 4 (0.90 +0.30 )/2
2 2
0.30 0.54
Grade Beam 1 x 1 14.40 0.23 0.30 0.99
Beam 1 x 1 14.40 0.23 0.30 0.99
Roof Slab 1 x 1 4.06 4.06 0.10 1.65
Sunshade 1 x 4 4.66 0.60 0.10 1.12
Total Quantity 6.48
Finishing the exposed surface of RCC items of work such as slabs, beams, sunshed faica, canopy
slab, staircase waist and landing slab, etc., with cement morter 1:3 mix to 10mm thick including
cost and convayense of all materials and labour charges etc..,
Roof bottom 1 x 1 4.06 4.06 16.48
9
Beam 1 x 1 14.40 0.83 11.95
Pillar alround 1 x 4 0.92 2.60 9.57
Sunshade 1 x 1 16.80 0.30 5.04
Total Quantity 43.04

Plastering with C.M. 1:5 mix using 12mm thick including curing, cost and conveyance of all
10
materials and all labor charges etc., complete

Basement outer allround 1 x 1 15.32 0.60 9.19


walls allround outer 1 x 1 15.60 0.60 9.36
walls allround outer 1 x 1 13.20 0.60 7.92
D/F Open 1 x 2 1.20 0.60 1.44
Top 1 x 1 14.40 0.23 3.31
Steps 1 x 1 1.30 0.90 1.17
Steps 1 x 1 0.80 0.20 0.16
Gable 1 x 2 1/2 (4.06) 0.45 1.83
Total Quantity 34.38

Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of
approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing
compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full
11 depth of tiles with same mortar as per std., specifications etc., complete.

Roof Top 1 x 1 3.60 3.60 12.96


Total Quantity 12.96
Providing Granolithic pattern floor finish with C.C. 1:2:4 mix using 10 to 12mm ISS metal
12
including cost & convayance of all materials to site and all labour charges etc., complete
Floor 1 x 1 3.60 3.60 12.96
White washing two coats with shell lime including cost & convayance of all materials to site and
13
all labour charges etc., complete
Roof bottom 1 x 1 4.06 4.06 16.48
Total Quantity 16.48

Plastic emulsion painting two coats with approved colour including cost & convayance of all
14
materials to site and all labour charges etc., complete

Basement outer allround 1 x 1 15.32 0.60 9.19


walls allround outer 1 x 1 15.60 0.60 9.36
walls allround outer 1 x 1 13.20 0.60 7.92
D/F Open 1 x 2 1.20 0.60 1.44
Top 1 x 1 14.40 0.23 3.31
Beam 1 x 1 14.40 0.83 11.95
Pillar alround 1 x 4 0.92 2.60 9.57
Sunshade 1 x 1 16.80 0.60 10.08
Steps 1 x 1 1.20 0.45 0.54
Steps 1 x 3 1.20 0.40 1.44
Gable 1 x 2 1/2 (4.06) 0.45 1.83
Total Quantity 66.63
15 Provision for Name Board LS

16 Provision for Photographic charges LS

17 Contingencies and unforeseen items etc., LS


COMPARATIVE STATEMENT
Name of work : Construction of waiting Shed at Thaneerpanthanpatty burial ground in E.Chithoor Panchayat.
Estimate Amount : Rs.1.50 lakhs

As per Estimate Thiru S.Sakthivel Thiru V.Murugesan


S.No Qty Description of Work
Rate Amount Rate Amount Rate Amount

Earthwork excavation for foundation in all


clauses of soils and subsoils to full depth as
may be directed except in hard rock requiring
1 5.07 83.70 424.36 83.70 424.36 85.00 430.95
blasting but inclusive of shoring, struting and
bailing out water wherever necessary and
refilling the sides of foundation.

Supplying and filling in foundation and


basement with filling sand in layers of not
more than 15cm thick well rammed, watered
2 1.30 13.00 16.90 13.00 16.90 15.00 19.50
and compacted including cost & conveyance
of sand and all labour charges etc., complete
as per std. specifications.

Cement Concrete 1:4:8 mix using 40mm ISS


HBG metal for foundation including watering
whenever necessary and laid in layers not
3 3.44 2332.41 8023.49 2332.00 8022.08 2335.00 8032.40
more than 15 cm thick compacting etc.,
complete complying with std. specifications
and as directed.
Cement Concrete 1:2:4 mix using 20mm ISS
HBG metal for foundation including watering
whenever necessary and laid in layers not
4 1.05 3343.23 3510.39 3343.00 3510.15 3345.00 3512.25
more than 15 cm thick compacting etc.,
complete complying with std. specifications
and as directed.

Brickwork in C.M. 1:5 mix using country


bricks ground moulded of size 23x11x7 cu.cm
5 4.86 3367.13 16364.25 3367.00 16363.62 3369.00 16373.34
including cost and conveyance of all materials
and all labor charges etc.,

Supplying and erecting centering for sides


and soffits including support and strutting up
to 3.29m high for plane surface such as using
mild steel sheets of size 90 x 40 cm and BG 10
stiffened with welded mild steel angle of size
6 59.90 398.00 23841.79 398.00 23841.79 398.00 23841.79
25x25x3mm for boarding laid over silver oak
(country wood) joists of size 10x6.50cm
spaced at about 90 centre to centre and
supported by casaurina props of 10 - 13cm
dia spaced at 75cm c/c etc. complete.

Supplying, fabricating and placing of mild


steel or ribbed for steel rods and all RCC
works as per the design given including cost
7 0.75 #N/A #N/A 57190.00 42892.50 57200.00 42900.00
steel and binding wire in all floors etc., &
convayence of steel as per std. specification
and directed.
RCC 1:1.5:3 mix using 20 mm ISS HBG metal
10 6.48 including cost & conveyance of all materials 4452.96 28855.18 4452.00 28848.96 4455.00 28868.40
to site and all labour charges etc., complete.

Plastering with cement morter 1:3 mix to


11 43.04 10mm thick including cost and convayense of 108.75 4680.60 108.00 4648.32 110.00 4734.40
all materials and labour charges etc..,

Plastering with C.M. 1:5 mix using 12mm


thick including curing, cost and conveyance
12 34.38 96.78 3327.30 96.00 3300.48 97.00 3334.86
of all materials and all labor charges etc.,
complete

Finishing the top of roof with one course of


machine pressed tiles of size
20cmx20cmx20mm of approved quality laid
in cement mortar 1:3 mix to 12mm thick
13 12.96 mixed with water proofing compound 549.86 7126.19 549.00 7115.04 550.00 7128.00
confirming to ISS by 2% weightof cement
used and the joint pointed neatly to full depth
of tiles with same mortar as per std.,
specifications etc., complete.

Providing Granolithic pattern floor finish


with C.C. 1:2:4 mix using 10 to 12mm ISS
14 12.96 metal including cost & convayance of all 79.02 1024.10 79.00 1023.84 80.00 1036.80
materials to site and all labour charges etc.,
complete
White washing two coats with shell lime
15 16.48 including cost & convayance of all materials 12.74 209.96 12.00 197.76 15.00 247.20
to site and all labour charges etc., complete

Plastic emulsion painting two coats with


approved colour including cost & convayance
15 66.63 124.00 8262.09 124.00 8262.12 125.00 8328.75
of all materials to site and all labour charges
etc., complete

#N/A 140205.80 140459.89

: #N/A - 140205.80
Thiru S.Sakthivel x 100 #N/A
#N/A

: #N/A - 140459.89
Thiru V.Murugesan x 100 #N/A
#N/A

The lowest rate quanted by the contractor Thiru. S.Sakthivel was 0.07 % less than the estimate rate. So this rate is may be approved
STATEMENT OF PARTICULARS TO ACCOMPANY T.R.TENDERS

1 Name Of the Panchayat Union : Vedasandur


2 Whether Panchayat Union : Vedasandur
Construction of waiting Shed at Thaneerpanthanpatty
3 Name of the Work :
burial ground in E.Chithoor Panchayat.

4 Amount Sanctioned estimate with : Rs #N/A

5 DR or SDR No & Date of Sanction :


Nature of Works whether road work or
6 :
building work
Rates adopted in the sanction i.e.
7 : 2013-14
scheduled of rates or the Year of Sanction

Value of Contracted as per the Sanctioned


8 :
estimate

Date with no. of Tender calls and the


9 :
results

1. First call :
2. Second call :
3. Third call :
10 Name of the Tenders :
1 : Thiru S.Sakthivel @Rs140205.801/- #N/A % less
2 : Thiru V.Murugesan @Rs140459.892/- #N/A % Exess
Name of lowest tenders recommended
11 : Thiru S.Sakthivel @Rs140205.801/- #N/A % less
with of Tender
Whether the tender is a registered
12 : Yes
contractor note with his money limit
His subsisting Value of Contract
13 : Yes
including this work new recommended

PU Challan No.
Whether the required EMD has been
14 :
remitted in case of at 5% of S.B.
Rs. #N/A

Whether the current LTYCA STVC have


15 :
been produced
Whether funds are avilable to execute the
16 : THAI-2014-15
work
Whether extra cot if any involved way of
17 :
premium tender is Prposed to be met with
Reasons for delay in entrustment of work
18 :
if any
19 Commissioner`s remarks :
20 Asst. Engineer`s remarks :
TENDER REGISTER
Name of work : Construction of waiting Shed at Thaneerpanthanpatty burial ground in E.Chithoor Panchayat.

Estimate Amount : Rs.1.50 lakhs

Whether tender notice has been approved by competent authority : Yes

Total No.of Tender Received ; 2 (Two Only) Date of Tender :

Whether Whether the Certificate


regitered or Verificationor Recommendation Order of the
contractor or clearance of income tax s of the authority
Tender Amount of
S.No Name of Tender not if registered assesments has been Commissions component to
percentage Deposit
the serial No.of obtained from the and Engineer If accept the
in the Register contractor for the year there is one tender
or contractor concerned

PU Challan No.
1 Thiru S.Sakthivel Yes Yes #N/A % less
Rs. #N/A

PU Challan No.
2 Thiru V.Murugesan Yes Yes #N/A % Exess
Rs. #N/A

The lowest rate quanted by the contractor Thiru. S.Sakthivel was 0.07 % less than the estimate rate. So this rate is may be approved

BLOCK DEVELOPMENT OFFICER ASSISTANT ENGINEER


PANCHAYAT UNION PANCHAYAT UNION
VEDASANDUR. VEDASANDUR.
TENDER SCHEDULE

Name of work : Construction of waiting Shed at Thaneerpanthanpatty burial ground in E.Chithoor Panchayat.

Estimate Amount : Rs.1.50 lakhs

Rate
S.No Qty Description of Work
In Figure In Words

Earthwork excavation for foundation in all


clauses of soils and subsoils to full depth as
may be directed except in hard rock
1 5.07 requiring blasting but inclusive of shoring,
struting and bailing out water wherever
necessary and refilling the sides of
foundation.

Supplying and filling in foundation and


basement with filling sand in layers of not
more than 15cm thick well rammed,
2 1.30
watered and compacted including cost &
conveyance of sand and all labour charges
etc., complete as per std. specifications.

Cement Concrete 1:4:8 mix using 40mm ISS


HBG metal for foundation including
watering whenever necessary and laid in
3 3.44
layers not more than 15 cm thick
compacting etc., complete complying with
std. specifications and as directed.
Cement Concrete 1:2:4 mix using 20mm ISS
HBG metal for foundation including
watering whenever necessary and laid in
4 1.05
layers not more than 15 cm thick
compacting etc., complete complying with
std. specifications and as directed.

Brickwork in C.M. 1:5 mix using country


bricks ground moulded of size 23x11x7
5 4.86
cu.cm including cost and conveyance of all
materials and all labor charges etc.,

Supplying and erecting centering for sides


and soffits including support and strutting
up to 3.29m high for plane surface such as
using mild steel sheets of size 90 x 40 cm
and BG 10 stiffened with welded mild steel
6 59.90 angle of size 25x25x3mm for boarding laid
over silver oak (country wood) joists of size
10x6.50cm spaced at about 90 centre to
centre and supported by casaurina props of
10 - 13cm dia spaced at 75cm c/c etc.
complete.

Supplying, fabricating and placing of mild


steel or ribbed for steel rods and all RCC
works as per the design given including
7 0.75
cost steel and binding wire in all floors etc.,
& convayence of steel as per std.
specification and directed.
RCC 1:1.5:3 mix using 20 mm ISS HBG
metal including cost & conveyance of all
8 6.48
materials to site and all labour charges etc.,
complete.

Plastering with cement morter 1:3 mix to


9 43.04 10mm thick including cost and convayense
of all materials and labour charges etc..,

Plastering with C.M. 1:5 mix using 12mm


thick including curing, cost and conveyance
10 34.38
of all materials and all labor charges etc.,
complete

Finishing the top of roof with one course of


machine pressed tiles of size
20cmx20cmx20mm of approved quality laid
in cement mortar 1:3 mix to 12mm thick
11 12.96 mixed with water proofing compound
confirming to ISS by 2% weightof cement
used and the joint pointed neatly to full
depth of tiles with same mortar as per std.,
specifications etc., complete.

Providing Granolithic pattern floor finish


with C.C. 1:2:4 mix using 10 to 12mm ISS
12 12.96 metal including cost & convayance of all
materials to site and all labour charges etc.,
complete
White washing two coats with shell lime
including cost & convayance of all
13 16.48
materials to site and all labour charges etc.,
complete

Plastic emulsion painting two coats with


approved colour including cost &
14 66.63
convayance of all materials to site and all
labour charges etc., complete
VEDASANDUR BLOCK
COMPLETION REPORT
Name of work : Construction of waiting Shed at Thaneerpanthanpatty burial ground in E.Chithoor Panchayat.

Estimate Amount : Rs.1.50 lakhs

As per Original Estimate As per Bills Differnce


S No. Particulars
Quantity Rate Amount Quantity Rate Amount Increse Decrese

Earthwork excavation for foundation in


all clauses of soils and subsoils to full
depth as may be directed except in
1 hard rock requiring blasting but 5.07 83.70 424 6.22 83.70 520.61 -96.61
inclusive of shoring, struting and
bailing out water wherever necessary
and refilling the sides of foundation.

Supplying and filling in foundation


and basement with filling sand in
layers of not more than 15cm thick well
2 rammed, watered and compacted 1.30 13.00 17 7.78 13.00 101.14 -84.14
including cost & conveyance of sand
and all labour charges etc., complete as
per std. specifications.
Cement Concrete 1:4:8 mix using
40mm ISS HBG metal for foundation
including watering whenever
3 necessary and laid in layers not more 3.44 2332.41 8023 3.44 2332.00 8022.08 0.92
than 15 cm thick compacting etc.,
complete complying with std.
specifications and as directed.

Brickwork in C.M. 1:5 mix using


country bricks ground moulded of size
4 23x11x7 cu.cm including cost and 4.86 3367.13 16364 2.56 3343.00 8558.08 7805.92
conveyance of all materials and all
labor charges etc.,

Supplying and erecting centering for


sides and soffits including support and
strutting up to 3.29m high for plane
surface such as using mild steel sheets
of size 90 x 40 cm and BG 10 stiffened
with welded mild steel angle of size
5 59.90 398.00 23842 48.19 3367.00 162255.73 -138413.73
25x25x3mm for boarding laid over
silver oak (country wood) joists of size
10x6.50cm spaced at about 90 centre to
centre and supported by casaurina
props of 10 - 13cm dia spaced at 75cm
c/c etc. complete.
Supplying, fabricating and placing of
mild steel or ribbed for steel rods and
all RCC works as per the design given
6 0.75 #N/A #N/A 0.86322 398.00 343.56 #N/A
including cost steel and binding wire in
all floors etc., & convayence of steel as
per std. specification and directed.

RCC 1:1.5:3 mix using 20 mm ISS HBG


metal including cost & conveyance of
7 6.48 4452.96 28855 6.37 57190.00 364300.30 -335445.30
all materials to site and all labour
charges etc., complete.

Plastering with cement morter 1:3 mix


to 10mm thick including cost and
8 43.04 108.75 4681 55.78 4452.00 248332.56 -243651.56
convayense of all materials and labour
charges etc..,

Plastering with C.M. 1:5 mix using


12mm thick including curing, cost and
9 34.38 96.78 3327 25.06 108.00 2706.48 620.52
conveyance of all materials and all
labor charges etc., complete
Finishing the top of roof with one
course of machine pressed tiles of size
20cmx20cmx20mm of approved quality
laid in cement mortar 1:3 mix to 12mm
thick mixed with water proofing
10 12.96 549.86 7126 18.84 96.00 1808.64 5317.36
compound confirming to ISS by 2%
weightof cement used and the joint
pointed neatly to full depth of tiles
with same mortar as per std.,
specifications etc., complete.

Providing Granolithic pattern floor


finish with C.C. 1:2:4 mix using 10 to
11 12mm ISS metal including cost & 12.96 79.02 1024 22.08 549.00 12121.92 -11097.92
convayance of all materials to site and
all labour charges etc., complete

White washing two coats with shell


lime including cost & convayance of all
12 16.48 12.74 210 16.48 79.00 1301.92 -1091.92
materials to site and all labour charges
etc., complete

Plastic emulsion painting two coats


with approved colour including cost &
13 66.63 124.00 8262 35.58 12.00 426.96 7835.04
convayance of all materials to site and
all labour charges etc., complete
14 Provision for Name Board L.S L.S 500 500.00

15 Provision for photographic charges L.S L.S 200 200.00

Contingencies and unforeseen items


16 L.S L.S 737 737.00
etc.,

Total #N/A 811299.99 -248991.43 #N/A

Difference = #N/A Difference = #N/A


M.F. Form No.83 CC I and Final
P.U. Form No.55 THAI-2014-2015 Voucher No………….

CONTRACT CERTIFICATE
Name of work : Construction of waiting Shed at
Estimate Amount : Rs.1.50 lakhs
Thaneerpanthanpatty burial ground in E.Chithoor Panchayat.
How executed Authority
Name of Contractor:
Last Certificate granted for this if any Voucher No Month
Quantity Executed or
Rate Amount
Supplied

ITEMS Per Remark


Since last Since last
Up to date Rs P Up to date
Certificate Certificate

Rs Rs

Earthwork excavation for


foundation in all clauses of soils
and subsoils to full depth as
may be directed except in hard
6.22 6.22 rock requiring blasting but 83.70 520.61 520.614
inclusive of shoring, struting
and bailing out water wherever
necessary and refilling the sides
of foundation.

Supplying and filling in


foundation and basement with
filling sand in layers of not
more than 15cm thick well
7.78 7.78 rammed, watered and 13.00 101.14 101.14
compacted including cost &
conveyance of sand and all
labour charges etc., complete as
per std. specifications.

Cement Concrete 1:4:8 mix


using 40mm ISS HBG metal for
foundation including watering
whenever necessary and laid in
3.44 3.44 2332.00 8022.08 8022.08
layers not more than 15 cm
thick compacting etc., complete
complying with std.
specifications and as directed.
Brickwork in C.M. 1:5 mix
using country bricks ground
moulded of size 23x11x7 cu.cm
2.56 2.56 3343.00 8558.08 8558.08
including cost and conveyance
of all materials and all labor
charges etc.,

Supplying and erecting


centering for sides and soffits
including support and strutting
up to 3.29m high for plane
surface such as using mild steel
sheets of size 90 x 40 cm and BG
10 stiffened with welded mild
48.19 48.19 steel angle of size 25x25x3mm 3367.00 162255.73 162255.73
for boarding laid over silver
oak (country wood) joists of
size 10x6.50cm spaced at about
90 centre to centre and
supported by casaurina props
of 10 - 13cm dia spaced at 75cm
c/c etc. complete.

Supplying, fabricating and


placing of mild steel or ribbed
for steel rods and all RCC
works as per the design given
0.86 0.86 398.00 343.56 343.56156
including cost steel and binding
wire in all floors etc., &
convayence of steel as per std.
specification and directed.

RCC 1:1.5:3 mix using 20 mm


ISS HBG metal including cost &
6.37 6.37 conveyance of all materials to 57190.00 364300.30 364300.3
site and all labour charges etc.,
complete.

Plastering with cement morter


1:3 mix to 10mm thick
55.78 55.78 including cost and convayense 4452.00 248332.56 248332.56
of all materials and labour
charges etc..,

Plastering with C.M. 1:5 mix


using 12mm thick including
25.06 25.06 curing, cost and conveyance of 108.00 2706.48 2706.48
all materials and all labor
charges etc., complete
Finishing the top of roof with
one course of machine pressed
tiles of size 20cmx20cmx20mm
of approved quality laid in
cement mortar 1:3 mix to 12mm
thick mixed with water
18.84 18.84 96.00 1808.64 1808.64
proofing compound confirming
to ISS by 2% weightof cement
used and the joint pointed
neatly to full depth of tiles with
same mortar as per std.,
specifications etc., complete.

Providing Granolithic pattern


floor finish with C.C. 1:2:4 mix
using 10 to 12mm ISS metal
22.08 22.08 549.00 12121.92 12121.92
including cost & convayance of
all materials to site and all
labour charges etc., complete

White washing two coats with


shell lime including cost &
16.48 16.48 convayance of all materials to 79.00 1301.92 1301.92
site and all labour charges etc.,
complete

Plastic emulsion painting two


coats with approved colour
35.58 35.58 including cost & convayance of 12.00 426.96 426.96
all materials to site and all
labour charges etc., complete

Provision for Name Board 500.00 500

811299.99 811299.99
COST OF MATERIALS ,LABOUR &WORK 2013-2014
MATERIALS
cement 4560.00 Mangalore ridge 23790.00
ISS METAL
tiles/1000
Mangalore tiles/1000 8295.00
Mangalore ceiling tiles 5000.00
steel 45600.00 Pressed 8710.00 40mm 742.00
tiles(20x20x2cm) /1000
bitumen 45100.00 pan tiles(23x8x 339.00 25mm 638.00
1.7cm)/1000
Emulsion 40500.00 Blasted soling stone 138.60 20mm 1034.00
Brick 3985.00 un blasted stone 84.70 12mm 958.00
Brick jelly 550.00 C.W.reeper(50x25mm)/R 29.00 10mm 705.00 10-12MM
832
(20mm) M metal ISS
Brick jelly 495.00 C.W.reeper(50x12mm)/R 21.10
(40mm) M
rough stone 332.00 country wood planks 33030.00 6mm 478.00
bond stone 455.00 C.W.scantling (upto 4m) 28790.00 IRC METAL
rough stone 288.00 U S Gravel 130.00 90mm& 293
(revetment) 75mm 328.00
KM stone 328.00 Well Gravel 107.80 63mm 423.00
Hectameter 165.00 sand for mortor 110.00 53mm 514.00
stone
(0.9x0.15x0.15)
45mm& 689
slacked lime 869.00 110.00 46.5mm

sand for filling 37.50mm 689


shell lime 1180.00 Cuddappah slab 50mm 342.00 26.5mm& 665 703
Tk 25mm 665
22.40mm 965.00
stone lime 77.00 Cuddappah slab 38/40 330.00 13.2mm
894.00
Tk
Mangalore tiles 8295.00 Cuddappah slab 20/30 304.00 11.2mm
608.00
AA Tk
6.7mm, 451
6mm, 451
5.60mm 451
Binding wire 48.00 4.75m 400

LABOUR
Mason 1 363 Road mazdoor 1 228 Fitter 1 322.00
Mason 2
326 206 300.00
except BW Road mazdoor 2 Fitter 2
Mazdoor 1 228 Head mazdoor 236 Painter 1 293.00
Mazdoor 2 206 Carpenter 1 355 Painter 2 271.00
Fitter 1 ( For
236 326 pipe laying & 316.00
Wodder Carpenter 2 Barbending)
Mason II class 326 Stone Cutter 1 280
Stone Cutter 2 258
WORK
jungle clearence earth work
Refilling sand 13.00 JC scrub 2.15 For street 41.85
Refilling soil 14.70 JC light 2.35 Drain 62.78
laying of well 5.16 JC heavy 3.10 for foundation 83.70
gravel
including rolling 10.56 Juliflora with uprooting 3.45 Road 44.60
tack coat over BT 5.12 Juliflora without uprooting 2.65 Silt 35.00
over WBM 12.74 1 st lead 5.25
Hire &labour Stacking 1 st lift 4.20
PC& SC 457.11 metal 3.15 Benching 1.75
Gravel 3.05 Centering 398.00
Charges
WBM 259.24 sand 3.05 Ghat 509.45
WBM Patch work 77.86 mixing charges 43.35

BT patch 167.5 Grinding lime mortor ordinary 105.9


Picking 5.59
ESTIMATE -CONVEYANCE 2013-2014

Mangalore Bricks I,II class,


Rough
tiles(1000 standard size
Lime stone Third Class
No)Machine bricks,Metric
stone ,brick ,broken Country cement, &
Distence KM preesed tiles bricks ,chamber
Jelly, wood stone bricks (1000 steel items
(2000 no) burnt bricks,
work for 1m3 ,sand ,Gravel no)
Hyd.preesed flooring squre
Suruki
tiles(500 no) bricks (1000)

0 0.00 0.00 0.00 0.00 0.00 0.00


1 5.40 7.80 6.60 8.80 11.00 4.90
2 10.80 15.60 13.20 17.60 22.00 9.80
3 16.20 23.40 19.80 26.40 33.00 14.70
4 21.60 31.20 26.40 35.20 44.00 19.60
5 27.00 39.00 33.00 44.00 55.00 24.50
6 32.40 46.80 39.60 52.80 66.00 29.40
7 37.80 54.60 46.20 61.60 77.00 34.30
8 43.20 62.40 52.80 70.40 88.00 39.20
9 48.60 70.20 59.40 79.20 99.00 44.10
10 54.00 78.00 66.00 88.00 110.00 49.00
11 58.65 84.70 71.65 95.60 119.25 53.20
12 63.30 91.40 77.30 103.20 128.50 57.40
13 67.95 98.10 82.95 110.80 137.75 61.60
14 72.60 104.80 88.60 118.40 147.00 65.80
15 77.25 111.50 94.25 126.00 156.25 70.00
16 81.90 118.20 99.90 133.60 165.50 74.20
17 86.55 124.90 105.55 141.20 174.75 78.40
18 91.20 131.60 111.20 148.80 184.00 82.60
19 95.85 138.30 116.85 156.40 193.25 86.80
20 100.50 145.00 122.50 164.00 202.50 91.00
21 104.60 150.90 127.50 170.70 210.85 94.70
22 108.70 156.80 132.50 177.40 219.20 98.40
23 112.80 162.70 137.50 184.10 227.55 102.10
24 116.90 168.60 142.50 190.80 235.90 105.80
25 121.00 174.50 147.50 197.50 244.25 109.50
26 125.10 180.40 152.50 204.20 252.60 113.20
27 129.20 186.30 157.50 210.90 260.95 116.90
28 133.30 192.20 162.50 217.60 269.30 120.60
29 137.40 198.10 167.50 224.30 277.65 124.30
30 141.50 204.00 172.50 231.00 286.00 128.00
31 145.60 209.90 177.50 237.70 294.35 131.70
32 149.70 215.80 182.50 244.40 302.70 135.40
33 153.80 221.70 187.50 251.10 311.05 139.10
34 157.90 227.60 192.50 257.80 319.40 142.80
35 162.00 233.50 197.50 264.50 327.75 146.50
36 166.10 239.40 202.50 271.20 336.10 150.20
37 170.20 245.30 207.50 277.90 344.45 153.90
38 174.30 251.20 212.50 284.60 352.80 157.60
39 178.40 257.10 217.50 291.30 361.15 161.30
40 182.50 263.00 222.50 298.00 369.50 165.00
41 185.95 267.95 226.70 303.60 376.50 168.10
42 189.40 272.90 230.90 309.20 383.50 171.20
43 192.85 277.85 235.10 314.80 390.50 174.30
44 196.30 282.80 239.30 320.40 397.50 177.40
45 199.75 287.75 243.50 326.00 404.50 180.50
46 203.20 292.70 247.70 331.60 411.50 183.60
47 206.65 297.65 251.90 337.20 418.50 186.70
48 210.10 302.60 256.10 342.80 425.50 189.80
49 213.55 307.55 260.30 348.40 432.50 192.90
50 217.00 312.50 264.50 354.00 439.50 196.00
51 220.45 317.45 268.70 359.60 446.50 199.10
52 223.90 322.40 272.90 365.20 453.50 202.20
53 227.35 327.35 277.10 370.80 460.50 205.30
54 230.80 332.30 281.30 376.40 467.50 208.40
55 234.25 337.25 285.50 382.00 474.50 211.50
56 237.70 342.20 289.70 387.60 481.50 214.60
57 241.15 347.15 293.90 393.20 488.50 217.70
58 244.60 352.10 298.10 398.80 495.50 220.80
59 248.05 357.05 302.30 404.40 502.50 223.90
60 251.50 362.00 306.50 410.00 509.50 227.00
61 254.95 366.95 310.70 415.60 516.50 230.10
62 258.40 371.90 314.90 421.20 523.50 233.20
63 261.85 376.85 319.10 426.80 530.50 236.30
64 265.30 381.80 323.30 432.40 537.50 239.40
65 268.75 386.75 327.50 438.00 544.50 242.50
66 272.20 391.70 331.70 443.60 551.50 245.60
67 275.65 396.65 335.90 449.20 558.50 248.70
68 279.10 401.60 340.10 454.80 565.50 251.80
69 282.55 406.55 344.30 460.40 572.50 254.90
70 286.00 411.50 348.50 466.00 579.50 258.00
71 289.45 416.45 352.70 471.60 586.50 261.10
72 292.90 421.40 356.90 477.20 593.50 264.20
73 296.35 426.35 361.10 482.80 600.50 267.30
74 299.80 431.30 365.30 488.40 607.50 270.40
75 303.25 436.25 369.50 494.00 614.50 273.50
76 306.70 441.20 373.70 499.60 621.50 276.60
77 310.15 446.15 377.90 505.20 628.50 279.70
78 313.60 451.10 382.10 510.80 635.50 282.80
79 317.05 456.05 386.30 516.40 642.50 285.90
80 320.50 461.00 390.50 522.00 649.50 289.00
81 323.60 465.50 394.25 527.05 655.80 291.85
82 326.70 470.00 398.00 532.10 662.10 294.70
83 329.80 474.50 401.75 537.15 668.40 297.55
84 332.90 479.00 405.50 542.20 674.70 300.40
85 336.00 483.50 409.25 547.25 681.00 303.25
86 339.10 488.00 413.00 552.30 687.30 306.10
87 342.20 492.50 416.75 557.35 693.60 308.95
88 345.30 497.00 420.50 562.40 699.90 311.80
89 348.40 501.50 424.25 567.45 706.20 314.65
90 351.50 506.00 428.00 572.50 712.50 317.50
91 354.60 510.50 431.75 577.55 718.80 320.35
92 357.70 515.00 435.50 582.60 725.10 323.20
93 360.80 519.50 439.25 587.65 731.40 326.05
94 363.90 524.00 443.00 592.70 737.70 328.90
95 367.00 528.50 446.75 597.75 744.00 331.75
96 370.10 533.00 450.50 602.80 750.30 334.60
97 373.20 537.50 454.25 607.85 756.60 337.45
98 376.30 542.00 458.00 612.90 762.90 340.30
99 379.40 546.50 461.75 617.95 769.20 343.15
100 382.50 551.00 465.50 623.00 775.50 346.00
101 385.60 555.50 469.25 628.05 781.80 348.85
102 388.70 560.00 473.00 633.10 788.10 351.70
103 391.80 564.50 476.75 638.15 794.40 354.55
104 394.90 569.00 480.50 643.20 800.70 357.40
105 398.00 573.50 484.25 648.25 807.00 360.25
106 401.10 578.00 488.00 653.30 813.30 363.10
107 404.20 582.50 491.75 658.35 819.60 365.95
108 407.30 587.00 495.50 663.40 825.90 368.80
109 410.40 591.50 499.25 668.45 832.20 371.65
110 413.50 596.00 503.00 673.50 838.50 374.50
111 416.60 600.50 506.75 678.55 844.80 377.35
112 419.70 605.00 510.50 683.60 851.10 380.20
113 422.80 609.50 514.25 688.65 857.40 383.05
114 425.90 614.00 518.00 693.70 863.70 385.90
115 429.00 618.50 521.75 698.75 870.00 388.75
116 432.10 623.00 525.50 703.80 876.30 391.60
117 435.20 627.50 529.25 708.85 882.60 394.45
118 438.30 632.00 533.00 713.90 888.90 397.30
119 441.40 636.50 536.75 718.95 895.20 400.15
120 444.50 641.00 540.50 724.00 901.50 403.00
ABSTRACT- DATA -2013-14
SL.NO. DESCRIPTION PER RATE

1 CC 1:5:10 CU. M. 2182.81

2 CC 1:4:8 CU. M. 2332.41

3 CC 1:2:4 CU. M. 3343.23

4 CC 1:3:6 WITH 40 MM METAL CU. M. 2581.75

5 CC 1:3:6 WITH 20 MM METAL CU. M. 2844.55

6 RR MASONRY WITH IN CM 1:5 MIX CU. M. 2206.36

7 RR MASONRY WITH IN CM 1:4 MIX CU. M. 2319.4


BW IN CM 1:5 MIX ABOVE FOOTING
8 UPTO PLINTH LEVEL(ie., FLOOR CU. M. 3337.58
LVL.)

9 BW IN CM 1:5 MIX ABOVE PLINTH LEVEL CU. M. 3367.13


UPTO 4.5 M HT.

10 R.C.C. 1:2:4 MIX , 20 MM JELLY FROM CU. M. 3911.01


FOUNDATION BASE UPTO PLINTH LEVEL
R.C.C. 1:2:4 MIX , 20 MM JELLY FROM
11 FOUNDATION ABOVE PLINTH LEVEL UPTO CU. M. 3955.66
4.5 M HT.

12 R.C.C. 1:1.5:3 MIX , 20 MM JELLY FROM CU. M. 4408.31


FOUNDATION BASE UPTO PLINTH LEVEL
R.C.C. 1:1.5:3 MIX , 20 MM JELLY FROM
13 FOUNDATION ABOVE PLINTH LEVEL UPTO CU. M. 4452.96
4.5 M HT.

14 SUPPLY AND FABRICATION OF STEEL MT. #N/A

15 CENTRING FOR ROOF SLAB,LINTEL,BEAMS SQ. M. 398.00

16 CENTRING FOR SUNSHADE SQ. M. 437.80

17 CENTRING FOR COLOUMN , PILLARS SQ. M. 338.94

CENTRING BELOW GL( INCL. PLINTH


18 SQ. M. 199.00
BEAMS SIDES)
TWO LEGGED SCAFFOLDING -
19 SQ. M. 288.25
FROM GL. UP-TO 3.00 M. HT.
TWO LEGGED SCAFFOLDING-
20 SQ. M. 288.25
FOR EVERY 2.5 M. HT.
21 Plastering 1:3,10mm TK SQ. M. 108.75

22 Plastering 1:5,12mm TK SQ. M. 96.78

23 Plastering 1:5,20mm TK SQ. M. 193.00

24 Plastering 1:4, 20 MM THK SQ. M. 200.31

25 Plastering 1:3, 20mm THK SQ. M. 212.5

26 Plastering 1:3,12 mm TK SQ. M. 109.20


0

27 POINTING 1:3 FOR PRES. TIL SQ. M. 115.84

28 POINTING 1:3 (R.R. Masonry work) SQ. M. 108.85

29 Granolithic Flooring SQ. M. 79.02

30 CERAMIC FLOOR FINISH 200 x 200 x 6 MM SQ. M. 746.44

DADOOING WALL TILES (COLOR GLAZED)


31 SQ. M. 783.84
15O x 150 x 6 MM

32 BRICK JELLY LIME CONCRETE(weathering CU. M. 1960.32


course)

33 PRESSED TILES WITH NEW PRESSED SQ. M. 549.86


TILES

34 PRESSED TILES WITH OLD PRESSED SQ. M. 332.11


TILES LAYING LABOUR CHARGE ONLY

35 Roofing with Mangalore tiles SQ. M. 226.58

36 Tiled roofing with Mangalore tiles over ceiling ti SQ. M. 390.54

37 Removing & readjusting old mangalore tiles SQ. M. 95.31

38 WHITE WASH SQ. M. 12.74

39 COLOUR WASHING SQ. M. 19.12

40 Snowcem SQ. M. 59.75

41 Distember SQ. M. 53.1

42 Enamel PAINTING SQ. M. 86.1


43 Distemper with primer for old surface -1 Sq.m. SQ. M. 87.3

Distemper with primer for New surface -1


44 SQ. M. 85.6
Sq.m.
EXTERIOR Plastic Emulsion with one coat
45 SQ. M. 124.00
primer

46 PAINTING Black Board SQ. M. 63.00

Supply and fixing of hollow MS pipes &


47 KG. 76.50
painting two coats etc.,

48 US GRAVEL FILLING FOR BUILDING CU. M. 150.80

49 WELL GRAVEL FILLING FOR BUILDING CU. M. 128.6

50 Direct Filling with US Gravel CU. M. 142.96

51 Direct Filling with Well Gravel CU. M. 120.76


LEAD &COST OF MATERIALS-2013-14
DESCRIPTION LEAD (km) Conveyance cost of materials total
Cement 12 57.40 4560.00 4617.40
Steel/MT 12 57.40 45600.00 45657.40
Sand for mortor 20 145.00 110.00 255.00
Sand for filling 20 145.00 110.00 255.00
Rough
stone(reverment) 7 54.60 288.00 342.60
Rough stone 7 54.60 332.00 386.60
Bond stone 7 54.60 455.00 509.60
Country bricks 10 66.00 3985.00 4051.00
40 mm metal ISS 7 54.60 742.00 796.60
25mm metal ISS 7 54.60 638.00 692.60
12mm metel ISS 7 54.60 958.00 1012.60
10mm metal ISS 7 54.60 705.00 759.60
10-12mm metal ISS 7 54.60 831.50 886.10
20mm metal ISS 7 54.60 1034.00 1088.60
6mm metal ISS 7 54.60 478.00 532.60
90mm metal IRC 7 54.60 243.00 297.60
63mm metal IRC 7 54.60 350.00 404.60
53mm metal IRC 7 54.60 514.00 568.60
45mm metal IRC 7 54.60 571.00 625.60
22.40mm metal IRC 7 54.60 800.00 854.60
13.2mm metal IRC 7 54.60 894.00 948.60
11.2mm metal IRC 7 54.60 608.00 662.60
6.7mm metal IRC 7 54.60 374.00 428.60
lime stone 0 0.00 77.00 77.00
Shell lime 0 0.00 1180.00 1180.00
Brick Jelly 20mm 10 54.00 550.00 604.00
Brick Jelly 40mm 10 54.00 495.00 549.00
Slaked lime 0 0.00 869.00 869.00
Pressed tiles 0 0.00 8710.00 8710.00
Binding wire/MT #N/A 48.00 #N/A
10MM
Rough Jelly #N/A 705.00 #N/A
stone(reverment) 7 54.60 0.00 54.60
bricks class I,II #N/A #N/A
wood #N/A #N/A
U S gravel 1 7.80 130.00 137.80
well gravel 1 7.80 107.80 115.60
suruki #N/A #N/A
Mangalore tiles 0 0.00 8295.00 8295.00
Mangalore ridge tiles 0 0.00 23790.00 23790.00
Ceiling tiles 0 0.00 5000.00 5000.00
DATA - 2013-14
CEMENT MORTOR
CEMENT MORTOR 1:2 CEMENT MORTOR 1:3 CEMENT MORTOR 1:4
720 cement 4617.4 3324.53 480 cement 4617.4 2216.35 360 cement 4617.4 1662.26
1 sand 255 255.00 1 sand 255 255.00 1 sand 255 255.00
total 3579.53 total 2471.35 total 1917.26
43.35 mixing 43.35 mixing 43.35
including mixing for including mixing for
3622.88 masonary works 2514.70 masonary works 1960.61

CEMENT MORTOR 1:5 CEMENT MORTOR 1:6 CEMENT MORTOR 1:2.5


288 cement 4617.4 1329.81 240 cement 4617.4 1108.18 576 cement 4617.4 2659.62
1 sand 255 255.00 1 sand 255 255.00 1 sand 255 255.00
total 1584.81 total 1363.18 total 2914.62
mixing 43.35 mixing 43.35 mixing 43.35
including mixing for including mixing for including mixing for
masonary works 1628.16 masonary works 1406.53 masonary works 2957.97

CEMENT MORTOR 1:1.5 Lime mortar 1:2 Filling with sand


960 cement 4617.4 4432.70 0.5 lime 869 434.50 1 sand 255 255.00
1 sand 255 255.00 1 sand 255 255.00 1 filling charge 13 13.00
1 Grinding 105.9 105.90
total 4687.70 total 795.40 total 268.00
CC 1:5:10 RCC 1:2:4 RR
9 40mm metal 796.6 7169.40 9 20mm 1088.6 9797.40 10 Rough stone 386.6 3866.00
4.5 cm 1:5 1584.81 7131.65 4.5 sand mortor 255 1147.50 1 Bond stone 509.6 509.60
1.8 mason II 326 586.80 3231 cement 4617.4 14918.82 3.4 CM 1:5 1628.16 5535.75
17.7 mazdoor I 228 4035.60 3.5 masonII 326 1141.00 7.1 mason I 363 2577.30
14.1 mazdoor II 206 2904.60 21.2 mazdoor I 228 4833.60 10.6 mason II 326 3455.60
sundries 0.00 35.3 mazdoor II 206 7271.80 14.1 mazdoor I 228 3214.80
total 21828.05 sundries 0.00 14.1 mazdoor II 206 2904.60
total 39110.12 sundries 0.00
total 22063.65
FOR 1CM 2182.81 FOR 1CM 3911.01 FOR 1CM 2206.36
above
basement 44.65 3955.66
RCC 1:1.5:3 Plastering 1:3,10mm TK Plastering 1:5,12mm TK
9 20mm 1088.6 9797.40 0.1 CM 1:3 2514.70 251.47 0.14 CM 1:5 1628.16 227.94
4.5 sand mortor 255 1147.50 1.1 mason II 326 358.60 1.1 mason I 363 399.30
4308 cement 4617.4 19891.76 1.1 mazdoor I 228 250.80 0.5 mazdoor I 228 114.00
3.5 masonII 326 1141.00 1.1 mazdoor II 206 226.60 1.1 mazdoor II 206 226.60
21.2 mazdoor I 228 4833.60
35.3 mazdoor II 206 7271.80

sundries 0.00 sundries 0.00 sundries 0.00


total 44083.06 total 1087.47 total 967.84
FOR 1CM 4408.31 FOR1CM 108.75 FOR1CM 96.78
above
basement 44.65 4452.96
BW 1:5 STEEL Granolithic Flooring
1300 bricks 4051 5266.30 1 qtl- steel 45657.4 4565.74 9 10-12mm jelly 886.1 7974.90
0.708 CM 1:5 1628.16 1152.74 1 qtl-binding wire #N/A #N/A 4.5 CM 1:2 3579.53 16107.88
1 mason I 363 363.00 3.5 fitter I 316 1106.00 1.8 mason II 326 586.80
3 mason II 326 978.00 sundries 0.00 17.7 mazdoor I 228 4035.60
2 mazdoor I 228 456.00 #N/A 14.1 mazdoor II 206 2904.60
6 mazdoor II 206 1236.00
sundries total total 31609.78
total 10cft 9452.04
for 1c 2.832 3337.58 total #N/A totalx0.25 79.02
above
basement 29.55 3367.13
Plastering 1:5,20mm TK POINTING 1:3 FOR PRES. TIL (top roof) pressed tiles
0.22 CM 1:5 1628.16 358.20 0.04 CM1:3 2514.70 100.59 250 P.Tiles 8710.00 2177.50
2.2 mason I 363 798.60 2.2 mason II 326 717.20 0.12 CM 1:3 2514.70 301.76
0.5 mazdoor I 228 114.00 0.5 mazdoor I 228 114.00 10 Pointing CM1:3 115.84 1158.40
3.2 mazdoor II 206 659.20 1.1 mazdoor II 206 226.60 1.152 water p. comp. 42.35 48.79
1.1 mason I 363 399.30
2.1 mason II 326 684.60
sundries sundries 2.2 mazdoor I 228 501.60
total 1930.00 total 1158.39 1.1 mazdoor II 206 226.60
sundries
total 5498.55
FOR 1CM 193.00 for 1m2 115.84 for 1m2 549.86
Only labour charge without 3321.05
Pressed Tiles 332.11
WHITE WASH CC 1:4:8 BW 1:3
0.07shell lime 1180 82.60 9 40MMmetal 796.6 7169.40 1300 bricks 4051 5266.30
1.6mason II 326 521.60 4.5 CM 1:4 1917.26 8627.69 0.708 CM 1:3 2514.70 1780.41
0.5mazdoorI 228 114.00 1.8 mason II 326 586.80 1 mason I 363 363.00
2.7mazdoorII 206 556.20 17.7 mazdoor I 228 4035.60 3 mason II 326 978.00
sundries 14.1 mazdoor II 206 2904.60 2 mazdoor I 228 456.00
total 1274.40 sundries 6 mazdoor II 206 1236.00
for1m2 12.74 sundries
colour wash 1911.60 23324.09 total 10cft 10079.71
for1m2 19.12 FOR 1CM 2332.41 for 1 cm 2.83 3559.22

CC 1:2:4 Snowcem Distember


9 20MMmetal 1088.6 9797.40 3.23 Distember 53.10 171.51 1.34 Distember 78.50 105.19
4.5 CM 1:2 3579.53 16107.88 0.5 Painter I 293.00 146.50 0.5 Painter I 293.00 146.50
1.8 mason II 326 586.80 0.5 mazdoor I 228 114.00 0.5 mazdoor I 228 114.00
17.7 mazdoor I 228 4035.60 0.8 mazdoor II 206 164.80 0.8 mazdoor II 206 164.80
14.1 mazdoor II 206 2904.60
sundries 0.00 sundries 0.69 sundries 0.51
33432.28 597.50 531.00
for 1CM 3343.23 for 1m2 59.75 for 1m2 53.10
cc 1:3:6 Plastering 1:4, 20 MM THK Enamel PAINTING
9 40 mm metal 796.6 7169.40 0.22 cm 1:4 1960.61 431.34 2.22 Paint 242.55 538.46
4.5 CM 1:3 2471.35 11121.08 2.2 mason I 363 798.60 1.1 painter I 293.00 322.30
1.8 mason II 326 586.80 0.5 mazdoor I 228 114.00 sundries 0.24
17.7 mazdoor I 228 4035.60 3.2 mazdoor II 206 659.20 861.00
14.1 mazdoor II 206 2904.60 sundries dd
sundries 0.00
Total 25817.48 Total 2003.14
for 1CM 2581.75 for 1CM 200.31 for 1CM 86.10
With CC 1:3:6 20 mm
metal 2844.55

PAINTING Black Board FLOORING TILES(CERAMIC) BRICK JELLY LIME CONCRETE(weathering


course)

2.22 paint 138.5 307.47 260 ceramic tiles 16.25 4225 12.8 20mm brick jelly 604 7731.2
1.1 painter I 293.00 322.30 0.1 cm1;2 3579.53 357.95 5 slacked lime 869.00 4345
white cement
with colour
4 pigment 26.65 106.6 1.8 mason II 326.00 586.8
1 masonI 363 363 17.7 mazdoor I 228 4035.6
3.7 masonII 326 1206.2 14.1 mazdoor II 206 2904.6
sundries 0.23 3.3 mazdoor I 228 752.4 sundries 0
2.2 mazdoor II 206 453.2
630.00 sundries 19603.2
7464.35
for 1m2 63.00 for 1m2 746.44 1960.32

WALL TILES(DADDOOING) Plastering 1:3, 20mm THK rough stone dry packing
450 glazed tiles 9.65 4342.50 0.22 cm 1:3 2514.70 553.23 11 rough stone 342.60 3768.60
0.10 cm1:2 3579.53 357.95 2.2 mason I 363 798.60 3.5 wooder 236 826.00
white cement
with colour
4.00 pigment 26.65 106.60 0.5 mazdoorI 228 114.00 10.6 mazdoor I 228 2416.80
1.10 mason I 363.00 399.30 3.2 mazdoor I I 206 659.20 7.1 mazdoor II 206 1462.60
4.10 mason II 326.00 1336.60 sundries 0.00 sundries
2.70 Mazdoor I 228.00 615.60 1.152 water proof 42.35 8474.00
3.30 Mazdoor II 206.00 679.80 2125.03
7838.35
for 1m2 783.84 for 1m2 212.50 for 1m2 847.40
Tiled roofing with Mangalore tiles Removing & readjusting old
Roofing with Mangalore tiles over ceiling tiles mangalore tiles
160 Manglore tiles 8295.00 1327.20 10 Manglore tiles 2265.79 2265.79
0.09 lime mortar 795.40 71.59 250 ceiling tiles 5000 1250.00 0.09 lime mortar 795.40 71.59
0.5 mason II 326 163.00 0.5 mason II 326 163.00 0.5 Carpenter I 355 177.50
1.1 mazdoorI 228 250.80 1.1 mazdoorII 206 226.60 1.1 mazdoorI 228 250.80
2.2 mazdoor I I 206 453.20 2.2 mazdoor I I 206 453.20
sundries 0.00 sundries 0.00 sundries 0.00

2265.79 3905.39 953.09

for 1m2 226.58 for 1m2 390.54 for 1m2 95.31

Supply and fixing of hollow MS pipes &


painting two coats etc., EXTERIOR Plastic Emulsion with
CC 1:2.5:5
one coat primer
Red oxide
1.33 primer 145.5 193.52 9 40MMmetal 796.6 7169.40 1.4 Plastic Emulsion 315.15 441.21
0.7 painter I 293.00 205.10 4.5 CM 1:2.5 2914.62 13115.80 0.98 Primer (Liquid) 156.75 153.62
1.8 mason II 326 586.80 2.2 Painter I class 293 644.60
for 1m2 398.62 17.7 mazdoor I 228 4035.60
14.1 mazdoor II 206 2904.60
10 Priming coat 398.62 398.62 sundries sundries 0.57
2.22 paint 220.50 489.51 1240.00
1.1 painter I 293.00 322.30 27812.20 for 1m2 124.00
Brush cleaning etc., 5.40 FOR 1CM 2781.22
1215.83
for 1m2 121.58
Plastering 1:3,12 mm TK POINTING 1:3 (R.R. Masonry work)

Steel size
4 3"x11/2" 48.00 192.00 0.14 CM 1:3 2514.70 352.06 0.09 CM1:3 2514.70 226.32
0.225 paint 121.58 27.36 1.1 mason I 363 399.30 1.6 mason II 326 521.60
4 Labour for fixing 19.25 77.00 0.5 mazdoor I 228 114.00 0.5 mazdoor I 228 114.00
Brush cleaning etc., 9.65 1.1 mazdoor II 206 226.60 1.1 mazdoor II 206 226.60
306.01 1.1 water proof 42.35
Rate for 1 Kg 298/4 76.50 sundries 0.00 sundries
total 1091.96 total 1088.52
FOR1CM 109.20 for 1m2 108.85
Distember with one coat
primer US GRAVEL FILLING FOR BUILDING Direct Filling with US Gravel
One coat of Primer 1 US Gravel 137.8 137.80 1 US Gravel 137.8 137.80

Scrapping
10 charge 1.7 17.00 1 filling charge 13 13.00 1 filling charge 5.16 5.16
0.98 Pimer(liquid) 132.00 129.36
0.7 Painter I 293.00 205.10 total 150.80 total 142.96
For 10 Sq.m. 351.46
MAIN DATA
10 Priming 1 coat 35.15 351.46
1.34 Distember 71.4 95.68 WELL GRAVEL FILLING FOR BUILDING Direct Filling with Well Gravel
0.5 Painter I 293.00 146.50 1 US Gravel 115.6 115.60 1 US Gravel 115.6 115.60
0.5 mazdoor I 228 114.00 1 filling charge 13 13.00 1 filling charge 5.16 5.16
0.8 mazdoor II 206 164.80
total 128.60 total 120.76
sundries 0.56
873.00
Distemper with primer for
old surface -1 Sq.m. 87.30
Distemper with primer for
New surface -1 Sq.m. 85.60
Dismantling
1 Brick / Stone masonry in L.M cum 78.65
Supplying and fixing PVC Rain water down fall pipes
2 Brick / Stone masonry in C.M cum 96.40 of following dia meter etc., complete.
3 Mangalore tiles without roof sqm 6.90 110mm dia PVC Rain water Pipe
Mangalore tiles over flat tiles without roof timber Cost of 110mm dia
4 -Sqm 9.60 3 PVC Pipe 114.5 343.50
5 AC sheet roof without roof timber sqm 6.30 1 110mm dia PVC shoe 72.7 72.70
6 Door, window incl moral of hinges sqm 45.35 1 110mm dia PVC Bend 94 94.00
7 Dismantling P.C.C cum 165.60 1 CI Gratings 29.3 29.30
8 Dismantiling RCC cum 2515.00 2 PVC Clamp 11 22.00
9 Chipping of concrete sqm 13.90 1 Plumber I class 322 322.00
10 Pressed tiles & weathering course sq.m 16.00 Sundries for cement 0.37
11 Pressed tiles only sq.m 8.90 For 3 Rm 883.87
12 Cleaning & Removing of cement plaster sq.m. 3.05 Rate Rs. 294.62 /1Rm
Dismantling B.W & clearing from site Say Rs. 295.00 /1Rm
Dry Brick work using country bricks 83/4"x41/4"x23/4"
Supplying and fixing in position best Indian make White glazed earthern
ware Oriya type Indian Water Closet including cost and onveyance of all materials to site and all
labour charges etc complete
Sub Data 4.59 x1000nos
Country bricks 4051.00 18594.09
Brick Jelly Lime Concrete 1:2:5 3.50 nos Mason I class 363.00 1270.50
9.5 Brik jelly 40mm 549 m3 5216 m3 7.20 nos Mason II class 326.00 2347.20
3.8 Lime Mortar 1:2 795.40 m3 3023 m3 7.10 nos Mazdoor I class 228.00 1618.80
1.8 Mason II Class 326 Nos 586.8 Nos 14.10 nos Mazdoor II class 206.00 2904.60
17.7 Mazdoor I Class 228 Nos 4036 Nos 26735.19
14.1 Mazdoor II Class 206 Nos 2905 Nos 2673.52
15765.02
Rate Rs. 15765.02 /1M3
Say Rs. 1576.5 /1M3 RATE @RS 2673.52 /cum
Main Data
1 White glazed Indian type W 1089 Each 1089 Nos Schedule of rates 12-13
0.6 110mm dia PVC pipe 107.5 Rm 64.5 Rm S.no Itm.No Description Unit Appr. Rates
0.45 Sand for filling 268.00 Cum 120.6 Cum 155 20 Labour wrought & put
0.11 Brick jelly lime concrete 1: 1576.5 1 Cum 173 Cum For Windows &
1 Plumber I Class 322 Each 322 Nos Ventilators Sq.m. 108.10
1 Mason I Class 363 Each 363 Nos 156 21 Labour wrought & put
0.25 Plumber II Class 300 Each 75 Nos a Single leaf shutter Sq.m. 80.2
1 Mazdoor I Class 228 Each 228 Nos b Double leaf Shutter Sq.m. 124.20
1 White Cement 23.00 1 Kg 23 kgs
6 Cement 4617.4 MT 27.7 kgs
400 Spun yarn 12 1 Kg 4.8 gms
2491
Rate Rs. 2491.0194 /1No
Say Rate R 2491.02 /1No
Roofing with AC corrugated Roofing with Cooland Colour
sheet 6mm thk with "J' bolts sheet 3 mm thk with "J' bolts R R IN CM 1:4 mix.
and Bitumen washer etc., and Bitumen washer etc.,
GI Coloured
AC sheets sheets 3 mm
11.00 6mm thick 175.50 1930.50 11.00 thick 0.00 10 Rough stone 386.6 3866.00
2.20 Fitter II class 300.00 660.00 2.20 Fitter II class 300.00 660.00 1 Bond stone 509.6 509.60
Carpenter I Carpenter I
1.10 class 355.00 390.50 1.10 class 355.00 390.50 3.4 CM 1:4 1960.61 6666.09
Mazdoor I Mazdoor I
3.20 class 228.00 729.60 3.20 class 326.00 1043.20 7.1 mason I 363 2577.30
Adj. J bolt Adj. J bolt
with nuts with nuts
20.00 6mm dia. 3.60 72.00 20.00 6mm dia. 3.60 72.00 10.6 mason II 326 3455.60
Bitumen Bitumen
washer 15 washer 15
20.00 mm dia. 1.20 24.00 20.00 mm dia. 1.20 24.00 14.1 mazdoor I 228 3214.80
Sundries for Sundries for
white lead white lead 14.1 mazdoor II 206 2904.60
3806.60 2189.70 sundries 0.00
total 23193.99
for 1m2 380.66 for 1m2 218.97 FOR 1CM 2319.40
DATA - 2013-14

Snowcum painting two coats with best quality of Cement paint distember including cost & conveyance
of all materials to site and all labour charges etc., complete.,
3.23 KG Cost of Distember 53.1 Kg 171.51
0.5 Nos Painter I class 293 E 146.50
0.5 Nos Mazdoor I class 228 E 114.00
0.8 Nos Mazdoor II class 206 E 164.80
Sundries 0.69
Total for 10sqm 597.50
Rate for 1sqm
59.75

Distembering two coats with best quality of Cement paint distember including cost & conveyance of all
materials to site and all labour charges etc., complete.,
1.34 KG Cost of Distember 78.5 Kg 105.19
0.5 Nos Painter I class 293 E 146.50
0.5 Nos Mazdoor I class 228 E 114.00
0.8 Nos Mazdoor II class 206 E 164.80
Sundries 0.51
Total for 10sqm 531.00
Rate for 1sqm
53.10

Supply and fixing of Hallow MS pipes 2'' X 1'' for bpurlion and 3'' x 11/2'' Hallow MS pipes trusses
including cost and conveyance all materials to site and painting two coats with priming coat etc.,
complete
SUB DATA
1.33 Lt Red oxide primer nee 145.5 LT 193.52
0.7 Nos Painter - I 293 A 205.10
398.62
39.86
Painting two coats with needy mixed enamel paints over new Iron work with priming cost 10m2
including cost and conveyance all materials to site and painting two coats with priming coat etc.,
complete.
10 m2 Priming coat 398.62 10m2 3986.15
2.22 CT Paint 242.55 LT 538.46
1.1 m2 Painter - I 293 ER 322.30
Add sunderies / Brush & Cleaning 135.00
4981.91
3''X 11/2'' size = 4kg / 1m
Painting Area : 1x0.225=0.225 1120.93
112.093
MAIN DATA
4 Kg Steel size 3'' X 11/2'' 48 192.00
0.225 m2 Painting 112.093 25.22
4 kg Labour charges fixing 19.25 77.00
Welding 11.78
Add sunderies / Brush & Cleaning 306.00
Rate for 1kg 76.50 76.50

Black Board painting two coats with including cost & conveyance of all materials to site and all labour
charges etc., complete.
2.22 LT Cost of Black board p 138.5 LT 307.47
1.1 Nos Painter I class 293 ER 322.30
SUNDRIES 0.23
Total 42.37 630.00
63.00
Lime Mortar
0.5 cum Cost of lime 869 LT 434.50
1 cum Sand 255 ER 255.00
1 m3 grinding mortar 105.9 105.90
795.40

Roofing with best mangalore tiles over reeper of size 0.05X0.025m including cost and conveyance and
all labour charges etc., complete.
160 Nos Mangalore Tiles 8295 1327.20
0.09 M3 Cost of lime mortar 795.40 71.59
0.5 Nos Mason II class 326 163.00
1.1 Nos mazdoor I class 228 250.80
2.2 Nos Mazdoor II class 206 453.20
2265.79
RATE FOR 1 SQ.M. 226.58
Best Tiled Roofing with mangalore tiles over ceiling tiles over of best quality including cost and
conveyance and all labour charges etc., complete.
10 Sqm Mangalore Tiles 2265.79 10sqm 2265.79
250 Nos Ceiling tiles 5000 1250.00
0.5 Nos Mason II class 326 163.00
1.1 Nos mazdoor II class 206 226.60
Conticens
3905.39
RATE FOR 1 SQ.M. 390.54

Supply and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such
as using mild steel sheets of size 90X40cm and BG for stiffened with welded mild steel angle of size 25x25x3mm for
boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported
by casaurina props of 10-13cm dia spaced at 75cm c/c etc. complete.

Such as RCC slabs, rectangular beam, Tee or L beam , etc.,

Sub Data
Weight of MS sheet 90x10 Gauge 13.46
Weight of MS angle 25X25X3mm 4.00

13.46 Kg Cost of MS sheet 10mm 48 Kg 646.08 567


4 Kg Cost of MS angle of size 25x25x3m 48 Kg 192.00

Add for cutting, bending & welding


charges etc.,
LS 29.08
867.16
Sub Data
Cost of MS sheets and angles and silver oak and casaurina

19 Nos Cost of MS sheet and MS angles 867.16 Each 16476.04

0.12 cum Silver oad (CW) joists of size 10X6 13060 1567.20
98.5 RM Casaurina props 10-13 cm dia 21.1 2078.35
3645.55
Adopting 40 uses for steel sheets and angles and 5 use of silver oad

1/40 Use Cost of steel angle 16476.04 Use 411.90


1/5 Use Cost of Silver oak 3645.55 Use 729.11
1141.01

Main Data
1 Uss Cost of MS sheet and angle 411.90 Use 411.901
2 Uss Cost of silver oad joists of size 10 729.11 Use 729.11
LS Add for silver oak props
3.8 Nos Carpenter I class 355 1349
5.4 Nos Mazdoor I class 228 1231.2
1 No Mazdoor II nd class 206 206
LS Add for periodical cleaning and painting silver oad props 29.000
LS Add for welding and Nails, etc 23.5
3980
Rate for 1 sqm
(i) Rate for Roof Slab , Lintel, Beam 398.00
509.45
For Ghat 509.45

(ii) Rate for Sunshade 398.00


Add 10% Above Rate 39.8
Rate for 1 sqm 437.80

(iii) Rate For Column (Post)


98.5 RM Casaurina props 10-13 cm dia 19.2 1891.20/5 415.67

0.3 Nos Carpenter I class 355 Nos 106.50


0.3 Nos Masdoor I class 228 Nos 68.40
590.57
3980.00 - 590.57 3389.43

Rate for 1 sqm 338.94

(iv) Centring Below Ground Level 335/2 199.00


50% of the above rate
199.00
Rate for 1 sqm
1349
1231.2
206

2786.2
1114.48
5094.48
DATA - 2013-14
Centring for OHT - Curved surfaces
Plain Surface (Steel)
Sl. No. Description of Height
Add for
Basic Rate Total
strutting

1 Up to 3.3 m 398.00 0.00 398.00

2 3.3 to 4.3 m 398.00 19.69 417.69

3 4.3 to 5.3 m 398.00 39.38 437.38

4 5.3 to 6.3 m 398.00 59.07 457.07

5 6.3 to 7.3 m 398.00 78.76 476.76

6 8.3 to 9.3 m 398.00 98.45 496.45

7 9.3 to 10.3 m 398.00 118.14 516.14

8 10.3 to 11.3 m 398.00 137.83 535.83

9 12.3 to 13.3 m 398.00 157.52 555.52

10 13.3 to 14.3 m 398.00 177.21 575.21

11 14.3 to 15.3 m 398.00 196.90 594.90

398.00 216.59 614.59

398.00 236.28 634.28

398.00 255.97 653.97


-14
ved surfaces
Curved Surface Sl. No:
Square Column Round Column
Up to 1 LL ST Above 1 LL SR 1

597.00 668.71 477.60 955.20 2

616.69 701.79 497.29 1014.27 3

636.38 734.88 516.98 1073.34 4

656.07 767.96 536.67 1132.41 5

675.76 801.04 556.36 1191.48 6

695.45 834.13 576.05 1250.55

715.14 867.21 595.74 1309.62

734.83 900.29 615.43 1368.69 Sl. No:

754.52 933.37 635.12 1427.76 1

774.21 966.46 654.81 1486.83 2

793.90 999.54 674.50 1545.90 3

813.59 4

833.28 5

852.97 6

Sl. No:

5
6
R .C.C. 1:1.5: 3
Vibration Lifting
For Various Height Rate Total
Charges Charges

Upto 1.59 m below GL 4408.31 35.25 0 4443.56

From 1.59 m to 4.50 m below


4408.31 35.25 44.05 4487.61
GL
From GL to 4.50 m Above GL 4408.31 35.25 44.65 4488.21
From 4.50 m to 9.00 m
4408.31 35.25 133.65 4577.21
Above GL
From 9.00 m to 13.50 m
4408.31 35.25 222.65 4666.21
Above GL
From 13.50 m to 17.00 m
4408.31 35.25 311.65 4755.21
Above GL

C.C. 1:4:8
Lifting
For Various Height Rate Total
Charges

Upto 1.59 m below GL 2332.41 0 2332.41


From 1.59 m to 4.50 m below
2332.41 44.05 2376.46
GL
From 4.50 m to 9.00 m below
2332.41 132.40 2464.81
GL
From 9.00 m to 13.5 m below
2332.41 220.75 2553.16
GL
From 13.5 m to 18.0 m
2332.41 309.10 2641.51
Above GL
From 18.00 m to 22.50 m
2332.41 397.45 2729.86
Above GL

R .C.C. 1:1.5: 3
Vibration Lifting
For Various Height Rate Total
Charges Charges
Upto 1.59 m below GL 4408.31 35.25 0 4443.56
From 1.59 m to 4.50 m below
4408.31 35.25 44.05 4487.61
GL
From 4.50 m to 9.00 m below
4408.31 35.25 132.40 4575.96
GL
From 9.00 m to 13.5 m below
4408.31 35.25 220.75 4664.31
GL
From 13.5 m to 18.0 m
4408.31 35.25 309.10 4752.66
Above GL
From 18.00 m to 22.50 m
4408.31 35.25 397.45 4841.01
Above GL
DATA - 2013-14

Providing two legged scaffolding using 15 cm diameter blue-gum posts or casuarine posts or best
quality bamboo posts of 4m overall length (3m height + 0.5m projection + 0.5m into the ground )
the distance between the two rows being 1.25 m. and the spacing of posts being 2m. in both the
rows with two horizontal posts with 0.5m. overlap on either side and braces at 2m c/c. including
longitudinal and transverse middle braces to step up and providing a platform with country
wood planks 40 mm. thick and 1m. width, etc in a complete form using coir and nails 1m. run.

Such as RCC slabs, rectangular beam, Tee or L beam , etc.,


Schedule item (no. 153)
Rate for 6m run

m.
70 15 cm. diameter posts (blue-gum 27.80 1m run 1946.00
run
posts or casuarine or bomboo posts)

0.3 Cu.m. 33030 1 Cu.m. 9909.00


Country wood planks
Total cost of materials A = 11855.00

Materials can be used for 10 Times


Cost per operation - A/10 B= 1185.50

Detailed data-
1 time Cost of materials for one operation- B = 1185.50 1 time 1185.50
2 Nos Masdoor Class 1 228.00 Each 456.00
Coir, nails, etc., 88.00
Total for 6 m. run C= 1729.50

For 1 m. Run. = C/6 D= 288.25

Rate for Scaffolding for


Height of 3m. And Length of D= 288.25
1 m.

For Every additional height of 2.5 m .Taking 6m. Run.

Extra Materials required-


m.
70 Vertical Post 27.80 1m run 1946.00
run

33030.00 1 Cu.m. 9909.00


0.3 Cu.m. Country wood Planks
Total cost of materials E= 11855.00

Materials can be used for 10 Times


Cost per operation - E/10 F= 1185.50

Detailed data-
1 time Cost of materials for one operation- F = 1185.50 1 time 1185.50
2 Nos Masdoor Class 1 228.00 Each 456.00
Coir, nails, etc., 88.00
Total for 6 m. run G= 1729.50

For 1 m. Run. = G/6 H= 288.25

Rate for Scaffolding for


Height of 2.5 m. And Length H= 288.25
of 1 m.
56] Supplying and paving the floor with plain marbonite tiles
approved quality of size 600x600x10mm

10 M2 Marbonite tiles 900.00 1M2 9000.00


600x600x8mm
0.21 M3 Cement Mortar 1:3 2471.35 1M3 518.98
4 Kg Colour cement 26.65 1Kg 106.60
1.2 Nos Mason I class 363.00 Each 435.60
1 Nos Mason II class 326.00 Each 326.00
0.5 Nos Stone cutter I class 280.00 Each 140.00
1 Nos Mazdoor I class 228.00 Each 228.00
1 Nos Mazdoor II class 206.00 Each 206.00
0.5 Kg Cotton waste 9.20 1 Kg 4.60
10965.78
Rate Rs. 1096.58 /M2
Say Rate Rs. 1096.60 /M2

39] Dadooing with Eurocon Tiles in CM 1:2, 10mm thick


10 M2 Cost of tiles (10.764 x 483.00 1M2 4830.00
10)
0.1 M3 Cement Mortar 1:2 3579.53 M3 357.95
4 Kg White cement 23.00 Kg 92.00
1 Nos Mason I class 363.00 Each 363.00
3.7 Nos Mason II class 326.00 Each 1206.20
3.3 Nos Mazdoor I class 228.00 Each 752.40
2.2 Nos Mazdoor II class 206.00 Each 453.20
Ls Cutting charges 9.96
8064.71
Rate Rs. 806.47 /M2
Say Rate Rs. 806.50 /M2
57] Paving the floor with Granite slab 20mm thick in floors in
CM 1:3, 20mm thick Granite slab (Jet black ) 20mm thick
4'x2'and above size over existing RCC precast work table

10 M2 Granite Slab 20mm 1815.00 1M2 18150.00


thick
0.12 M3 Cement Mortar 1:3 2471.35 M3 296.56
1.1 Nos Mason I class 363.00 Each 399.30
2.7 Nos Mason II class 326.00 Each 880.20
2.7 Nos Mazdoor I class 228.00 Each 615.60
3.3 Nos Mazdoor II class 206.00 Each 679.80
LS Cement slurry LS 40.10
4 Kg Colour cement 26.65 1Kg 106.60
lS Nosing for LS 550.00
edges.55.00x10.00=550

21718.16
Rate Rs. 2171.82 /M 2

Say Rate Rs. 2171.80 /M2

58] Paving the floor with Granite slab 20mm thick in floors in
CM 1:3, 20mm thick Granite slab (Jet Black) 20mm thick
for flooring.
10 M2 Granite Slab 20mm 1815.00 1M2 18150.00
thick
0.21 M3 Cement Mortar 1:3 2471.35 M3 518.98
1.1 Nos Mason I class 363.00 Each 399.30
2.7 Nos Mason II class 326.00 Each 880.20
2.7 Nos Mazdoor I class 228.00 Each 615.60
3.3 Nos Mazdoor II class 206.00 Each 679.80
LS Cement slurry LS 39.93
4 Kg Colour cement 26.65 1Kg 106.60
21390.41
Rate Rs. 2139.04 /M2
Say Rate Rs. 2139.00 /M2
36] Dadooing pre polished Jet black Granite tiles of size
600x300x10mm of best quality and free from any defect,
approved quality colour set in CM 1:2

10 M2 Cost of Granite tiles 902.00 M2 9020.00


0.1 M3 Cement Mortar 1:2 3579.53 M3 357.95
4 Kg Colour cement 26.65 1 Kg 106.60
1 Nos Mason I class 363.00 Each 363.00
3.7 Nos Mason II class 326.00 Each 1206.20
3.3 Nos Mazdoor I class 228.00 Each 752.40
2.2 Nos Mazdoor II class 206.00 Each 453.20
Ls Cutting charges 9.96
12269.31
Rate Rs. 1226.93 /M2
Open Well Earth Work Rate

SL . No. Depth Co-efficient Ew Rate Per Rate

1 1 1 64.2 m3 64.20

2 1 1 64.2 m3 64.20

3 2 2 64.2 m3 128.40

4 3 3 64.2 m3 192.60

5 4 4 64.2 m3 256.80

6 5 5 64.2 m3 321.00

7 6 6 64.2 m3 385.20

8 7 8 64.2 m3 513.60

9 8 10 64.2 m3 642.00

10 9 12 64.2 m3 770.40

11 10 14 304.25 m3 4259.50

12 11 16 304.25 m3 4868.00

13 12 18 304.25 m3 5476.50

14 13 20 304.25 m3 6085.00

15 14 22 304.25 m3 6693.50
0 2

2 4

4 6

6 8

8 10

10 12

12 14

14 16

16 18

18 20

20 22

22 24

24 26

26 28
Open Well Earth Work Rate

SL . No. Depth Co-efficient Ew Rate Per Rate

1 1 1 304.25 m3 304.25

2 1 1 304.25 m3 304.25

3 2 2 304.25 m3 608.50

4 3 3 304.25 m3 912.75

5 4 4 304.25 m3 1217.00

6 5 5 304.25 m3 1521.25

7 6 6 304.25 m3 1825.50

8 7 8 304.25 m3 2434.00

9 8 10 304.25 m3 3042.50

10 9 12 304.25 m3 3651.00

11 10 14 304.25 m3 4259.50

12 11 16 304.25 m3 4868.00

13 12 18 304.25 m3 5476.50

14 13 20 304.25 m3 6085.00

15 14 22 104.4 m3 2296.80

16 15 24 104.4 m3 2505.60

17 16 26 104.4 m3 2714.40

18 17 28 104.4 m3 2923.20
0 2

2 4

4 6

6 8

8 10

10 12

12 14

14 16

16 18

18 20

20 22

22 24

24 26

26 26

28 26

30 26