Rev. Etabli par Vérifié par Approuvé par Date Modifications Statut
Owner:
REPUBLIC OF ZIMBABWE
ZIMBABWE POWER COMPANY
Contractor:
Document Title:
ALSTOM © 2007. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Numéro général du Document: Numéro interne du Document: REV P/P. fin Tot. P
A H S - K R S - 3 0 - B T M- P E - 0 0 - 0 0 1 A
TABLE OF CONTENTS
1 PURPOSE OF TESTS ...........................................................................................................................................................4
3 SCOPE ....................................................................................................................................................................................4
4 TERMINOLOGY ..................................................................................................................................................................4
7 PRELIMINARY CHECKS...................................................................................................................................................4
The rectifier provides from a three-phase AC source power to charge the battery with which
it is associated and supply the load.
The tests are intended to check that the rectifier has the characteristics required for correct
operation of the system in which it is implemented.
2 REFERENCE DOCUMENT
……………Equipment drawing
3 SCOPE
4 TERMINOLOGY
Not applicable.
6 EQUIPMENT REQUIRED
- Multimeter
- Megohmmeter
- Stop watch
7 PRELIMINARY CHECKS
- Check :
. that the fuses are fitted, that their ratings and types conform to the manufacturer’s
manual, and that their microswitches are set
. that the mains voltage conforms to the power supply specifications given on the name
plate
8 ELECTRICAL CHECKS
- The metallic parts to be checked are; all accessible parts which does not require shut down
during normal operation or maintenance of the equipment such :
- the doors
- the handles
- key locks
- chassis
- The checks are satisfactory if the resistance value measured is < 0,4 ohm.
Check:
. AC input terminals
. DC output terminals
This initial energizing shall be performed only if the checks described in paragraphs 8.1 and
8.2 have been successfully completed:
- disconnect the battery and load if the charger is set with a stand-by load resistance
Depending on the rectifier technology and type, check and if necessary adjust the following
voltages as instructed in the manufacturer’s manual :
- floating mode
- equalizing mode
If a battery has to supply the load for a time longer than the specified (programmable) time
(e.g. during a main power failure across the rectifier), it has to be recharged.
The rectifier charges the battery at equalizing charge for a selectable time period before
return to floating charge when the main power voltage is restored.
Check the automatic system operation and adjust as instructed in the manufacturer’s
manual and technical specifications :
- the AC supply failure time period at the end of which the cycle is to be started
During normal operation, the charger supplies only the average current necessary to the
load while the battery caters for peak demands.
Current limiting is generally factory-set. Check the set limits by applying the charger output
to a resistor.
Some systems, especially rectifiers connected to lead-acid batteries include battery current
limiting.
If the rectifier includes battery current limiting, check the current limit as above.
As a rule, at least the following indications are provided on the rectifier front display:
. rectifier on/off
. operating modes
. rectifier current limiting
. rectifier faults
. over/under voltages
. AC voltmeter
. DC voltmeter
. DC ammeter
- Check on the rectifier output terminals that alarm, indication and measurement returns are
correct
9 PUTTING IN OPERATION
- Connect the rectifier to the battery and load and check the polarities
- The results of the checks and measurements made during the field tests shall be recorded
on the following test forms
2 RECTIFIER SPECIFICATIONS 3 X
3 PRELIMINARY CHECKS 4 X
4 ELECTRICAL TESTS 4 X
4.9 - Comments 8 X
2. MANUFACTURER :………………………………………………………..
3. TYPE :………………………………………………………..
4. SERIAL N° :………………………………………………………..
. Cabinet grounding
. Connections tight
. Plugged-in, connection
. Fuses
. Rating
. Type
. Microswitch set
. AC voltage
. Ventilation grills
4 ELECTRICAL TESTS
- ph1/Gnd
- ph2/Gnd
- ph3/Gnd
- +/Gnd
- -/Gnd
- ph1/+
- ph2/+
- ph3/+
- ph1/-
- ph/2-
- ph3/-
Transformer : Pri/Gnd
Pri/Sec
Sec/Gnd
. equalizing mode
- Thermaloverload trippings
- Battery fuses
- Charger faults
- Timer checking
- Current limiting :
- Load regulation
- Equalizing mode
- Current limiting
- Clock adjustment
4.9 COMMENTS