Vous êtes sur la page 1sur 1

In a self-supportingUniversal

Accessories
Ericsson
Electrical matters
cable,
– influence on network?
Content
Planning cable
type EXCEL/AXCES™, instructions
concept –itand is theadvice
what is it?
conductors that take the
Short
greatest circuit
Universal
part of thecurrents
cable concept– a cost effective and safe solution
be made
A cable
The
To
Introduction direct
first
make
network
definition
on
Universal Cable Handbook
pulling tension in the cable. As the conductors are live the tensioning cannot
the
evaluation
the
has other cable
“Universal
conductors,
universal is tocable
……………………….………………………………….…………………………...
electrical
the
consider concept”
axial
concept
properties
forces
different
a ishave
well not that
solutionsonly differ
to bein
functioning
from a network
atransmitted
description
line
system routeitthroughof
topography.
is
built but
a cable
necessary
withabare
the outer This
to whole
sheath
oftena
have
5
or
covered
system Traditionally
conductor electrical overhead distribution
lines, whether has
Totothe beencable divided laidbetween
isbenefits, underground underground or it cables
if economically,
is hanging and
and
depends
range
Description
overhead
between ofofaccessories
insulation oncomponents
poles.of
lines
system
thethe type
system
where
The toof
cable
and
toconstruct
the instructions.
supporting
installation, the linei.e.conductor,
………………………………………………………………………....
underground
built overhead cables
rebuilding
and
between
have
gain
have
been
full
without
antheold
poles aids damaging
line,
dominating
can
new
required
be dealt
technically
in
the
to
with
insulation
installation
design
urban in
and
areas
the theorsystem.
same
expansion
line.
and way 6 as an
overhead
of
fromexisting
How
the theCable
this system
functions
network.
design it isis………………………………………………………….……………………
important
shown Byinhaving thetocrosstake into
thesection consideration
of a universal
possibility of being andcable usebelow.
able the factors the
to utilise that same makes it a
6 cable
lines
underground
system. in rural cable. areas. The Withsame the Universal
methods ofcable earthing conceptand dealing
this pattern withisearth changingfault currents
with a new shalland be
underground, Accessories overhead and in water or a combination of these different installation methods,
……………………………………………………………………………….. 8
cost
used. effective
A wide Ericsson way
programmeof
Cables electrical&
of power
Interconnect
accessories distribution
and in on
Falun,
instructions 12 and
develops, 24 kV.
manufactures and sells power
Planning
provides instructions
greater freedom and when advice ………………………………………………………………...
choosing routes. The useasofwell as aidscable
universal for planning,
means that designing
9
there is
and
are need The
included
Electrical electrical
pilot cables
in application
the background
system for to the
electrical
isdescription. differences
distribution,
Regulating is that a cable
installation,
tablesiscan solution
beall found is
connectioncapacitive
in the andchapter to while
the
Design an
no This tomatters
new
have – influence
separate on
underground network
that one cables
and……………………………………….……………..
Spiralthetosamethe cable
overhead
Sheath used
line, just the way
install the the method
universal 10 cable of
overhead line is reactive.
thattelecommunication
instructions
installation
is most Earth isfault
in this
chosen
suitable currents
for and
handbook.
thateachispowermost
part of distribution
……………………………………………………………………….
Advice theand
suitable route. rules
for market.
eachforpart Ericsson
construction ScreenThe
of line. C&I also
are Insulation
in offers
the chapter
methods installation 10 can
Construction
of installation
When
services
instructions
be a mixtureand Short choosing
for high
circuit a
voltage
current
of maintenance
undergrounding,circuit breaker,
projects.
……………………………………………………………………….
issuessay consideration
arewhere
in the ploughing
Maintenance has to be made to
chapter. in water and
is possible, the fact that a cable11 with
self supported
Conductor
low load
Cable has a drop
capacitive current with aconsidered
phase angle that
thecan isbe up to 90°. 10To the circuit breaker
overhead ToVoltage
An type
important
between
select EXCEL
the …………………………………………………………………….………..
question
poles,
best which 3x10/10
route in isever 12
an isand
introducingimportant24 akV newwith
partassystem
the
in conductor
most
achievingnetwork
cost size security
effective.
the best mm² andhas
Separate
economy offrom
safety. 12
course
cables Theto
the a
alimited
small
transformers
universal capacitive
Lightning
We
short
cable keep
circuit
and current
over
a wide
concept voltages
strength;
lightning hascan
range be
the
arrestors
through as difficult
aresheet
many to
………………………………………………...…………….…..
of data
standard break
products
states 2inkA
notinstallations
required. as a
In short
stock.
for
proved circuit
this1Oursec.
way goal current.
isispossible
itThis
its safety. to
oftenbe considered
Additional limits 13
the use
to optimise
tough asfield
to
for
network. 14 high
the
radials Connection
both economy
tests
Direct
best
in
have beenand the strikes
supplier
network or disconnection
……………………………………………………………………………..
of cables
or
security.
carried as
out byAEAa and
satellite
numbercableof one
systems
cable. phase by on
our long
customers cable lines
concerning
of positive factors to take into consideration are:
Technology. with, for
quality, example,
delivery
voltage
precision Induced
fuses, over
andshallservicevoltages
be avoided,
level. …………………………………………………………………….
as this operation gives an unsymmetrical earth fault 15 current.
Design instructions
This unsymmetrical
Due to the small ……………………………………………………………………………….
earthconductor
fault current size,can theberesistance
detected in by the protection
cable isdevices relatively higher high 16
up andin the it
network
increases General
that
at in
a instructions
turn
high would
conductor ………………………………………………………………………
cause disconnection
temperature, e.g. of
at parts
a shortof the network.
circuit. This fact will limit 16 short
the
• Drop Do
Greateryou want freedom to know whenmore choosing aboutline Ericsson
routes.C&I? Do you want to know more about
offs …………………………………………………………………………………. 17
circuit
our current products? so that You a short
can circuit
order has to happen
product facts, close to the feeder
presentations, point if and
brochures the current
installation reaches
Wind loads ……………………………………………………………………………….. 18
Cable
2 kA. • design
instructions Universal
Calculations direct use, and
from i.e.ourunderground,
short
Swathes, routes ………………………………………………………………………….. 19
circuit
offices. in water,
tests done onat overhead
NEFI highpoles. voltage laboratory in Skien,
Norway
Earth• Building shows
fault
Together that
currents
MV, with EXCEL
LV LV and and 3x10/10,
telecom telecom. to a certain degree,
on same poles……….…………….…………………….. 19 is self protected if a short circuit
happens The longer
You cables
Crossing are thanalways
called
road 500
or mwelcome
away
universal
railroad on 10contact
to
cables kVhave andsome
………………………………….……………………………. 1000
us m on 20 kV
atimportant
Ericsson C&I. Especially
common properties.if They you need have to
20
Factors
At
• both
Lower to consider
suspension
service are:
andclampsrunning and dead
costs end spirals the cable can be exposed to large forces
If
The
advice
withstand EXCELuse
and
Angles,all the of 3x10/10
cable
questions
extradifferent in is
the
answered
suspension exposed
network
conditions to
concerning a
means
of being short
………………………………….……………………………. that circuit current >2 kA
installed underground, in water and increases
cables. the capacitive earth for
fault 1 sec
current (or inequivalent
air.
20 For in
for a
current To
long maintain
period
x Lower
time) of the
time,
itmaintenance
has provenproperties
e.g. by a tree
short ofheavythe
circuit installation
with snow
testsandthateasy it
lying
the is on important
conductor the line.
burns to use
Therefore
off only
at the the approved
cable has
the range
laying Design
••designed of 30-50
underground data
Possibilities
times
EXCEL/FXCEL
theto the
compared
cable
build has
costs
together towith
bewith
bare/covered
……………………………….……………………………
robustexisting or
conductors.
ploughable.
planned LV or
This Formeans
telecom laying
lines.
thatincable
there
water21lug as
isit an
is
to
accessories
the be
conductor
increase demand
Design with
Ericsson has
dataso
the
ona that
cable.
slightly
compensation
AXCES
C&I Only
different
reduced thenand layers
will
area
………………………………………….………………………….
hasmakesbeen manufacturing the
and
breaking doline
hasnot fulfil
no
capacity
cables slip itsagainst
cooling
sinceof expectations.
the from each
circuit the
1888 sodemands other
insulation
breakers.
you can rely and that
material.
oncable the 23
our long screen
This
important that the density the cable sink. Maybe the greatest on the design
threads ••Earthing
We
Accessories
normally
areexperience.
when
Greater
arestrongly
it
prevented
Aesthetic
is ofWe
used
freedom
recommend
before from
appearance.
installations
as do not
in protruding
…………………………………………………………..…………….…………….
happens the location
only
self-supporting
that
cable
isaim only
gets
most ofdamaged
transformers.
accessories
into
at often
aerialquality the
cable.
outer
and
specified described
one
manufacturing semi-conducting
incan inbut
say
safety this
that handbook,layer.
theconcentrate
regulations.
also cable to or
A some
On in
conventional
atoother 26 waysis
aextent
non direct
high
cable
approved • designed
self-protecting.
earthed by
No
Suspension
high Ericsson,
need
on voltage forfor underground
are
lightning
clamps…………………….
network used. In use
case
arrestors
the earth does
of
and doubt,
not
separatefulfil
contact these
cables
…………………………………………………
faultinsulated,
current
design, depends Ericsson
for demands.
for
transformer advice. The universal
connections. cables
27 ice
degree •To withstand
Excellentdelivery the
safety precision.
sometimes
aspects, Planning,
extreme
i.e. fully conditions a cableoninthe
installation,
screened. airconnection
maintenance
can be exposed andof the network
accessories
to with to
EXCEL/AXCES™
earth. • Dead
The The endsensitivity
capacitivespiralsare, through
to
………………………
earth lightning
fault their
current unique
over-voltages design, are
…………………………………………………
toineffectiveness
a acable networkadaptable
much can for
reduced
be 0.7 the in different
comparison circumstances
with28 bare
are as
loading, much
storms priorities
and…………………………….
trees when
heavy it comes
from snow, special and security
cable design as –the 2.8patented
A/km depending EXCEL and on
when
the •
How
conductor Cable
used as
to joints
self-supporting
conductors
No electric
protect
size and and
field,
the covered
voltage low
cable?aerial
level. cables.
conductors.
magnetic The field.
answer ……………………………………………….
depends on a lot of factors, cable length,33 the
AXCES™ Cable is terminations
required. ……………………. ………………………………………………. 34
probability •The Possibility
for faults,
most common towhatrunway alongside
typetoofreduce public
faults canroads.
the Therefore
be expected,
earth fault what
current easier to to
iskind ofinspect
connectprotectionafromzeroisthe used
point car.reactor
on the
Construction • the High instructions
degree of …………………………………………………………..……………..
safety givesand the earth.
possibility to gogiveoverhead where it is notphase, 35
possible to
overhead
between network,
zero what
point ofkind
the of consequences
system can be
This accepted
will and
a so
current on. in counter which
AsGeneral instructions ……………………………………………………………………….. 35
willERICSSON
compensate athis
use
AtTools gives
barethe
satellite oracable,
completely
covered
earth fuses
fault
……………………………………………………………………………………….
newoften
conductors.
are
current thinking
fully usedor and
beforepossibility
partly. the when planning
transformer and a network
these then design,
protect
36
it
the
is important
cable •also The that
reduced
&against all the possibilities
operation andand are considered
maintenance costsIf at
ofthethe planning
a cable itselfstage
network. to fully utilize the
Cables Pulling in airoverload
Interconnect transformer
………………………...…………………………………………………….. faults. cable should be damaged 37 by
cables
external • potential.
Box Tensioningviolence
731Appearance, In
this this
will
a handbook,
lead
cable to
is an
less there
earth
visible, is
fault information
can Conductor
normally
go low about
detected
(4.5 or the
6 by
m steps
protection
in required
rural or on for
the
suburban planning,
overhead
areas)
– regulation of the line …………………….……………………….…………. 39
designing,
network
SE-791 orchoice
and of materials,
disconnection
29underground.
Difficult Falun
lines – steep –will construction
long occur.
– curvedA instructions
connection and
……………………………………………………. withoutmaintenance
fuses orissues. breakers of a 41 satellite
cable to a
Laying ring innetwork
ground is
and acceptable
water as the
………………………………………………………………. Conductor
probability for screen
faults are very small and the damage
42
Sweden The Universal cable concept provides the possibility to install in a way that has superior
that
safetycanaspectsCable handling
occur iscompared ……………………………………………………………………………..
limited. to traditional methods. How this is dealt with in relation to 43
Maintenance …………………………………………………………………..…………………... XLPE-insulation 44
A high
www.ericsson.com
specifications voltage
and safety fuseregulations
in the feeding can end be foundalwaysonprotectspage 46. theDetails
cable. for A problem
use as athat spare thencable,can
happen
especially Operation
is that,
EXCEL experiences
if the fuses are
3x10/10 …………………………………………………...…………….…..
12 kV, connected
in both or 12disconnected
and Easy
24 kVstrip one
networks at acan time bethen found theoncapacitive 44
page 49. earth
Tree falls ………………………………………………………………………………….. insulation screen 44
fault current gives an unbalance which can be detected in the network and cause disconnection.
Safety issues – standards ………………………………………………………………….……… 46
E-mail:
Spare Cableeca .marketing@ericsson.com
…………………………………………………………….….…………….………... 47
Technical data ……………………………………………………………..……………………… Screen tape. Tinned wowen copperthreads 48
EXCEL/FXCEL …….. …………………………………………..……………………….. 48
AXCES™ ……………… ……………………………………………..……….…………. 50
An electrical factor also to be considered is that a cable provides a capacitive load that is often
Drum tables ………………………………………………………………………………………. 51
advantageous in rural networks. Compared with a bare/covered conductor line the voltage drop
Summary of performed tests …………………………………………………………………….. 52
is lower
Referencesfor a cable line. More about thatreproduced
………………………………………………………………………………………….
The content in this book in the next chapter.
Sheath, extra strong LLD PEfrom Ericsson54
Zeromay not reactor
point be copied,
to compensate or duplicated without
earth fault permission
currents
Network Technologies.
Conclusion: A study of the total economy should be done, e.g. by an TM
LCC- analyses or similar to
EXCEL
determine the cost3x10/10 12 kV
effectiveness. AXCES 3x95/25 24 kV

4 10
6
8 9
53
7
11