Académique Documents
Professionnel Documents
Culture Documents
potential non-conformance
modes. As the ratings are necessarily subjective, they are subject to differing interpretations and should not be construed as definitive
1 OF 4
POTENTIAL
findings. The ratings are not indicators of performance in actual product utilization. For any specific end-use application, the
user/purchaser has the sole responsibility for making the final determination as to the suitability of the product for its application or use.
Accordingly, EMERSON MOTOR TECHNOLOGIES MAKES NO REPRESENTATION OR WARRANTY AS TO MERCHANTABILITY OR
Process FMEA
upon request.
Process C Potential O D
Function Potential Potential S l Cause(s) / c Current e R. Recommended Responsibility Action Results
Failure Effect(s) of e a Mechanism(s) c Process t P. Actions(s) & Target Actions S O D R.
Mode Failure v s of failure u Controls e N. Completion Taken e c e P.
Requirements s r c Date v c t N.
1 - Wind tooth segments
X76 Drawing Spec.'s, SEIM Machine setup / Program / resistance inspection of final
Wrong number of turns 2 2 24
4-3 programming unit
Operator places
incorrect wire size Stator Electrical Test wrong Spool in 2 resistance inspection of final unit 2 24
Failure: Incorrect stator machine
6
resistance, inductance / Machine setup /
Wind in wrong direction performance 1 None 10 60
programming
6-10 lbs & 11-13 lbs (look at winder automated process control,
Machine setup 2 2 24
supplier rec) Incorrect wire tension Setup Verification
Dirty nozzles 6 resistance inspection of final unit 2 72
Damage to wire
Wire insulation damage Turn to turn shorting 6 2 None 10 120
guides in machine Hi-Pot SPC Audit Final Unit L. Whitten
Operator handling 2 None 10 120
Stator Won't assemble,
Damaged Magnet Wire,
6 36
Stator Electrical Test
Winding form outside of Failure (short)
Incorrect setup 3 Pass through gaging 2
envelope
Long Term Wire Damage
due to vibration, leading 8 48
to Motor Failure (short)
All products are sold only pursuant to Emerson Motor Technologies’ standard terms and conditions of sale, copies of which are available
FMEA Number
Process FMEA
upon request.
Process C Potential O D
Function Potential Potential S l Cause(s) / c Current e R. Recommended Responsibility Action Results
Failure Effect(s) of e a Mechanism(s) c Process t P. Actions(s) & Target Actions S O D R.
Mode Failure v s of failure u Controls e N. Completion Taken e c e P.
Requirements s r c Date v c t N.
1 - Attach Pin Terminals to
Wire
Operator selects Work Instructions/Set-Up/Visual
Incorrect Wire size Bad Terminal Connection 7 2 5 70
wrong lead wire coil Inspection
Operator selects Work Instructions/Tool Set-
Wrong Strip Length Bad Terminal Connection 7 2 5 70
wrong program Up/Inspection
Tool Maintenance Schedule/Set-
Bad crimp Bad Terminal Connection 7 Tool wear 2 5 70
up/Visual Inspection
2 - Insert Leads into
Connector Housing
Product: GPM Process Responsibility: Ensamble final Approved By: J. Pequeño M. Campa
C O D Action Results
Process Responsibility
Function Potential Potential S l c Current e R
Potential Cause(s) / Mechanism(s) Recommended & Target
Failure Effect (s) of e a c Process t P
of failure Actions(s) Completion
Mode Failure v s u Controls e N
Date Actions S O D R
s r c
Taken e c e P
Requirements v c t N
Dimension "C" / "B", Alto consumo y potencia Hoja de primera pieza y captura de Pull trainers y supervisor
Prensa estator cuerpo 7 B Mala interpretacion de dibujo. 5 2 70 Capacitacion y entrenamiento.
incorrecta. de motor(Amps y Watts). informacion en el sistema spc. de produccion.
Profundidad de agujeros de
Sistema de seguridad mecanico y ayuda
Taladro. cover capacitor star, run y Diseño de herramental(broca) con Departamento de
EN-140-1
Motor aterrizado. 9 C Mal set up del taladro. 8 visual de lampara indicadora de 2 144
cliente, fuera de pokayoke. manufactura.
profundidad.
espacificacion.
Ensamble de cover capacitor. Falta de informacion para el Pokayoke para ensamble de cover
EN-147-1A
Capacitores mal posicionados. Componente dañado. 10 C 4 1 40 Pokayoke Activo. Departamento de Calidad.
ensamble del componente(cover). capacitor.
Ensamble de guasas. Acomodo de guasas Altura de flecha fuera de Gages de altura de flecha y hoja de Traduccion de dibujos de Departamento de
EN-020-1
7 B Dibujos de especificacion en ingles. 7 1 49
incorrecta. especificacion. registros de alturas. especificaciones al idioma español. especificaciones.
Cerrado de motor. Altura de tornillo, fuera de Cliente no podra montar Mejorar metodologias de 6S en los Departamento de
EN-130-2A
7 B Material revuelto. 2 Hoja deprimera pieza y auditoria final. 4 56
especificacion. su unidad. set up de las lineas de produccion. produccion ensamble
Product: GPM Process Responsibility: Ensamble final Approved By: J. Pequeño M. Campa
C O D Action Results
Process Responsibility
Function Potential Potential S l c Current e R
Potential Cause(s) / Mechanism(s) Recommended & Target
Failure Effect (s) of e a c Process t P
of failure Actions(s) Completion
Mode Failure v s u Controls e N
Date Actions S O D R
s r c
Taken e c e P
Requirements v c t N
Ensamble de capacitor con Departamento de
Cables dentro de especificacion Reducir el rango de tolerancia en
abrazadera. Terminal dañada. Motor no arranca. 9 C 9 Medible(escala) 2 162 ingenieria de diseño St.
EN-142-1A pero condiferencias de tamaños. longitud de cables.
Louis.
Dificultad para
Padmill Generar una base de datos para el
EN 225 Soporte mal maquinado. ensamblarse en la 8 B Equipo mal ajustado. 8 Mediciones con gages. 2 128 Departamento de calidad.
monitoreo de las lecturas.
aplicacion del cliente.
Carga de pintura liquida Preparacion de pintura Desprendimiento de Implementar equipo que verifique la Departamento de
EN-216 7 B Mezcla de reactivos incorrectos. 4 No hay. 10 280
incorrecta. pintura. combinacion de la mezcla de pintura. manufactura.
Descarga y empaque de Desconocimiento de los procesos Inspeccion de procesos en area de Colocar instrucciones visuales de Departamento de
motores EN-218
Mal manejo de motores. Cables dañados. 8 B 2 1 16
de empaque. pintura liquida. empaque en el area de pintura. manufactura.