Académique Documents
Professionnel Documents
Culture Documents
FECHA: FECHA: (D) IGV [18% of (C)] 0.00 + 0.00 = 0.00 = (34,817.13)
CONTROL DE PROYECTOS GERENTE DE INFRAESTRUCTURA (E) TOTAL (C+D) 0.00 + 0.00 = 0.00 = (228,245.62)
FECHA: FECHA: (H) MONTO A PAGAR (E+F+G) 0.00 + 0.00 = 0.00 = (214,550.88)