Vous êtes sur la page 1sur 1

MACRA1 2002 MACRA1 2002 MACRA1 2002 MACRA1 2002

Program released to: JOSE ANTONIO Tel: TDM


Company: TDM EMail: jcrispin@tdm.com.pe
Title: DEFENSA RIBEREÑA Notice
Description: TDM is not responsible for the drawings and the
calculations trasmitted, since they should be intended as
general design outlines and advice,aiming only to the best
Folder: use of the products.
Date: 03/04/2014

Run n.1
Gradient [%] 1.5 Froude number 1.176895936
Discharge [m3/s] 542 Cross section [m2] 121.5438401
Water level [m] 1.463932918 Wetted perimeter [m] 85.92831183
Average velocity [m/s] 4.459296329 Hydraulic radius [m] 1.414479553

Stretch Length V K Vadm Vb Material V tau max tau adm GeoFil


[m] [m/s] [m/s] [m/s] [N/m2] [N/m2]
1 4.000609312 - 1
1.1 4.000609312 0.75 0.576264525 Gabions 1.00m N 161.4974196 288.6751346 Y
2 4 4.270130804 1
2.1 4 0.75 0.45431169 Gabions 0.50m N 215.3298929 470.4 Y
4 75 4.511542325 1
4.1 75 - - Cobbles and shingles N 215.3298929 52.6 N
6 4 3.672312491 1
6.1 4 - - Cobbles and shingles N 215.3298929 52.6 N
7 4.000609312 - 1
7.1 4.000609312 - - Cobbles and shingles N 161.4974196 52.6 N

Materials used
Description Roughness Allow. shear stress Rock d50 Thickness Rockfill unit weight Rockfill unit weight Time C Shields
[N/m2] [m] [m] [kN/m3] [kN/m3] [h]
Cobbles and shingles 0.035 52.6 52.6
Gabions 0.50m 0.0301 470.4 0.21 0.5 26 26 0.14
Gabions 1.00m 0.0301 500 0.3 1 26 26 0.14