Vous êtes sur la page 1sur 5

HYDROTEST PROCEDURE

TANK D101-1 REPAIR AND CLEANING


SERVICES

( PBL – 2017 – 056 )

TABULATION OF REVISED SHEETS


REVISIONS REVISIONS
SHEET SHEET
A B C 0 1 2 3 4 A B C 0 1 2 3 4
1 X 41
2 X 42
3 X X 43
4 X 44
5 X 45
6 46
7 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80
HYDROTEST PROCEDURE

TANK D101-1 REPAIR AND CLEANING


SERVICES

( PBL – 2017 – 056 )

1 . SCOP E

This procedure will be applied to Hydrostatic Test Storage Tank D101-1.

2 . REFERENCE

 API 650.
 Client Specification.

3. PREPARATION PRIOR TO HYDROSTATIC TEST

3.1. Hydrostatic test shall be performed when all of shell accessories installation and
inspections mentioned in specification and drawings have been completed and approved.
The attachment welding around all openings and their reinforcement on the wall of tank shall
be installed and inspected both inside and outside the tank as per design. Inside surface of
tank shall be cleaned and free from all dirt and debris, weld slag and spatter, oil, rust scale,
stone or sand, etc.
3.2. All shell openings holes such as nozzles, couplings shall be provided with covers or plugs and
blinded off.
3.3. Prior to commence of hydrostatic test, a benchmark elevation shall be established at a
fixed point. The fixed point shall be on foundation or other suitable object not susceptible
to changes in elevation.
3.4. All shell and roof nozzles shall be blinded off with the exception of those nozzles require
valves or roof venting devices. Roof venting devices shall be installed and operating prior to
beginning the test. All blinds and valves must be inspected periodically throughout the
duration of the hydrostatic test to do assure that no leakage.
3.5. All survey equipment used during the test shall be calibrated prior to the test. Use the same
equipment throughout the test is recommended.
3.6. Install safety sign warning of hazards in all potential problem location prior start of work.

4. HYDROSTATIC TEST PROCEDURE

4.1 The top of tank is vented to atmosphere. The tank will be filled with water to require level /
design capacity. The water will be filled into the tank through inlet nozzle.
4.2 The water & equipment for hydrostatic test will be supplies by Petrogas.
4.3 Water for hydrotest shall be meet requirement in API 650 standard, water treatment is
required when in the quality is not comply with requirement standard, PT. Petrogas
responsible for treatment of the water.
4.4 The rate at which water is introduced into tank shall be 1 foot of depth per hour but not
more than 3 feet of depth per hour.
4.5 NDE shall be completed prior Hydrostatic test perfomed.
4.6 Domensional & check list inlined finished.
HYDROTEST PROCEDURE

TANK D101-1 REPAIR AND CLEANING


SERVICES

( PBL – 2017 – 056 )

Recommended water filling and dewatering stages shown as diagram below:

Volume “Holding” High (mm)


1 x 24 hour 12200
100%
“Water Filling” “Dewatering”
1h 1h 9150
75%

1h 1h
50% 6100

1h 1h 3050
25%

Time (hours)

Fig. 1
4.6. When the water level is equal to design capacity, it shall be added 50 mm water level more
than design capacity.
4.7. Check the settlements of foundation during water filling on every stage. To measure
decreasing of foundation refer to survey brackets around bottom tank. PT. GKP shall provide
the surveyor.
4.8. Holding time when full of water is 1 x 24 hours to permit close visual inspections
of all joints in wall of tank and all welding around manhole, nozzles and other connections
shall be in accordance with owner’s specification.
4.9. When there is some leakage on the tank wall, the water filling stages would be stopped
and release the water from tank. The leakages on the wall shall be repaired.
4.10. Water filling in Tank D-101-1 must reach 12,2 Mtr.

5. P OS T H YDR OS TA T I C T EST

5.1. The tank shall be vented to atmosphere.


5.2. After completed all visual inspections, the water in the tank shall be discharged
gradually 1 foot per hour.
5.3. The hydrostatic test water shall be released to the drainage (dump area) in a manner to
prevent flooding or soil erosion on the Shop Area.
5.4. Cleaning and drying inside of the tank from water.
5.5. Visual inspection shall be made of both inside and outside of the tank.
5.6. After finish cleaning and inspection close all Manhole and Nozzle with manhole cover or
blind flange
5.7. After hydrostatic test, all welding works on shells shall not be permitted. Unless there‘s
modification and approval from Client.
HYDROTEST PROCEDURE

TANK D101-1 REPAIR AND CLEANING


SERVICES

( PBL – 2017 – 056 )

6. ATTECHMENT
SKETCH DRAWING

Vous aimerez peut-être aussi