Delivery Service Record

Delivery Checklist CONTINUED ON REVERSE SIDE

1. Prior to delivery Daily fluid sight gauges and fill points: engine,
Review copy of completed PDI checklist hydraulic, cooling, windshield washer,
Check fuel level (recommend ½ tank) Filter locations
Inspect for cleanliness & presentation Engine oil
Hydraulic
2. Introduce the machine
Primary Fuel and Lift Pump
Model, Capacity, Horsepower, Work Tools, Tires Internal & external cab air
Work Tools and Attachments, Installed and loose Engine Air filter & dust ejection
Location of all serial numbers (machine / engine) Fuel / Water separator – water & sediment
3. Check OMM is in machine and show operator draining, filter changing
Machine operation controls Cooling system cleaning – Engine, Hydraulic,
Air Conditioning
Warning and safety decals
S•O•SSM points
Maintenance section – fluids, filters, maintenance
intervals Transport locks and tie-down points
Daily and weekly checks Battery Isolation switch
Parts book / CD Battery jump-starting procedure
4. 4. Machine inspection, daily checks & maintenance Wheel lug nut tightness
Location of all grease points Backup Alarm
Instruction of lubrication and maintenance chart Work tool G.E.T.
Safety checks and hazard points Seat Belt

Page 1 of 2
906H2 – 908H2, 910K – 914K
Allow operator stick time, observe and comment:
Compact Wheel Loader
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________

Machine Inspection – Follow up items:


_________________________________________
5. Safety Walk-around _________________________________________
_________________________________________
Warning and safety Decals and their meaning _________________________________________
Correct cab entry / exit _________________________________________
Safety interlocks (F-N-R switch & Park Brake) _________________________________________
Hazard points _________________________________________
Articulation Hitch, Under Loader Arms
1. The above Checklist and delivery information has been
Emergency exits – left & right doors
explained to me.
6. Machine Controls, Operation Tips, Unique Features 2. I understand the operation and maintenance of this
machine
Demonstrate Correct Starting / Stopping Procedure 3. I acknowledge the warranty conditions and limitations as
Joystick Configuration – F-N-R, Auxiliary outlined in my copy of the warranty statement.
Hydraulics, Speeds 1 & 2, Differential Lock,
Continuous Flow
Signatures:
Road & Load Feature Package:
Implement Modulation Date___________ Location____________________
Hystat Aggressiveness
Ride Control Owner_______________________________________
Return To Dig Operator 1____________________________________
Lift Kickout
Throttle Lock Operator 2____________________________________
Creeper Operator 3____________________________________
Rim Pull Control
Inching and Braking Pedal Operator 4____________________________________
Quick Coupler Operation
Dealer Rep___________________________________
Relieving Hydraulic Pressure
Hydro-mechanical work tool use
For more information, click on image, or visit:
http://www.youtube.com/user/catconstructiontrade
7. Explain Caterpillar Warranty Policy Created July 2014 (Version 1)
Accepts warranty statement Content Owner: B J Meier (Meier_B_J@cat.com)

Page 2 of 2 0315CWL Compact Wheel Loader Delivery Service Record/Checklist