: ENVIROTECH/WTP/22/19-20
Date : 20/05/19
TO
UTKAL BUILDERS LIMITED
PLOT 777, SAHID NAGAR
BHUBANESWAR
SUB: OFFER FOR REVERSE OSMOSIS PLANT WITH PRE-TREATMENT 1000 LTRS/HR FOR KANIKA GALLERIA
Dear Sir,
We thank you for the interest shown in our products and the kind courtesy extended to the
undersigned discussion over telephone regarding the above-mentioned subject.
Based on the discussions and the requirement of treated water indicated by you, please find
enclosed our offer for the same as per the enclosures given below.
Hope this is in line with your requirement. For any further clarification, please revert back to the
undersigned.
Looking forward for your valued order and assuring our best services all the time.
For ENVIROTECH
Design Basis:
THE FEED WATER SHOULD BE FREE FROM ORGANIC IRON,SDI,BOD & COD
Design pressure (Min-Max): 2.0 – 3.5 Kgs. /Cm2
ANNEXURE - II
U.V
Quantity in Nos. 01
Material of construction SS
Maximum Flow rate in Litres per hour 1000
Make ALPHA/GOODLIFE
1 RAW WATER PUMP
Purpose To feed the Dual Media Filter at pressure more than 2.0 bar,
which is min. operating pressure for filter.
Specifications a) MOC: CI
b) Type: Horizontal Centrifugal
c) Flow Rate: 3000 liters per hour
d) Head: 25 m
e) Power Required: 0.37 kw
f) Electrical: 220 V, single phase, 50 hz
g) Cycle: 2900 rpm
h) Make: Kirlosker. /KSB
Quantity: 2 Nos.
RAW WATER
TANK Pump MGF-30 ACF-30 RO-
1W +1S)
CLIENT’S 1000
SCOPE SKID
TREATED
WATER TANK
CLIENTS SCOPE
PRICE AND COMMERCIAL TERMS & CONDITIONS:
PAYMENT TERMS
VALIDITY - The offer is valid for 30 days from the above-mentioned date.
DESPATCH - The plants will be dispatched within 04 – 06 weeks of receipt of your commercially clear
purchase order along with the above-mentioned advance and relevant documents.
WARRANTY - The product shall be under warranty only towards performance and workmanship for
a period of 12 months from the date of installation or 18 months from the date of delivery
whichever is earlier. Any change in raw water quality at the time of installation or later beyond the
design basis as mentioned in the Annexure – I of our offer could result in variation in performance of
the equipment, which is not covered under the warranty. Replacement of Consumable items such as
Media, Membranes, is not covered under the warranty along with plastic parts which are subject to
breakage due to poor handling or normal wear and tear.
EXCLUSIONS – All civil work to erect the plants, unloading of material at site, storage and handling of
material at site, all civil foundations, electrical connections, interconnecting pipelines, 2 no’s of Raw
water feed pumps, labors and plumbers, chemicals, salt, raw water and treated water storage tanks
are excluded from our offer.
SCHEDULE OF EXCLUSION:
1. Raw & Treated Storage Tank
2. Electrical arrangement
3. Civil work if any
4. Consumables
5. Lodging & boarding during E&C
6. Proper drainage facility in plant room.
7. Plumber during erection job.
8. Safe storage and security of material.
9. Interconnecting pipe-works
For ENVIROTECH