0 évaluation0% ont trouvé ce document utile (0 vote)
14 vues1 page
The document outlines the various costs associated with operating an incinerator, including fixed costs of over RM 102 million for land, equipment, and construction; collection costs of RM 140,000 per truck; fuel costs per liter of diesel and gallon of propane or per MMBtu of natural gas; operational costs of RM 35.50 per kW of electricity and RM 1.2 million annually for chemicals; maintenance costs of RM 50,000 for offices and RM 1.5 million for equipment annually; and labor costs of RM 10,000, RM 7,000, RM 2,000, and RM 1,800 per month for managers, engineers, technicians, and non-technical staff respectively.
The document outlines the various costs associated with operating an incinerator, including fixed costs of over RM 102 million for land, equipment, and construction; collection costs of RM 140,000 per truck; fuel costs per liter of diesel and gallon of propane or per MMBtu of natural gas; operational costs of RM 35.50 per kW of electricity and RM 1.2 million annually for chemicals; maintenance costs of RM 50,000 for offices and RM 1.5 million for equipment annually; and labor costs of RM 10,000, RM 7,000, RM 2,000, and RM 1,800 per month for managers, engineers, technicians, and non-technical staff respectively.
The document outlines the various costs associated with operating an incinerator, including fixed costs of over RM 102 million for land, equipment, and construction; collection costs of RM 140,000 per truck; fuel costs per liter of diesel and gallon of propane or per MMBtu of natural gas; operational costs of RM 35.50 per kW of electricity and RM 1.2 million annually for chemicals; maintenance costs of RM 50,000 for offices and RM 1.5 million for equipment annually; and labor costs of RM 10,000, RM 7,000, RM 2,000, and RM 1,800 per month for managers, engineers, technicians, and non-technical staff respectively.