Name of Block / Contract Amount

Sl No Name of Agency Name of the scheme Estimated Amount (Rs)


Municipality (Rs)

Construction of concrete road from Baraghuni PHC


1 Capital to Rath Sadak on PMGSY bus road via Baraghuni
Suklalchak Primary School.
Construction of concrete road from Dalbarh
2 Chandipur Aristocon PMGSY road to Kulapara Uttar Khalpar (Market) at 7,826,965.00 7,746,347.00
Jalpai-II GP.
Construction of concrete road from Sashiganj
3 Deb Construction bazaar to Nandapur bus stop via Nandapur khan 15,758,275.00 16,073,440.00
more

Sweeping, cleaning, maintenance, beautification,


surveillance and arrangement of security guard for
4 Haldia Atanu Singh 2,600,064.00 2,600,064.00
Haldia Gateway and its adjacent gardens at
Brajalalchak, Haldia.

Construction of concrete road from Kharichak


5 Kolay Construction 53,643,021.00 53,643,021.00
Bridge to Kanaichak Sluice under Kolaghat Block.

Construction of concrete road from Siddha to


6 Kolaghat Al Amin 36,312,999.00 35,227,240.00
Pitpur.

Construction of Bituminous Road from Jadupur to


7 D. K. Mondal 65,489,171.00 67,349,063.00
Katamoni Shasan upto Keshapat

Re-excavation of Hijli Tidal Canal from Geonkhali to


8 Krishendu Bhakta 87,041,861.00 86,989,636.00
Itamogra.

Renovation and repairing work of Triveni Sangam


9 Sahoo Construction 4,350,640.00 4,349,770.00
Guest House at Geonkhali.

10 Meghna Engineering Construction of Pontoon Jetty at Donipur. 33,175,289.00 34,077,657.00


Mahishadal
Name of Block / Contract Amount
Sl No Name of Agency Name of the scheme Estimated Amount (Rs)
Municipality
Mahishadal (Rs)

Inetrior work of tribeni Sangam Guest House at


11 Chocolate Brown 1,108,859.00 1,107,750.00
Geonkhali.

Construction of road from Gopalpur Bus Stop to


12 Swarup Das Ghasipur Babubazar via Kamalpur & Satish 31,795,240.00 32,745,918.00
Samanta Residence.

Construction of concrete road from Hatibhanga


13 Khajababa Pool to Laluageria Durga Mandir via Pursha Ghat 36,440,742.00 36,433,454.00
and Shini.
Moyna Construction of concrete road from Kanchichak
PWD Slope to Brajaballavpur river bank via Bimal
14 Swarup Das 47,604,486.00 47,599,726.00
Maiti's Ration shop and Gagendra Pry. School at
Gokulnagar G.P.
Name of Block / Contract Amount
Sl No Name of Agency Name of the scheme Estimated Amount (Rs)
Municipality (Rs)

Annapurna Construction of concrete road from Chhaypukar


15 18,222,503.00 18,076,722.00
Construction Ferry Ghat (Konmatha) to Pariya Ghat
Moyna
Construction of Bituminous road from Srirampur
16 BCSPL Ghat to Ramchandrapur High School under Moyna 81,213,857.00 81,213,857.00
Panchayat Samity.
Construction of boundary wall and concrete road
17 Bhupati Bera 19,902,846.00 19,900,856.00
of Maharaja Nandakumar College.

Repairing of black top road from Piyada to Mirpur


18 D. K. Mondal 7,624,957.00 7,578,916.00
(Donipur Hat).

Construction of concrete road from PWD Road at


19 P Banik Bagmari, in front of the house of Narayan Maiti to 18,595,405.00 18,548,916.00
Rautouri concrete bridge.
Nandakumar
Construction of concrete road from Tamluk Haldia
20 Swarup Das Pucca Road to Narayanpur river embankment via 20,892,160.00 20,890,071.00
Ichhapur Panchagrami High School.

Structural designing, drawing and preparation of


21 Sinha & Associates plan and estimate for estalishment of National 485,000.00 485,000.00
Flag.
Construction of concrete road from NH-116B to
22 Bharat Engineering 8,154,053.00 8,316,317.00
Shitalpur Barman Pally near Narghat Bridge.

Construction of concrete road along with drain


Moonstar Enterprise from Tamluk Panskura bus road near Bhimtala
23 Panskura Municipality 7,790,817.00 7,786,921.00
stoppage towards Kansi river bandh via
Chakraborty Para.

Construction of Concrete road from Paschim


24 Prabir Karan 16,797,108.00 16,795,428.00
Nekrah Bazar to Raniyarah river embankment.

Panskura-I
Name of Block / Contract Amount
Sl No Name of Agency Name of the scheme Estimated Amount (Rs)
Municipality (Rs)

Construction of concrete road from NH-116B to


25 Bela Construction Shitalpur Barman Pally near Narghat Bridge under 143,359,407.00 147,617,181.00
Panskura-I Nandakumar Panchayat Samity.

Construction of concrete road from Sahajogita


26 Nabab Wood kendra to Shyamsundarpur Patna via Dutta 10,133,530.00 10,336,201.00
para,Sanapati para under Mysora G.P.

Construction of black top on morrum road from


27 Gangadhar Bera 49,826,836.00 49,577,702.00
Kishorepur PMGSY road to Kanktiya Durgamandap.

Sahid Matangini Construction of concrete road from Krishnaganj


28 Supreme India 28,063,629.00 28,063,629.00
Bazar to Saira Football Ground.

Construction of concrete road from Kashipur Khan


29 AG Infrastructure 14,853,535.00 15,144,664.00
Bahadur road to Dhalhara.

Beautification and lighting of Baikuntha Sarabar at


30 Tamluk Municipality Anuska Enterprise Parbatipur and Ramsagar Tank at Town 26,300,048.00 27,078,529.00
Padumbasan.
Construction of cncrete road from Shrirampur to
31 Electro Engineering 40,684,157.00 40,659,746.00
Rajnagar Foot Bridge Bazar.

Construction of concrete road from Kurpai to


32 M. H. Trading 36,597,714.00 36,597,714.00
Chansarpur.

Tamluk
Construction of concrete road from Kurpai Bat tala
33 GM Construction 24,288,035.00 24,773,798.00
to Mirzapur Atul Rana house under Padumpur-I GP.

Tarun Kumar Mandal Improvement of Burning Ghat , boundary wall at


34 1,380,046.00 1,378,804.00
Anantapur
Scheduled
Work Order Date Completion Status
Date

25.02.2019 24.08.2019

11.10.2018 10.05.2019

06.03.2019 05.03.2022

27.11.2017 26.05.2019

20.09.2018 19.05.2019

28.09.2019 27.03.2020

25.08.2017 24.08.2018

28.03.2018 27.09.2018

26.02.2019
Scheduled
Work Order Date Completion Status
Date

Completed final bill


24.12.2018 13.03.2019 pending

27.09.2018 26.09.2019

22.06.2018 21.06.2019

19.03.2018 18.01.2019
Scheduled
Work Order Date Completion Status
Date

10.10.2018 11.06.2019

24.01.2019 23.07.2020

28.05.2018 27.01.2019

28.03.2018 27.07.2018

22.06.2018 21.02.2019

22.06.2018 21.12.2018

29.01.2019 28.03.2019

28.09.2018 27.03.2019

24.04.2017 23.10.2017

Completed final bill


18.06.2018 17.02.2019 pending
Scheduled
Work Order Date Completion Status
Date

28.09.2018 27.09.2020

Completed final bill


28.09.2018 27.03.2019 pending

25.08.2017 26.02.2019

02.02.2018 01.05.2018

10.09.2018 09.03.2019

15.12.2017 14.12.2018

07.06.2018 06.06.2019

28.05.2018 27.01.2019

28.09.2018 27.07.2019

06.08.2018 05.12.2018
Sl No Name of Agency Name of the scheme

construction of concrete road with drain from


1 Ajit kumar Maity Biswajit Patra's cement shop to Sura sub canal near
Hanuman Mandir via Karigar Para at ward no.-10

Beautification and lighting of Baikuntha Sarabar at


2 Anuska Enterprise Parbatipur and Ramsagar Tank at Town
Padumbasan.
Construction of concrete road from Santipur
3 B. B. M. Enterprise
(Mecheda) to Hogalberia (Ramtarakhat).
Construction of boundary wall and concrete road of
4 Bhupati Bera
Maharaja Nandakumar College.
Comtel Consultants Structural designing and drawing and preparation
5 & Infraprojects Pvt. of Plan and Estimate for Renovation of Ferry
Ltd. Ghat/Jetties at Kendemari.
Comtel Consultants
Construction/Reconstruction/Repairing/Renovation
6 & Infraprojects Pvt.
of jetties in Purba Medinipur District.
Ltd.
D. K. Mondal
Repairing of black top road from Piyada to Mirpur
7 Engineers Private
(Donipur Hat).
Limited.
Electro Engineering Development and beautification of ground beside
8
Concern Chiranjibpur Muktadhara Auditorium.
Electro Engineering Construction of cncrete road from Shrirampur to
9
Concern Rajnagar Foot Bridge Bazar.
Construction of black top on morrum road from
10 Gangadhar Bera Kishorepur PMGSY road to Kanktiya
Durgamandap.
Construction of concrete road form Biswanth
11 Haldia Architect Co Maity’s house to Ratan Parui house via Tapan
Maity’s house and Ashok Patra’s house.
Construction of concrete road from Baichberia to
12 Kanu Binod Giri
Chausarpore under Tamluk Block (Phase-I).
Construction of concrete road from Hatibhanga
Khajababa
13 Pool to Laluageria Durga Mandir via Pursha Ghat
Construction
and Shini.

Construction of concrete road from Kharichak


14 Kolay Construction
Bridge to Kanaichak Sluice under Kolaghat Block.

Re-excavation of Hijli Tidal Canal from Geonkhali


15 Krishendu Bhakta
to Itamogra.
Construction of concrete road from Kurpai to
16 M. H. Trading Co.
Chansarpur.
Beautification of riverside garden near Ganga
17 Moon Enterprise
Mandir at Uttar Narghat.
Construction of concrete road along with drain
from Tamluk Panskura bus road near Bhimtala
18 Moonstar Enterprise
stoppage towards Kansi river bandh via
Chakraborty Para.
Nabab Wood Construction of concrete road from Machinan
19
Industries Masjidtola to Panchugang IRWD road.
Construction of concrete road from PWD Road at
20 P Banik and Co Bagmari, in front of the house of Narayan Maiti to
Rautouri concrete bridge.
Construction of Concrete road from Paschim
21 Prabir Karan
Nekrah Bazar to Raniyarah river embankment.
Construction of boundary wall for the land allotted
22 Rocky Enterprise to HDA at the new District Administrative
Complex at Nimtouri.
Construction of concrete road from Mechada road
23 S. K. Engineering
(Near Bus Stand) to Iskon Jaganath Temple.
Renovation and repairing work of Triveni Sangam
24 Sahoo Construction
Guest House at Geonkhali.
Construction of Sahid Matangini Hazra Govt.
25 Satyen Construction Degree college for women (phase-II for 1st floor)
at Nimtouri, Tamluk.
Sonu Engineering Beautification of Riverside Garden beside Triveni
26
Construction Sangam at Geonkhali.
Infrastructural development works for the
27 Supreme India construction of the bus depot cum terminal at
Haldia (Phase-II) under SBSTC.

Construction of concrete approach road and drain


28 Supreme India
of Haldia Bus Depot-cum-Terminus under SBSTC.

Construction of concrete road from Krishnaganj


29 Supreme India
Bazar to Saira Football Ground.
Construction of concrete road from Tamluk Haldia
30 Swarup Das Adhikari Pucca Road to Narayanpur river embankment via
Ichhapur Panchagrami High School.
Construction of concrete road from Kanchichak
PWD Slope to Brajaballavpur river bank via Bimal
31 Swarup Das Adhikari
Maiti's Ration shop and Gagendra Pry. School at
Gokulnagar G.P.
Name of Block /
Status
Municipality

Completed, final bill


Panskura Municipality
pending.

Tamluk Municipality

Sahid Matangini

Nandakumar

Nandigram-I

Haldia Planning Area

Nandakumar

Haldia Municipality 95%

Tamluk

Sahid Matangini

Sahid Matangini

Completed, final bill


Tamluk
pending.

Moyna

Kolaghat

Mahishadal
Tamluk

Nandakumar

Panskura Municipality

Kolaghat

Nandakumar

Panskura-I

Tamluk

Sahid Matangini

Mahishadal

Tamluk

Mahishadal

Haldia

Haldia

Sahid Matangini

Nandakumar

Moyna

Vous aimerez peut-être aussi