Component -04: Construction of Boundary wall and inner road inside the SWTP area BDT 3,02,01,118.29
Component -05: Construction of Surface Drain inside the SWTP BDT 1,97,34,438.79
Component -07. Electrical Works, Sub-stations and Pumping Machinery BDT 5,45,56,980.00
BDT 37,32,47,482.21
Total Construction Cost of SWTP and Related Works
Component -13: Construction of Functional buildings and Boundary Wall BDT 1,95,80,975.19
BDT 35,46,20,276.80
Total Construction Cost of Pipelines, OHTs and Related Structures
4 Provisional Sum
Part 1.0 Design Review Activity BDT 25,00,000.00
Part 2.0 Investigation (geo-technical and water quality), Utility shifting and Other Incidental BDT 1,14,46,433.00
expenses
Part 3.0 Construction Activity BDT 17,90,000.00
Part 4.0 Power Consumtion
Power consump cost for operation & maintenance of the SWTP for 2 years (based BDT 2,33,32,800.00
on actual monthly electric bill submitted)
Part 5 Operation and Maintenance Activity BDT 15,00,000.00
Total Provisional Sum 4,05,69,233.00
80,04,69,233.00
GRAND TOTAL (1 + 2 +3+4)