NAME OF WORK:- Construction of sharda type fall at R.D. 10000m of LMC gip.

1.HYDRAULIC PARTICULARS: U/S D/s


1 Full supply diascharge u/s Q 10.00 10.00 Cumec use Rectangular crest
2 Drop HL 1.00 m
3 Full supply level FSL 101.50 100.50 m
4 Full supply depth D 1.50 1.50 m
5 Bed level CBL 100.00 99.00 m
6 Bed width U/S 8.00 8.00 m
7 Assume Bligh coefficient BLC 7.00
8 Water side slope 1 :1
9 Bed slope 1: 3000
10 Free board 0.50 0.50

u/s T.B.L. = 102.00 Drop


u/s F.S.L. = 101.50
1.00
Creast width= 0.75 d/s T.B.L. = 101.00
Creast level= 100.74 d/s F.S.L. = 100.50 F.B.

u/s CBL= 100.00 1.50


d/s CBL= 99.00
1.30
cistern level= 98.70
### #NAME? #NAME? #NAME?
#NAME? 1.50
2.90 1.20 R.L. = 97.50
0.30
4.10 2.00 2.00 2.00 3.10
section at A - A
2.30 2.00

13.20

1.20
8.00

0.50
2.00
1.50
3.00

Plan
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0 0

DESIGN

1.HYDRAULIC PARTICULARS: U/S D/s


1 Full supply diascharge u/s Q 10.00 10.00 Cumec < 15 Reactangular creast
2 Drop HL 1.00 m C = 1.835
3 Full supply level FSL 101.50 100.50 m
4 Full supply depth D 1.50 1.50 m
5 Bed level CBL 100.00 99.00 m
6 Bed width U/S 8.00 8.00 m
7 Assume Bligh coefficient BLC 7.00
8 Water side slope 1 :1
9 Bed slope 1: 3000

DESIGN

1. Length of crest
In case of vertical drop falls, the length of crest should be the same as the d.s. bed width of channel.

Crest length (L) = 8.00 m

2. Crest Level
Thus Q < 15 cumec hence Reactangular creast adopted
The discharge is given by Q = C x L x D(3/2) x (D/Bt)(1/6)
Q = 1.835 x L x D(3/2) x (D/Bt)(1/6)
Assuming crest width (Bt) = 0.80 m
10 = 1.835 x 8 x D3/2 x (D / 0.8 )1/6
D = 0.77 m
Velocity of approach with slope 1 : 1
Va = 10 /( 8 + 1.5 x 1.5 )
Va = 0.702 m/sec
Velocity Head ha = Va2/2g
= 0.025
u/s TEL = u/s FSL + velocity head
= 101.5 + 0.025
= 101.53 m
RL of crest = u/s TEL - D
= 101.53 - 0.77
= 100.73 m
Adopt crest level = 100.74 m
3. Shape of Crest
(a). Width of crest
Width of crest (Bt) = 0.55 * ÖD1
where D1 = height of crest in meter above d.s. bed
= 100.73 - 99
= 1.73 m
Bt = 0.55 X Ö 1.73
= 0.72 m
Keep width of crest = 0.75 m
(b). Width at base
Thickness at base = 0.5 x D1+D
= 0.5 X 1.73
= 0.87 m
Provide thickness at base = 0.90 m
Its top shall be capped with 20 cm thick cement concrete
4.Approach
For non - meter falls, the side walls may be splayed straight at an angle of 45 degree from the u.s. edge
of the crest and extending b 1.0 m in the earthen bank from the line of FSL

5. Downstream expansion
Side walls shall be straight and parallel up to the end of floor and shall be kept vertical

6. Upstream Protection

Brick/stone pitching in length 1.5 m should be laid on the u.s. bed sloping down towards
the crest 1:10 ; and three drain pipes of 15 cm diameter at the bed during the closure of the channel

7. Cistern Elements
Depth of cistern = dc / 3
= (q / g )
2 1/3
dc
q = 1.25 cumec/m
dc = 0.54 m
Thus Depth of cistern = 0.181 m But provided = 0.30 m
RL of cistern = d/s bed level - Depth of cistern
= 99.000 - 0.300 m
= 98.700 m
Provide RL of cistern = 98.700 m
Length of cistern = 3.8*dc + 0.415+ HL
= 3.8 X 0.542 + 0.415 + 1
= 3.475 m
Provide 4.0 m long cistern at RL 98.700 m.

8. Length of Impervious floor


Bligh's coefficient = 7
Maximum static head = Crest level - d/s bed level
= 100.74 - 99.00
= 1.74 m
Total floor length required = 7 X 1.74
= 12.18
Total floor lengthprovided = 12.20 m
Minimum d.s. floor length reqd. = 10.53*dc + 4.877-1.5* HL
= 10.53 X 0.54 + 4.877 - 1.5 X 1
= 9.08 m
Provide d.s. floor length reqd. = 9.10 m

Provide d.s. floor 9.10 m long and the balance 3.10 m under and upstream of the crest.

9 Floor thockness
Draw the hydrolic gradient line 1:7 for maximum static head i.e. when water headed upto the top of creast on
the u/s.and no water in down stream . The ordinate between the H.G. line and floor level would give the un balanced head .

The maximum uplift pressure in the u/s shall be counter balanced by the weight of water it self. Hence
theoretically there is no requirement of floor thickness in u.s. but minimum floor thickness of 0.30 m should be provided.

maximum unbalanced head at toe = 1.20 / 1.25 = 0.96 m


\ floor thickness required = say 1.00 m

maximum unbalanced head at 2.25 m from toe 0.90 / 1.25 = 0.72 m


\ floor thickness required say 0.70 m
say
maximum unbalanced head at 4.50 m from toe 0.61 / 1.25 = 0.49 m
\ floor thickness required say 0.50 m

maximum unbalanced head at 6.75 m from toe 0.31 / 1.25 = 0.25 m


\ floor thickness required say 0.25 m

10 Curtain wall :-
(a) Down stream curtain wall:-
The curtain wall at d/s end of floor should be 45 cm thick and depth d/2 + 0.6 m to a minimum 1.00 m
\ Depth of curtain wall at the end of floor = 1.50 / 2 = 0.75 + 0.6 = 1.35 say 1.40 m

(b) Up stream curtain wall


The curtain wall at d/s end of floor should be 45 cm thick and depth d/3 + 0.6 m to a minimum 1.00 m
\ Depth of curtain wall at the end of floor = 1.50 / 2 = 0.5 + 0.6 = 1.10 say 1.10 m

11 D.S. protection :-
(a) Bed protection
Length of bed protection = 3 x d3 3 x fsd = 3.00 x 1.50 = 4.50 m

12 Side protection :-
Length = same as for bed protection.= 4.50 m

pk_nandwana@yahoo.co.in
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0 0
Depth of sheet piles from scour considerations :

U/S sheet pile :


Discharge intensity 'q' = 1.25 cumec/m
Depth of scour 'R' = 1.36{q2/f}1/3 = 1.58 m
Anticipated scour = 1.25 R = 1.97 m
R.L. of the bottom of scour hole = #NAME? - 1.97
= #NAME? m
Minimum depth of u/s cutoff below bed level = yd/3+0.60 (where yd is water depth im m at u/s)
= #NAME? + 0.60
= #NAME? m
Provided u/s cut off wall depth = ### m
RL of the bottom of sheet pile = ### m
Provide sheet pile bottom elevation at = #NAME? m
If U/S sheet bottom El. is above Cistern level then provide El.= #NAME? m

D/S sheet pile :


Discharge intensity 'q' = 1.25 cumec/m
Depth of scour 'R' = 1.36{q2/f}1/3 = 1.58 m
Anticipated scour = 1.5 R = 2.37 m
R.L. of the bottom of scour hole = 100.50 - 2.37
= 98.13 m
Minimum depth of d/s cutoff below bed = yd/2 + 0.60 (where yd is water depth in m at d/s )
= 0.75 + 0.60
= 1.35 m
Provided d/s cut off wall depth = 1.50 m
RL of bottom of sheet pile = d/s bed level-depth of cutoff
Sheet pile bottom elevation = 99.00 - 1.50 = 97.50 m
Provide sheet pile bottom elevation= 97.50 m

Total floor length and exit gradient


The exit gradient should be checked for the condition when there is no water in the stilling basin
when high flood is passing in the river; this provides the worst static condition.

Maximum static head = 100.74 - 99.00


= 1.74 m
depth of d/s cut off wall d = 1.50 m
H 1
GE = ------X ------
d pÖl
1 GE*d
------------- = ----------- = 0.14
pÖl H
From Khosla's exit gradient curve a = 8.76
Hence requirement of total floor length b= a X d
= 8.76 X 1.50 = 13.14 m
Provided total floor length = 13.20 m

The floor length shall be provided as below:-


d.s floor length including cistern = 9.10 m
Width of the crest at base = 0.90 m
Upstream floor = 3.20 m
Total = 13.20 m
Pressure calculations
Let the u/s floor thickness = 0.30 m
and downstream near cutoff wall = 0.30 m.

(i) Upstream sheet pile


d = 100.00 - #NAME?
= #NAME? m
b = 13.20 m
#NAME?
d/b = = #NAME? '= 1/ a
13.20
From Khosla's Pressure curves
l = #NAME?
fC1 = #NAME? %
fD1 = #NAME? % fD1 - fC1 = ### %
Correction for floor thickness = #NAME? (+ ve)
Correction for interference due to d/s sheet pile line, C = 19ÖD/b'.(d+D)/b

where, D = 99.00 - 97.50 = 1.50 m


d = 100.00 - #NAME? = ### m
b' = 12.80 m
b = 13.20 m
Then, C = #NAME? (+ ve)
fC1 corrected = #NAME? + #NAME? + ###
= ### %
(ii) Downstream sheet pile
d = 99.00 - 97.50
= 1.50 m
b = 13.20 m
d 8.00
= = 0.11 = 1/a
b 13.20
From Khosla's Pressure curves
l = 4.93
fE1 = 29.75 %
fD1 = 20.64 % fE1 - fD1 = 9.11 %
Correction for floor thickness = 1.82 (- ve)
Correction for interference due to u/s sheet pile line, C = 19ÖD/b'.(d+D)/b
where, d = 99.00 - 97.50 = 1.50 m
D = 100.00 - #NAME? = ### m
b' = 12.80 m
b = 13.20 m
than, C = #NAME? (- ve)
fE1 corrected = 29.75 - 1.82 - ###
= #NAME? %
Downstream Floor thickness
(i) At 0.00 m from toe of creast wall to 2.00 m

8.70
% pressure = #NAME? + X ### - ###
12.40
= #NAME? %
#NAME? x 1.74
Unbalanced head = = ### m
100.00
Floor thickness required = #NAME? / 1.25 = ### m
Provide floor thickness = #NAME? m

(ii) At 2.00 m from toe of creast wall and upto 4.00 m


6.70
% pressure = #NAME? + X ### - ###
12.40
= #NAME? %
#NAME? x 1.74
Unbalanced head = = ### m
100.00
Floor thickness required = #NAME? / 1.25 = ### m

Provide floor thickness = #NAME? m


(iii) At 4.00 m from toe of creast wall and upto 6.00 m
4.70
% pressure = #NAME? + X ### - ###
12.40
= #NAME? %
#NAME? x 1.74
Unbalanced head = = ### m
100.00
Floor thickness required = #NAME? / 1.25 = ### m
Provide floor thickness = #NAME? m
(iv) At 6.00 m from toe of creast wall and upto 9.10
2.70
% pressure = #NAME? + X ### - ###
12.40
= #NAME? %
#NAME? x 1.74
Unbalanced head = = ### m
100.00
Floor thickness required = #NAME? / 1.25 = ### m
Provide floor thickness = #NAME? m
Downstream Protection
(a). Bed Protection
Length of bed protection = 3*d/s water depth
= 3.00 x 1.50
= 4.50 m
This shall consist of R.R.Stone dry pitching
This shall be protected by a toe wall 0.4 m wide R.R.sotne masonry and of depth equal to 0.80m.

(b). Side protection


Length of bed protection = 3*d/s water depth
= 3.00 x 1.50
= 4.50 m
Provide dry stone pitching 0.2 m thick on sides, resting on wall 0.4m wide and of the
same depth as other toe walls.
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0 0

3.00

1.50

0.30
2.00

1.00
A

0.5 :1
3.00
2.00

2.00
0.50 0.50
100.000

creast level = 100.740


98.700
0.500
1.500

102.000

X- section at A-A
###

8.00

8.00

Cistern level=
0.00

12.30
B.W.
FSD
CBL
TBL
F.B.

TBL
0.50 0.50

2.00
1.50

3.00
0.50
A 2.00
6.80

0.80 2.30
CANAL DATA
U/S D/S
1 NSL 100.000 100.000 m
2 CBL 100.000 99.000 m
TBL 102.000 3 FSL 101.500 100.500 m
2.00 4 TBL 102.000 101.000 m
U/S FSL 101.500 0.75 TBL 101.000 5 B.W. 8.00 8.00 m
Creast level 100.740 D/S FSL 100.500 6 FSD 1.500 1.500 m
7 F.B. 0.500 0.500 m
u/sCBL 100.000
1.50 8 Discharge 10.000 10.000 cum
2.04 d/sC.B.L. 99.000
1.30
0.90 cistern level= 98.700
###
### RL #NAME?
### ### RL #NAME?
1.50
### R.L. #NAME?
R.L #NAME? R.L. #NAME? R.L. 97.800
R.L #NAME? 0.30 R.L. 97.500
0.70
2.90 1.20 2.00 2.00 2.00 3.10
4.10 9.10
(Drawing not to scale)
cum
DETAIED ESTIMATE
NAME OF WORK:-CONSTRUCTION OF sharda type FALL a 0 0

SNO. ITEM QTY


1 Earth work in excavation including loading
unloading disposal and dressing of excavated
earth within intial lead of 50m and lift upto
1.5m in dry or moist including dressing of
excavted area with cost of dewatering
wherever required and all applicable taxes
and levies etc complete in all respect

A. Hard soil mixed with kankar, boulder


morrum
D/S cistern 1 0.00 0.00 0.00 0.00
D/S curtain wall 1 0.00 0.00 0.00 0.00
U/S impervious floor 1 0.00 0.00 0.00 0.00
U/S curtain wall 1 0.00 0.00 0.00 0.00
Wing wall A-A 2 2.60 0.00 0.00 0.00
Side wall B-B 2 0.00 2.30 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00 0.00
Total 0.00
A. E/w in hard Dence soil 25 % qty taken = 0.00
cum
2 Earth work in excavation including loading
unloading, disposal and dressing of
excavated rock within initial lead of 50 m and
lift upto 1.50 m indry or moist including
dressing of excavated area wirh cost of
dewatering wherever required and all
applicable taxes and . levies etc. complete in
all respect.
(A)Soft disintegreted rock. 25 % qty taken = 0.00
(B)Hard rock not rquirding blasting 25 % qty taken = 0.00
© Phylites & other hard rockrequiring nominal blasting 25 % qty taken = 0.00
cum
3 Cement concrete M-10(1:3:6) well mixed and
laid in position complete including all leads of
all construction material including curing and
finishing having well graded broken stone
aggregate of complete as per technical
specification
(a)maximum size upto 20mm
Wing wall A-A 2 0.00 0.00 0.00 0.00
Side wall B-B 2 0.00 2.30 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00 0.00
Total 0.00
4 Cement concrete M-20(1:1.5:3) well mixed for 1 nos 0.00
and laid in position complete including all cum
leads of all construction material including
curring and finishing having well graded
broken stone aggregate of maximum size
upto 20mm complete as per technical
specification

D/S cistern 1 0.00 0.00 0.00 0.00


D/S curtain wall 1 0.00 0.00 0.00 0.00
D/S curtain wall 1 0.00 0 0.00 0.00
U/S impervious floor 1 0.00 0.00 0.00 0.00
U/S curtain wall 1 0.00 0.00 0.00 0.00
coping 2 0.00 0.00 0 0.00
creast top 1 0.00 0.00 0 0.00
Total 0.00
5 Random rubble stone masonry (using R,R. for 1 nos 0.00
stone where 75% stone to be not less than cum
15 cm. in any direction and weighing not less
than 23 kg. for foundation including curing
all leads of all construction material and all
taxes and with inial lift delift 5m from ground
level etc complete
In cement sand mortar 1:5
Creast wall 1 0.00 0.00 0.00 0.00
Wing wall A-A 2 0.00 0.00 0.00 0.00
Side wall B-B 2 0.00 0.00 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00 0.00
Total 0.00
for 1 nos 0.00
6 Random rubble stone masonry (using R,R. cum
stone where 75% stone to be not less than
15 cm. in any direction and weighing not less
than 23 kg. for superstructure including
curing all leads of all construction material
and all taxes and with inial lift delift 5m from
ground level etc complete
In cement sand mortar 1:5
Wing wall A-A 2 0.00 0.00 0.00 0.00
Side wall B-B 2 0.00 0.00 0.00 0.00
D/S return 2 0.00 0.00 0.00 0.00
Total 0.00
7 Plaster in cement sand mortar 1:3 including for 1 nos 0.00
raking of joints smooth finishing & curing etc. cum
including all leads of all construction material
complete of thickness 20 mm.
Creast wall 1 0.00 0.00 0.00
Wing wall A-A 2 0.00 0.00 0.00
Side wall B-B 2 0.00 0.00 0.00
Side wallC-C 2 0.00 0.00 0.00
D/S return 2 0.00 0.00 0.00
total 0.00
for 1 nos 0.00

8 Flush and ruled pointing on stone masonry


including raking of joint and curing etc.
complete including all leads of all construction
materials in mortar ratio cement sand mortar
(1:3)
Rate as BSR 2006 page 42 item 15c

Wing wall A-A out side 2 0.00 0.00 0.00


Side wall B-B out side 2 0.00 0.00 0.00
Side wallC-C out side 2 0.00 0.00 0.00
D/S return out side 2 0.00 0.00 0.00
total 0.00
for 0 nos 0.00
9 Rehandling excavated earth ( excluding sqm
rock) in trenches, pilinth side of foundations
etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering including cost of water
including loading unloading wherever
required with cost of dewatering wherever
required and all applicable taxes .
as per item no 1 0.00
for 1 nos 0.00
cum
29 368 60 64 45 64
ABSTRACT OF COST
NAME OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0 0

Sno. ITEM Qtty Rate Unit Amount


1 Earth work in excavation including loading unloading disposal
and dressing of excavated earth within intial lead of 50m and lift
upto 1.5m in dry or moist including dressing of excavted area
with cost of dewatering
Rate as per BSR 2008 page 13 item 1
A. Hard soil mixed with kankar, boulder morrum cum 47.00 cum #VALUE!

2 Earth work in excavation including loading unloading, disposal


and dressing of excavated rock within initial lead of 50 m and lift
upto 1.50 m indry or moist including dressing of excavated area
wirh cost of dewatering wherever required and all applicable
taxes and . levies etc. complete in all respect.
Rate as per BSR 2008 page 13 item 2

(A)Soft disintegreted rock. 0.00 78.00 cum 0.00


(B)Hard rock not rquirding blasting 0.00 121.00 cum 0.00
© Phylites & other hard rockrequiring nominal blasting 0.00 166.00 cum 0.00

3 Cement concrete M-10(1:3:6) well mixed and laid in position


complete including all leads of all construction material including
curring and finishing having well graded broken stone aggrgate 0.00 2105.00 cum 0.00
of complete as per technical specification
(a)maximum size upto 20mm
Rate as per BSR 2008 page 22 item 6d

4 Cement concrete M-20(1:1.5:3) well mixed and laid in position


complete including all leads of all construction material including
curring and finishing having well graded broken stone aggrgate 0.00 2951.00 cum 0.00
of maximum size upto 20mm complete as per technical
specification
Rate as per BSR 2008 page 22 item 4d

5 Random rubble stone masonry (using R,R. stone where 75%


stone to be not less than 15 cm. in any direction and weighing
not less than 23 kg. for foundation including curring all leads of 0.00 1618.00 cum 0.00
all construction material and all taxes and with inial lift delift
In cement sand mortar 1:5
Rate as per BSR 2008 page 29 item 1e

6 Random rubble stone masonry (using R,R. stone where 75%


stone to be not less than 15 cm. in any direction and weighing
not less than 23 kg. for superstructure including curring all 0.00 1660.00 cum 0.00
leads of all construction material and all taxes and with inial lift
delift
In cement sand mortar 1:5
Rate as per BSR 2008 page 29 item 1e+item13a
7 Plaster in cement sand mortar 1:3 including raking of joint
smooth finishing & curing etc. including all leads of all 0.00 94.00 sqm 0.00
construction material complete of thickness 20 mm.
Rate as per BSR 2008 page 34 item 4b

8 Flush and ruled pointing on stone masonry including raking of


joint and curing etc. complete including all leads of all 0.00 52.00 sqm 0.00
construction materials in mortar ratio cement sand mortar (1:3) sqm
Rate as BSR 2008 page 35 item 15c

9 Rehandling excavatedearth ( excluding rock) in trenches, pilinth


side of foundation etc. in layers not exceeding 20cm in depth,
consolidation each ldeposited layer by ramming and watering 0.00 52.00 cum 0.00
including cost of water including loading unloading wherever
required with cost of dewatering wherever required and all
applicable taxes .

Rate as BSR 2008 page 14 item 8c Total #VALUE!


3 % contengcy #VALUE!
G total #VALUE!
Say Rs. ### lacs
29 320 60 64 45 64
SCHEDULE - G
OF WORK:-CONSTRUCTION OF sharda type FALL at R.D. 0 0

1 NIT No. 7/2008-09 S.No.32


2 NIT Amount Rs. #VALUE! lacs
3 Earnest money 1.Regd. Contractor @1/2%Rs. #VALUE!
2.Other Contractor @ 2%Rs. #VALUE!
4 Tender cost Rs. 200
5 Date of Selling Tender 15.09.08 to 22.09.08
6 Date of Receiving Tender 24.09.08 upto 3.00 PM
7 Date of Opening Tender 24.09.08 At 4.00 PM
8 Time of completion 4 Month
9 B.S.R. Irrigation BSR 2008

Sno. ITEM Qtty Rate Unit Amount


1 Earth work in excavation including loading unloading
disposal and dressing of excavated earth within intial
lead of 50m and lift upto 1.5m in dry or moist including
dressing of excavted area with cost of dewatering
Rate as per BSR 2008 page 13 item 1
A. Hard soil mixed with kankar, boulder morrum cum 47.00 cum #VALUE!

2 Earth work in excavation including loading unloading,


disposal and dressing of excavated rock within initial
lead of 50 m and lift upto 1.50 m indry or moist including
dressing of excavated area wirh cost of dewatering
wherever required and all applicable taxes and . levies
etc. complete in all respect.
Rate as per BSR 2008 page 13 item 2

(A)Soft disintegreted rock. 0.00 78.00 cum 0.00


(B)Hard rock not rquirding blasting 0.00 121.00 cum 0.00
© Phylites & other hard rockrequiring nominal blasting 0.00 166.00 cum 0.00

3 Cement concrete M-10(1:3:6) well mixed and laid in


position complete including all leads of all construction
material including curring and finishing having well 0.00 2105.00 cum 0.00
graded broken stone aggrgate of complete as per
technical
(a)maximumspecification
size upto 20mm
Rate as per BSR 2008 page 22 item 6d

4 Cement concrete M-20(1:1.5:3) well mixed and laid in


position complete including all leads of all construction
material including curring and finishing having well 0.00 2951.00 cum 0.00
graded broken stone aggrgate of maximum size upto
20mm complete as per technical specification
Rate as per BSR 2008 page 22 item 4d

5 Random rubble stone masonry (using R,R. stone where


75% stone to be not less than 15 cm. in any direction
and weighing not less than 23 kg. for foundation 0.00 1618.00 cum 0.00
including curring all leads of all construction material
including curring all leads of all construction material
and all taxes
In cement andmortar
sand with inial
1:5 lift delift
Rate as per BSR 2008 page 29 item 1e

6 Random rubble stone masonry (using R,R. stone where


75% stone to be not less than 15 cm. in any direction
and weighing not less than 23 kg. for superstructure 0.00 1660.00 cum 0.00
including curring all leads of all construction material
and all taxes and with inial lift delift
In cement sand mortar 1:5
Rate as per BSR 2008 page 29 item 1e+item13a

7 Plaster in cement sand mortar 1:3 including raking of


joint smooth finishing & curing etc. including all leads of 0.00 94.00 sqm 0.00
all construction material complete of thickness 20 mm.
Rate as per BSR 2008 page 34 item 4b

8 Flush and ruled pointing on stone masonry including


raking of joint and curing etc. complete including all 0.00 52.00 sqm 0.00
leads of all construction materials in mortar ratio cement sqm
sand mortar
Rate as BSR(1:3)
2008 page 35 item 15c

9 Rehandling excavatedearth ( excluding rock) in


trenches, pilinth side of foundation etc. in layers not
exceeding 20cm in depth, consolidation each ldeposited 0.00 52.00 cum 0.00
layer by ramming and watering including cost of water
including loading unloading wherever required with cost
of dewatering wherever required and all applicable
taxes .
Rate as BSR 2008 page 14 item 8c Total #VALUE!
Say Rs. #VALUE! lacs
DETERMINATION OF CONJUGATE DEPTH
(Refer IS 4997-1968)

HL/DC = 0.231 0.235 0.240 0.244 0.249 0.254 0.259 0.264 0.269
D1/DC = 0.6 0.598 0.596 0.594 0.592 0.59 0.588 0.586 0.584

HL = #NAME?
q = 1.25
DC = 0.54 Sequent depth determination
HL/DC = #NAME? 0.7

D1/DC = #NAME?
D1 = #NAME? 0.6

D2 = #NAME? 0.5
Ef1 = #NAME?
Ef2 = #NAME? 0.4
D
D1/DC
0.3

0.2
#NAME?
0.1

0
0 10 20 30 40 50 60
HL/DC

COEFFICIENT OF DISCHARGE

VALUES OF COEFFICIENT VALUES OF h d / H d


Cs / C h d / Hd
RATIO OF MODIFIED COEFFICIENT TO FREE DISCHARGE COEFFICIENT Cs / C

Y-AXIS X-AXIS

0.000 0.000
0.460 0.050
0.680 0.100
0.800 0.150
0.860 0.200
0.905 0.250 RATIO OF DISCHARGE COEFFICIENTS DUE TO TAILWATER EFFECT
0.930 0.300
0.950 0.350
0.965 0.400
0.975 0.450
1
0.980 0.500 f(x) = - 118.8555361122x^6 + 334.5618522008x^5 - 376.0978919526x^4 + 216.52231639x^3 - 68.3596523
R² = 0.9996402935
0.985 0.550 0.8

0.6

0.4

0.2

0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RATIO OF MODIFI
1
f(x) = - 118.8555361122x^6 + 334.5618522008x^5 - 376.0978919526x^4 + 216.52231639x^3 - 68.3596523
R² = 0.9996402935
0.8

0.990 0.600 0.6


0.998 0.650
0.999 0.700 0.4

1.000 0.750 0.2


1.000 0.800
0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
h d / He = 0.000 DEGREE OF SUBMERGENCE hd / He

Cs / C = 0.004
Cs = 0.007

KHOSLA CURVE
Value of Khosla curve
1/a =d/b fD' fD fE
0 0 0 0 80
0.1 14 19 29
0.2 19 27 40 70
0.3 21 31 47
0.4 23 34 53 60
Scale for f = P/Hx100

0.5 25 37 57.5
0.6 26.5 40 62
50
0.7 27 42 65
40
0.8 28.5 43.5 68.5
0.9 29.5 44 71 30
1 30 44.5 74
20
10

0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Value of 1/a =d/b

Depressed floor
w.s. w.s.
H b
d b
fE = 1/Õcos-1(l-2)l
fD = 1/Õcos-1(l-1)l Sheet pile at end
fc' = 100-fE
fD; = 100-fD
fD' = 100-fD; (Depressed floor)
fD' = fD-2/3(fE-fD)+3/a^2 (Depressed floor)
0.274 0.279 0.284 0.290 0.295 0.301 0.306 0.312 0.318 0.324
0.582 0.58 0.578 0.576 0.574 0.572 0.57 0.568 0.566 0.564

ermination

D1/Dc

40 50 60

DUE TO TAILWATER EFFECT

78919526x^4 + 216.52231639x^3 - 68.3596523269x^2 + 11.8271760909x + 0.0038481177

0.7 0.8 0.9


78919526x^4 + 216.52231639x^3 - 68.3596523269x^2 + 11.8271760909x + 0.0038481177

0.7 0.8 0.9

fE

fD

fD'

6 0.7 0.8 0.9 1

w.s.

b
d

heet pile at end


0.330 0.336 0.342 0.348 0.355 0.361 0.368 0.375 0.382 0.389
0.562 0.56 0.558 0.556 0.554 0.552 0.55 0.548 0.546 0.544
0.396 0.403 0.410 0.417 0.425 0.433 0.441 0.448 0.456 0.465
0.542 0.54 0.538 0.536 0.534 0.532 0.53 0.528 0.526 0.524
0.473 0.481 0.490 0.499 0.508 0.517 0.526 0.535 0.545 0.554
0.522 0.52 0.518 0.516 0.514 0.512 0.51 0.508 0.506 0.504
0.564 0.574 0.584 0.594 0.605 0.616 0.626 0.637 0.648 0.660
0.502 0.5 0.498 0.496 0.494 0.492 0.49 0.488 0.486 0.484
0.671 0.683 0.695 0.707 0.719 0.732 0.745 0.758 0.771 0.784
0.482 0.48 0.478 0.476 0.474 0.472 0.47 0.468 0.466 0.464
0.798 0.812 0.826 0.840 0.855 0.870 0.885 0.900 0.916 0.932
0.462 0.46 0.458 0.456 0.454 0.452 0.45 0.448 0.446 0.444
0.948 0.964 0.981 0.998 1.015 1.033 1.051 1.069 1.087 1.106
0.442 0.44 0.438 0.436 0.434 0.432 0.43 0.428 0.426 0.424
1.125 1.145 1.165 1.185 1.206 1.227 1.248 1.270 1.292 1.314
0.422 0.42 0.418 0.416 0.414 0.412 0.41 0.408 0.406 0.404
1.337 1.360 1.384 1.408 1.433 1.458 1.484 1.510 1.536 1.563
0.402 0.4 0.398 0.396 0.394 0.392 0.39 0.388 0.386 0.384
1.591 1.618 1.647 1.676 1.706 1.736 1.767 1.798 1.830 1.862
0.382 0.38 0.378 0.376 0.374 0.372 0.37 0.368 0.366 0.364
1.895 1.929 1.964 1.999 2.035 2.071 2.108 2.146 2.185 2.225
0.362 0.36 0.358 0.356 0.354 0.352 0.35 0.348 0.346 0.344
2.265 2.306 2.348 2.391 2.435 2.479 2.525 2.571 2.619 2.667
0.342 0.34 0.338 0.336 0.334 0.332 0.33 0.328 0.326 0.324
2.716 2.767 2.818 2.871 2.925 2.980 3.036 3.093 3.151 3.211
0.322 0.32 0.318 0.316 0.314 0.312 0.31 0.308 0.306 0.304
3.272 3.335 3.399 3.464 3.531 3.599 3.669 3.741 3.814 3.889
0.302 0.3 0.298 0.296 0.294 0.292 0.29 0.288 0.286 0.284
3.965 4.044 4.124 4.206 4.290 4.376 4.464 4.554 4.647 4.742
0.282 0.28 0.278 0.276 0.274 0.272 0.27 0.268 0.266 0.264
4.839 4.939 5.041 5.145 5.253 5.363 5.476 5.591 5.710 5.832
0.262 0.26 0.258 0.256 0.254 0.252 0.25 0.248 0.246 0.244
5.958 6.086 6.218 6.354 6.493 6.636 6.784 6.935 7.090 7.250
0.242 0.24 0.238 0.236 0.234 0.232 0.23 0.228 0.226 0.224
7.415 7.584 7.759 7.938 8.123 8.313 8.509 8.711 8.919 9.133
0.222 0.22 0.218 0.216 0.214 0.212 0.21 0.208 0.206 0.204
9.355 9.583 9.818 10.061 10.312 10.572 10.839 11.116 11.402 11.698
0.202 0.2 0.198 0.196 0.194 0.192 0.19 0.188 0.186 0.184
12.004 12.320 12.648 12.987 13.339 13.703 14.080 14.472 14.878 15.300
0.182 0.18 0.178 0.176 0.174 0.172 0.17 0.168 0.166 0.164
15.738 16.193 16.666 17.158 17.669 18.201 18.756 19.334 19.936 20.564
0.162 0.16 0.158 0.156 0.154 0.152 0.15 0.148 0.146 0.144
21.219 21.904 22.619 23.366 24.148 24.967 25.824 26.723 27.666 28.656
0.142 0.14 0.138 0.136 0.134 0.132 0.13 0.128 0.126 0.124
29.695 30.788 31.939 33.150 34.426 35.773 37.195 38.698 40.288 41.972
0.122 0.12 0.118 0.116 0.114 0.112 0.11 0.108 0.106 0.104
43.757 45.652 47.666 49.808 52.091 54.526
0.102 0.1 0.098 0.096 0.094 0.092