ARC WILSON M.

RIEGO October 1, 2013


BSEE/ 5TH YEAR ENGR. DEL ROSARIO

CLASS A (LOT AREA 350m)


COMPUTATION OF LOADS:

A) COOKING LOADS

1-10KW RANGE
2-12KW RANGE 17,000 VA = 17000 VA
1-11KW RANGE
2-8KW RANGE
1-5KW RANGE (16+5KW)0.55 = 11550 VA
2-3KW OVEN (2X3KW) 0.75 = 4500 VA

B) AIRCONDITIONING UNITS

7-2HP ACU 7x12x230 = 19320 VA

C) LIGHTING LOADS

350m 350x24 = 8400VA

D) OTHER LOADS

5-3KW WATER HEATER 5x3KW = 1500VA


1-1.5 WATER PUMP 1x230x10 = 2300VA
LAUNDRY CIRCUIT = 1500VA
SMALL APLLIANCES = 1500VA
20,300VA

DEMAND FACTOR (40%) = 20300VAX0.40 = 8120VA

TOTAL COMPUTED LOAD = 17000+11550+4500+19320+8400+8120


= 68,890VA

IFL = 68890+(.25x12x230)
230
= 302.52 A
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

CLASS C (LOT AREA 150m)


COMPUTATION OF LOADS:

A) LIGHTING LOADS

149m x24 = 3576VA


LAUNDRY CIRCUIT = 1500VA
SMALL APPLIANCES = 1500VA
6576VA

DEMAND FACTOR (35%)

@ 1ST 3000VA @(100%) 3000x1 = 3000VA


Remainder @ 35% (6576-3000)0.35 =1252 VA

B) OTHER LOADS

2-2HP ACU = 2x12x230 =5520VA


3-3KW WATER HEATER = 3x3000VA =9000VA
2-8KW RANGE =
2-5KW RANGE = (16+10+4).45 =13500VA
1-4KW OVEN =
1-1HP WATER PUMP = 1x8x230 =1840VA
1-10KW OVEN =
2-12KW RANGE = =14000VA

TOTAL COMPUTED LOAD = 3000+1252+5520+9000+13500+1840+14000

= 48,112 VA

IFL = 48112+(.25x12x230)
230
= 121.18A
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

CLASS B (LOT AREA 250m)


COMPUTATION OF LOADS:

A) COOKING LOADS

2-2.5KW OVEN (2X2.5KW).75 =3750VA


2-8KW W.M. COOKING
1-5KW RANGE (16+5KW).55 =11550VA
2-12KW RANGES =1100VA

B) AIR-CONDITIONING UNITS

3-2HP ACU 3x12x230 =8280VA


2-1.5HP ACU 2x10x230 =4600VA

C) LIGHTING LOAD

250m 250x24 =6000VA

D) OTHER LOADS

5-5KW WATER HEATER 5x5KW =25000VA


1-1.5HP WATER PUMP 1x10x230 =2300VA
1-5KW CLOTHS DRIER 1X5KW =5000VA
SMALL APPLIANCES LOAD =1500VA
LAUNDRY CIRCUITS =1500VA
35,300VA

DEMAND FACTOR (40%) = 35,300x0.4 =14120VA

TOTAL COMPUTED LOAD = 14120+6000+4600+8280+1100+11550+3750


= 59,300 VA

IFL = 59300+(.25x12x230)
230
= 260.82 A

CLASS D (LOT AREA 100m)


ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

COMPUTATION OF LOADS:

A) LIGHTING LOADS

100m x24 = 2400VA


LAUNDRY CIRCUIT = 1500VA
SMALL APPLIANCES = 1500VA
5400VA

DEMAND FACTOR (35%)

@ 1ST 3000VA @(100%) 3000x1 = 3000VA


Remainder @ 35% (5400-3000)0.35 =840 VA

B) OTHER LOADS

2-2HP ACU = 2x12x230 =5520VA


2-3KW WATER HEATER = 2x3000VA =6000VA
2-5KW RANGE = (10+4).45 =6300VA
1-4KW OVEN =
1-1HP WATER PUMP = 1x8x230 =1840VA

TOTAL COMPUTED LOAD = 3000+840+5520+6000+6300+1840

= 23500VA

IFL = 23500+(.25x12x230)
230
= 105.17 A
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

TRANSFORMER CAPACITY DEMAND

TRANSFORMER 1
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER2
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER3
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 4
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 5
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 6
Max. Demand = (23.5 x 10) / 1.45 = 162.07 KVA
Use: 167 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER7
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

TRANSFORMER8
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER9
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER 10
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER11
Max. Demand = (23.5 x 12) / 1.45 = 243.10 KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER12
Max. Demand = (23.5 x 10) / 1.45 = 162.07 KVA
Use: 167 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER13
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER14
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER15
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER16
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Use: 333 KVA, 1Ø Transformer


Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER17
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER18
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER19
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)

TRANSFORMER20
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER21
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA

Use: 333 KVA, 1Ø Transformer


Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER22
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER23
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Supplies: Block 1 (1-6), Block 5 (23-28)


TRANSFORMER24
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER25
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER26
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER27
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER28
Max. Demand = (48.112 x 10) / 1.45 = 331.81 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER29
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER30
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER31
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER32
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA


Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER33
Max. Demand = (59.3 x 8) / 1.45 = 327.17 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER34
Max. Demand = (59.3 x 6) / 1.45 = 245.38KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER35
Max. Demand = (59.3 x 6) / 1.45 = 245.38KVA
Use: 250 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER36
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER37
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER38
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER39
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER40
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Supplies: Block 1 (1-6), Block 5 (23-28)


TRANSFORMER41
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER42
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER43
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER44
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER45
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER36
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER46
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
TRANSFORMER47
Max. Demand = (68.84 x 7) / 1.45 = 332.33 KVA
Use: 333 KVA, 1Ø Transformer
Supplies: Block 1 (1-6), Block 5 (23-28)
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:

A5
Php Php
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' dia. Hole 2
6.85 13.70
Php Php
insulator, suspension, 6'', clevis type 2
90.75 181.50
Php Php
clamp, deadend loop, #6 to #2/0 ACSR 1
33.00 33.00
Php Php
Bolt, Oval Eye, 5/8" X 12" 2
59.45 118.90
7.62/13.2 KV. PRIMARY, 1-
Php Php
PHASE Anchor tape 1
14.31 14.31
DEADEND (SINGLE)
Php Php
Clevis, Secondary Swinging Without Spool 1
61.35 61.35
Php Php
Clamp, Loop Deadend, #6 to #2/0 ACSR 2
36.36 72.72
Php Php
Insulator, Spool, 1-3/4", ANSI Class 53 - 2 1
16.21 16.21
Php Php
Nut, Lock, Mf Type, 5/8" 2
7.08 14.16
Sub Php
Total 525.85
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:

G9
Php Php
Bolt, Machine, 5/8" X 10" 2
28.81 57.62
Php Php
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' dia. Hole 2
6.85 13.70
Php Php
Connector, Compression, 4
32.88 131.52
Php Php
Cutout And Arrester Combination 1
4,700.00 4,700.00
Php Php
Cutout Fuse 1
500 500
7.62/13.2 KV SINGLE Php Php
Connector, Split Bolt 1
PHASE TRANSFORMER 100.60 100.60
AT 1- PHASE TANGENT Php Php
Wire, Grounding, Aluminum Alloy, 3 Strand, #4 AWG (Ft.) 6
5.99 35.94
Php Php
Transformer, Pole Type, CSP, 10 KVA 25, 1
152.75 152.75
Php Php
Clamp, Hot Line, #2 - #4/0 ACSR Main to #2 - #4/0 1
259.15 259.15
Lead , Duples Poly. 4 A C S R for 10 KVA, 2 A C SR for 15 Php Php
4
and 25 KVA 500 2000
Php Php
Nut, Lock, Mf Type, 5/8" 2
7.08 14.16
Php Php
Armor Rod, Tapping 1
28.35 28.35
Php
Sub Total
5,493.79
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:

C22X
Php Php
Insulator, Pin Type, Porcelain, ANSI Class 55 - 3 8
87.75 702.00
Php Php
Pin, Pole Top, Channel, 1" Thread, 20" Long 12
109.94 1,319.28
Php Php
Bolt, Machine, 5/8" X 12" 8
33.69 269.52
Php Php
Bolt, Machine, 5/8" X 16" 1
35.75 35.75
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' dia. Php Php
8
Hole 6.85 54.80
Php Php
Bolt, Oval Eye, 5/8" X 12" 1
59.76 59.76
Php Php
7.62/13.2 KV 3-PHASE Armor Tape 3.936
14.31 56.32
CROSSARM
Php Php
CONSTRUCTION Clamp, Hot Line, #2 - #4/0 ACSR Main to #2 - #4/0 3
259.15 777.45
SINGLE PHASE JUCTION
Php Php
AT 0 - 5 ANGLE Jumpers , 4 AWG, 3 Strand Aluminum Alloy 1
5.99 5.99
Php Php
Shackle, Anchor, Forged Steel, Galvanized 4
80.19 320.76
Php Php
Insulator, Spool, 3", ANSI Class 53 - 4 2
31.27 62.54
Php Php
Nut, Eye, 5/8" Conventional 4
59.58 238.32
Php Php
clamp, deadend loop, #6 to #2/0 ACSR 4
33.00 132.00
Php Php
Armor Rod, Tapping 3
28.35 85.05
Php Php
Clevis, Secondary Swinging Without Spool 2
200.00 400.00
Php
Sub Total
4,519.54
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:


C1-1
Php
Insulator, Pin Type, Porcelain, ANSI Class 55 - 3 6 Php 526.50
87.75
Php
Pin, Pole Top, Channel, 1" Thread, 20" Long 2 Php 219.88
109.94
Php
Bolt, Machine, 5/8" X 12" 2 Php 67.38
33.69
washer, square, flat, 2¼'' x 2¼'' x 3/16'', 13/16'' Php
11 Php 75.35
dia. Hole 6.85
Php
Pin, Crossarm, Steel, 5/8" X 10-3/4" 4 Php 375.84
93.96
Php
Crossarm, Wood, 3-1/2" X 4-1/2" X 8' 2 Php 2,800.00
1,400.00
Php
Bolt, Carriage 3/8" X 4-1/2" 4 Php 29.64
7.41
Php
Lag, Screw, 1/2" X 4" 2 Php 22.66
7.62/13.2 KV THREE 11.33
PHASE CROSSARM Php
Bolt, Double Arming, 5/8" X 18" 3 Php 150.90
CONSTRUCTION 50.30
DOUBLE PRIMARY Php
Bolt, Single Upset, 5/8" X 14" 1 Php 55.17
SUPPORT AT 0° TO 5° 55.17
ANGLE Php
Rod, Armor, Preformed For #2 ACSR, Single Set 1 Php 182.38
182.38
Rod, Armor, Preformed For #2 ACSR, Double Php
3 Php 888.90
Set 296.30
Php
Nut, Lock, Mf Type, 3/8" 13 Php 77.74
5.98
Php
Nut, Lock, Mf Type, 5/8" 4 Php 28.32
7.08
Php
Brace, Wood 38" 4 Php 294.40
73.60
Php
Insulator, Spool, 1-3/4", ANSI Class 53 - 2 1 Php 16.21
16.21
Php
Spacer, Pipe, 3/4" X 1-1/2" 2 Php 25.62
12.81
Php
Wire, Tie, Aluminum Alloy, Soft, #4 AWG (Ft.) 55.77 Php 330.18
5.92
Sub Total Php 6,167.07
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Post Type Sub-Parts Calculations:


E3-2
Php Php
Bolt, Machine, 1/2" X 10" 1
18.50 18.50
Php Php
Connector, Compression, 2
32.88 65.76
Php Php
Clamp, Guy Straight, 3 Bolt Heavy Duty 2
107.10 214.20
Php Php
Wire, Guy, Steel, 3/8", 7 Strand 50
17.74 887.00
Php Php
Jumpers , 4 AWG, 3 Strand Aluminum Alloy 5
5.99 29.95
7.62/13.2 KV
Php Php
SINGLE DOWN GUY Guy Guard, 8' min. length 1
17.74 17.74
WRAPPED TYPE
Php Php
Hook, Guy 34.33 2
34.33 68.66
Php Php
Guy Plate, 4" x 8" 2
41.03 82.06
Php Php
Nail, 8 penny, Galvanized 8
6.62 52.96
Php Php
Clamp, Rod Bonding, Single Eye 1
30.14 30.14
Php Php
Nut, Lock, Mf Type, 5/8" 1
7.08 7.08
Php
SUb Total
1,474.05
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO

Estimated Total Cost:

Transformer Type No. of Transformer Cost Total Cost/Transformer


Php Php
Capacity 167 kVA 2
200,856.85 401,713.69
Php Php
Capacity 250 kVA 12
411,106.85 4,933,282.17
Php Php
Capacity 333 kVA 34
659,106.85 22,409,632.80
Post Type No. of post Cost Total Cost/Post
Php Php
C22X 7
4,519.54 31,636.81
Php Php
C1-1 3
6,167.07 18,501.22
Php Php
E3-2 14
1,474.05 20,636.70
Php Php
A5 7
525.85 3,680.95
Php Php
G9 47
7,993.79 375,708.13
Php
Total1
28,194,792.47

NO. OF UNIT or
Items Cost/Unit TOTAL (Php)
meter

PHP
Pole, Concrete 35’ 9464.25 10
96,640
PHP
Pole, Concrete 30' 6982.63 46
321,172
PHP
Transformer Bracket 352.77 76
26,810.52
Conductor, Bare,
PHP
ACSR #2 AWG. 6/1 20.25 12000
243,000.00
704.82m,
PHP
Total2
671,347.80

Total1+Total2
OVERALL TOTAL COST
PHP 28,866,140.27
ARC WILSON M. RIEGO October 1, 2013
BSEE/ 5TH YEAR ENGR. DEL ROSARIO