Vous êtes sur la page 1sur 83

QUALITY MANAGEMENT SYSTEM (QMS)

CONSTRUCTION OF NEW DOHA INTERNATIONAL AIRPORT


PASSENGER TERMINAL COMPLEX PROJECT MODEL
ISO 9001: 2015
QUALITY MANAGEMENT SYSTEM

ISO 9001 builds on seven quality management


principles.
Seven Quality Management Principles

1. Customer focus
2. Leadership
3. Engagement of people
4. Process approach
5. Improvement
6. Evidence-based decision making
7. Relationship management
1/7 CUSTOMER FOCUS

Meeting – and exceeding – customer


needs is the primary focus of quality
management
2/7 LEADERSHIP

Having a unified direction or mission that


comes from strong leadership is essential
to ensure that everyone in the organization
understands what you are trying to
achieve.
3/7 ENGAGEMENT OF PEOPLE

Creating value for your customers will


be easier if you have competent,
empowered and engaged people at
all levels of your business or
organization.
4/7 PROCESS APPROACH

Understanding activities as processes that


link together and function as a system helps
achieve more consistent and predictable
results.
5/7 IMPROVEMENT
Reacting to changes in the internal and
external environment is necessary if you
want to continue to deliver value for your
customers.
This is of paramount importance today
when conditions evolve so quickly.
6/7 EVIDENCE-BASED DECISION
MAKING

Making decisions based on the


analysis and evaluation of data is
more likely to produce the desired
result.
7/7 RELATIONSHIP MANAGEMENT

Identifying the important relationships you


have with interested parties and setting out
a plan to manage them – will drive
sustained success.
QUALITY ASSURANCE PLAN
QAP OUTLINE
COMPANY PROFILE
QUALITY POLICY AND KEY PERFORMANCE
OBJECTIVES
TERMS AND DEFINITIONS
QUALITY MANAGEMENT SYSTEM
PROJECT MANAGEMENT AND RESPONSIBILITY
RESOURCE MANAGEMENT
PRODUCT REALIZATION
MEASUREMENT, ANALYSIS & IMPROVEMENT
1.0 COMPANY PROFILE

Brief description of the contractor


undertaking the construction of the
proposed project.
2.0 QUALITY POLICY & KEY PERFORMANCE
OBJECTIVES

2.1 Mission

2.2 Quality Policy & Objective

2.3 Application of this Quality Plan


2.0 QUALITY POLICY &
KEY PERFORMANCE OBJECTIVES
2.1 Mission

• Provide highest standard of service to the


customer
• Complete the project successfully, on-
time and in-budget
• Achieve excellence in all activities for
full satisfaction of the client
2.0 QUALITY POLICY &
KEY PERFORMANCE OBJECTIVES
2.2 Quality Policy & Objective

Quality Policy: Committed to achieving


quality excellence in all aspects of the
work

Objectives: Complete the project within


stated time, cost, and quality
2.0 QUALITY POLICY &
KEY PERFORMANCE OBJECTIVES
2.3 Application of this Quality Plan

QP is the overall quality management system


of the company which intend to encompass
all activities carried out within the scope of
the Project.
3.0 TERMS AND DEFINITIONS

QUALITY
THE DEGREE OF COMPLIANCE WITH THE SPECIFIED
CRITERIA
QUALITY MANAGEMENT SYSTEM (QMS)
COMPANY MANAGEMENT SYSTEM USED TO
DEVELOP AND IMPLEMENT ITS QUALITY
ASSURANCE POLICY AND OBJECTIVES.
3.0 TERMS AND DEFINITIONS

CONTINUAL IMPROVEMENT

RECURRING PROCESS ENHANCING THE QUALITY


MANAGEMENT SYSTEM IN ORDER TO ACHIEVE
IMPROVEMENTS IN THE OVERALL QUALITY
3.0 TERMS AND DEFINITIONS
CORRECTIVE ACTION

ACTION TO ELIMINATE THE CAUSE OF A


DETECTED NON-CONFORMANCE WITH THE
REQUIRED CRITERIA

PREVENTIVE ACTION

PRE-EMPTIVE ACTION TAKEN TO PREVENT THE


CAUSE OF A POTENTIAL NON-CONFORMANCE
3.0 TERMS AND DEFINITIONS

ASSESSMENT

A SURVEILLANCE/ REVIEW TO ESTABLISH THE


EXTENT OF COMPLIANCE/POTENTIAL
COMPLIANCE WITH THE SPECIFIED CRITERIA
3.0 TERMS AND DEFINITIONS
AUDIT
A SYSTEMATIC EXAMINATION OF WORK SYSTEM
PROCESSES TO DETERMINE THE EXTENT AND RECORD
EVIDENCE TO DEMONSTRATE WHETHER (OR NOT)
ACTIVITIES, AND THEIR RESPECTIVE OUTPUTS, COMPLY
WITH THE AGREED PROCEDURES.
3.0 TERMS AND DEFINITIONS

ISO 9001: 2015 QUALITY SYSTEMS

 MODEL FOR QUALITY ASSURANCE IN


DESIGN/DEVELOPMENT, PRODUCTION, INSTALLATION,
AND SERVICING.

ISO 14001: 1996

 ENVIRONMENTAL MANAGEMENT SYSTEMS


4.0 QUALITY MANAGEMENT SYSTEM

4.1 AUTHORIZED REPRESENTATIVE

QA MANAGER IS THE AUTHORIZED


REPRESENTATIVE OF THE COMPANY DURING
THE PROJECT EXECUTION.
4.0 QUALITY MANAGEMENT SYSTEM

4.2 GENERAL REQUIREMENTS

 FOSTER CLOSE WORKING RELATIONSHIP WITH THE


EMPLOYER AND ENGINEER

IMPLEMENT QMS TO MEET THE REQUIREMENT OF


ISO 9001:2000 & ISO 14001: 1996 STANDARDS.
4.0 QUALITY MANAGEMENT SYSTEM

4.3 SUB-CONTRACTED WORKS


QMS TO ENCOMPASS WORKS TO BE PERFORMED BY
OTHERS
MAJOR SUB-CONTRACTORS TO SUBMIT QP
FOR APPROVAL, INCLUDING APPLICABLE
PROCEDURES/ITP AND RECORDS DURING
WORK EXECUTION.
ALSO SUBJECTED TO PERIODIC AUDITS
4.0 QUALITY MANAGEMENT SYSTEM

4.4 QMS OBJECTIVES

CONTINUAL IMPROVEMENT IN ALL ASPECTS OF


MANAGEMENT OF THE WORKS.
CONSISTENCY IN PHYSICAL QUALITY OUTPUT.
PROGRESSION AND DELIVERY OF WORKS TO MEET
SCHEDULED MILESTONES.
4.0 QUALITY MANAGEMENT SYSTEM

4.5 CONTROL OF DOCUMENTS

DOCUMENT CONTROL PROCEDURE TO BE


CARRIED OUT DURING THE ENTIRE DURATION OF
THE PROJECT.
4.0 QUALITY MANAGEMENT SYSTEM

4.6 CONTROL OF QUALITY RECORDS

DOCUMENT CONTROL ENGINEER IS RESPONSIBLE


FOR KEEPING OF RECORDS PERTAINING TO
IDENTIFICATION, STORAGE, PROTECTION,
RETRIEVAL, RETENTION TIME AND DISPOSITION OF
RECORDS.
4.0 QUALITY MANAGEMENT SYSTEM

4.7 QA/QC RECORDS

 QA/QC REPORTS
 RECORDS OF ALL TESTS AND INSPECTIONS
 QA REPORT
 NCR
 CURRENT CONTRACTS AND SPECIFICATIONS
 SHOP DRAWINGS
 ETC
4.0 QUALITY MANAGEMENT SYSTEM

4.8 CUSTOMER FOCUS

WORKS SHALL BE PERFORMED IN COMPLIANCE


WITH CONTRACT WITH THE SATISFACTION OF THE
CUSTOMER AS THE PRIMARY OBJECTIVE
5.0 PROJECT MANAGEMENT &
RESPONSIBILITY

5.1 MANAGEMENT COMMITMENT

MANAGEMENT COMMITMENT TO DEVELOP AND


MAINTAIN ITS QMS IN ACCORDANCE WITH THE
PRINCIPLES PRESCRIBED IN ISO 9001:2000.
5.0 PROJECT MANAGEMENT &
RESPONSIBILITY

5.2 PROJECT ORGANIZATION

WORK EXECUTION OF THE PROJECT SHALL BE


CARRIED OUT UNDER THE RESPONSIBILITY OF THE
PERSONNEL DESCRIBED IN THE PROJECT
ORGANIZATION CHART
5.0 PROJECT MANAGEMENT &
RESPONSIBILITY

5.3 MANAGEMENT BOARD

RESPONSIBLE FOR THE OVERALL EXECUTION OF


THE PROJECT.
RESPONSIBLE TO ENSURE EFFECTIVE
IMPLEMENTATION, APPLICATION, AND
UTILIZATION OF PHYSICAL, FINANCIAL
RESOURCES.
5.0 PROJECT MANAGEMENT &
RESPONSIBILITY

5.4 INTERNAL COMMUNICATION

DISTRIBUTION OF CORRESPONDENCE FROM


VARIOUS DEPARTMENTS TO ALL CONCERNED
PERSONNEL.
CONDUCT MONTHLY QA/QC MEETINGS TO
REVIEW IMPLEMENTATION OF THE QUALITY
SYSTEM OF THE PROJECT.
5.0 PROJECT MANAGEMENT &
RESPONSIBILITY

5.5 MANAGEMENT REVIEW

MANAGEMENT REVIEW MEETINGS WILL BE


CONDUCTED 6 MONTHS INTERVAL TO DETERMINE
THE EFFECTIVENESS OF THE QMS.
6.0 RESOURCE MANAGEMENT

6.1 Human Resources

6.2 Infrastructure

6.3 Orientation/Training and Awareness


6.0 RESOURCE MANAGEMENT

6.1 HUMAN RESOURCES

PERSONNEL EMPLOYED TO WORK ON THE


PROJECT SHALL BE APPROPRIATELY QUALIFIED
AND EXPERIENCED TO PERFORM THEIR
APPOINTED TASKS
6.0 RESOURCE MANAGEMENT

6.2 INFRASTRUCTURE

 PERTAINS TO OFFICE ACCOMMODATION,


COMMUNICATION NETWORKS, OFFICE FACILITIES,
ETC.
 ONLY LICENSED SOFTWARE IS USED DURING PROJECT
EXECUTION
 APPROPRIATE TRANSPORT FOR STAFF FOR SAFE
MOVEMENT AND WORK PERFORMANCE AT THE
WORKSITE.
6.0 RESOURCE MANAGEMENT

6.3 ORIENTATION/TRAINING AND AWARENESS

TRAININGS MAY BE CONDUCTED IN CASES OF


CHANGE IN POSITION, USE OF DIFFERENT
TECHNOLOGIES, TECHNIQUES ASSOCIATED WITH
SUCH CHANGE
7.0 PRODUCT REALIZATION

7.1 Planning of Product Realization

7.2 Verification, Validation, Monitoring,


Measurement and Analysis

7.3 Process Control


7.4 Company Quality System Procedures
7.5 Inspection and Testing
7.6 Customer Communication
7.0 PRODUCT REALIZATION

7.1 PLANNING OF PRODUCT REALIZATION

CONTRACT SPECIFICATION SHALL BE THE


BINDING DOCUMENT FOR THE PROJECT
EXECUTION AND COMPLIANCE REFERENCE
7.0 PRODUCT REALIZATION

7.2 VERIFICATION, VALIDATION, MONITORING, MEASUREMENT


AND ANALYSIS

 SHALL BE CARRIED OUT FOR EACH STAGE OF CONSTRUCTION


IN CONFORMANCE WITH THE CONTRACT

 PUT IN PLACE PRIOR TO START OF WORKS ON SITE THE


APPROVED:
MATERIAL SUBMITTALS
QUALITY PROCEDURES
METHOD STATEMENTS
7.0 PRODUCT REALIZATION

7.2 VERIFICATION, VALIDATION, MONITORING,


MEASUREMENT AND ANALYSIS

ENGINEER TO BE INFORMED THROUGH “INSPECTION


REQUEST” IR TO PERFORM NECESSARY INSPECTION
TO APPROVE THE WORK
7.0 PRODUCT REALIZATION

7.3 PROCESS CONTROL

ALL ACTIVITIES INVOLVED IN THE PROJECT SHALL


BE CARRIED IN ACCORDANCE WITH APPROVED
QP.
FOR EACH ACTIVITY A SEPARATE METHOD
STATEMENT/ITP SHALL BE PREPARED AND
SUBMITTED TO THE ENGINEER FOR APPROVAL.
7.0 PRODUCT REALIZATION

7.4 COMPANY QUALITY SYSTEM PROCEDURES

THE QUALITY PLAN


7.0 PRODUCT REALIZATION

7.5 Inspection and Testing


7.5.1 Purchase Procedure
7.5.2 In-process Inspection
7.5.3 Final Inspection
7.5.4 Laboratory Test Facilities
7.5.5 As-Built Documentation and Project
Dossier
7.0 PRODUCT REALIZATION

7.5 Inspection and Testing


7.5.1 Purchase Procedure
QC department will initiate all inspection and
testing requirements for material
Tests will be performed by an Independent
Testing Laboratory
Inspection and status shall be maintained by
Computerized Tracking System
7.0 PRODUCT REALIZATION

7.5 Inspection and Testing


7.5.2 In-process Inspection
 Field engineers, construction personnel, and QC
Engineers shall carryout Inspections during
construction activities in accordance with Method
Statements, Quality plans, Inspection and Test plans
7.0 PRODUCT REALIZATION

7.5 Inspection and Testing


7.5.3 Final Inspection

Perform Final Handover inspection with the


Engineer
7.0 PRODUCT REALIZATION

7.5 Inspection and Testing


7.5.4 Laboratory Test Facilities

 Laboratory testing shall be carried out as required in


the Contract specification; including testing on site
using an approved laboratory or testing by an
approved Third Party Material Testing Laboratory.
7.0 PRODUCT REALIZATION

7.5 Inspection and Testing


7.5.5 As-Built Documentation and Project Dossier

PROJECT RECORD BOOK FOR HANDOVER


 Project master document
 Contract documents
 Quality Assurance documents
 Operations and Maintenance Manuals
7.0 PRODUCT REALIZATION
7.6 Customer Communication
Communication with customer shall be carried out
effectively by means of
 Meetings
 Technical submittals
 Letters
 Memos
 Inspection Requests & Request For Information, etc.
 Submit
 Daily Program of activities
 Weekly progress Report
7.0 PRODUCT REALIZATION

7.6 Customer Communication


Communication with customer shall be carried out
effectively by means of
Meetings
Technical submittals
Letters
Memos
7.0 PRODUCT REALIZATION

7.6 Customer Communication


Communication with customer shall be carried out
effectively by means of
Inspection Requests & Request For
Information, etc.
Submit Daily Program of activities
Submit Weekly progress Report
7.0 PRODUCT REALIZATION

7.7 Design Control

Initial design by client


Final design work by Contractor
Design to be checked by Independent
checker and approved by the Engineer
7.0 PRODUCT REALIZATION
7.8 Purchasing

 All Purchasing activity to be in accordance with the


Procurement Procedure

 Material submittals and technical data must be submitted for


approval prior major purchases.

 Material received at site to be checked, and offered to the


Engineer for inspection prior to incorporation into permanent
construction.

 Quarantine defective materials and removed from site.


7.0 PRODUCT REALIZATION
7.9 Product Identification and Traceability

 Traceability shall be maintained on all equipment,


material, parts and components, as required by
standards and specifications.
 Identification of an item shall be addressed by
either using tags, item codes, stamps, color coding,
stencils or labels or by record trace an item
throughout its fabrication, erection, installation,
repair, modification and use.
7.0 PRODUCT REALIZATION

7.10 Customer Property

Care of customer property like street lights, roads,


etc.
7.0 PRODUCT REALIZATION

7.11 Preservation of Product

Material delivered to site intended for use in the


permanent works shall be stored and protected in
a proper manner
7.0 PRODUCT REALIZATION
7.12 Inspection, Measuring and Test Equipment
All inspection, testing and measuring
equipment, shall be checked for accuracy and
relevant calibration standards/specification.

Only instruments having current and valid


calibration certification will be used for
inspection, testing and measuring purposes.
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.1 Customer Satisfaction


8.2 Quality Audits
8.3 Control of Non-Conforming Products
8.4 Analysis of Data
8.5 Corrective Action
8.6 Preventive Action
8.7 Servicing
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.1 Customer Satisfaction

Customer satisfaction shall be assessed through


written complaints and non-conformities.
Any complaints received during the contract
period shall be analyzed and the effective
/remedial action shall be checked and
confirmed as satisfactory with Customer.
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.2 Quality Audits

Quality Audits shall be carried out on the project


at regular intervals as per the internal audit
schedule.
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.3 Control of Non-Conforming Products

Implement procedure to control non-


conforming products to prevent inadvertent use
of defective material, parts, components,
services, or workmanship not conforming to
contract, codes and specifications.
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.4 Analysis of Data

Review of Key performance Indicators (KPI)


to confirm compliance to contract
specification.
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.4 Analysis of Data


To ensure compliance with the contract scope of
review to include but not limited to:
 Accomplishment of quality objectives of sub-
contractors
 Safety violations, accidents, report during the
period and identify the preventive measures
 Test results of concrete, soil and other materials
shall be analyzed to evaluate the consistency of
quality of supplied materials
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.5 Corrective Action

Corrective and Preventive action as detailed in


the procedure
8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.6 Preventive Action

Method to prevent recurrence of system failure.


8.0 MEASUREMENT, ANALYSIS & IMPROVEMENT

8.7 Servicing

Servicing shall be in accordance with the


maintenance and guarantee periods stipulated
in the Contract.
9.0 Appendices
 Appendix 1 – Distribution Matrix
 Appendix 2 – Project Quality System Procedures
 Appendix 3 – Project Key Performance Measures (KPI)
 Appendix 4 – Project Organization Chart
 Appendix 5 – Generic Project and Test Plan Schedule
 Appendix 6 – Audit Schedule (Internal & External)
 Appendix 7 – Quality Management System Cross
Reference List
 Appendix 8 – Work Instruction Format
 Appendix 9 – Generic Project Method Statement List
 Appendix 10 – Activity, Responsibility and Procedure
Matrix
SITE PHOTOS
SITE PHOTOS
SITE PHOTOS
SITE PHOTOS
THANK YOU