125 mm dia GI pipe laying works for 30m (Ref no. 17.4a)
Manpower
Plumber 2.00 md @ 800.00 =
Helper 2.50 md @ 630.00 =
Coolies 5.00 md @ 630.00 =
Material
Red lead paint, hemp etc. 10% of labour cost
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
100 mm dia GI pipe laying works for 30m (Ref no. 17.4a)
Manpower
Plumber 1.75 md @ 800.00 =
Helper 2.00 md @ 630.00 =
Coolies 4.00 md @ 630.00 =
Material
Red lead paint, hemp etc. 10% of labour cost
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
65,80 mm dia GI pipe laying works for 30m (Ref no. 17.4a)
Manpower
Plumber 1.25 md @ 800.00 =
Helper 2.00 md @ 630.00 =
Coolies 3.00 md @ 630.00 =
Material
Red lead paint, hemp etc. 10% of labour cost
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
Manpower
Plumber 0.75 md @ 800.00 =
Helper 2.00 md @ 630.00 =
Coolies 2.00 md @ 630.00 =
Material
Red lead paint, hemp etc. 10% of labour cost
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
25,32 mm dia GI pipe laying works for 30m (Ref no. 17.4a)
Manpower
Plumber 0.50 md @ 800.00 =
Helper 1.50 md @ 630.00 =
Coolies 1.50 md @ 630.00 =
Material
Red lead paint, hemp etc. 10% of labour cost
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
15,20 mm dia GI pipe laying works for 30m (Ref no. 17.4a)
Manpower
Plumber 0.50 md @ 800.00 =
Helper 1.00 md @ 630.00 =
Coolies 1.00 md @ 630.00 =
Material
Red lead paint, hemp etc. 10% of labour cost
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
Rate per m = 2147.82 / 30 =
Rate per m = NRs. 71.59
63 & 75 mm dia HDPE pipe laying works (with butt welded joints) incl. fitting for 50m (Ref no. 17.2)
Manpower
Plumber 1.00 md @ 800.00 =
Helper 1.00 md @ 630.00 =
Coolies 2.00 md @ 630.00 =
Material
Rent of Machineries 1.00 day @ 250.00 =
Fuel 0.05 ltr @ 93.50 =
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
110 & 125mm dia HDPE pipe laying works (with butt welded joints) incl. fitting for 50m (Ref no. 17.2)
Manpower
Plumber 1.50 md @ 800.00 =
Helper 1.50 md @ 630.00 =
Coolies 3.00 md @ 630.00 =
Material
Rent of Machineries 1.00 day @ 250.00 =
Fuel 0.50 ltr @ 93.50 =
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
50 mm dia HDPE pipe laying works (with butt welded joints) incl. fitting for 1000m (Ref no. 17.2)
Manpower
Plumber 1.50 md @ 800.00 =
Helper 1.50 md @ 630.00 =
Coolies 3.00 md @ 630.00 =
Material
Rent of Machineries 1.00 day @ 250.00 =
Fuel 0.37 ltr @ 93.50 =
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
Manpower
Plumber 1.00 md @ 800.00 =
Helper 1.00 md @ 630.00 =
Coolies 2.00 md @ 630.00 =
Material
Rent of Machineries 1.00 day @ 250.00 =
Fuel 0.25 ltr @ 93.50 =
Miscellaneous - 2.51% of labour cost =
Sub-total:
Add 15% C.P.
Total
2. Earthwork
E/W excavation for foundation, drain, pipeline, etc. in boulder mixed soil including disposal , 10m lead & 1.5m lift (Re
no. 2.14)
Manpower
Skilled 0.00 md @ 855.00 =
Unskilled 1.59 md @ 630.00 =
Contingencies - 3% =
Sub-total:
Add 15% C.P.
Total
E/W excavation of soft clay and silty soils including disposal , 10m lead & 15 m lift (Ref. no. 2.1)
Manpower
Skilled 0.00 md @ 855.00 =
Unskilled 0.70 md @ 630.00 =
Contingencies - 3% =
Sub-total:
Add 15% C.P.
Total
Manpower
Skilled 0.00 md @ 855.00 =
Unskilled 3.00 md @ 630.00 =
Contingencies - 3% =
Sub-total:
Add 15% C.P.
Total
E/W filling with ordinary soils in 15 cm thick layers and hand compaction including haulage, 10m lead (Ref. no. 2.25-
Manpower
Skilled 0.00 md @ 855.00 =
Unskilled 0.25 md @ 630.00 =
Contingencies - 3% =
Sub-total:
Add 15% C.P.
Total
Filling by stones in the foundation and levelling including haulage, 30m lead (Ref. no. 6.5)
Manpower
Skilled 0.00 md @ 855.00 =
Unskilled 1.50 md @ 630.00 =
Material
Stone (Blockstone & Bundstone) 1.10 cum @ 4287.00 =
Sub-total:
Add 15% Contractors Profit =
Total
12.5 mm thick cement sand plastering works 1:4 ratio (Ref. no. 12.1-c)
Manpower
Skilled 12.00 md @ 855.00 =
Unskilled 16.00 md @ 630.00 =
Material
Cement 538.00 kg @ 18.04 =
Sand 1.46 cum @ 2584.45 =
Sub-total:
Add 15% Contractors Profit =
Total
3 mm flushing plaster using 1:1 cement sand mortar (Ref. no. 14.6)
Manpower
Skilled 10.00 md @ 855.00 =
Unskilled 10.00 md @ 630.00 =
Material
Cement 336.00 kg @ 18.04 =
Sand 0.23 cum @ 2584.45 =
Sub-total:
Add 15% Contractors Profit =
Total
Manpower
Skilled 1.00 md @ 855.00 =
Unskilled 4.00 md @ 630.00 =
Material
Cement 170.00 kg @ 18.04 =
Sand 0.47 cum @ 2584.45 =
Aggr. 20mm 0.24 cum @ 4336.00 =
Aggr. 40mm 0.65 cum @ 4336.00 =
Sub-total
Add 15% Contractors Profit =
Total
Concreting of foundations, vertical faces, walls (cement conc.) including supply of materials and haulage, 30m lead ; P
1:2:4 (Ref. no. 7.2-d)
Manpower
Skilled 1.00 md @ 855.00 =
Unskilled 4.00 md @ 630.00 =
Material
Cement 320.00 kg @ 18.04 =
Sand 0.45 cum @ 2584.45 =
Aggr. 10 mm 0.11 cum @ 4336.00 =
Aggr. 20mm 0.22 cum @ 4336.00 =
Aggr. 40mm 0.52 cum @ 4336.00 =
Sub-total:
Add 15% Contractors Profit =
Total
Manpower
Skilled 0.80 md @ 855.00 =
Unskilled 7.00 md @ 630.00 =
Material
Cement 400.00 kg @ 18.04 =
Sand 0.43 cum @ 2584.45 =
Aggr. 10 mm 0.29 cum @ 4336.00 =
Aggr. 20mm 0.57 cum @ 4336.00 =
Sub-total:
Add 15% Contractors Profit =
Total
Cutting, bending, placing in position as shown in the drawings & binding by GI wire of reinforcement steel bars for RC
works including haulage, 30m lead (Ref. no. 7.5)
Manpower
Skilled 12.00 md @ 855.00 =
Unskilled 12.00 md @ 630.00 =
Material
MS bars 1050.00 kg @ 86.06 =
Binding wire 10.00 kg @ 106.06 =
Sub-total
Add 15% Contractors Profit =
Total
Manpower
Skilled 1.72 md @ 855.00 =
Unskilled 2.57 md @ 630.00 =
Material
Timber 0.53 cum @ 46377.60 =
Nails 2.50 kg @ 112.59 =
Sub-total
Add 15% Contractors Profit =
Total
Making wooden forms including supply & selection of materials, fixing, nailing according to drawings, placing separat
dismantling forms and haulage, 30m lead; Vertical surface, wall etc. (4 m high & 0.5 m wide) (Ref. no. 8.2-b)
Manpower
Skilled 1.44 md @ 855.00 =
Unskilled 2.10 md @ 630.00 =
Material
Timber 0.53 cum @ 46377.60 =
Nails 2.50 kg @ 112.59 =
Sub-total
Add 15% Contractors Profit =
Total
Making wooden forms including selection of materials, measuring cutting, fixing, nailing as per specified drawings an
haulage and placing in piles, 30m lead; Forms for circular arch (radius up to 1 m) (Ref. no. 8.1-e)
Manpower
Skilled 4.00 md @ 855.00 =
Unskilled 6.00 md @ 630.00 =
Sub-total
Add 15% Contractors Profit =
Total
Manpower
Skilled 1.50 md @ 855.00 =
Unskilled 5.00 md @ 630.00 =
Material
Blockstone & Bundstone 1.10 cum @ 4287.00 =
Cement 159.00 kg @ 18.04 =
Sand 0.45 cum @ 2584.45 =
Sub-total
Add 15% Contractors Profit =
Total
Brick masonry works along with supplying bricks, making cement-sand mortar & construction of brick walls includin
haulage, 30m lead; Chimney (Bhatta) bricks 1:4 cement-sand mortar (Ref. no. 5.1-b)
Manpower
Skilled 1.50 md @ 855.00 =
Unskilled 2.20 md @ 630.00 =
Material
Bricks 560.00 no. @ 18.87 =
Cement 100.00 kg @ 18.04 =
Sand 0.28 cum @ 2584.45 =
Sub-total
Add 15% Contractors Profit =
Total
Manpower
Skilled 0.50 md @ 855.00 =
Unskilled 0.20 md @ 630.00 =
Material
GI wire 20.00 kg @ 99.06 =
Sub-total
Add 15% Contractors Profit =
Total
Barbed wire fencing works with 5 rows & two diagonal barbed wires and columns at 3m spacing. Size of concrete col
is 75mm*100mm*2.1m Ref. 24.7 (30m)
Manpower
Skilled 1.00 md @ 855.00 =
Unskilled 2.00 md @ 630.00 =
Material
RCC 1:2:4 0.19 cum. @ 13983.48
Barbed Wires 250 rm @ 18.14
U-Hooks 77 no. @ 1.21
Sub-total
Add 15% Contractors Profit =
Total
Rate per rm = 10811.54 / 30 =
Rate per cum = NRs. 360.38
Supply and Filling stone in gabion box (Ref. no. 16.11)
Manpower
Skilled 0.00 md @ 855.00 =
Unskilled 0.50 md @ 630.00 =
Material
Stone 1.10 cum. @ 4287.00
Sub-total
Add 15% Contractors Profit =
Total
3. Electric works
Erection of pre-stressed concrete pole for electric line (Ref. no. 20.5.3)
Manpower
Skilled 3.00 md @ 855.00 =
Unskilled 25.00 md @ 630.00 =
Material
RCC pole 4.00 no. @ 9517.00 =
Sub-total
Add 15% Contractors Profit =
Total
1600.00
1575.00
3150.00
6325.00
632.50
158.76 WUA RATE
7116.26 7116.25
1067.44
8183.70
272.78
1400.00
1260.00
2520.00
5180.00
518.00
130.02 WUA RATE
5828.02 5828.01
874.20
6702.22
223.40
1000.00
1260.00
1890.00
4150.00
415.00
104.17 WUA RATE
4669.17 4669.16
700.37
5369.54
178.98
600.00
1260.00
1260.00
3120.00
312.00
78.31 WUA RATE
3510.31 3510.31
526.55
4036.86
134.56
400.00
945.00
945.00
2290.00
229.00
57.48 WUA RATE
2576.48 2576.47
386.47
2962.95
98.76
400.00
630.00
630.00
1660.00
166.00
41.67 WUA RATE
1867.67 1867.66
280.15
2147.82
71.59
50m (Ref no. 17.2)
800.00
630.00
1260.00
2690.00
250.00
4.68
67.52 WUA RATE
3012.19 3012.19
451.83
3464.02
69.28
1200.00
945.00
1890.00
4035.00
250.00
46.75
101.28 WUA RATE
4433.03 4433.02
664.95
5097.98
101.95
1200.00
945.00
1890.00
4035.00
250.00
34.60
101.28 WUA RATE
4420.87 4420.87
663.13
5084.00
5.08
m (Ref no. 17.2)
800.00
630.00
1260.00
2690.00
250.00
23.38
67.52 WUA RATE
3030.89 3030.89
454.63
3485.52
3.48
0.00
1001.70
1001.70
1186.51
0.00
441.00
441.00
522.36
t). (Ref. no. 2.4)
0.00
1890.00
1890.00
2238.71
0.00
157.50
157.50
186.55
r
no. 6.5)
0.00
945.00
945.00
6509.80
10260.00
10080.00
20340.00
VAT
9705.52 1202.97
3773.30 WUA RATE
33818.82 350.21
5072.82
38891.64
388.91
8550.00
6300.00
14850.00
VAT
6061.44 751.30
594.42 WUA RATE
14850.10 156.01
2227.51
17077.61
170.77
materials and haulage, 30m lead ; PCC
855.00
2520.00
3375.00
VAT
3066.80 380.12
1214.69
1040.64
2818.40 WUA RATE
11515.53 11895.65
1727.32
13242.85
13242.85
855.00
2520.00
3375.00
VAT
5772.80 715.52
1150.08
476.96
953.92
2254.72 WUA RATE
13983.48 14699.00
2097.52
16081.00
16081.00
als and haulage, 30m lead ; PCC 1:1.5:3
684.00
4410.00
5094.00
VAT
7216.00 894.40
1098.39
1257.44
2471.52 WUA RATE
17137.35 18031.75
2570.60
19707.95
19707.95
10260.00
7560.00
17820.00
VAT
90367.20 11602.50
1060.64 136.50 WUA RATE
109247.84 120.98
16387.17
125635.01
125.63
ording to drawings, placing separators,
1470.60
1619.10
3089.70
VAT
24394.62
281.48 36.40 WUA RATE
6420.50 645.69
963.07
7383.57
738.35
1231.20
1323.00
2554.20
VAT
24394.62
281.48 36.40 WUA RATE
5885.00 592.14
882.75
6767.75
676.77
3420.00
3780.00 WUA RATE
7200.00 720.00
1080.00
8280.00
828.00
mortar & const.of wall upto 5m high.
1282.50
3150.00
4432.50
VAT
4715.70
2868.36 355.52
1150.08 WUA RATE
13166.64 13522.16
1974.99
15141.63
15141.63
1282.50
1386.00
2668.50
VAT
10566.08 1310.40
1804.00 223.60
723.65 WUA RATE
15762.23 17296.22
2364.33
18126.56
18126.55
ommercial GI wire mesh with two way
150mm (Ref. no. 16.9-b)
427.50
126.00
553.50
VAT
1981.28 254.80
2534.78 2789.58
380.21
2914.99
2914.99
855.00
1260.00
2115.00
VAT for WUA WUA Rate
2656.86
4535.96 585.00
93.53 12.01
9401.34 333.27
1410.20
10811.54
360.38
0.00
315.00
315.00
5785.30
2565.00
15750.00
18315.00
16210.11
RATE ANALYSIS OF MATERIALS INCLUDING COLLECTION AND HAULAGE
FY 2075/76
Collection Extra Lead
Labour Metalled Road Earthen Road
SN Materials Unit District Rate Rate Amount Wt.
Ref. km Rate/kg/k Amount km Rate/kg/km
(NRs.) (NRs.) (kg) Amount
md no. m (NRs.) (NRs.) (NRs.) (NRs.)
1 Sand cum Arghakhanchi 1.49 3.1-e 630.0 938.70 1450 1 0.03 43.50 6.5 0.07 659.75
2 Aggregate 20mm to 40 mm cum Arghakhanchi 4 3.2-b 630.0 2520.00 1600 1 0.03 48.00 6.5 0.07 728.00
3 Aggregate 10mm to 20 mm cum Arghakhanchi 4 3.2-b 630.0 2520.00 1600 1 0.03 48.00 6.5 0.07 728.00
4 Stone cum Arghakhanchi 1.4 3.4 630.00 882.00 3000 1 0.03 90.00 6.5 0.07 1365.00
5 Brick (9"×4"×2.5") Nos 18.00 Arghakhanchi 18.00 1.8 2 0.03 0.11 6 0.07 0.76
6 Cement bag 860.00 Arghakhanchi 860.00 50 2 0.03 3.00 6 0.07 21.00
7 Reinforcement bar kg 85.00 Arghakhanchi 85.00 1 2 0.037 0.07 6 0.10 0.60
8 Binding wire kg 105.00 Arghakhanchi 105.00 1 2 0.037 0.07 6 0.10 0.60
9 Binding wire kg 105.00 Arghakhanchi 105.00 1 2 0.037 0.07 6 0.10 0.60
10 GI Wire 8 & 10 gauge, kg 98.00 Arghakhanchi 98.00 1 2 0.037 0.07 6 0.10 0.60
Commercial
Making, Painting and fixing of
Iron Gate in Fence using MS
11 angle and 14-16 gauge MS kg 123.00 Arghakhanchi 123.00 1 2 0.037 0.07 6 0.10 0.60
strip
12 iron gate fabrication sqm 550.00 Arghakhanchi 550.00 1 2 0.037 0.07 6 0.10 0.60
Barbed Wire 12 gauge
13 (commercial) rm 18.00 Arghakhanchi 18.00 0.1376 2 0.037 0.01 6 0.10 0.08
14 U-hooks for barbed wire no. 1.20 Arghakhanchi 1.20 0.01 2 0.037 0.00 6 0.10 0.01
fencing
15 Nails kg 112.00 Arghakhanchi 112.00 1 0 0.037 0.00 2 0.10 0.20
16 Nutbolt with washer kg 155.00 Arghakhanchi 155.00 1 2 0.037 0.07 6 0.10 0.60
17 Iron plate kg 145.00 Arghakhanchi 145.00 1 2 0.037 0.07 6 0.10 0.60
18 160mm GI pipe rm 2988.00 Arghakhanchi 2988.00 16 2 0.037 1.18 6 0.10 9.60
19 100mm GI pipe rm 1642.00 Arghakhanchi 1642.00 11.5 2 0.037 0.85 6 0.10 6.90
20 80mm GI pipe rm 1059.00 Arghakhanchi 1059.00 8.88 2 0.037 0.66 6 0.10 5.33
21 65mm GI pipe rm 1008.00 Arghakhanchi 1008.00 7.53 2 0.037 0.56 6 0.10 4.52
22 90mm/4kgf/cm2 HDPE pipe rm 356.24 Arghakhanchi 356.24 1.22 2 0.037 0.09 6 0.10 0.73
RATE ANALYSIS OF MATERIALS INCLUDING COLLECTION AND HAULAGE
FY 2075/76
Collection Extra Lead
Labour Metalled Road Earthen Road
SN Materials Unit District Rate Rate Amount Wt.
Ref. km Rate/kg/k Amount km Rate/kg/km
(NRs.) (NRs.) (kg) Amount
md no. m (NRs.) (NRs.) (NRs.) (NRs.)
23 75mm/4kgf/cm2 HDPE pipe rm 356.24 Arghakhanchi 356.24 1.191 2 0.037 0.09 6 0.10 0.71
24 63mm/10kgf/cm2 HDPE pipe rm 370.55 Arghakhanchi 370.55 0.403 2 0.037 0.03 6 0.10 0.24
25 63mm/6kgf/cm2 HDPE pipe rm 248.20 Arghakhanchi 248.20 2.545 2 0.037 0.19 6 0.10 1.53
26 160mm/10kgf/cm
2
HDPE rm 3076.00 Quotation 3076.00 3.293 2 0.037 0.24 6 0.10 1.98
pipe
27 160mm/4kgf/cm2 HDPE pipe rm 1101.72 Arghakhanchi 1101.72 0.557 2 0.037 0.04 6 0.10 0.33
28 50mm/6kgf/cm2 HDPE pipe rm 158.26 Arghakhanchi 158.26 0.251 2 0.037 0.02 6 0.10 0.15
29 25mm/10kgf/cm2 HDPE pipe rm 58.98 Arghakhanchi 58.98 0.092 2 0.037 0.01 6 0.10 0.06
30 Local Wood cum 45864.00 Arghakhanchi 45864.00 535 0 0.037 0.00 6 0.10 321.00
31 RCC pole item 9000.00 Arghakhanchi 9000.00 500 2 0.037 37.00 6 0.10 300.00
32 Bitumen kg 87.00 Arghakhanchi 87.00 1 2 0.037 0.07 6 0.10 0.60
33 ABC Cable 50mm2 rm 550.00 Arghakhanchi 550.00 5 2 0.037 0.37 6 0.10 3.00
34 Three phase MCB 40-50A item 1854.00 Arghakhanchi 1854.00 0.5 2 0.037 0.04 6 0.10 0.30
35 Gate valve 1" item 1780.90 Arghakhanchi 1780.90 0.25 2 0.037 0.02 6 0.10 0.15
36 Gate valve 90mm item 19200.00 Arghakhanchi 19200.00 0.25 2 0.037 0.02 6 0.10 0.15
37 Gate valve 75mm item 14400.00 Arghakhanchi 14400.00 0.5 2 0.037 0.04 6 0.10 0.30
38 Gate valve 160mm item 28800.00 Arghakhanchi 28800.00 1 2 0.037 0.07 6 0.10 0.60
RATE ANALYSIS OF MATERIALS INCLUDING COLLECTION AND HAULAGE
FY 2075/76
Collection Extra Lead
Labour Metalled Road Earthen Road
SN Materials Unit District Rate Rate Amount Wt.
Ref. km Rate/kg/k Amount km Rate/kg/km
(NRs.) (NRs.) (kg) Amount
md no. m (NRs.) (NRs.) (NRs.) (NRs.)
39 2" Outlet, 11KW, 15 HP Three item 143000.00 From Quotation 143000.00 50 383 0.037 708.55 6 0.10 30.00
Phase Submersible pump
46 Pipe fittings (2"MS Tee, Bend, item 25000.00 From Quotation 25000.00 18 383 0.037 255.08 7 0.10 12.60
Nipple, Reducer etc.)
47 6 sqmm submersible flat item 375.00 From Quotation 375.00 1 383 0.037 14.17 7 0.10 0.70
cable
50 25mm Sockets item 92.00 Arghakhanchi 92.00 0.15 2 0.037 0.01 6 0.07 0.06
RATE ANALYSIS OF MATERIALS INCLUDING COLLECTION AND HAULAGE
FY 2075/76
Collection Extra Lead
Labour Metalled Road Earthen Road
SN Materials Unit District Rate Rate Amount Wt.
Ref. km Rate/kg/k Amount km Rate/kg/km
(NRs.) (NRs.) (kg) Amount
md no. m (NRs.) (NRs.) (NRs.) (NRs.)
51 50mm Sockets item 280.00 Arghakhanchi 280.00 0.2 2 0.037 0.01 6 0.07 0.08
52 63mm Sockets item 507.00 Arghakhanchi 507.00 0.25 2 0.037 0.02 6 0.07 0.11
53 25mm Nipples item 71.00 Arghakhanchi 71.00 0.15 2 0.037 0.01 6 0.07 0.06
54 50mm Nipples item 240.00 Arghakhanchi 240.00 0.2 2 0.037 0.01 6 0.07 0.08
55 63mm Nipples item 288.00 Arghakhanchi 288.00 0.25 2 0.037 0.02 6 0.07 0.11
56 25mm Ball Valves item 872.00 Arghakhanchi 872.00 0.4 2 0.037 0.03 6 0.07 0.17
57 50mm Ball Valves item 4320.00 Arghakhanchi 4320.00 0.6 2 0.037 0.04 6 0.07 0.25
58 63mm Gate Valves item 9504.00 Arghakhanchi 9504.00 1 2 0.037 0.07 6 0.07 0.42
59 25mm HDPE/GI Flange item 571.00 Arghakhanchi 571.00 0.6 2 0.037 0.04 6 0.07 0.25
60 50mm HDPE/GI Flange item 1325.00 Arghakhanchi 1325.00 0.8 2 0.037 0.06 6 0.07 0.34
61 63mm HDPE/GI Flange item 1613.00 Arghakhanchi 1613.00 1 2 0.037 0.07 6 0.07 0.42
62 63mm to 25mm Reducer item 387.00 Kapilvastu 387.00 0.15 156 0.037 0.87 6 0.07 0.06
63 63mm to 50mm Reducer item 387.00 Kapilvastu 387.00 0.2 156 0.037 1.15 6 0.07 0.08
64 50mm to 25mm Reducer item 385.00 Kapilvastu 385.00 0.25 156 0.037 1.44 6 0.07 0.11
65 50 mm Cross Tee item 1140.00 Kapilvastu 1140.00 0.15 156 0.037 0.87 6 0.07 0.06
66 63 mm Cross Tee item 1950.00 Kapilvastu 1950.00 0.2 156 0.037 1.15 6 0.07 0.08
67 50 mm End Cap item 190.00 Arghakhanchi 190.00 0.15 2 0.037 0.01 6 0.07 0.06
68 63 mm End Cap item 264.00 Arghakhanchi 264.00 0.2 2 0.037 0.01 6 0.07 0.08
69 MS channel galvanized Kg 120.66 Arghakhanchi 120.66 9.5 2 0.037 0.70 6 0.07 3.99
70 Pole Clamp galvanized Nos 312.00 Arghakhanchi 312.00 2.5 2 0.037 0.19 6 0.07 1.05
71 Stay insulator HT Nos 120.00 Arghakhanchi 120.00 5 2 0.037 0.37 6 0.10 3.00
72 33 kV Pin insulator Nos 1,200.00 Arghakhanchi 1200.00 3.5 2 0.037 0.26 6 0.10 2.10
73 33 kV DO fuse Set of three Set 35,000.00 Arghakhanchi 35000.00 10 2 0.037 0.74 6 0.10 6.00
74 27 kVA Lightening Arrester Set o Set 30,000.00 Arghakhanchi 30000.00 10 2 0.037 0.74 6 0.10 6.00
75 33 kV DO Barrel Pipe Nos 3,000.00 Arghakhanchi 3000.00 2.5 2 0.037 0.19 6 0.10 1.50
76 9 M PSC Pole Nos 9,000.00 Arghakhanchi 9000.00 35 2 0.037 2.59 6 0.10 21.00
RATE ANALYSIS OF MATERIALS INCLUDING COLLECTION AND HAULAGE
FY 2075/76
Extra Lead Loading/Unloadin
Porter as per Dist. Rate Porter as per Norms g
Total Amount
(NRs.)
km Rate/kg/k Amount Dist. Ref. Amount Rate/kg Amount
md
m (NRs.) (NRs.) (m) no. (NRs.) (NRs.) (NRs.)
Rate (NRs.)
S.N. Particulars Unit WITHOUT VAT
Manpower
1 Skilled Manpower e.g. Plumber, Welder, etc. md 800.00
2 Skilled Manpower e.g. Mason, Carpenter, Painter, etc. md 855.00
3 Unskilled Manpower e.g. Labour, Helper, etc. md 630.00
4 Supervisor (Oversear) md 630.00
Materials
Nepali Cement (Ordinary Portland Cement) including
5 bag 860.00
load/unload (1 bag = 50 kg )
6 Sand cum 850.00
7 Aggregate size 10mm - 40mm (crushed aggregate) cum 1950.00
8 Stone from river cum 680.00
51 2" Cast Steel Flush Valve (Class 300) with flange nut bolt item 33600.00
washer complete set
52 2" Cast Steel Horizontal Non Return Valve (class 300) with item 35000.00
Flange Nut Bolt and Washer
53 Pipe fittings (2"MS Tee, Bend, Nipple, Reducer etc.) item 25000.00
54 2.5" Outlet 3Stage, 11KW 15HP Three Phase Submersible rm 60775.00
Pump
55 6 sqmm submersible flat cable rm 375.00
56 3" Cast Steel Sluice Valve (Class 300) with flange nut bolt item 50200.00
washer complete set
57 3" Cast Steel Horizontal Non Return Valve (class 300) with Watt 46900.00
Flange Nut Bolt and Washer
58 65mm GI/HDP Flange set with adaptor item 1613.00
59 65 HDP/HDP Flange set with adaptor item 1613.00
Fittings
25mm Sockets item 92
50mm Sockets item 280
63mm Sockets item 507
25mm Nipples item 71
50mm Nipples item 240
63mm Nipples item 288
25mm Ball Valves item 872
50mm Ball Valves item 4320
63mm Gate Valves item 9504
25mm HDPE/GI Flange item 571
50mm HDPE/GI Flange item 1325
63mm HDPE/GI Flange item 1613
63mm to 25mm Reducer item 387.00
63mm to 50mm Reducer item 387.00
50mm to 25mm Reducer item 385.00
50 mm Cross Tee item 1140.00
63 mm Cross Tee item 1950.00
50 mm End Cap item 190
63 mm End Cap item 264
MS channel galvanized Kg 120.66
Pole Clamp galvanized Nos 312.00
Stay insulator HT Nos 120.00
33 kV Pin insulator Nos 1,200.00
33 kV DO fuse Set of three Set 35,000.00
27 kVA Lightening Arrester Set of three Set 30,000.00
33 kV DO Barrel Pipe Nos 3,000.00
9 M PSC Pole Nos 9,000.00
Transportation
60 Metalled roads
per kg
Easy goods 0.03
per km
per kg
Difficult goods 0.04
per km
61 Porter
per kg
Easy goods 1.30
per km
per kg
Difficult goods 1.45
per km
per kg
GI/CI/HDPE pipes 1.95
per km
Low tension wire Timber pole (upto 5 km) per pole 500.00
62 Loading/Unloading
Easy goods per kg 0.10
Difficult goods per kg 0.10
63 Earthen roads
Easy goods per kg per km 0.07
Difficult goods per kg per km 0.10
D MATERIALS
2075/76
Remarks
md = man days
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Quotation
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
From Quotation
From Quotation
Arghakhanchi
From Quotation
From Quotation
From Quotation
From Quotation
From Quotation
From Quotation
From Quotation
From Quotation
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Kapilvastu
Kapilvastu
Kapilvastu
Kapilvastu
Kapilvastu
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
Arghakhanchi
HDPE Pipe 2.5kgf Rate per rm 4kgf Rate per rm 6kgf Rate per rm 10kgf
O.D. kg/m kg/m kg/m kg/m
16 0 0 0 0.092
20 0 0 0 0.134
25 0 0 0 0.202
32 0 0 0.226 65.992 0.334
40 0 0.251 73.292 0.35 102.2 0.514
50 0 0.378 110.376 0.542 158.264 0.796
63 0.403 117.676 0.585 170.82 0.85 248.2 1.269
75 0.557 162.644 0.846 247.032 1.191 347.772 1.782
90 0.799 233.308 1.22 356.24 1.715 500.78 2.568
110 1.185 346.02 1.703 497.276 2.545 743.14 3.801
125 1.53 446.76 2.289 668.388 3.293 961.556 4.962
140 1.897 553.924 2.901 847.092 4.15 1211.8 6.209
160 2.453 716.276 3.773 1101.716 5.355 1563.66 8.079
180 3.148 919.216 4.762 1390.504 6.8 1985.6 10.256
200 3.876 1131.792 5.89 1719.88 8.391 2450.172 12.62
225 4.822 1408.024 7.445 2173.94 10.544 3078.848 16.014
250 6.012 1755.504 9.187 2682.604 13.041 3807.972 19.757
280 7.417 2165.764 11.455 3344.86 16.327 4767.484 24.708
315 9.417 2749.764 14.508 4236.336 20.694 6042.648 31.16
355 11.957 3491.444 18.382 5367.544 26.243 7662.956 39.635
400 15.221 4444.532 23.343 6816.156 33.309 9726.228 50.344
District Rate
Rate Per Kg: 292
Rate per rm
26.864
39.128
58.984
97.528
150.088
232.432
370.548
520.344
749.856
1109.892
1448.904
1813.028
2359.068
2994.752
3685.04
4676.088
5769.044
7214.736
9098.72
11573.42
14700.448