Sl.No Description Page No.

1 Part-I(Water Resources work items) 1 23

2 Part-II(Road& Bridge works) 1 8

3 Part-IV(Public Health Items) 1 17


STATEMENT OF RATES FOR MATERIALS FOR THE YEAR 2010-11

Basic Rate for


SoR 2010-11
Sl
DESCRIPTION OF MATERIAL UNIT excluding
No.
subsumed taxes
in Rs.
1 Acetylene gas cum 207

2 Asphalt 80/100 Grade Kg 25

3 Binding wire Kg 43

4 Burnt stone slab 10 cm thick sqm 174

Cement 43 Gr(including loading charges)


5 tonne 2835
Note: As per Monthly rate fixed by Sub-Committee
6 Chequered plate Kg 33

Coarse aggregate 10-4.75 mm(including


7 cum 721
Seignioragecharges)

Coarse aggregate 20-10 mm(including


8 cum 986
Seignioragecharges)

Coarse aggregate 40-20 mm(including


9 cum 938
Seignioragecharges)

Coarse aggregate 80-40 mm(including


10 cum 538
Seignioragecharges)

11 Coir brush Each 18

12 Copper sheet 16 SWG kg 356

Coursed rubble stone 30 x 30 x 45 cm(including


13 Each 13
Seignioragecharges)
Coursed rubble stone 30 x 30 x 60 cm(including
14 Each 14
Seignioragecharges)

15 Curing Compound Ltr 73

16 D – cord Rm 8

17 Delay - noiseless trunk Each 16

18 Detonating fuse coil Rm 5

1
19 Detonating shock tube / Cord relays Rm 38

20 Detonator delay type Each 13

21 Detonator electric Each 8

22 Detonator ordinary Each 4

23 Empty cement bag Each 3

24 Explosive ANFO kg 21

25 Explosive ANFO high strength booster kg 46

26 Explosive small dia ( Kelvex-220 or equivalent) kg 38

(a)Fine aggregate/ sand(un- screened) (including


27 cum 125
Seigniorage charges)

Fine aggregate /Sand (Screened) (including


28 cum 250
Seigniorage charges)

29 Geo-textile ( filter fabric ) 160 gsm sqm 61

30 Geo-textile ( filter fabric ) 200 gsm sqm 73

31 Geo-textile ( filter fabric ) 250 gsm sqm 89

32 G I Pipe 100 mm dia B Class Rm 435

33 G I Pipe 15 mm dia A class Rm 62

34 G I pipe 25 mm dia A class Rm 91

35 G I pipe 40 mm dia B class Rm 149

36 G I pipe 50 mm dia A class Rm 182

37 G I Pipe 80 mm dia B Class Rm 232

38 G.I Bolts / Nuts and Washers kg 62

39 G.I sheet ( plain ) tonne 36472

40 Hariyala turfing sods sqm 18

2
41 Hectometer stone one line dressed Each 159

42 Hemp yarn kg 48

43 Honne wood planks cum 32184

44 Hume pipe with collar 150 mm dia Rm 174

45 Hume pipe with collar 300 mm dia Rm 348

46 J- Bolts 30 cm long Each 18

47 Jungle wood planks cum 14222

48 Khandki stone 15 to 20 cm height Each 7

49 Khandki stone 20 to 25 cm height Each 9

50 Khandki stone 25 to 30 cm height Each 11

51 Kilometer stone one line dressed Each 303

52 LDPE sheet ( Geo membrane ) 500 micron thick sqm 52

53 LDPE sheet ( Geo membrane ) 750 micron thick sqm 78

54 LDPE sheet ( Geo membrane ) 1000 micron thick sqm 104

55 M S Bolts / Nuts / Washers kg 41

Murrum(including loading charges and Seigniorage


56 cum 73
charges )

57 Oxalic acid Ltr 46

58 Oxygen gas cum 32

59 PVC sealing strip Rm 28

3
60 PVC water stopper 310 mm wide Rm 365

61 PVC pipe of 100 mm dia Rm 130

Reinforcement steel (HYSD/TMT ) (including


62 loading charges) tonne 28183
Note: As per Monthly rate fixed by Sub-Committee

63 Resin bond Cement capsule Each 43

Rough stone 20 x 20 x 75 cm ( Including Seigniorage


64 Each 11
Charges)

Shahabad stone slab (including loading charges and


65 sqm 163
Seigniorage charges)

Stone chips (at dump yard/Spoil)(including loading


66 cum 154
charges and Seigniorage charges)

Stone chips ( at quarry )(including loading charges


67 cum 275
and Seigniorage charges)
Structural steel angle / channel / beam / bars
(including loading charges)
68 tonne 28183
Note: As per Monthly rate fixed by Sub-Committee
Structural steel plate / flats (including loading
charges)
69 tonne 33157
Note: As per Monthly rate fixed by Sub-Committee
70 Super Plasticizer (Conplast RP-264 or equivalent ) kg 44

71 Synthetic Enamel paint 1st quality Ltr 134

72 Synthetic adhesive ( Resin + Hardener ) Kg 138

73 Tar felt joint filler board 12 mm thick sqm 245

74 Tar felt joint filler board 20 mm thick sqm 398


Through stones 20 x 20 x 30 to 45 cm (including
75 Each 16
loading charges and Seigniorage charges)

Through stones 25 x 25 x 45 to 60 cm long (including


76 Each 27
loading charges and Seigniorage charges)

4
Through stones 30 x 30 x 65 to 75 cm long (including
77 Each 38
loading charges and Seigniorage charges)

Un-coursed rubble stones ( at dump yard /Spoil)


78 cum 140
(including loading charges and Seigniorage charges)

Un-coursed rubble stones ( at quarry )( including


79 cum 230
loading charges and Seigniorage charges)

80 Water proofing compound kg 42

81 Welding electrodes 4 mm dia Each 8

82 Wire brush Each 26

83 Wire mesh 20 gauge sqm 138

84 Zinc chromate red oxide primer paint Ltr 69

85 inorganic zinc silicate Ltr 337

86 solvent less coal tar epoxy paint Ltr 152

87 Zinc phosphate primer Ltr 119

88 Allkyd based iron oxide paint Ltr 92

89 Cost of hdpe/light black MS casing pipe(150 mm dia) Rm 435

90 welded steel wire fabric 100X100X5 mm size Kg 87

ADDITIONAL MATERIALS FOR GATES & HOISTS


1 Alloy steel ( IS : 1570-carbon steel ) shafts Kg 120

2 Alloy steel ( IS : 1570-stainless steel ) pins Kg 228

3 Bolt / Nut / Washer ( hot dipped galvanized ) Kg 75

4 Bolt / Nut / Washer ( stainless steel ) Kg 166

5 Bronze/Aluminum alloy(IS:305)bearings/bushes Kg 456

6 Cast iron blocks Kg 46

7 Cast steel drums / gears Kg 91

5
8 Cast steel pinions Kg 128

9 Cast steel wheels / pulleys / hubs / rollers /Retainers Kg 99

Chemical for de-greasing/ de-rusting/phosphate


10 Ltr 89
Coating
11 Coal tar epoxy paint Ltr 116

12 Forged steel hooks / shackles Kg 145

13 MS pipe 200 / 300 mm dia Kg 99

14 MS pipe 32 mm dia Rm 108

15 MS pipe 25 mm dia Rm 95

16 Rubber bottom seal ( IS : 11855 ) (100mmX14 mm) Rm 406

Rubber side seal ( music note type Teflon claded ) (


17 Rm 766
IS : 11855 )(36ØX113mmX14mm)

Rubber side seal ( music note type uncladed ) ( IS :


18 Rm 651
11855 )(36ØX113mmX14mm)

Rubber side seal Z-type ( IS : 11855


19 Rm 1379
)(36ØX120mmX19mm)

Rubber corner seal ( Teflon claded ) ( IS : 11855 )


20 Each 1571
(36Ø)

21 Rubber corner seal ( un claded ) ( IS : 11855 ) (36Ø) Each 1418

22 Stainless steel plates / flats Kg 157

Welding electrode 4 mm dia x 450 mm (radiographic


23 Each 9
low hydrogen )

Welding electrode 4 mm dia x 450 mm (stainless


24 Each 15
steel )

25 Wire rope 6x37 constn ( IS : 2266 ) Kg 99

26 Zinc Kg 99

27 Zinc rich ( zinc content : 90 % ) epoxy primer Ltr 295

6
Capital cost of Machinery/Equipment
Sl DESCRIPTION OF MACHINERY / EQUIPMENT UNIT S.Rate for
No 2010-11
1 Agitator car / Transit mixer 2 cum ( excluding tyres ) Each 17,00,000
tyres and tubes 6 sets Each 63,000
2 Air compressor 5 cmm electric Each
4,40,000
3 Air compressor 7 cmm diesel Each
6,50,000
4 Air compressor 7 cmm electric Each
6,30,000
5 Air compressor 8.5 cmm diesel Each
7,50,000
6 Air compressor 8.5 cmm electric Each
7,14,000
7 Air compressor 15 cmm electric Each
9,00,000
8 Angle Dozer 90 hp Each
38,00,000
9 Batching plant 0.5 cum with accessories(6 Cum/hr) Each
950000
10 Batching plant 2 x 1.00 cum with accessories( 15 Each
25,00,000
Cum/hr)
11 Batching plant 2 x 1.50 cum with accessories( 50 Each
32,00,000
Cum/hr)
12 Bending machine Each
1,80,000

13 Clamp shell and hoisting ropes Each 21,000


14 Concrete bucket 1.5 cum Each 42,000
15 Concrete hand mixer 45/30 ltr Each 10,500
16 Concrete mixer 300/200 ltr(diesel) Each
1,15,000
17 Concrete mixer 300/200 ltr ( electric ) Each
1,05,000
18 Concrete mixer 600/400 ltr(diesel) Each
1,95,000
19 Concrete mixer 600/400 ltr ( electric ) Each
1,60,000
20 Concrete paver 100 Sqm / hr Each 17,00,000
21 Convey mucker ( excluding tyres ) Each 29,00,000
tyres and tubes 6 sets 63,000
22 Core drilling machine Each 8,00,000
23 Diesel generating set 30 KVA Each 3,40,000
24 Diesel generating set 50 KVA Each 4,50,000
25 Diesel Loco 45 hp Each 12,50,000
7
26 Dewatering pump 5 hp diesel Each 30,000
27 Dewatering pump 5 hp electric Each 15,750
28 Dewatering pump 10 hp diesel Each 45,000
29 Dewatering pump 10 hp electric Each 24,000
30 Dewatering pump 20 hp diesel Each
1,30,000
31 Dewatering pump 20 hp electric Each
45,000

32 Drifter Each 6,58,000


33 Drilling jumbo ( excluding tyres ) Each 9,60,000
tyres and tubes 6 sets 63,000
34 Dumper 4.5 cum ( excluding tyres ) Each
8,82,000
tyres and tubes 6 sets 63,000
35 Geophysical Ele.resistivity meter Each 2,88,000
36 Grouting pump Each 73,000
37 Guniting / sand blasting equipment Each
1,98,000
38 Ice plant with accessories 30 t / day Each
17,32,000
39 Jack hammer Each 40000
40 Needle vibrator 40 mm petrol Each 14000
41 Needle vibrator 40 mm electric Each 16000
42 Needle vibrator 60 mm petrol Each 14700
43 Needle vibrator 60 mm electric Each 18900
44 Planing machine 4 m stroke Each
5,53,000

45 Plate shearing machine up to 12 mm Each


2,95,000

46 Pneumatic placer 0.5 cum Each


4,20,000
47 Pneumatic tamper Each
50,900
48 Pug cutting machine Each
13,600

49 Pusher leg Each


31,500
50 Road roller diesel 10 t Each
6,30,000
51 Shovel 0.50 cum 75 hp Each
24,00,000

8
52 Shovel 0.85 cum 110 hp Each
40,90,000
53 Stationery derrick crane 5 t Each
4,70,000
54 Tipper 5 cum ( excluding tyres ) Each 11,95,000
tyres and tubes 6 sets 63,000
55 Tipping tub 1.5 cum Each 1,15,000
56 Tower crane 5 tonne Each 57,00,000
57 Transformer 250 KVA Each 3,00,000
58 Truck 10 t ( excluding tyres ) Each 8,80,000
tyres and tubes 6 sets 63,000
59 Truck mounted derrick crane 5 t ( excluding tyres ) Each
15,00,000
tyres and tubes 6 sets 63,000
60 Upright drilling machine Each 42,000
61 Ventilation fan 20 hp Each
1,31,000

62 Vibratory pad foot roller 8 t Each


18,90,000

63 Wagon drill Each 4,70,000


64 Water tanker 8000 ltr (excluding tyres) Each
8,80,000
tyres and tubes 6 sets 63,000
65 Welding set Each 36,500
66 Winch 35 hp electric Each 2,68,000
ACCESSORIES TO MACHINERY / EQUIPMENT

1 Casing shoe bit Each


7500
2 Diamond core bit BX size Each
9038

3 Diamond core bit NX size Each


13942
4 Double tube core barrel Each
10096

5 Extension drill rod with coupling sleeve Rm 1285

6 Jack hammer drill rod 1.5 m Each 2570

7 Jack hammer drill rod 2.5 m Each 4310

9
8 Nozzle for Guniting / sand blasting gun Each 435

9 Paving Cylinder Each


20192
10 Rails 30R ( 30 kg / m ) tonne
33173
11 Reamer shell Each 3462
12 T.C. Cross bit 50 mm dia Each 4519
13 T.C. Cross bit 75 mm dia Each 7500
14 T.C. Cross bit 100 mm dia Each 9519
15 Tyres and Tubes for truck Set 10038
16 Wire rope 16 mm dia Rm
149
17 Excavation of drain with Excavator cum
21

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT

1 Air hose 25 mm dia Rm 95


2 Air hose 50 mm dia Rm
182
3 Demand charges (HT-I : General-11 KV category)on KVA
power supply(as per APEPDCL tariff) /month 195

4 Diesel Ltr 38.50


5 Electric power (HT-VIII Category) including tax ( 1.5 Kwhr
times of the Tariff of HT-I(A):General-11 KVA 4.30
Category) (as per APEPDCL tariff)
6 Excise duty on Gates / Hoist supplies %
0%

7 Insurance charges on machinery %/


annum 1%

8 Interest on capital cost %/


annum 12%

9 Lubricants Ltr 157


10 Petrol Ltr 53
11 Rivets Kg 62
12 Road tax on transport vehicles Rs./annum
13000

13 Shalimatic sealing compound Kg


58

14 Shutter oil Ltr 43

10
15 Structural steel fabrication Kg 15
16 Sundries ( Lump sum for un quantified inputs ) LS
30

17 Water hose ( pressure ) 20 mm dia Rm 137


18 Steel wedges LS 9
19 Elbows / Nipple / Plugs etc., LS 10
20 Soldering materials LS 9
21 Steam circulation arrangement LS 9
22 Fuel charges ( gas for heating ) LS 11
23 Vulcanizing materials LS 11
24 Other accessories / controls / junctions LS
11
25 Miscellaneous fittings / switches etc LS
11
26 Anchors / supports for cables / lights LS
11

27 Civil works for foundations / pedestals / duct etc LS


11

28 Gas cutting set ( 2 No’s 15 m hose and nozzle unit ) Each 8289
29 Grease Kg 120

Welding holder set ( cable / holder / gloves / mask etc


30 Each 3813
)
31 Use rate of ropes LS 110

MATERIALS FOR GATES AND HOISTS

1 Worm reducers Each 120690

2 Electric motor 20 hp(Double Shaft) Each 64368

3 Electric motor 17.5 hp(Double Shaft) Each 44444


4 Electric motor 12.5 hp(Double Shaft) Each 35632
5 Electric motor 5 hp(Double Shaft) Each 19540
6 Electric motor 3 hp (Double Shaft) Each 13410
7 Electric motor 2 hp (Double Shaft) Each
6897

8 Floating shaft 300 mm dia Kg 103

9 Manual operating system Each 18667

10 Gate position indicator Each 91954

11 Ele-magnetic brake Each 17625

11
12 Electric cable / switch / control panel etc LS 22795

13 Wire rope sockets Each 2280

Materials other than covered under WR Work items


Sl. No. Description Unit Basic Rate for
SoR 2010-11
excluding
subsumed
taxes
M-002 Quarried stone 150 - 200 mm size for Hand Cum
124
Broken(excluding lead charges)
M-003 Boulder with minimum size of 300 mm for Pitching Cum
(Excluding Seigniorage) 138

M-004 Coarse sand for filling (including Seigniorage) Cum


105

M-005 Coarse sand for mortar(including Seigniorage) Cum


124
M-006 Fine Sand (including Seigniorage charges) Cum Rate as per
item no.28 of
material of
WRD
M-007 Murrum (including Seigniorage charges) Cum
Rate as per
item no.56 of
Material rates
of WRD.
M-008 Gravel/Quarry spall(Excluding Seigniorage Charges) Cum
73

M-009 Granular Material or hard Murrum for GSB works Cum


Deleted

M-010 Granular Material or hard Murrum for GSB Cum


works(Excluding Seigniorage charges) Rate as per
item no.56 of
material rates
of Irrigation.

M-011 Fly ash conforming to IS: 3812 ( Part II & I) Cum


36

M-012 Filter media/Filter Material as per Table 300-3 Cum


(MoRT&H Specification) 290

M-013 Close graded Granular sub-base Material 53 mm to Cum


9.5 mm 576

12
M-014 Close graded Granular sub-base Material 37.5 mm to Cum
9.5 mm 595

M-015 Close graded Granular sub-base Material 26.5 mm to Cum


9.5 mm 614

M-016 Close graded Granular sub-base Material 9.5 mm to Cum


4.75 mm 519

M-017 Close graded Granular sub-base Material 9.5 mm to Cum


2.36 mm 510

M-018 Close graded Granular sub-base Material 4.75 mm to


2.36 mm 452

M-019 Close graded Granular sub-base Material 4.75mm to cum


433
75 micron mm
M-020 Close graded Granular sub-base Material 2.36 mm Cum
433

M-021 Stone crusher dust finer than 3mm with not more Cum
than10% passing 0.075 sieve 243

M-022 Coarse graded Granular sub-base Material 2.36 mm & Cum


below 395

M-023 Coarse graded Granular sub-base Material 4.75mm to cum


75 micron mm 424

M-024 Coarse graded Granular sub-base Material 4.75 mm Cum


to 2.36 mm 424

M-025 Coarse graded Granular sub-base Material 9.5 mm to Cum


4.75 mm 495

M-026 Coarse graded Granular sub-base Material 26.5 mm Cum


to 4.75 mm 538

M-027 Coarse graded Granular sub-base Material 26.5 mm Cum


to 9.5 mm 586

M-028 Coarse graded Granular sub-base Material 37.5 mm Cum


to 9.5 mm 595

M-029 Coarse graded Granular sub-base Material 53 mm to Cum


26 .5mm 729

M-030 Aggregates below 5.6 mm Cum


481

M-031 Aggregates 22.4 mm to 2.36 mm Cum


767

M-032 Aggregates 22.4 mm to 5.6 mm Cum


862

13
M-033 Aggregates 45 mm to 2.8 mm Cum
600

M-034 Aggregates 45 mm to 22.4 mm Cum


929

M-035 Aggregates 53 mm to 2.8 mm Cum


767

M-036 Aggregates 53 mm to 22.4 mm Cum


729

M-037 Aggregates 63 mm to 2.8 mm Cum


595

M-038 Aggregates 63 mm to 45 mm Cum


567

M-039 Aggregates 90 mm to 45 mm Cum


533

M-040 Aggregates 10 mm to 5 mm Cum


714

M-041 Aggregates 11.2 mm to 0.09 mm Cum


600

M-042 Aggregates 13.2 mm to 0.09 mm Cum


671

M-043 Aggregates 13.2 mm to 5.6 mm Cum


767

M-044 Aggregates 13.2 mm to 10 mm Cum


852

M-045 Aggregates 20 mm to 10 mm Cum


976

M-046 Aggregates 25 mm to 10 mm Cum


938

M-047 Aggregates 19 mm to 6 mm Cum


862

M-048 Aggregates 37.5 mm to 19 mm Cum


914

14
M-049 Aggregates 37.5 mm to 25 mm Cum
900

M-050 Aggregates 6 mm nominal size Cum


624

M-051 Aggregates 10 mm nominal size Cum


781

M-052 Aggregates 13.2/12.5 mm nominal size Cum


933
M-053 Aggregates 20 mm nominal size Cum
1119

M-054 Aggregates 25 mm nominal size Cum


1100

M-055 Aggregates 40 mm nominal size Cum


710

M-056 AC pipe 100 mm dia Metre


Rate as per PH
item
M-057 Acrylic polymer bonding coat Litre
304

M-058 Aluminum Paint Litre


207

M-059 Aluminum alloy plate 2mm Thick Sqm


226

M-060 Aluminum alloy/Galvanized steel Tonne


41051

M-061 Aluminum sheeting fixed with encapsulated lens type Sqm


reflective sheeting including 2% towards lettering,
cost of angle iron, cost of drilling holes, nuts, bolts 608
etc. and signs as applicable
M-062 Aluminum studs 100 x 100 mm fitted with lens No’s As per local
market rate
M-063 Barbed wire Kg
49
M-064 Bearing (Cost of parts) No’s
369

15
M-065 Bearing (Cast steel rocker bearing assembly of 250 No’s
tonne ) 517

M-066 Bearing (Elastomeric bearing assembly consisting of 7 Cm3


internal layers of elastomer bonded to 6 nos. internal
reinforcing steel laminates by the process of
vulcanization,) 0.41
M-067 Bearing (Forged steel roller bearing of 250 tonne) No’s

M-068 Bearing (Pot type bearing assembly consisting of a No’s


metal piston supported by a disc, PTFE pads providing
sliding surfaces against stainless steel mating together
with cast steel assemblies/fabricated structural steel As per market
assemblies duly painted with all components competitive Rates
M-069 Bearing (PTFE sliding plate bearing assembly of 80 No’s
tonne)

M-070 Bearing (Supply of sliding plate bearing of 80 tonne) No’s

M-071 Bentonite Kg
5
M-072 Binding wire Kg Rate as per item
no.3 of Material
rates of WRD.
M-073 Bitumen ( Cationic Emulsion ) Tonne
As per rates fixed
by R&B Dept
based on refinery
rates
M-074 Bitumen (60-70 grade)(Excluding taxes) Tonne

M-075 Bitumen (80-100 grade ) (Excluding taxes) Tonne


As per rates fixed
M-076 Bitumen (Cutback ) Tonne by R&B Dept
based on refinery
rates
M-077 Bitumen (emulsion)(Excluding taxes) Tonne

M-078 Bitumen (modified graded) Tonne

M-079 Brick Each As per Building


SSR
M-080 C.I. shoes for the pile Kg
34
M-081 Cement Tonne Rate as per item
no.5 of Material
rates of WRD.
16
M-082 Cold twisted bars (HYSD/TMT Bars) Tonne
Rate as per item
no.62 of Material
rates of WRD
M-083 Collar for joints 300 mm dia No’s
96
M-084 Compressible Fibre Board(20mm thick) Sqm
373
M-085 Connectors/ Staples Each
48
M-086 Copper Plate(12m long x 250mmwide) Kg
299
M-087 Corrosion resistant Structural steel Tonne
36125
M-088 Corrugated sheet, 3 mm thick, "Tie" beam section Kg
railing 123

M-089 Credit for excavated rock found suitable for use Cum
105

M-090 Curing compound Liter Rate as per item


No.15, material
rates of Irrigation
M-091 Delineators from ISI certified firm as per the standard Each As per local
drawing given in IRC - 79 competitive
quotations
M-092 Earth Cost or compensation for earth taken from Cum
private land(Excluding Seigniorage Charges)
25
M-093 Elastomeric slab seal expansion joint assembly Metre
manufactured by using chloroprene, elastomer for As per local
elastomeric slab unit conforming to clause 915.1 of competitive
IRC: 83 (part II), quotations

M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick 100 no’s
of 125 gms each
805
M-095 Epoxy compound with accessories for preparing epoxy Kg
mortar
211
M-096 Epoxy mortar Kg
65
M-097 Epoxy primer Kg
368
M-098 Epoxy resin-hardener mix for prime coat Kg
383
M-099 Flag of red color cloth 600 x 600 mm Each

20
M-100 Flowering Plants Each
26

17
M-101 Galvanized MS flat clamp No’s

131
M-102 Galvanized steel wire crates of mesh size 100 mm x Sqm
100 mm woven with 4mm dia. GI wire in rolls of
required size. 111
M-103 Galvanized structural steel plate 200 mm wide, 6 mm Kg
thick, 24 m long 603
M-104 Gelatin 80% Kg
402
M-105 Geo grids Sqm As per local
competitive
quotations
M-106 (a)Geo membrane 500 micron thick Sqm Rate as per item
No. 52 of WRD
(b) Geo membrane 750 micron thick Sqm Rate as per item
No. 53 of WRD
(c) Geo membrane 1000 micron thick Sqm
Rate as per item
No. 54 of WRD
M-107 Geo nets Sqm As per local
competitive
quotations
M-108 (a)Geo textile 160 gsm Sqm
Rate as per item
No. 29 of WRD
(b) Geo textile 200 gsm Sqm
Rate as per item
No. 30 of WRD
(c) Geo textile 250 gsm Sqm
Rate as per item
No. 31 of WRD
M-109 Geo textile filter fabric Sqm
As per local
competitive
quotations
M-110 GI bolt 10 mm Dia No’s
14
M-111 Grouting pump with agitator Hour
Rate covered in
item no. 36 in
hire charges of
machinery of
Water Resources
work items
M-112 Grass (Doob) Kg 3
M-113 Grass (Fine) Kg 5
M-114 HDPE pipes 75mm dia Metre
Rate as per PH
M-115 HDPE pipes 90mm dia Metre items

18
M-116 Hedge plants Each

M-117 Helical pipes 600mm diameter Metre

M-118 Hot applied thermoplastic compound Litre

M-119 HTS strand Tonne


Rate as per local
M-120 Joint Sealant Compound Kg
competitive
quotations
M-121 Jute netting, open weave, 2.5 cm square opening for Sqm
seeding and Mulching
57
M-122 LDO for steam curing Litre
38
M-123 M.S. Clamps Kg
Deleted
M-124 M.S. Clamps Kg Rate as per local
competitive
quotations
M-125 M.S. shoes @ 35 Kg per pile of 15 m Kg Rate as per local
competitive
quotations
M-126 Mild Steel bars Tonne
27094
M-127 Modular strip/box seal expansion joint including Metre
anchorage catering to a horizontal movement beyond
70 mm and up to 140mm assembly comprising of
edge beams, central beam,2 modules chloroprene
seal, anchorage elements, support and control
system, all steel sections protected against corrosion
and installed by the manufacturer or his authorized Rate as per local
representative competitive
quotations
M-128 Modular strip/box seal expansion joint catering to a Metre
horizontal movement beyond 140mm and up to
210mm box/box seal joint assembly containing 3
modules/cells and comprising of edge beams, two Rate as per local
central beams, chloroprene seal, anchorage elements, competitive
support and control system, all steel sections quotations
protected against corrosion and installed by the
manufacturer or his authorized representative
M-129 Nipples 12mm No’s
11
M-130 Nuts and bolts Kg
53
M-131 Paint Litre As per Building
SSR
M-132 Pavement Marking Paint Litre
Rate as per local
M-133 Paving Fabric Sqm competitive
quotations
19
M-134 Perforated geo synthetic pipe 150 mm dia Metre
M-135 Perforated pipe of cement concrete, internal dia 100 Metre
mm
M-136 Pesticide Kg Rate as per local
competitive
quotations
M-137 R.C.C Pipes 200 mm dia, 2.5 m long for drainage Metre

Rate as per PH
item
M-138 Plastic sheath, 1.25 mm thick for dowel bars Sqm
Rate as per local
competitive
M-139 Plastic tubes 50 cm dia , 1.2 m high No’s quotations

M-140 Polymer braids Metre


M-141 Pre moulded Joint filler, 25 mm thick for expansion Sqm Rate as per local
joint competitive
M-142 Pre-coated stone chips of 13.2 mm nominal size Cum quotations

M-143 Preformed continuous chloroprene elastomer or closed Meter


cell foam sealing element with high tear strength,
vulcanized in a single operation for the full length of a
joint to ensure water tightness.
Rate as per local
competitive
M-144 Pre-moulded asphalt filler board Sqm quotations

M-145 Pre-packed cement based polymer concrete of Kg Rate as per local


strength 45 Mpa at 28 days competitive
quotations
M-146 Sealant Primer Kg As per Building
SSR
M-147 Quick setting compound Kg

As per local
market rate
M-148 Random Rubble Stone Cum

195
M-149 RCC Pipe NP 4 heavy duty non pressure pipe 1000mm Metre
dia
M-150 RCC Pipe NP 4 heavy duty non pressure pipe 1200 Metre
mm dia
M-151 RCC Pipe NP 4 heavy duty non pressure pipe 300 mm Metre Rate as per PH
dia items
M-152 Reflectorising glass beads Kg
Rate as per local
competitive

20
M-153 Reinforcement strips 60 mm wide 5 mm thick as per Metre quotations
clause 3102. (Copper Strips)

M-154 Reinforcement strips 60 mm wide 5 mm thick as per Metre


clause 3102. (Galvanized carbon steel strips)

M-155 Reinforcement strips 60 mm wide 5 mm thick as per Metre


clause 3102. (Glass reinforced polymer/ fiber
reinforced polymer/polymeric strips)
M-156 Reinforcement strips 60 mm wide 5 mm thick as per Metre
clause 3102. (Stainless steel strips)

M-157 Reinforcement strips 60 mm wide 5 mm thick as per Metre


clause 3102. (Aluminum strips)

M-158 Rivets Each


3
M-159 Sand bags (Cost of sand and Empty cement bag) Per bag
13
M-160 Sapling 2 m high 25 mm dia Each Rate as per local
competitive
quotations
M-161 Scrap tyres of size 900 x 20 No’s

45
M-162 Seeds(Grass) Kg 13
M-163 Cost of Selected earth Cum
65
M-164 Separation Membrane of impermeable plastic sheeting Sqm
125 micron thick
Rate as per local
competitive
quotations
M-165 Sheathing duct Metre

Rate as per local


competitive
quotations
M-166 Shrubs Each
11
M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm Cum
Rate as per local
at site of work for turfing
competitive
quotations
M-168 Sodium vapour lamp Each As per Building
SSR
M-169 Square Rubble Coursed Stone Cum

1680

21
M-170 Steel circular hollow pole of standard specification for Each
street lighting to mount light at 5 m height above
deck level
Rate to be
obtained from
Electricity/Municip
al Departments
M-171 Steel circular hollow pole of standard specification for Each
Rate to be
street lighting to mount light at 9 m height above road
obtained from
level
Electricity/Municip
al Departments
M-172 Steel drum 300 mm dia 1.2 m high/empty bitumen No’s
drum As per local
competitive
market rate
M-173 Steel helmet and cushion block on top of pile head Kg As per local
during driving. competitive
market rate
M-174 Steel pipe 25 mm external dia as per Metre
IS:1239
172
M-175 Steel pipe 50 mm external dia as per Metre
IS:1239
345
M-176 Steel wire rope 20 mm Kg
111
M-177 Steel wire rope 40 mm Kg
127
M-178 Strip seal expansion joint Metre Rate as per local
competitive
quotations
M-179 Structural Steel(HYSD/TMT bars) Tonne
27915
M-180 Super plasticizer admixture IS marked as per 9103- Kg Rate as per item
1999 no.70 of Material
rates of WRD
M-181 Synthetic Geo grids as per clause 3102.8 and Sqm Rate as per local
approved design and specifications. competitive
quotations
M-182 Through and bond stone Each
Rate as per item
no.75 of Material
(a) 20X20x30 to 45 cm long Each rates of WRD.

Through and bond stone Rate as per item


(b) 25X25x45 to 60 cm long no.76 of Material
rates of WRD.
Through and bond stone Each
Rate as per item
(c) 30X30x65 to 75 cm long no.77 of Material
rates of WRD.

22
M-183 Tie rods 20mm diameter No’s
27
M-184 Tiles size 300 x 300 mm and 25 mm thick Each
As per Building
M-185 Timber Cum SSR

M-186 Traffic cones with 150 mm reflective sleeve No’s

Rate as per
local
M-187 Tube anchorage set complete with bearing plate, No’s competitive
permanent wedges etc quotations
M-188 Un slaked lime Tonne
1810
M-189 Water KiloLitre
67
M-190 Water based cement paint Litre
As per Building
SSR
M-191 Welded steel wire fabric Kg
90
M-192 Wire mesh 50mm x 50mm size of 3mm wire Kg
152
M-193 Wooden ballies 2" Dia for bracing Each As per Building
SSR
M-194 Wooden ballies 8" Dia and 9 m long Each As per Building
SSR
M-195 Wooden packing Cum
780
M-196 Wooden staff for fastening of flag 25 mm dia, one m Each
long 47
Item Printing new letter and figures of any shade (ii) per cm
8.3 English Roman height per
letter 1
Item Painting Two Coats on New Concrete Surfaces Sqm
8.8 As per Building
SSR
Item Painting angle iron post Two Coats Sqm
8.9 As per Building
SSR
Miscellaneous Items
1 Benching old embankment slopes 0.45 X 0.45 M RM
2.40
2 Laying Sand Bags in the stipulated places including per bag
cost of empty cement bag, sand, thread, stiching
charges and labour charges with 13.615 % overhead 17.10
charges and contractors profits.

3 Rough stone for revetment 225mm thick ( including Cum


Seigniorage charges) 121.00

23
ROAD & BRIDGE WORKS
MATERIAL & WORK ITEM RATES
RATES OF MATERIALS & WORK ITEMS
Sl. S.S. Description Unit Basic Rate
No. Item (per) for SoR
No. 2010-11
excluding
subsumed
taxes in Rs.
1 2 3 4 5
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING
WEDGING, BREAKING, BURNING, SPLITING
AND STACKING
1 22.a For R.R Masonary Work (other than Granite, 1 cum 127.90
Dolomite and Trap)
2 b.I For SS Revetment work 225 mm 1 cum 68.30
3 b.ii For SS Revetment work 300 mm 1 cum 91.40
4 b.iii For SS Revetment work450 mm 1 cum 109.60
5 C Jeddy Stone above 450 mm to 600 mm 1 cum 150.00
6 d I. Laterite for revetment 225 mm 1 cum 94.20
7 d II. Laterite for revetment 300 mm 1 cum 109.60
8 d.iii Granite for SS revetment 225 mm 1 cum 112.50
9 d.iv Granite for SS revetment 300 mm 1 cum 130.80
Note:- Only when other granite is not available
10 E Laterite for masonry 1 cum 109.60
11 F Cyclopean stones above 0.2 cum 1 cum 201.90
12 G For R.R.Masonry works ( granite, dolamite and 1 cum 149.00
trap variety)
13 NOTE:- For items 22(a) to 22© and 22(g) add 1 cum 67.00
extra Rs /cum, wherever quarrying is done by
blasting
COURSED RUBBLE STONE QUARRYING
WEDGING, BREAKING, BURNING AND
SPLITTING INCLUDING STACKING FOR SS
FIRST SORT WORKS
14 23.a Granite, Dolamite and trap 1 cum 209.60
15 B For other varieties 1 cum 146.20
16 27 Granite stone slabs for culverts, lintels and 1 cum 1354.80
copings (3 faces dressed coarsed rubble
masonry)
17 NOTE: - For items 23(a), 23(b) and 27 add extra 1 cum 69.00
Rs. Per Cum, wherever quarrying is done by
blasting
18 28 Bond stones ( 600 x 200 x 200 mm ) each 24.00
19 B Chainage stones and Centre line stones each 28.90
(750x150x150xmm)
20 31 Demarcation Stones ( 900 x 150 x 150 mm) each 55.30
21 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 82.70

1
22 B Guide Stones ( 800 x 150 x150 mm ) each 55.30
23 C Carving letters and figures in stone up to 100 each 5.10
mm size
24 D Carving letters and figures in stone above 100 each 6.70
mm size
HARD BROKEN STONE OF GRANITE, TRAP
AND DOLERITE FREE FROM DUST
OBTAINED BY QUARRYING, WEDGING,
BREAKING, BURNING AND SPLITTING
INCLUDING STACKING.
25 33.a - do - 6mm size (SS 5) 1 cum 411.50
26 b - do - 10mm size (SS 5) 1 cum 538.50
27 c - do - 12mm size (SS 5) 1 cum 661.50
28 d - do - 20mm size (SS 5) 1 cum 811.50
29 e - do - 25mm size (SS 5) 1 cum 796.20
30 f - do - 40mm size (SS 5) 1 cum 480.80
31 g - do - 50mm size (SS 5) 1 cum 375.00
32 h - do - 60mm size (SS 5) 1 cum 346.20
33 I - do - 65mm size (SS 5) 1 cum 312.50
34 j - do - 75mm size (SS 5) 1 cum 250.00
35 k - do - 75 to 100mm size (SS 5) 1 cum 201.90
36 NOTE:- (1) Add extra Rs. /- per cum for items 70.00
33 (a) to 33 (k) if the metal is obtained by
blasting
37 (2) Add 25% extra per cum if the metal is 25%
obtained by machine crushing excluding cost of
blasting.
38 (3) Deduct Rs. /- per cum if the metal or rubble 9.00
is obtained from surface stone and boulders.
39 (4) Add Rs. /- per cum for selection of stones 15.00
and boulders from excavated spoil dumps for 9.00
items 33 a to 33 k, when this addition of Rs. /-
per Cum is allowed, deduction of Rs. /- per
Cum mentioned under Note (3) above should
invariably be made.
SOFT BROKEN STONE SCREENED AND FREE
FROM DUST INCLUDING STACKING
40 33.l - do - 40 mm size ( SS 5 ) 1 Cum 101.00
41 33.m - do - 50 mm size ( SS 5 ) 1 Cum 91.40
42 33.n - do - 60 mm size ( SS 5 ) 1 Cum 72.10
43 33.o - do - 65 mm size ( SS 5 ) 1 Cum 64.40
44 33.p - do - 75 mm size ( SS 5 ) 1 Cum 60.60
HARD BROKEN STONE OF GRANITE TRAP
DOLERITE AND DOLAMITE FREE FROM DUST
OBTAINED BY QUARRYING WEDGING,
BREAKING, BURNING AND SPLITTING
INCLUDING STACKING (QUARTZITE AND
BASALT WITH AGGREGATE IMPACT OF LESS
THAN 20)

2
45 33a -do- 2.36 to 5 mm size (IRC&MORTH) 1 cum 250.00
46 b -do- 5 to 7mm size (IRC&MORTH) 1 cum 413.50
47 c -do- 9.5 to 11.2mm size (IRC&MORTH) 1 cum 538.50
48 d -do- 12mm to 14 mm size ( IRC and MORTH ) 1 cum 663.50
49 e -do- 19 mm to 22 mm size ( IRC and MORTH ) 1 cum 913.50
50 f -do- 25 mm to 27 mm size ( IRC and MORTH ) 1 cum 798.10
51 g -do- 40 mm to 45 mm size ( IRC and MORTH ) 1 cum 480.80
52 h -do- 50 mm to 55 mm size ( IRC and MORTH ) 1 cum 375.00
53 i -do- 60 mm to 63 mm size ( IRC and MORTH ) 1 cum 346.20
54 j -do- 65 mm size ( IRC and MORTH ) 1 cum 312.50
55 k -do- 75 mm size ( IRC and MORTH ) 1 cum 250.00
56 1 NOTE:- Add extra Rs. /- per cum for items 33 1 cum 70.00
(a) to 33 (j) if the metal is obtained by blasting
57 2 Add 25% extra per cum if the metal is obtained 1 cum 25%
by machine crushing excluding cost of blasting.
58 3 Deduct Rs. /- per cum if the metal or rubble is 1 cum 9.00
obtained from surface stones and boulders
59 4 Add Rs. /- per cum for selection of stones and 1 cum 15.00
boulders from excavated soil dumps for items 33 9.00
(a) to 33 (k), when this addition of Rs. /- per
cum allowed deduction of Rs. /- per cum
mentioned under note (3) above should
invariably be made
HARD BROKEN STONE OTHER THAN
GRANITE SUCH AS QUARTZ, QUARTZ-NAPA
AND BASALT SCREENED AND FREE FROM
DUST INCLUDING STACKING
60 33.q - do - 10 mm size (SS 5) 1 Cum 318.30
61 -do- 9.5 mm to 11.2 mm size ( IRC and MORTH 1 Cum 318.30
)
62 r - do - 12 mm size (SS 5) 1 Cum 298.10
63 -do- 12mm to 14 mm size ( IRC and MORTH ) 1 Cum 298.10
64 S - do - 20 mm size (SS 5) 1 Cum 241.40
65 -do- 19 mm to 22 mm size ( IRC and MORTH ) 1 Cum 241.40
66 T - do - 25 mm size (SS 5) 1 Cum 237.50
67 U - do - 40 mm size (SS 5) 1 Cum 140.40
68 -do- 40 mm to 45 mm size ( IRC and MORTH ) 1 Cum 140.40
69 V - do - 50 mm size (SS 5) 1 Cum 124.00
70 -do- 50 mm to 55 mm size ( IRC and MORTH ) 1 Cum 124.00
71 33.w - do - 65 mm size (SS 5) 1 Cum 117.30
72 -do- 60 mm to 65 mm size ( IRC and MORTH ) 1 Cum 117.30
73 X - do - 75 mm size (SS 5) 1 Cum 97.10
74 - do - 75 mm size ( IRC &MORTH) 1 Cum 97.10
75 Y - do - 75 to 100 mm size (SS 5) 1 Cum 76.90
76 - do - 75 to 100 mm ( IRC& MORTH) 1 Cum 76.90
OTHER ITEMS INCLUDING STACKING

3
77 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 84.10
78 z2 kankar, hard broken kankar 40 to 75 mm ( ring 1 Cum 63.00
)
79 z3 Soling stone of 150 mm size of granite, trap and 1 Cum 78.90
Dolamite varieties.
80 NOTE:- (1) Add extra for items to 33(z3) Rs /- 1 Cum 70.00
Per cum, wherever quarrying is done by blasting.
(2) Wherever controlled blasting is resorted to
the Chief Engineer concerned shall approve the
observed data in support of SS item No. 22 a to
22 c , 22g, 23
81 z4 Soling stone of 150 mm size other than granite 1 Cum 55.30
variety
82 z5 Soling Stone laterite, Kankar 150mm, surface 1 Cum 33.70
stone
83 z6 Field picked metal unbroken 20 mm size 1 Cum 45.70
84 z7 - do - 25 mm size 1 Cum 36.10
85 z8 - do - 40 mm size 1 Cum 40.40
86 z9 - do - 50 mm size 1 Cum 36.10
87 z10 - do - 60 mm size 1 Cum 29.80
88 z11 - do - 80 mm size 1 Cum 21.60
89 NOTE:- Add Rs. /- Per Cum for selection of stone and 15.00
boulders from excavated spoil dumps for items 33 (Q) TO 9.00
33 Z , when this addition of Rs. /- per Cum is allowed,
deduction of Rs. /- per Cum should invariably be made
towards the metal or rubble if it is obtained from surface
stone and boulders.
90 34 Gravel including stacking 1 Cum 50.50
91 35 a Quarry rubbish 1 Cum 48.60
92 B HBG Stone Chips 2.36mm and below 1 Cum 226.90
93 36.a Sand for mortar, ceiling coat including washing 1 Cum 211.50
screening etc.,
94 B Sand for filling and blindage 1 Cum 67.30
95 37 Clay for puddle and masonry Items 38 (a) to 39 1 Cum 28.00
(h) As per local prevailing rates based on
competitive quotations.
(C) LIME AND CEMENT
96 40 to
41(c )
97 42 Cement excluding cost of empty cement bags 1 MT The monthly
rates will be
communicated
by Govt.
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates applicable
to the District. 3) Least of the (1) and (2 ) above may be allowed 4) The
price of cement will be reviewed and fixed on monthly basis and rates will be
communicated separately.
98 C Grinding lime mortar or Surkhi mortar 1 Cum 75.00
99 D Shell lime slaked and screened 1 Cum 750.00

4
100 E White cement 1 Kg. 19.20
101 (D) MORTARS
102 43 to Items 43 to 45 Rates have to be
45 worked out based on
MORT&H data.
(E) METAL AND IRON WORKS
103 Mild steel rods 6mm dia. 1 MT The monthly
104 Mild steel flats 1 MT rates will be
communicated
105 Mild Steel, Structural Steel, I.e., Angles, 1 MT
by Govt.
Channels and I sections.
106 High Yield Strength Deformed Bars/TMT bars 1 MT
107 Mild steel plates 1 MT
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates
applicable to the District. 3) Least of the (1) and (2 ) above may
allowed 4) The prices of steel will be reviewed and fixed on
monthly basis and rates will be communicated separately.
III RATES OF WORKS
(A) CLEARING SITE
108 1.a Clearing heavy Jungle 1 Sqm 2.20
109 B Clearing light Jungle 1 Sqm 2.00
110 C Clearing Scrub Jungle 1 Sqm 2.00
111 D Clearing Juliflora (Prosafis) jungle including up- 1 Sqm 3.30
rooting and removing of Juliflora stumps.
112 2.a.I Cutting and removing Palmyrah trees including Each 27.00
stacking of girth 30 to 100 cm.
113 Ii - do - 100 to 200 cm. Each 42.50
114 2.b.I Uprooting and removing Palmyrah stumps Each 30.00
including stacking of girth 30 to 100 cm.
115 Ii - do - 100 to 200 cm. Each 46.00
116 2.c.I Cutting and removing date trees including Each 18.00
stacking of girth 30 to 100 cm
117 Ii - do - 100 to 200 cm Each 28.00
118 d.I Uprooting and removing stumps of date trees Each 18.00
including stacking of girth 30 to 100 cm.
119 Ii - do - 100 to 200 cm Each 24.00
120 eI Cutting and removing other kind of trees Each 24.00
including stacking of girth 30 to 100 cm
121 Ii - do - 100 to 200 cm Each 38.00
122 iii - do - above 200 cm Each 62.00
123 f.I Uprooting and removing stumps of other kind of Each 18.00
trees including stacking of girth 30 to 100 cm.
124 Ii - do - 100 to 200 cm Each 26.00
125 iii - do - above 200 cm Each 35.50
126 3.a Uprooting and clearing prickly pear jungle 1 Sqm 1.90
127 B - do - under 2.5 meters height including burning 1 Sqm 2.40
and burrying as directed.

5
128 C - do - over 2.5 meters height including burning 1 Sqm 2.90
and burrying with an initital lead of conveyance
129 4.a Removing of natchu, goobi, thooti etc., from 1 Sqm 1.50
drains, channels including clearance if not more
than 1 metre depth of water with an initial lead
of 10 metresand lift of 2 metres.
130 b.I Clearing alchi, tilla 1 Sq.m 2.90
131 b.ii Removal of Jammu 1 Sq.m 2.50
132 c.I Removal of imponea, cornea 1 Sq.m 2.90
133 c.ii Removal of water hyacinth upto 30 cm thick. 1 Sqm 3.00
134 c.iii - do - more than 30 cm thick 1 Sq.m 4.10
135 D Removal of natchu, goobi, thooti etc., for every 1 Sqm 1.00
extra lead or lift over the initial lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND
CAREFULLY STACKING MATERIALS USEFUL
FOR REUSE.
136 n.(i) Dry rough stone revetment for aprons and 1 cum 50.00
stacking within 40 metres
7 Drilling holes in hard granite or sheet rock
a) Manually ( Hand)
137 I) 20 mm dia meter 1 RM 97.00
138 ii) 25 mm dia meter 1 RM 105.00
139 iii) 36 mm dia meter 1 RM 120.00
140 b) Pneumatic Compressor
141 I) 20 mm dia meter 1 RM 110.00
142 ii) 25 mm dia meter 1 RM 121.00
143 iii) 36 mm dia meter 1 RM 133.00
8 Grouting the holes with neat cement slurry
excluding cost of steel
144 I) 20 mm dia meter 1 RM 71.00
145 ii) 25 mm dia meter 1 RM 89.00
146 iii) 36 mm dia meter 1 RM 109.50
White Washing and Painting works
147 AI White washing and colour banding for guard and each 6.50
guide stones including cost of materials
148 BI Screening sand and gravel 1 cum 6.30
149 B2 Screening chips and metal 1 cum 13.00
150 C1 Removing and refixing Hectometre or each 9.50
Demarcation stones
(S ) ROAD WORK ITEMS

6
PICKING OLD METALLED SURFACE TO
DEPTH OF 40 TO 100 mm SPREADING OLD
METAL AND NEW METAL SECTIONING
INCLUDING EDGEBUNDS AND SUBGRADE
ROLLING, SPREADING METAL INCLUDING
BLINDAGE OFGRAVEL WATERING WITH AN
INITIAL LEAD OF 2 HECTOMETERS AND
HAND ROLLER ( 1.5 TO 2 TONNES) ROLLING
ETC., INCLUDING BARRICADING,
DIVERSION OF TRAFFIC AND WETTING THE
NEW CONSOLIDATION FOR A FORTNIGHT
COMPLETE
( For a compact thickness )
1 (I ) HARD METAL
151 A 40 mm thickness 10 57.20
sqm
152 B 50 mm thickness 10 60.50
sqm
153 C 75 mm thickness 10 66.00
sqm
154 D 100 mm thickness 10 71.50
sqm
155 1 (ii ) (For compact thickness of soft metal)
156 A 50 mm thickness 10 44.00
sqm
157 B 75 mm thickness 10 52.80
sqm
158 C 100 mm thickness 10 57.20
sqm
5 Picking old metalled surface to a depth of
40 to 100 mm and spreading metal
including watering with an initial lead of 2
Hectometers and rolling with power rollers
watering and spreading gravel for blindage
and power roller rolling including hire
charges of power roller( 8 to 10 T )
barricading and diversion of traffic and
wetting the new consolidation for a
fortnight(for compacted thickness of )
HARD METAL
159 5 (a) 40 mm thick ness 10 150.70
sqm
160 (b) 50 mm thick ness 10 170.50
sqm
161 (c ) 75 mm thick ness 10 187.00
sqm
162 (d ) 100 mm thick ness 10 203.50
sqm
163 (e) 150 mm thick excluding hire charges 10 363.00
sqm

7
164 Gelatin(For MORTH data, for works of state & Per Kg 46.00
national high ways only)
165 Electric Detonators(For MORTH data, for works of each 2.30
state & national high ways only)
166 Hot applied thermoplastic compound(For MORTH Per 153.30
data, for works of state & national high ways Litre
only)
167 Reflectionising glass beads of 2 mm thick(For Per Kg 49.80
MORTH data, for works of state & national high
ways only)
168 Road marking paint confirming to IS 164(For Per Kg 122.60
MORTH data, for works of state & national high
ways only)
169 n Labour charges for laying filters with coarse 1 cum 45.00
aggregate.
170 o Labour charges for laying filter with sand. 1 cum 25.00
New Items.
171 Fly Ash 1 cum Deleted
172 Binding wire 1 Kg. 43.10

8
PUBLIC HEALTH ITEMS
1. S o R FOR R.C.C. PLAIN ENDED PIPES
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to
1 B.I.S 458/2003 , Ex-factory, Excluding transportation, taxes & duties

Size Unit Revised SoR For 2010-11


NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Meter 112
100 mm dia Meter 132
150 mm dia Meter 155
200 mm dia Meter 185
225 mm dia Meter 201
250 mm dia Meter 214
300 mm dia Meter 731 736
310
350 mm dia Meter 385 872 888
400 mm dia Meter 443 965 984
450 mm dia Meter 544 1107 1117
500 mm dia Meter 593 1191 1373
600 mm dia Meter 883 1805 2120
700 mm dia Meter 1125 2230 2831
800 mm dia Meter 1376 2944 3675
900 mm dia Meter 1731 3685 4586
1000 mm dia Meter 2119 4602 6288
1100 mm dia Meter 2499 5409 7274
1200 mm dia Meter 2978 6364 8494
1400 mm dia Meter 4076 8189 11686
1600 mm dia Meter 4682 10591 13841
1800 mm dia Meter 6172 14012 18509

The above rates of RCC Plain ended pipes are based on the following raw materials
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).

1
2. S o R FOR R.C.C. COLLARS
Sl.No. Description
1 2
Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.
1 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes
including transportation but excluding taxes & duties
Size Unit Revised SoR For 2010-11
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Each 34.00
100 mm dia Each 37.00
150 mm dia Each 38.00
200 mm dia Each 52.00
225 mm dia Each 55.00
250 mm dia Each 61.00
110.00
300 mm dia Each 79.00 110.00
350 mm dia Each 98.00 140.00 140.00
400 mm dia Each 108.00 159.00 159.00
450 mm dia Each 171.00 213.00 213.00
500 mm dia Each 195.00 255.00 255.00
600 mm dia Each 261.00 334.00 334.00
700 mm dia Each 339.00 443.00 443.00
800 mm dia Each 475.00 568.00 568.00
900 mm dia Each 572.00 662.00 662.00
1000 mm dia Each 668.00 827.00 827.00
814.00
1100 mm dia Each 1046.00 1046.00
1200 mm dia Each 985.00 1310.00 1310.00
1400 mm dia Each 1273.00 1659.00 1659.00
1600 mm dia Each 1625.00 2120.00 2120.00
1800 mm dia Each 1637.00 2723.00 2723.00
The above rates of RCC Collars suitable to plain ended pipes are based on the following raw
materials cost.
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).

2
3. S o R FOR R.C.C. S/S PIPES (Non - Pressure)
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes
1 conforming to B.I.S. 458/2003 at ex-factory (rate per meter of
effective length) Excluding transportation, taxes & duties.
Size Unit Revised SoR For 2010-11
NP - 2 Class NP - 3 Class NP - 4 Class
Meter 141
80 mm dia
100 mm dia Meter 160
150 mm dia Meter 188
200 mm dia Meter 232
225 mm dia Meter 252
250 mm dia Meter 269
Meter 378 944 991
300 mm dia
350 mm dia Meter 487 1173 1193
400 mm dia Meter 535 1299 1322
450 mm dia Meter 667 1434 1445
500 mm dia Meter 769 1637 1773
600 mm dia Meter 1082 2293 2305
700 mm dia Meter 1398 2924 2977
800 mm dia Meter 1795 3866 3867
900 mm dia Meter 2269 4851 4877
1000 mm dia Meter 2768 5453 5720
1100 mm dia Meter 3226 6420 6591
1200 mm dia Meter 3640 7569 7707
Meter 5226 10018 10906
1400 mm dia
1600 mm dia Meter 6465 12973 12918
1800 mm dia Meter 7177 17172 17287
The above rates of RCC S/S Non-Pressure pipes are based on the following raw materials
cost.
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).

3
4. S o R FOR R.C.C. S/S PIPES (Pressure)
Sl.No. Description
1 2
Manufacture, Supply and Delivery of R.C.C. Socket and Spigot
1 pipes conforming to B.I.S. 458/2003 Ex-factory (rate per meter of
effective length) Excluding transportation, taxes & duties.

Size Unit Revised SoR For 2010-11


P1 - Class P2 - Class P3 - Class
Meter 213
80 mm dia
191 241
100 mm dia Meter 215 254 293
150 mm dia Meter 296 378 463
200 mm dia Meter 343 490 647
225 mm dia Meter 386 557 717
250 mm dia Meter 422 592 746
300 mm dia Meter 567 850 1050
350 mm dia Meter 706 1188 1525
400 mm dia Meter 837 1579 2021
450 mm dia Meter 886 1870 2476
500 mm dia Meter 1191 2014 2800
600 mm dia Meter 1630 3007 3861
700 mm dia Meter 2172 3928 4882
Meter 5873

800 mm dia

2715 4626
900 mm dia Meter 3269 5413
1000 mm dia Meter 4143 6182
1100 mm dia Meter 4975
1200 mm dia Meter
5821
The above rates of RCC S/S Pressure pipes are based on the following raw materials
cost.
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).

4
Public Health Items

11. S o R FOR PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES FOR THE YEAR 2010-11
Sl.No. Description
1 2
Manufacture, Supply, Delivery of Pre-stressed (Non-cylinder) concrete pipes conforming to IS 784/2001 ex-factory excluding
1 transportation, taxes & duties., for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS
Code 784-2001)
Size Unit Revised SoR For 2010-11
Rs. Rs. Rs. Rs. Rs. Rs.
6 Kg/cm2 8 Kg/cm2 10 Kg/cm2 12 Kg/cm2 14 Kg/cm2 16 Kg/cm2
350 MM DIA Metre 2378 2388 2396 2400 2446 2531
400 MM DIA Metre 2551 2570 2596 2618 2662 2697
450 MM DIA Metre 2688 2694 2718 2759 2822 2876
500 MM DIA Metre 2908 2912 2925 2973 3026 3108
600 MM DIA Metre 3332 3344 3364 3447 3547 3646
700 MM DIA Metre 4097 4095 4142 4212 4348 4426
800 MM DIA Metre 4812 4835 4938 5024 5204 5334
900 MM DIA Metre 5571 5579 5678 5876 6081 6443
1000 MM DIA Metre 6531 6544 6697 6922 7221 7535
1100 MM DIA Metre 7396 7454 7621 8004 8267 8630
1200 MM DIA Metre 8173 8254 8644 9004 10091 10187
1300 MM DIA Metre 9237 9712 10195 10688 11522 12499
1400 MM DIA Metre 10547 11094 11669 12575 13430 14106
1500 MM DIA Metre 12303 12951 13598 14642 15560 16326
1600 MM DIA Metre 13831 14570 15308 17166 17598 18465
1700 MM DIA Metre 15248 15873 16637 18529 20614 21552
1800 MM DIA Metre 16496 17482 18263 19961 22211 23241
1900 MM DIA Metre 17633 18527 19938 21021 22756 25363
2000 MM DIA Metre 19338 20472 21352 23334 26401 28432

Note: a) The above rate of PSC pipes are based on the HT wire cost of Rs.41872/-MT (Excluding taxes).
and cement price of Rs.2835/- per MT (Excluding all taxes and freight)
7
Public Health Items

12. S o R FOR PRE-STRESSED (CYLINDER) CONCRETE PIPES FOR THE YEAR 2010-11

Sl
Description
No.
1 2
Pre-stressed (Cylinder type ) concrete pipes conforming to IS 784/2001 @ ex-factory cost of pipes, excluding transportation, laying, jointing,
1 testing, bends, tees, specials, taxes & duties for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS
Code 784-2001)
Size Unit Revised SoR For 2010-11
8 10 12 14 16 18 20
4 Kg/cm2 6 Kg/cm2
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
400 MM DIA Meter 4,281 4,281 4,281 4,281 4,299 4,333 4,396 4,459 4,502
450 MM DIA Meter 4,642 4,642 4,642 4,660 4,704 4,757 4,838 4,889 4,952
500 MM DIA Meter 5,074 5,074 5,082 5,233 5,188 5,260 5,321 5,419 5,489
600 MM DIA Meter 6,017 6,052 6,113 6,202 6,281 6,361 6,486 6,601 6,716
700 MM DIA Meter 6,928 7,017 7,123 7,239 7,345 7,452 7,585 7,754 7,877
800 MM DIA Meter 8,116 8,240 8,392 8,543 8,674 8,817 8,985 9,172 9,394
900 MM DIA Meter 9,600 9,760 9,947 10,133 10,319 10,487 10,727 10,965 11,205
1000 MM DIA Meter 11,088 11,302 11,522 11,753 11,984 12,187 12,472 12,763 13,066
1100 MM DIA Meter 12,239 12,490 12,761 13,022 13,293 13,534 13,844 14,172 14,887
1200 MM DIA Meter 13,841 14,131 14,450 14,769 15,098 15,388 15,745 16,461 16,973
1300 MM DIA Meter 15,369 15,727 16,094 16,471 16,849 17,187 18,038 18,503 19,083
1400 MM DIA Meter 16,821 17,235 17,671 18,105 18,541 19,392 19,923 20,476 21,697
1500 MM DIA Meter 18,185 18,638 19,091 19,543 20,489 20,999 21,780 22,958 20,808
1600 MM DIA Meter 20,514 21,015 21,525 22,488 23,077 23,664 25,119 25,764 26,389
1700 MM DIA Meter 22,058 22,636 23,262 24,360 25,025 26,258 27,374 28,078 28,743
1800 MM DIA Meter 24,149 24,754 25,948 26,688 27,409 28,755 29,939 30,776 31,603
1900 MM DIA Meter 28,183 28,876 30,203 31,040 32,457 33,343 34,682 35,616 36,493
8
Public Health Items
2000 MM DIA
Meter 30,063 31,383 32,278 33,202 34,821 35,794 37,306 38,375 39,329
Note: The rates of PCCP pipes which were incorporated in the SSR are based on the following raw materials cost.
HT Wire: - Rs.41872/- (Excluding all taxes & freight)
HR Coil (Hot Rolled): - Rs.34893/- (Excluding all taxes & freight)
Cement Cost Rs. 2835/-.per MT (Excluding all duties, taxes & freight)

9
Public Health Items

13. S o R FOR BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES FOR THE YEAR 2010-11
Sl.
Description
No
1 2
Bar Wrapped Steel Cylindrical (BWSC) pipes conforming to IS 15155 - 2002, ex-factory excluding transportation, taxes and duties etc., for bar
1
wrapped steel cylindrical pipes for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS Code 784-2001)
Size Unit Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
4 -12 14 16 18 20 22 24 26 28 30
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
250 MM DIA Meter 2,534 2,534 2,534 2,534 2,534 2,534 2,534 2,556 2,569 2,719
300 MM DIA Meter 2,841 2,841 2,841 2,841 2,841 2,863 2926 3,029 3,072 3252
350 MM DIA Meter 3,458 3,458 3,458 3,470 3,482 3,497 3,571 3,685 3,778 3,968
400 MM DIA Meter 3,785 3,785 3,797 3,820 3837 4,001 4,146 4,291 4454 5063
450 MM DIA Meter 4,156 4,166 4,193 4,208 4,395 4,559 4,740 4,921 5,106 5,606
6614
500 MM DIA Meter 4,652 4,669 4,696 4,894 5129 5,342 5,583 5783 6,166
600 MM DIA Meter 6,127 6,166 6,196 6,527 6847 7,115 7,449 7775 8,244 8734
700 MM DIA Meter 7,396 7,467 7932 8,381 8806 9,297 9954 10,244 10751 11551
800 MM DIA Meter 8,378 8891 9464 10,028 10594 11425 12,022 12905 13558 14548
900 MM DIA Meter 10,330 10583 11325 12,052 12761 13267 14727 15623 16366 17656
1000 MM DIA Meter 11,625 12537 13317 14134 15041 16529 17953 19260 20100 21770
1100 MM DIA Meter 16,671 16,958 16921 18510 20338 21663 23862 25247 26800 29480
19370
1200 MM DIA Meter 18,443 18884 21302 23375 25386 27457 28283 31694 35344
Note: The above rates of BWSC pipes are based on the following raw materials' cost.
HR Plates - Rs.34893/- per MT (Excluding all taxes)
10
Public Health Items
Wire rods - Rs.33251/- per MT (Excluding all taxes)
Cement Cost Rs. 2835/-.per MT (Excluding all duties, taxes & freight)

11
14. S o R FOR M.S. PIPES FOR THE YEAR 2010-11

Thicknes
Sl.No. Description Unit Rate (Rs.)
s in mm
1 2 3 4 5
1 Manufacture, supply and delivery of M.S
Pipes conforming to is 3589/2001 including
in lining with cement mortar (1:2) 15mm
thick using 4 numbers of 6mm dia
M.S.Rings at each end of the pipe and out
coating with cement mortar (1:3) 30mm
thick by shortcreting or gunetting duly
providing wire mesh of size 50x50x3mm
including cost of all materials, labour
charges, transportation to anywhere in AP,
but excluding taxes & duties, etc.
500 mm dia Meter 8.00 6296.00

600 mm dia Meter 8.00 7506.00

700 mm dia Meter 8.00 8764.00


700 mm dia Meter 10.00 11135.00

800 mm dia Meter 8.00 10076.00


800 mm dia Meter 10.00 11670.00
800 mm dia Meter 12.00 14021.00

900 mm dia 8.00 11230.00


900 mm dia Meter 10.00 13024.00
900 mm dia Meter 12.00 14820.00

1000 mm dia Meter 8.00 12649.00


1000 mm dia Meter 10.00 14634.00
1000 mm dia Meter 12.00 16537.00
1000 mm dia Meter 14.00 19312.00

1100 mm dia Meter 8.00 15217.00


1100 mm dia Meter 10.00 17402.00
1100 mm dia Meter 12.00 19589.00
1100 mm dia Meter 14.00 22874.00
1100 mm dia Meter 16.00 26170.00

1200 mm dia Meter 8.00 17369.00


1200 mm dia Meter 10.00 19743.00
1200 mm dia Meter 12.00 22129.00
12
1200 mm dia Meter 14.00 24524.00
1200 mm dia Meter 16.00 28055.00
1200 mm dia Meter 18.00 31595.00

1300 mm dia Meter 8.00 18995.00


1300 mm dia Meter 10.00 21566.00
1300 mm dia Meter 12.00 24146.00
1300 mm dia Meter 14.00 26734.00
1300 MM DIA Meter 16.00 29334.00
1300 MM DIA Meter 18.00 33033.00
1300 MM DIA Meter 20.00 36742.00

1400 MM DIA Meter 8.00 20150.00


1400 MM DIA Meter 10.00 22915.00
1400 MM DIA Meter 12.00 25691.00
1400 MM DIA Meter 14.00 28478.00
1400 MM DIA Meter 16.00 31269.00
1400 MM DIA Meter 18.00 35208.00
1400 MM DIA Meter 20.00 39156.00
1400 MM DIA Meter 22.00 43118.00

1500 MM DIA Meter 8.00 21567.00


1500 MM DIA Meter 10.00 24532.00
1500 MM DIA Meter 12.00 27498.00
1500 MM DIA Meter 14.00 30480.00
1500 MM DIA Meter 16.00 33468.00
1500 MM DIA Meter 18.00 36460.00
1500 MM DIA Meter 20.00 40545.00
1500 MM DIA Meter 22.00 44640.00
1500 MM DIA Meter 24.00 48748.00

1600 MM DIA Meter 8.00 22736.00


1600 MM DIA Meter 10.00 25876.00
1600 MM DIA Meter 12.00 29043.00
1600 MM DIA Meter 14.00 32221.00
1600 MM DIA Meter 16.00 35403.00
1600 MM DIA Meter 18.00 38591.00
1600 MM DIA Meter 20.00 42911.00
1600 MM DIA Meter 22.00 47243.00
1600 MM DIA Meter 24.00 51584.00
1600 MM DIA Meter 26.00 55935.00

1700 MM DIA Meter 8.00 24137.00


1700 MM DIA Meter 10.00 27489.00
1700 MM DIA Meter 12.00 30850.00
13
1700 MM DIA Meter 14.00 34221.00
1700 MM DIA Meter 16.00 37596.00
1700 MM DIA Meter 18.00 40985.00
1700 MM DIA Meter 20.00 45570.00
1700 MM DIA Meter 22.00 50166.00
1700 MM DIA Meter 24.00 54773.00
1700 MM DIA Meter 26.00 59390.00
1700 MM DIA Meter 28.00 64017.00

1800 MM DIA Meter 8.00 25553.00


1800 MM DIA Meter 10.00 29100.00
1800 MM DIA Meter 12.00 32658.00
1800 MM DIA Meter 14.00 36226.00
1800 MM DIA Meter 16.00 39794.00
1800 MM DIA Meter 18.00 43378.00
1800 MM DIA Meter 20.00 46968.00
1800 MM DIA Meter 22.00 51701.00
1800 MM DIA Meter 24.00 56445.00
1800 MM DIA Meter 26.00 61197.00
1800 MM DIA Meter 28.00 65961.00
1800 MM DIA Meter 30.00 70735.00

1900 MM DIA Meter 8.00 25721.00


1900 MM DIA Meter 10.00 30450.00
1900 MM DIA Meter 12.00 34199.00

1900 MM DIA Meter 14.00 37961.00


1900 MM DIA Meter 16.00 41730.00
1900 MM DIA Meter 18.00 45509.00
1900 MM DIA Meter 20.00 49290.00
1900 MM DIA Meter 22.00 54254.00
1900 MM DIA Meter 24.00 59229.00
1900 MM DIA Meter 26.00 64214.00
1900 MM DIA Meter 28.00 69208.00
1900 MM DIA Meter 30.00 74213.00
1900 MM DIA Meter 32.00 79227.00

2000 MM DIA Meter 8.00 26864.00


2000 MM DIA Meter 10.00 31799.00
2000 MM DIA Meter 12.00 35747.00
2000 MM DIA Meter 14.00 39702.00
2000 MM DIA Meter 16.00 43666.00
2000 MM DIA Meter 18.00 47640.00
2000 MM DIA Meter 20.00 51615.00
2000 MM DIA Meter 22.00 55563.00
14
2000 MM DIA Meter 24.00 60654.00
2000 MM DIA Meter 26.00 65754.00
2000 MM DIA Meter 28.00 70865.00
2000 MM DIA Meter 30.00 75985.00
2000 MM DIA Meter 32.00 81115.00
2000 MM DIA Meter 34.00 86255.00

2100 MM DIA Meter 8.00 28227.00


2100 MM DIA Meter 10.00 33411.00
2100 MM DIA Meter 12.00 37555.00
2100 MM DIA Meter 14.00 41694.00
2100 MM DIA Meter 16.00 45864.00
2100 MM DIA Meter 18.00 50031.00
2100 MM DIA Meter 20.00 54204.00
2100 MM DIA Meter 22.00 58389.00
2100 MM DIA Meter 24.00 63736.00
2100 MM DIA Meter 26.00 69093.00
2100 MM DIA Meter 28.00 74460.00
2100 MM DIA Meter 30.00 79836.00
2100 MM DIA Meter 32.00 85222.00
2100 MM DIA Meter 34.00 90618.00
2100 MM DIA Meter 36.00 96024.00

2200 MM DIA Meter 8.00 29368.00

2200 MM DIA Meter 10.00 34761.00


2200 MM DIA Meter 12.00 39100.00
2200 MM DIA Meter 14.00 43444.00
2200 MM DIA Meter 16.00 47799.00
2200 MM DIA Meter 18.00 52159.00
2200 MM DIA Meter 20.00 56530.00
2200 MM DIA Meter 22.00 60911.00
2200 MM DIA Meter 26.00 72071.00
2200 MM DIA Meter 28.00 77665.00
2200 MM DIA Meter 30.00 83269.00
2200 MM DIA Meter 32.00 88883.00
2200 MM DIA Meter 34.00 94508.00
2200 MM DIA Meter 36.00 100141.00
2200 MM DIA Meter 38.00 105785.00

2300 MM DIA Meter 10.00 36372.00


2300 MM DIA Meter 12.00 40907.00
2300 MM DIA Meter 16.00 49992.00
2300 MM DIA Meter 18.00 54552.00
2300 MM DIA Meter 20.00 59119.00
15
2300 MM DIA Meter 22.00 63690.00
2300 MM DIA Meter 26.00 75354.00
2300 MM DIA Meter 28.00 81199.00
2300 MM DIA Meter 30.00 87057.00
2300 MM DIA Meter 32.00 92922.00
2300 MM DIA Meter 34.00 98798.00
2300 MM DIA Meter 36.00 104684.00
2300 MM DIA Meter 38.00 110579.00
2300 MM DIA Meter 40.00 116484.00

2400MM DIA Meter 10.00 37719.00


2400 MM DIA Meter 12.00 42450.00
2400 MM DIA Meter 14.00 48075.00
2400 MM DIA Meter 16.00 52822.00
2400 MM DIA Meter 18.00 57573.00
2400 MM DIA Meter 20.00 62335.00
2400 MM DIA Meter 22.00 67911.00
2400 MM DIA Meter 26.00 72234.00
2400 MM DIA Meter 28.00 77376.00
2400 MM DIA Meter 30.00 82526.00
2400 MM DIA Meter 32.00 87685.00

2400 MM DIA Meter 34.00 92852.00


2400 MM DIA Meter 36.00 98028.00
2400 MM DIA Meter 38.00 103211.00
2400 MM DIA Meter 40.00 102423.00
2400 MM DIA Meter 42.00 107619.00

2500 MM DIA Meter 10.00 39334.00


2500 MM DIA Meter 14.00 49190.00
2500 MM DIA Meter 16.00 54130.00
2500 MM DIA Meter 18.00 59077.00
2500 MM DIA Meter 20.00 64034.00
2500 MM DIA Meter 22.00 68996.00
2500 MM DIA Meter 28.00 87947.00
2500 MM DIA Meter 30.00 94282.00
2500 MM DIA Meter 34.00 106985.00
2500 MM DIA Meter 36.00 113350.00
2500 MM DIA Meter 38.00 119726.00
2500 MM DIA Meter 40.00 126112.00
2500 MM DIA Meter 42.00 132507.00
2500 MM DIA Meter 44.00 138912.00
2500 MM DIA Meter 46.00 145327.00

2600 MM DIA Meter 12.00 45799.00


16
2600 MM DIA Meter 14.00 50930.00
2600 MM DIA Meter 16.00 56067.00
2600 MM DIA Meter 18.00 61209.00
2600 MM DIA Meter 20.00 66361.00
2600 MM DIA Meter 22.00 71518.00
2600 MM DIA Meter 32.00 104291.00
2600 MM DIA Meter 34.00 110875.00
2600 MM DIA Meter 36.00 117469.00
2600 MM DIA Meter 38.00 124073.00
2600 MM DIA Meter 40.00 130686.00
2600 MM DIA Meter 42.00 137309.00
2600 MM DIA Meter 44.00 143942.00
2600 MM DIA Meter 46.00 150584.00
2600 MM DIA Meter 48.00 157238.00

The above rates of MS Spiral pipes are based on the following raw materials cost.
MS Plates = Rs 32841/- Per MT.