Document Review Sheet

From: KEIL To: PETROJET


Contract: KEIL/SIBA/2015/C-051
Document Title: MCC for Dry Gas Compression
Document No.: C-051-390-MCC-TR1-02-003 Revision:
Touchstone Document No.:
Please respond by: (Refer to Transmittal for Return Date)
The document as listed above has been reviewed and has been found to be:

Reviewed - no comment. Revise and re-submit. Revise and re-submit.


Work may proceed subject to incorporation Work will NOT proceed.
of comments.

*(Tick as appropriate)

Sl. No. Comments (Identify Section/Page/Paragraph) Response


Instrumentation
Followings instruments is not in "List of Instrument" Noted and Covered in the list of instruments
1 LG-1481 and RO-1402B.
The temperature indicator failed in calibration and
KEIL shall supply another TI to replace the failed
Calibration Certificate of TI-1402B is rejected. Where is the one (KEIL supplied material). Hence, no
2 recalibration certificate? recalibration certificate, only a new TI shall be in
place.
Copy the attached data sheet for UT-1481A and UT-1481B into CD. Noted and Covered at Sec.15
3
Civil
Drawings of C 1101 to be provided. Noted and Covered
1

Page 1 of 4
Classification: General
Sl. No. Comments (Identify Section/Page/Paragraph) Response
MOD 105 DRAWINGS and all related documents to be provided. Covered and attached at MCC for GTP-TR1-02-
2 002

Electrical
Noted and Covered
1 Copy the attached solo run report for A-1101 and P-1101 into CD.

Name: Zainuddin/ Alaa Name:


Date: 27/04/18 Date:
Note: Please add/ insert rows for additional comments/ response(s).Do not add additional column.

Page 2 of 4
Classification: General
1

evise and re-submit. Review not Required - for


ork will NOT proceed. information only.

Conclusion

Closed

Transfer to MPL as punch B

Closed

Closed

Page 3 of 4
Classification: General
Conclusion

Closed

Closed

Name: Mehdi
Date: 6-May-18

Page 4 of 4
Classification: General