Vous êtes sur la page 1sur 4

Document Review Sheet

From: KEIL To: PETROJET


Contract: KEIL/SIBA/2015/C-051
Document Title: MCC for Amine Regeneration(Lean Amine)
Document No.: C-051-390-MCC-TR1-04-001 Revision:
Touchstone Document No.:
Please respond by: (Refer to Transmittal for Return Date)
The document as listed above has been reviewed and has been found to be:

Reviewed - no comment. Revise and re-submit. Revise and re-submit.


Work may proceed subject to incorporation Work will NOT proceed.
of comments.

*(Tick as appropriate)

Sl. No. Comments (Identify Section/Page/Paragraph) Response


Instrumentation
Insert the atttached brochure into Vendor documents inside the CD Noted and Covered at Sec.15
1 for vibration transmitter.

Datasheet for LT-1522 is not available Noted and Covered at Sec.15


2
Noted and Covered at Sec.15
3 Datasheet /Vendor information for RO's not available.

Civil
Noted and Covered
1 Survey reports for E-1224, P-1623, P-1624 and P-1625 to be provided.

Noted and Covered


2 Isolation reports for P-1623, P-1624 and P-1625 to be provided.

Page 1 of 4
Classification: General
Sl. No. Comments (Identify Section/Page/Paragraph) Response

Name: Rouhollah/ Alaa Name: Ahmed Salah


Date: 26/04/18 Date:29/04/2018
Note: Please add/ insert rows for additional comments/ response(s).Do not add additional column.

Page 2 of 4
Classification: General
1

evise and re-submit. Review not Required - for


ork will NOT proceed. information only.

Conclusion

Closed.

Closed.

Closed.

Closed.

Closed.

Page 3 of 4
Classification: General
Conclusion

Name: Rouhollah/ Alaa


Date: 3/5/2018

Page 4 of 4
Classification: General

Vous aimerez peut-être aussi