Académique Documents
Professionnel Documents
Culture Documents
To
The Owner
Mr. Md. Mahfuzar Rahman
Project Address: House-171, Road– 09, Savar DOHS, Dhaka.
Dear Sir,
We are pleased to submit our best price for a passenger lift brand for your project
- Passenger Lift
- Hospital Lift
- Cargo Lift
- Panoramic Lift
- Sub-Station
- Generator
- Solar System
Thanking you
Technical Specification
01. General specification
1.1 Type of Model Client choose, St/St Mirror Etching
1.2 Quantity One set new elevator 100% import
1.3 Elevator type Gearless passenger Lift
1.4 Machine room Position above shaft in machine room
1.5 Control type AC-VVVF
1.6 Capacity 630kg, 08 Passenger Lift
1.7 Speed 1.0m/sec
1.8 Traction machine 4.2KW, Gearless, TurinDrive/ Manufacturer standerd
1.9 Inverter 7.5 KW, Monarch / Manufacturer standerd
1.10 Traveling height 27m (APPROX)
1.11 No of floor 09 floor
1.12 No of opening 09 opening
1.13 No of entrance 09 entrance
1.14 The floor name G-1-2-3-4-5-6-7-8
1.15 The depth of pit 1500mm
1.16 Over head height 4500mm
1.17 Shaft clear dimension W-1800mm D-1800mm
1.18 Operation Automatic without operator
02. Technical parameter
2.1 Derive Variable, voltage, variable frequency (VVVF)
inverter driving system
2.2 Control Microprocessor type (simplex)
03. Car design
3.1 Car net size mm W-1300mm D-1200mm H-2400mm
3.2 Destination indicator Digital display / indicator
3.3 Operation button Push button
3.4 Car front wall Stainless steel mirror etching 1.2mm, 304grade
3.5 Car rear wall Stainless steel mirror etching 1.2mm, 304grade
3.6 Car side wall Stainless steel mirror etching 1.2mm, 304grade
3.7 Car door panels Stainless steel mirror etching 1.2mm, 304grade
3.5 Car Opening type Tow panels center opening
3.6 Car door opening (W × H) W-800mm×H-2100mm
Stainless steel mirror etching 1.2mm, 304grade
3.7 Handrail Hairline stainless steel finish
3.8 Car Flooring PVC
3.9 C.O.P Stainless steel mirror
Ref: NEL/SS/11-19K-MR Date: 27 May, 2019
04. Landing door design
4.1 Landing door size W-800mm×H-2100mm
4.2 Car opening type 2 panels center opening
4.3 Ground floor frame Wide door jamb with tran jams panel
4.4 Others floor frame Narrow jamb
4.5 At ground floor door Stainless steel mirror etching
4.6 Others floors door Hairline stainless steel finish
05. General Information
5.1 Power supply 3phase, 380V, 3-Phase, ±7% 50Hz
5.2 Light and Fan supply 1 phase,220V+-10%AC 50HZ
06. Safety Function
6.1 Intercom Protection 2 ways
6.2 Photocell Protection Full height Photocell Protecton device
6.3 Speed governor Protection Break the complete lift. For over Speed Protection
6.4 Buffer Protection Hydraulic / if lift down emergency than buffer make
spring save the people.
6.5 Door lock Protection Manual
6.6 Up / Down Protection Up/Down over-run and final limit Protection Device
6.7 Up / Down Over-speed Up / Down over-speed Protection Device
6.8 Over load holding stop Over load / full load protection device buzzer rings
and stops the elevator in the floor.
In emergency conditions, if bell button above cabin
6.9 Bell opertion panel is continuously pressed, electric bell
rings on top of the cabin.
If the lift can not open the door in the destination
6.10 Designated stop floor out of sume reason, the elevator will close the
door and travel to the nex designated floor.
6.11 Fire emergency Fire emergency protection device
07. Function List of Elevator
7.1 Full connective control 7.2 VVVF drive
7.3 Emergency car lighting 7.4 Light curtain protection
7.5 Shaft self learning 7.6 Full load direct run
7.7 Power on re-level 7.8 Automatic return to main landing
7.9 Inspection operation 7.10.Self diagnosis for failure
7.11Car arrival chime 7.12 Five-way communication
7.13 Car’s bell 7.14 Limit protection Handrail
7.15 Over speed protection 7.16 Fan
8.Optional functions/devices
Delivery time:
The lift shall be delivery at site within 90 days for Intac from receiving the first
payment or L/C Opening Date.
Delivery place:
Loading and unloading will be done by the professional supplier.
Store:
A suitable (dry, cool and secured) store should be provided by the purchaser at job
site under their won security.
Warranty:
12 (twelve) months from the date commissioning. Warranty covers replacement of
any defective parts due to manufacturing defects and comes from bad
workmanship. The warranty will be cancelled for installation by un authorized
person organization , serviced by service person, whose did not pass the initial
course how to operate The lift , Intervention by unlicensed person
Including user, unavoidable incident (e.g. fire, floor etc.)other inexact intervention.
Exclusion
Lift Shaft:
shaft, pit and machine room construction and all stricture modification if necessary
to install the lift free consolation is available before contraction of the shaft,
machine room and pit for avoiding any such modification. The machine room
should be cool be taken so that there is no possibility of entering any water during
rain season, or from any others source.
Electric line:
A complete three phase power feed line up to the machine room to ensure the
supply to the controller including all agreement of ducting, bus bar and board from
connection
As specified or required by us . A separate circuit breaker will be required at the
designated floor from where the power line may be turn.
Ref: NEL/SS/11-19K-MR Date: 27 May, 2019