Vous êtes sur la page 1sur 4
S1BA Filed bevelopment Project Company: Kuwait Energy, P.0.Box. $614, Salmi, Kawait Kuwait eB Energy | EPC Contractor: PETROJET - 70, 80x.2048, Horreyactetiopotce | AY Cairo, EGY WETROseT Sy Project Titi: SIBA FIELD DEVELOPMENT PROJECT Contract No: KEIL/SIBA/2015 /C-051-REV-CPF EPC Document Title: MECHANICAL COMPLETION CERTIFICATE (MCC) PACKAGE (TR1-06-002) AMINE DRAINING cae nee vestige nent | oebifiy 2m | ears Document No: C-051-390-MCC-TR1-06-002 Format Pages as & ‘CONTRACT NO. KEIL/siNA/2015/C081-REV.CPF EPC & ROJET —| ell SIBA FIELD DEVELOPMENT PROJECT REMARKS sien AS NAME be fussein | Ahh Daltaades am Po co macal aply Becle y Op Reda Oreo par fe (1°13 spore TiESHAWCAL COMPLETION READY FoR] _&B Pron Conscious ConTireATe py a SYSTEM NO. GTP-TRI-OS ‘SUB SYSTEMNO. | GrP-TR1-06-002 CONTRACT NO. | KEILISIBA/2015/C-051-REV-CPF EPC. PROJECT NAME | SIBA FIELD DFVELOPMENT PROJECT LOCATION TRAIN DESCRIPTION: GTP-TR1-06-002 AMINE DRAINING this sto confirm that the Construction Scope of Work andthe Pre-commistioning Scope of Work for the System /Subsystem have been completed in accordance with the project standards and kpecitications. [Fhe SUBSYSTEM does not include any Punch tem. GOODS under this System Subsystem shall fer to Company's Responsibility. The remaining Punch B tems tobe cleared by PETROJET, efore demobilzation, as pat of thelr Scope. ts accepted as Mechanically Completed and sy for Comnmissio Petrojet __KEIL Khabl € bd Bieks Dabtaadeh Fecithe LOR Leabines Manger 2a Ab aichon

Vous aimerez peut-être aussi