S1BA Filed bevelopment Project
Company:
Kuwait Energy,
P.0.Box. $614, Salmi, Kawait
Kuwait eB Energy
| EPC Contractor:
PETROJET -
70, 80x.2048, Horreyactetiopotce | AY
Cairo, EGY WETROseT
Sy
Project Titi:
SIBA FIELD DEVELOPMENT PROJECT
Contract No:
KEIL/SIBA/2015 /C-051-REV-CPF EPC
Document Title:
MECHANICAL COMPLETION CERTIFICATE (MCC) PACKAGE (TR1-06-002)
AMINE DRAINING
cae nee vestige nent | oebifiy 2m | ears
Document No: C-051-390-MCC-TR1-06-002
Format Pages
as& ‘CONTRACT NO. KEIL/siNA/2015/C081-REV.CPF EPC &
ROJET
—| ell SIBA FIELD DEVELOPMENT PROJECT
REMARKS
sien AS
NAME be fussein | Ahh Daltaades
am Po co macal aply Becle y Op Reda Oreo
par fe (1°13 sporeTiESHAWCAL COMPLETION READY FoR] _&B
Pron Conscious ConTireATe
py a
SYSTEM NO. GTP-TRI-OS
‘SUB SYSTEMNO. | GrP-TR1-06-002
CONTRACT NO. | KEILISIBA/2015/C-051-REV-CPF EPC.
PROJECT NAME | SIBA FIELD DFVELOPMENT PROJECT
LOCATION TRAIN
DESCRIPTION:
GTP-TR1-06-002 AMINE DRAINING
this sto confirm that the Construction Scope of Work andthe Pre-commistioning Scope of Work for
the System /Subsystem have been completed in accordance with the project standards and
kpecitications.
[Fhe SUBSYSTEM does not include any Punch tem. GOODS under this System Subsystem shall
fer to Company's Responsibility. The remaining Punch B tems tobe cleared by PETROJET,
efore demobilzation, as pat of thelr Scope.
ts accepted as Mechanically Completed and
sy for Comnmissio
Petrojet __KEIL
Khabl € bd Bieks Dabtaadeh
Fecithe LOR Leabines Manger
2a Ab aichon