|_SUBA Filed Development Project -
Company:
Kuwait Energy,
P.U.Wox. 5614, Salmiya, Kuwait
Kuwoit £3 Energy
EPC Contractor
PETROJET.
eee nomaastcopace ap
Cairo, EGY ETROJET
Project Tit
SIBA FIELD DEVELOPMENT PROJECT
Contract No:
KEIL/SIBA/2015/C-051-REV-CPF EPC
Document Title:
|
MECHANICAL COMPLETION CERTIFICATE (MCC) PACKAGE (TR1-06-003)
HMO HEATER H-1781
¢
Zi.
t ==
I |
3 asee-}—rorkaproat HS
‘Rew[-~ tate | tev beeriton 7 aprows 8
Document No: C-051-390-MCC-TRI-06-003
| Format Pages
a 1 0F 259CONTRACT NO, xaIL/ina/2015/c051-REV.CHP ERC Ed
sina sexo evetormesr Project Howat BBerergy
7 sre xo NOT APPLICABLE
SOFTWARE LAP TO xo NOT APPLICABLE
19 MISCELLANEOUS no NOT APPLICABLE
| REMARKS -
arvana fy first 7
“sGN 7a AE
NAME PAshs Daktinclel
me Facilihee Be easiness tRareoer
| showSen rsigice
‘SUB SYSTEW NO. | cTP-TR1-06-003
contract No. | KEILISIBA2015IC-051-REV.CPF EPC
PROJECT NAME | SIBAFIELD DEVELOPMENT PROJECT
LocaTION TRAINT
DESCRIPTION:
|GTP-TR1-06-003 HMO HEATER H-1781
|rhis is to confirm thatthe Construction Scope of Work and the Pre-commissoning Scope of Work for
phe System Subsystem have been completed in accordance with the project standards and
specifications.
[rhe SUBSYSTEM doesnot include any Punch A item. GOODS under this System/Subsystem shall
franster to Company's Responsibility. The remaining Punch B items tobe cleared by PETROJET,
fore demobilization, as par of thle Scope
kis accopted as Mechanically Completed and fea
Petrojet_) KEIL
hse hse Alpha Dadian
Faiths y Opt Qandines Mmager
AT Abe alsioen |