Vous êtes sur la page 1sur 4
|_SUBA Filed Development Project - Company: Kuwait Energy, P.U.Wox. 5614, Salmiya, Kuwait Kuwoit £3 Energy EPC Contractor PETROJET. eee nomaastcopace ap Cairo, EGY ETROJET Project Tit SIBA FIELD DEVELOPMENT PROJECT Contract No: KEIL/SIBA/2015/C-051-REV-CPF EPC Document Title: | MECHANICAL COMPLETION CERTIFICATE (MCC) PACKAGE (TR1-06-003) HMO HEATER H-1781 ¢ Zi. t == I | 3 asee-}—rorkaproat HS ‘Rew[-~ tate | tev beeriton 7 aprows 8 Document No: C-051-390-MCC-TRI-06-003 | Format Pages a 1 0F 259 CONTRACT NO, xaIL/ina/2015/c051-REV.CHP ERC Ed sina sexo evetormesr Project Howat BBerergy 7 sre xo NOT APPLICABLE SOFTWARE LAP TO xo NOT APPLICABLE 19 MISCELLANEOUS no NOT APPLICABLE | REMARKS - arvana fy first 7 “sGN 7a AE NAME PAshs Daktinclel me Facilihee Be easiness tRareoer | show Sen rsigice ‘SUB SYSTEW NO. | cTP-TR1-06-003 contract No. | KEILISIBA2015IC-051-REV.CPF EPC PROJECT NAME | SIBAFIELD DEVELOPMENT PROJECT LocaTION TRAINT DESCRIPTION: |GTP-TR1-06-003 HMO HEATER H-1781 |rhis is to confirm thatthe Construction Scope of Work and the Pre-commissoning Scope of Work for phe System Subsystem have been completed in accordance with the project standards and specifications. [rhe SUBSYSTEM doesnot include any Punch A item. GOODS under this System/Subsystem shall franster to Company's Responsibility. The remaining Punch B items tobe cleared by PETROJET, fore demobilization, as par of thle Scope kis accopted as Mechanically Completed and fea Petrojet_) KEIL hse hse Alpha Dadian Faiths y Opt Qandines Mmager AT Abe alsioen |

Vous aimerez peut-être aussi