Reliability
There´s increasing pressure to
continually improve reliability and Training
customer satisfaction. Network computers and its protocols,
topologies and communication
Disruptive technologies $ redundancy.
Digitalization techniques for substation
automation via IEC 61850, concerns about
cyber security and asset management
demands attention by the utilities part. Spending justification
Risks Costs Revenue challenges and regulatory
Avoid Manage Minimize Optimize inspection will drive the
costs/expenditure.
SCADA Level 2
1 6
Teleprotection over
MPLS with FOX615 RTU Gateway Level 2
Intelligent SDM600
substation Data
HMI manager Operation
Station bus
Cyber security
Process bus
Opportunities to explore with digital substations
- Process bus Merging units
- Cyber security
x - MPLS/TP teleprotection Mobile workforce
management
- PMUs
- Asset management
- MESH industrial Wifi communication
- Primary apparatus sensing
ABB AbilityTM • The MicroSCADA supervisory system get data from the IEDs and
LEVEL 2 On Prem or Cloud
show the real time status of the substation via the single line
Control room diagrams, event and alarm lists. The architecture of such
ABB Ability on digital substation journey
4
MicroSCADA supervisory system system contains 2 GPS clocks to offers a 1 microsecond synch
time to the entire network architecture
LEVEL 0 • All the control copper cables from VTs, CTs and
1 The substation swichyard apparatus (circuit breaker and disconnectors) to
the control room are replaced by optical fibers
Sceneries: From conventional to digital What happen inside the control room? The direct impacts of a digital substation
Merging
SAM600
Unit
Network redundancy in IEC 62439-3 standard (PRP and HSR). Bay 1 Bay n
1
4800
It´s the number of
samples in one
second in a 60Hz
frequency rate
5Mb/s
It´s the Ethernet
network bandwidth
allocated for a single
SMV frame
PRP
Recommended
to station bus
HSR
Recommended
to process bus
There´s different standards to deal to sensitive data protection in a substation. These mechanisms are aligned to the digital substation philosophy once the
data and network communications were expanded with the introduction of process bus. Anyway, more attention is requited from utilities regarding this issue
Pilot installation Pilot installation Pilot installation Pilot installation Real installation Pilot installation Pilot installation Pilot installation Real installation
NL Braemar, AU SvK, SE Nehden, DE Millmerran, AU Vattenfall, SE TPC, TW TPC, TW UK
GIS NCIT GIS NCIT, DCB with FOCS, 3rd party NCIT, GIS NCIT, AIS 3rd party NCIT, SAM600 SAM600 SAM600, FOCS
L+G revenue meter 670series 670series REB500 670series, REB500 670, 630, 615series 670series, 3rd party 670series, 3rd party 670series, 3rd party
Pilot installation Real installation Pilot installation Real installation Pilot installation Pilot installation Pilot installation Pilot installation Real installation
Laufenburg, CH Loganlea, AU CH Bulli Creek, AU* UK CN (several) US BR IN
GIS NCIT, GIS NCIT, GIS NCIT, GIS NCIT, GIS NCIT, DCB with FOCS DTB with FOCS, SAM600 SAM600
670series, REB500 670series, REB500 670series, 3rd party 670series, REB500 670 series 3rd party SAM600, 670 series 670series 670, 615 series