Vous êtes sur la page 1sur 4

Document Review Sheet

From: KEIL To: PETROJET


Contract: KEIL/SIBA/2015/C-051
Document Title: MCC for Condensate Stabilization
Document No.: C-051-390-MCC-GTP-TR2-01-001 Revision:
Touchstone Document No.:
Please respond by: (Refer to Transmittal for Return Date)
The document as listed above has been reviewed and has been found to be:

Reviewed - no comment. Revise and re-submit. Revise and re-submit.


Work may proceed subject to incorporation of Work will NOT proceed.
comments.

*(Tick as appropriate)

Sl. No. Comments (Identify Section/Page/Paragraph) Response


Mechanical/Piping
1 Add E 2211 & E 2212 to list of equipments. Noted and covered in SEC 7.1

Electrical
No Comments

Civil
1 Piles RFIs/Reports to be provided. Noted & covered in sec 5
2 RC test report for T 2511 to be provided. Foundation poured with pedestal according to
anchor bolt(see drawing)

Instrument

Page 1 of 4
Classification: General
Sl. No. Comments (Identify Section/Page/Paragraph) Response
1 Loop folder for all instruments related with this subsystem shall be
added in the ICSS subsystem MCC Dossier. This comment should be added in ICSS SYSTEM

2
Blind flange is missing for Air manifold on top of Equipment No. T-2511. Done at site

Name: Dilio/Munther/Suresh/Alaa Name: Ehab


Date: 27/05/2018. Date:30/05/2018.
Note: Please add/ insert rows for additional comments/ response(s).Do not add additional column.

Page 2 of 4
Classification: General
0

vise and re-submit. Review not Required - for


ork will NOT proceed. information only.

Conclusion

Closed.

Closed.
Closed.

Page 3 of 4
Classification: General
Conclusion

Closed.

Closed.

Name: Dilio/Alaa/Munther
Date: 2/6/2018.

Page 4 of 4
Classification: General