AY Tea ele) alg Managing the Cost-Plus Construction Manager By Barbara A. Res
sent, the buying should be done by
ecutive. Estimating departments
5 can assist, but the process must be
wner S e managed by the project team to
avoid confusion and possible omis-
sions with the subs. No trade
11a major building project or any project that starts work before | should be bought without com~
all the design is completed and the trades are purchased, the best | Plted plans for tha trade, unless
ae is absolutely necessary. Scopes of
project delivery system s the cst-plus-a-ee contract, aso caled oa hy the
“agency-style” or “pure” construction management. Although there ar@ | Cf and reviewed and augmented
other types of contracts that include a price guarantee, those contracts | by the owner’ representative. The
set up an adversarial relationship | that it works with, but that might | owner’ rep should fully participate
between the owner and the contrac- | eliminate the owner’ chance of get- | in the buy-out process.
tor. I prefer a pure CM contract | tinga good price. Also,a CM may | The CM should provide a
because, using this system, any | have a limited number of jobs and | schedule and monitor it regularly
‘owner can achieve a cost-effective | may not want to give too many proj- | to assure that it is realistically up-
result and avoid pitfall. ectsto one sub, although the price is | dated, with the owner's representa-
However, I have one caveat: A | low. The way to avoid having this | tive double-checking it. Often,
competent owner's representative | affect your job is to have your own | CMs tell the owner what it wants
must serve the owner's interest. | bidders lst and to participate ac- | to hear, knowing the schedule will
‘The owner's representative plays a | tively in the bidding. change. Flawed schedules set up
crucial, often overlooked, roe. Keeping track of the general- | costly delay claims that get in the
‘The owner’ rep should have suf- | conditions costs is paramount. | way of project management.
ficient experience working | Owners and CMs should agree to | “The owner'srep must participate
for owners but also for con- | staff and salary ranges before they | in negotiations over staffing levels,
tractors and subcontractors. | enter the contract, and the markup | too, but no incentives or penalties
Credentials as an engineer | factor should be analyzed and nego- | should be leftto the subs. Damages,
or architect are helpful, but | tiated. The CM should make its | if required, should fall on the subs,
icismore importantthat the | money from a fair fee, not in per- | with limits negotiated when the
owner’ rep has worked in- | sonnel costs. trades are bought out.
timately with the owner's organiza- | _ The owner’ rep and staff also
tion to the greatest extent possible. | AllStaff Members Are Valuable | should be physically present, with
Hiring an owner's-representative | ‘The owner’ representative mustap- | the understanding that the owner’
CCM firm just adds another layer of | prove the CM's staff, including the | repisin charge and the CMs staffis,
competing interests—the chosen | one individual who will take charge. | responsible to him or her.
CM firm has other jobs and owners | The CM owes the owner a project | If your company does all or most
to represent. ‘manager who can run the job without | of this, it will be on its way to a suc-
Ifpossible, the owner’ represen- | constantly relying ona vce president | cessful project. a
tative should work on one project at | atthe ownerS expense. Further,CMs | Barbara A. Res, an engincer
a time. Also, since the owner’ rep- | should not “park” people on the | and attorney, serves as an owner's
resentative should takea hands-on | job—every person should be neces- | representative and is president of
approach to managing the CM's | sary and accountable. consultant Res Construction Ser-
team, the rep should have decision- | ‘That aid, itisimportant to bring | vices. She is also the author of “All
making authority in experienced people early in the | Alone on the 68tb Floor: How One
One purpose this serves is to | process. Money is well spent on a | Woman Changed the Face of Con-
keep the construction manager hon- | superintendent who can oversee the | struction.” Res can be reached at
est amid the competing interests | demolition, get up to speed on the | barbara07675@gmail.com.
that may interfere with the owner | drawings and participate in the early
getting the best price. For example, | buys before foundations start. ccaawripant una moet eee
the CM may have a coterie of subs | Ifthere is no purchasing depart | atetwrsamanGcastucton com
56 » ENR *June 13,2016 enr.com