CRONOGRAMA DE ADQUISICION DE MATERIALES

"CREACION DEL SISTEMA DE AGUA POTABLE Y PERFORACION DE POZO EN EL CENTRO POBLADO EL TARO - DISTRITO DE ALTO LARAN - CHINCHA - ICA"

und cantidad precio total 1er. MES 2do. MES 3 er. MES
DESCRIPCION
MONTO ( S/.) AVANCE % MONTO ( S/.) AVANCE % MONTO ( S/.) AVANCE %
MANO DE OBRA
CAPATAZ hh 184.6042 19.20 3,544.40 1,115.78 31.48% 874.76 24.68% 1,553.86 43.84%
OPERARIO hh 1,643.6443 17.46 28,698.03 9,034.14 31.48% 7,082.67 24.68% 12,581.22 43.84%
OFICIAL hh 659.0074 14.63 9,641.28 3,035.07 31.48% 2,379.47 24.68% 4,226.74 43.84%
PEON hh 2,686.6330 13.18 35,409.82 11,147.01 31.48% 8,739.14 24.68% 15,523.67 43.84%
OPERADOR DE EQUIPO PESADO hh 71.6764 17.46 1,251.47 393.96 31.48% 308.86 24.68% 548.64 43.84%
TOPOGRAFO hh 29.4409 17.46 514.04 161.82 31.48% 126.87 24.68% 225.36 43.84%
TECNICO hh 72.0000 14.63 1,053.36 331.60 31.48% 259.97 24.68% 461.79 43.84%
MATERIALES 0.00
GRASA AMARILLA kg 1.0000 4.50 4.50 0.00 0.00% 1.35 30.00% 3.15 70.00%
PETROLEO D-2 gal 3.7220 12.90 48.01 0.00 0.00% 21.60 45.00% 26.41 55.00%
FLETE TRANSPORTE LOCAL kg 448.8000 0.10 44.88 44.88 100.00% 0.00 0.00% 0.00 0.00%
TRANSPORTE DE MATERIALES glb 1.0000 2,400.00 2,400.00 2,400.00 100.00% 0.00 0.00% 0.00 0.00%
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 2.0000 4,586.02 9,172.04 2,843.33 31.00% 2,293.01 25.00% 4,035.70 44.00%
MOVILIZACION Y DESMOVILIZACION DE EQUIPO BOMBEO - COLUMNA und 1.0000 1,000.00 1,000.00 125.00 12.50% 470.00 47.00% 405.00 40.50%
POZO
EDUCACION SANITARIA glb 1.0000 3,125.00 3,125.00 0.00 0.00% 0.00 0.00% 3,125.00 100.00%
ALAMBRE NEGRO RECOCIDO N° 8 kg 76.1478 3.40 258.90 80.26 31.00% 63.95 24.70% 114.69 44.30%
ALAMBRE NEGRO RECOCIDO N° 16 kg 162.9563 4.80 782.19 246.23 31.48% 193.04 24.68% 342.91 43.84%
ALAMBRE NEGRO N° 16 kg 1.3500 4.90 6.62 2.12 32.00% 1.59 24.00% 2.91 44.00%
ANGULO 2"X2"X1/4"X6M pza 8.2500 88.20 727.65 0.00 0.00% 0.00 0.00% 727.65 100.00%
ANGULO DE ACERO 1"X1"X3/16"x6M pza 8.7680 33.00 289.34 0.00 0.00% 0.00 0.00% 289.34 100.00%
ANGULO DE ACERO 1 1/4"X1 1/4"X3/16"x6M pza 8.1800 46.22 378.08 0.00 0.00% 0.00 0.00% 378.08 100.00%
ANGULO 4"x4"x1/4"x6m SIDERPERU und 0.0667 144.65 9.65 0.00 0.00% 9.65 100.00% 0.00 0.00%
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 3,201.0730 2.25 7,202.41 2,232.75 31.00% 1,800.60 25.00% 3,169.06 44.00%
FIERRO CORRUGADO DE 3/8" kg 0.1380 3.18 0.44 0.14 32.00% 0.11 24.00% 0.19 44.00%
FIERRO CUADRADO DE 3/8" x 3/8" m 6.5000 4.45 28.93 8.68 30.00% 7.23 25.00% 13.02 45.00%
CLAVOS PARA MADERA CON CABEZA DE 1" kg 0.1076 4.90 0.53 0.17 32.00% 0.14 26.00% 0.22 42.00%
CLAVOS PARA MADERA CON CABEZA DE 3" kg 58.3655 4.50 262.64 81.42 31.00% 65.66 25.00% 115.56 44.00%
CLAVOS PARA MADERA CON CABEZA 1/2" kg 12.0000 4.50 54.00 16.82 31.15% 14.77 27.35% 22.41 41.50%
CLAVOS CON CABEZA PROMEDIO kg 4.1249 3.50 14.44 0.00 0.00% 0.00 0.00% 14.44 100.00%
CLAVOS PARA CEMENTO DE ACERO CON CABEZA DE 3/4" kg 5.3400 6.50 34.71 0.00 0.00% 0.00 0.00% 34.71 100.00%
MALLA DE ACERO D=1/8"x2" m2 3.2500 23.53 76.47 0.00 0.00% 0.00 0.00% 76.47 100.00%
PLATINA DE FIERRO 1/2" x 4" m 0.2200 10.50 2.31 0.72 31.13% 0.64 27.70% 0.95 41.17%
PLATINA DE FIERRO 1/8"x1 1/2"x6 m pza 0.8250 68.60 56.60 16.98 30.00% 14.72 26.00% 24.90 44.00%
PLATINA DE FIERRO 1/4 x 1 1/2" x 6 m und 0.0833 88.70 7.39 2.29 31.00% 1.85 25.00% 3.25 44.00%
PLANCHA DE ACERO LISO (1/20) pln 3.3000 100.00 330.00 105.60 32.00% 85.80 26.00% 138.60 42.00%
TEE DE ACERO DE 3/4"X3/4"X1/8"X6M pza 0.2520 22.18 5.59 1.73 31.00% 1.40 25.00% 2.46 44.00%
TEE DE ACERO DE 1"X1"X3/16"X6M pza 5.9948 49.61 297.40 89.22 30.00% 71.38 24.00% 136.80 46.00%
TEE DE ACERO BRIDADO DE 1 1/2" x 1/2" und 2.0000 145.00 290.00 89.90 31.00% 66.70 23.00% 133.40 46.00%
ABRAZADERA DE FIERRO GALVANIZADO 8" und 3.0000 38.50 115.50 34.65 30.00% 27.72 24.00% 53.13 46.00%
ABRAZADERA DE FIERRO FUNDIDO (PRECIO PROMEDIO) und 17.0000 8.52 144.84 46.35 32.00% 36.21 25.00% 62.28 43.00%
TUBERIA PVC-SAP ELECTRICA DE 3/4" X 3 m (20 mm) m 60.4500 1.20 72.54 22.49 31.00% 16.68 23.00% 33.37 46.00%
TUBERIA PVC-SAP ELECTRICA DE 1" X 3 m (25 mm) m 15.7500 1.98 31.19 9.98 32.00% 6.55 21.00% 14.66 47.00%
CURVAS PVC-SAP ELECTRICAS 3/4" (20 mm) und 35.0000 0.80 28.00 8.68 31.00% 6.16 22.00% 13.16 47.00%
UNIONES PVC-SAP 3/4" ELECTRICAS (20 mm) und 3.0000 0.90 2.70 0.89 33.00% 0.62 23.00% 1.19 44.00%
UNIONES PVC-SAP 1" ELECTRICAS (25 mm) und 0.1500 2.00 0.30 0.10 32.00% 0.07 24.00% 0.13 44.00%
TUBERIA PVC SAP 1/2" CLASE 10 m 92.0000 1.80 165.60 51.34 31.00% 39.74 24.00% 74.52 45.00%
TUBERIA PVC 4" CLASE 10 ISO 4422 m 6.0000 30.00 180.00 57.60 32.00% 45.00 25.00% 77.40 43.00%
TUBERIA PVC 6" CLASE 10 ISO 4422 m 50.0000 20.00 1,000.00 330.00 33.00% 240.00 24.00% 430.00 43.00%
CODO PVC SAP 1/2" X 90° und 34.0000 2.45 83.30 25.82 31.00% 19.16 23.00% 38.32 46.00%
TAPON HEMBRA SP PVC PARA AGUA DE 4" und 6.0000 45.00 270.00 83.70 31.00% 67.50 25.00% 118.80 44.00%
CURVA PVC 1/2" P/AGUA und 17.0000 2.91 49.47 15.83 32.00% 11.87 24.00% 21.77 44.00%
UNIONES PVC-SAP S/P 1/2" und 34.0000 1.00 34.00 11.22 33.00% 7.82 23.00% 14.96 44.00%
UNION DE REPARACION PVC DE 75mm (3") x 75mm (3") und 4.0000 14.56 58.24 18.05 31.00% 13.98 24.00% 26.21 45.00%
ADAPTADOR PVC-SAP S/P 1 1/2" und 2.0000 12.45 24.90 7.97 32.00% 5.98 24.00% 10.96 44.00%
TUBERIA DE PVC U.F C-7.5 DN 75mm ISO 4422 m 1.2500 9.18 11.48 3.56 31.00% 2.87 25.00% 5.05 44.00%
TUBERIA PVC U.F C-7.5 DN 75 mm ISO 4422 m 940.1222 7.90 7,426.97 2,376.63 32.00% 1,559.66 21.00% 3,490.68 47.00%
TUBERIA PVC UF S-20 DN 37.5 mm ISO 4435 und 2.9400 15.48 45.51 15.02 33.00% 10.01 22.00% 20.48 45.00%
TUBERIA DE PVC U.F 37.5 ISO 4422 C-10 m 36.0500 24.58 886.11 292.42 33.00% 203.81 23.00% 389.89 44.00%
CODO PVC UF 75 mm x 22.5° C-7.5 und 24.0000 15.00 360.00 111.60 31.00% 86.40 24.00% 162.00 45.00%
CODO PVC UF 75 mm x 45° C-7.5 und 4.0000 28.45 113.80 36.42 32.00% 28.45 25.00% 48.93 43.00%
CODO PVC UF DN 37.5 mm x 45° und 2.0000 28.45 56.90 18.78 33.00% 13.09 23.00% 25.04 44.00%
CODO PVC UF DN 37.5 mm x 90° und 3.0000 28.45 85.35 26.46 31.00% 20.48 24.00% 38.41 45.00%
CODO PVC UF DN 37.5 mm x 90° und 2.0000 45.00 90.00 28.80 32.00% 22.50 25.00% 38.70 43.00%
TEE PVC UF 75mm x 75mm C-7.5 und 2.0000 24.00 48.00 15.36 32.00% 11.04 23.00% 21.60 45.00%
CORPORATION RT-NIPLE-TUERCA-EMPAQ. 1/2" und 17.0000 5.50 93.50 30.86 33.00% 22.44 24.00% 40.21 43.00%
NIPLE PVC DE 1/2" CON TUERCA und 17.0000 2.98 50.66 15.70 31.00% 12.67 25.00% 22.29 44.00%
TRANSICION PVC UF @ FºFº MAZZA 75 mm und 12.0000 18.00 216.00 69.12 32.00% 49.68 23.00% 97.20 45.00%
TRANSICION SCH 40 BB 1 1/2" @ PVC UF und 1.0000 84.45 84.45 27.87 33.00% 20.27 24.00% 36.31 43.00%
TAPON PVC UF 75mm C-7.5 und 4.0000 14.50 58.00 17.98 31.00% 14.50 25.00% 25.52 44.00%
TUBERIA PVC SAL 4" X 3 m pza 5.3000 14.68 77.80 24.90 32.00% 18.67 24.00% 34.23 44.00%
TUBERIA PVC SAL 2" X 3 m pza 5.6000 3.20 17.92 5.56 31.00% 4.12 23.00% 8.24 46.00%
CODO PVC-SAL 2" X 90° und 2.0000 2.30 4.60 1.52 33.00% 1.15 25.00% 1.93 42.00%
UNION FLEXIBLE TIPO DRESSER DE 1 1/2" und 5.0000 245.78 1,228.90 380.96 31.00% 294.94 24.00% 553.01 45.00%
UNION FLEXIBLE TIPO DRESSER DE 1/2" und 2.0000 112.45 224.90 71.97 32.00% 51.73 23.00% 101.21 45.00%
RAMAL TEE SIMPLE PVC SAL DE 2" und 2.0000 14.50 29.00 9.57 33.00% 7.25 25.00% 12.18 42.00%
TEE SANITARIA PVC-SAL DE 4" A 2" und 2.0000 15.50 31.00 10.23 33.00% 7.44 24.00% 13.33 43.00%
PIEDRA CHANCADA 1/2" m3 26.9050 55.00 1,479.78 458.73 31.00% 355.15 24.00% 665.90 45.00%
PIEDRA MEDIANA m3 0.4133 55.00 22.73 7.27 32.00% 5.23 23.00% 10.23 45.00%
PIEDRA MEDIANA DE 4" m3 0.1152 48.00 5.53 1.71 31.00% 1.38 25.00% 2.43 44.00%
PIEDRA GRANDE DE 8" m3 3.2820 50.00 164.10 52.51 32.00% 39.38 24.00% 72.20 44.00%
CANTO RODADO 1/4" m3 10.2700 280.00 2,875.60 948.95 33.00% 718.90 25.00% 1,207.75 42.00%
ARENA FINA m3 9.4087 38.00 357.53 107.26 30.00% 92.96 26.00% 157.31 44.00%
ARENA GRUESA m3 242.7876 15.00 3,641.81 1,092.54 30.00% 874.03 24.00% 1,675.23 46.00%
HORMIGON m3 47.9595 35.00 1,678.58 520.36 31.00% 419.65 25.00% 738.58 44.00%
MATERIAL DE PRESTAMO SELECCIONADO OBRA m3 1.0360 28.40 29.42 9.41 32.00% 7.06 24.00% 12.94 44.00%
AFIRMADO m3 10.1235 25.21 255.21 79.12 31.00% 58.70 23.00% 117.40 46.00%
AFIRMADO
AGUA PUESTA EN OBRA m3 0.4496 8.00 3.60 1.19 33.00% 0.79 22.00% 1.62 45.00%
TUBERIA PVC-SEL 5/8" X 3 m m 29.0000 1.68 48.72 14.62 30.00% 11.21 23.00% 22.90 47.00%
CURVAS PVC-SEL 5/8" und 8.0000 0.85 6.80 2.11 31.00% 1.63 24.00% 3.06 45.00%
CODO F°F° C/BRIDA 1 1/2" x 45° und 2.0000 125.45 250.90 80.29 32.00% 62.73 25.00% 107.89 43.00%
CODO F°F° C/BRIDA 1 1/2" x 90° und 2.0000 125.00 250.00 82.50 33.00% 60.00 24.00% 107.50 43.00%
WATER STOP PVC DE 9" m 12.1800 22.35 272.22 0.00 0.00% 0.00 0.00% 272.22 100.00%
ANILLO 75 mm UF PARA PVC und 250.5480 2.00 501.10 0.00 0.00% 0.00 0.00% 501.10 100.00%
ANILLO DE JEBE DN=37.5 mm und 14.0000 5.40 75.60 0.00 0.00% 0.00 0.00% 75.60 100.00%
ANILLO 37.5 mm UF PARA PVC und 8.8300 4.50 39.74 0.00 0.00% 0.00 0.00% 39.74 100.00%
ANILLO 37.5 mm UF PARA PVC und 2.0000 2.59 5.18 0.00 0.00% 0.00 0.00% 5.18 100.00%
CEMENTO PORTLAND TIPO I (42.5 kg) bol 739.6380 17.50 12,943.67 4,012.54 31.00% 3,753.66 29.00% 5,177.47 40.00%
YESO BOLSA 28 kg bol 0.9380 8.00 7.50 2.40 32.00% 1.80 24.00% 3.30 44.00%
YESO BOLSA 18 kg bol 0.0663 15.00 0.99 0.31 31.15% 0.25 25.00% 0.43 43.85%
TIZA kg 45.8370 0.85 38.96 12.08 31.00% 8.96 23.00% 17.92 46.00%
LADRILLO KK 18 HUECOS 9X13X24 cm und 4,591.0200 0.56 2,570.97 822.71 32.00% 617.03 24.00% 1,131.23 44.00%
LADRILLO PASTELERO DE 3X24X24 cm und 423.3000 0.70 296.31 86.66 29.24% 74.08 25.00% 135.58 45.76%
LADRILLO PARA TECHO 8H DE 15X30X30 cm und 227.8500 2.20 501.27 156.05 31.13% 130.33 26.00% 214.89 42.87%
PERNO HEXAGONAL PARA BRIDA DE 8" INCLUYE TUERCA und 300.0000 10.00 3,000.00 930.00 31.00% 720.00 24.00% 1,350.00 45.00%
PERNO HEXAGONAL PARA BRIDA DE 1 1/2" INCLUYE TUERCA und 304.0000 2.84 863.36 276.28 32.00% 215.84 25.00% 371.24 43.00%
PERNO HEXAGONAL PARA BRIDA DE 1/2" INCLUYE TUERCA und 12.0000 2.05 24.60 7.63 31.00% 5.66 23.00% 11.32 46.00%
CONCRETO C:H 1:10 CEMENTO TIPO V m3 0.8010 235.65 188.76 60.40 32.00% 39.64 21.00% 88.72 47.00%
NIPLE HFD DOBLE BB DN 200 MM und 1.5000 134.50 201.75 66.58 33.00% 44.39 22.00% 90.79 45.00%
NIPLE HFD DOBLE BB DN 37.5 MM und 1.8000 134.50 242.10 75.05 31.00% 55.68 23.00% 111.37 46.00%
CAJA DE CONCRETO PREFABRICADA DE AGUA und 17.0000 40.00 680.00 0.00 0.00% 0.00 0.00% 680.00 100.00%
CAJA CONCRETO DESAGUE 12"X24" und 1.0000 60.00 60.00 0.00 0.00% 0.00 0.00% 60.00 100.00%
PEGAMENTO PARA PVC gal 0.1000 110.00 11.00 3.63 33.00% 2.64 24.00% 4.73 43.00%
PEGAMENTO PARA TUB. PVC gal 0.0929 94.80 8.81 2.82 32.00% 2.20 25.00% 3.79 43.00%
PEGAMENTO PARA PVC AGUA FORTUIT gal 0.1100 110.00 12.10 3.75 31.00% 3.15 26.00% 5.20 43.00%
COLA SINTETICA FULLER gal 0.1015 30.00 3.05 0.98 32.00% 0.73 24.00% 1.34 44.00%
LUBRICANTE PARA TUB. PVC gal 11.5078 23.72 272.97 90.08 33.00% 62.78 23.00% 120.11 44.00%
ADITIVO IMPERMEABILIZANTE CHEMA 1 EN POLVO kg 56.4579 8.50 479.89 148.77 31.00% 115.17 24.00% 215.95 45.00%
IMPERMEABILIZANTE gal 4.5801 29.00 132.82 42.50 32.00% 33.21 25.00% 57.11 43.00%
ADITIVO CURADOR gal 0.6543 16.80 10.99 3.30 30.00% 2.53 23.00% 5.17 47.00%
MADERA TORNILLO p2 805.7163 4.80 3,867.44 1,198.91 31.00% 966.86 25.00% 1,701.67 44.00%
MADERA TORNILLO INC. CORTE P/ENCOFRADO p2 1,059.7628 2.50 2,649.41 847.81 32.00% 635.86 24.00% 1,165.74 44.00%
MADERA NACIONAL P/ENCOFRADO-CARP. p2 27.7638 4.80 133.27 41.31 31.00% 33.32 25.00% 58.64 44.00%
ESTACA DE MADERA TORNILLO TRATADA p2 0.8760 4.50 3.94 1.18 30.00% 1.02 26.00% 1.73 44.00%
MADERA NACIONAL PARA ENCOF. Y CARPINT. p2 0.4197 4.80 2.01 0.58 29.00% 0.46 23.00% 0.96 48.00%
MADERA TORNILLO CEPILLADA p2 27.9474 4.62 129.12 27.12 21.00% 30.99 24.00% 71.02 55.00%
MADERA CEDRO p2 26.8585 4.90 131.61 43.43 33.00% 32.90 25.00% 55.28 42.00%
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE glb 1.0000 2,100.34 2,100.34 651.11 31.00% 546.09 26.00% 903.15 43.00%
SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCION INDIVUDUAL glb 15.0000 159.45 2,391.75 2,391.75 100.00% 0.00 0.00% 0.00 0.00%
EQUIPOS DE PROTECCION COLECTIVA glb 1.0000 800.32 800.32 800.32 100.00% 0.00 0.00% 0.00 0.00%
SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.0000 670.61 670.61 670.61 100.00% 0.00 0.00% 0.00 0.00%
CAPACITACION EN SEGURIDAD Y SALUD glb 1.0000 1,784.68 1,784.68 1,784.68 100.00% 0.00 0.00% 0.00 0.00%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y glb 1.0000 396.24 396.24 122.83 31.00% 99.06 25.00% 174.35 44.00%
SALUD
ESTACAENDEEL TRABAJO
MADERA p2 0.2000 4.50 0.90 0.29 32.00% 0.23 25.00% 0.39 43.00%
TRIPLAY pln 18.0000 22.90 412.20 136.03 33.00% 98.93 24.00% 177.25 43.00%
TRIPLAY LUPUNA 4 x 8 x 4 mm pln 1.6240 30.00 48.72 15.10 31.00% 12.67 26.00% 20.95 43.00%
TRIPLAY DE 1.20X2.40 m X 12 mm und 11.1055 18.20 202.12 60.64 30.00% 48.51 24.00% 92.98 46.00%
ANDAMIO METAL C/TABLAS ALQUILER est 40.9661 80.00 3,277.29 1,048.73 32.00% 753.78 23.00% 1,474.78 45.00%
REGLA DE MADERA p2 1.0706 6.80 7.28 2.26 31.00% 1.82 25.00% 3.20 44.00%
CANDADO INC. ALDABA und 4.0000 33.80 135.20 0.00 0.00% 0.00 0.00% 135.20 100.00%
CANDADO FORTE 40 MM und 1.0000 32.50 32.50 0.00 0.00% 0.00 0.00% 32.50 100.00%
CHAPA P/PUERTA PRINC. C/LLAVES INTERIOR Y EXTERIOR 2 GOLPES und 4.2600 48.50 206.61 0.00 0.00% 0.00 0.00% 206.61 100.00%
CERRADURA DE 3 GOLPES PARA PUERTAS und 1.0000 58.82 58.82 0.00 0.00% 0.00 0.00% 58.82 100.00%
BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/2" und 7.0000 4.50 31.50 0.00 0.00% 0.00 0.00% 31.50 100.00%
BISAGRA DE FIERRO DE 4" PARA PUERTA und 12.7800 12.40 158.47 0.00 0.00% 0.00 0.00% 158.47 100.00%
CERRADURA GEO PUERTA DE PASO und 1.0000 35.60 35.60 0.00 0.00% 0.00 0.00% 35.60 100.00%
LIJA PARA MADERA plg 0.4060 1.68 0.68 0.21 31.00% 0.16 24.00% 0.31 45.00%
LIJA PARA FIERRO plg 1.9320 1.68 3.25 1.11 34.00% 0.81 25.00% 1.33 41.00%
LIJA PARA PARED plg 9.0320 1.70 15.35 4.61 30.00% 3.99 26.00% 6.75 44.00%
LIJA und 16.7262 1.68 28.10 8.15 29.00% 6.46 23.00% 13.49 48.00%
LIJA PARA MADERA und 1.4060 1.68 2.36 0.73 31.00% 0.57 24.00% 1.06 45.00%
LIJA PARA MADERA hja 3.0000 2.50 7.50 2.40 32.00% 1.88 25.00% 3.23 43.00%
PINTURA LATEX LAVABLE gal 9.1604 50.85 465.81 144.40 31.00% 121.11 26.00% 200.30 43.00%
PINTURA ESMALTE gal 2.8283 34.50 97.58 29.27 30.00% 23.42 24.00% 44.89 46.00%
PINTURA ESMALTE SINTETICO gal 2.2231 29.41 65.38 18.96 29.00% 16.35 25.00% 30.07 46.00%
PINTURA PARA TRAFICO gal 1.0000 49.00 49.00 13.72 28.00% 12.74 26.00% 22.54 46.00%
PINTURA ANTICORROSIVA gal 0.3957 26.74 10.58 3.17 30.00% 2.54 24.00% 4.87 46.00%
PINTURA ANTICORROSIVA EPOXICA gal 2.2377 36.90 82.57 25.60 31.00% 20.64 25.00% 36.33 44.00%
PINTURA ANTICORROSIVA EPOX-USO NAVAL gal 0.7920 150.00 118.80 38.02 32.00% 28.51 24.00% 52.27 44.00%
THINNER gal 0.4554 16.90 7.70 2.54 33.00% 1.77 23.00% 3.39 44.00%
IMPRIMANTE kg 53.8250 0.86 46.29 14.35 31.00% 12.04 26.00% 19.90 43.00%
SELLADOR gal 4.8846 21.00 102.58 30.77 30.00% 25.65 25.00% 46.16 45.00%
BARNIZ MARINO gal 0.1015 39.11 3.97 1.15 29.00% 0.95 24.00% 1.87 47.00%
BARNIZ SELLADOR PARA MADERA gal 0.0974 36.56 3.56 1.14 32.00% 0.93 26.00% 1.50 42.00%
CINTA AISLANTE rll 1.0968 2.52 2.76 0.86 31.00% 0.63 23.00% 1.27 46.00%
CINTA TEFLON und 3.0600 2.50 7.65 2.45 32.00% 1.76 23.00% 3.44 45.00%
CINTA TEFLON m 5.4667 0.15 0.82 0.27 33.00% 0.20 24.00% 0.35 43.00%
CINTA SEÑALIZADORA COLOR AMARILLO m 4,019.9880 0.10 402.00 124.62 31.00% 100.50 25.00% 176.88 44.00%
VIDRIO SEMIDOBLE COLOR GRIS p2 4.3680 4.80 20.97 6.71 32.00% 5.45 26.00% 8.81 42.00%
PERNOS HEXAGONALES DE 1/2" x 6" INC. TUERCA und 2.0000 3.05 6.10 1.83 30.00% 1.53 25.00% 2.75 45.00%
PERNOS HEXAGONALES DE 3/4" x 4" INC. TUERCA und 2.0000 3.05 6.10 1.77 29.00% 1.65 27.00% 2.68 44.00%
SOPORTE T/ABRAZADERA P/TUBERIA DN 200-160mm und 12.0000 32.60 391.20 109.54 28.00% 109.54 28.00% 172.13 44.00%
TANQUE ELEVADO DE 600 Lts C/ACCESORIOS und 1.0000 351.33 351.33 0.00 0.00% 0.00 0.00% 351.33 100.00%
TUBERIA DE FIERRO GALVANIZADO 3/4" m 20.9000 11.51 240.56 74.93 31.15% 65.79 27.35% 99.83 41.50%
VENTILACION C/TUB. FIERRO PINTADA DE 4" und 1.0000 245.00 245.00 78.40 32.00% 58.80 24.00% 107.80 44.00%
TUBERIA DE FIERRO GALVANIZADO 1 1/2" m 25.1600 40.50 1,018.98 315.88 31.00% 254.75 25.00% 448.35 44.00%
PUERTA PARA REGLA GRADUADA S/DISEÑO und 1.0000 835.00 835.00 244.19 29.24% 217.10 26.00% 373.71 44.76%
REJILLA METALICA PLATINA 1/10"x1/4" glb 1.0000 148.50 148.50 46.23 31.13% 35.64 24.00% 66.63 44.87%
REJILLA DE FIERRO/PLATINA EN DUCTO DE IZAJE DE OBRA glb 1.0000 400.00 400.00 128.00 32.00% 100.00 25.00% 172.00 43.00%
CODO FIERRO GALVANIZADO DE 1/2" X 90° und 2.0000 1.00 2.00 1.54 77.05% 0.46 23.00% 0.00 -0.05%
CODO DE FIERRO FUNDIDO BRIDADO DE 1 1/2" und 2.0000 23.48 46.96 14.56 31.00% 11.27 24.00% 21.13 45.00%
NIPLE DE FIERRO GALVANIZADO DE 1½" x 2½" und 2.0000 15.48 30.96 9.91 32.00% 7.74 25.00% 13.31 43.00%
NIPLE DE ACERO BRIDADO DE 2" x 0.25m und 4.0000 22.70 90.80 29.96 33.00% 23.61 26.00% 37.23 41.00%
NIPLE DE ACERO SOLDADO A TUBO DE SALIDA C/VALVULA DE 1" und 1.0000 7.80 7.80 2.65 34.00% 1.87 24.00% 3.28 42.00%
NIPLE DE ACERO BRIDADO DE 1 1/2" x 0.15m und 18.0000 23.15 416.70 125.01 30.00% 95.84 23.00% 195.85 47.00%
TEE 1 1/2"x1 1/2"x1/8"x6M und 2.0625 8.95 18.46 5.35 29.00% 4.62 25.00% 8.49 46.00%
TEE FF DUCTIL BB DN 200MM X 150MM und 1.0000 450.00 450.00 126.00 28.00% 117.00 26.00% 207.00 46.00%
MEDIDOR DE CAUDAL HIDROMETRO WOLTMANN VERTICAL und 2.0000 1,500.00 3,000.00 0.00 0.00% 0.00 0.00% 3,000.00 100.00%
TEE FF DUCTIL BB DN 37.5MM X 37.5MM und 2.0000 89.45 178.90 50.09 28.00% 48.30 27.00% 80.51 45.00%
UNION SIMPLE DE FIERRO GALVANIZADODE 2" und 1.0000 8.95 8.95 2.77 31.00% 2.33 26.00% 3.85 43.00%
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1½" und 2.0000 23.45 46.90 15.01 32.00% 11.73 25.00% 20.17 43.00%
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 2" und 2.0000 27.50 55.00 18.15 33.00% 13.20 24.00% 23.65 43.00%
TORNAPUNTA METALICA DE EXTENSION und 80.0000 4.62 369.60 114.58 31.00% 92.40 25.00% 162.62 44.00%
TUBERIA SCHELUDE 40 DE 1 1/2" (37mm) m 9.3000 45.00 418.50 133.92 32.00% 108.81 26.00% 175.77 42.00%
TUBERIA SCHELUDE 40 DE 1 1/2" (12.5mm) m 6.0000 12.45 74.70 23.16 31.00% 20.17 27.00% 31.37 42.00%
TUBERIA INTERIOR (EJE ESTABILIZADOR) DE 1.7x18"x3.05m C/U und 1.0000 259.55 259.55 83.06 32.00% 72.67 28.00% 103.82 40.00%
BRIDA DE ACERO PARA SOLDAR O EMPERNAR DE 1 1/2" und 18.0000 25.40 457.20 150.88 33.00% 114.30 25.00% 192.02 42.00%
BRIDA DE ACERO PARA SOLDAR O EMPERNAR DE 1/2" und 8.0000 8.94 71.52 21.46 30.00% 18.60 26.00% 31.47 44.00%
BRIDA DE ACERO PARA SOLDAR O EMPERNAR DE 1 1/2" und 30.0000 38.42 1,152.60 334.25 29.00% 276.62 24.00% 541.72 47.00%
BRIDA ACERO PARA SOLDAR ROMPE AGUA DE 1 1/2" und 18.0000 32.48 584.64 163.70 28.00% 146.16 25.00% 274.78 47.00%
BRIDA HD PARA SOLDAR ROMPE AGUA DN 37.5 MM und 1.0000 42.13 42.13 13.06 31.00% 10.95 26.00% 18.12 43.00%
VALVULA CHECK BRONCE BRIDA CIERRE LENTO 1 1/2" und 1.0000 256.45 256.45 82.06 32.00% 61.55 24.00% 112.84 44.00%
EMPAQUETADURA DE JEBE ENLONADO DE 10" und 38.0000 10.34 392.92 129.66 33.00% 106.09 27.00% 157.17 40.00%
EMPAQUETADURA DE JEBE ENLONADO DE 4" und 14.0000 6.49 90.86 28.17 31.00% 23.62 26.00% 39.07 43.00%
EMPAQUETADURA DE JEBE ENLONADO DE 1 1/2" und 24.0000 3.10 74.40 22.32 30.00% 18.60 25.00% 33.48 45.00%
VALVULA DE PASO 1/2" TR-NIPLE-TUERCA-EMPAQ. und 34.0000 12.30 418.20 125.46 30.00% 100.37 24.00% 192.37 46.00%
VALVULA COMPUERTA DE 1 1/2" und 1.0300 215.45 221.91 68.79 31.00% 57.70 26.00% 95.42 43.00%
VALVULA COMPUERTA DE BDR DE 1 1/2" und 1.0000 110.56 110.56 35.38 32.00% 29.85 27.00% 45.33 41.00%
VALVULA COMPUERTA DE BDR DE 1/2" und 2.0000 37.56 75.12 22.54 30.00% 19.53 26.00% 33.05 44.00%
VALVULA DE AIRE DE 75 mm FFD und 1.0000 1,245.48 1,245.48 386.10 31.00% 311.37 25.00% 548.01 44.00%
VALVULA PURGA 75mm FFD und 1.0000 425.78 425.78 136.25 32.00% 114.96 27.00% 174.57 41.00%
VALVULA COMPUERTA TIPO MAZZA 75 mm und 6.0000 240.00 1,440.00 475.20 33.00% 360.00 25.00% 604.80 42.00%
VALVULA DE ALIVIO BB CON PILOTO DE 1/2" und 1.0000 126.78 126.78 38.03 30.00% 32.96 26.00% 55.78 44.00%
VALVULA DE AIRE DE FIERRO FUNDIDO 1/2" und 1.0000 189.56 189.56 54.97 29.00% 51.18 27.00% 83.41 44.00%
MANGUERA DE 1"x1/8" SEGUN DISEÑO und 1.0000 135.68 135.68 43.42 32.00% 33.92 25.00% 58.34 43.00%
SOLDADURA ELECTRICA CELLOCORD P 3/16" kg 0.5500 16.86 9.27 2.87 31.00% 2.32 25.00% 4.08 44.00%
SOLDADURA ELECTRICA CELLOCORD PUNTO AZUL 3/16" kg 49.3020 15.88 782.92 234.88 30.00% 187.90 24.00% 360.14 46.00%
SOLDADURA CITODUR 600 kg 24.0000 55.00 1,320.00 422.40 32.00% 343.20 26.00% 554.40 42.00%
SOLDADURA INOXIDABLE BW kg 1.9000 50.00 95.00 29.45 31.00% 23.75 25.00% 41.80 44.00%
DRISSA DE NYLON DE 1/4" m 21.0000 1.20 25.20 7.56 30.00% 6.05 24.00% 11.59 46.00%
FLOTADOR DE BRONCE DE 5" und 1.0000 345.20 345.20 100.11 29.00% 86.30 25.00% 158.79 46.00%
MANOMETRO DE PRESION und 2.0000 75.00 150.00 42.00 28.00% 39.00 26.00% 69.00 46.00%
BOMBA SUMERGIBLE TIPO TURBINA VERTICAL Q=1.5LPS, ADT=40.00m, und 1.0000 7,245.38 7,245.38 0.00 0.00% 0.00 0.00% 7,245.38 100.00%
BOMBA DE 5HP, 220V
FLUORESCENTE Ø 1 1/2"40 W C/EQUIPO
CIRCULAR und 3.0000 23.00 69.00 21.39 31.00% 16.56 24.00% 31.05 45.00%
CANASTILLA DE BRONCE BRIDADA DE 1 1/2" und 2.0000 198.45 396.90 127.01 32.00% 99.23 25.00% 170.67 43.00%
INTERRUPTOR TERMOMAGNETICO 3 X40 A und 1.0000 92.40 92.40 30.49 33.00% 22.18 24.00% 39.73 43.00%
INTERRUPTOR TERMOMAGNETICO 2 X20 A X 240 V und 4.0000 25.00 100.00 31.00 31.00% 26.00 26.00% 43.00 43.00%
INTERRUPTOR TERMOMAGNETICO 2 X20 A und 1.0000 34.10 34.10 10.91 32.00% 8.18 24.00% 15.00 44.00%
INTERRUPTOR TERMOMAGNETICO 2 X30 A und 1.0000 34.10 34.10 10.57 31.00% 8.53 25.00% 15.00 44.00%
INTERRUPTOR SIMPLE TICINO und 5.0000 6.50 32.50 10.40 32.00% 8.45 26.00% 13.65 42.00%
TOMACORRIENTE BIPOLAR DOBLE und 2.0000 3.90 7.80 2.42 31.00% 2.11 27.00% 3.28 42.00%
TOMACORRIENTE DOBLE PLANO BAKELITA und 5.0000 8.50 42.50 12.75 30.00% 10.63 25.00% 19.13 45.00%
TUBO DE ACERO NEGRO 21" (ALQUILER) und 13.2000 65.00 858.00 248.82 29.00% 223.08 26.00% 386.10 45.00%
SELLO METALICO CON PLANCHA NEGRA LAS 1/4"x4x8 CON SOLDADURA glb 1.0000 700.00 700.00 217.00 31.00% 168.00 24.00% 315.00 45.00%
1/8"
TUBERIA DE ACERO INOXIDABLE DE 5"x15mm m 5.0000 200.00 1,000.00 320.00 32.00% 230.00 23.00% 450.00 45.00%
TUBERIA FILTRO INOXIDABLE D=5"x1.5mm TIPO 304 m 5.0000 150.00 750.00 232.50 31.00% 187.50 25.00% 330.00 44.00%
TUBERIA ACERO NEGRO DE 5"x1/4" m 29.8700 100.00 2,987.00 955.84 32.00% 746.75 25.00% 1,284.41 43.00%
TUBO DE FIERRO NEGRO SCHELUDEE 40 DE 1 1/2" (37.5 mm) m 18.5400 124.98 2,317.13 764.65 33.00% 556.11 24.00% 996.37 43.00%
VIGA DE ACERO H 6"x6"x3/8" m 4.0000 12.00 48.00 14.40 30.00% 12.48 26.00% 21.12 44.00%
CAJA OCTOGONAL PLASTICO 4" x 2" x 2" und 7.0000 1.34 9.38 2.72 29.00% 2.25 24.00% 4.41 47.00%
CAJA RECTANGULAR PLASTICO DE 4" x 2" x 2" und 12.0000 1.26 15.12 4.69 31.00% 3.78 25.00% 6.65 44.00%
CAJA DE PASE CUADRADA DE FIERRO GALVANIZADO SAP 100 X 100 X50 und 1.0000 1.45 1.45 0.44 30.00% 0.38 26.00% 0.64 44.00%
mm
CAJA METAL PARA INDICADOR NIVEL und 1.0000 98.00 98.00 30.38 31.00% 26.46 27.00% 41.16 42.00%
TAPA METALICA und 1.0000 350.00 350.00 112.00 32.00% 87.50 25.00% 150.50 43.00%
TAPA PL LAC S/D P ING. RESERVORIO und 1.0000 348.00 348.00 114.84 33.00% 95.18 27.35% 137.98 39.65%
CABLE THW # 4 AWG m 16.5000 12.20 201.30 62.40 31.00% 50.33 25.00% 88.57 44.00%
ALAMBRE TW 2.5 mm2 m 100.0000 0.10 10.00 3.20 32.00% 2.60 26.00% 4.20 42.00%
ALAMBRE TW 4 mm2 m 20.0000 0.21 4.20 1.30 31.00% 1.01 24.00% 1.89 45.00%
CABLE TW # 14 AWG 2.5 mm2 m 100.7500 1.26 126.95 39.52 31.13% 33.01 26.00% 54.42 42.87%
SISTEMA DE UTILIZACION EN MEDIA TENSION 10-22.9 Kv glb 1.0000 91,456.78 91,456.78 31,095.31 34.00% 28,351.60 31.00% 32,009.87 35.00%
CABLE ENERGIA NYY 1 KV UNIPOLAR 1x2.5 mm2 m 15.7500 12.20 192.15 59.57 31.00% 43.23 22.50% 89.35 46.50%
REFLECTOR TIPO LED ALTO LUMINACS und 2.0000 38.00 76.00 24.32 32.00% 18.24 24.00% 33.44 44.00%
FLUORESCENTE RECTO ISPE 2x40 W C/EQ + PANT und 6.0000 25.13 150.78 49.76 33.00% 37.70 25.00% 63.33 42.00%
BANCO DE CONDENSADORES REGULARES PARA MOTOR 25 HO und 1.0000 1,200.00 1,200.00 360.00 30.00% 312.00 26.00% 528.00 44.00%
TUERCA HEXAGONAL 5/8" und 48.0000 2.00 96.00 27.84 29.00% 23.04 24.00% 45.12 47.00%
HUACHA PLANA 3/4" und 48.0000 1.00 48.00 13.44 28.00% 12.00 25.00% 22.56 47.00%
UNION DE DESMONTAJE TIPO DRESSER HD BB DN 37.5 MM und 4.0000 62.34 249.36 77.30 31.00% 64.83 26.00% 107.22 43.00%
POZO DE TIERRA und 1.0000 750.00 750.00 240.00 32.00% 202.50 27.00% 307.50 41.00%
PERNO 1"x4" und 48.0000 8.00 384.00 126.72 33.00% 92.16 24.00% 165.12 43.00%
TABLERO ELECTRICO METAL - 3 CIRCUITOS und 1.0000 145.00 145.00 44.95 31.00% 36.25 25.00% 63.80 44.00%
TABLERO GABINETE METAL BARRA BRONCE 6 POLOS und 1.0000 245.00 245.00 78.40 32.00% 63.70 26.00% 102.90 42.00%
WINCHA und 0.0300 5.00 0.15 0.05 34.00% 0.04 24.00% 0.06 42.00%
HIPOCLORITO DE CALCIO AL 70% kg 12.9277 20.00 258.55 74.98 29.00% 64.64 25.00% 118.93 46.00%
AGUA und 3.9258 1.83 7.18 2.01 28.00% 1.72 24.00% 3.45 48.00%
AGUA m3 369.0143 1.83 675.30 182.33 27.00% 168.83 25.00% 324.14 48.00%
GIGANTOGRAFIA DE 3.60 x 2.40m und 1.0000 250.00 250.00 77.50 31.00% 65.00 26.00% 107.50 43.00%
TRANSFORMADOR 220/120V und 0.5000 158.00 79.00 24.49 31.00% 19.75 25.00% 34.76 44.00%
CORDEL m 6.0971 0.50 3.05 0.98 32.00% 0.73 24.00% 1.34 44.00%
POLEA METALICA DE DIAMETRO 3" x 1/2" und 4.0000 135.00 540.00 178.20 33.00% 135.00 25.00% 226.80 42.00%
CASETA PARA ALMACEN Y GUARDIANIA glb 1.0000 1,800.00 1,800.00 540.00 30.00% 468.00 26.00% 792.00 44.00%
DISEÑO DE MEZCLA DE CONCRETO und 2.0000 350.00 700.00 217.00 31.00% 175.00 25.00% 308.00 44.00%
PROBETAS P/TESTIGOS und 10.0000 25.00 250.00 80.00 32.00% 60.00 24.00% 110.00 44.00%
DIAGRAFIA, RESISTIVIDAD, RAYOS GAMMA, ETC und 2.0000 2,200.00 4,400.00 0.00 0.00% 0.00 0.00% 4,400.00 100.00%
REGLA GRADUADA I/ACCESOR Y PINTUA und 1.0000 553.27 553.27 160.45 29.00% 132.78 24.00% 260.04 47.00%
CENTRALIZADORES und 10.0000 350.00 3,500.00 1,085.00 31.00% 875.00 25.00% 1,540.00 44.00%
ANALISIS FISICO Y BACTERIOLOGICO und 5.0000 300.00 1,500.00 480.00 32.00% 390.00 26.00% 630.00 42.00%
TRIPOLIFOSFATO SODICO kg 15.7500 25.00 393.75 118.13 30.00% 94.50 24.00% 181.13 46.00%
EQUIPOS 0.00
MEDIDOR DE CAUDAL TUBULAR DE 1 1/2" (37.5 mm) pza 1.0000 845.89 845.89 0.00 0.00% 0.00 0.00% 845.89 100.00%
TEODOLITO hm 10.2873 15.00 154.31 47.84 31.00% 37.03 24.00% 69.44 45.00%
EQUIPO TOGRAFICO hm 0.7008 8.50 5.96 1.91 32.00% 1.49 25.00% 2.56 43.00%
EQUIPO COMPLETO DE BOMBEO PARA PRUEBA DE POZO hm 40.0000 140.00 5,600.00 1,680.00 30.00% 1,456.00 26.00% 2,464.00 44.00%
MIRA TOPOGRAFICA hm 9.5804 4.00 38.32 11.88 31.00% 8.81 23.00% 17.63 46.00%
NIVEL TOPOGRAFICO hm 18.4530 5.00 92.27 27.68 30.00% 22.14 24.00% 42.44 46.00%
TEODOLITO Y MIRA hm 9.1914 12.80 117.65 34.12 29.00% 28.24 24.00% 55.30 47.00%
TRIPODE Y CABLE PARA PRUEBA DE VERTICABILIDAD hm 5.3333 10.00 53.33 14.93 28.00% 13.33 25.00% 25.07 47.00%
HERRAMIENTAS MANUALES %mo 2,451.04 735.31 30.00% 637.27 26.00% 1,078.46 44.00%
BOMBA NEUMATICA DE 4HP hm 4.0000 25.00 100.00 31.00 31.00% 24.00 24.00% 45.00 45.00%
MOTOBOMBA DE 4" (10 HP) hm 0.5175 50.00 25.88 8.28 32.00% 5.95 23.00% 11.65 45.00%
BOMBAS PARA PRUEBAS HIDROSTATICAS hm 14.6038 11.00 160.64 49.80 31.00% 38.55 24.00% 72.29 45.00%
LINTERNA DE DESCARGA DE 1 1/2" und 1.0000 310.00 310.00 93.00 30.00% 65.10 21.00% 151.90 49.00%
MOTOR ELECTRICO DE 1.5 HP 220v und 1.0000 350.00 350.00 101.50 29.00% 84.00 24.00% 164.50 47.00%
COMPACTADORA DE PLANCHA día 0.3125 11.45 3.58 1.00 28.00% 0.82 23.00% 1.75 49.00%
COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 31.9778 12.50 399.72 88.05 22.03% 99.93 25.00% 211.74 52.97%
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 63.3568 19.30 1,222.79 379.06 31.00% 317.93 26.00% 525.80 43.00%
PISON MANUAL P/PRIMERA CAPA hm 30.3942 0.90 27.35 8.48 31.00% 6.56 24.00% 12.31 45.00%
TALADRO CON BROCA hm 2.0000 20.50 41.00 12.30 30.00% 9.43 23.00% 19.27 47.00%
CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3 hm 0.0751 217.95 16.37 4.75 29.00% 3.77 23.00% 7.86 48.00%
CARGADOR RETROEXCAVADOR 62 HP 1 YD3 hm 36.6872 135.00 4,952.77 1,386.78 28.00% 1,040.08 21.00% 2,525.91 51.00%
RETROEXCAVADORA SOBRE LLANTAS 58 HP 1 y3 hm 0.4440 125.00 55.50 17.21 31.00% 13.32 24.00% 24.98 45.00%
WINCHE MANUAL hm 1.4663 44.00 64.52 20.32 31.50% 16.13 25.00% 28.07 43.50%
CAMION VOLQUETE DE 15 m3 hm 0.2252 145.00 32.65 10.45 32.00% 7.84 24.00% 14.37 44.00%
CAMION VOLQUETE DE 10 m3 hm 2.1877 120.00 262.52 86.63 33.00% 68.26 26.00% 107.63 41.00%
CAMION CISTERNA 4x2 (AGUA) 122 HP 1,500G hm 36.5094 85.00 3,103.30 962.02 31.00% 754.10 24.30% 1,387.18 44.70%
MOTOSOLDADORA DE 350 AMP hm 90.4825 38.56 3,489.01 1,133.93 32.50% 837.36 24.00% 1,517.72 43.50%
VIBRADOR DE CONCRETO 4 HP 2.40" hm 21.4685 12.00 257.62 74.71 29.00% 59.25 23.00% 123.66 48.00%
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 34.7682 25.00 869.21 243.38 28.00% 234.69 27.00% 391.14 45.00%
CIZALLA ELECTRICA DE FIERRO CONST. HASTA 1" hm 0.7050 35.00 24.68 7.65 31.00% 6.17 25.00% 10.86 44.00%
CIZALLA PARA ACERO DE CONSTRUCCION HASTA 1" und 1.2000 5.00 6.00 1.80 30.00% 1.56 26.00% 2.64 44.00%
EQUIPO DE CORTE Y SOLDEO (OXI-ACET) hm 35.7760 18.00 643.97 186.75 29.00% 154.55 24.00% 302.67 47.00%
PERFORADORA DE POZO PROFUNDO hm 90.4560 190.00 17,186.64 5,671.59 33.00% 5,551.28 32.30% 5,963.76 34.70%
ANDAMIO METAL TABLAS - ALQUILER est 41.0000 6.50 266.50 85.28 32.00% 63.96 24.00% 117.26 44.00%
ANDAMIO METALICO hm 55.3280 5.00 276.64 79.12 28.60% 69.16 25.00% 128.36 46.40%
TECLE 5 TON TRIPODE hh 68.0000 12.50 850.00 246.50 29.00% 221.00 26.00% 382.50 45.00%
SOPORTES METALICOS DE ANGULOS 1"x1/8" S/DISEÑO uso 1.0000 10.00 10.00 2.80 28.00% 2.40 24.00% 4.80 48.00%
BALDE PRUEBA-TAPON-ABRAZ. Y ACCESORIOS hm 31.7038 10.00 317.04 98.28 31.00% 75.95 23.96% 142.80 45.04%
METRATER hm 1.0000 250.00 250.00 80.00 32.00% 52.50 21.00% 117.50 47.00%

COSTO DIRECTO 368,328.91 115,960.41 31.48% 90,895.30 24.68% 161,473.20 43.84%


% ACUMULADO 31.48% 56.16% 100.00%
GASOLINA
PETROLEO D-2

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAS


ALAMBRE NEGRO RECOCIDO N° 8
ALAMBRE NEGRO RECOCIDO N° 16
ALAMBRE GALVANIZADO N°16
ANGULO 2"X2"X1/4"X6M
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
CLAVOS PARA MADERA CON CABEZA DE 3"
PLATINA DE FIERRO 1/8"x1 1/2"x6 m
PLANCHA DE ACERO LISO (1/20)
TUBERIA PVC UF ISO 4435 DN=160mm S-25
TUBERIA PVC UF ISO 4435 DN=200mm S-20
CODO PVC UF DN 200 mm x 90°
CODO PVC UF DN 160 mm S-25
TEE PVC UF 160mm x 160mm C-7.5
CACHIMBA PVC ISO 4435 160mm A 160mm INC. ANILLO
PIEDRA CHANCADA 1/2"
PIEDRA GRANDE DE 8"
FILTRO DE GRAVILLA O CASCAJO
ARENA FINA
ARENA GRUESA
HORMIGON
MARCO DE FIERRO FUNDIDO PARA BUZON
WATER STOP
ANILLO 200 mm UF PARA PVC
ANILLO 160 mm UF PARA PVC
ANILLO DE JEBE PARA TUBERIA PVC ISO 4435 DN=160 mm
ANILLO DE JEBE PARA TUBERIA PVC ISO 4435 DN=200 mm
CEMENTO PORTLAND TIPO I (42.5 kg)
YESO EN BOLSA DE 25 kg
LADRILLO KK 18 HUECOS 9X13X24 cm
TAPA DE CONCRETO ARMADO 3 PESTAÑAS C/PERFIL F°F°0.65
PEGAMENTO PARA TUBERIA PVC 4LT
LUBRICANTE PARA TUBERIA PVC UF
ADITIVO IMPERMEABILIZANTE
COBERTURA CON TIJERAL DE MADERA, CON CARTELAS DE ACERO, PERNOS Y PLANCHAS DE ETERNIT

PLAN DE MONITOREO ARQUEOLOGCO


MADERA TORNILLO
MADERA TORNILLO INC. CORTE P/ENCOFRADO
TRIPLAY DE 6 mm
CERRADURA DOS GOLPES FORTE O SIMILAR
LIJA
LIJA PARA MADERA
PINTURA LATEX
PINTURA ESMALTE
PINTURA ESMALTE EPOXICA
PINTURA AL TEMPLE SIMPLE
PINTURA SELLADOR
PINTURA ANTICORROSIVA
PINTURA ANTICORROSIVA EPOXICA
THINNER
IMPRIMANTE
CINTA SEÑALIZADORA COLOR AMARILLO
MASILLA
VERTEDERO SUTRO E=20mm
COMPUERTA METALICA TIPO TARJETA DE 0.50mx0.70m
TEE 1 1/2"x1 1/2"x1/8"x6M
TORNAPUNTA METALICA DE EXTENSION
BRIDA DE ACERO PARA SOLDAR O EMPERNAR DE 8"
VALVULA COMPUERTA FIERRO FUNDIDO BRIDA BRIDA DE 8"
SOLDADURA ELECTRICA CELLOCORD PUNTO AZUL 3/16"
BARANDA METALICA INC. INSTALACION
TUERCA HEXAGONAL 5/8"
HUACHA PLANA 3/4"
PERNO 1"x4"
AGUA
CORDEL
CASETA PARA ALMACEN Y GUARDIANIA
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

Suministro y colocacion de rejillas 30x30x5(Espersor=8")


COSTO AMBIENTAL EN FASE DE EJECUCION DE REDES DE ALCANTARILLADO
COSTO AMBIENTAL EN FASE DE CONTINGENCIA Y CIERRE DE REDES DE ALCANTARILLADO

TEODOLITO
EQUIPO TOGRAFICO
MIRA TOPOGRAFICA
MIRAS Y JALONES

NIVEL TOPOGRAFICO CON TRIPODE


HERRAMIENTAS MANUALES
MOLDE METALICO PARA BUZON
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
PISON MANUAL P/PRIMERA CAPA
CARGADOR SOBRE LLANTAS DE 100-115 HP 2-2.25 yd3
RETROEXCAVADORA SOBRE LLANTAS 58 HP 1 y3
RETROEXCAVADORA 125 HP 1.3Y3, 9.0M BRAZO
CAMION VOLQUETE DE 10 m3
CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000G
MOTOSOLDADORA DE 350 AMP
VIBRADOR DE CONCRETO 4 HP 2.40"
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3
EQUIPOS DE PROTECCIÓN INDIVIDUAL
EQUIPOS DE PROTECCIÓN COLECTIVA
CIZALLA ELECTRICA DE FIERRO CONST. HASTA 1"
GASOLINA
PETROLEO D-2
FLETE TERRESTRE
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAS
ALAMBRE NEGRO RECOCIDO N° 8
ALAMBRE NEGRO RECOCIDO N° 16
ALAMBRE GALVANIZADO N°16
ANGULO 2"X2"X1/4"X6M
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
CLAVOS PARA MADERA CON CABEZA DE 3"
PLATINA DE FIERRO 1/8"x1 1/2"x6 m
PLANCHA DE ACERO LISO (1/20)
TUBERIA PVC UF ISO 4435 DN=160mm S-25
TUBERIA PVC UF ISO 4435 DN=200mm S-20
CODO PVC UF DN 200 mm x 90°
CODO PVC UF DN 160 mm S-25
TEE PVC UF 160mm x 160mm C-7.5
CACHIMBA PVC ISO 4435 160mm A 160mm INC. ANILLO
PIEDRA CHANCADA 1/2"
PIEDRA GRANDE DE 8"
FILTRO DE GRAVILLA O CASCAJO
ARENA FINA
ARENA GRUESA
HORMIGON
MARCO DE FIERRO FUNDIDO PARA BUZON
WATER STOP
ANILLO 200 mm UF PARA PVC
ANILLO 160 mm UF PARA PVC
ANILLO DE JEBE PARA TUBERIA PVC ISO 4435 DN=160 mm
ANILLO DE JEBE PARA TUBERIA PVC ISO 4435 DN=200 mm
CEMENTO PORTLAND TIPO I (42.5 kg)
YESO EN BOLSA DE 25 kg
LADRILLO KK 18 HUECOS 9X13X24 cm
TAPA DE CONCRETO ARMADO 3 PESTAÑAS C/PERFIL F°F°0.65
PEGAMENTO PARA TUBERIA PVC 4LT
LUBRICANTE PARA TUBERIA PVC UF
ADITIVO IMPERMEABILIZANTE
COBERTURA CON TIJERAL DE MADERA, CON CARTELAS DE ACERO, PERNOS Y PLANCHAS DE
ETERNIT

PLAN DE MONITOREO ARQUEOLOGCO


MADERA TORNILLO
MADERA TORNILLO INC. CORTE P/ENCOFRADO
TRIPLAY DE 6 mm
CERRADURA DOS GOLPES FORTE O SIMILAR
LIJA
LIJA PARA MADERA
PINTURA LATEX
PINTURA ESMALTE
PINTURA ESMALTE EPOXICA
PINTURA AL TEMPLE SIMPLE
PINTURA SELLADOR
PINTURA ANTICORROSIVA
PINTURA ANTICORROSIVA EPOXICA
THINNER
IMPRIMANTE
CINTA SEÑALIZADORA COLOR AMARILLO
MASILLA
VERTEDERO SUTRO E=20mm
COMPUERTA METALICA TIPO TARJETA DE 0.50mx0.70m
TEE 1 1/2"x1 1/2"x1/8"x6M
TORNAPUNTA METALICA DE EXTENSION
BRIDA DE ACERO PARA SOLDAR O EMPERNAR DE 8"
VALVULA COMPUERTA FIERRO FUNDIDO BRIDA BRIDA DE 8"
SOLDADURA ELECTRICA CELLOCORD PUNTO AZUL 3/16"
BARANDA METALICA INC. INSTALACION
TUERCA HEXAGONAL 5/8"
HUACHA PLANA 3/4"
PERNO 1"x4"
AGUA
CORDEL
CASETA PARA ALMACEN Y GUARDIANIA
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

Suministro y colocacion de rejillas 30x30x5(Espersor=8")


COSTO AMBIENTAL EN FASE DE EJECUCION DE REDES DE ALCANTARILLADO
COSTO AMBIENTAL EN FASE DE CONTINGENCIA Y CIERRE DE REDES DE ALCANTARILLADO

TEODOLITO
EQUIPO TOGRAFICO
MIRA TOPOGRAFICA
MIRAS Y JALONES

NIVEL TOPOGRAFICO CON TRIPODE


HERRAMIENTAS MANUALES
MOLDE METALICO PARA BUZON
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
PISON MANUAL P/PRIMERA CAPA
CARGADOR SOBRE LLANTAS DE 100-115 HP 2-2.25 yd3
RETROEXCAVADORA SOBRE LLANTAS 58 HP 1 y3
RETROEXCAVADORA 125 HP 1.3Y3, 9.0M BRAZO
CAMION VOLQUETE DE 10 m3
CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000G
MOTOSOLDADORA DE 350 AMP
VIBRADOR DE CONCRETO 4 HP 2.40"
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3
EQUIPOS DE PROTECCIÓN INDIVIDUAL
EQUIPOS DE PROTECCIÓN COLECTIVA
CIZALLA ELECTRICA DE FIERRO CONST. HASTA 1"
GASOLINA gal 6.1338 12.43
PETROLEO D-2 gal 31.0623 13.40
MOVILIZACION Y glb 1.0000 7,756.45
DESMOVILIZACION
DE EQUIPO Y
MAQUINARIAS

ALAMBRE NEGRO kg 141.1716 5.03


RECOCIDO N° 8

ALAMBRE NEGRO kg 149.2054 5.03


RECOCIDO N° 16

ALAMBRE kg 4.7200 8.03


GALVANIZADO N°16

ANGULO pza 9.0000 18.12


2"X2"X1/4"X6M

ACERO kg 6,669.9441 3.59


CORRUGADO fy =
4200 kg/cm2 GRADO
60

CLAVOS PARA kg 255.7900 4.90


MADERA CON
CABEZA DE 3"

PLATINA DE FIERRO pza 3.6000 18.34


1/8"x1 1/2"x6 m

PLANCHA DE ACERO pln 4.5000 118.00


LISO (1/20)

TUBERIA PVC UF m 708.0000 33.66


ISO 4435 DN=160mm
S-25

TUBERIA PVC UF m 1,815.6428 39.78


ISO 4435 DN=200mm
S-20

CODO PVC UF DN und 7.0000 29.78


200 mm x 90°

CODO PVC UF DN und 118.0000 25.00


160 mm S-25

TEE PVC UF 160mm und 3.0000 26.41


x 160mm C-7.5

CACHIMBA PVC ISO und 118.0000 23.00


4435 160mm A
160mm INC. ANILLO
PIEDRA CHANCADA m3 165.8836 67.00
1/2"

PIEDRA GRANDE DE m3 22.3970 60.00


8"

FILTRO DE m3 14.5951 55.00


GRAVILLA O
CASCAJO

ARENA FINA m3 25.2632 32.21


ARENA GRUESA m3 159.6104 45.00

HORMIGON m3 46.8451 28.00


MARCO DE FIERRO und 30.0000 84.03
FUNDIDO PARA
BUZON

WATER STOP m 62.4000 30.78


ANILLO 200 mm UF und 7.0000 7.00
PARA PVC

ANILLO 160 mm UF und 9.0000 5.00


PARA PVC

ANILLO DE JEBE und 118.0000 6.90


PARA TUBERIA PVC
ISO 4435 DN=160 mm

ANILLO DE JEBE und 303.1947 8.78


PARA TUBERIA PVC
ISO 4435 DN=200 mm

CEMENTO bol 2,402.6677 18.32


PORTLAND TIPO I
(42.5 kg)

YESO EN BOLSA DE bol 52.1611 18.00


25 kg

LADRILLO KK 18 und 8,034.0000 0.45


HUECOS 9X13X24
cm

TAPA DE CONCRETO und 30.0000 45.00


ARMADO 3
PESTAÑAS C/PERFIL
F°F°0.65

PEGAMENTO PARA und 0.9440 85.63


TUBERIA PVC 4LT

LUBRICANTE PARA gal 11.2637 38.00


TUBERIA PVC UF

ADITIVO gal 79.7260 78.45


IMPERMEABILIZANT
E
COBERTURA CON glb 1.0000 18,456.78
TIJERAL DE
MADERA, CON
CARTELAS DE
ACERO, PERNOS Y
PLANCHAS DE
ETERNIT

PLAN DE glb 1.0000 35,750.00


MONITOREO
ARQUEOLOGCO

MADERA TORNILLO p2 3,439.1893 4.62

MADERA TORNILLO p2 689.7080 4.50


INC. CORTE
P/ENCOFRADO

TRIPLAY DE 6 mm pln 3.0000 45.80

CERRADURA DOS und 1.0000 150.00


GOLPES FORTE O
SIMILAR

LIJA und 108.0680 2.00


LIJA PARA MADERA und 4.0000 1.68

PINTURA LATEX gal 108.0680 37.45


PINTURA ESMALTE gal 1.0000 34.50

PINTURA ESMALTE gal 0.1800 72.45


EPOXICA

PINTURA AL TEMPLE kg 54.0340 29.45


SIMPLE

PINTURA SELLADOR gal 24.3153 26.45

PINTURA gal 0.1800 49.47


ANTICORROSIVA

PINTURA gal 2.2500 55.45


ANTICORROSIVA
EPOXICA

THINNER gal 1.0000 16.90


IMPRIMANTE gal 21.6136 24.36
CINTA m 3,827.8920 0.35
SEÑALIZADORA
COLOR AMARILLO

MASILLA kg 0.3000 7.80


VERTEDERO SUTRO und 4.0000 120.00
E=20mm
COMPUERTA und 2.0000 357.46
METALICA TIPO
TARJETA DE
0.50mx0.70m

TEE 1 1/2"x1 und 4.5000 25.78


1/2"x1/8"x6M

TORNAPUNTA und 13,794.1600 4.59


METALICA DE
EXTENSION

BRIDA DE ACERO und 1.0000 45.78


PARA SOLDAR O
EMPERNAR DE 8"

VALVULA und 1.0000 125.70


COMPUERTA
FIERRO FUNDIDO
BRIDA BRIDA DE 8"

SOLDADURA kg 12.1500 45.00


ELECTRICA
CELLOCORD PUNTO
AZUL 3/16"

BARANDA METALICA glb 1.0000 946.14


INC. INSTALACION

TUERCA und 12.0000 1.20


HEXAGONAL 5/8"

HUACHA PLANA 3/4" und 12.0000 1.45

PERNO 1"x4" und 12.0000 1.78


AGUA m3 621.9674 8.00
CORDEL m 1,246.7701 0.25
CASETA PARA glb 1.0000 2,100.00
ALMACEN Y
GUARDIANIA

CAPACITACION EN glb 1.0000 5,899.25


SEGURIDAD Y
SALUD

RECURSOS PARA glb 1.0000 1,965.64


RESPUESTAS ANTE
EMERGENCIAS EN
SEGURIDAD Y
SALUD DURANTE EL
TRABAJO
Suministro y glb 1.0000 254.78
colocacion de rejillas
30x30x5(Espersor=8")

Prueba: Rotura de und 12.0000 35.00


Probeta

Prueba: proctor und 10.0000 145.00


modificado de campo

COSTO AMBIENTAL glb 1.0000 8,748.00


EN FASE DE
EJECUCION DE
REDES DE
ALCANTARILLADO

COSTO AMBIENTAL glb 1.0000 4,725.70


EN FASE DE
CONTINGENCIA Y
CIERRE DE REDES
DE
ALCANTARILLADO
76.24
416.23
7,756.45

710.09

750.50

37.90

163.08

23,945.10

1,253.37

66.02

531.00

23,831.28

72,226.27

208.46

2,950.00

79.23

2,714.00
11,114.20

1,343.82

802.73

813.73
7,182.47

1,311.66
2,520.90

1,920.67
49.00

45.00

814.20

2,662.05

44,016.87

938.90

3,615.30

1,350.00

80.83

428.02

6,254.50
18,456.78

35,750.00

15,889.05

3,103.69

137.40

150.00

216.14
6.72

4,047.15
34.50

13.04

1,591.30

643.14

8.90

124.76

16.90
526.51
1,339.76

2.34
480.00
714.92

116.01

63,315.19

45.78

125.70

546.75

946.14

14.40

17.40

21.36
4,975.74
311.69
2,100.00

5,899.25

1,965.64
254.78

420.00

1,450.00

8,748.00

4,725.70