Remaining Works @ Ceiling

Level Unit 1 Unit 2


3rd Floor Ready for Ceiling Ready for Ceiling
5th floor Retouchment of Ficem Board Retouchment of Ficem Board
6th floor Ready for Ceiling Ready for Ceiling
7th floor Ready for Ceiling Ready for Ceiling

for grinding/ formworks should be for installation of FicemBoard


removed/for installation of Furring
8th floor
for grinding/ formworks should be for grinding/ formworks should be
9th floor removed/for installation of Furring removed/for installation of Furring

Remaining Works @ Partition


Level Unit 1 Unit 2

Continue Application of Primer / For Continue Application of Primer / For


3rd Floor Retouchment of Termination of wall to floor Retouchment of Termination of wall
(see Partition Plan) to floor (see Partition Plan)

For Application of Primer For Application of Primer

5th floor

Continue Application of Primer Except for


Continue Application of Primer
Master's bedroom that has no primer at all
6th floor

For Application of Primer in all Ares Except For Application of Primer


for master's bedroom and Bedroom 1
7th floor

For Application of Primer For Application of Primer

8th floor

Walls Should be retouched or Grinded Walls Should be retouched or


Grinded / Removal of Formworks in
9th floor Some Areas
Remaining Works @ Flooring
Level Unit 2

Waterproof membrane should be plastered Waterproof membrane should be


3rd Floor on bathroom, kitchen, and kitchen area plastered on bathroom

Ongoing tile laying in some areas (see


5th floor Flooring Plan) ok

No Tiles in Some Areas (see Flooring


6th floor No Tiles in Some Areas (see Flooring Plan) Plan)

No Tiles / Waterproof membrane


No Tiles / Waterproof membrane should be should be plastered on Bathroom
plastered on Bathroom and laundry Area Areas
7th floor

No Tiles / Waterproof membrane


No Tiles / Waterproof membrane should be should be plastered on Bathroom
plastered on Bathroom and laundry Area Areas
8th floor

No Tiles / Waterproof membrane should be No Tiles / Waterproof membrane


plastered on Bathroom and laundry Area should be plastered on Bathroom
Areas
9th floor
Unit 3 Unit 4 Unit 5
Ready for Ceiling Ready for Ceiling Ready for Ceiling
Retouchment of Ficem
Retouchment of Ficem Board Retouchment of Ficem Board
Board
Ready for Ceiling Ready for Ceiling Ready for Ceiling
Ready for Ceiling Ready for Ceiling Ready for Ceiling

for grinding/ formworks


for grinding/ formworks should be should be removed/for for grinding/ formworks should be
removed/for installation of Furring installation of Furring removed/for installation of Furring
for grinding/ formworks
for grinding/ formworks should be should be removed/for for grinding/ formworks should be
removed/for installation of Furring installation of Furring removed/for installation of Furring

Unit 3 Unit 4 Unit 5

Continue Application of
Continue Application of Primer Continue Application of Primer
Primer

Continue Application of
Continue Application of Primer Continue Application of Primer
Primer

Continue Application of Primer For Application of Primer Continue Application of Primer

For Application of Primer For Application of Primer Continue Application of Primer

Walls Should be retouched or Grinded For Application of Primer For Application of Primer

Walls Should be retouched or Grinded For Application of Primer Walls Should be retouched or Grinded
Unit 3 Unit 4 Unit 5
Waterproof membrane
Waterproof membrane should be Waterproof membrane should be
should be plastered on
plastered on balcony plastered on balcony
balcony

Ready for Tile laying Ready for Tile laying Ready for Tile laying

Ready for Tile laying Ready for Tile laying Ready for Tile laying
No Tiles / Waterproof
No Tiles / Waterproof membrane
No Tiles / Waterproof membrane should membrane should be should be plastered on Bathroom
be plastered on Bathroom Areas plastered on Bathroom Areas
Areas

No Tiles / Waterproof No Tiles / Waterproof membrane


No Tiles / Waterproof membrane should membrane should be should be plastered on Bathroom
be plastered on Bathroom plastered on Bathroom Areas
Areas

No Tiles / Waterproof
No Tiles / Waterproof membrane should membrane should be No Tiles / Waterproof membrane
be plastered on Bathroom Areas plastered on Bathroom should be plastered on Bathroom
Areas
Areas
Unit 6 Unit 7 Unit 8
Ready for Ceiling Ready for Ceiling Ready for Ceiling
Retouchment of Ficem Board Retouchment of Ficem Board Retouchment of Ficem Board
Ready for Ceiling Ready for Ceiling Ready for Ceiling
Ready for Ceiling Ready for Ceiling Ready for Ceiling

for grinding/ formworks


should be removed/for for grinding/ formworks should be for installation of FicemBoard
installation of Furring removed/for installation of Furring
for grinding/ formworks for grinding/ formworks should be
should be removed/for for grinding/ formworks should be removed/for installation of
installation of Furring removed/for installation of Furring Furring

Unit 6 Unit 7 Unit 8

Continue Application of Primer /


Continue Application of Continue Application of Primer For Retouchment of Termination
Primer of wall to floor (see Partition Plan)

Continue Application of Continue Application of Primer/Bedroom


Continue Application of Primer
Primer 01 Ongoing Application of Primer

For Application of Primer For Application of Primer For Application of Primer

Continue Application of For Application of Primer Continue Application of Primer


Primer

For Application of Primer (except for


Bedroom 1 and bedroom 2 that needs to
Walls Should be retouched or Walls Should be retouched or
be grinded and retouched)/ Ongoing
Grinded Grinded
Application of Rubbed Concrete in Masters
Bedroom)

For Application of Primer (except


Walls Should be retouched or Walls Should be retouched or Grinded for bedroom area which needs to
Grinded be retouched or grinded
Unit 6 Unit 7 Unit 8
Waterproof membrane Waterproof membrane should be plastered Waterproof membrane should be
should be plastered on on kitchen and laundry area plastered on bathroom
balcony

No Tiles in Some Areas/Some Areas has


Ready for Tile laying Ongoing Tile laying (see Flooring Plan) ready for ceiling

Master's Bedroom Ready For tile


laying/Bedroom 01 has Ongoing Tile laying Bedroom 01 only Ready for Tile
Ready for Tile laying (see Flooring Plan) laying (see Flooring Plan)

No Tiles / Waterproof No Tiles / Waterproof membrane


No Tiles / Waterproof membrane should be should
membrane should be be plastered on Bathroom
plastered on Bathroom Areas plastered on Bathroom and laundry Area Areas

No Tiles / Waterproof No Tiles / Waterproof membrane should be No Tiles / Waterproof membrane


membrane should be plastered on (Maid's Bathroom only and should be plastered on Bathroom
plastered on Bathroom Areas laundry Area) Areas

No Tiles / Waterproof No Tiles / Waterproof membrane should be No Tiles / Waterproof membrane


membrane should be plastered on Bathroom Areas should be plastered on Bathroom
plastered on Bathroom Areas Areas
Unit 9 Unit 10 Unit 11
Ready for Ceiling Ready for Ceiling Ready for Ceiling
Retouchment of Ficem Board Retouchment of Ficem Board Retouchment of Ficem Board
Ready for Ceiling Ready for Ceiling Ready for Ceiling
Ready for Ceiling Ready for Ceiling Ready for Ceiling

for grinding/ formworks


should be removed/for for grinding/ formworks should be
installation of Furring Ongoing Installation of Furring removed/for installation of Furring
for grinding/ formworks for grinding/ formworks
should be removed/for should be removed/for for grinding/ formworks should be
installation of Furring installation of Furring removed/for installation of Furring

Unit 9 Unit 10 Unit 11

Continue Application of Continue Application of Continue Application of Primer


Primer Primer

Continue Application of Continue Application of


Continue Application of Primer
Primer Primer

Continue Application of Continue Application of


For Application of Primer
Primer Primer

Continue Application of
For Application of Primer Continue Application of Primer
Primer

Walls Should be retouched or Walls Should be retouched or Walls Should be retouched or Grinded
Grinded Grinded

Walls Should be retouched or For Application of Primer Walls Should be retouched or Grinded
Grinded
Unit 9 Unit 10 Unit 11
Waterproof membrane Waterproof membrane should Waterproof membrane should be
should be plastered on be plastered on balcony plastered on balcony
balcony

ready for ceiling for rubbed con ready for ceiling

Ready for Tile laying Ready for Tile laying Ready for Tile laying

No Tiles / Waterproof No Tiles / Waterproof No Tiles / Waterproof membrane should


membrane should be membrane should be be plastered on Bathroom Areas
plastered on Bathroom Areas plastered on Bathroom Areas

No Tiles / Waterproof No Tiles / Waterproof


membrane should be membrane should be No Tiles / Waterproof membrane should
be plastered on Bathroom Areas
plastered on Bathroom Areas plastered on Bathroom Areas

No Tiles / Waterproof No Tiles / Waterproof No Tiles / Waterproof membrane should


membrane should be membrane should be be plastered on Bathroom Areas
plastered on Bathroom Areas plastered on Bathroom Areas
Unit 12
Ready for Ceiling
Retouchment of Ficem Board
Ready for Ceiling
Ready for Ceiling

for grinding/ formworks should be removed/for


installation of Furring
for grinding/ formworks should be removed/for
installation of Furring

Unit 12

Continue Application of Primer

For Application of Primer

For Application of Primer

Continue Application of Primer

Walls Should be retouched or Grinded

Walls Should be retouched or Grinded


Unit 12

Waterproof membrane should be plastered on


balcony

ready for ceiling

Ready for Tile laying

No Tiles / Waterproof membrane should be


plastered on Bathroom Areas

No Tiles / Waterproof membrane should be


plastered on Bathroom Areas

No Tiles / Waterproof membrane should be


plastered on Bathroom Areas