Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PIPELINES, DISTRIBUTION & TERMINAL
ASH
ASH
ASH

PROJECTS DEPARTMENT
LEADS

LEADS
LEADS
ALL

ALL
ALL

YANBU-NORTH JIDDAH DISTRIBUTION &


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

PIPELINE PROJECTS DIVISION


ISSUED FOR 60% FEL3

BI-10-02399
JO/EWO

YANBU DISTRIBUTION HUB AND NORTH


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

JIDDAH BULK PLANT EXPANSION


09/08/16
08/04/16
06/01/16

(YANBU DISTRIBUTION HUB PORTION)


NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:

PROJECT PROPOSAL NARRATIVE


CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16

DATE:
OPERATIONS

ISSUED FOR 100% PROJECT PROPOSAL


SHAHZAD YAZDANI

09/08/16

DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PREPARED BY:
(DCC) NO. _____________________

MUSTANG-HDP,
AL-KHOBAR, SAUDI ARABIA.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 1


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH TABLE OF CONTENTS
ASH
ASH

SECTION 1.0 – INTRODUCTION...............................................................................................4


LEADS

LEADS
LEADS
ALL

1.1 PREFACE......................................................................................................................4
ALL
ALL

1.2 PRESENT SITUATION..................................................................................................4


1.3 PROJECT PROPOSAL NARRATIVE............................................................................4
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

1.4 SAUDI ARAMCO DESIGN / ENGINEERING STANDARDS.........................................6


DESCRIPTION
ISSUED FOR 60% FEL3

1.5 LIST OF ABBREVIATIONS AND ACRONYMS...........................................................21


SECTION 2.0 – PROJECT DESCRIPTION...............................................................................25
2.1 PLANT LOCATION......................................................................................................25
2.2 LAND USE PERMIT (LUP)..........................................................................................25
SECTION 3.0 – PROJECT DESIGN CRITERIA........................................................................25
SECTION 4.0 – DETAILED SCOPE OF WORK........................................................................26
JO/EWO

4.1 OVERALL SCOPE......................................................................................................26


10-02399-

10-02399-
10-02399-
0001

0001
0001

4.2 INTERFACES WITH OTHER BI’S..............................................................................26


DATE

4.3 PROJECT PHYSICAL INTERFACES.........................................................................27


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
4.4 PROJECT OPERATING INTERFACES......................................................................42
ENGINEER
4.5 DEMOLITION ACTIVITIES..........................................................................................42
C
A

DATE:
PROJECT 4.6 RECEIPT PIPELINE AND CONNECTIONS..........................................................................44
ALL LEADS
ENGINEER
09/08/16 4.7 YANBU’ DISTRIBUTION HUB TANK FARM AND SUPPORT INFRASTRUCTURE.......................50
DATE:
CERTIFIED 4.8 YANBU TO JIDDAH PIPELINE 1 & 2 SUPPORT INFRASTRUCTURE......................................71
A M ALMATROOK
09/08/16 4.9 PUMPS AND MOTORS FOR THE YANBU TO JIDDAH PIPELINE...........................................73
DATE:
CONSTRUCTION
AMR EL SHARKAWY 4.10 PUMP OPERATIONS FOR THE YANBU TO JIDDAH PIPELINE..............................................79
AGENCY
09/08/16
4.11 PIPELINE CONNECTION FROM GRASSROOTS-YANBU ARAMCO REFINERY.........................80
DATE:
OPERATIONS
SHAHZAD YAZDANI
4.12 PIPELINE CONNECTION FROM SAMREF REFINERY........................................................81
09/08/16 4.13 PIPELINE CONNECTION FROM YASREF REFINERY.........................................................87
DATE:
4.14 PIPELINE CONNECTION FROM YANBU REFINERY TERMINAL.............................................90
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
4.15 ELECTRICAL..............................................................................................................96
EDSD

4.16 COMMUNICATION........................................................................................................120
DATE:
BY:

4.17 FIRE PROTECTION.....................................................................................................180


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

4.18 INDUSTRIAL DRAINAGE SYSTEM..................................................................................187


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

4.19 GRADING & STORM WATER DRAINAGE...............................................................193


4.20 UTILITY WATER SUPPLY.........................................................................................194
4.21 SANITARY WASTE WATER......................................................................................194
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 2


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 4.22 OVERALL SITE DEVELOPMENT AND FACILITIES:...............................................194
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.23 PROCESS AUTOMATION & CONTROLS..........................................................................198
ASH
ASH
ASH

4.24 INTEGRATED SECURITY SYSTEM.........................................................................205


LEADS

LEADS
LEADS
ALL

4.25 STRUCTURAL..........................................................................................................217
ALL
ALL

SECTION 5.0 – BUILDINGS...................................................................................................233


GENERAL ARCHITECTURAL BASIS OF DESIGN............................................................233
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

5.1. MAIN GATEHOUSE..................................................................................................236


ISSUED FOR 60% FEL3

5.2. MUSALLAH...............................................................................................................237
5.3. SECURITY GUARD HOUSE (2 NOS.).....................................................................240
5.4. OPERATOR SHELTER (2 NOS.).............................................................................242
5.5. SMOKING SHELTER................................................................................................246
5.6. FSF SUPPORT BUILDING.......................................................................................247
5.7. RECEIVING SUBSTATION.......................................................................................251
JO/EWO

5.8. UTILITY POWER SUBSTATION...............................................................................256


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

5.9. ENGINEERING & MAINTENANCE (E & M) BUILDING...........................................262


5.10. SECURITY SUPPORT BUILDING (2 NOS)..............................................................268
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE 5.11. TEMPORARY CONSTRUCTION FACILITY.............................................................273


ENGINEER
5.12. X-RAY BUILDING......................................................................................................276
C
A

DATE:
PROJECT 5.13. FIRE WATER UTILITY WATER PUMP SHELTER....................................................279
ALL LEADS
ENGINEER
09/08/16 5.14. CHEMICAL SHELTER...............................................................................................279
DATE:
CERTIFIED 5.15. REMOTE I/O BUILDINGS (2 UNITS)........................................................................283
A M ALMATROOK
09/08/16 5.16. IDAS SHELTER (2 UNITS)........................................................................................286
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
5.17. OPERATION BUILDING............................................................................................289
09/08/16
SECTION 6.0 – MATERIALS REQUIREMENT.......................................................................294
DATE:
OPERATIONS
SHAHZAD YAZDANI
SECTION 7.0 – HIGH COMMISSION FOR INDUSTRIAL SECURITY....................................294
09/08/16
SECTION 8.0 – VALUE PRACTICES / WORKSHOPS...........................................................294
DATE:
SECTION 9.0 – OTHER ENGINEERING STUDIES / ASSESSMENTS / ANALYSIS..............294
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
SECTION 10.0 – APPENDICES..............................................................................................295
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 3


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 1.0 – INTRODUCTION
ASH
ASH
ASH

1.1 PREFACE
LEADS

LEADS
LEADS
ALL

ALL
ALL

The purpose of the proposed facilities is to efficiently meet the Kingdom’s refined product
demand in Makkah Province through the construction of the Yanbu Distribution Hub
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

(YDH). This project will aggregate refined product from the three local refineries
(SAMREF, YASREF, and Yanbu Terminal) to facilitate shipment via two connecting
DESCRIPTION

pipelines: the (a) Yanbu to Jiddah pipeline and the (b) Yanbu to Central Region pipeline,
ISSUED FOR 60% FEL3

which are two additional Budget Items under development.

This project is in alignment with the current Distribution Master Plan.

The Yanbu-Jiddah Pipeline, BI-10-02155, initially included the Yanbu to Jiddah pipeline
scope, NJBP scope, YDH scope, and the SSSP-5 supply pipeline scope. As the scope
for BI-10-2155 increased, it was decided to split and segregate the pipelines scope from
the in-plant scope.
JO/EWO

BI-10-02399, Additional Capacity – North Jiddah Bulk Plant, has been introduced to the
10-02399-

10-02399-
10-02399-

2016-2018 Business Plan to handle the below major scope elements from BI-10-2155:
0001

0001
0001
DATE

1. North Jiddah Bulk Plant Expansion (NJBP)


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
2. Yanbu Distribution Hub (YDH), this Project Proposal Narrative (PPN)
ENGINEER
C
A

1.2 PRESENT SITUATION


DATE:
PROJECT
ALL LEADS
ENGINEER The three refineries in the Yanbu area currently deliver product to the Western Region of
09/08/16
Saudi Arabia via truck loading, marine vessel loading, and pipeline deliveries to
DATE: Madinah. Projected product demand growth in the central and western regions will
CERTIFIED
A M ALMATROOK require that additional infrastructure be built to meet these higher demands. With
09/08/16 currently over 900 MBD of refining capacity, Yanbu has been identified as the refined
DATE:
CONSTRUCTION
AMR EL SHARKAWY
product origin hub to supply Jiddah and the Central Region.
AGENCY
09/08/16
The 2040 demand forecasts identify the following demand gaps to be supplied by YDH:
DATE:
OPERATIONS
SHAHZAD YAZDANI
 576 MBD on the Yanbu to North Jiddah (YNJ-1/2) pipelines (to be constructed as part
09/08/16
of this budget item, BI-10-02155); and,
DATE:
 400 MBD on the Yanbu to Central Region pipeline (future construction, BI-10-02167).
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

1.3 PROJECT PROPOSAL NARRATIVE


DATE:

This document, the “Project Proposal Narrative” (PPN), is intended to describe the
BY:

overall scope for YDH project. CONTRACTOR shall read this document and its
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

attachments carefully and determine all the Materials, Equipment and other
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

requirements of the entire project for supply, installation and successful commissioning
(DCC) NO. _____________________

of YDH project, fully meeting the objective of BI-10-02399.

The PPN shall be treated as construction scope of work. It provides overall requirements
REVISION

of the systems in a comprehensive way and is not intended to cover the work in detail.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 4


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG This document (PPN) describes the overall and major equipment, material and the work
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to be provided for YDH project and it is deemed to be the responsibility of
CONTRACTOR to supply, fabricate, install, inspect, test, pre-commissioning,
ASH
ASH
ASH

commissioning support, and hand over the project to SAUDI ARAMCO, on time, in a full
operating condition in compliance with the relevant SAUDI ARAMCO standards,
LEADS

LEADS
LEADS
ALL

ALL
ALL

practices, GIs, procedures and other requirements.

The term “Provide” used in the document in different sections by various engineering
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

disciplines/trades shall mean to instruct CONTRACTOR to detail design, supply,


fabricate, install, erect, inspect, test, and commission the equipment, system for the
DESCRIPTION

entire facility. This also includes, but is not limited to, all other sundry materials, products,
ISSUED FOR 60% FEL3

consumables and all other necessary items including labor to build the facilities/ project
safely and make it operational and deliver the expected results.

Any equipment/system/materials and efforts that are missing, not fully covered in this
document, but are required to complete the systems shall be identified by
CONTRACTOR during the bidding process and shall be provided.

CONTRACTOR shall conduct field surveys & testing and other engineering studies
JO/EWO

workshops and best practices required for the project.


10-02399-

10-02399-
10-02399-
0001

 CONTRACTOR shall address all project proposal comments which were closed and
0001
0001
DATE

reflected in drawings during the detail design and construction phases as applicable.
09/08/16
08/04/16
06/01/16

 CONTRACTOR shall address and consider in the detail design package all the
NO.
REV

DISCIPLINE recommendations outlined in various studies and submitted proposals to relevant


ENGINEER
authorities for setting up YDH.
C
A

DATE:  CONTRACTOR shall be responsible to produce a detail design package based on


PROJECT
ALL LEADS
ENGINEER Project Proposal Package using a SAUDI ARAMCO approved engineering design
09/08/16 office; CONTRACTOR shall be responsible for the correctness of all the engineering
DATE: drawings, documents produced by the design office also for the drawings & documents
A M ALMATROOK
CERTIFIED provided by vendors. Approval of above drawings and documents by SAUDI ARAMCO
09/08/16 does not relieve CONTRACTOR of the responsibility of correct design, right
DATE: equipment, proper installation, testing & commissioning.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  CONTRACTOR shall have full responsibility for the detail design and engineering of all
required items, elements and systems necessary for the complete, functional and safe
DATE:
OPERATIONS
operation of the entire scope of equipment and systems. The design criteria and
SHAHZAD YAZDANI
contract documents included are not all-inclusive and represent minimum
09/08/16
requirements. Any additional elements or items required to achieve the correct and
DATE:
safe operation of the system shall be engineered, designed, and shall be in place,
CONTROL NUMBER

ALI H GHAMDI
complete and functional.
VERIFICATION

09/08/16
EDSD

 CONTRACTOR shall review and approve Vendor and SUBCONTRACTOR drawings,


design, specifications and other documents for conformity to this Contract and institute
DATE:

effective internal control for prompt receipt, review, approval, and return of such
BY:

documents. CONTRACTOR shall incorporate all such applicable Vendor and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

SUBCONTRACTOR information in THE CONTRACTOR’S submittals to SAUDI


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ARAMCO.
(DCC) NO. _____________________

 THE CONTRACTOR’S drawings shall include all necessary plans, elevations,


arrangements, sections, profiles, views and details of all facilities
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 5


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall follow relevant guidelines and Standards mandated by Yanbu
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Royal Commission (YRC) for setting up YDH facility and its operation.
 CONTRACTOR shall systematically check his design and drawings to ensure they
ASH
ASH

comply with the Scope of Work, relevant SAUDI ARAMCO, YRC standards and
LEADS

LEADS

International Standards and are in keeping with good engineering practices.


LEADS
ALL

ALL
ALL

1.4 SAUDI ARAMCO DESIGN / ENGINEERING STANDARDS


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall consider the SAUDI ARAMCO Design and Engineering Standards
DESCRIPTION

as per the cut-off date of September 2016. CONTRACTOR shall meet all the
ISSUED FOR 60% FEL3

requirements of the Mandatory SAUDI ARAMCO Engineering Requirements (MSAERs),


YRC, SAMREF, YASREF and Marafiq standards.

Contractor shall use the latest edition, revision, addenda, errata of the applicable local
and international codes and standards, unless otherwise explicitly specified.
In case of conflict between requirements mentioned in different documents, the most
stringent interpretation shall be followed.
JO/EWO

The following are the latest applicable Design and Engineering Standards and
international Codes and Standards, available for the project design.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Any changes during execution of the project will be informed by SAUDI ARAMCO.
09/08/16
08/04/16
06/01/16
NO.
REV

1.4.1 SAUDI ARAMCO Engineering Standards (SAES)


DISCIPLINE
ENGINEER
SAES-A-004 General Requirements for Pressure Testing
C
A

DATE: SAES-A-007 Hydrostatic Testing Fluids and Lay-Up Procedures


PROJECT
ALL LEADS
ENGINEER SAES-A-100 Survey Coordinates, Datum and Data Formats
09/08/16
SAES-A-102 Ambient Air Quality and Source Emissions Standards
DATE:
CERTIFIED
SAES-A-104 Waste water treatment, Reuse and Disposal
A M ALMATROOK
SAES-A-105 Noise Control
09/08/16
DATE: SAES-A-112 Meteorological and Seismic Design Data
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
SAES-A-113 Geotechnical Engineering Requirements
09/08/16
SAES-A-114 Excavation and Backfill
DATE: SAES-A-202 SAUDI ARAMCO Engineering Drawing Preparation
OPERATIONS
SHAHZAD YAZDANI
SAES-A-204 Preparation of Structural Calculations
09/08/16
SAES-A-400 Industrial Drainage Systems
DATE:
SAES-A-401 Closed Drain Systems (CDS)
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 SAES-B-005 Spacing and Diking for Atmospheric Low Pressure Tanks
EDSD

SAES-B-006 Fireproofing for plants


SAES-B-014 Safety Requirements for Plant and Operations Support
DATE:
BY:

Buildings
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAES-B-017 Fire Water System Design


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-B-018 Foam Systems


(DCC) NO. _____________________

SAES-B-019 Portable, Mobile and Special Fixed Firefighting


Equipment
SAES-B-054 Access, Egress and Material Handling for Plant Facilities
REVISION

SAES-B-055 Plant Layout


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 6


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG SAES-B-058 Emergency Shutdown, Isolation and Depressurizing
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-B-067 Safety Identification and Safety Colors
SAES-B-068 Electrical area classification
ASH
ASH
ASH

SAES-B-069 Emergency Eyewashes and Showers


LEADS

LEADS
LEADS
ALL

SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling
ALL
ALL

Terminals and sulfur Handling Facilities


SAES-D-109 Design of Small Metallic Storage Tank
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-D-001 Design Criteria for Pressure Vessels


DESCRIPTION

SAES-D-100 Design Criteria of Atmospheric and Low Pressure Tanks


ISSUED FOR 60% FEL3

SAES-E-007 Design Criteria for Air-Cooled heat Exchanges


SAES-G-005 Centrifugal Pumps
SAES-G-006 Positive Displacement Pumps-Controlled Volume
SAES-G-007 Submersible Pumps and Motors for Water Well and
Offshore Service
SAES-G-101 Regulated Vendors List for Pumps and Mechanical Seals
SAES-H-001 Coating Selection and Application Requirements for
Industrial Plant and Equipment
JO/EWO

SAES-H-002 Internal and External Coatings for Steel Pipelines &


10-02399-

Piping
10-02399-
10-02399-
0001

0001
0001
DATE

SAES-H-003 Protective Coating for Industrial Concrete Structures


SAES-H-101V Approved SAUDI ARAMCO Data Sheets- Paints and
09/08/16
08/04/16
06/01/16
NO.
REV

Coatings
DISCIPLINE
ENGINEER SAES-J-002 List of Inspectable Instruments
C
A

SAES-J-003 Instrumentation – Basic Design Criteria


DATE:
PROJECT
ALL LEADS
SAES-J-200 Pressure
ENGINEER
09/08/16 SAES-J-300 Level
DATE: SAES-J-400 Temperature
A M ALMATROOK
CERTIFIED
SAES-J-505 Combustible Gas and Hydrogen Sulfide in Air Detection
09/08/16 Systems
DATE:
CONSTRUCTION
AMR EL SHARKAWY
SAES-J-600 Pressure Relief Devices
AGENCY
09/08/16 SAES-J-601 Emergency Shutdown and Isolation Systems
DATE:
SAES-J-604 Protective and Condition Monitoring Equipment for
OPERATIONS
SHAHZAD YAZDANI
Rotating Machinery
09/08/16 SAES-J-700 Control Valves
DATE: SAES-J-801 Control Buildings
CONTROL NUMBER

ALI H GHAMDI
SAES-J-605 Surge Relief Protection System
VERIFICATION

09/08/16
SAES-J-902 Electrical Systems for Instrumentation
EDSD

SAES-J-904 Foundation fieldbus (FF) Systems


DATE:

SAES-K-001 Design and Installation of Heating, Ventilating and Air


BY:

Conditioning Systems
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

SAES-K-002 Air Conditioning Systems for Essential Operating


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Facilities
(DCC) NO. _____________________

SAES-K-003 HVAC Systems for Communications Facilities & Data


Centers
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 7


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG SAES-L-100 Applicable Codes and Standards for Pressure Piping
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Systems
SAES-K-101 Regulated Vendors List for Heating, Ventilating and Air
ASH
ASH
ASH

Conditioning (HVAC) Equipment.


LEADS

LEADS
LEADS
ALL

SAES-L-102 Regulated Vendors List for Valves


ALL
ALL

SAES-L-105 Piping Material Specifications


SAES-L-108 Selection of Valves
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-L-109 Selection of Flanges, Stud Bolts & Gaskets


DESCRIPTION

SAES-L-132 Material Selection for Piping Systems


ISSUED FOR 60% FEL3

SAES-L-133 Corrosion Protection Requirements for Pipelines, Piping


and Process Equipment
SAES-L-150 Pressure Testing of Plant Piping and Pipelines
SAES-L-310 Design of Plant Piping
SAES-L-350 Construction of Plant Piping
SAES-L-610 Nonmetallic Piping in Oily Water
SAES-M-001 Structural Design Criteria for Non-Building Structures
SAES-M-006 SAUDI ARAMCO General Purpose Fencing
JO/EWO

SAES-M-009 Design Criteria for Blast Resistant Buildings


10-02399-

SAES-M-100 SAUDI ARAMCO Building Code


10-02399-
10-02399-
0001

0001
0001
DATE

SAES-N-004 Design and Installation of Building Thermal Insulation


SAES-O-201 Application of security directive
09/08/16
08/04/16
06/01/16
NO.
REV

SAES-O-202 Security Fencing


DISCIPLINE
ENGINEER SAES-O-203 Security Gate
C
A

SAES-O-204 Security Lighting


DATE:
PROJECT
ALL LEADS
SAES-O-205 Integrated Security System
ENGINEER
09/08/16 SAES-O-206 Security Devices
DATE: SAES-O-207 Power Supply for Security System
A M ALMATROOK
CERTIFIED
SAES-O-208 Communication for security system
09/08/16 SAES-O-209 Security Door
DATE:
CONSTRUCTION
AMR EL SHARKAWY
SAES-O-210 Security Lock
AGENCY
09/08/16 SAES-O-211 Identification Card
DATE:
SAES-O-212 Security Information Protection
OPERATIONS
SHAHZAD YAZDANI
SAES-P-100 Basic Power System Design Criteria
09/08/16 SAES-P-101 Regulated Vendors List for Electrical Equipment
DATE: SAES-P-103 UPS and DC system
CONTROL NUMBER

ALI H GHAMDI
SAES-P-104 Wiring Methods and Materials
VERIFICATION

09/08/16
SAES-P-107 Overhead Distribution System
EDSD

SAES-P-111 Grounding
DATE:

SAES-P-113 Motors and Generators


BY:

SAES-P-114 Power System and Equipment Protection


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-P-116 Switchgear and Control Equipment


(DCC) NO. _____________________

SAES-P-119 Onshore Substations


SAES-P-121 Transformers and Reactors
SAES-P-123 Lighting
REVISION

SAES-P-126 Power System Automation


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 8


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG SAES-Q-001 Criteria for design and construction of
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
concrete structures
SAES-Q-005 Concrete Foundations
ASH
ASH
ASH

SAES-Q-006 Asphalt and Sulfur Extended Asphalt Concrete Paving


LEADS

LEADS
LEADS
ALL

SAES-Q-007 Foundations and Supporting Structures for Heavy


ALL
ALL

Machinery
SAES-Q-009 Concrete Retaining Walls
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and


DESCRIPTION

Equipment Grouting
ISSUED FOR 60% FEL3

SAES-Q-011 Epoxy Grout for Machinery Support


SAES-Q-012 Criteria for Design and Construction of Precast and
Pre stressed Concrete Structures
SAES-R-004 Building Design & Finishing Guidelines
SAES-S-010 Sanitary Sewers
SAES-S-020 Oily Water Drainage Systems
SAES-S-030 Storm Water Drainage Systems
SAES-S-040 SAUDI ARAMCO Water Systems
JO/EWO

SAES-S-060 SAUDI ARAMCO Plumbing Code


10-02399-

SAES-S-070 Installation of Utility Piping Systems


10-02399-
10-02399-
0001

0001
0001
DATE

SAES-T-018 Telecommunications – Symbols, Abbreviations and


Definitions
09/08/16
08/04/16
06/01/16
NO.
REV

SAES-T-151 D.C. Power Systems


DISCIPLINE
ENGINEER SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio Communication
C
A

SAES-T-493 Digital Trunked Radio System


DATE:
PROJECT
ALL LEADS
SAES-T-494 Very Small Aperture Terminal (VSAT) Network Design
ENGINEER
09/08/16 SAES-T-556 Circuit Quality and Performance
DATE: SAES-T-566 Plant Demilitarized Zone (DMZ) Architecture
A M ALMATROOK
CERTIFIED
SAES-T-603 Safeguards and Warning Devices
09/08/16 SAES-T-624 Telecommunications – OSP Fiber Optics
DATE:
CONSTRUCTION
AMR EL SHARKAWY
SAES-T-625 Inter and Intra-Building Fiber Optic Communications
AGENCY
09/08/16 Cables
DATE:
SAES-T-628 Underground Cable
OPERATIONS
SHAHZAD YAZDANI
SAES-T-629 Telecommunications – Buried Cable and Wire
09/08/16 SAES-T-631 Communications Cable Terminals
DATE: SAES-T-632 Communications Cable Splicing
CONTROL NUMBER

ALI H GHAMDI
SAES-T-633 Communications Splice Closures
VERIFICATION

09/08/16
SAES-T-634 Telecommunications – Cable Testing and Acceptance
EDSD

SAES-T-744 Design Criteria and Installation of Communication


DATE:

Towers
BY:

SAES-T-795 Communications Facility Grounding System


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-T-887 Protection at Power Plants and Radio Stations


(DCC) NO. _____________________

SAES-T-903 Electrical Protection – Outside Plant


SAES-T-911 Telecommunications Conduit System Design
SAES-T-912 Communications Feeder Cable
REVISION

SAES-T-914 Telecommunications Distribution Cable


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 9


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG SAES-T-916 Telecommunications Building Cable Systems
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-T-920 Telecommunications Cable Information
SAES-T-928 Telecommunications – OSP Buried Plant
ASH
ASH
ASH

SAES-T-938 Telecommunications – OSP System DesignSAES-U-101


LEADS

LEADS
LEADS
ALL

Regulated Vendors List for Fire Protection Equipment


ALL
ALL

SAES-U-101 Regulated Vendors List for Fire Protection Equipment


SAES-W-010 Welding Requirements for Pressure Vessels
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-W-011 Welding Requirements for On Plot Piping


DESCRIPTION

SAES-W-012 Welding Requirements for Pipelines


ISSUED FOR 60% FEL3

SAES-W-017 Welding Requirements for Tanks


SAES-X-400 Cathodic Protection Buried pipelines
SAES-X-500 Cathodic Protection of Vessel and Tank Internals
SAES-X-600 Cathodic Protection of Plant facilities
SAES-X-700 Cathodic Protection of onshore well casings
SAES-Y-103 Royalty/Custody Metering of Hydrocarbon Liquids
SAES-Y-301 Royalty/Custody Measurement of Hydrocarbon using
Radar Tank Gauging Systems
JO/EWO

SAES-Y-501 Dynamic Sampling of Hydrocarbon Liquids for


10-02399-

Royalty/Custody Transfers
10-02399-
10-02399-
0001

0001
0001
DATE

SAES-Z-001 Process Control System


SAES-Z-002 Technically Acceptable Process Automation Systems
09/08/16
08/04/16
06/01/16
NO.
REV

SAES-Z-008 Terminal Management System


DISCIPLINE
ENGINEER SAES-Z-010 Process Automation Networks Connectivity
C
A

SAES-Z-020 Design and Installation of Fiber Optic Cables Systems for


DATE:
PROJECT
ALL LEADS
Process Control Networks
ENGINEER
09/08/16

DATE:
1.4.2 SAUDI ARAMCO Inspection Requirements
CERTIFIED
A M ALMATROOK
09/08/16
175-000003 Instructions & Explanations of Inspection Requirements
DATE: 175-321900 Pressure Vessels
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 175-343100 Panels and Cabinets for Outdoor Area
09/08/16
175-013100 Fabricated Carbon Steel Piping
DATE:
OPERATIONS
175-019800 Auxiliary Piping for Mechanical Equipment
SHAHZAD YAZDANI

09/08/16
175-022500 Flanges, Spectacle Plates, Spacers & Blinds
DATE:
175-022501 Flanges; Weld Neck, Forged Steel
175-091900 Inspection and Testing Requirements
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 175-060100 GASKETS: Metal, Spiral-Wound or Jacketed


EDSD

175-120100 Steel Structures


DATE:

175-170200 Severe Duty Totally Enclosed Squirrel Cage Induction


BY:

Motors to 500 HP
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

175-170300 Motors Foam-Wound, Squirrel Cage Induction 500 HP


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and above or Brushless Synchronous


(DCC) NO. _____________________

175-171300 Galvanic Anodes: Aluminum, Magnesium, or Zinc for


Cathodic Protection
175-171500 Cables for Cathodic Protection
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 10


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 175-120150 Spreader Beam
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
175-310200 Mechanical Seals for Pumps
175-130900 Coupling Shaft Special Purpose
ASH
ASH
ASH

175-320300 Positive Material Identification


LEADS

LEADS
LEADS
ALL

175-324900 Tanks Atmosphere, Steel within scope


ALL
ALL

175-323600 Air Cooled Heat Exchangers


175-325100 Steel Tanks Aboveground according to API-12F, API-650
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Appendix-J and UL-142


DESCRIPTION

175-326100 Lubrication, Shaft Sealing and Control Oil Systems


ISSUED FOR 60% FEL3

175-310500 Pump: API, Centrifugal Horizontal, End Suction Single


Stage or Vertical Inline
175-341700 Pressure Retaining Instruments
175-310600 Pump: API, Centrifugal
175-310200 Mechanical Seals for Pumps
175-341900 Valve Safety Relief Conventional and Balanced Type
175-310300 Pumps: Rotary per API-676
175-173700 Skid Mounted Equipment: Auxiliary Electrical
JO/EWO

Systems
10-02399-

175-340100 Valve: Control


10-02399-
10-02399-
0001

0001
0001
DATE

175-340200 Package Unit Instrumentation


175-343100 Control Panels
09/08/16
08/04/16
06/01/16
NO.
REV

175-345100 Monitoring Systems Vibration, Axial position and


DISCIPLINE
ENGINEER bearing Temperatures
C
A

175-347600 Cable: Instrumentation


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
1.4.3 SAUDI ARAMCO Material Specification Standards
DATE:
CERTIFIED 01-SAMSS-010 Fabricated Steel Piping
A M ALMATROOK
09/08/16
01-SAMSS-017 Auxiliary Piping for Mechanical Equipment
DATE: 01-SAMSS-029 RTR (Fiberglass) Sewer Pipe and Fittings for Gravity
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Flow
09/08/16
01-SAMSS-034 RTR (Fiberglass) Pressure Pipe and Fittings
DATE:
OPERATIONS
01-SAMSS-035 API Line Pipe
SHAHZAD YAZDANI

09/08/16
01-SAMSS-038 Small quantity purchase and Approved pipe mills
DATE:
01-SAMSS-091 Oil Field Chemical Injection Skid System
02-SAMSS-005 Butt Welding Pipe Fittings
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 02-SAMSS-011 Forged Steel and Alloy Flanges


EDSD

04-SAMSS-001 Gate Valves


DATE:

04-SAMSS-002 Globe Valves


BY:

04-SAMSS-005 Check Valves, Swing Type


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

04-SAMSS-035 General Requirements for Valves


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

04-SAMSS-041 Expanding Plug Valves


(DCC) NO. _____________________

04-SAMSS-048 Valve Inspection and Testing Requirements


04-SAMSS-051 Ball Valves, API SPEC 6D
04-SAMSS-052 Ball Valves, API SPEC 6A
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 11


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 09-SAMSS-021 Qualification Requirements for Alkyd Enamel Coating
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
System (APCS-6)
09-SAMSS-060 Packaging Requirements for Coatings
ASH
ASH
ASH

09-SAMSS-067 Qualification Requirements for Internal Coating Systems


LEADS

LEADS
LEADS
ALL

Used in Immersion Service


ALL
ALL

09-SAMSS-069 Qualification Requirements for Epoxy Coatings for


Atmospheric Service
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

09-SAMSS-088 Aggregates for Concrete


DESCRIPTION

09-SAMSS-091 Qualification Requirement For Shop-Applied Internal


ISSUED FOR 60% FEL3

FBE Coatings
09-SAMSS-097 Ready-Mixed Concrete
09-SAMSS-107 Qualification Requirements and Application of Composite
Fluoro-polymer/Ceramic Coatings to Fasteners
12-SAMSS-005 Marking of Metal Products
12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
12-SAMSS-008 Erection of Structural and Miscellaneous Steel
12-SAMSS-014 Pre-Engineered Metal Buildings
JO/EWO

14-SAMSS-531 Power Transformers


10-02399-

14-SAMSS-536 Pad mounted Three Phase Distribution Transformers


10-02399-
10-02399-
0001

0001
0001
DATE

15-SAMSS-502 Medium Voltage Cable 5KV through 35 KV


16-SAMSS-502 Metal-Enclosed Metal-Clad Low Voltage Switchgear
09/08/16
08/04/16
06/01/16
NO.
REV

Assemblies
DISCIPLINE
ENGINEER 16-SAMSS-503 Indoor Control gear-Low Voltage
C
A

16-SAMSS-504 Indoor Metal-Clad Switchgear: 1 to 38 KV


DATE:
PROJECT
ALL LEADS
16-SAMSS-512 Outdoor Switchrack – Low Voltage
ENGINEER
09/08/16 16-SAMSS-513 Power System Automation Components
DATE: 16-SAMSS-518 Low Voltage Panel boards
A M ALMATROOK
CERTIFIED
16-SAMSS-519 Indoor Switchboards-Low Voltage
09/08/16 16-SAMSS-520 Cable Bus
DATE:
CONSTRUCTION
AMR EL SHARKAWY
17-SAMSS-004 Conventional (Tap Adjustable) Rectifiers for Cathodic
AGENCY
09/08/16 protection
DATE:
17-SAMSS-005 Cathodic Protection phase controlled Rectifiers
OPERATIONS
SHAHZAD YAZDANI
17-SAMSS-006 Galvanic Anodes for Cathodic Protection
09/08/16 17-SAMSS-007 Impressed Current Anodes for Cathodic Protection
DATE: 17-SAMSS-008 Junction Boxes for Cathodic Protection
CONTROL NUMBER

ALI H GHAMDI
17-SAMSS-017 Impressed Current Cathodic protection Cables
VERIFICATION

09/08/16
17-SAMSS-018 Remote Monitoring System for Cathodic protection
EDSD

17-SAMSS-502 Form-Wound Induction Motors 500 HP and Above


DATE:

17-SAMSS-503 Severe Duty, Totally Enclosed Squirrel Cage Induction


BY:

Motors to 500 HP
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment


(DCC) NO. _____________________

17-SAMSS-511 Stationary Storage Batteries


17-SAMSS-514 Battery Charger/Rectifier
17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment
REVISION

17-SAMSS-516 Uninterruptible Power Supply System


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 12


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 17-SAMSS-518 Diesel Generator Sets
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
26-SAMSS-059 Insulating Oil Uninterruptible Power Supply System
18-SAMSS-625 Outside Plant – Fiber optic cable specifications (single
ASH
ASH
ASH

mode and multiple mode).


LEADS

LEADS
LEADS
ALL

20-SAMSS-001 Welding and Brazing Consumables


ALL
ALL

21-SAMSS-011 Fluoro Protein Foam Concentrate For MTBE


Hydrocarbon Fires
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

23-SAMSS-010 Distributed Control Systems


DESCRIPTION

23-SAMSS-050 Terminal Management System


ISSUED FOR 60% FEL3

23-SAMSS-701 Industrial Ethernet Switch Specifications


26-SAMSS-084 Turbo Compressor oil 46
27 SAMSS-011 Fire, Smoke, and Combination Fire-Smoke Dampers
31-SAMSS-003 Reciprocating Compressors for Air or Gas Service
31-SAMSS-004 Centrifugal Pumps
31-SAMSS-009 Positive Displacement Pumps – Controlled Volume3
31-SAMSS-010 Submersible Pumps and Motors for Water Well and
Offshore Service
JO/EWO

31-SAMSS-012 Shaft Sealing System for Centrifugal and Rotary


10-02399-

Pumps
10-02399-
10-02399-
0001

0001
0001
DATE

32-SAMSS-004 Manufacture of Pressure Vessels


32-SAMSS-005 Manufacture of Atmospheric Tanks
09/08/16
08/04/16
06/01/16
NO.
REV

32-SAMSS-013 Lubrication, Shaft Sealing and Control Oil Systems


DISCIPLINE
ENGINEER 32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage
C
A

Tanks
DATE:
PROJECT
ALL LEADS
32-SAMSS-038 manufacture of Skid Mounted units
ENGINEER
09/08/16 34-SAMSS-117 Turbine Flow Meters in Liquid Service
DATE: 34-SAMSS-118 Positive Displacement Meters
A M ALMATROOK
CERTIFIED
34-SAMSS-119 Bi-Directional Meter Prover
09/08/16 34-SAMSS-120 Uni-Directional Meter Prover
DATE:
CONSTRUCTION
AMR EL SHARKAWY
34-SAMSS-121 Small Volume Prover
AGENCY
09/08/16 34-SAMSS-167 Truck Loading Metering Systems
DATE:
34-SAMSS-319 Radar Tank Gauging Equipment
OPERATIONS
SHAHZAD YAZDANI
34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors
09/08/16 34-SAMSS-318 Automatic Tank Gauging Equipment
DATE: 34-SAMSS-321 Radar Tank Gauging Systems for Royalty/Custody
CONTROL NUMBER

ALI H GHAMDI
Measurement of Hydrocarbon Liquids
VERIFICATION

09/08/16
34-SAMSS-010 Quality Requirement for Pressure Retaining
EDSD

Instruments
DATE:

34-SAMSS-611 Safety Relief Valves Conventional and Balanced


BY:

Types
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

34-SAMSS-623 Programmable Controller Based ESD Systems


(DCC) NO. _____________________

34-SAMSS-625 Machinery Protection System


34-SAMSS-634 Local ZV Control Systems
34-SAMSS-711 Control Valves
REVISION

34-SAMSS-717 Hydraulic Valve Actuators Systems


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 13


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
34-SAMSS-718 Electric Motor Operated Valve Actuators
34 SAMSS 820 Instrument Control Panel Indoors
ASH
ASH
ASH

34-SAMSS-821 Instrument Control Cabinets – Outdoor


LEADS

LEADS
LEADS
ALL

34-SAMSS-830 Programmable Logic Controllers


ALL
ALL

34-SAMSS-831 Instrumentation for Packaged Units


34-SAMSS-841 Flow Computer for Custody Transfer Measurement of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Hydrocarbon Liquids
DESCRIPTION

34-SAMSS-847 Preset Controller for Truck Loading and Unloading


ISSUED FOR 60% FEL3

Systems
34-SAMSS-913 Instrumentation and Thermocouple Cable

1.4.4 SAUDI ARAMCO Engineering Procedure

SAEP-14 Project Proposal


SAEP-22 Tank Calibration Requirements
SAEP-28 Radar Tank Gauging System Verification Requirements
JO/EWO

SAEP-99 Process Automation Networks and Systems Security


SAEP-302 Instructions for Obtaining a Waiver of a Mandatory
10-02399-

10-02399-
10-02399-
0001

SAUDI ARAMCO Engineering Requirement


0001
0001
DATE

SAEP-334 Retrieval, Certification and Submittal of SAUDI ARAMCO


09/08/16
08/04/16
06/01/16

Engineering & Vendor Drawings


NO.
REV

DISCIPLINE SAEP-316 Performance Qualification Requirements of Coating


ENGINEER
Personnel
C
A

DATE:
SAEP-318 Pressure Relief Valve Program Authorization for
PROJECT Installation, Deletion and Changes
ALL LEADS
ENGINEER
09/08/16
SAEP-319 Pressure Relief Devices - Testing and Inspection
Requirements
DATE:
CERTIFIED SAEP-747 Pipelines Leak Detection Systems
A M ALMATROOK
09/08/16
DATE: SAEP-1152 Approval procedure for Ready-Mixed concrete mix
CONSTRUCTION
AMR EL SHARKAWY
AGENCY design
09/08/16
SAEP-1624 Preparation of System Design Document
DATE:
SAEP-1630 Preparation of Integration Test Procedure
OPERATIONS
SHAHZAD YAZDANI
SAEP-1634 Factory Acceptance Test
09/08/16
SAEP-1638 Site Acceptance Test
DATE:
SAEP-3101 Equipment & Spare Parts Data Requirement for
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 CONTRACTOR Produced Equipment.


EDSD

1.4.5 SAUDI ARAMCO Standards Drawings (SASD)


DATE:
BY:

AA-036024-001 Roof framing plan sunshade type-I, community


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

AA-036513-001 Custody Transfer


(DCC) NO. _____________________

AA-036322-001 Rev.08 Anchor Bolt Details


AA-036026-001 Site L/O-Decorative Metal Gate
AA-036026-002 Foundation General
REVISION

AA-036026-003 Details, Decorative Metal Gate


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 14


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG AA-036051 Site Layout-Computer Gate House Fac. 4 lanes
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AA-036678 SAUDI ARAMCO Security and General Purpose Fencing
AA-036755-001 Details-Drive Gate & Walk Gate
ASH
ASH
ASH

AA036755-002 Details-Gates Locking Device and Drop Bolt


LEADS

LEADS
LEADS
ALL

AB-036003-001 Manways and Vents for Tanks


ALL
ALL

AB-036054 Oily Water Sewer Manholes


AB-036260 Concrete Sidewalk, Curb and Gutter Details
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

AB-036019 Thermowell Assembly and Detail


DESCRIPTION

AB-036106-001 Assembly and Details of Type "A” Stairs for Walkways


ISSUED FOR 60% FEL3

and Platforms.
AB-036106-002 Assembly and Details of Type "A" Stairs for Walkways
and Platforms-Metric
AB-036227 Standard Symbols for Piping Orthographic Drawings
AB-036386 Hardness Testing for Welding Procedure Qualifications
AB-036521 Bridge Weld and Typical Brace Seal Welded and Socket
Welded Valves On Process Lines
AC-036045 Detail Vent, Drain and Sample Connections
JO/EWO

AC-036950 Instrument Symbols


10-02399-

AE-036137 Truck Loading Bottom Specification


10-02399-
10-02399-
0001

0001
0001
DATE

AE-036175 Details of Heavy Welding Boss for Threaded


Connections to Vessels and Lines
09/08/16
08/04/16
06/01/16
NO.
REV

AE-036451 Pre-Heat Levels for Welding Carbon Steel


DISCIPLINE
ENGINEER AE-036141 Truck loading or unloading – general arrangement
C
A

SA-2693 Safety Instruction Sheet – Tanks


DATE:
PROJECT
ALL LEADS
AB-036402 Details Cast Iron Catch Basin with Side inlet s
ENGINEER
09/08/16 AE-036470 RIP-RAP Slope Protection Detail
DATE: AC-036078 Details Cast Iron Catch Basin without Side inlets
A M ALMATROOK
CERTIFIED
AC-036489 Traffic Control Devices
09/08/16 AC-036680 SAUDI ARAMCO Security and General Purpose
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Fencing-Footing Details
AGENCY
09/08/16 AB-036677 SAUDI ARAMCO Security and General Purpose Fencing
DATE:
AB-036679 Gate Details
OPERATIONS
SHAHZAD YAZDANI
AD-036009 Water Line Valve Direct Buried
09/08/16 AD-036512 Arrows and Cross Walk Markings
DATE: AE-036083 Manhole Cover for Sewer
CONTROL NUMBER

ALI H GHAMDI
AE-036254 Parking Bumpers Precast Concrete Block
VERIFICATION

09/08/16
AE-036412 Guard Post and Guardrail details
EDSD

DATE:

1.4.6 SAUDI ARAMCO Library Drawings (SALD)


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

DB-950054 Thermocouple Well Assemblies-Horizontal Process Lines


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Details
(DCC) NO. _____________________

DC-950040 Pressure Indicators and Switches - Locally Mounted


DC-950042 Pressure Instrument - Blinds and Indicating Type -
Instrument Piping Details
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 15


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG DC-950043 Electrical Connections for Field-Mounted Instruments
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DD-950022-006 Details of Ground Connections, Switchboard/Control
Panels Ground Bus to Ground Grid
ASH
ASH
ASH

DD-950025 Nameplate Details for Instrument Boards


LEADS

LEADS
LEADS
ALL

DD-950053 Field Mounting Details for Instruments.


ALL
ALL

1.4.7 Non-Material Requirement (NMR)


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

NMR - 7907 Instrumentation


DESCRIPTION

NMR - 7912 Electric Rotary Machinery


ISSUED FOR 60% FEL3

NMR - 7919-1 Pressure Vessels


NMR - 7925 Valves
NMR - 7927 Fabricated Structural Steel
NMR - 7918 Safety relief Valves
NMR - 7923 Control Panel
NMR - 7927 Fabricated Structural Steel
NMR - 7918-1 Tanks
JO/EWO

NMR - 7902 Pumps


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

1.4.8 SAUDI ARAMCO Construction Safety Manual and Safety Handbook


09/08/16
08/04/16
06/01/16

All work is to be carried out in accordance with the SAUDI ARAMCO


NO.
REV

DISCIPLINE Construction Safety Manual and the minimum behavioral safety standards
ENGINEER
detailed in the SAUDI ARAMCO Safety Handbook. Furthermore, the project
C
A

DATE: shall provide Safety and Hazard Identification Plans (HIP) for Loss Prevention
PROJECT
ALL LEADS
ENGINEER approval.
09/08/16

DATE: 1.4.9 SAUDI ARAMCO General Instructions


CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall adhere to all pertinent general instructions, in particular,
DATE:
CONSTRUCTION
AMR EL SHARKAWY
the following for the execution of the work:
AGENCY
09/08/16
G.I.001 General Instruction
DATE:
OPERATIONS
SHAHZAD YAZDANI
G.I.2.100 Work Permit System
09/08/16 G.I.2.721 Electrical Arc Flash Hazard Mitigation
DATE: G.I.6.001 Notification Requirement for Incidents (Including Fires)
CONTROL NUMBER

ALI H GHAMDI G.I.6.012 Isolation, Lockout and Use of Hold Tags


VERIFICATION

09/08/16
G.I.6.030 Traffic and Vehicle Safety
EDSD

G.I.8.001 Safety Requirements for Scaffolding


DATE:

G.I.298.010 Administration Procedure of Contractor Camps/Parks


BY:

and Construction Camps


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

G.I.710.001 SAUDI ARAMCO ID Cards


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

G.I.710.002 Classification of Sensitive Documents


(DCC) NO. _____________________

GI-1781.001 Inspection, Testing and Maintenance of Fire


Protection Equipment
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 16


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 1.4.10 Yanbu Royal Commission Standards
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This project is within YRC jurisdictions and CONTRACTOR shall adhere to all
ASH
ASH
ASH

YRC applicable standards. For full list of applicable standards See Appendix 9.
LEADS

LEADS
LEADS
ALL

ALL
ALL

RCER-2015-Volume I- FINAL-July 2, 2015 Environmental Regulations


RCER-2015-Volume II- FINAL-July 2, 2015 Environmental Regulations
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

1.4.11 SAMREF Standards


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall adhere to all SAMREF standards, format, procedures and


requirements standards, for the scope of work inside SAMREF facilities. See
Appendix 10.

Dwg. Numbering Procedure


Drafting Procedure
Juction Box -Numbering Std
JO/EWO

Junction Box and Cable Installation Std


Marked up P&ID - Tie-ins
10-02399-

10-02399-
10-02399-
0001

MOV’s Purchase Specs - Sample


0001
0001
DATE

P&ID Legend & Details


09/08/16
08/04/16
06/01/16

SAMREF Approved Manufacturer List (AML)


NO.
REV

DISCIPLINE SAMREF Piping Class


ENGINEER
Eqp. & Inst. Tag number Req. Form
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER 1.4.12 INTERNATIONAL CODES AND STANDARDS
09/08/16

DATE: IBC-2009 International Building Code.


CERTIFIED
A M ALMATROOK NFPA-72 National Fire Alarm Code
09/08/16
DATE:
AISC Steel Construction Manual-13th Edition
CONSTRUCTION
AMR EL SHARKAWY ACI American Concrete Institute
AGENCY
09/08/16 API Standard 650 Welded Tanks for oil storage
DATE: API 2003 Protection Against Ignitions Arising Out of Static,
OPERATIONS
SHAHZAD YAZDANI Lightning and Stray Currents
09/08/16 API 505 Recommended practice for classification of locations for
DATE:
electrical installations at petroleum facilities
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
API 541 Form-wound Squirrel-Cage Induction Motors—500
EDSD

Horsepower and Larger


API 546 Brushless synchronous machines-500KVA and larger
DATE:
BY:

API 675 Positive Displacement Pumps – Controlled Volume


REVISIONCERTIFICATION

API 676 Positive Displacement Pumps – Rotary


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ANSI American National Standards Institute (ANSI) Standards


(DCC) NO. _____________________

API STD 610 Centrifugal Pumps for Petroleum, Petrochemical and


Natural Gas Industries
API STD 614 Lubrication shaft sealing and control oil system
REVISION

for special purpose application


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 17


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG API STD 682 Shaft Sealing Systems for Centrifugal and Rotary
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Pumps
API STD 671 Special purpose coupling for petroleum, chemical
ASH
ASH
ASH

and gas industry services


LEADS

LEADS
LEADS
ALL

HI 9.6.7 Viscosity Correction


ALL
ALL

API American Petroleum Institute (API) Standards


AWS American Welding Society (AWS) Standards
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

ASTM American Society for Testing Materials


DESCRIPTION

ASME Section IX Welding & Brazing Qualifications


ISSUED FOR 60% FEL3

ASME Section V Non Destructive Testing


ASME SEC VIII Div. 1 Rules for Construction of Pressure Vessels
ASME B31.3 Process Piping
ASME B31.4 Pipeline Transportation for liquid hydrocarbons
ASME B16.5 Pipe Flanges and Flanged Fittings
ASME B16.11 Forged Steel Fittings, Socket-welded and Threaded.
ASME B73.1 Specification for End suction horizontal Centrifugal
Pumps for chemical Process
JO/EWO

API – MPMS API Manual of Petroleum Measurement Standards


10-02399-

(MPMS)
10-02399-
10-02399-
0001

0001
0001
DATE

API, RP 2000 Safety Relief Valve Sizing


API-RP 686 Recommended Practices for machinery Installation and
09/08/16
08/04/16
06/01/16
NO.
REV

Installation Design
DISCIPLINE
ENGINEER B30.10 Hooks
C
A

B30.17 Overhead and Gantry Cranes (Top Running Bridge


DATE:
PROJECT
ALL LEADS
Single Girder, Under Hung Hoist)
ENGINEER
09/08/16 HST-4M Performance Standard for Overhead Electric Wire Rope
DATE: Hoists
CERTIFIED
A M ALMATROOK
09/08/16 American National Standards Institute (ANSI)/National Electrical Manufacturers
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Association (NEMA)
AGENCY
09/08/16
ANSI / NEMA ICS 2 Industrial Control Devices
DATE:
OPERATIONS
SHAHZAD YAZDANI
ANSI / NEMA ICS 6 Enclosures or Industrials Controls and Systems
09/08/16

DATE:
American National Standards Institute (ANSI)/National Fire Protection
Association (NFPA)
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

ANSI / NFPA 70 National Electric Codes


NFPA 13 Standard for the Installation of Sprinkler Systems
DATE:
BY:

NFPA 16 Installation of Foam-Water Sprinkler and Foam-Water


REVISIONCERTIFICATION

Spray Systems
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

NFPA 20 Installation of Stationary Pumps


(DCC) NO. _____________________

NFPA 22 Water Tanks for Private Fire Protection


NFPA 24 Installation of Private Fire Service Mains and Their
Appurtenances
REVISION

NFPA 30 Flammable and Combustible Liquids Code


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 18


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
NFPA 90A Installation of Air Conditioning and Ventilating System
American Society of Heating, refrigerating & Air-Conditioning Engineers,
ASH
ASH
ASH

Inc. (ASHRAE)
LEADS

LEADS
LEADS
ALL

ALL
ALL

ASHRAE STD 52 Filters, Testing Air-Cleaning Devices


ASHRAE STD 55 Thermal Environmental Conditions for Human
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Comfort
DESCRIPTION

ASHRAE STD 62 Ventilation for Acceptable Indoor Quality


ISSUED FOR 60% FEL3

ASHRAE STD 111 Practice for Measurement, Testing, Adjusting and


Balancing of HVAC Systems
ASHRAE Handbook HVAC Applications
ASHRAE Handbook Systems and Equipment
ASHRAE Handbook Fundamentals

INSTRUMENT, SYSTEMS AND AUTOMATION SOCIETY (ISA)


JO/EWO

ISA S5.1 Instrumentation Symbols and Identification


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

International Organization for Standardization


09/08/16
08/04/16
06/01/16

ISO 9000 Quality Systems – Model for Quality Assurance in


NO.
REV

DISCIPLINE Design/Development, Production, Installation and Servicing.


ENGINEER
C
A

DATE: International Electro -Technical Commissions (IEC)


PROJECT
ALL LEADS
ENGINEER
09/08/16 IEC 61000-6-2 Generic Standards – Immunity for Industrial
DATE: Environments
CERTIFIED
A M ALMATROOK
09/08/16 IEC 62305-1,2, 4, 5 Standard for Lightning Protection System
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY SMACNA
09/08/16

DATE: SMACNA 2002 HVAC SYSTEM-TESTING, Adjusting and


OPERATIONS
SHAHZAD YAZDANI Balancing, 3rd Edition
09/08/16 SMACNA 2005 HVAC Duct Construction Standard-Metal and
DATE:
Flexible, 3rd Edition
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
SMACNA 2002 Fire, Smoke and Radiation damper Installation Guide
EDSD

for HVAC Systems, 5th Edition


DATE:
BY:

American National Standards Institute (ANSI) / American Water Works


Association (AWWA)
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ANSI / AWWA C503 Wet Barrel Fire Hydrants


(DCC) NO. _____________________

American National Standards Institute (ANSI) Standards


American Petroleum Institute (API) Standards.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 19


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AMS/ANSI B31.3 Process Piping
CMAA SPEC # 70 Specification for Top Running & Gantry Type Multiple
ASH
ASH
ASH

Girder Electric Overhead Traveling Cranes


LEADS

LEADS
LEADS

CMAA SPEC #74 Specification for Top Running and Under Running Single
ALL

ALL
ALL

Girder Electrical Travelling Cranes Utilizing Under


Running Trolley Hoist
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

The International Society of Automation (ISA) Standards and Recommended


ISSUED FOR 60% FEL3

Practices for Instrumentation and Control.


National Fire Protection Association (NFPA) Standards
National Electrical Manufacturers Association (NEMA) Standards
ISA RP 12.1 - Electrical Instruments in Hazardous Atmospheres
IEEE 100 - Standard Dictionary of Electrical and Electronic Terms
ANSI/ICS 6-1983 - Enclosures for Industrial Controls and Systems
JO/EWO

API Manual of Petroleum Measurement Standards (MPMS)


API Recommended Practice 2003-1998, Protection Against Ignitions Arising
10-02399-

10-02399-
10-02399-
0001

0001
0001

Out of Static, Lighting and Stray Currents


DATE

API Recommended Practice 2610-1194, Design, Construction, Operation,


09/08/16
08/04/16
06/01/16
NO.
REV

Maintenance and Inspection of Terminal, Tank Facilities


DISCIPLINE
ENGINEER American Society of Civil Engineers (ASCE) Publication 7- 05 Standards -
C
A

Minimum Design Loads for Buildings and Other Structures


DATE:
PROJECT
ALL LEADS
ENGINEER
API Recommended Practice 1004, Bottom Loading and Vapor Recovery
09/08/16 MC 306 Tank Motor Vehicles (to be used in conjunction with U.S. Department
DATE: of Transportation 406, Section 49)
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
PROCESS INDUSTRIES PRACTICES (PIP)
CONSTRUCTION
AMR EL SHARKAWY UL Underwriters Laboratories, Inc.
AGENCY
09/08/16
OSHA Occupational Safety and Health Act Standards
DATE:
OPERATIONS
SSPC Society for Protective Coatings
SHAHZAD YAZDANI

09/08/16
1.5 LIST OF ABBREVIATIONS AND ACRONYMS
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Process
BBL Barrels
EDSD

BPD Barrels per day


DATE:

DO Diesel oil
BY:

DPK Dual purpose kerosene


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

MB 1000 barrel
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MBD 1000 barrel per day


(DCC) NO. _____________________

NJBP North Jiddah Bulk Plant


PG 91 Premium Gasoline-91 RON
PG 95 Premium Gasoline-95 RON
PSP Project Scoping Paper
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 20


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG TBD To be decided
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ULSD Ultra-low Sulphur diesel
YNJ-1 Yanbu Jiddah pipeline -1
ASH
ASH
ASH

YNJ-2 Yanbu Jiddah pipeline -2


LEADS

LEADS
LEADS
ALL

ALL
ALL

TELECOM
ARS Automatic Route Selection
AUTH Authorization Code
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

BI Budget Item
BS Base Station
DESCRIPTION

CAT Category
ISSUED FOR 60% FEL3

CIDR Classless Inter-Domain Routing


CNI Caller Number Identification
DB Decibel
DDF Digital Distribution Frame
DHCP Dynamic Host Configuration Protocol
DWS Dispatcher Work Station
EADS European Aeronautic Defense and Space Company
EARP Ethernet Address Resolution Protocol
JO/EWO

EIA Electronic Industries Alliance


EMS Electronic Marker System
10-02399-

10-02399-
10-02399-

ETSI European Telecommunications Standards Institute


0001

0001
0001
DATE

FAT Factory Acceptance Test


FDP Fiber Distribution Panel
09/08/16
08/04/16
06/01/16
NO.
REV

FMR Field Material Request


DISCIPLINE
ENGINEER FOC Fiber Optic Cable
C

FSD Functional Specification Document


A

DATE: FSF Facility Security Forces


PROJECT
ALL LEADS
ENGINEER GI General Instructions
09/08/16 GPS Global Positioning System
DATE: HCRMON Remote Monitoring for High Capacity Network
CERTIFIED
A M ALMATROOK HDPE High Density Polyethylene
09/08/16 HPR Hand Portable Radio
DATE:
ICMP Internet Control Message Protocol
CONSTRUCTION
AMR EL SHARKAWY
AGENCY IEEE Institute of Electrical and Electronics Engineers
09/08/16
IF Interfaces
DATE: IL Insertion Loss
OPERATIONS
SHAHZAD YAZDANI IP Internet Protocol
09/08/16 ISDN Integrated Services Digital Network
DATE: ISIS Intermediate System to Intermediate System
CONTROL NUMBER

ALI H GHAMDI
ITU International Telecommunications Union
VERIFICATION

09/08/16 kb/s Kilobits Per Second


EDSD

Km Kilometers
LAG Line Access Gateway
DATE:
BY:

LAN Local Area Network


REVISIONCERTIFICATION

LCD Liquid Crystal Display


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MAC Media Access Control


(DCC) NO. _____________________

Mb/s Megabits Per Second


Mbps Mega-bits per second transmission data rate
MCAN Mechanical Completion Acceptance Notice
MCC Mechanical Completion Certificate
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 21


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG MDPE Medium Density Polyethylene
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MGCP Media Gateway Control Protocol
MH Maintenance Hole
ASH
ASH
ASH

MHz Mega Hertz


MIB Management Information Base
LEADS

LEADS
LEADS
ALL

ALL
ALL

MOH Music on Hold


MSTP Multiple Spanning Tree Protocol
MTBF Mean Time between Failures
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

MTO Material Take-off


MTTR Mean Time to Repair
DESCRIPTION

NEC National Electric Code


ISSUED FOR 60% FEL3

NEMA National Electrical Manufacturer’s Association


NESC National Electric Safety Code
NFC National Fire Code
NFPA National Fire Protection Association
Nm Nanometer
NMS Network Management System
O&M Operation & Maintenance
OSP Outside Plant
JO/EWO

OSPF Open Shortest Path First


OTDR Optical Time Domain Reflectometer
10-02399-

10-02399-
10-02399-

P/L Pipeline
0001

0001
0001
DATE

PAT Performance Acceptance Test


PED Pedestal
09/08/16
08/04/16
06/01/16
NO.
REV

PoE Power over Ethernet


DISCIPLINE
ENGINEER PVC Polyvinyl Chloride
C

QoS Quality of Service


A

DATE: REA Rural Electrification Administration


PROJECT
ALL LEADS
ENGINEER RFC Request for Comments
09/08/16 RFDT Radio Frequency Dispatch Terminal
DATE: RFI Request for Information
CERTIFIED
A M ALMATROOK RFUT RF User Terminal
09/08/16 RMON Remote Network Monitoring
DATE:
RSTP Rapid Spanning Tree Protocol
CONSTRUCTION
AMR EL SHARKAWY
AGENCY SACS Saudi Aramco Construction Standards
09/08/16
SAEP Saudi Aramco Engineering Procedure
DATE: SAES Saudi Aramco Engineering Standards
OPERATIONS
SHAHZAD YAZDANI SAMSS Saudi Aramco Materials Supply System
09/08/16 SAPMT SAUDI ARAMCO Project Management Team
DATE: SASO Saudi Arabian Standards Organization
CONTROL NUMBER

ALI H GHAMDI
SAT Site Acceptance Test
VERIFICATION

09/08/16 SCCP Skinny Client Control Protocol


EDSD

SCN Switching Control Node


SIP Session Initiation Protocol
DATE:
BY:

SNMP Simple Network Management Protocol


REVISIONCERTIFICATION

SSD Safety and Security Directives


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

STP Spanning Tree Protocol


(DCC) NO. _____________________

TBC TETRA Base Station Controller


TCP Transmission Control Protocol
TDMA Time Division Multiple Access
TER Telecommunications Equipment Room
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 22


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG TETRA Terrestrial Trunk Radio
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TGB Telecommunications Ground Bar
TIA Telecommunications Industry Association
ASH
ASH
ASH

TMGB Telecommunications Master Ground Bar


TR Telecommunication Room
LEADS

LEADS
LEADS
ALL

ALL
ALL

UDP UTP Distribution Panel


UHF Ultra High Frequency
UPS Uninterruptible Power Supply
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

UTP Unshielded Twisted Pair


VAC Voltage Alternating Current
DESCRIPTION

VAD Voice Activity Detection


ISSUED FOR 60% FEL3

VDC Voltage Direct Current


VHF Very High Frequency
VLAN Virtual Local Area Network
VMR Vehicle Mounted Radios
VPN Virtual Private Network
WAN Wide Area Network
WAP Wireless Access Protocol
WLAN Wireless Local Area Network
JO/EWO

INSTRUMENTATION
10-02399-

10-02399-
10-02399-

BOL Bill of Lading


0001

0001
0001
DATE

ESD Emergency Shut Down


DID Driver Interface Device
09/08/16
08/04/16
06/01/16
NO.
REV

DVS Drivers verification device


DISCIPLINE
ENGINEER FCU Field Control Unit
C

FOC Fiber Optic Cable


A

DATE: LAN Local Area Network


PROJECT
ALL LEADS
ENGINEER MOV Motor Operated Valve
09/08/16 OID Optical Interface Detector
DATE: OIS Order Identification System
CERTIFIED
A M ALMATROOK PLC Programmable Logic Controller
09/08/16 PP Patch Panel
DATE:
RFI Radio Frequency Interference
CONSTRUCTION
AMR EL SHARKAWY
AGENCY RTG Radar Tank Guag / Inventory
09/08/16
SAT Site Acceptance Test
DATE: SI System International
OPERATIONS
SHAHZAD YAZDANI SIB Satellite Instrument Building
09/08/16 TIS Truck Identification System
DATE: TMS Terminal Management System
CONTROL NUMBER

ALI H GHAMDI
UPS Uninterruptible Power Supply
VERIFICATION

09/08/16 WAN Wide Area Network


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 23


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG SECTION 2.0 – PROJECT DESCRIPTION
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.1 PLANT LOCATION
ASH
ASH
ASH

This project is located near the city of Yanbu and the Yanbu area refineries. This plot of
LEADS

LEADS
LEADS
ALL

ALL
ALL

land is approximately 2 km2 in size and is located east of the SAUDI ARAMCO Yanbu
Refinery (YR), adjacent to the east side of King Abdulaziz Road, and within the Yanbu
Royal Commission (YRC) Industrial City.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

2.2 LAND USE PERMIT (LUP)


DESCRIPTION
ISSUED FOR 60% FEL3

This project requires Land Use Permits (LUP) for both the work areas in and around
NJBP and YDH, including: YDH plant, MARAFIQ to YDH corridor for Electrical & FO
cables, Yanbu refinery/YDH Interconnecting pipelines corridor, SAMREF/YDH
Interconnecting pipeline corridor, Access road for YDH and Temporary Construction
Facility

SECTION 3.0 – PROJECT DESIGN CRITERIA


JO/EWO

3.1 The Project Proposal Narrative with all its attachments and drawings shall be the basis
10-02399-

10-02399-
10-02399-
0001

and serve the purpose of defining the overall scope of this project.
0001
0001
DATE

09/08/16
08/04/16
06/01/16

3.2 In addition, the SAUDI ARAMCO engineering procedures, practices, and general
NO.
REV

DISCIPLINE instructions are also considered as part of the design basis for the development of
ENGINEER
CONTRACTOR’s bid.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
3.3 Any conflict between various design basis documents shall be highlighted to SAUDI
09/08/16 ARAMCO for their review and resolution.
DATE:

A M ALMATROOK
CERTIFIED 3.4 This document shall be read in conjunction with relevant contract documents.
09/08/16
DATE:
CONSTRUCTION
3.5 CONTRACTOR shall prepare detail design package as per latest Saudi Aramco
AMR EL SHARKAWY
AGENCY
09/08/16 Engineering Standards, procedures and material specifications. Yanbu Royal
Commission standards & guidelines shall be considered for the detail design package.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16 3.6 CONTRACTOR shall prepare the earthquake resistant design and detailing per
DATE: requirements of AISC-341, Seismic Design Manual of AISC, ACI-318 and ASCE-05.
Geotech report of the project shall be utilized for the determination of Seismic Design
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Category (SDC) per guidelines of ASCE-05.


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 24


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH SECTION 4.0 – DETAILED SCOPE OF WORK
ASH
ASH

Section 4 is included in this PPN to provide design basis and an overall picture of the total
project associated with BI-10-02399. This is specifically intended to provide CONTRACTOR
LEADS

LEADS
LEADS
ALL

ALL
ALL

as much overall project information as possible to enable CONTRACTOR to consider


execution methods/ strategies that may reduce the overall cost of the defined scope included
in this PPN. Note that portions of section 4 are applicable to YDH PPN scope of work.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

General Engineering and Design


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall commit dedicated manpower, equipment and all necessary resources to
perform the Works activities.

CONTRACTOR shall assign a dedicated full-time team to work on the Yanbu Distribution Hub
for the entire project duration which includes but not limited to the engineering design office
and construction site office. The team shall be located in the same floor as the SAUDI
ARAMCO PMT assigned offices.
JO/EWO

4.1 OVERALL SCOPE


10-02399-

10-02399-
10-02399-

The proposed facilities shall interface with the related budget items (BI’s) and other
0001

0001
0001
DATE

components of this BI. Work for this project shall be coordinated with the respective
projects as noted below. Each respective BI below shall address interconnections
09/08/16
08/04/16
06/01/16
NO.
REV

between the other related BI’s and existing facilities. To the extent possible, any
DISCIPLINE
ENGINEER physical tie-ins shall be made without affecting operations. Any changes in the
approved Testing and Inspection (T&I) schedules shall be coordinated with Oil Supply
C
A

DATE: Planning and Scheduling department (OSPAS).


PROJECT
ALL LEADS
ENGINEER
09/08/16 4.2 INTERFACES WITH OTHER BI’s
DATE:

A M ALMATROOK
CERTIFIED Related Budget Items
09/08/16
DATE:
4.2.1 BI-10-02155, Yanbu – Jiddah Refined Product Pipeline
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
This project shall construct refined product pipelines to deliver products from
Yanbu to the North Jiddah Bulk Plant. The current scope transports 576 MBD
DATE:
of refined petroleum products. These pipeline systems will deliver Diesel,
OPERATIONS
SHAHZAD YAZDANI
Kerosene, Premium 91, and Premium 95 Gasoline designated for the Makkah
09/08/16
province.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
The project must consider the origin pipeline pump station and origin storage
tank requirements into the facility design.
EDSD

DATE:
BY:

ERA: 8/16, ERC: 7/20


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4.2.2 BI-10-02167, Refined Product Pipeline – Yanbu-Central Region


(DCC) NO. _____________________

This project constructs a refined product pipeline to delivery product from


Yanbu into the central region of Saudi Arabia. The current scope transports 400
MBD of refined petroleum product to a bulk plant destination in the central
REVISION

region.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 25


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The project must consider the origin pipeline pump station and origin storage
tank requirements into the facility design. Additional storage tanks at YDH shall
ASH
ASH
ASH

be constructed as part of this pipeline project.


LEADS

LEADS
LEADS
ALL

ALL
ALL

ERA: 2/17, ERC: 1/21


ISSUED FOR 100% PROJECT PROPOSAL

4.2.3 BI-10-02159, Grassroots Refinery and Petrochemical – Yanbu


ISSUED FOR 90% PROJECT PROPOSAL

This project expands the Yanbu Refinery to increase Western Region’s refined
DESCRIPTION

products supply and increase the integration between the refinery and
ISSUED FOR 60% FEL3

chemicals to maximize profitability.

The refined product production resulting from this project will be a significant
amount of product supply for YDH.

ERA: 7/18, ERC: 12/23


JO/EWO

4.2.4 BI-10-00043, Yanbu Refinery Clean Fuels – YASREF Interface


This project constructs two pipelines to transfer Clean Transportation Fuels
10-02399-

10-02399-
10-02399-
0001

(ULSD, PG91, and PG95) from the YASREF Refinery to the Yanbu Refinery.
0001
0001
DATE

The proposed pipeline route shall follow the Royal Commission Corridor
between the YASREF Refinery and the Yanbu Refinery.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
The custody metering shall be located inside YDH battery limit along with
C
A

supervisory monitoring and control Process Automation.


DATE:
PROJECT
ALL LEADS
The YASREF supply connection into YDH will connect into each of the
ENGINEER
09/08/16
pipelines.
DATE:

A M ALMATROOK
CERTIFIED ERA: 2/16, ERC: 5/19
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 4.3 PROJECT PHYSICAL INTERFACES
09/08/16

DATE:
OPERATIONS
The project scope for the YNJ-1/2 pipelines, BI-10-02155 & YDH and North Jiddah
SHAHZAD YAZDANI
Bulk Plant (NJBP) Expansion & Upgrade, BI-10-02399 will contain elements that shall
09/08/16
be interfaced to achieve project purpose and intend.
DATE:
CONTROL NUMBER

ALI H GHAMDI
This project has very complicated interfaces as listed below; it is highly recommended
VERIFICATION

09/08/16
that the CONTRACTOR assign a dedicated Interfaces Manager to handle those
EDSD

challenging interfaces and to present an interface management plan at an early stage


DATE:

of the project following the direction of SAEP-367.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall consider the interfaces when studying the Project Risk
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Management, and Constructability and logistic assessment.


(DCC) NO. _____________________

CONTRACTOR shall consider all the relevant Reservation forms and interface
packages used in the Project Proposal package for the detail design.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 26


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG BI-10-02155 is comprised of:
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Yanbu-North Jiddah Pipeline System
ASH
ASH
ASH
LEADS

LEADS
LEADS

This BI also provides for The YNJ-1/2 Pipeline System to transport 576 MBD of refined
ALL

ALL
ALL

product from YDH to the NJBP. This pipeline system will deliver Diesel, Kerosene,
Premium 91, and Premium 95 Gasoline designated for the Makkah province.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

BI-10-02399 is comprised of the following two components:


DESCRIPTION
ISSUED FOR 60% FEL3

a) Yanbu Distribution Hub

YDH is a Greenfield refined storage facility at Yanbu that collects products


(PG91, PG95, DO and DPK) from the local Yanbu area refineries and delivers
to pipelines extending to Jiddah and the Central Region.

b) North Jiddah Bulk Plant Expansion and Upgrade


JO/EWO

The existing bulk plant at North Jiddah shall be upgraded and expanded to
10-02399-

10-02399-
10-02399-

accommodate the receipt of the YNJ-1/2 pipelines as well as increased truck


0001

0001
0001
DATE

loading and offloading facilities..


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Figure 1. Project boundaries for BI-10-02155 and BI-10-02399
AGENCY
09/08/16

DATE:
4.3.1 Refinery Connections:
OPERATIONS
SHAHZAD YAZDANI

09/08/16
Refer to Appendix 2 Project Proposal Interface Packages.
DATE:
Appendix 2 contains all reservation forms, 90% comment logs, documents and
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
drawings related to the interfaces with MARAFIQ, Yanbu Royal Commissioning,
Yanbu NGL, Yanbu refinery, SAMREF, and YASREF. The drawings included in
EDSD

this Appendix are also included in the general YDH package.


DATE:
BY:

YDH shall construct multiple pipelines to tie into the tank farm of each respective
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

refinery. The tie-in location shall be downstream of any tankage and booster
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

pumps within the respective refinery tank farm and YRT discharge lines from
(DCC) NO. _____________________

terminal ship pump.

YASREF
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 27


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG YDH shall receive PG 91/95 and DO products from the YASREF via two
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipelines. Part of the pipeline supply from YASREF to YDH will be provided by BI-
10-00043, for the supply of clean transportation fuel to Yanbu refinery. Two (2)
ASH
ASH
ASH

pipelines (one for DO and one for PG 91/95) between YASREF & Yanbu refinery
shall be provided under BI-10-00043. This project will tie-in to the isolation valve
LEADS

LEADS
LEADS
ALL

ALL
ALL

downstream provided on the pipeline and shall be the connecting points for the
pipelines leading to YDH. BI-10-00043 will provide a manual valve on both
pipelines for tie-ins to YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The interface scope with YASREF is described as following:


DESCRIPTION
ISSUED FOR 60% FEL3

A. Instrumentation:
 The YDH control system shall be interfaced to YASREF control system to
have READ ONLY access to the data points such as the CMS, EIV status
and Pump status. The data is to be exchanged via plant DMZ through PI
system at both the facilities.
 Contractor shall provide new fiber optic cable from YASREF to YDH for the
data exchange. The interface is shown in preliminary block # IN-A00001.004
JO/EWO

 Contractor shall coordinate with Refinery Control System Vendor for the
interface requirements.
10-02399-

10-02399-
10-02399-


0001

Reference Drawing: BLOCK DIAGRAM-YASREF INTERFACE IN-


0001
0001
DATE

A00001.004
09/08/16
08/04/16
06/01/16
NO.
REV

B. Telecom
DISCIPLINE
ENGINEER  Provide 12 core Fiber optic cable from Yanbu Distribution Hub to YASREF
C
A

Central Control Building (CCB).


DATE:
PROJECT
ALL LEADS
 Provide VOIP hotline in YASREF Central Control Building (CCB)
ENGINEER
09/08/16
Notes: Engineering / construction contractor for BI-10-00043 need to
DATE:
CERTIFIED accomplish the requirement of new surge relief systems for both
A M ALMATROOK
pipelines (YASREF – YR) and a surge relief tank & its pumps inside
09/08/16
DATE:
YASREF. Surge tank pumps to be protected with foam system.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 SAMREF
DATE:
OPERATIONS YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
SHAHZAD YAZDANI
pipelines extending from the SAMREF tank farm to YDH product receiving
09/08/16
manifolds. The SAMREF supply connection to YDH shall be downstream of
DATE:
existing export pumps. And the required new metering skids shall be installed
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
at SAMREF. These tie-ins will be taken from the SAMREF export lines going to
their terminal near to the fence at King Fahad Road (RC Corridor). All new
EDSD

equipment shall also be installed at space available adjacent to the tie-ins.


DATE:
BY:

The interface scope with SAMREF is described as following:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. Piping:
(DCC) NO. _____________________

 Construct 4 tie-ins with SAMREF pipelines, including MOVs, and ZVs.


 Construct 1 tie-in with drain system
 Install 3 metering skids & 2 Prover skids.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 28


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Installation of 01 surge tank & 02 pumps
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 Using the existing pumps.
ASH
ASH
ASH

B. Instrumentation:
LEADS

LEADS

 Provide and install Three (3) custody metering skids PG91/95, DO and DPK
LEADS
ALL

ALL
ALL

with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall
be as per SAES-Y-103. The metering skids field instrumentation shall be
integrated to metering and control cabinets such as flow computer cabinet,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

PLC cabinet and MSC cabinet. A vendor supplied metering shelter shall be
DESCRIPTION

provided to house these cabinets.


ISSUED FOR 60% FEL3

 Skid Vendor/LSTK shall supply prefab air-conditioned Metering Shelter


constructed in compliance with electrical area classification requirements and
Saudi Aramco /SAMREF Standards.
 The contractor shall provide a new DCS Controller with input-output modules
and a FTA/marshalling cabinet to integrate new field instruments added by
BI-10-02399 in SAMREF facility. The DCS cabinets shall be installed in
metering shelter. The Metering Supervisory Computer (MSC) shall be
interfaced to DCS via open industry standard protocol such as Modbus
JO/EWO

TCP/IP, OPC etc. Refer block diagram IN-A00001.009 for Custody Metering
System.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 The contractor shall provide redundant fiber optic cables between metering
shelter and nearest OMS control building in the tank farm area of SAMREF.
09/08/16
08/04/16
06/01/16

The new DCS shall be tied to the existing plant control network at OMS
NO.
REV

DISCIPLINE control room. The HMI station at OMS control room will be updated with the
ENGINEER
new instrumentation added by BI-10-02399.
C
A

DATE:  The new ESD valves added by BI-10-02399 at the battery limit of SAMREF
PROJECT
ALL LEADS
ENGINEER facility shall be integrated to existing ESD system. The contractor shall
09/08/16 provide new junction boxes and cables. The ESD marshalling cabinet
DATE: OMMRS01 shall be used to terminate ESD cables at OMS Rack-room.
CERTIFIED
A M ALMATROOK  The contractor shall provide junction boxes and field homerun cables as
09/08/16 indicated in block diagram# IN-A00001.007
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 The YDH control system shall be interfaced to SAMREF control system to
09/08/16 have READ ONLY access to the data points such as the CMS, EIV status
DATE:
and Pump status and tank status. The data is to be exchanged via plant DMZ
OPERATIONS
SHAHZAD YAZDANI
through PI system at both the facilities. New fiber optic cable is to be laid from
09/08/16 SAMREF to YDH for the data exchange.
DATE:  Contractor shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 A00435/36/37/38. Provide and install Junction boxes and lay homerun cable
EDSD

IC-0116/117/124/125 up to new DCS Marshalling Cabinet in located in


metering shelter.
DATE:
BY:

 Contractor shall provide and install ZV-1112/1212/1312 and install cable IC-
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Contractor shall utilize existing cable tray to run home cable from junction to
(DCC) NO. _____________________

OMS control room.


 Installation shall be as per below reference drawings
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 29


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Drawing Description
ASH
ASH
ASH

J8DF5007-001 OMS CONTROL ROOM LAYOUT


LEADS

232J081-001 BLOCK DIAGRAM, OM & S CONTROL HOUSE


LEADS
LEADS
ALL

ALL
ALL

IN-A00001.009 SAMREF CUSTODY METERING SKIDS


IN-A00001.007 SAMREF INTERFACE
ISSUED FOR 100% PROJECT PROPOSAL

IN-E00031 DCS INPUT-OUTPUT LIST


ISSUED FOR 90% PROJECT PROPOSAL

IN-E00032 ESD INPUT-OUTPUT LIST


DESCRIPTION
ISSUED FOR 60% FEL3

IN-D00030.001 CABLE AND CONDUIT SCHEDULE


IN-E00015 FSD- DISTRIBUTED CONTROL SYSTEM
IN-E00016 TSD-DCS MODIFICATION-SAMREF DCS
IN-E00011 SHT 001-014 ISS FOR MOVs
IN-E00006/7 SHT 001-003 ISS FOR PZVs
IN-E00013 SHT 001-003 ISS FOR ZVs
JO/EWO
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 C. Telecom
DATE:  Provide 12 core Fiber optic cable from Yanbu Distribution Hub to SAMREF
CERTIFIED
A M ALMATROOK new Metering Shelter.
09/08/16
DATE:  Provide 12 core Fiber optic cable from SAMREF new Metering Shelter to
CONSTRUCTION
AMR EL SHARKAWY OMS Control Room.
AGENCY
09/08/16
 Provide VOIP hotline in SAMREF OMS Control Room.
DATE:
OPERATIONS
SHAHZAD YAZDANI D. Electrical:
09/08/16  Provide and Install two 480V, 3phase, 3wire MOVs Panels feeding from
DATE: SAMREF existing Substation No. 12.
CONTROL NUMBER

ALI H GHAMDI

VERIFICATION

Provide and Install new rack mounted 10kVA UPS with 60 mins back up time
09/08/16
in Substation No. 12 to feed Metering Skids.
EDSD

 Empty spaces of existing MCCs in Substation No. 12 shall be utilized to feed


DATE:
BY:

MOVs Panels and UPS.



REVISIONCERTIFICATION

Run and terminate power cables for Panels and metering skids etc.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Provide Grounding to new equipment from existing SAMREF Grounding


(DCC) NO. _____________________

network.
 Provide task lighting for new equipment from existing lighting Panels.
REVISION

E. Structural:
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 30


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 LSTK contractor shall perform required geotechnical investigation inside
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH SAMREF refinery during detailed design.

ASH

All necessary structures and foundations for MOV’s and metering skids.
ASH
LEADS

Yanbu Refinery
LEADS
LEADS
ALL

ALL
ALL

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
through three pipelines extending from YRT through Yanbu refinery tank farm
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

to YDH. The Yanbu refinery supply connection to YDH shall be downstream of


DESCRIPTION

existing marine loading pumps. These pumps will take suction from ship pump.
ISSUED FOR 60% FEL3

The required new metering skids shall be installed at YDH.

Provisions shall be provided in the receiving manifold for the future connection
of PG 91/95, DO & DPK from Yanbu grass root refinery.

The interface scope with SAMREF is described as following:


JO/EWO

A. Piping:
 Construct 4 tie-ins with YR pipelines, including MOVs, and ZVs.
10-02399-

10-02399-
10-02399-


0001

Installation of surge tanks and pumps


0001
0001
DATE

B. Instrumentation:
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
 Contractor shall provide and install Motor Operated and Electrohydraulic ESD
ENGINEER valves at the battery limit of Yanbu Refinery, MOVs shall also be provide at
C
A

the tie-in locations.


DATE:
PROJECT
ALL LEADS
 Contractor shall provide and install new homerun cables from valves up to
ENGINEER
09/08/16 the existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-
1590 is expanded under BI-10-00043, the project shall coordinate with BI-10-
DATE:
CERTIFIED 00043 to reserve the space in the cabinets required by this BI. All new EIVs
A M ALMATROOK
will be connected to new ESD Marshalling Cabinet provided by BI-10-00043.
09/08/16
DATE: BI-10-02399 will provide required input-output modules to integrate to ESD
CONSTRUCTION
AMR EL SHARKAWY system provided under BI-10-00043.
AGENCY
09/08/16
 All non-ESD instruments will be connected to new DCS Marshalling Cabinet
DATE: provided by BI-10-00043. BI-10-02399 will provide required input-output
OPERATIONS
SHAHZAD YAZDANI modules to integrate to DCS system provided under BI-10-00043.
09/08/16
 SIH-1590 will be expanded under BI-10-00043 to accommodate the
DATE:
expansions under this BI. The DCS/ESD provided under BI-10-00043 will be
CONTROL NUMBER

ALI H GHAMDI
integrated to YR plant network.
VERIFICATION

09/08/16
EDSD

 New instrumentation provided under BI-10-02399 will be controlled from YR


tank farm control room and the HMIs at tank farm control room will be
DATE:

updated accordingly Refer block diagram IN-A00001.008 for details.


BY:

 In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

system to YDH provides View only signals related to product transfer. The
data points shall be the status of product pumps and EIVs such as running,
(DCC) NO. _____________________

stopped, tripped etc. The requirements of data from Yanbu Refinery shall be
further evaluated during detailed design in coordination with YDH and YREF
operations.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 31


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 The interface shall be through PI system installed at both the facility, DMZ
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be used in order to make the data exchange highly secured. Contractor
shall provide fiber cables between YREF and YDH. The possible option of
ASH
ASH
ASH

interfacing both the facilities shall be further evaluated during detailed design.
LEADS


LEADS

Contractor shall provide and install new junction boxes, branch cables,
LEADS
ALL

ALL
ALL

homerun cables for instruments added by this BI.


 The field installation shall be as per P & IDs VA-247876/877 and VA-
ISSUED FOR 100% PROJECT PROPOSAL

234308.015/020/027 and Piping Plans PI-A00403.004, VA-236952.001, VA-


ISSUED FOR 90% PROJECT PROPOSAL

236952.002, VA-236956.001, VA-236956.002 and VA-236960.002


DESCRIPTION

 Contractor shall run homerun cables from Junction boxes to SIH-1590


ISSUED FOR 60% FEL3

utilizing existing cable trays. Refer drawing VA-549870.001 for cable routing.

 Reference Drawings:
JO/EWO
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16

DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 32


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
IN-A00001.008
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
33
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
34
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
35
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
36
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
37
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
38
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
39
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
40
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
41
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
42
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

AMR

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A

ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001

AGENCY
BY:

LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE

09/08/16
ENGINEER

09/08/16
ENGINEER
10-02399-

09/08/16
09/08/16
DISCIPLINE
ALL

ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG

EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL

OPERATIONS
LEADS SAY

CONSTRUCTION
A M ALMATROOK
C

SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

YDH & NJBP EXPANSION


PROJECT PROPOSAL NARRATIVE
Drawing

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
43
Of
307
SHT.NO.

C
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Telecom
ASH
ASH
ASH

 Provide two(2) 48 core Fiber optic cable from Yanbu Distribution Hub to
Yanbu Refinery Admin Bldg 1401. One fiber is for IT and the other for
LEADS

LEADS
LEADS
ALL

ALL
ALL

Process connectivity.
 Provide hotline circuits in Operation Bldg. at Yanbu Distribution Hub to
connect in the Yanbu RSCC.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Provide PE Router in Yanbu Distribution Hub to connect in the existing PPE


DESCRIPTION

Routers at Yanbu Refinery Admin Bldg 1401 and Yanbu NGL.


ISSUED FOR 60% FEL3

 Provide Access Points (APs) in Yanbu Distribution Hub to connect in the


existing WLAN Controller at Yanbu NGL.
 Provide connectivity and associated equipment in Yanbu Distribution Hub to
the third party SAMREF, YASREF and YRT.
 Provide the TETRA Radio system in Yanbu Distribution Hub to connect in the
existing SCN in Yanbu NGL.
 Provide Transmission connectivity for SDH equipment in Riyadh Refinery.
JO/EWO
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

D. Electrical:
 Provide and Install three 480V, 3phase, 3wire MOVs Panels feeding from
09/08/16
08/04/16
06/01/16

YANBU refinery existing Substation No. 7, 8 and 9.


NO.
REV

DISCIPLINE
ENGINEER
 Empty spaces of existing MCCs in Substation No. 7, 8 and 9 shall be utilized
to feed MOVs Panels.
C
A

DATE:
 Run and terminate power cables for MOV.
PROJECT
ALL LEADS
ENGINEER
09/08/16
 Provide Grounding to new MOV panels from existing YANBU refinery
Grounding network.
DATE:

A M ALMATROOK
CERTIFIED  Provide task/area lighting for new equipment from existing nearby lighting
09/08/16 Panels.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY E. Structural:
09/08/16
 LSTK contractor shall use geotechnical report recommendation from proposal
DATE: geotechnical report 2015/104 and existing geotechnical report 93/90 for
OPERATIONS
SHAHZAD YAZDANI foundation design requirement during detailed design.
09/08/16
 All necessary structures and foundations for MOV’s and Pipe Supports.
DATE:
CONTROL NUMBER

ALI H GHAMDI
Other Connection: MARAFIQ
VERIFICATION

09/08/16
EDSD

A. Electrical Scope at MARAFIQ Substation # 9I Interface:


DATE:

 THE CONTRACTOR shall coordinate with Saudi Aramco and MARAFIQ for
BY:

the portion of works under MARAFIQ scope and insure correct interface of all
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

discipline’s i.e. Civil, Electrical, Protection, Communication, etc.


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 THE CONTRACTOR shall furnish electrical detailed drawings, documents


(DCC) NO. _____________________

and any calculation requested by MARAFIQ / Roya Commission (RC) to fulfill


the connection agreement requirements.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 44


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 THE CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to feed power to Yanbu Distribution Hub (YDH). (Refer sketch # SK-A10011,
SK-A10013 & SK-A10014)
ASH
ASH
ASH

 THE CONTRACTOR shall provide one (1) metering panel to accommodate


LEADS

LEADS

two (2) revenue meters & two check meters for YDH feeders-1 & 2. (Refer
LEADS
ALL

ALL
ALL

sketch # SK-A10013 & SK-A10014)


 THE CONTRACTOR shall provide Four (4) protection relay panel to
ISSUED FOR 100% PROJECT PROPOSAL

accommodate line differential relays & directional relays for YDH feeders-1 &
ISSUED FOR 90% PROJECT PROPOSAL

2. (Refer sketch # SK-A10013 & SK-A10014)


DESCRIPTION

 THE CONTRACTOR shall provide one (1) 125VDC Power Panel to supply
ISSUED FOR 60% FEL3

power to new relay panels. (Refer sketch # SK-A10012)


 THE CONTRACTOR shall provide two (2) fiber optic patch panel to be install
in Substation 9I. (Refer sketch # SK-A10014)
 THE CONTRACTOR shall design, supply, install, test and assist with
commissioning of two run, 3x1/C- 630 mm2, 115kV cables of 3.5km in length,
from MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 & SK-
A10015)
JO/EWO

 THE CONTRACTOR shall provide termination kits, including connectors, at


the MARAFIQ end and at the Saudi Aramco 115kV GIS end. THE
10-02399-

10-02399-
10-02399-
0001

CONTRACTOR shall coordinate with MARAFIQ and Saudi Aramco for


0001
0001
DATE

termination at the MARAFIQ end.


09/08/16
08/04/16
06/01/16

 THE CONTRACTOR shall confirm MARAFIQ protection and metering


NO.
REV

DISCIPLINE requirements and reflect accordingly within the Detail Design Drawings.
ENGINEER
Development of protection, control, fire alarm, communication, etc., interface
C
A

DATE:
drawings shall be THE CONTRACTOR responsibility including purchase,
PROJECT installation, termination and testing of the required cabling.
ALL LEADS
ENGINEER
09/08/16  THE CONTRACTOR shall assist MARAFIQ as required with Manpower, and
DATE: test equipment, as necessary to complete MARAFIQ 115kV and Saudi
A M ALMATROOK
CERTIFIED Aramco 115kV Interface Testing including Protection, Metering, Controls, etc.
09/08/16 including wiring interface drawing development. Test Results shall be signed
DATE: by all relevant parties including POD, PID, MARAFIQ, etc. and be included
CONSTRUCTION
AMR EL SHARKAWY
AGENCY within the Project Test Results binders maintained and developed by THE
09/08/16
CONTRACTOR as per SAEP-122.
DATE:
OPERATIONS
 THE CONTRACTOR to consider Integration Philosophy between the
SHAHZAD YAZDANI
MARAFIQ 115KV Substation # 9I and the New Saudi Aramco 115kV
09/08/16
Receiving Substation. Interface philosophy will be finalized as per Connection
DATE:
Agreement between MARAFIQ & Saudi Aramco. Initial communication has
CONTROL NUMBER

ALI H GHAMDI
been established to finalize the scope segregation between Saudi Aramco &
VERIFICATION

09/08/16
MARAFIQ. Proposed interface requirements are as followed:
EDSD

- MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays:
DATE:

=EB04 and =EA06 for Saudi Aramco YDH project. MARAFIQ requested
BY:

Saudi Aramco to submit the breaker reservation thru official letter.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

- MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
(DCC) NO. _____________________

control panel =EB04+S and =EA06+S.


- A new metering panel is required, same model and configuration than as in
existing Crystal metering panels. This new metering panel shall be the
REVISION

combine metering panels for 2 feeders of YDH. Each YDH feeders shall
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 45


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG have a separate revenue meters and will be accommodated in this panel.
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Reserved available floor space for this panel. New Panel to be tagged as:
=E+MP05 115KV Service Cable/Revenue Metering panel.
ASH
ASH
ASH

- Protection Scope- Primary Protection: Two (2) new Relay Panels are
LEADS

LEADS
LEADS
ALL

required based on ABB relays. Reserved available floor spaces for these
ALL
ALL

two panels. New panels to be tagged as: =EB04+R1 and =EA06+R1


115kV Service Line Aramco- YDH/ Primary Protection.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

- Protection Scope- Back Up Protection: Two (2) new relay Panels are
DESCRIPTION

required based on Siemens relays. Available floor spaces for these 2


ISSUED FOR 60% FEL3

panels. New Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV


Service Line Aramco- YDH/ Back Up protection Panel.
- MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for
Bus Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
- DC System scope: Existing 125V DC Distribution Panel has not enough
spare breakers for new DC scope. MARAFIQ requested to provide new
DC panel same manufacturer than existing panels “Riyadh Factory For
Panelboard” Available floor space for this new DC panel. New Panel to be
JO/EWO

tagged as: 125V DCDB 125V Main DCDB No. 3.


10-02399-

- AC System scope: Existing 220V AC Distribution Panel has required spare


10-02399-
10-02399-
0001

0001
0001
DATE

breakers for new AC scope. THE CONTRACTOR to utilize existing spare


breakers from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No
09/08/16
08/04/16
06/01/16
NO.
REV

480V AC panel available in MARAFIQ Substation.


DISCIPLINE
ENGINEER - Power Cable Routing in Basement: MARAFIQ requested as minimum to
C
A

follow the same cable routing design in the basement:


DATE:
PROJECT
ALL LEADS
- Cable trays have to be heavy duty 600mmx150mm for cable transition to
ENGINEER
09/08/16 the wall.
DATE: - Cable trays support shall be unistrut type.
A M ALMATROOK
CERTIFIED
- Cable structural support shall be Unistrut type similar design that existing
09/08/16 ones.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
 General:
AGENCY
09/08/16 - MARAFIQ shall be included in the Review Cycle during Detail Engineering.
DATE: - MARAFIQ informed that technical queries shall be submitted on separate
OPERATIONS
SHAHZAD YAZDANI Memos, queries under same discipline can be grouped in one Memo.
09/08/16 - MARAFIQ requested Saudi Aramco to provide the SOW Narrative for
DATE:
review.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

- MARAFIQ informed that all equipment related to MARAFIQ scope shall be


09/08/16
procured as per RC Standards.
EDSD

DATE:

B. Telecom:
BY:

 THE CONTRACTOR shall design, supply, install, test and assist with
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

commissioning of two (2) x 2 run 12C Single Mode Fiber Optic Cables run
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

along with each power feeder cable from MARAFIQ Substation #9I to YDH.
(DCC) NO. _____________________

(Refer sketch # SK-A10010 & ELA10130-001-003). Each of the two (2) fiber
run will have one 12 core fiber for Control and one 12 core fiber for
Communication connectivity.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 46


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 The fiber patch panel in Substation #91 shall be wall type and in YDH the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH fiber patch panel shall be rack mounted type.
ASH
ASH

C. Instrumentation:
THE CONTRACTOR shall provide and install the following for Water metering
LEADS

LEADS
LEADS
ALL

ALL
ALL

system with MARAFIQ:

 UTILITY WATER
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

- Provide metering skid for utility water system as indicated in the drawing
DESCRIPTION

INA00001-011, the skid shall be provided with field instruments such as


ISSUED FOR 60% FEL3

Electromagnetic flowmeter, Pressure transmitters, Temperature


transmitters and pH analyzer.
- Supplied field instruments shall be as per MARAFIQ standard and from
approved vendors list.
- Provide and install Junction boxes and branch cabling.
- Provide and install RTU with GPRS Communication Gateway. Integrate
the RTU with existing MARAFIQ SCADA.
JO/EWO

 SANITARY WATER
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

- Provide metering skid for Sanitary water system as indicated in the


drawing INA00001-011, the skid shall be provided with field instruments
09/08/16
08/04/16
06/01/16
NO.
REV

such as Electromagnetic flowmeter, Pressure transmitters and


DISCIPLINE
ENGINEER Temperature transmitters.
C
A

- Supplied field instruments shall be as per MARAFIQ standard and from


DATE:
PROJECT approved vendors list.
ALL LEADS
ENGINEER
09/08/16 - Provide and install Junction boxes and branch cabling.
DATE:
- Provide and install RTU with GPRS Communication Gateway. Integrate
A M ALMATROOK
CERTIFIED the RTU with existing MARAFIQ SCADA.
09/08/16
DATE: D. Civil:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
 THE CONTRACTOR shall provide and install the following for Water systems
with MARAFIQ.
DATE:
OPERATIONS  UTILITY WATER
SHAHZAD YAZDANI

09/08/16 - Provide connection of Utility Water at the approved tie-in point for Potable
DATE: water system as indicated in the drawing CIA00110-002 and CIA00116-
CONTROL NUMBER

ALI H GHAMDI
001, using the standard typical connections of RC.
VERIFICATION

09/08/16
- Contractor shall coordinate with MARAFIQ for the time to make the
EDSD

connection to facilitate the connection without interfering with the line


DATE:

operation. Requesting the close down of the pipe section if applicable and
BY:

execute the connection in a time manner.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

- Provided with pipes, fittings and flanges for a proper connection and leave
the connection uncovered until a water test verifies there are not spills at
(DCC) NO. _____________________

the joint of tie in point.


- Provide excavation and backfilling following Aramco standard SAES A 114.

REVISION

SANITARY WATER
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 47


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG - Provide connection of Sanitary Water at the approved tie- in point for
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Sanitary water system as indicated in the drawing CIA00110-002 and
CIA00116-001, using the standard typical connections of RC.
ASH
ASH
ASH

- Contractor shall coordinate with MARAFIQ for the time to make the
LEADS

LEADS
LEADS
ALL

connection to facilitate the connection without interfering with the line


ALL
ALL

operation.
- Provided with pipes, fittings and flanges for a proper connection and leave
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

the connection uncovered until a water test verifies there are not spills at
DESCRIPTION

the joint of tie in point.


ISSUED FOR 60% FEL3

- Provide excavation and backfilling following Aramco standard SAES-A-


114.

Yanbu NGL & Yanbu Royal Commissioning

 Refer to Appendix 2 for reservation forms and drawings.

Storage Tanks and Piping


JO/EWO

The interface point shall be at the flange face at each respective product
10-02399-

header line downstream of any tankage, booster pumps, process piping, and
10-02399-
10-02399-
0001

0001
0001
DATE

measurement equipment downstream of YDH Receipt Header Line as outlined


below.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
 Manifolds shall be constructed to allow for dedicated product service and
DATE: dedicated receipt and delivery of product (2-PG91, 2-PG95, 2-DO, 2-
OPERATIONS
SHAHZAD YAZDANI
DPK, and slop).
09/08/16

DATE:  A product dedicated receipt manifold shall connect all of the refinery
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

supply pipelines to each tank in that respective service including the T&I
09/08/16
tank with dual product service.
EDSD

DATE:

 A product dedicated delivery manifold shall connect each tank in that


BY:

respective service including the T&I tank with dual product service with
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

each of the designated outbound pipelines.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 Each manifold shall be designed to provide for future expansion of


connections for additional tanks or supply/delivery pipelines. All piping
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 48


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG and manifolds shall be designed to minimize product cross
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH contamination.
ASH
ASH

 Manifold/piping velocities shall comply with SAUDI ARAMCO standards


LEADS

and Loss Prevention Study Recommendations (CFPE-011-2014) on


LEADS
LEADS
ALL

ALL
ALL

reduced loading rates for low sulfur diesel and aromatic products.

Gasoline Dye Injection


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

Two separate red and green color dye injection systems shall be installed in
ISSUED FOR 60% FEL3

YDH facility. The dye injection must inject dye at the inlet header of storage
tanks (at the downstream of receiving manifold) so that a single skid of green
dye and single skid for red dye can provide adequate coloration for PG-91 and
PG-95 from all the source. The color dye injection system shall be a complete
vendor skid with tank and injection pumps.

The scope for the color dye injection Skid is outlined in PFD VA247835-001
and P&IDs VA247891-001. CONTRACTOR shall develop a detailed P&ID after
JO/EWO

vendor information during detail design.


10-02399-

10-02399-
10-02399-

DPK Filtration System


0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16
NO.
REV

The DPK filtration is proposed to be a complete vendor skid with circulation


DISCIPLINE pumps, pre filters and after filters. Normally, the filtration skid shall be designed
ENGINEER
and shall have flexibilities to circulate into the same product tanks or to an
C
A

DATE: empty DPK tank as per the operation requirement. DPK filtration skids shall be
PROJECT
ALL LEADS
ENGINEER
sized to handle a capacity of 45 to 200 MBD and will be a completely vendor
09/08/16 designed skid
DATE:
CERTIFIED The scope for Filtration Skid is outlined in PFD VA-247843.001 and P&IDs VA-
A M ALMATROOK
09/08/16
247915.001. CONTRACTOR shall develop a detailed P&ID after vendor
DATE: information during detail design and CONTRACTOR shall make sure the
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
design shall meet the requirement of SAES-A-302 Aviation fuel quality
09/08/16 assurance design requirement
DATE:
OPERATIONS
SHAHZAD YAZDANI Conductivity Enhancer Injection Skid
09/08/16

DATE:
Conductivity enhancer injection skid shall be provided at YDH to enhance
CONTROL NUMBER

ALI H GHAMDI
conductivity of DPK. The conductivity enhancer injection skid is proposed to be
VERIFICATION

09/08/16
a complete vendor skid. The injection shall be provided on the inlet line to DPK
EDSD

storage tanks from receiving manifold. Provision shall also be provided for
DATE:

injection to the suction of the booster pumps in view of conductivity reduced in


BY:

the product due to filtration or aging. The conductivity enhancer injection


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

system shall be a complete vendor skid with tank and injection pumps.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The scope for the conductivity enhancer injection Skid is outlined in PFD
(DCC) NO. _____________________

VA247835-001 and P&IDs VA247892-001. CONTRACTOR shall develop a


detailed P&ID after receiving vendor information during detail design.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 49


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Static Dissipative Additive (SDA) Injection Skid
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH

Static Dissipative Additive (SDA) injection skid shall be provided at YDH to


reduce the static charge accumulation in DO. The SDA injection skid is
LEADS

LEADS
LEADS
ALL

ALL
ALL

proposed to be a complete vendor skid. The injection shall be done on the inlet
line to DO storage tanks from distribution manifold. The static dissipative
additive injection system shall be a complete vendor skid with tank and
ISSUED FOR 100% PROJECT PROPOSAL

injection pumps.
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

The scope for the static dissipative additive injection Skid is outlined in PFD
ISSUED FOR 60% FEL3

VA247835-001 and P&IDs VA247893-001. CONTRACTOR shall develop a


detailed P&ID after receiving vendor information during detail design.

Process Automation and Communications

TMS with Distributed Control System (DCS) shall be provided for the control
and logic functions required to operate YDH. The TMS-DCS shall also be
JO/EWO

interfaced with subsystems such as the Emergency Shutdown System (ESD),


Vibration Monitoring System (VMS), Radar Tank Gauging System (RTG), Fire &
Gas Detection System (FDS), and Custody Monitoring System (CMS) and
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

other Third party controls within YDH. All the relevant communication, process
parameters and status shall be interlinked between Yanbu, YASREF, SAMREF
09/08/16
08/04/16
06/01/16

refineries, MARAFIQ & YDH.


NO.
REV

DISCIPLINE
ENGINEER
4.3.2 Yanbu to Jiddah Pipeline
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
The YNJ-1/2 pipeline system shall tie-in with YDH at downstream of shipper
09/08/16 pump after the PCVs. The battery limit will be the tie-in flange provided by YDH
DATE:
in the scraper launcher lateral line for YNJ-1 / YNJ-2 and the flanges provided
CERTIFIED in the delivery manifold for the central region pipeline. As YDH is a greenfield
A M ALMATROOK
09/08/16
development, the planning of both the YNJ-1/2 pipeline system and YDH shall
DATE: consider each other in the design as well as future plans for the facilities within
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
YDH.
09/08/16

DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16
4.3.2.1 Mechanical 
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 The project construction interface point shall be a flange connection at the
EDSD

pipeline scraper launcher. The design interface point shall be at the tank outlet
flange because the system hydraulic modelling shall be included in the scope
DATE:
BY:

of the YNJ-1/2 pipeline project, BI-10-02155 Industrial drainage system piping


shall take into account YNJ-1/2 Pipeline System drainage requirements.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4.3.2.2 Electrical 
(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 50


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG YDH 480V systems shall provide power to the panel board located at the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Scraper Launcher area within YDH battery limit. The 480V panel board shall
be provided by BI-10-02155.
ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

4.3.2.3 Non-Electrical Utilities


ALL
ALL

The YNJ-1/2 pipeline project, BI-10-02155, shall provide information required


ISSUED FOR 100% PROJECT PROPOSAL

for the sizing, not design, of the non-electrical facilities included in YDH project
ISSUED FOR 90% PROJECT PROPOSAL

scope, BI-10-02399. The non-electrical utility systems include, but are not
DESCRIPTION

limited to:
ISSUED FOR 60% FEL3

 Potable water system


 Fire protection system
 Industrial drainage (oily water) system
 Storm water drainage
 Sewerage system

4.3.2.4 Buildings
JO/EWO
10-02399-

There are no anticipated interfaces for the building scope at YDH.


10-02399-
10-02399-
0001

0001
0001
DATE

4.3.2.5 Process Automation and Communications


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER Process Automation systems for YDH and YNJ-1/2 pipelines should synergize
C
A

engineering design, construction and/or start-up to ensure cost effective and


DATE: safe commissioning and start-up.
PROJECT
ALL LEADS
ENGINEER
09/08/16
4.3.3 Yanbu to Central Region Pipeline
DATE:
CERTIFIED
A M ALMATROOK The pipeline system shall tie-in with YDH at each respective product header
09/08/16
DATE:
line downstream of any tankage and upstream of the pipeline booster pumps.
CONSTRUCTION
AMR EL SHARKAWY The detailed planning of the pipeline connection shall occur at a future date
AGENCY
09/08/16 when the project plan is initiated and further developed. At this time, YDH shall
consider general provisions for the pipeline connection.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE:
4.3.4 Communications / IT
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

The communications system shall interface to existing SAUDI ARAMCO (SA)


communication infrastructure for Voice, Plant Dedicated Network (PDN),
DATE:
BY:

Corporate IT, data centers, mobile radio and security. The project shall provide
REVISIONCERTIFICATION

the necessary interface cards in the telecommunications equipment and cables


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

to provide the connectivity to the networks as required.


(DCC) NO. _____________________

 The single mode fiber (per 18-SAMSS-625) connections to the Yanbu’


area refineries will be provided under this project. Connectivity of YDH
to Yanbu NGL will terminate first to Yanbu Refinery Admin Bldg. 1401.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 51


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 The YDH Package shall reserve rack space location at Engineering
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and Maintenance Building for Pipeline FOC patch panel provided
under BI-10-2155
ASH
ASH
ASH

 The YDH Package shall reserve duct bank at Engineering and


Maintenance Building for Pipeline FOC cable provided under BI-10-
LEADS

LEADS
LEADS
ALL

ALL
ALL

2155
 The process automation traffic shall be transmitted through dedicated
fiber strands, PDN segregated from the corporate IT data network.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 The IT and security systems traffic shall be transmitted through the


DESCRIPTION

corporate IT data network. PDN should meet SAEP-99 as a minimum


ISSUED FOR 60% FEL3

requirement.
 The telephone services shall be IP based and provided through the
VoIP call control systems core servers in Dhahran and Abqaiq.
 Mobile radio shall be based on Terrestrial Trunked Radio (TETRA)
technology.
 The security systems will be interfaced to Yanbu Regional Security
Control Center (YRSCC).
JO/EWO

4.3.5 MARAFIQ
10-02399-

Electrical
10-02399-
10-02399-
0001

0001
0001
DATE

The electrical interface includes a 115 kV power connection with GIS at


09/08/16
08/04/16
06/01/16

MARAFIQ’s Substation #9I, which is located about 3.85 km away from the
NO.
REV

DISCIPLINE proposed YDH. Refer to Cable Routing drawing EL-A10150.001,EL-


ENGINEER
A10130.001-004.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
Non-Electrical Utilities
09/08/16

DATE:
This BI will also interface with MARAFIQ utilities. The scope development
CERTIFIED design activities will coordinate with MARAFIQ to finalize a formal agreement.
A M ALMATROOK
09/08/16
DATE: The non-electrical utility Interfaces include:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 Potable water system
09/08/16  Fire protection system
DATE:  Sanitary sewer
OPERATIONS
SHAHZAD YAZDANI  Storm water drainage (MARAFIQ channels)
09/08/16

DATE:
4.3.6 Yanbu Royal Commission (YRC)
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

All pipelines, power cables and fiber optic cables connecting YDH to the
previously mentioned interfaces (SAMREF, YASREF, YR, MARAFIQ and
DATE:
BY:

YNGL) are within Yanbu Royal Commission jurisdictions.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards


and regulations for any scope related to YRC and MARAFIQ.
(DCC) NO. _____________________

4.4 PROJECT OPERATING INTERFACES


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 52


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG This project shall coordinate construction activities with the respective refineries,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipeline construction, OSPAS and Domestic Sales & Logistics (DS&LD) departments.
Scheduling for refinery shutdowns and other critical operations shall be developed
ASH
ASH
ASH

during the detail design and shall be included in the Project Execution Plan. Pre-
commissioning, shutdown, commissioning and startup procedures shall be
LEADS

LEADS
LEADS
ALL

ALL
ALL

implemented in such a manner that disruptions to continuing refinery operations are


minimized. All shutdowns shall be coordinated with related companies and
departments for review and scheduling of work. Any changes in approved T&I
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

schedules shall be coordinated with OSPAS.


DESCRIPTION

4.5 DEMOLITION ACTIVITIES


ISSUED FOR 60% FEL3

A. GENERAL

The demolition activities in this project will be limited to the demolition required
for tie-in to the existing piping in:
 Yanbu refinery for the terminal unloading line and existing pump
headers.
JO/EWO

 SAMREF for the product pipeline tie-in.


 MARAFIQ tie-in points for utilities (water supply, sanitary and oily water)
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16

CONTRACTOR shall identify the required demolitions for tie-in during detail
NO.
REV

DISCIPLINE design and construction.


ENGINEER
C
A

DATE: B. PIPING
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall be responsible for demolishing the following facility
DATE: components:
CERTIFIED
A M ALMATROOK
09/08/16 YANBU REFINERY
DATE:  Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m
CONSTRUCTION
AMR EL SHARKAWY
AGENCY length) for new tie-in connection for Product pipelines from YR Terminal per
09/08/16
SAUDI ARAMCO standards.
DATE:  To install new feed line for Gasoline(PG91/PG95) to YDH ,Tie-in at the 18”
OPERATIONS
SHAHZAD YAZDANI common header of Gasoline loading and Transfer pumps(V25-P-P17 A-E)to
09/08/16 be taken at Yanbu Refinery near Pump Station-C
DATE:  To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
CONTROL NUMBER

ALI H GHAMDI
common header of Kerosene loading and Transfer pumps(V25-P22 A/B/C)
VERIFICATION

09/08/16 to be taken at Yanbu Refinery near Pump Station-B.


EDSD

 To install new feed line for Diesel (DO) to YDH ,Tie-in at the 20”MDO
DATE:

common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to


BY:

be taken at Yanbu Refinery near Pump Station-B.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

 Refer below mentioned demolition piping plan drawings.


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 VA236952D-001, VA236952D-002, VA236956D-001, VA236956D-002 and


(DCC) NO. _____________________

VA236960D-002.

SAMREF REFINERY
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 53


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
length) for new tie-in connection for product pipelines from SAMREF
Refinery per SAUDI ARAMCO standards.
ASH
ASH
ASH

 These tie-ins are required to transfer products from SAMREF to YDH from
LEADS

LEADS
LEADS
ALL

ALL
ALL

existing product export pumps (DO, PG 91, 95 & DPK) at the SAMREF
refinery.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Refer demolition piping plan drawings. PIA00438D-001


DESCRIPTION
ISSUED FOR 60% FEL3

YASREF REFINERY

 No Demolition is required at the YASREF. Tie-in will be provided by other


BI-10-00043 inside the Yanbu refinery

 These tie-ins are required to transfer products from YASREF to YDH from
existing product export pumps (DO & PG 91,95) at the YASREF refinery.
JO/EWO

NEW GRASS ROOT YANBU REFINERY


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 It is future refinery, at present there is no interface scope.


09/08/16
08/04/16
06/01/16
NO.
REV

General Requirement:
DISCIPLINE
ENGINEER
Tie-in connections:
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER CONTRACTOR to provide construction tie-in package with regard to location,
09/08/16 orientation, dimensions, etc., prior to final fabrication.
DATE:

A M ALMATROOK
CERTIFIED CONTRACTOR shall verify each tie-in with regard to location, orientation,
09/08/16 dimensions, etc., prior to final fabrication.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall assist SAUDI ARAMCO to isolate product lines & re-
09/08/16
commission each system to be tied into.
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall submit to SAUDI ARAMCO, for approval specific
09/08/16 procedures and sequences for tie-ins to existing facilities and to new facilities.
DATE: The tie-in procedures are to be submitted fourteen (14) days in advance of the
planned tie-in date.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

CONSTRUCTION CONTRACTOR shall perform tie-ins to existing facilities as


stipulated in the project. For interface with other BI’s CONTRACTOR is
DATE:
BY:

mandated to closely co-ordinate with other BI’s to ensure that all agreed
REVISIONCERTIFICATION

interfaces are covered and performed. Refer to interfaces are covered and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

performed.
(DCC) NO. _____________________

Refer to Tie-in index drawings for YANBU, PI-B00401.001/002/003/004.


Refer to Tie-in index drawing for YASREF, PIB00451-001.
Refer to Tie-in index drawing for SAMREF, PIB00434-001.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 54


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. CIVIL
ASH
ASH
ASH

 CONTRACTOR shall provide demolition drawing for the demolition of existing


LEADS

LEADS
LEADS
ALL

ALL
ALL

asphalt road and paving and or concrete paving in location where pipelines
redundant in open cut road crossings are to be installed.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall provide civil and structural drawings for all the required
DESCRIPTION

road crossings and fence penetration for laying the product pipelines, electrical
ISSUED FOR 60% FEL3

& instrument cables.

 CONTRACTOR shall determine other demolition activities during detail design


stage, which have not been included in this demolition scope.

 Roads that are demolished for the above reasons will be backfilling following
SAES-A-114 and reinstated after the under pavement work is completed. Work
JO/EWO

shall be in accordance with SAES-Q-006 clause 6, Pavement Reconstruction


after trenching.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16

4.6 Receipt Pipeline and Connections


NO.
REV

DISCIPLINE
ENGINEER
A. GENERAL
C
A

DATE:
PROJECT CONTRACTOR shall design and install the product receiving station in YDH
ALL LEADS
ENGINEER
09/08/16
including, but not limited to the following facilities:
DATE:
CERTIFIED  Four product receiving and distribution manifolds, one each for PG 95,
A M ALMATROOK
PG 91, DO & DPK
09/08/16
DATE:  One Slop manifold
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 Provision for connections in the receiving manifolds for two product
09/08/16 pipelines from YASREF
DATE:  Provision for connections in the receiving manifolds for three product
OPERATIONS
SHAHZAD YAZDANI
pipelines from SAMREF
09/08/16  Provision for connections in the receiving manifolds for three product
DATE: pipelines from Yanbu Refinery Terminal (YRT) via Yanbu Refinery (YR)
 Provision in the receiving manifolds for future connection of PG 91/95,
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 DO & DPK from Yanbu Grass root refinery


EDSD

 Two dye injection skids for PG 95 and PG 91 at YDH


 Conductivity enhancer injection skid for DPK at YDH
DATE:
BY:

 Static Dissipative Additive (SDA) injection skid for DO at YDH


REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

Three custody metering skids with two provers (1 for PF/DO & 1 for
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

DPK) and densitometer at YDH (for YRT products)


(DCC) NO. _____________________

 Surge relief protection for all eight inbound pipelines from all 3 sources
(SAMREF, YASREF & YR)
 Interface management system
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 55


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The receipt manifolds shall be sized for the maximum flow rate of a single
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
refinery supply and the manifold is not expected to receive the same
product from two sources simultaneously. The manifolds shall be connected
ASH
ASH
ASH

to all the three product sources at the upstream and to respective storage
tanks at the downstream. CONTRACTOR shall provide Process interlocks
LEADS

LEADS
LEADS
ALL

ALL
ALL

to the manifold valves to receive the product from one source at a time.
Provision for connecting the future GR refinery shall be provided in all
receipt manifolds.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

The product and slop manifolds shall be of 30” size and for each manifold
ISSUED FOR 60% FEL3

CONTRACTOR shall provide the provision for extension in future. Each of


the manifold inlet and outlet lines shall be equipped with motor operated
valves and the segregation of the batches between PG 95 and PG 91 shall
be through a batch management system. Manifold inlet lines shall also be
equipped with ZV.

Conductivity enhancer injection skid shall be installed to inject the chemical


for enhancement of conductivity of DPK. The additives shall be injected to
the main line from DPK receiving manifold to DPK storage tanks and also to
JO/EWO

DPK main line from DPK storage tanks to booster pumps. Details of
Conductivity enhancer injection skid shall be finalized after vendor
10-02399-

10-02399-
10-02399-
0001

information during detail design.


0001
0001
DATE

09/08/16
08/04/16
06/01/16

Static Dissipative Additive (SDA) injection skid shall be installed to inject the
NO.
REV

DISCIPLINE chemical to reduce the static charge of DO. The additives shall be injected
ENGINEER
to the main line from the DO receiving manifold to the DO storage tanks.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER Three custody metering skids each dedicated for PG95/PG91, DO and
09/08/16 DPK shall also be installed at YDH for YRT products. Each metering skid
DATE: shall consist of 4 meter runs (3 operating and 1 standby), prover assembly
CERTIFIED
A M ALMATROOK and densitometer. Prover shall be common for PG 91 , PG 95 and diesel,
09/08/16
DATE:
whereas one prover will be dedicated for DPK.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Red and green dye injection skids shall be installed at YDH for the coloring
DATE: of PG 95 and PG 91 products from all sources. The red and green dye shall
OPERATIONS
SHAHZAD YAZDANI be injected to the main line from the PG-95/91 receiving manifold to the
09/08/16
PG-95/91 storage tanks respectively.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 All eight inbound pipelines from all 3 sources (SAMREF, YASREF & YR)
EDSD

shall be protected for surge relief and will relief into surge relief tank at
YDH. Each inlet line shall have two SRVs with its isolation valves and a
DATE:
BY:

thermal relief valve.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The scope for the product receiving station is outlined in PFD VA-
(DCC) NO. _____________________

247835.001 & VA-247949.001 and P&IDs VA-247891.001 to VA-


247897.001 & VA-247929.001.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 56


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The details of the batch management system are outlined in Section B
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH instrumentation.
ASH
ASH

B. INSTRUMENTATION
LEADS

LEADS
LEADS
ALL

ALL
ALL

 THE CONTRACTOR shall provide and install cables IC-0952/0610


& IC-0953/0611 from red and green dye injection controller to DCS,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

the connection to Skid controller shall be over Modbus Serial.


Cables IC-0959 & IC-0960 shall be provided to ESD system as
DESCRIPTION

hardwire connection. For details refer block diagram IN-A00001.010


ISSUED FOR 60% FEL3

 THE CONTRACTOR shall provide and install cable IC-0956 from


Conductivity Enhancer Injection Skid controller to DCS, the
connection to Skid controller shall be over Modbus Serial. For
details refer block diagram IN-A00001.010

 THE CONTRACTOR shall provide and install cable IC-0957 from


SDA Injection Skid controller to DCS, the connection to Skid
JO/EWO

controller shall be over Modbus Serial. For details refer block


diagram IN-A00001.010
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 THE CONTRACTOR shall provide and install field instruments for


09/08/16
08/04/16
06/01/16

Gasoline P95/91 at receiving manifold as indicated in P & ID# VA-


NO.
REV

DISCIPLINE
247894.001 and Block Diagram IN-A00002.017
ENGINEER
C
A

 THE CONTRACTOR shall provide and install branch cables from


DATE:
PROJECT field instruments to junction boxes X40-AJB-2033/DJB-1037/EAJB-
ALL LEADS
ENGINEER
4027/EDJB-3022 as per Block Diagram IN-A00002.017.
09/08/16

DATE:
CERTIFIED
 THE CONTRACTOR shall provide and install homerun cables IC-
A M ALMATROOK
0790/0797/0798/0805/0806 from junction boxes X40-AJB-
09/08/16
DATE:
2033/DJB-1037/EAJB-4027/EDJB-3022 to DCS/ESD Remote I/O
CONSTRUCTION
AMR EL SHARKAWY Marshalling Cabinets located in RIB-1 as per Block Diagram IN-
AGENCY
09/08/16 A00002.017.
DATE:
OPERATIONS  THE CONTRACTOR shall provide and install field instruments for
SHAHZAD YAZDANI

09/08/16
DO/DPK at receiving manifold as indicated in P & ID# VA-
247895.001/ VA-247896.001/ VA-247897.001 and Block Diagram
DATE:
IN-A00002.018
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16

EDSD

THE CONTRACTOR shall provide and install branch cables from


field instruments to junction boxes X40-AJB-2034/DJB-1038/EAJB-
DATE:

4028/EDJB-3023 as per Block Diagram IN-A00002.018.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

 THE CONTRACTOR shall provide and install homerun cables IC-


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

0832/0838/0839/0849/0850/0851 from junction boxes X40-AJB-


(DCC) NO. _____________________

2034/DJB-1038/EAJB-4028/EDJB-3023 to DCS/ESD Remote I/O


Marshalling Cabinets located in RIB-1 as per Block Diagram IN-
A00002.018.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 57


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 THE CONTRACTOR shall provide and install field instruments for
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
slop manifold as indicated in P & ID# VA-247897.001 and Block
Diagram IN-A00002.019.
ASH
ASH
ASH

 THE CONTRACTOR shall provide and install branch cables from


LEADS

LEADS
LEADS
ALL

ALL
ALL

field instruments to junction boxes X40-DJB-1039/DJB-1040 as per


Block Diagram IN-A00002.018.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 THE CONTRACTOR shall provide and install homerun cables IC-


DESCRIPTION

0856/0857/0862/0863 from junction boxes X40-DJB-1039/DJB-1040


ISSUED FOR 60% FEL3

to DCS Remote I/O Marshalling Cabinets located in RIB-1 as per


Block Diagram IN-A00002.019.
 THE CONTRACTOR shall provide and install custody metering
skids X40-U-0014A/B/C for Gasoline-P91/95, DO & DPK and
provers X40-U-0014D/E inside YDH facility at the location indicated
in facility plot plan. The skids shall be vendor supplied, cable
between field instrument, junction boxes and marshaling cabinet
shall be vendor supplied.
JO/EWO

 THE CONTRACTOR/SKID VENDOR shall supply and install


metering shelter to house metering and control cabinets. Contractor
10-02399-

10-02399-
10-02399-

shall integrate metering shelter F & G to DCS system.


0001

0001
0001
DATE

 Refer block diagram IN-A00001.003 for YDH CMS overview and IN-
09/08/16
08/04/16
06/01/16

A 00002.020 metering MOVs. The preliminary custody metering


NO.
REV

DISCIPLINE design is indicated in P &IDs VA-247886-001 to VA247890-001.


ENGINEER
 THE CONTRACTOR/VENDOR shall provide and install cables
C
A

DATE: between metering skid junction boxes to metering shelter control


PROJECT
ALL LEADS
ENGINEER panels. The quantity and type cables shall be provided by skid
09/08/16 vendor to LSTK.
DATE:
CERTIFIED  CMS shall be interfaced to DCS over Modbus TCP/IP, fiber optic
A M ALMATROOK
cables shall be provided to connect to DCS system located in rack
09/08/16
DATE:
room of operations building.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY  All branch cables shall be through conduit and homerun cables shall
09/08/16
run on the cables trays provided on pipe sleepers.
DATE:
OPERATIONS
SHAHZAD YAZDANI
 Communications with all third party control system shall be
09/08/16 redundant.
DATE:  Reference drawings:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Drawing # Description


EDSD

IN-A00001 System Block Diagrams


DATE:

IN-A00002 Instrument Block Diagrams


BY:

IN-A00027 Instrument Points & Lines


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

IN-D00201 Instrument Installation Schedule-Flow


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

IN-D00202 Instrument Installation Schedule-Pressure


(DCC) NO. _____________________

IN-D00203 Instrument Installation Schedule-Level


IN-D00204 Instrument Installation Schedule-Temperature
IN-D00205 Instrument Installation Schedule-Misc
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 58


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV


SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IN-D00207 Instrument Installation Schedule-Relief Valves
ASH
ASH
ASH

IN-A00004 Equipment Layouts


IN-A00003 Cable Routing Plan
LEADS

LEADS
LEADS
ALL

ALL
ALL

IN-D00005 Cable and Conduit Schedule


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

C. COMMUNICATION
DESCRIPTION
ISSUED FOR 60% FEL3

 CONTRACTOR shall provide FO cable infrastructure to be installed


for Metering System connectivity to YASREF Control System,
SAMREF Control System, and YRT Control System All terminations
will be done on proposed 12-core fiber patch panels except for
Yanbu Refinery where 48-core fiber will be used.
 CONTRACTOR shall provide one (1) analog telephone each inside
YASREF Control System, SAMREF Control System, and YRT Control
System to be connected to existing Saudi Aramco Telephone Network via the
JO/EWO

proposed network of YDH.

Drawing # Description
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CO-A10002 Cable Routing Plan – YDH –YREF, YASREF & SAMREF


CO-A10003 Instrument Connection/Interconnection Diagram - YREF,
09/08/16
08/04/16
06/01/16
NO.
REV

YASREF & SAMREF


DISCIPLINE CO-A10029 Schematic Diagram Analog Telephone System
ENGINEER
C
A

DATE:
PROJECT
D. CIVIL
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
 CONTRACTOR shall provide Oily water system to collect oily water
A M ALMATROOK from this facility.
09/08/16
DATE:  CONTRACTOR shall provide Utility/potable water connection for
CONSTRUCTION
AMR EL SHARKAWY
AGENCY washing, eye wash and shower.
09/08/16

DATE:
 CONTRACTOR shall provide sealed catch basin.
OPERATIONS
SHAHZAD YAZDANI  CONTRACTOR shall provide storm water system.
09/08/16

DATE:

E. PIPING
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

The design and installation of product receiving manifold in YDH shall


include, but not limited to the following facilities:
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Piping shall provide Dedicated product receipt manifold from the


(DCC) NO. _____________________

source refineries consist of total four (04) receipt manifold


connecting eight pipelines carrying PG95/PG91/DO & DPK near
battery limit of YDH/RC corridor on west side of plot(Refer Plot plan
REVISION

No.PI-A00001-001)
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 59


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 This manifold connected to all the three product sources on the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
upstream side of the facility to respective storage tanks on the
ASH

downstream side of the facility.


ASH

 Pipelines at Receipt manifold provided with structural


LEADS

LEADS
LEADS
ALL

ALL
ALL

supports/Operating platforms to operate control valves/ZVs/PZVs &


Isolation valves.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 The Product and slop manifold shall be provided with future


DESCRIPTION

connections with Isolation valves.


ISSUED FOR 60% FEL3

 The pipeline for three custody metering skids each is dedicated for
PG95/PG91, DO and DPK, also two provers shall be provided near
Receipt manifold.
 Pipeline for Red and Green dye injection skids shall be installed at
YDH for product identification for products received from all source
refineries
JO/EWO

 SDA injection skid and Conductivity enhancer skid located near


metering skid.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 The piping layout for Receipt manifold, Custody metering skids are
shown in Piping plan as per Drawing control sheet.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE  Piping layout for Dye injection, SDA & Conductivity enhancer skid are
ENGINEER
mainly small bore lines, which to be carried during detail design.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall design and install the product receiving manifold in YDH
DATE: as per drawings issued DCL.no.GEN-D0001 including, but not limited to the
CERTIFIED
A M ALMATROOK following facilities:
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  CONTRACTOR shall perform Piping Design, Procurement,
DATE: Fabrication, Transportation, Erection, Installation, Testing, Inspection,
OPERATIONS
SHAHZAD YAZDANI Pre commissioning and Commissioning support for the following
09/08/16 piping system in accordance with the latest edition of SAUDI
DATE: ARAMCO Engineering Standards & Specifications and other
CONTROL NUMBER

ALI H GHAMDI
applicable International Codes and Standards:
VERIFICATION

09/08/16
 Distribution manifold of four products and slops shall be routed to
EDSD

associated facilities inside YDH limit in accordance with project


DATE:
BY:

drawings listed in document control list.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

All new piping from Battery limit of RC Corridor to New storage Tank
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

feeding to the booster pumps as per Project P&IDs and Piping Plans
(DCC) NO. _____________________

listed in DCL.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 60


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Hydraulics & surge analysis of the pipeline system shall be provided
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
by the contractor and approved prior to laying and installation of the
ASH

pipeline system.
ASH

 Surge relief system for the pipelines along with associated pumps
LEADS

LEADS
LEADS
ALL

ALL
ALL

and connections shall be covered under contractor’s scope of work.


 Pipe supports/platforms/elevated structures as per piping plans and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

other project documents. Requirement of additional supports not


DESCRIPTION

covered in the proposal drawings but required to complete the


ISSUED FOR 60% FEL3

project shall be include in CONTRACTOR scope


 Overall dimensions of all CONTROL VALVES,ZVs/MOVs/PZVs/SP
items shown in piping plan are preliminary only, contractor to verify
final dimensions and all piping drawings, size, elevation of operating
platforms, lifting arrangement to be executed during detail design by
THE CONTRACTOR.
 Insulating gaskets and stud bolds at interface with pipelines shall be
JO/EWO

within piping CONTRACTOR scope.


10-02399-

10-02399-
10-02399-
0001

4.7 Yanbu’ Distribution Hub Tank Farm and Support Infrastructure


0001
0001
DATE

Yanbu’ distribution hub tank farm and support infrastructure consists of the
09/08/16
08/04/16
06/01/16
NO.
REV

following facilities:
DISCIPLINE
ENGINEER
GENERAL
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER  Product storage tanks
09/08/16  Slop System
DATE:  Surge Relief System
CERTIFIED
A M ALMATROOK  DPK Filtration Skid
09/08/16
 Hydrocarbon Drain System
DATE:
CONSTRUCTION
AMR EL SHARKAWY  Metering System
AGENCY
09/08/16
NON-ELECTRICAL UTILITIES
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16
 Potable water system
DATE:
 Fire protection system
 Industrial drainage (oily water) system
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Sanitary sewer


EDSD

 Storm water drainage


 Evaporation Pond
DATE:
BY:

 Oily water treatment system


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

A. GENERAL
REVISION

Product Storage Tanks


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 61


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The product tanks shall be constructed as a separate construction package in the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
distribution hub (YDH) and is not included in this scope of THE CONTRACTOR;
however CONTRACTOR shall provide automatic tank dewatering system, the
ASH
ASH
ASH

required instrumentation and piping requirements as specified in the piping, and


instrumentation sections of this document. Refer to Appendix 6 for YDH Storage
LEADS

LEADS
LEADS
ALL

ALL
ALL

Tanks Package (by Others).

The product split, the type and the capacities for the tanks to be constructed in
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Yanbu’ distribution hub are summarized in the table below.


DESCRIPTION

Tank Size-
ISSUED FOR 60% FEL3

Total Capacity
Working Number Design Design MDMT
Tank Type Working
Volume m³ of Tanks Pressure Temp. (⁰C) (⁰C)
Volume m³ (MB)
(MB)
External
PG 91 27,658 (174) 3 82,974 (522) Atm 75 0
Floating roof

External
PG 95 27,658 (174) 3 82,974 (522) Atm 75 0
Floating roof
JO/EWO

Fixed Dome
DO 40,842 (256.9) 3 122,526 (770.7) Atm 75 0
roof
10-02399-

10-02399-
10-02399-
0001

Internal
0001
0001
DATE

DPK 40,228 (253) 1 Atm 75 0


Floating roof
121,552 (764.5)
Internal
09/08/16
08/04/16
06/01/16

DPK 27,108 (170.5) 3 Atm 75 0


NO.
REV

Floating roof
DISCIPLINE Internal
ENGINEER DO/DPK 53,132 (334.2) 1 53,132 (334.2) Atm 75 0
C

Floating Roof
A

DATE:
PROJECT
ALL LEADS
ENGINEER Note: The tank capacities are provided to meet the 85% of nominal volume
09/08/16
specified per the project scoping paper.
DATE:
CERTIFIED
A M ALMATROOK
09/08/16 Slop System
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Slop system shall be consisting of two slop tanks (by others) and two slop pumps
(one operating, one spare) with necessary instrumentation and piping. Two slop
DATE:
tanks each of 13,514 m³ (85 MB) working capacity shall be provided to handle the
OPERATIONS
SHAHZAD YAZDANI
intermix products from the pipeline, slops from the oily water treatment and surge
09/08/16
relief tank. The design parameters for the slop tank shall be as follows:
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

Total Capacity,
DATE:

Tank Size- Working Number of Working Design Design MDMT


BY:

Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

(MB)
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Internal
(DCC) NO. _____________________

Slop 13514 (85) 2 27028 (170) Atm 75 0


Floating roof
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 62


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The slop tanks shall be constructed as separate construction package in YDH
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
along with product storage tanks and is not included in this scope of The
CONTRACTOR; however CONTRACTOR shall provide tank dewatering system,
ASH
ASH
ASH

the required instrumentation and piping requirements as specified in the piping and
instrumentation sections of this document. Refer to Appendix 6 for YDH Storage
LEADS

LEADS
LEADS
ALL

ALL
ALL

Tanks Package (by Others).

CONTRACTOR shall provide pumps to empty the slop tanks to product tanks and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

the slop product shall be blended with the finished product in in storage tanks
without affecting the quality of the product. CONTRACTOR shall connect the slop
DESCRIPTION

tank pump discharge to individual tank inlet to avoid any product contamination
ISSUED FOR 60% FEL3

during transfer. Slop tank shall also be provided with a provision to connect to the
DO /DPK booster pump suction, which enables YDH to pump the slop product to
NJBP along with the intermix products.

The scope for the slop system is outlined in PFD VA-247842.001 and P&IDs VA-
247912.001 to VA-247914.001.
Surge Relief System
JO/EWO

The following is a general scope narrative for the surge relief system:
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall design and install surge relief systems for the YNJ-1 & YNJ-2
pipelines per surge requirement from BI-10-02155 and for all the inbound pipelines
09/08/16
08/04/16
06/01/16
NO.
REV

from each source. A surge relief system consisting of a surge relief tank (by others)
DISCIPLINE
ENGINEER
and pumps shall be installed. The surge tank pump will transfer the surge volume
to the slop tank. The central pipeline flowrate (400 MBD) is used as the basis for
C
A

DATE: the surge relief tank volume & line sizing. Accordingly, 30 minutes holdup of 400
PROJECT
ALL LEADS
ENGINEER
MBD has been taken for surge tank sizing and 400 MBD for its inlet line sizing. The
09/08/16 surge relief system shall include the surge relief valves, the piping to the surge
DATE:
relief tank and the instrumentations. The surge relief tank shall be of 1,351 m³ (8.5
CERTIFIED MB) capacity as specified below to cater the requirement of both YNJ-1 & YNJ-2
A M ALMATROOK
09/08/16 and future central region pipeline.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Total Capacity,
09/08/16
Tank Size- Working Number of Working Design Design MDMT
Tank Type
DATE: Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
OPERATIONS
SHAHZAD YAZDANI (MB)
09/08/16
Surge Internal
DATE: 1351 (8.5) 1 1351 (8.5) Atm 75 0
Relief Floating roof
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall provide tank dewatering and the required instrumentation


piping and pumps as specified in instrumentation, piping and mechanical sections
DATE:
BY:

of this document.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

transfer the surge volumes to the slop tanks as necessary. The details of the pump
(DCC) NO. _____________________

and piping requirements are specified in piping and mechanical rotating sections of
this document. The scope for the surge relief system is outlined in PFD VA-
247849.001 and P&IDs VA-247929.001 to VA-247930.001.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 63


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Similarly, like surge relief system at YDH, same systems shall also be provided at
SAMREF and YR.
ASH
ASH
ASH

At SAMREF, CONTRACTOR shall design and install surge relief systems for the
LEADS

LEADS
LEADS
ALL

ALL
ALL

SAMREF pipeline protection. A surge relief system consisting of a surge relief tank
and pumps shall be installed. The surge tank pump will transfer the surge volume
to YDH via respective inbound pipeline from SAMREF to YDH. The SAMREF PG
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

pipeline flowrate (554 MBD) is used as the basis for the surge relief tank volume &
line sizing. Accordingly, 30 minutes holdup of 554 MBD has been taken for surge
DESCRIPTION

tank sizing and 554 MBD for its inlet line sizing. The surge relief system shall
ISSUED FOR 60% FEL3

include the surge relief valves, the piping to the surge relief tank and the
instrumentations. The surge relief tank shall be of 1849 m³ (11.6 MB) capacity as
specified below.

Total Capacity,
Tank Size- Working Number of Working Design Design MDMT
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
JO/EWO

(MB)
Surge Internal
Relief (at Floating 1849 (11.6) 1 1849 (11.6) Atm 75 0
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

SAMREF) roof
09/08/16
08/04/16
06/01/16

CONTRACTOR shall provide tank dewatering and the required instrumentation


NO.
REV

DISCIPLINE piping and pumps as specified in instrumentation, piping and mechanical sections
ENGINEER of this document.
C
A

DATE:
PROJECT CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
ALL LEADS
ENGINEER
transfer the surge volumes to YDH via respective inbound pipeline from SAMREF
09/08/16
to YDH. The details of the pump and piping requirements are specified in piping
DATE:
CERTIFIED
and mechanical rotating sections of this document. The scope for the surge relief
A M ALMATROOK system is outlined in PFD VA-247849.001 and P&IDs VA-247934.001 to VA-
09/08/16
DATE:
247934.002.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 At YR, CONTRACTOR shall design and install surge relief systems for the
YASREF and YR pipeline protection. A surge relief system consisting of a surge
DATE:
OPERATIONS relief tank and pumps shall be installed. The surge tank pump will transfer the
SHAHZAD YAZDANI
surge volume to YDH via respective inbound pipeline from YR to YDH. The
09/08/16
YASREF DO pipeline flowrate (650 MBD) is used as the basis for the surge relief
DATE:
tank volume & line sizing. Accordingly, 30 minutes holdup of 650 MBD has been
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
taken for surge tank sizing and 650 MBD for its inlet line sizing. The surge relief
system shall include the surge relief valves, the piping to the surge relief tank and
EDSD

the instrumentations. The surge relief tank shall be of 2,180 m³ (13.7 MB) capacity
DATE:

as specified below.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Total Capacity,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Tank Size- Working Number of Working Design Design MDMT


(DCC) NO. _____________________

Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 64


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Surge Internal
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Relief (at Floating 2180 (13.7) 1 2180 (13.7) Atm 75 0
SAMREF) roof
ASH
ASH
ASH

CONTRACTOR shall provide tank dewatering and the required instrumentation


LEADS

LEADS
LEADS
ALL

ALL
ALL

piping and pumps as specified in instrumentation, piping and mechanical sections


of this document.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
transfer the surge volumes to YDH via respective inbound pipeline from YR to
DESCRIPTION

YDH. The details of the pump and piping requirements are specified in piping and
ISSUED FOR 60% FEL3

mechanical rotating sections of this document. The scope for the surge relief
system is outlined in PFD PR-A00004.001 and P&IDs PR-A00001.001 to PR-
A00001.002.

DPK Filtration Skid

The CONTRACTOR shall provide a DPK filtration system to filter the off spec DPK
from the tanks. The DPK filtration is proposed to be a complete vendor skid with
JO/EWO

circulation pumps, pre filters and after filters. Normally, the filtration skid circulates
into the same product tanks or to an empty DPK tank as per the operation
10-02399-

10-02399-
10-02399-

requirement. . The DPK filtration skids shall be sized to handle a capacity of 45 to


0001

0001
0001
DATE

200 MBD and will be a completely vendor designed skid.


09/08/16
08/04/16
06/01/16
NO.
REV

The preliminary scope for Filtration Skid is outlined in PFD VA-247843.001 and
DISCIPLINE
ENGINEER P&IDs VA-247915.001. CONTRACTOR shall develop detailed P&ID after vendor
C

information during detail design and CONTRACTOR shall make sure the design
A

DATE: shall meet the requirement of SAES-A-302 Aviation fuel quality assurance design
PROJECT
ALL LEADS
ENGINEER requirement.
09/08/16

DATE:
CERTIFIED
A M ALMATROOK B. NON-ELECTRICAL UTILITIES
09/08/16
DATE: The MARAFIQ battery limit will be the tie-in point at the RC corridor for potable
CONSTRUCTION
AMR EL SHARKAWY
AGENCY water and sanitary waste water. MARAFIQ will be supplying the required quantity
09/08/16
of potable water and YDH will be discharging the industrial waste and sanitary
DATE: waste water to MARAFIQ network. CONTRACTOR shall make sure that the
OPERATIONS
SHAHZAD YAZDANI receipt and discharge from / to MARAFIQ network is provided with the metering
09/08/16 system as per the requirement of MARAFIQ.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 The non-electrical utility systems include, but are not limited to:
EDSD

 Utility water system


 Sanitary sewer
DATE:
BY:

 Storm water drainage


REVISIONCERTIFICATION

 Fire protection system


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Utility water system


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 65


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall provide utility water tank for the storage and supply of utility
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
water. The utility water tank and pressure equipment pumps shall be separated
from the Fire protection water tanks and equipment.
ASH
ASH
ASH

Utility water shall be provided from the MARAFIQ sweet water main. Adequate
LEADS

LEADS
LEADS
ALL

ALL
ALL

metering system per the requirement of MARAFIQ will be provided for the metering
of utility water inflow.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Utility water will be supplied to the buildings, eyewash / safety showers, and YNJ-1
& YNJ-2 pipeline scraper launchers through utility water pumps (one operating,
DESCRIPTION

one spare).
ISSUED FOR 60% FEL3

CONTRACTOR shall provide Metering system required for the receipt of utility
water per the requirement of MARAFIQ. The scope for the utility water system is
outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.

Oily Water Collection and Treatment system


JO/EWO

CONTRACTOR shall install two (2) oily water lift stations in Yanbu’ distribution hub
to facilitate the gravity drain of oily water from all sources.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Oily water discharge from all identified sources shall be routed to the oily water lift
stations.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER The rainfall water within the tank farm dikes is considered contaminated water and
C

it will be collected by an oily water pipe system towards the oily water lift stations.
A

DATE:
PROJECT
ALL LEADS
ENGINEER In addition to the oily water drains from catch basins in the process area and storm
09/08/16 water inside of the tank dike, Oily water & DO storage tanks, sump shall also
DATE: receive flammable tank dewatering, pure hydrocarbon drains from process areas,
CERTIFIED
A M ALMATROOK and pumps. The details of hydrocarbon drain network are specified below under
09/08/16 utilities section.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Before water entering into the lift stations, the water shall pass through a sand
09/08/16
separator /trap which properly designed will retain sand particles from the sump
DATE: pumps
OPERATIONS
SHAHZAD YAZDANI

09/08/16 Each oily water lift station shall be provided with two pumps for normal flow (one
DATE: operating, one spare) and two pumps for maximum flow (one operating, one
CONTROL NUMBER

ALI H GHAMDI
spare). The normal flow pumps will discharge to an oily water treatment system
VERIFICATION

09/08/16 whereas the maximum flow pump shall discharge to the Evaporation pond.
EDSD

The details of the oily water lift station, instrumentation and details of pumps are
DATE:
BY:

outlined in instrumentation and mechanical sections below.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide an Oily water treatment system for the treatment of
oily water. The oily water treatment system shall be of a complete vendor skid
(DCC) NO. _____________________

design and the treatment system shall receive the effluent from the oily water sump
via normal flow pump.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 66


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall route the effluent from normal flow pumps to an equalization
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH tank which will discharge into the CPI Oily water treatment.
ASH
ASH

The oily water treatment system shall receive the effluent from the normal flow
pump and the dewatered effluent from the product storage tanks. Before oily water
LEADS

LEADS
LEADS
ALL

ALL
ALL

entering into the oily water treatment unit, it shall pass through an equalization
tank.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The oily water treatment system shall be of a complete vendor skid design. The
oily water treatment system shall consist of but is not limited to an oily water
DESCRIPTION

equalization tank, CPI separator, water break tank, two effluent water pumps (one
ISSUED FOR 60% FEL3

operating, one spare), two skimmed oil pumps (one operating, one spare) and
necessary instrumentation and interconnecting piping. Pumps shall be provided to
transfer the recovered oil to the slop tank while effluent water to be transferred to
the MARAFIQ network.

The detail for the skid is outlined in mechanical section below. CONTRACTOR
shall provide the pump to transfer the recovered oil to the slop tank while effluent
water to be transferred to the evaporation pond.
JO/EWO

The scope for the oily water system is outlined in PFD VA-247846.001 & VA-
10-02399-

10-02399-
10-02399-
0001

247848.001 and P&IDs VA-247921.001 to VA-247923.001 CONTRACTOR shall


0001
0001
DATE

develop detailed P&ID after vendor information during detail design.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER Hydrocarbon Drain System
C
A

DATE:
PROJECT
CONTRACTOR shall make sure that a separate drain network Drains from the
ALL LEADS
ENGINEER product tanks, manifolds, scraper launchers and pump stations will be routed to
09/08/16
the oily water lift stations in a separated network from the other oily water
DATE: resources.
CERTIFIED
A M ALMATROOK
09/08/16 Utility water system
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the
DATE:
OPERATIONS
metering of utility water inflow. CONTRACTOR shall provide utility water tank
SHAHZAD YAZDANI
for the storage and supply of utility water. Utility water will be supplied to
09/08/16
eyewash / safety showers, YNJ-1 & YNJ-2 pipeline scraper launchers and to
DATE: the buildings through utility water pumps (one operating, one spare).
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
CONTRACTOR shall provide Metering system required for the receipt of utility
EDSD

water per the requirement of MARAFIQ. The scope for the utility water system
DATE:

is outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Sewage collection and disposal


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Instrumentation for the collection and discharge of sewage from the buildings to
the MARAFIQ network.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 67


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Sewage discharged from buildings will be routed to a common sump and
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
transported by two lift pumps (one operating, one spare) to the MARAFIQ
sewage water network.
ASH
ASH
ASH

Sanitary sewage pipes from Operator shelters in the tank farm area will be
LEADS

LEADS
LEADS
ALL

ALL
ALL

discharge in two separate lift stations. The further lift station will discharge in
the other which will pump the waste water to the main lift station located close
to the main buildings area.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Adequate metering system per the requirement of MARAFIQ shall be provided


DESCRIPTION

for the metering of discharge effluent. The scope for the sanitary system is
ISSUED FOR 60% FEL3

outlined in PFD VA-247848.001 and P&IDs VA-247926.001.

Storm water collection system

CONTRACTOR shall construct the storm water collection system consisting in


but not limited to pipes, culverts, transfer boxes, manholes, channels, and
headwalls discharge structures.
JO/EWO

The drainage system considers an adequate and consistent finish floor slope
towards channels and catch basins. Channels will be sloped properly to
10-02399-

10-02399-
10-02399-

conduct the storm water and discharge to MARAFIQ channels network.


0001

0001
0001
DATE

The contaminated storm water is collected by an oily water system to be


09/08/16
08/04/16
06/01/16
NO.
REV

discharge in the evaporation pond


DISCIPLINE
ENGINEER
C
A

DATE: Evaporation pond


PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall validate the design of evaporation pond considering the
DATE: total influent of fire water, contaminated storm water, hydro test water from
CERTIFIED
A M ALMATROOK pumps house and tank farm area. In addition to these requirements, Project
09/08/16 shall consider the Royal Commission Environmental Regulation in sizing the
DATE:
Pond.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Provide Two (2) evaporation ponds for waste oily water sewage and one (1)
DATE: evaporation pond for hydro test and contaminated storm water. The
OPERATIONS
SHAHZAD YAZDANI evaporation ponds shall be excavated with sufficient depth in order to
09/08/16 accommodate about 2.0 meter deep oily water waste. Provide 0.6m minimum
DATE: free board.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Provide 300mm thick marl capping bed inside evaporation pond includes 60mil
EDSD

rough surface HDPE (UV Resistant) liner above the marl capping.
DATE:
BY:

Provide 150 mm thick reinforced concrete Splash.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

C. MECHANICAL ROTATING EQUIPMENT


(DCC) NO. _____________________

YDH Tank Farm and Support structure will have following sets of pumps.

SLOP TANK PUMPS (X40-G-0022 A/B)


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 68


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Slop tanks will be emptied through Slop Tank Pumps (X40-G-0022 A/B) to
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
product tanks. These pumps shall be of Vertical Can Type due to low NPSH
available as per hydraulic calculations. Pumps shall be in accordance with 31-
ASH
ASH
ASH

SAMSS-004. Reference shall be made to datasheet no. RE-E00105 in Index-G


LEADS

LEADS
LEADS
ALL

for further details of these pumps.


ALL
ALL

MISCELLANEOUS DUTY PUMPS


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Apart from above following sets of pumps shall also be provided as part of YDH
DESCRIPTION

Tank Farm and Support structure. Reference shall be made to Index-G for
ISSUED FOR 60% FEL3

preliminary datasheets of these pumps.

 Utility Water Pumps (X40-G-0030 A/B) for eyewash, safety showers and
drinking water – Datasheet No. RE-E00113

 Sanitary Pumps for Sewage Lift Stations (X40-G-0029 A/B) – Datasheet


No. RE-E00112
JO/EWO

 Surge Relief Pumps to transfer the surge volumes to respective product


tanks (X40-G-0023 A/B) – Datasheet No. RE-E00106
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CPI Separator Skim Oil Pumps (X40-G-0025 A/B) – Datasheet No. RE-
E00108 and effluent water pumps (X40-G-0026 A/B) – Datasheet No.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
RE-E00109. These will be part of CPI Separator package and shall be
ENGINEER
finalized by CPI Package vendor.
C
A

DATE:
PROJECT
In addition to above following sets of pumps are required at Yanbu Refinery
ALL LEADS
ENGINEER
09/08/16
and SAMREF.
DATE:
CERTIFIED
 Surge Relief Pumps (V25-G-X004 A/B) at Yanbu Refinery – Datasheet
A M ALMATROOK
No. RE-E00147.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY  Surge Relief Pumps at SAMREF (X40-G-X002 A/B) – Datasheet No.
AGENCY
09/08/16 RE-E00148.
DATE:
OPERATIONS
SHAHZAD YAZDANI
MISCELLANEOUS REQUIREMENTS
09/08/16

DATE:
 Reference shall be made to technical specifications for pumps included
in Index-A for further details of these pumps.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

 Pump Datasheets provided in this package will be further verified by


CONTRACTOR during detailed design phase of the project before
DATE:
BY:

issuing for procurement activities.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 CONTRACTOR shall be responsible for producing equipment


(DCC) NO. _____________________

datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI


ARAMCO standard forms and datasheets.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 69


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG  All pumps will be procured by CONTRACTOR from SAUDI ARAMCO
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
approved manufacturer for each Commodity Classification Code (CCC).
SAUDI ARAMCO will provide the list of approved manufacturers after
ASH
ASH
ASH

award of Contract.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall prepare Material Requisition Package for all the


pumps and shall obtain approvals from relevant SAUDI ARAMCO
ISSUED FOR 100% PROJECT PROPOSAL

Departments before issuing to Vendors.


ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 Material take-offs have been prepared for reference only and will not be
ISSUED FOR 60% FEL3

considered as contractual documents and cannot be used as a basis for


any change order.

 Technical quotations obtained from vendors will list all exceptions and
/or, additions to applicable project Drawings and SAUDI ARAMCO
Specifications. If there is no exception to specifications, CONTRACTOR
will make a statement to that effect.
JO/EWO

 CONTRACTOR shall be responsible for Technical Bid Evaluation,


10-02399-

placing the Purchase Order to technically approved Vendors.


10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall be responsible for review and approval of NMRs


09/08/16
08/04/16
06/01/16
NO.
REV

601, 602 and 603.


DISCIPLINE
ENGINEER
 Inspection and Testing of CONTRACTOR supplied materials will be
C
A

DATE: performed as per applicable SAUDI ARAMCO Inspection Requirement


PROJECT
ALL LEADS
ENGINEER form A-175. CONTRACTOR will arrange with his sub suppliers to
09/08/16
comply with these requirements by stating on all sub suppliers’
DATE:
CERTIFIED
purchase order SAUDI ARAMCO’s intention to inspect material.
A M ALMATROOK
09/08/16
DATE:
 Equipment installation and Commissioning shall be in accordance with
CONSTRUCTION
AMR EL SHARKAWY approved Vendor’s installation and commissioning procedures.
AGENCY
09/08/16

DATE:
 Supply of Commissioning and Start-up spares and first fill of all the
OPERATIONS
SHAHZAD YAZDANI
lubricants and chemicals is in the scope of CONTRACTOR.
09/08/16 CONTRACTOR shall obtain approval of Aramco Operations before
DATE: filling of lubricants and chemicals.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  CONTRACTOR will provide all Non Material Requirement (NMR-


EDSD

602/603), Operation and Instruction Manuals of CONTRACTOR


DATE:

supplied material in electronic format (Latest Acrobat Reader).


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

 CONTRACTOR will provide critical spare parts for CONTRACTOR


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

supplied items in accordance with SAEP-3101. Contractor will develop


(DCC) NO. _____________________

list of critical plant equipment spares and identification.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 70


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG  CONTRACTOR shall be responsible to complete the Novation
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
procurement process for the Gasoline and Diesel shipper pumps.
CONTRACTOR will be provided with all relevant details of the purchase
ASH
ASH
ASH

order and Novation terms.


LEADS

LEADS
LEADS
ALL

ALL
ALL

D. MECHANICAL STATIC EQUIPMENT

This section describes the Contractor’s scope of work for the design,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

manufacture /fabrication, supply, packaging & storage, supervision for


DESCRIPTION

installation, commissioning, start-up activities. Provision of Spare Parts


ISSUED FOR 60% FEL3

required for erection & commissioning, start-up and 2 years operation.

Following list of equipment shall be provided by CONTRACTOR:

SR NO
EQUIPMENT TAG NO. QTY SERVICE

1 X40-D-0028A/B 2 FIRE WATER TANK


JO/EWO

2 X40-D-0014 1 UTILITY WATER TANK


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

3 X40-D-0037 1 DIESEL DAY TANK


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE 4 X40-D-0001 1 SURGE TANK


ENGINEER
C
A

DATE:
PROJECT 5 V25-D-0003 1 SURGE TANK
ALL LEADS
ENGINEER
09/08/16

DATE: 6 X40-U-0021, X40-U- 3 OVERHEAD CRANES


CERTIFIED
A M ALMATROOK 0024 & X40-U-0025
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Following Packages shall be provided by CONTRACTOR:
09/08/16
SR NO
DATE: EQUIPMENT TAG NO. QTY SERVICE
OPERATIONS
SHAHZAD YAZDANI

09/08/16 1 X40-U-0001 1 KEROSENE FILTRATION SKID


DATE:

GASOLINE 95 RED DYE


CONTROL NUMBER

ALI H GHAMDI 2 1
VERIFICATION

X40-U-0002
09/08/16 INJECTION SKID
EDSD

3 1 GASOLINE 91 GREEN DYE


DATE:

X40-U-0003
BY:

INJECTION SKID
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

4 1 OILY WATER TREATMENT


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

X40-U-0004
PACKAGE
(DCC) NO. _____________________

5 1 CONDUCTIVITY ENHANCER
X40-U-0005
INJECTION SKID
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 71


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

6 1 STATIC DISSIPATIVE ADDITIVE


SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
X40-U-0011
INJECTION SKID
ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

Below are the reference documents for all Mechanical Static equipment
and Packages.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

REFERENCE DOCUMENTS:
DESCRIPTION

TECHNICAL SPECIFICATION:
ISSUED FOR 60% FEL3

EQE00006012 TECHNICAL SPECIFICATION FOR FIRE & UTILITY WATER TANKS


TECHNICAL SPECIFICATION FOR OILY WATER TREATMENT PACKAGE
EQE00009018 (X40-U-0004)
EQE00011029 TECHNICAL SPECIFICATION FOR DPK FILTRATION SKID
EQE00012030 TECHNICAL SPECIFICATION FOR DYE INJECTION SKIDS
EQE00015014 TECHNICAL SPECIFICATION FOR OVERHEAD CRANES
JO/EWO

EQE00016010 TECHNICAL SPECIFICATION FOR UL-142 TANKS


10-02399-

10-02399-
10-02399-
0001

EQE00018008 TECHNICAL SPECIFICATION FOR DROP ARM BARRIER


0001
0001
DATE

EQE00019010 TECHNICAL SPECIFICATION FOR CRASH BARRIER


09/08/16
08/04/16
06/01/16
NO.
REV

EQE00013018 TECHNICAL SPECIFICATION FOR INJECTION SKID


DISCIPLINE
ENGINEER EQE00054013 TECHNICAL SPECIFICATION FOR INTERNAL FLOATING ROOF TANK
C
A

DATE: EQE00055013 TECHNICAL SPECIFICATION FOR INTERNAL FLOATING ROOF TANK


PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16

DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 72


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG DATA SHEETS:
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EQE00027004 DATA SHEET FOR FIRE WATER TANKS (X40-D-0028 A/B)
ASH
ASH
ASH

EQE00028004 DATA SHEET FOR UTILITY WATER TANK (X40-D-0014)


LEADS

LEADS
LEADS
ALL

ALL
ALL

EQE00030001 DATA SHEET FOR OILY WATER TREATMENT PACKAGE (X40-U-0004)


EQE00032001 DATA SHEET FOR DPK FILTRATION SKID (X40-U-0001)
ISSUED FOR 100% PROJECT PROPOSAL

EQE00033001 DATA SHEET FOR P95 RED DYE INJECTION SKIDS (X40-U-0002)
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

EQE00034001 DATA SHEET FOR P91 GREEN DYE INJECTION SKIDS (X40-U-0003)
ISSUED FOR 60% FEL3

DATASHEET FOR CONDUCTIVITY ENHANCER INJECTION SKID (X40-U-


EQE00041001 0005)
DATASHEET FOR STATIC DISSIPATIVE ADDITIVE INJECTION SKID (X40-U-
EQE00042001 0011)
EQE00046003 DATASHEET FOR DIESEL DAY TANK X40-D-0037
DATASHEET FOR OVERHEAD CRANE FOR GASOLINE SHIPPER PUMP
EQE00047002 SHELTER (X40-U-0017)
DATASHEET FOR OVERHEAD CRANE FOR DIESEL SHIPPER PUMP
JO/EWO

EQE00048002 SHELTER (X40-U-0018)


DATASHEET FOR OVERHEAD CRANE FOR GASOLINE BOOSTER PUMP
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

EQE00049002 SHELTER (X40-U-0019)


DATASHEET FOR OVERHEAD CRANE FOR DIESEL BOOSTER PUMP
09/08/16
08/04/16
06/01/16

EQE00050002 SHELTER (X40-U-0020)


NO.
REV

DISCIPLINE DATASHEET FOR OVERHEAD CRANE FOR FIRE WATER PUMP SHELTER
ENGINEER
EQE00051002 (X40-U-0021)
C
A

DATE: EQE00052002 DATASHEET FOR OVERHEAD CRANE FOR GIS ROOM (X40-U-0024)
PROJECT
ALL LEADS
ENGINEER DATASHEET FOR OVERHEAD CRANE FOR ENGG. & MAINTENANCE
09/08/16
EQE00053002 BUILDING (X40-U-0025)
DATE:
CERTIFIED EQE00057004 DATA SHEET FOR SURGE TANK (X40-D-X001)
A M ALMATROOK
09/08/16 EQE00058004 DATA SHEET FOR SURGE TANK (V25-D-X003)
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
CONTRACTOR shall be responsible for supply, procurement, fabrication,
DATE: transportation handling, storage at site, erection, inspection, testing and Pre-
OPERATIONS
SHAHZAD YAZDANI commissioning, Commissioning support of all equipment and packages.
09/08/16

DATE: CONTRACTOR shall take necessary precautions in handling the equipment to


CONTROL NUMBER

ALI H GHAMDI
prevent any damage during transportation and loading/unloading.
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance


rigging plans and transportation calculations for all major equipment.
DATE:
BY:
REVISIONCERTIFICATION

CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

of equipment.
(DCC) NO. _____________________

All equipment shall be installed and commissioned as per SAUDI ARAMCO


Standards and Manufacturer recommendations.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 73


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall be responsible for insulation (where specified on the data
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
ASH
ASH

All skid packages design shall be vendor proven design. Skid packages shall
be suitable for the specific application by meeting all the process design
LEADS

LEADS
LEADS
ALL

ALL
ALL

requirements and environmental, safety and Industry standards.

E. INSTRUMENTATION
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall perform the following activities at following areas as


DESCRIPTION

mentioned below:
ISSUED FOR 60% FEL3

RTG for Product Storage & Slop Tanks:

 Provide and install radar level transmitters, multisport temperature sensors,


pressure transmitters and other tank gauging devices as indicated in P &
IDs VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-
247912/ VA-247913. Refer block diagram IN-A00001.005 for details.
JO/EWO

 Provide and install cable between RTG instruments, the cables shall run
through conduits.
10-02399-

10-02399-
10-02399-
0001

 Provide RTG junction boxes at the tanks as indicated in block diagram IN-
0001
0001
DATE

A00001.005.
09/08/16
08/04/16
06/01/16


NO.
REV

Provide and install fieldbus cables from RTG level transmitters to RTG
DISCIPLINE
ENGINEER
junction boxes through conduit.
C
A

 Provide and install RTG fieldbus homerun cables between RTG junction
DATE:
PROJECT
boxes and Field Communication Units located in Rack room of Operation
ALL LEADS
ENGINEER building.
09/08/16

DATE:  Refer block diagram IN-A00001.005 for fieldbus cabling and FCU
A M ALMATROOK
CERTIFIED assignments. The assignment shown is preliminary and shall be finalized
09/08/16 during detail design phase.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
 All RTG components inside the rack room shall be supplied within a
AGENCY
09/08/16 cabinet. The RTG shall be interfaced to DCS over industry standard open
protocols.
DATE:
OPERATIONS
SHAHZAD YAZDANI Product Storage & Slop Tanks Field Instrumentation
09/08/16

DATE:  Provide and install field instruments in the tank farm area as per P & IDs
VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-247912/
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 VA-247913 and block diagrams IN-A00002.001/002/003/004.


EDSD

 Provide and install branch cables from field instruments to junction boxes.
DATE:
BY:

 Provide and install junction boxes as per block diagrams IN-


REVISIONCERTIFICATION

A00002.001/002/003/004.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Provide and install homerun cables from field junction boxes to DCS/ESD
(DCC) NO. _____________________

marshalling cabinets located in Rack room of Operations Building and


Remote Instrument Buildings as per overall cable routing drawing IN-
A00003.001 and block diagrams IN-A00002.001/002/003/004.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 74


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 To include product quantity measuring system from YDH to
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH

Surge Relief System


LEADS

LEADS
LEADS
ALL

CONTRACTOR shall
ALL
ALL

 Provide and install field instruments as indicated in P &IDs VA-247929-001


and VA-247930-001 and as per block diagram IN-A00002.016
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL


DESCRIPTION

Provide and install field junction box X40-AJB-2032 & X40-EAJB-X032 lay
ISSUED FOR 60% FEL3

homerun cable IC-0773,IC-0950 from JB to RIB-2.


 Provide and install cables between IRP panels located in substation XXX1
to RIB-2 DCS/ESD remote I/O cabinets.
DPK Filtration Skid

THE CONTRACTOR/VENDOR SHALL

 DPK Filtration Skid vendor shall provide and install field instruments as
JO/EWO

indicated in P &IDs VA-247915 as per block diagram IN-A00002.022


10-02399-


10-02399-
10-02399-

DPK Filtration Skid vendor shall provide and install junction boxes.
0001

0001
0001
DATE

 Contractor shall provide and install homerun cables from skid junction
09/08/16
08/04/16
06/01/16

boxes to DCS marshaling cabinet located in RIB-2. The cables laying shall
NO.
REV

DISCIPLINE
be as per block diagram IN-A00002.022.
ENGINEER
 Contractor shall integrate skid pumps to IRP panel located in substation
C
A

DATE: XXX2. Provide and install homerun cables DCS marshaling cabinet located
PROJECT
ALL LEADS
ENGINEER in RIB-2 to MCC. The cables laying shall be as per block diagram IN-
09/08/16 A00002.022.
DATE:
CERTIFIED
 Field instruments for all the skids to be included
A M ALMATROOK
09/08/16 Oily Water Collection and Treatment system
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY  Contractor shall provide and install field instruments as indicated in P &IDs
09/08/16
VA-247921, VA-247922 & VA-247923 and as per block diagram IN-
DATE: A00002.011, IN-A00002.012 & IN-A00002.021
OPERATIONS
SHAHZAD YAZDANI

09/08/16
 Provide and install branch cables from field instruments to junction boxes.
DATE:  Provide and install junction boxes as per block diagrams IN-A00002.011,
CONTROL NUMBER

ALI H GHAMDI
IN-A00002.012 & IN-A00002.021
VERIFICATION

09/08/16
EDSD

 Provide and install homerun cables from field junction boxes to DCS/ESD
marshalling cabinets located in Rack room of Operations Building and
DATE:

Remote Instrument Buildings as per overall cable routing drawing IN-


BY:

A00003.001 and block diagrams IN-A00002.011/012/021.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Provide and install cables between MCC IRP to DCS/ESD cabinets located
(DCC) NO. _____________________

in Remote Instrument Buildings.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 75


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Utilities
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a) Utility Water/Waste Water/Sanitary water
ASH
ASH
ASH
LEADS

LEADS
LEADS


ALL

Contractor shall provide water metering skids as shown in P&IDs.


ALL
ALL

 Contractor shall supply metering skid for Utility water, Waste water
and sanitary water.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Metering skids shall be provided with an RTU to connect to existing


DESCRIPTION

SCADA located in MARAFIQ facility.


ISSUED FOR 60% FEL3

 Metering skid interface shall be as per block diagram IN-


A00001.001
 Totalizer / quantity measurement reading for products at YDH
upstream of Yanbu-Jiddah pipeline to be connected to the DCS.

 Reference drawings
JO/EWO

Drawing # Description
IN-A00001 System Block Diagrams
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

IN-A00002 Instrument Block Diagrams


IN-A00027 Instrument Points & Lines
09/08/16
08/04/16
06/01/16
NO.
REV

IN-D00201 Instrument Installation Schedule-Flow


DISCIPLINE
ENGINEER IN-D00202 Instrument Installation Schedule-Pressure
C
A

DATE:
IN-D00203 Instrument Installation Schedule-Level
PROJECT
ALL LEADS
ENGINEER
IN-D00204 Instrument Installation Schedule-Temperature
09/08/16 IN-D00205 Instrument Installation Schedule-Misc
DATE: IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
CERTIFIED
A M ALMATROOK IN-D00207 Instrument Installation Schedule-Relief Valves
09/08/16
DATE:
IN-A00004 Equipment Layouts
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
IN-A00003 Cable Routing Plan
09/08/16 IN-D00005 Cable and Conduit Schedule
DATE:
OPERATIONS
SHAHZAD YAZDANI
F. PIPING
09/08/16

DATE:
 Piping plans have been developed showing the conceptual routing of all
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
major pipes with proper configuration in order to meet process objectives.
Pipe supports, platform and elevated structures shown in this submittal are
EDSD

preliminary. All major instruments such as MOVs, ZVs, PZVs and control
DATE:

valves are located.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 These piping plans are intended to define scope of work for


(DCC) NO. _____________________

CONTRACTOR and calculate “Bill of Quantity” for estimation.

 The Detail Design contractor shall develop further details of the


REVISION

Piping Plan & Isometrics for construction and installation purposes.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 76


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 The preliminary stress analysis has been done for only the critical
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lines connected to pump systems. Any re-adjustment of the pipe
routing if needed and provision proper supports such as guides,
ASH
ASH
ASH

stoppers, spring supports in order to limit the stresses within the


acceptable code limits will be developed during detail design phase.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 All the Facility shall be design & constructed with adequate space to
facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL


DESCRIPTION

The Piping Design, Procurement, Fabrication, Transportation,


ISSUED FOR 60% FEL3

Erection, Installation, Testing, Inspection, Pre commissioning and


Commissioning support of the following piping system in the New
Tank Farm Area shall be in accordance with project drawings listed
in the document control list.
 All new piping systems associated with New Product Tanks
(Ref. Process Equipment list PR-E00103 & Overall Plot plan-PI-
A00001.001)
JO/EWO

 All New piping (Only 2” & above) from Source refinery to receipt
10-02399-

manifold, Inside YDH routing to product/ slop, surge storage tanks,


10-02399-
10-02399-
0001

0001
0001
DATE

Booster/Shipper Pumps, OWS lift station, DPK Filtration skid, Dye-in


skid, Drain vessel, Scraper Launchers, Utility station, Raw/Drinking
09/08/16
08/04/16
06/01/16
NO.
REV

water system, Firewater piping near tank/pumps, drain lines should


DISCIPLINE be as per the requirements of the Project P&IDs and Piping plan As
ENGINEER
per DCL list located in Appendix 13.2.2.)
C
A

DATE:
PROJECT
 Line sizes 1.5” & below are not considered in during the Project
ALL LEADS
ENGINEER Proposal, MTO will be factored for small bore lines for estimation
09/08/16
purpose.
DATE:

A M ALMATROOK
CERTIFIED  Future space considered for extension of sleepers in Pipe way &
09/08/16 Pipe trench.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
 The requirement of surge tank, surge skid, surge tank pump are
AGENCY
09/08/16 tentatively shown in SAMREF and Yanbu refinery overall plot plan
Yanbu refinery. The location & feasibility study to be carry after
DATE:
OPERATIONS
confirmation from client.
SHAHZAD YAZDANI

09/08/16  Detail layout showing assembly areas, travel distances shall be


DATE: develop during detail design by CONTRACTOR.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
General Requirement for Piping
EDSD

DATE:
BY:

CONTRACTOR shall implement and comply with all the requirements below, in
full.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 CONTRACTOR shall perform Piping Design, Procurement, Fabrication,


(DCC) NO. _____________________

Transportation, Erection, Installation, Testing, Inspection, Pre-


commissioning and Commissioning support in accordance with the latest
edition of SAUDI ARAMCO Engineering Standards & Specifications and
REVISION

other applicable International Codes and Standards.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 77


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide the detailed construction drawing package
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
required to complete the facility and shall comply with all applicable codes
and standards.
ASH
ASH
ASH

 CONTRACTOR shall complete the design calculations in support of the


LEADS

LEADS
LEADS
ALL

construction drawings and all other necessary calculations/documents.


ALL
ALL

 CONTRACTOR shall develop further details and isometrics for construction


and installation purpose.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall also perform the stress calculations and readjust the
DESCRIPTION

pipe routing if needed and provide proper supports such as guides,


ISSUED FOR 60% FEL3

stoppers, spring supports in order to limit the stresses within the acceptable
code limits.
 CONTRACTOR shall design and construct the Facility with adequate space
to facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
 CONTRACTOR shall perform Piping Design, Procurement, Fabrication,
Transportation, Erection, Installation, Testing, Inspection, Pre
JO/EWO

commissioning and commissioning support of the following piping system in


the New Tank Farm Area in accordance with project drawings listed in the
10-02399-

10-02399-
10-02399-

document control list.


0001

0001
0001
DATE

 CONTRACTOR shall perform all Piping works in accordance with SAUDI


09/08/16
08/04/16
06/01/16

ARAMCO Engineering Standard SAES-L-310, SAES-L-350 other


NO.
REV

DISCIPLINE
applicable SAUDI ARAMCO Standards and Specifications and the
ENGINEER American Society of Mechanical Engineers (ASME) Code ASME B31.4.
C
A

DATE:  CONTRACTOR shall carry out all piping work in close liaison with the
PROJECT
ALL LEADS
ENGINEER SAUDI ARAMCO Representative to meet the project requirements.
09/08/16
 CONTRACTOR shall be responsible for verifying all dimensions, angles,
DATE:
CERTIFIED and elevations prior to fabrication and installation.
A M ALMATROOK
09/08/16  CONTRACTOR shall provide all necessary vehicles for transportation of
DATE: personnel, utilities equipment and materials to and from the job site.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  CONTRACTOR shall be responsible for the security and protection of all
DATE:
equipment, tools and materials at the job site until installation is complete
OPERATIONS
SHAHZAD YAZDANI
and accepted by SAUDI ARAMCO.
09/08/16  Materials that are removed from the job site shall be hauled back to the
DATE: materials storage yard. Any of the materials left at the end of the job shall
CONTROL NUMBER

ALI H GHAMDI
be transported to designated yard or stored as directed by SAUDI
VERIFICATION

09/08/16 ARAMCO.
EDSD

 CONTRACTOR shall provide all labor and support equipment including, but
DATE:

not limited to, scaffolding to perform piping work.


BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall field verify all the dimensions and elevations shown
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

on drawings prior to start of any fabrication, erection and installation.


(DCC) NO. _____________________

 CONTRACTOR shall install all bolted flanged joints in accordance with


SAEP-351.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 78


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall follow all safety precautions required by SAUDI
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ARAMCO Standards and those suggested by the Loss Prevention Engineer
to ensure safe construction works.
ASH
ASH
ASH

 Flanged and bolted connections shall meet the requirements of SAES-L-


LEADS

LEADS
LEADS
ALL

109.
ALL
ALL

 Bolts and studs shall extend completely through their nuts. As a minimum,
three (3) bolt threads shall extend through the nuts.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall design and fabricate all miscellaneous pipe supports


DESCRIPTION

required for the project and ensure that pipe support attachments to piping
ISSUED FOR 60% FEL3

are included during fabrication of piping spools and prior to any hydrostatic
testing of the system. Pipes shall be provided with necessary guides,
springs, clamps, anchors, etc. as required. Pipe shoe shall be provided for
insulated lines. Height of shoe for different lines shall be adjusted as per the
thickness of insulation. Pipe Support number shall be marked in relevant
piping drawings
 CONTRACTOR shall fabricate and install field pipe supports, dummy legs,
guides, saddles, slide bearing plates, shoes and shims.
JO/EWO

 CONTRACTOR shall provide high point vent and low point drain at suitable
10-02399-

10-02399-
10-02399-

locations shall be provided in piping system.


0001

0001
0001
DATE

 CONTRACTOR shall furnish, without limitation, all facilities, tools, labor,


09/08/16
08/04/16
06/01/16

supervision, technical and professional services, material, equipment,


NO.
REV

DISCIPLINE
supplies and consumables required to procure, construct, install, test and
ENGINEER commission, the NJBP expansion facility in accordance with the Project
C
A

Documents listed in Document Control list.


DATE:
PROJECT
ALL LEADS
ENGINEER  CONTRACTOR shall design and construct the Facility with adequate space
09/08/16 to facilitate operation and maintenance and with minimum spacing
DATE: requirement as per SAUDI ARAMCO standard. Layout shall allow crane
A M ALMATROOK
CERTIFIED access for equipment from relevant sides.
09/08/16
DATE:
 Detailed design package shall be prepared with use of 3D modeling
CONSTRUCTION
AMR EL SHARKAWY software (PDS).
AGENCY
09/08/16
 CONTRACTOR shall design and construct all piperacks, pipe bridges, pipe
DATE: supports and concrete pipe sleepers. CONTRACTOR shall consider all
OPERATIONS
SHAHZAD YAZDANI relevant loads in his design. Structural steel shall be galvanized. Material
09/08/16 shall be as per 12-SAMSS-007.
DATE:
 CONTRACTOR shall follow SAES-Q-001 for concrete design.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 CONTRACTOR shall consider necessary clearance under roads while


EDSD

designing piperacks.
DATE:
BY:

PIPING MATERIAL SUPPLY


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 CONTRACTOR shall supply all materials and consumables required for


(DCC) NO. _____________________

fabrication and construction of piping works for North Jiddah Bulk Plant
Expansion.
 CONTRACTOR shall ensure that all piping materials shall conform to the
REVISION

SAUDI ARAMCO piping specification SAES-L-105 together with project


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 79


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG piping material specification and other related applicable SAUDI ARAMCO
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Standards and Specifications.
ASH


ASH

CONTRACTOR shall use only new materials. Material substitutions shall


not be permitted without the approval of SAUDI ARAMCO prior to any
LEADS

LEADS
LEADS
ALL

procurement or fabrication activities.


ALL
ALL

WELDING WORK
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Welders and Welding Procedures shall be qualified and approved in


DESCRIPTION

accordance with SAUDI ARAMCO Engineering Procedures SAEP-324,


ISSUED FOR 60% FEL3

SAEP-352 (CONTRACTOR Welders and Procedures) and Standard SAES-


W-011 before welding start.
 Welds which are defective and beyond repair, in the sole opinion of the
SAUDI ARAMCO Representative, shall be cut out and replaced by
CONTRACTOR at no additional cost to SAUDI ARAMCO.
 CONTRACTOR shall provide all required welding equipment accessories
and consumables.
JO/EWO

 When joining pipes and fittings of unequal wall thickness, CONTRACTOR


10-02399-

10-02399-
10-02399-

shall counter bore the larger wall thickness prior to welding in accordance
0001

0001
0001
DATE

with ASME B31.3.


09/08/16
08/04/16


06/01/16

Before welding pipe joints, CONTRACTOR shall inspect each joint or spool
NO.
REV

DISCIPLINE
to ensure that it is free of sand, debris or other foreign materials. Each pipe
ENGINEER string or section shall be internally cleaned before welding, coupling or
C
A

bolting to another pipe section or equipment in accordance with SAES-L-


DATE:
PROJECT
350.
ALL LEADS
ENGINEER
09/08/16

DATE:
RADIOGRAPHY AND NDT
CERTIFIED
A M ALMATROOK
09/08/16  CONTRACTOR shall perform radiography of all piping joints as per clauses
DATE: 17.2 and 17.5 of SAES-W-011.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  Magnetic Particle Testing and Liquid Penetrant Testing requirements for
pressure containing welds other than butt welds (including sockolets,
DATE:
OPERATIONS weldolets and welded bosses) shall be per clause 17.5.3 of SAES-W-011.
SHAHZAD YAZDANI

09/08/16  Upon approval of waiver, spool pieces which cannot be hydro tested are to
DATE: be 100% radio graphed.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 Radiography of welds shall be in accordance with SAEP-1143.
EDSD

 CONTRACTOR shall provide adequate testing facilities at site including all


necessary equipment, consumables, materials, labor etc., to enable to
DATE:
BY:

complete the Piping work, including radiography and other NDT methods
REVISIONCERTIFICATION

and testing. CONTRACTOR shall develop and propose the required


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

inspection and NDT methods, documentation records and procedures to


(DCC) NO. _____________________

meet the Aramco requirements.

PAINTING, COATING AND INSULATION


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 80


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall supply and apply painting and coating material in
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
accordance with vendor's recommended practice and as outlined in SAUDI
ARAMCO Engineering Standards Index-H series.
ASH
ASH
ASH

 CONTRACTOR shall supply all mixing, cleaning, spray, and other


LEADS

LEADS
LEADS
ALL

applicable materials and all equipment required to perform painting.


ALL
ALL

 CONTRACTOR shall provide all instruments and tools required to verify


paint dry film thickness.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall be responsible for cleanup of all paint cans and


DESCRIPTION

debris associated with painting at the jobsite at the end of each working
ISSUED FOR 60% FEL3

day.
 CONTRACTOR shall ensure that no paint shall be placed within 2 inches of
areas to be welded prior to welding. Weld areas can only be painted after
the successful completion of required testing.
 CONTRACTOR shall adhere to safety identification and color coding as
specified in SAES-B-067.
 CONTRACTOR shall supply insulation for piping system. CONTRACTOR
JO/EWO

shall also be responsible for application of insulation material, stainless


steel cladding including provision of vapor barrier, supports, wire mesh,
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

cleat, clips, etc. on piping system as per relevant specifications.


09/08/16
08/04/16
06/01/16
NO.
REV

Special Requirements:
DISCIPLINE
ENGINEER
 Prior to start of construction, CONTRACTOR shall perform field verification
C
A

DATE: of all existing hazards that may jeopardize the safety of personnel and
PROJECT
ALL LEADS
ENGINEER property.
09/08/16

DATE:
CERTIFIED
 CONTRACTOR shall submit Loss Prevention Program and Hazard
A M ALMATROOK Identification Plan for SAUDI ARAMCO approval no later than thirty (30)
09/08/16
DATE:
days after the effective date of the contract.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
 Prior to start of construction activities, CONTRACTOR shall identify the
DATE: existing pipeway/pipe culverts to be extend in SAMREF/YASREF & submit
OPERATIONS
SHAHZAD YAZDANI safe execution plan to SAUDI ARAMCO representative to work nearer to
09/08/16 active product/utility lines
DATE:
 CONTRACTOR shall comply with all SAUDI ARAMCO safety regulations
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 and manual.


EDSD

 CONTRACTOR shall prepare a detailed construction Critical Path Method


DATE:
BY:

(CPM) schedule and submit it to SAUDI ARAMCO for approval. Unless


REVISIONCERTIFICATION

otherwise instructed by the SAUDI ARAMCO Representative,


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall dismantle all temporary facilities after completion of


(DCC) NO. _____________________

work and return all SAUDI ARAMCO supplied materials to a location


designated by the SAUDI ARAMCO Representative.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 81


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall dispose wastes associated with this scope of work in
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH accordance with G.I. 430. 001 “Waste Management” and Cat-3 EIA report.
ASH
ASH

 CONTRACTOR shall be responsible for handling, transporting and storing


LEADS

LEADS
LEADS
ALL

critical materials such as scraper cups, chemicals and other materials


ALL
ALL

which require temperature controlled storage space


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

4.8 Yanbu to Jiddah Pipeline 1 & 2 Support Infrastructure


DESCRIPTION

A. GENERAL
ISSUED FOR 60% FEL3

CONTRACTOR shall design and install the YNJ-1 & YNJ-2 support infrastructure
including, but not limited to the following facilities:

 Tie-in to 20” YNJ-1 pipeline for PG95/PG91


 Tie-in to 24” YNJ-2 pipeline for DO/DPK
 Utility water supply tie-in to YNJ-1 & YNJ-2 pipeline scrapers
 Drain collection tie-in from YNJ-1 & YNJ-2 pipeline scrapers
JO/EWO

The battery limit will be the tie-in flange provided by YDH in the scraper launcher
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

lateral line for YNJ-1 / YNJ-2. Utility Water supply from YDH shall also be provided
for YNJ-1 & YNJ-2 pipeline scrapers and accordingly drain from YNJ-1 & YNJ-2
09/08/16
08/04/16
06/01/16

pipeline scrapers shall also be received into oily water lift station.
NO.
REV

DISCIPLINE
ENGINEER The following are the interfaces with BI-10-02155 and CONTRACTOR shall re-
C
A

confirm the tie-in conditions with BI-10-02155 during detail design.


DATE:
PROJECT
ALL LEADS
ENGINEER
a) Pipelines (YNJ-1 & YNJ-2):
09/08/16

DATE: 2 Nos. pipelines, one of 20” ND (YNJ-1) and the other of 24” ND (YNJ-2) of
CERTIFIED
A M ALMATROOK following specs:
09/08/16
DATE: Pipeline Material = API 5L Gr.X65
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Flange Rating = 900#
DATE: MAOP = 15513.2 kPag (2250 PSIG)
OPERATIONS
SHAHZAD YAZDANI
Design Temperature = 60 °C
09/08/16

DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
b) Utilities:
EDSD

- Utility water supply from YDH to YNJ-1/2 pipeline scraper launchers via two
DATE:

4” connections.
BY:

- Drain from YNJ-1/2 pipeline scrapers to YDH via two 4” lines


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The scope for the YNJ-1 & YNJ-2 support infrastructure is outlined in PFDs VA-
(DCC) NO. _____________________

247844.001 to VA-247847 and P&IDs VA-247918.002, VA-247920.002, VA-


247924.001 and VA-247921.002.

B. PIPING
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 82


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 The scope of work includes design and construction of two pipelines ,YNJ-1
& 2 inside battery limit of YDH, but not limited to, the following activities:
ASH
ASH
ASH

 YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:


LEADS

LEADS
LEADS
ALL

ALL
ALL

 The design and installation of YNJ-1 20” Gasoline Pipeline & YNJ-2 24”
DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to Scraper
Launcher Facility constructed under BI-10-02155. Design and Installation of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

the Scraper launcher shall be the part of BI-10-02155 YDH Scope will start
DESCRIPTION

at a flange upstream of the Scraper launcher.


ISSUED FOR 60% FEL3

 Interface requirements shall be accordingly coordinated with pipeline


project BI-10-02155. Following are the interface connections.

a. YNJ-1 Pipeline connection Upstream scraper Launcher


b. YNJ-2 Pipeline connection Upstream of Scraper Launcher
c. Drain connection for both Scraper Launchers.
d. Utility water connection.
JO/EWO

Reference Dwg: As per DCL no.GEN-D0001.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

General Requirement for Piping


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE  CONTRACTOR scope of work includes design and construction of two


ENGINEER pipelines ,YNJ-1 & 2 inside battery limit of YDH ,but not limited to the
C
A

following activities:
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16  YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
DATE:
CERTIFIED
A M ALMATROOK
 CONTRACTOR shall design and install YNJ-1 20” Gasoline Pipeline &
09/08/16
DATE:
YNJ-2 24” DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to
CONSTRUCTION
AMR EL SHARKAWY Scraper Launcher Facility constructed under BI-10-02155. Design and
AGENCY
09/08/16 Installation of Scraper launcher shall be the part of BI-10-02155; YDH
DATE:
Scope will start at a flange upstream of Scraper launcher.
OPERATIONS
SHAHZAD YAZDANI

09/08/16  Interface requirements shall be accordingly coordinated with pipeline


DATE: project BI-10-02155. Following are the interface connections.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

e. YNJ-1 Pipeline connection Upstream scraper Launcher


f. YNJ-2 Pipeline connection Upstream of Scraper Launcher
DATE:
BY:

g. Drain connection for both Scraper Launchers.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

h. Utility water connection.


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 CONTRACTOR shall perform Piping Design, Procurement, Fabrication,


Transportation, Erection, Installation, Testing, Inspection, and
Commissioning the following piping system in accordance with the latest
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 83


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG edition of SAUDI ARAMCO Engineering Standards & Specifications and
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH other applicable International Codes and Standards.
ASH
ASH

a. Product piping upstream of scraper launcher which shall be


connected to respective shipper pumps as per project drawings.
LEADS

LEADS
LEADS
ALL

ALL
ALL

b. New pipe ways and pipe supports as required by project


drawings shall be provided.
c. An elevated platform shall be provided for control valves station.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

d. Surge relief tanks and associated piping.


DESCRIPTION

e. Surge product transfer pump and associated piping.


ISSUED FOR 60% FEL3

f. Interface product shipper pumps and associated piping.

Refer DCL no.GEN-D0001.for list of drawings.

4.9 Pumps and Motors for the Yanbu to Jiddah Pipeline

A. GENERAL
JO/EWO

CONTRACTOR shall design and install the booster and shipper pumps for YNJ-1
10-02399-

10-02399-
10-02399-
0001

and YNJ-2 pipelines including, but not limited to the following facilities:
0001
0001
DATE


09/08/16
08/04/16
06/01/16

Three (3) booster pumps for YNJ-1 pipeline


NO.
REV

DISCIPLINE
 Three (3) shipper pumps for YNJ-1 pipeline
ENGINEER  Three (3) booster pumps for YNJ-2 pipeline
C
A

 Three (3) shipper pumps for YNJ-2 pipeline


DATE:
PROJECT  Pumps associated automation, control and safety shutdown requirements.
ALL LEADS
ENGINEER
09/08/16
CONTRACTOR shall design and install three (3) booster pumps for YNJ-1 and
DATE:
CERTIFIED YNJ-2.Pumps shall be electric motor and fixed speed with spillback to tank being
A M ALMATROOK
emptied. The motors shall be sized to accommodate the pump loads for the full
09/08/16
DATE:
spectrum of the pump curve. The pumps shall be fitted with all necessary
CONSTRUCTION
AMR EL SHARKAWY instrumentation to protect the pump (including seal leak detection) and prevent
AGENCY
09/08/16 overpressure.
DATE:
OPERATIONS CONTRACTOR shall design and install three (3) shipper pumps for YNJ-1 and
SHAHZAD YAZDANI

09/08/16
YNJ-2. Pumps shall be electric motor driven and fixed speed. The motors shall be
sized to accommodate the pump loads for the full spectrum of the pump curve. The
DATE:
pumps shall be fitted with all necessary instrumentation to protect the pump
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
(including seal leak detection) and to prevent overpressure.
EDSD

The following design parameters are established for the pipeline booster pumps.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Rated flow Diff. Pressure Design Temp


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Service Product No. of pumps


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

m³/hr (MBD) (kPa) ⁰C


(DCC) NO. _____________________

YNJ-1 PG 91 /95 530 (80) 3* 490.2 75


YNJ-2 DO /DPK 744 (112.33) 3* 557.8 75
REVISION

*Fourth pump shall be installed during Phase-II.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 84


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The following design parameters are established for the pipeline shipper pumps.
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Rated flow Diff. Pressure Design Temp
ASH
ASH
ASH

Service Product No. of pumps


m³/hr (MBD) (kPa) ⁰C
LEADS

LEADS
LEADS
ALL

ALL
ALL

YNJ-1 PG 91 /95 530 (80) 3* 13479.3 75


YNJ-2 DO /DPK 744 (112.33) 3* 13451.7 75
*Fourth pump shall be installed during Phase-II.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The scope for the YNJ-1 & YNJ-2 pumps is outlined in PFDs VA-247844.001 &
DESCRIPTION

VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.


ISSUED FOR 60% FEL3

B. MECHANICAL – ROTATING EQUIPMENT

B.01 BOOSTER PUMPS

GASOLINE BOOSTER PUMPS (X40-G-0020 A/B/C)


JO/EWO

Gasoline booster pumps shall be in accordance with 31-SAMSS-004 and shall be


of Vertical Can type centrifugal pumps (API VS6 or VS7) due to low NPSH
10-02399-

availability. These pumps are provided to meet the high NPSHR of shipper pumps.
10-02399-
10-02399-
0001

0001
0001
DATE

Pumps will be limited to maximum of 1800 RPM. Pump materials, mechanical


seals shall be in accordance with SAES-G-005. Reference shall be made to
09/08/16
08/04/16
06/01/16

datasheet no. RE-E00103 included in Index-G.


NO.
REV

DISCIPLINE
ENGINEER
DIESEL/DPK BOOSTER PUMPS (X40-G-0018 A/B/C)
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
Diesel/DPK booster pumps shall be in accordance with 31-SAMSS-004 and shall
09/08/16 be of between bearings, horizontal split casing type Centrifugal pumps (API BB1).
DATE:
These pumps are provided to meet the high NPSHR of shipper pumps. Pump
CERTIFIED materials, mechanical seals shall be in accordance with SAES-G-005. Reference
A M ALMATROOK
09/08/16
shall be made to datasheet no. RE-E00101 included in Index-G.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
MISCELLANEOUS REQUIREMENTS
09/08/16

DATE:  Reference shall be made to technical specifications for pumps included


OPERATIONS
SHAHZAD YAZDANI in Index-A for further details of these pumps.
09/08/16

DATE:  Pump Datasheets provided in this package are preliminary only. These
will be further verified by CONTRACTOR during detailed design phase
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
of the project before issuing for procurement activities.
EDSD

DATE:

 CONTRACTOR shall be responsible for producing equipment


BY:

datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

ARAMCO standard forms and datasheets.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 All pumps will be procured by CONTRACTOR from SAUDI ARAMCO


approved manufacturer for each Commodity Classification Code (CCC).
SAUDI ARAMCO will provide the list of approved manufacturers after
REVISION

award of Contract.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 85


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall prepare Material Requisition Package for all the
pumps and shall obtain approvals from relevant SAUDI ARAMCO
ASH
ASH
ASH

Departments before issuing to Vendors.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 Technical quotations obtained from vendors will list all exceptions and
ISSUED FOR 60% FEL3

/or, additions to applicable project Drawings and SAUDI ARAMCO


Specifications. If there is no exception to specifications, CONTRACTOR
will make a statement to that effect.

 CONTRACTOR shall be responsible for Technical Bid Evaluation,


placing the Purchase Order to technically approved Vendors.

 CONTRACTOR shall be responsible for review and approval of NMRs


JO/EWO

601, 602 and 603.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Inspection and Testing of CONTRACTOR supplied materials will be


performed as per applicable SAUDI ARAMCO Inspection Requirement
09/08/16
08/04/16
06/01/16

form A-175. CONTRACTOR will arrange with his sub suppliers to


NO.
REV

DISCIPLINE
ENGINEER
comply with these requirements by stating on all sub suppliers’
purchase order SAUDI ARAMCO’s intention to inspect material.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER  Equipment installation and Commissioning shall be in accordance with
09/08/16 approved Vendor’s installation and commissioning procedures.
DATE:
CERTIFIED
A M ALMATROOK  Supply of Commissioning and Start-up spares and first fill of all the
09/08/16 lubricants and chemicals is in the scope of CONTRACTOR.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
CONTRACTOR shall obtain approval of Aramco Operations before
AGENCY
09/08/16 filling of lubricants and chemicals.
DATE:
OPERATIONS
SHAHZAD YAZDANI
 CONTRACTOR will provide all Non Material Requirement (NMR-
09/08/16 602/603), Operation and Instruction Manuals of CONTRACTOR
DATE: supplied material in electronic format (Latest Acrobat Reader).
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  CONTRACTOR will provide critical spare parts for CONTRACTOR


EDSD

supplied items in accordance with SAEP-3101. Contractor will develop


DATE:

list of critical plant equipment spares and identification.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

B.02 SHIPPER PUMPS

GASOLINE SHIPPER PUMPS (X40-G-0021 A/B/C)


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 86


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Gasoline Shipper pumps shall be in accordance with 31-SAMSS-004 and shall be
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
of between bearing, vertical split casing type centrifugal pumps (API BB5). Pump
materials, mechanical seals are in accordance with SAES-G-005. Reference shall
ASH
ASH
ASH

be made to datasheet no. RE-E00104 included in Index-G.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Shipper pumps shall be provided with forced type lubrication system i-e lube oil
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
Each shipper pump will also have a Vibration Monitoring System in accordance
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

with applicable SAUDI ARAMCO Standards.


DESCRIPTION

Gasoline Shipper Pumps have gone through Novation Procurement by the design
ISSUED FOR 60% FEL3

contractor. These pumps shall be novated to the LSTK Contractor upon award of
the contract and all relevant details of the purchase order and Novation terms will
be handed over to the successful LSTK contractor. The purchase requisition is
attached for reference in Appendix 11.

DIESEL/DPK SHIPPER PUMPS (X40-G-0019 A/B/C)

Diesel/DPK Shipper pumps shall be in accordance with 31-SAMSS-004 and shall


JO/EWO

be of between bearing, vertical split casing design centrifugal pumps (API BB5).
Pump materials, mechanical seals shall also be in accordance with SAES-G-005.
10-02399-

10-02399-
10-02399-

Reference shall be made to datasheet no. RE-E00102 included in Index-G.


0001

0001
0001
DATE

Shipper pumps will be provided with forced type lubrication system i-e lube oil
09/08/16
08/04/16
06/01/16
NO.
REV

skids will be provided in accordance with applicable SAUDI ARAMCO Standards.


DISCIPLINE
ENGINEER Each shipper pump will also have Vibration Monitoring System in accordance with
C

applicable SAUDI ARAMCO Standards


A

DATE:
PROJECT
ALL LEADS
ENGINEER Diesel Shipper Pumps have gone through Novation Procurement by the design
09/08/16 contractor. These pumps shall be novated to the LSTK Contractor upon award of
DATE: the contract and all relevant details of the purchase order and Novation terms will
CERTIFIED
A M ALMATROOK be handed over to the successful LSTK contractor. The purchase requisition is
09/08/16 attached for reference in Appendix 11.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
MISCELLANEOUS REQUIREMENTS
DATE:  Reference shall be made to technical specifications for pumps included
OPERATIONS
SHAHZAD YAZDANI
in Index-A for further details of these pumps.
09/08/16

DATE:
 Pump Datasheets provided in this package are preliminary only. These
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
will be further verified by CONTRACTOR during detailed design phase
EDSD

of the project.
DATE:

 CONTRACTOR shall be responsible for producing equipment


BY:

datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ARAMCO standard forms and datasheets.


(DCC) NO. _____________________

 CONTRACTOR shall be responsible for review and approval of NMRs


601, 602 and 603.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 87


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG  Inspection and Testing of CONTRACTOR supplied materials will be
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
performed as per applicable SAUDI ARAMCO Inspection Requirement
form A-175. CONTRACTOR will arrange with his sub suppliers to
ASH
ASH
ASH

comply with these requirements by stating on all sub suppliers’


LEADS

LEADS
LEADS
ALL

purchase order SAUDI ARAMCO’s intention to inspect material.


ALL
ALL

 Equipment installation and Commissioning shall be in accordance with


ISSUED FOR 100% PROJECT PROPOSAL

approved Vendor’s installation and commissioning procedures.


ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 Supply of Commissioning and Start-up spares and first fill of all the
ISSUED FOR 60% FEL3

lubricants and chemicals is in the scope of CONTRACTOR.


CONTRACTOR shall obtain approval of Aramco Operations before
filling of lubricants and chemicals.

 CONTRACTOR will provide all Non Material Requirement (NMR-


602/603), Operation and Instruction Manuals of CONTRACTOR
supplied material in electronic format (Latest Acrobat Reader).
JO/EWO

 CONTRACTOR will provide critical spare parts for CONTRACTOR


10-02399-

supplied items in accordance with SAEP-3101. Contractor will develop


10-02399-
10-02399-
0001

0001
0001
DATE

list of critical plant equipment spares and identification.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
C. INSTRUMENTATION
C
A

DATE: SHIPPER & BOOSTER PUMP STATIONS FOR P91/95, DO/DPK


PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall perform the following activities at the pump shipper and
DATE:
booster pump stations.
CERTIFIED
A M ALMATROOK
09/08/16  Provide and install field instrument as indicated in below P & IDs
DATE: and block diagrams IN-A00002.005/006/007/008.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
VA247917-001 P&ID-GASOLINE 95/91 BOOSTER PUMPS
DATE: VA247918-001 P&ID-GASOLINE 95/91 SHIPPER PUMPS
OPERATIONS
SHAHZAD YAZDANI
VA247918-002 P&ID-GASOLINE 95/91 SHIPPER PUMPS
09/08/16
VA247919-001 P&ID-DO/DPK BOOSTER PUMPS
DATE:
VA247920-001 P&ID-DO/DPK SHIPPER PUMPS
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 VA247920-002 P&ID-DO/DPK SHIPPER PUMPS


EDSD

DATE:
BY:

 Provide and install branch cables from field instruments to field


REVISIONCERTIFICATION

junction boxes as indicated in block diagrams IN-


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A00002.005/006/007/008.
(DCC) NO. _____________________

 Provide and install homerun cables from field junction boxes to


remote instrument buildings as indicated in IN-
A00002.005/006/007/008.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 88


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Provide and install cables from DCS/ESD IRP panels located in
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Substations to RIBs as indicated in IN-A00002.005/006/007/008.
ASH
ASH

 Provide and install vibration and bearing temperature junction boxes


as per block diagram IN-A00001.006
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Provide homerun cables from junction boxes to VMS Marshaling


Cabinets and system racks located in respective RIBs.
 VMS system shall be connected to DCS via Modbus TCP/IP and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

hardwired to ESD remote I/O’s located in RIB buildings.


DESCRIPTION
ISSUED FOR 60% FEL3

 Reference drawings:

Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
IN-A00027 Instrument Points & Lines
IN-D00201 Instrument Installation Schedule-Flow
JO/EWO

IN-D00202 Instrument Installation Schedule-Pressure


IN-D00203 Instrument Installation Schedule-Level
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

IN-D00204 Instrument Installation Schedule-Temperature


IN-D00205 Instrument Installation Schedule-Misc
09/08/16
08/04/16
06/01/16
NO.
REV

IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV


DISCIPLINE
ENGINEER IN-D00207 Instrument Installation Schedule-Relief Valves
C
A

IN-A00004 Equipment Layouts


DATE:
PROJECT
ALL LEADS
IN-A00003 Cable Routing Plan
ENGINEER
09/08/16 IN-D00005 Cable and Conduit Schedule
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
D. ELECTRICAL
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  CONTRACTOR shall utilize the one line diagrams attached to this package
to develop the detail design package for utilization within purchase orders
DATE:
OPERATIONS and for construction and commissioning.
SHAHZAD YAZDANI

09/08/16  CONTRACTOR shall use induction motors for all shipper pumps. Design of
DATE: induction motors shall be such that to achieve power factor equal or greater
than 0.95.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 Shipper pump motors power supply shall be from 13.8kV switchgear (Refer
EDSD

to drawing # EL-A10008). Auxiliary loads for these main pumps shall be


DATE:

from 480V control gears (refer to drawing # EL-A10014 to EL-A10017).


BY:


REVISIONCERTIFICATION

Booster pump motors power supply shall be from 4.16kV switchgear (Refer
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

to drawing # EL-A10011). Auxiliary loads for these main pumps shall be


(DCC) NO. _____________________

from 480V control gears (refer to drawing # EL-A00014 to EL-A00017).


 CONTRACTOR shall design, supply, install, test, pre-commission and
provide assistance in commissioning and integrated testing to insure fully
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 89


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG operational systems. All Electrical Control Panels and Stop-Start Stations
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH shall have Push-to-Test Multi-Cluster LED’s for indication.
ASH


ASH

CONTRACTOR shall design, supply and install and test Local Control Push
Button Stations appropriate for the areas of installation, Install control
LEADS

LEADS
LEADS
ALL

cables and conduits between control stations and the Interposing relay
ALL
ALL

panels or Control gear.


 Within Switchgear and Control gear switching assemblies and Starter
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Control panels for all motors 75 kW (100 HP) and larger, and all other
motors where the engineering documents indicate motor space heaters are
DESCRIPTION

installed, a contact shall be wired to a terminal block in the low voltage


ISSUED FOR 60% FEL3

compartment of the Switchgear Feeder or Control gear bucket, as


applicable, for connection to a 24VAC control circuit (panel shall be
designed and provided by THE CONTRACTOR) of a remotely mounted
motor space heater contactor. Contact shall be closed when the main motor
circuit contactor is de-energized. This is in accordance with SAES-P-116
and shall be provided, installed, tested, pre commissioned, and with
commissioning assistance, by THE CONTRACTOR.
JO/EWO

 CONTRACTOR shall be responsible for design, supply, installation and


testing of the interconnection wiring between Vendor supplied Electrical
10-02399-

Equipment and Skids and the parent equipment, field instruments, etc. and
10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall develop Wiring Interconnection Drawings, based on


Actual Vendor Certified NMR 602 Drawings and NMR 603 Manuals, to
09/08/16
08/04/16
06/01/16

SAUDI ARAMCO standards and submit to SAUDI ARAMCO for acceptance


NO.
REV

DISCIPLINE prior to termination of cabling.


ENGINEER
C
A

 CONTRACTOR shall develop Area Classification drawings at the beginning


DATE:
PROJECT
of detailed design phase and obtain SAUDI ARAMCO Approval. Equipment
ALL LEADS
ENGINEER installed in YDH area will be rated according to area classification layout
09/08/16
drawings (Refer to drawing #EL-A10003). Attached drawings shall be used
DATE: only as guide actual drawings shall be developed by the CONTRACTOR.
CERTIFIED
A M ALMATROOK
09/08/16
 CONTRACTOR to update the ETAP study provided during the detail
DATE: design.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
4.10Pump Operations for the Yanbu to Jiddah Pipeline
DATE:
OPERATIONS
SHAHZAD YAZDANI
A. GENERAL
09/08/16

DATE:
CONTRACTOR shall ensure the pump operation of the YNJ-1 and YNJ-2 pipelines
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
including, but not limited to the following facilities:
EDSD

Three (3) Booster and Three (3) shipper pumps shall be designed for YNJ-1 and
DATE:

YNJ-2. (Fourth pump shall be installed in phase-2) Pumps shall be electric motor
BY:

and fixed speed with spillback to tank being emptied.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The pipeline booster and shipper pumps shall be controlled locally from YDH but
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide viewing capabilities to OSPAS. Pump start-up


(DCC) NO. _____________________

philosophy shall be based on the start-up of a single shipper pump at a time and
not two or more shipper pumps simultaneously. CONTRACTOR shall co-ordinate
with BI-10-02155 for the operation philosophy required by the pipeline prior to
detail design and construction.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 90


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The scope for the YNJ-1 & YNJ-2 pumps’ operation is outlined in PFDs VA-
247844.001 & VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
ASH
ASH
ASH

4.11 Pipeline Connection from Grassroots-Yanbu Aramco Refinery


LEADS

LEADS
LEADS
ALL

ALL
ALL

A. GENERAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide provision in the receiving manifolds for the future
connections of PG 91/95, DO & DPK from Yanbu grass root refinery. A valve with a
DESCRIPTION

same size as of manifold (30”) shall be kept as provision in each of the product
ISSUED FOR 60% FEL3

manifold.

The scope for the pipeline connections from Yanbu Grass root refinery is outlined
in PFD VA-247835.001 and P&IDs VA-247894.001 to VA-247897.001.

B. PIPING

All pumps are located centrally with respective storage tanks, so that the pressure
JO/EWO

reduction due to pipe length from tank outlet to pump inlet is minimized to meet
process requirement.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Pumps are grouped to permit economical pipe routing with free space for future
pumps & possible extension of main pipe header for future expansion.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER Space for laydown areas has been considered for all pump bays which will be
C
A

required for pump maintenance purpose.


DATE:
PROJECT
ALL LEADS
ENGINEER The layout of pump suction-discharge lines, associated header lines & the
09/08/16 provision for future connection in PG95/PG91, DO, DPK shall be provided as per
DATE: branch connections with isolation valves with blinds as per piping plan (Ref. DCL
CERTIFIED
A M ALMATROOK No GEN-D0001 )
09/08/16
DATE:
CONSTRUCTION
CONTRACTOR shall provide branch connection with isolation valves with blind per
AMR EL SHARKAWY
AGENCY piping plan (Ref. Piping Plan listed in DCL No GEN-D0001) for future connection in
09/08/16
PG95/PG91, DO, DPK and Slop manifold
DATE:
OPERATIONS
SHAHZAD YAZDANI Based on surge study, it is proposed to add new Surge tank & associated facilities
09/08/16 inside SAMREF refinery, this has been shown as preliminary information in overall
DATE: plot plan. Exact location and feasibility study to be conducted after confirmation
CONTROL NUMBER

ALI H GHAMDI
during detail design phase. No piping plan and MTO considered in 90% submittal.
VERIFICATION

09/08/16
EDSD

4.12 Pipeline Connection from SAMREF Refinery


DATE:
BY:
REVISIONCERTIFICATION

A. GENERAL
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

YDH is designed to receive gasoline, diesel, and kerosene products from the
SAMREF refinery via three pipelines extending from the SAMREF tank farm to
YDH product manifolds. SAMREF existing export Pumps shall be utilized to supply
products (PG95/91, DO and DPK) to YDH.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 91


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The three pipelines will extend from the SAMREF manifold to YDH manifold of the
relevant product type. SAMREF export pumps shall supply the pressure to move
ASH
ASH
ASH

the product into YDH tank at full height.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design and install the three product pipelines from SAMREF
and their connections into YDH receiving manifolds including, but not limited to the
following facilities:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Tie-ins in existing piping at SAMREF


DESCRIPTION


ISSUED FOR 60% FEL3

Three product pipelines each for PG95/91, DO and DPK from SAMREF to
YDH.
 Three metering skids with two provers (1 for PG/DO and 1 for DPK) at
SAMREF
 Connections in YDH receiving manifolds for three product pipelines from
SAMREF.
 Surge relief system at SAMREF including SRVs, surge tank & pump.
 Fire water system connection

JO/EWO

Connection to oily water system.

YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

pipelines extending from the SAMREF tank farm to YDH receiving manifolds. The
SAMREF supply connection to YDH shall be taken from downstream of existing
09/08/16
08/04/16
06/01/16

export pumps at SAMREF. The required new metering skids shall be installed at
NO.
REV

DISCIPLINE SAMREF. The tie-ins will be taken from the SAMREF export lines going to their
ENGINEER
terminal near to the fence at King Fahad Road (RC Corridor). All new equipment
C
A

DATE:
shall also be installed at space available near to tie-ins.
PROJECT
ALL LEADS
ENGINEER
09/08/16
CONTRACTOR shall design and install three product pipelines each of 30” size for
PG95/PG91, DO and DPK. These pipelines will be connected at the discharge of
DATE:
CERTIFIED SAMREF export pumps. Accordingly, tie-ins will be taken from 24” existing pipes to
A M ALMATROOK
SAMREF terminal. CONTRACTOR shall design and install three custody metering
09/08/16
DATE:
skids each dedicated for PG95/PG91, DO and DPK at SAMREF. Each metering
CONSTRUCTION
AMR EL SHARKAWY skid shall consists of 3 meter runs (2 operating and 1 standby), two prover
AGENCY
09/08/16 assembly (1 for PG/DO and 1 for DPK) and a densitometer. These metering skids
DATE:
shall be interfaced with YDH through SAMREF.
OPERATIONS
SHAHZAD YAZDANI

09/08/16
CONTRACTOR shall install surge relief system for the new pipeline at SAMREF.
The surge relief system shall consist of surge relief valves discharging to a
DATE:
common tank from all pipelines. The product collected in the tank to be emptied to
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
the pipeline with the pump provided along with surge relief tank. Details of surge
EDSD

relief system at SAMREF are mentioned in section 4.7.


DATE:

Connections of oily water drain from metering skids and surge relief tank & pump
BY:

shall be finalized during detailed design. CONTRACTOR shall verify the tie-ins to
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

the drain / oily water system and shall connect the drains accordingly.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

The scope for the SAMREF pipelines and their connections into YDH receiving
manifolds is outlined in PFD VA-247834.001 and P&IDs VA-247878.001 to VA-
247885.001.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 92


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG B. PIPING
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
ASH
ASH
ASH

pipelines extending from the SAMREF tank farm to YDH product receiving
manifolds.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 The SAMREF supply connection to YDH shall be downstream of existing


export pumps. And the required new metering skids & injections skids shall be
installed at SAMREF.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL


DESCRIPTION

The main interface connection between this BI-10-02399 and others is at the
ISSUED FOR 60% FEL3

existing headers itself, i.e., from the SAMREF export lines going to their
terminal near to the fence at King Fahad Road (RC Corridor. Inside plant,
piping team will bring the connection to battery limit where inside plant piping
and these 3 YR - YDH pipelines interfaces.

 The tie-in details and routing of three pipelines are shown in piping plans, Tie-
in Index as per DCL No GEN-D0001. The drawings mentioned here are only
for reference; however these drawing to be verify during detail design.
JO/EWO

 New metering skid to be installed inside SAMREF refinery. (Ref. Plot plan
Drawing PIA00430-001). This drawing indicates tentative location only; it will
10-02399-

10-02399-
10-02399-
0001

be get freeze during detail design phase.


0001
0001
DATE

09/08/16
08/04/16


06/01/16

Based on surge study, new Surge tank & associated facilities inside SAMREF
NO.
REV

DISCIPLINE
refinery were added, exact location and feasibility study to be conducted after
ENGINEER confirmation during detail design phase.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER C. PIPELINE
09/08/16

DATE:
CERTIFIED
C.01 PURPOSE
A M ALMATROOK The following design basis has been established for YDH to be constructed by this
09/08/16 project.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 C.02 PIPELINE DESIGN BASIS
DATE:
OPERATIONS
Three product pipelines shall be constructed from SAMREF refinery to YDH receipt
SHAHZAD YAZDANI
manifolds. These pipelines shall handle diesel, DPK/kerosene and gasoline. The
09/08/16
gasoline pipeline shall transfer both PG91 and PG95 products in a batching
DATE:
operation.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
C.03 PIPELINE PHYSICAL INTERFACES
EDSD

DATE:

The main interface connection between this BI-10-02399 and SAMREF is at the
BY:

existing lines (SAMREF to Marine Terminal). Inside plant piping team will bring the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

connection to battery limit where inside plant piping and these 3 SAMREF - YDH
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

pipelines interfaces
(DCC) NO. _____________________

C.04 PRODUCT PIPELINE CORRIDOR


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 93


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The pipeline to be constructed for this project shall be routed through existing RC
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipeline corridors. Pipeline route from SAMREF is through pipeline corridor at BB
Avenue, going to the 4th street corridor and to the pipeline corridor in between
ASH
ASH
ASH

King Abdul-Aziz road and Haul road of the refineries. Each product pipeline is
approximately 11.0 km long from SAMREF to YDH. Each pipeline shall be design
LEADS

LEADS
LEADS
ALL

ALL
ALL

to have elevated horizontal U-Loops for flexibility.


CONTRACTOR shall verify the Pipeline route according to the Overall Pipeline
route DWG PP-A00005.001 and Piping Plans.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

C.05 PIPELINE PARAMETERS


DESCRIPTION
ISSUED FOR 60% FEL3

Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)


Design Temperature = 75°C
Corrosion Allowance = 1.6mm
Pipeline Diameter (D) = 30 inch
Pipe Specification = API-5L Grade X60
JO/EWO

Flange Rating = ASME Class 150


10-02399-

10-02399-
10-02399-

*Other Flow conditions are shown in the Line Designation Table see PID00442
0001

0001
0001
DATE

sheet 001 to 002 and PID00442 sheet 001 to 003.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE C.06 PIPELINE ROAD CROSSING


ENGINEER
C
A

DATE:
The three (3) 30” pipelines will cross eleven (11) roads as follow:
PROJECT
ALL LEADS
ENGINEER
09/08/16
Item Road Name PROPOSED Length (M) REF. DWG
No. CROSSING Approx.
DATE:
CERTIFIED TYPE
A M ALMATROOK
09/08/16
1 #1-King Fahd Road Thrust Boring 90 PP-
DATE: A00130.001
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
2 #2-Main Berth Access Road Thrust Boring 21 PP-
09/08/16 A00131.001
DATE: 3 #3-Causeway Road and piping Thrust Boring 45 PP-
OPERATIONS
SHAHZAD YAZDANI
Corridor A00131.002
09/08/16 4 #4-NGL Main Facilities Open Cut 23 PP-
DATE: A00132.001
5 #5-NGL Plant Entrance Road Thrust Boring 37 PP-
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 A00133.001
EDSD

6 #6-Access Road to Diners Open Cut 34 PP-


A00134.001
DATE:
BY:

7 #7- Al Mishani Street (Haul Road) Thrust Boring 25 PP-


A00135.001
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

8 #8-Approach Road(From/To Thrust Boring 47 PP-


YASREF) A00136.001
(DCC) NO. _____________________

9 #9-Approach Road(From/To YR) Thrust Boring 46 PP-


A00137.001
10 #10-King Abdul Aziz Road Thrust Boring 55 PP-
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 94


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
Item Road Name PROPOSED Length (M) REF. DWG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
No. CROSSING Approx.
TYPE
ASH
ASH
ASH

A00138.001
11 #11-Shareh Al Awel Thrust Boring 126 PP-
LEADS

LEADS
LEADS
ALL

ALL
ALL

A00139.001

Thrust boring procedure shall be done by the approved SAUDI ARAMCO Thrust boring
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

contractor and pipe shall be coated as per SAES-H-002 Para. 5.1.2. and 5.4.4.
DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.

CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required and detour for open cut
road crossings.

CONTRACTOR shall conduct detailed geotechnical investigation at road crossing


JO/EWO

location to assess soil condition to determine methodology to be used for thrust boring
option.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
09/08/16
08/04/16
06/01/16

for above & underground transitions at road crossings and interface points (between
NO.
REV

DISCIPLINE
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO Standard
ENGINEER requirements for cathodic protection.
C
A

DATE:
PROJECT
CONTRACTOR shall review the proposed road crossing techniques and prepare a
ALL LEADS
ENGINEER complete construction packages and seek approval from SAUDI ARAMCO, YRC and
09/08/16
relevant local authorities at early stage of project design.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
09/08/16 pipeline road crossings, wherever it entails time and safety advantages to the project..
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
SAMREF pipeline drawings submitted to YRC for road crossings are attached under
Appendix 2.
DATE:
OPERATIONS
SHAHZAD YAZDANI
D. INSTRUMENTATION
09/08/16

DATE:
CONTRACTOR shall perform the following activities in SAMREF
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Provide and install Three (3) custody metering skids for PG91/95, DO and DPK
EDSD

with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall be
DATE:

as per SAES-Y-103. The metering skids field instrumentation shall be integrated to


BY:

metering and control cabinets such as flow computer cabinet, PLC cabinet and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

MSC cabinet. A vendor supplied metering shelter shall be provided to house these
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

cabinets.
(DCC) NO. _____________________

The CONTRACTOR shall supply the Gas detection sensors field mounted beacon
and horns in the metering shelter.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 95


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Skid Vendor/LSTK shall supply prefab air-conditioned Metering Shelter constructed
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
in compliance with electrical area classification requirements and Saudi Aramco
/SAMREF Standards.
ASH
ASH
ASH

The CONTRACTOR shall provide a new DCS Controller with input-output modules
LEADS

LEADS
LEADS
ALL

ALL
ALL

and a separate FTA/marshalling cabinet to integrate new field instruments added


by BI-10-02399 in SAMREF facility. The DCS cabinets shall be installed in
metering shelter. The Metering Supervisory Computer (MSC) shall be interfaced to
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

DCS via open industry standard protocol such as Modbus TCP/IP, OPC etc. Refer
block diagram IN-A00001.009 for Custody Metering System.
DESCRIPTION
ISSUED FOR 60% FEL3

The CONTRACTOR shall provide redundant fiber optic cables between metering
shelter and nearest OMS control building in the tank farm area of SAMREF. The
new DCS shall be tied to the existing plant control network at OMS control room.
The HMI station at OMS control room will be updated with the new instrumentation
added by BI-10-02399.

The new ESD valves added by BI-10-02399 at the battery limit of SAMREF facility
shall be integrated to existing ESD system. The contractor shall provide new
JO/EWO

junction boxes and cables. The ESD marshalling cabinet OMMRS01 shall be used
to terminate ESD cables at OMS Rack-room.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

The CONTRACTOR shall provide junction boxes and field homerun cables as
indicated in block diagram# IN-A00001.007
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER The YDH control system shall be interfaced to SAMREF control system to have
C
A

READ ONLY access to the data points such as the CMS, EIV status and Pump
DATE: status and tank status. The data is to be exchanged via plant DMZ through PI
PROJECT
ALL LEADS
ENGINEER system at both the facilities. New fiber optic cable is to be laid from SAMREF to
09/08/16
YDH for the data exchange.
DATE:
CERTIFIED
A M ALMATROOK As alternate method, LSTK CONTRACTOR shall evaluate the
DATE:
09/08/16
implementation of the MODBUS TOFINO Firewall method within P&CSD
CONSTRUCTION
AMR EL SHARKAWY concurrence once PCS vendor is selected.
AGENCY
09/08/16
CONTRACTOR shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
DATE:
OPERATIONS 1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
SHAHZAD YAZDANI

09/08/16
A00435/36/37/38. Provide and install Junction boxes and lay homerun cable IC-
0116/117/124/125 up to new DCS Marshalling Cabinet in located in metering
DATE:
shelter.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
CONTRACTOR shall provide and install ZV-1112/1212/1312 and install cable IC-
EDSD

0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
DATE:

Contractor shall utilize existing cable tray to run home cable from junction to OMS
BY:

control room.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

THE CONTRACTOR shall provide and install field instruments such as surge relief
(DCC) NO. _____________________

System as indicated in P &IDs VA-247878-001 and VA-247879-001and VA-


247880-001 and as per block diagram IN-A00001.012
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 96


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG THE CONTRACTOR shall Provide and install field junction box X40-AJB-001 &
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
X40-EAJB-001 and DJB-003 lay homerun cable IC-3029,IC-3032,IC-3039 from JB
to OMS control room.
ASH
ASH
ASH
LEADS

LEADS
LEADS

THE CONTRACTOR shall provide and install cables between IRP panels located
ALL

ALL
ALL

in substation to OMS control room.


Installation shall be as per below reference drawings
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

J8DF5007-001 OMS CONTROL ROOM LAYOUT


ISSUED FOR 60% FEL3

232J081-001 BLOCK DIAGRAM, OM & S CONTROL HOUSE


IN-A00001.009 SAMREF CUSTODY METERING SKIDS
IN-A00001.007 SAMREF INTERFACE
IN-A00001.012 SAMREF INTERFACE
IN-E00031 DCS INPUT-OUTPUT LIST
IN-E00032 ESD INPUT-OUTPUT LIST
IN-D00030.001 CABLE AND CONDUIT SCHEDULE
JO/EWO

IN-E000000 FSD- DISTRIBUTED CONTROL SYSTEM


10-02399-

IN-E000000 TSD-DCS MODIFICATION-SAMREF DCS


10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16
NO.
REV

E. ELECTRICAL
DISCIPLINE
ENGINEER
SAMREF shall supply all electrical power and connections required for MOVs and
C
A

DATE: other miscellaneous loads.


PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR scope shall include but not be limited to Design Two (2nos.) 480V,
DATE: 100A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X) with all cables, conduits,
A M ALMATROOK
CERTIFIED supports structures and other required accessories to feed power to MOVs and
09/08/16 other miscellaneous loads (refer to drawing # EL-A10052 located in Appendix
DATE: 13.2.4).
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
CONTRACTOR scope shall include but not be limited to Design for one (1), 10KVA
DATE: UPS including cables, conduit and other required accessories in Substation # 12 at
OPERATIONS
SHAHZAD YAZDANI SAMREF.
09/08/16

DATE: CONTRACTOR shall Provide Lighting and Grounding system in compliance with
SAUDI ARAMCO Standards by utilizing existing system.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

F. CIVIL
DATE:
BY:

A 6.0m wide asphalt access road shall be provided. Road structure shall be as per
section 4.20 (In-Plant roads).
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Oily water drainage system shall be provided and tie-in the new oily water line to
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

the nearest available OWS system.


(DCC) NO. _____________________

E. Telecom
REVISION

For FOC cable road crossing, refer to Appendix 2


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 97


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH 4.13 Pipeline Connection from YASREF Refinery
ASH
ASH

A. GENERAL
LEADS

LEADS
LEADS
ALL

ALL
ALL

YDH is designed to receive gasoline and diesel products from the YASREF refinery
via two pipelines. The pipeline connection will be downstream of the YASREF
pumps to utilize the pump as the pressure source to move the product into a full
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

tank at YDH. YDH pipeline connection shall not interfere with the transfer operation
of product flowing from YASREF to Yanbu as per the project BI-10-00043, Yanbu
DESCRIPTION

Refinery Clean Fuels – YASREF Interface.


ISSUED FOR 60% FEL3

CONTRACTOR shall design and install the two product pipelines from YASREF
and their connections into YDH receiving manifolds including, but not limited to the
following facilities:

 Two tie-ins in pipes at Yanbu Refinery


 Two product pipelines each for PG95/91 and DO from tie-in
 Interfacing of both custody metering skids from YASREF to YDH
JO/EWO

 Connections in YDH receiving manifolds for two product pipelines from


YASREF
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Two pipelines (one for DO and one for PG 95/91) along with metering skids at
09/08/16
08/04/16
06/01/16

YASREF shall be provided under BI-10-00043. This project will tie-in to the
NO.
REV

DISCIPLINE
downstream of the metering skid and isolation valve (outside YASREF battery limit,
ENGINEER inside the Yanbu refinery ) to utilize the existing export pumps and new metering
C
A

skids provided by BI-10-00043, for the supply to YDH. The tie-in locations to the
DATE:
PROJECT
pipeline will be inside the Yanbu refinery and BI-10-00043 will provide a manual
ALL LEADS
ENGINEER valve on both pipelines for tie-ins to YDH. CONTRACTOR shall co-ordinate with
09/08/16
BI-10-00043 for the tie-in location before detail design.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall design and install two product pipelines each of 30” size for
09/08/16 PG95/PG91 and DO. Tie-ins will be taken accordingly in the 30” pipeline to YR
DATE:
CONSTRUCTION
AMR EL SHARKAWY
under BI-10-00043 scope. Two custody metering skids to be installed under BI-10-
AGENCY
09/08/16
00043 shall be interfaced with YDH.
DATE:
OPERATIONS
The scope for the YASREF pipelines and their connections into YDH receiving
SHAHZAD YAZDANI
manifolds is outlined in PFD VA-247833.001 and P&IDs VA-247876.001 & VA-
09/08/16
247877.001.
DATE:
CONTROL NUMBER

ALI H GHAMDI
B. PIPING
VERIFICATION

09/08/16
EDSD

YDH shall receive PG 91/95 and DO products from the YASREF via two pipelines.
DATE:

The pipeline supply to YDH will connect to the pipeline provided by BI-10-00043.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The location of Tie in connection of PG91/95 (Tie-in No. V25-023) & DO (Tie-in No.
(DCC) NO. _____________________

V25-025) from YASREF will be taken near the entrance of YR or inside the YR.
The exact location will be decided during detail design stage & co-ordination with
BI-10-00043.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 98


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The tie-in details and routing of two pipelines are shown in PIB00451.001 & piping
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
plan dwg no. PI-A00403.004 located in DCL no GEN-D0001. The drawing
mentioned here are only for reference.
ASH
ASH
ASH

The dye injection skid & associated facilities for YASREF product pipeline for
LEADS

LEADS
LEADS
ALL

ALL
ALL

PG91/95 will be provided inside boundary limit of YDH.

Based on surge study, new Surge lines & associated facilities were added inside
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

YANBU refinery, exact location and feasibility study to be conducted after


confirmation during detail design phase.
DESCRIPTION
ISSUED FOR 60% FEL3

C. PIPELINE

C.01 PURPOSE

The following design basis has been established for YDH to be constructed by this
project.
JO/EWO

C.02 PIPELINE DESIGN BASIS


10-02399-

10-02399-
10-02399-

The two new 30-inch product pipelines shall tie-in to the existing YASREF refinery
0001

0001
0001
DATE

lines going to the YDH receipt manifolds. The pipeline shall handle diesel and
gasoline. The gasoline pipeline shall transfer both PG91 and PG 95 products in a
09/08/16
08/04/16
06/01/16
NO.
REV

batching operation.
DISCIPLINE
ENGINEER
C

C.03 PIPELINE PHYSICAL INTERFACES


A

DATE:
PROJECT
ALL LEADS
ENGINEER These products, diesel and gasoline, shall be transferred from YASREF to YANBU
09/08/16 refinery as part of BI-10-00043. The tie-in to these two pipelines will be to manual
DATE: Tie-in Globe Valves (provided by BI-10-00043) located inside the perimeter fence
CERTIFIED
A M ALMATROOK of YANBU refinery, the physical interface shall be at the flange provided by plant
09/08/16 piping team.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY C.04 PRODUCT PIPELINE CORRIDOR
09/08/16

DATE: The pipeline to be constructed for this project shall be routed through new pipeline
OPERATIONS
SHAHZAD YAZDANI corridors. Pipeline route from YANBU refinery is through a thrust boring starting
09/08/16 from inside YANBU refinery and going to cross SSD fence, Haul Road, King
DATE: Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
CONTROL NUMBER

ALI H GHAMDI
approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
VERIFICATION

09/08/16 Each pipeline shall be designed to have elevated horizontal U-Loops for flexibility.
EDSD

C.05 PIPELINE PARAMETERS


DATE:
BY:
REVISIONCERTIFICATION

Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Design Temperature = 75°C


(DCC) NO. _____________________

Corrosion Allowance = 1.6mm


Pipeline Diameter (D) = 30 inch
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 99


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Pipe Specification = API-5L Grade X60
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Flange Rating = ASME Class 150
ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

*Other Flow conditions are shown in the Line Designation Table see PID0450
ALL
ALL

sheet 001 to 002.

C.06 PIPELINE ROAD CROSSING


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

The two (2) pipelines will cross Three (3) roads as follows:
ISSUED FOR 60% FEL3

Item Road Name PROPOSED Length (M) REF. DWG


No. CROSSING Approx.
TYPE
1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001
Road
2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001
3 #12-Haul Road (Yanbu Thrust Boring 69 PP-A00150.001
JO/EWO

Refinery
10-02399-

10-02399-

CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
10-02399-
0001

0001
0001
DATE

during detailed design.


09/08/16
08/04/16
06/01/16
NO.
REV

CONTRACTOR shall provide all adequate civil /structural arrangements for road
DISCIPLINE
ENGINEER
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall conduct detailed geotechnical investigation at road crossing
09/08/16 location to assess soil condition to determine methodology to be used for thrust boring
DATE:
option.
CERTIFIED
A M ALMATROOK
09/08/16
CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
DATE: for above and underground transitions at road crossings and interface points (between
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO
09/08/16 Standard requirements for cathodic protection.
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall review the proposed road crossing techniques and prepare a
09/08/16 complete construction packages and seek approval from SAUDI ARAMCO, YRC and
DATE: relevant local authorities at early stage of project design.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
EDSD

pipeline road crossings, wherever it entails time and safety advantages to the project..
DATE:
BY:

YASREF pipeline drawings submitted to YRC for road crossings attached.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

D. INSTRUMENTATION
(DCC) NO. _____________________

YDH control system shall be interfaced to YASREF control system to have


READ ONLY access to the data points such as the CMS, EIV status and Pump
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 100


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG status. The data is to be exchanged via plant DMZ through PI system at both
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH the facilities.
ASH
ASH

As alternate method, LSTK CONTRACTOR shall evaluate the implementation


of the MODBUS TOFINO Firewall method within P&CSD concurrence once
LEADS

LEADS
LEADS
ALL

ALL
ALL

PCS vendor is selected.

Contractor shall provide new fiber optic cable from YASREF to YDH for the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

data exchange. The interface is shown in preliminary block # IN-A00001.004


DESCRIPTION

Contractor shall coordinate with Refinery Control System Vendor for the
ISSUED FOR 60% FEL3

interface requirements.

F. Telecom

For FOC cable road crossing, refer to Appendix 2

4.14Pipeline Connection from Yanbu Refinery Terminal


JO/EWO

A. GENERAL
10-02399-

10-02399-
10-02399-

YDH is designed to receive PG 91, PG 95, Diesel, and Kerosene from the Yanbu
0001

0001
0001
DATE

Refinery Terminal. Three pipelines will connect into the Yanbu Refinery Terminal
offload pipelines at a location just upstream of the Existing Aramco refinery tank
09/08/16
08/04/16
06/01/16
NO.
REV

farm to utilize the vessel offload pump as the primary pressure source and the
DISCIPLINE
ENGINEER existing marine loading & transfer pumps as booster pumps to move the product
into a full tank at YDH. The new connections shall be designed not to interfere with
C
A

DATE: the current vessel offload operations


PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall design and install the three product pipelines each of 24” size
DATE: from Yanbu Refinery Terminal (YRT) through Yanbu Refinery (YR) and their
A M ALMATROOK
CERTIFIED connections into YDH receiving manifolds including, but not limited to the following
09/08/16 facilities:
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY  Tie-ins in existing piping at YR
09/08/16
 Three product pipelines each for PG95/91, DO and DPK from YR to
DATE: YDH
OPERATIONS
SHAHZAD YAZDANI  Connections in YDH receiving manifolds for three product pipelines from YRT
09/08/16
 Surge relief system at YR including SRVs, surge tank & pump.
DATE:
 Fire water system connection
CONTROL NUMBER

ALI H GHAMDI

VERIFICATION

Connection to oily water system.


09/08/16
EDSD

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
DATE:

through three pipelines extending from Yanbu refinery tank farm to YDH. The
BY:

interface to the terminal unloading lines will be at Yanbu refinery tank farm. The
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

primary source for the supply of products to YDH shall be the pumps on the ship
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and the existing marine loading & transfer pumps shall be used as booster pumps
(DCC) NO. _____________________

to move the product into a full tank at YDH.

CONTRACTOR shall design and install three product pipelines each of 24” size for
PG95/PG91, DPK and DO. These pipelines will be connected at the discharge of
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 101


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG existing marine loading & transfer pumps. Pump suction side shall be connected to
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
new lines that are tied into existing lines coming from YRT. Accordingly, tie-ins will
be taken from the existing pipes at existing pump suction & discharge side and
ASH
ASH
ASH

existing pipes coming from YRT.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall install surge relief system for the new pipelines of YASREF
and YR at Yanbu refinery. The surge relief system shall consist of surge relief
valves discharging to a common tank from all pipelines. The product collected in
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

the tank to be emptied to the pipeline with the pump provided along with surge
relief tank. Details of surge relief system at SAMREF are mentioned in section 4.7.
DESCRIPTION

<This requirement is on hold until approval of surge analysis report from P&CSD>
ISSUED FOR 60% FEL3

Connection of oily water drain from surge relief tank & pump shall be finalized
during detailed design. CONTRACTOR shall verify the tie-ins to the oily water
system and shall connect the drain accordingly.

The scope for the YRT pipelines and their connections into YDH receiving
manifolds is outlined in PFDs VA-239708.002, VA-250323.001, VA-250324.002 &
VA-250325.002 and P&IDs VA-239739.001, VA-234308.015, VA-234308.020, VA-
JO/EWO

234308.026 & VA-234308.027.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

B. PIPING
09/08/16
08/04/16
06/01/16
NO.
REV

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
DISCIPLINE
ENGINEER through three pipelines extending from Yanbu refinery tank farm to YDH. The
C

interface to the terminal unloading lines will be at Yanbu refinery tank farm.
A

DATE:
PROJECT
ALL LEADS
ENGINEER The primary source for the supply of products to YDH shall be by utilizing the
09/08/16 existing pumps installed at Yanbu Refinery Tank farm near to available space
DATE: towards YRT fence to feed to YDH.
CERTIFIED
A M ALMATROOK
09/08/16  To install new feed line for Gasoline (PG91/PG95) to YDH, tie-in at the 18”
DATE:
CONSTRUCTION
AMR EL SHARKAWY
common header of Gasoline loading and Transfer pumps (V25-P-P17 A-E)
AGENCY
09/08/16 to be taken at Yanbu Refinery near Pump Station-C.
DATE:
OPERATIONS  To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
SHAHZAD YAZDANI

09/08/16
common header of Kerosene loading and Transfer pumps (V25-P22 A/B/C)
to be taken at Yanbu Refinery near Pump Station-B.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  To install new feed line for Diesel(DO) to YDH ,Tie-in at the 20”MDO
EDSD

common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to


be taken at Yanbu Refinery near Pump Station-B.
DATE:
BY:

The Layout of feed lines from existing header lines to Interface connection
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

with pipeline near YR battery limit, refer to section C.03 for detailed
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

description.
(DCC) NO. _____________________

 OWS UG/AG connection shall be verified during detail design Phase.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 102


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH C. PIPELINE
ASH
ASH

C.01 PURPOSE
LEADS

LEADS
LEADS
ALL

ALL
ALL

The following design basis has been established for YDH to be constructed by this
project.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

C.02 PIPELINE DESIGN BASIS


DESCRIPTION

Three product pipelines shall be constructed from YANBU refinery terminal to YDH
ISSUED FOR 60% FEL3

receipt manifolds. The pipeline shall handle diesel, both grades of gasoline, and
DPK/kerosene. The gasoline pipeline shall transfer both PG91 and PG 95
products in a batching operation.

C.03 PIPELINE PHYSICAL INTERFACES

The main interface connection between this BI-10-02399 and others is at the
existing headers itself and not elsewhere. Inside plant piping team will bring the
JO/EWO

connection to battery limit where inside plant piping and these 3 YR - YDH
pipelines interfaces
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

C.04 PRODUCT PIPELINE CORRIDOR


09/08/16
08/04/16
06/01/16
NO.
REV

The pipeline to be constructed for this project shall be routed through new pipeline
DISCIPLINE
ENGINEER corridors. Pipeline route from YANBU refinery is through Thrust Boring starting
C

from inside YANBU refinery and going to cross existing SSD fence, Haul Road,
A

DATE: King Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
PROJECT
ALL LEADS
ENGINEER approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
09/08/16 Each pipeline shall be design to have elevated horizontal U-Loops for flexibility.
DATE: CONTRACTOR shall verify the Pipeline route according to the Overall Pipeline
CERTIFIED
A M ALMATROOK route DWG PP-A00005.001 and Piping Plans.
09/08/16
DATE:
C.05 PIPELINE PARAMETERS
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)
DATE:
OPERATIONS
SHAHZAD YAZDANI
Design Temperature = 75°C
09/08/16 Corrosion Allowance = 1.6mm
DATE:
Pipeline Diameter (D) = 24 inch
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Pipe Specification = API-5L Grade X60


EDSD

Flange Rating = ASME Class 150


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

*Other Flow conditions are shown in the Line Designation Table see PID00402
(DCC) NO. _____________________

sheet 001 to 004.

C.06 PIPELINE ROAD CROSSING


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 103


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The three (3) pipelines will cross three (3) roads as follow:
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Item Road Name CROSSING TYPE Length(M) REF. DWG
ASH
ASH
ASH

No. Approx.
1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001
LEADS

LEADS
LEADS
ALL

ALL
ALL

Road
2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001
3 #12-Haul Road Thrust Boring 69 PP-A00150.001
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

(Yanbu Refinery
DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.

CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required.

CONTRACTOR shall conduct detailed geotechnical investigation at road crossing


location to assess soil condition to determine methodology to be used for thrust boring
JO/EWO

option.
10-02399-

10-02399-
10-02399-
0001

0001

CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
0001
DATE

for above & underground transitions at road crossings and interface points (between
09/08/16
08/04/16
06/01/16

Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO
NO.
REV

DISCIPLINE
STANDARD requirements for cathodic protection.
ENGINEER
C
A

CONTRACTOR can consider thrust boring thru the Micro-Tunneling Method (MTM) for
DATE:
PROJECT
pipeline road crossings, wherever it entails cost, time and safety advantages to the
ALL LEADS
ENGINEER project with previous SAUDI ARAMCO approval.
09/08/16

DATE: SAMREF pipeline drawings submitted to YRC for road crossings to be attached.
CERTIFIED
A M ALMATROOK
09/08/16 D. INSTRUMENTATION
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide and install field instruments, Motor Operated
DATE:
and Electrohydraulic ESD valves at the battery limit of Yanbu Refinery,
OPERATIONS
SHAHZAD YAZDANI
MOVs shall also be provide at the tie-in locations.
09/08/16

DATE:
CONTRACTOR shall provide and install new homerun cables from valves
up to the existing SIH-1590 (Satellite Instrument House) in tank farm area.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 SIH-1590 is expanded under BI-10-00043, the project shall coordinate with
EDSD

BI-10-00043 shall to reserve the space required by this BI. All new EIVs will
be connected to new ESD Marshalling Cabinet provided by BI-10-00043. BI-
DATE:
BY:

10-02399 will provide required input-output modules to integrate to ESD


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

system provided under BI-10-00043.


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

All non-ESD instruments will be connected to new DCS Marshalling Cabinet


provided by BI-10-00043. BI-10-02399 will provide required input-output
modules to integrate to DCS system provided under BI-10-00043.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 104


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
SIH-1590 will be expanded under BI-10-00043 to accommodate the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
expansions under this BI. The DCS/ESD provided under BI-10-00043 will be
integrated to YR plant network.
ASH
ASH
ASH
LEADS

New instrumentation provided under BI-10-02399 will be controlled from YR


LEADS
LEADS
ALL

ALL
ALL

tank farm control room and the HMIs at tank farm control room will be
updated accordingly.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control


DESCRIPTION

system to YDH provides View only signals related to product transfer. The
ISSUED FOR 60% FEL3

data points shall be the status of product pumps and EIVs such as running,
stopped, tripped etc. The requirements of data from Yanbu Refinery shall be
further evaluated during Detail design phase in coordination with YDH and
YREF operations.

The interface shall be through PI system installed at both the facility, DMZ
shall be used in order to make the data exchange highly secured.
JO/EWO

Contractor shall provide fiber cables between YREF and YDH.


10-02399-

10-02399-
10-02399-

As alternate method, LSTK CONTRACTOR shall evaluate the


0001

0001
0001
DATE

implementation of the MODBUS TOFINO Firewall method within P&CSD


concurrence once PCS vendor is selected.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER CONTRACTOR shall provide and install new junction boxes, branch cables,
C
A

homerun cables for instruments added by this BI.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
The field installation shall be as per P & IDs VA-247876/877 and
VA-234308.015/020/027 and Piping Plans PI-A00403.004, VA-236952.001,
DATE:
CERTIFIED VA-236952.002, VA-236956.001, VA-236956.002 and VA-236960.002
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall provide and install field instruments such as surge
09/08/16
relief System as indicated in P &IDs PR-A00001.Sht001 & 002 and VA-
DATE: 234308-015 and VA-234308-Sht 020 and Sht027 as per block diagram IN-
OPERATIONS
SHAHZAD YAZDANI A00001.013
09/08/16

DATE:
CONTRACTOR shall Provide and install field junction box X40-AJB-001 &
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 X40-EAJB-004 and DJB-007 lay homerun cable IC-2071,IC-2074,IC-2064


EDSD

from JB to SIH-1590 Building.


DATE:
BY:

CONTRACTOR shall provide and install cables between IRP panels located
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

in substation to SIH-1590 Building.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall run homerun cables from Junction boxes to SIH-1590


utilizing existing cable trays. Refer drawing VA-549870.001 for cable routing.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 105


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
Reference Drawings:
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH

Drawing# Description
ASH

IN-A00001.008 Block Diagram-Yanbu Refinery


LEADS

LEADS
LEADS
ALL

ALL
ALL

IN-A00001.013 Instrument Block Diagram


VA-549870.001 Cable/Conduit Layout
VA-549714.002 System Architecture PCS Tank Farm
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

IN-D00031.001 Cable and Conduit Schedule


DESCRIPTION

IN-E00000 Technical Specification Document -DCS Modification


ISSUED FOR 60% FEL3

IN-E00033 DCS INPUT-OUTPUT LIST


IN-E00034 ESD INPUT-OUTPUT LIST

G. ELECTRICAL

Yanbu’ Refinery shall supply all electrical power and connections required for
MOVs and other miscellaneous loads. Total electrical loads anticipated are about
JO/EWO

78.5kVA Two (2) 480V, 150A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X)
shall be provided to feed power to MOVs and other miscellaneous loads. (Refer to
10-02399-

10-02399-
10-02399-

drawing # EL-A10111).
0001

0001
0001
DATE

CONTRACTOR shall utilize existing space in V21-MC71A, V21-MC81A & V21-


09/08/16
08/04/16
06/01/16
NO.
REV

MC91A at Substation no-7, 8 & 9 for three (3nos.) 100AF new circuit breakers to
DISCIPLINE
ENGINEER feed new MOV power panels (Refer drawing # VA-240892-001, VA-240893.002 &
C

VA-240894.002).
A

DATE:
PROJECT
ALL LEADS
ENGINEER CONTRACTOR shall coordinate with YANBU refinery to utilize the existing feeders
09/08/16
of YANBU substation to feed the power to newly added 150A, 480V, Switchrack at
DATE:
CERTIFIED
Tank Farm area.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall supply and install One (1) No. 150A, 480V Switchrack near
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
tank farm area to feed the power to newly added Surge relief pump (X40-
09/08/16
X004A/B).
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall Provide Lighting and Grounding system in compliance with
09/08/16 SAUDI ARAMCO Standards by utilizing existing system.
DATE:
CONTROL NUMBER

ALI H GHAMDI
H. Telecom
VERIFICATION

09/08/16
EDSD

For FOC cable road crossing, refer to Appendix 2


DATE:
BY:

4.15 ELECTRICAL
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. GENERAL
(DCC) NO. _____________________

Electrical General Requirements


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 106


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall implement and comply with all the requirements as stated but
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH not limited to following:
ASH
ASH

CONTRACTOR scope shall include but not be limited to Detail Design,


LEADS

LEADS
LEADS
ALL

procurement, supply, deliver / store, install, test, pre-commission, commissioning


ALL
ALL

assistance and Final Integrated Testing, with New and Existing Systems, for all the
equipment provided by CONTRACTOR and all the equipment provided by SAUDI
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

ARAMCO under this BI / Project, as required for a Fully Functional and Operational
DESCRIPTION

Facility.
ISSUED FOR 60% FEL3

CONTRACTOR shall include MARAFIQ on the Engineering Review Cycle for any
job related to MARAFIQ.

CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards and
regulations for any scope related to YRC and MARAFIQ.

CONTRACTOR shall comply with SAMREF and YASREF refineries Standards and
JO/EWO

regulations for any scope related to these refineries.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall implement Electricity & Cogeneration Regulatory Authority


(ECRA) requirement.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER CONTRACTOR shall be responsible for the correctness of all Drawings and
C
A

Documents and Software provided from vendors / manufactures / suppliers / sub-


DATE:
PROJECT
ALL LEADS
contractors, etc. Approval or Acceptance of these Drawings and Documents and
ENGINEER
09/08/16 Software by SAUDI ARAMCO does not relive CONTRACTOR of the responsibility
DATE: of correct design, right equipment, proper installation, testing and commissioning.
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall be fully responsible for the preparation of purchase orders,
DATE:
CONSTRUCTION
AMR EL SHARKAWY
SAUDI ARAMCO Acceptance or Approvals, FAT’s (Factory Inspection test)
AGENCY
09/08/16 inspections, Delivery to Site and storage of all the required electrical items; cooling
DATE:
for batteries (UPS & DC) shall be operational prior to site delivery at a temperature
OPERATIONS
SHAHZAD YAZDANI
concurred by the battery manufacturer. All electric equipment that requires space
09/08/16 heater or anti condensation shall be provided with safe space heating arrangement
DATE: to prevent moisture absorption and damage to equipment; temporary power
CONTROL NUMBER

ALI H GHAMDI
requirements shall be arranged by THE CONTRACTOR.
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall provide an Equipment Preservation Plan to SAUDI ARAMCO


DATE:

a Minimum of 90 days prior to site delivery of any major electrical equipment or


BY:

electronic or battery systems and temperature sensitive equipment arrival on the


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

project site or delivery to an off-site storage warehouse/location for SAUDI


(DCC) NO. _____________________

ARAMCO Projects Inspection Acceptance.

CONTRACTOR shall be responsible for the proper function and safe operation of
REVISION

all the equipment and systems. The design criteria and contract documents
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 107


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG included are not all-inclusive and represent minimum requirements. Any additional
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
elements or items required to achieve the correct and safe operation of the system
shall be engineered, designed, supplied and installed in place to render a complete
ASH
ASH
ASH

functional system.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall utilize the Metric System measurement in all documents and
drawings unless specifically directed otherwise by SAUDI ARAMCO.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

CONTRACTOR shall review and approve Vendor and Subcontractor drawings,


ISSUED FOR 60% FEL3

design, specifications and other documents for conformity to this Contract and
institute effective internal control for prompt receipt, review, approval and return of
such documents. CONTRACTOR shall incorporate all such applicable Vendor and
Subcontractor information in THE CONTRACTOR’S submittals to SAUDI
ARAMCO.

THE CONTRACTOR’S detailed “SHOP Drawings” (site developed for site


installation and interface of Vendor equipment’s based on actual purchased
JO/EWO

equipment Certified NMR 602 & NMR 603 data) shall include all necessary plans,
10-02399-

elevations, arrangements, sections, profiles, views and details of all facilities.


10-02399-
10-02399-
0001

0001
0001
DATE

The Project SOW as conveyed herein and the documents and drawings provided
09/08/16
08/04/16
06/01/16
NO.
REV

with this Scope of Work document are Coherent and NOT to be utilized separately.
DISCIPLINE
ENGINEER Any item mentioned in this document and not indicated on drawings or indicated on
C
A

drawings or not mentioned in other documents provided with this PPN, shall be of
DATE:
PROJECT
ALL LEADS
like effect as if indicated or mentioned in both and vice versa.
ENGINEER
09/08/16

DATE: CONTRACTOR shall check and verify all Sub-Contractor and Vendor design and
A M ALMATROOK
CERTIFIED
drawings provided comply with the Scope of Work, and documents provided with
09/08/16 this Scope, relevant SAUDI ARAMCO and International Standards and are in
DATE:
CONSTRUCTION
AMR EL SHARKAWY
keeping with “Good Engineering Practices”.
AGENCY
09/08/16

DATE:
CONTRACTOR shall comply with SAUDI ARAMCO Standards and seek SAUDI
OPERATIONS
SHAHZAD YAZDANI
ARAMCO advice for any potential Waivers. CONTRACTOR shall prepare such
09/08/16 Waivers as per SAEP-302, as required by SAUDI ARAMCO.
DATE:
CONTROL NUMBER

ALI H GHAMDI
CONTRACTOR shall note that “CLOUDS” on the drawings indicate a HOLD point
VERIFICATION

09/08/16
due to unavailability of information or indicates a REQUIRED Tie-in from Existing
EDSD

Equipment and Systems into New Equipment and Systems. This Tie-in is part of
DATE:

CONTRACTOR Scope including any Software Supply, Upgrade and / or


BY:

modifications of Existing software.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall verify the power source of all equipment supplied under this
project by installing a Label on or near each equipment or device receiving power.
Switchgear, Controlgear, Power Panels, Motors, Receptacles, Light Switches, each
REVISION

Light, HVAC Panel, Communication Cabinet, Security Cabinet, Fire Alarm Panel,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 108


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG etc. shall have a Phenolic Label with Black text on a White background attached
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
with stainless steel screws identifying the upstream power source. For example,
for each Receptacle, Light Switch and Light, the label shall indicate the Upstream
ASH
ASH
ASH

Panelboard Number and Circuit Breaker Number and indicate if a GFCI circuit.
LEADS

LEADS
LEADS
ALL

ALL
ALL

SAUDI ARAMCO requires new power sub-distribution systems to be


400VAC/230VAC for four wire systems as listed in SAES-P-100.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

SAUDI ARAMCO requires general purpose receptacles be powered with 230VAC


ISSUED FOR 60% FEL3

as per SASCO 2203 receptacle requirements as indicated within SAES-P-119


“Substations”. On drawings which indicate a GFCI is required, CONTRACTOR is
permitted to install a GFCI molded case circuit breaker within the panelboard
powering the receptacle with a 5mA trip or an Equipment Protection Device with
nominal 30mA trip and shall label the receptacle with the panelboard number,
circuit breaker number and indicate on the label “Fed from GFCI MCCB”. The label
shall be phenolic with Black text on a White background attached with stainless
steel screws. Receptacles with integral ground fault protection are NOT
JO/EWO

acceptable.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Framed A-Size one lines (as-built) shall be provided by CONTRACTOR and


installed in applicable Substations & Electrical Rooms including ALL rooms which
09/08/16
08/04/16
06/01/16
NO.
REV

contain at least one (1) or more Switchgear, Controlgear, ATS, Battery Charger,
DISCIPLINE
ENGINEER Stand Alone UPS, Panelboard, etc. A copy of the applicable Certified NMR-602
C
A

shall be provided in the applicable electrical equipment room and with a metal book
DATE:
PROJECT
ALL LEADS
case within each room in which an NMR is provided. These shall be provided
ENGINEER
09/08/16 before energization of the equipment.
DATE:

A M ALMATROOK
CERTIFIED
CONTRACTOR shall carry out all Electrical work in close liaison with the SAPMT
09/08/16 to meet the project requirements.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE:
procurement, supply, deliver / store, install, test, pre-commission, commissioning
OPERATIONS
SHAHZAD YAZDANI
assistance and Final Integrated Testing, with New and Existing Systems, including
09/08/16 required ETAP studies, Plant Distribution system, Plant & buildings internal &
DATE: external Lighting System, Plant & Buildings Grounding & Lightning System,
CONTROL NUMBER

ALI H GHAMDI
Security & Fence Lighting System, Plant & Buildings Fire Alarm System,
VERIFICATION

09/08/16
Emergency Power supply System by installing Generators, UPS power supply
EDSD

System for Plant operations, Security operations and Communication operations,


DATE:

DC system for Substation switchgear protection, Complete Substation with


BY:

Substation Automation system, Cathodic Protection System, LED Lighting within


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

the Buildings and for all External Lights (except substation exterior & fence lighting)
(DCC) NO. _____________________

attached to the buildings,115kV cable routing, Interfacing with 115kV GIS at


MARAFIQ Substation # 9I, Electrical Interfacing with the SAMREF, YASREF,
Yanbu Refinery and Yanbu-Jiddah Pipeline to provide power & Cathodic
REVISION

Protection(CP).
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 109


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Electrical Studies
ASH
ASH

CONTRACTOR shall perform and validate all the Electrical studies as per SAES-
LEADS

LEADS
LEADS
ALL

P-100 and obtain SAUDI ARAMCO approval in order to finalize and freeze the long
ALL
ALL

lead electrical items to facilitate timely procurement. The purpose of the electrical
studies is to verify the ability of the plant electrical power distribution components
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

are adequately sized and perform as designed during normal steady state
DESCRIPTION

operation, with stand allowable transients and isolate faulty sections during faults.
ISSUED FOR 60% FEL3

Following Electrical studies shall be perform as a minimum but not limited to:

 ETAP Short Circuit Analysis


 ETAP Loads Flow Analysis
 ETAP Motor Starting Study
 ETAP Protective Device Co-Coordination
 ETAP Arc Flash Studies as per SABP-P-051 & SAES-P-100
JO/EWO

 ETAP Grounding study


 ETAP Power Factor Correction study
10-02399-

10-02399-
10-02399-
0001


0001
0001
DATE

Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation and


Insulation Coordination studies
09/08/16
08/04/16
06/01/16

 Lightning Protection Studies


NO.
REV

DISCIPLINE
ENGINEER
 Cathodic protection study
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall perform the ETAP study and give recommendations to
09/08/16
improve overall power factor as per SAES-P-100. Based on preliminary ETAP
DATE:
CERTIFIED study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
A M ALMATROOK
09/08/16 required to achieve power factor above 0.95 at PCC. It shall be further evaluated
DATE: with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
CONSTRUCTION
AMR EL SHARKAWY
AGENCY requirement.
09/08/16

DATE:
OPERATIONS For each of the above studies, the final study shall be completed to confirm that all
SHAHZAD YAZDANI

09/08/16
electrical equipment including all transformers, switchgear, all controlgear and all
DATE:
large motors, are adequately rated and properly specified. The study and report
shall be issued for review and approval to SAUDI ARAMCO.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

DATE:

All electrical loads and equipment ratings indicated on the project proposal
BY:

drawings and documents are preliminary and shall be verified and updated as part
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

of the detailed design engineering phase. These load values are intended only for
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ER estimate and shall not be used for construction.


(DCC) NO. _____________________

CONTRACTOR shall define jointly with Saudi Aramco the electrical substation ID
number.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 110


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Electrical Overall Power Distribution System – Design Basis
ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

Total power demand for the proposed YDH facility is estimated to be 46 MVA, with
ALL
ALL

a first phase of approximately 23.0 MVA by 2019. Adequate spare space at all
levels of power distribution shall be considered in order to accommodate future
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

proposed shipper pumps for Yanbu to Central Region pipeline planned from this
DESCRIPTION

facility. The power system shall be suitable to start larger shipper pumps without
ISSUED FOR 60% FEL3

any voltage drop impact when started direct on line. For detailed electrical load list
refer to document # CAL- EL121.

Electrical Load Summary – Estimation electrical load include the demand load till
2040.

S.No. Load Description by Project Maximum Operating Load


Phase (MVA)
JO/EWO

1. Phase-1 23.0 MVA


2. Phase-2 9.5 MVA
10-02399-

10-02399-
10-02399-
0001

0001
0001

3. Future 12.8 MVA


DATE

Total Demand Load (including 46.0 MVA


09/08/16
08/04/16
06/01/16

10% growth)
NO.
REV

DISCIPLINE
ENGINEER
The normal power supply to the proposed facility shall be from ‘MARAFIQ’s
C
A

DATE: Substation # 9I’ which is located about 3.85km from YDH facility fence. Two (2) 115
PROJECT
ALL LEADS
ENGINEER kV feeder from the GIS at MARAFIQ’s Substation #9I, shall be used to supply
09/08/16 power to YDH facility.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall coordinate with MARAFIQ and implement the connection
09/08/16
DATE:
agreement requirements between MARAFIQ & SAUDI ARAMCO during detail
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
design & construction phase of the project.
09/08/16

DATE: MARAFIQ substation is connected to a reliable and strong grid point, the SSBB
OPERATIONS
SHAHZAD YAZDANI 115 kV substation of Yanbu-II power plant (by 2018 this new power plant will be
09/08/16
available to generate 800 MW electricity, a strong reliable power source of this
DATE:
region).
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

Two (2) new substations (Receiving & Utility Substation) shall be built at YDH to
receive & distribute the power within YDH.
DATE:
BY:
REVISIONCERTIFICATION

Receiving Substation shall house 115kV Gas Insulated Circuit Breaker bay, 13.8kV
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

& 480V Metal Clad Switchgear and 480V Controlgear as main electrical equipment
(DCC) NO. _____________________

to receive power from MARAFIQ substation # 9I and further distribute power to


Utility Substation and Shipper Pumps.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 111


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall perform the ETAP study and give recommendations to
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
improve overall power factor as per SAES-P-100. Based on preliminary ETAP
study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
ASH
ASH
ASH

required to achieve power factor above 0.95 at PCC. It shall be further evaluated
LEADS

LEADS
LEADS
ALL

with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
ALL
ALL

requirement.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Utility Substation shall house 4.16kV & 480V Metal Clad Switchgear and 480V
DESCRIPTION

Controlgear as main electrical equipment to distribute power within YDH facilities.


ISSUED FOR 60% FEL3

Refer to Document Control Log (GEN-D0001) for the Overall Electrical System
Design and proposed Power Distribution to YDH facilities.

Power is stepped down from 115kV to 13.8kV and from 13.8kV to 4.16kV, 480V
and 400V by installing appropriate Power and Pad Mounted Transformers, refers to
Key Single Line Diagram EL-A10006.
JO/EWO

HV Switchgear & HV Controlgear shall be used to supply power to shipper pump


10-02399-

motors, booster pump motors, fire pumps motors, power transformers & loop feed
10-02399-
10-02399-
0001

0001
0001
DATE

pad mounted transformers.


09/08/16
08/04/16
06/01/16
NO.
REV

LV MCC, Switchracks and local panels for power supply to auxiliary pump motors,
DISCIPLINE
ENGINEER MOVs, auxiliary power and lighting power requirements, etc.
C
A

DATE:
PROJECT
ALL LEADS
Plant Emergency backup generator c/w emergency distribution panel/MCC shall be
ENGINEER
09/08/16 provided to power the critical loads and all vital service loads and infrastructure in
DATE: order to enable safe shutdown of the facility in the event of loss of Utility Power.
A M ALMATROOK
CERTIFIED
Generator shall be provided with an acoustic enclosure suitable for outdoor
09/08/16 environment.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Dry type transformers, sub distribution power panels, lighting control panel, control
DATE:
wiring, power receptacles, indoor/outdoor lighting, and grounding, for all buildings.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 Additionally, existing MV and LV power networks associated with Yanbu area
DATE: refineries (Yanbu Terminal, SAMREF & YASREF) will be utilized for any new loads
CONTROL NUMBER

ALI H GHAMDI
to be added in the respective facilities. Refer to Appendix 2 Interface packages.
VERIFICATION

09/08/16
EDSD

Electrical System Optimization


DATE:
BY:

CONTRACTOR is full responsible to Optimize the complete electrical system


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

during the Detail Engineering based on latest vendor data, current site conditions,
(DCC) NO. _____________________

good industrial practices, International Codes and Standards, Safety Standards,


and SAUDI ARAMCO Standards, to make the electrical system as effective or
functional as possible.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 112


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall apply optimization techniques in the following areas, but not
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH limited to:
ASH
ASH

 Substation equipment layout arrangement and building dimensions.


LEADS

LEADS
LEADS
ALL

ALL


ALL

Transformer yard arrangement based on transformer vendor data.


 Optimize the GIS room layout and dimensions based on latest vendor data.
 Power and distribution transformer sizing, and loading factors.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Switchgears, switchboards, motor control centers, and power panel boards’


DESCRIPTION

location, number’s and bus ratings.


ISSUED FOR 60% FEL3

 Power cable sizing.


 Electrical load duties for equipment sizing purpose.
 Major electrical equipment location in plot plan in order to minimize voltage
drop issues, oversized cables, and unnecessary costs.

The current Receiving Substation equipment layout is as indicated in the


Equipment Layout Dwg ELA10001.001-002. LSTK CONTRACTOR shall revise
JO/EWO

and submit all affected deliverables based on this equipment layout during detail
design.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

This Optimization shall be oriented to determine the most economical expansion


09/08/16
08/04/16
06/01/16

policy remaining the electrical system optimized around the desired criteria (cost,
NO.
REV

DISCIPLINE reliability, environmental, safety, etc.).


ENGINEER
C
A

DATE: CONTRACTOR shall re-check all electrical drawings provided in this Project
PROJECT
ALL LEADS
ENGINEER Proposal in order to identify the possible Optimization with appropriate solutions as
09/08/16
well as discuss with SAUDI ARAMCO its implementation.
DATE:
CERTIFIED
A M ALMATROOK
Electrical Detailed Description
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR scope shall include but not be limited to Detail Design,
09/08/16
procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE:
assistance and Final Integrated Testing, for the following items but is not limited to:
OPERATIONS
SHAHZAD YAZDANI

09/08/16
One (1) Lot 115kV, 1250A, 3Ph, 3W, 60Hz, Gas Insulated Switchgear in receiving
DATE:
substation as well as the Gas Insulated Bus (GIB) in GIS Room (Refer to drawing #
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 EL-A10007 & EL-A10005).


EDSD

One (1) 13.8kV, 3000A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
DATE:
BY:

substation (Refer to drawing # EL-A10008).


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz, Outdoor type, detuned switched capacitor
(DCC) NO. _____________________

bank, at receiving substation transformer yard. (Refer to drawing # EL-A10008 &


EL-A10001.002).
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 113


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH (Refer to drawing # EL-A10009).
ASH
ASH

One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
LEADS

LEADS
LEADS
ALL

substation (Refer to drawing # EL-A10012).


ALL
ALL

One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

(Refer to drawing # EL-A10013).


DESCRIPTION
ISSUED FOR 60% FEL3

One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10010).

One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10011).

Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in receiving substation (Refer to
drawing # EL-A10014 to EL-A10015).
JO/EWO
10-02399-

Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
10-02399-
10-02399-
0001

0001
0001
DATE

drawing # EL-A10016 to EL-A10017).


09/08/16
08/04/16
06/01/16
NO.
REV

One (1) 400V, 1250A, 3Ph, 4W, 60Hz, switchboard in E & M building (Refer to
DISCIPLINE
ENGINEER drawing # EL-A10018).
C
A

DATE:
PROJECT
ALL LEADS
One (1) 480V, 600A, 3Ph, 3W, 60Hz, emergency controlgear in Security Support
ENGINEER
09/08/16 building (Refer to drawing # EL-A10020).
DATE:

A M ALMATROOK
CERTIFIED
Three (3) 480V, 100A, 3Ph, 3W, 60Hz, switchracks, strategically located inside
09/08/16 YDH to feed power to tank farms auxiliary motors, area lighting power panels,
DATE:
CONSTRUCTION
AMR EL SHARKAWY
MOVs power panels, Cathodic Protection power panels and other facilities loads
AGENCY
09/08/16 (Refer to drawing # EL-A10021 to EL-A10023).
DATE:
OPERATIONS
SHAHZAD YAZDANI
Two (2) 50/66.6 MVA OA/FA, 115kV/13.8kV, power transformer located at receiving
09/08/16 substation feeding 13.8kV switchgear (Refer to drawing # EL-A10006).
DATE:
CONTROL NUMBER

ALI H GHAMDI
Two (2) 3.75/4.68 MVA OA/FA, 13.8kV/4.16kV, power transformer located at utility
VERIFICATION

09/08/16
substation feeding 4.16kV switchgear (Refer to drawing #EL-A10006).
EDSD

DATE:

Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at receiving substation
BY:

feeding 480V switchgear (Refer to drawing #EL-A10006).


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at utility substation
feeding 480V switchgear (Refer to drawing #EL-A10006).
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 114


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG One (1) 500KVA, 13.8kV/0.48kV, pad mounted transformer strategically located
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
inside YDH to feed power to emergency controlgear in control room (Refer to
drawing #EL-A10006)
ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

One (1) 1000 KVA, 13.8kV/0.4kV, pad mounted transformer strategically located
ALL
ALL

inside YDH to feed power to switchboard in E & M building (Refer to drawing #EL-
A10006).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
ISSUED FOR 60% FEL3

container with motorized louvers, complete with lighting, Fire Alarm and grounding
for the container. The Emergency Diesel Generator 160kW, 400V, 3Ph, 4W, 60Hz,
200kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
Generator (Refer to drawing# EL-A10019).

One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
JO/EWO

for the container. The Emergency Diesel Generator 400kW, 480V, 3Ph, 3W, 60Hz,
10-02399-

500kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
10-02399-
10-02399-
0001

0001
0001
DATE

system along with Generator controls/protection and generator circuit breaker at


Generator (Refer to drawing# EL-A10020).
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER One (1), 400V, 400A, 3Ph, 4W, 60Hz Automatic Transfer Switch (Refer to drawing#
C
A

EL-A10019).
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 One (1), 480V, 600A, 3Ph, 3W, 60Hz Automatic Transfer Switch (Refer to drawing#
DATE: EL-A10020).).
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall design Local Control Push Button Stations appropriate for
DATE:
CONSTRUCTION
AMR EL SHARKAWY
the areas of installation, Install control cables and conduits between control
AGENCY
09/08/16 stations and the Interposing relay panels or MCC.
DATE:
OPERATIONS
SHAHZAD YAZDANI
Convenience Outlets: 480 VAC welding receptacles shall be installed at locations
09/08/16 where mobile welding sets or power water wash equipment use is required. In
DATE: addition, 230 VAC convenience outlets shall be placed throughout the plant at all
CONTROL NUMBER

ALI H GHAMDI
location where hand tools would be required for maintenance and inside the
VERIFICATION

09/08/16
buildings.
EDSD

DATE:

UPS & DC System


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR scope shall include but not be limited to Detail Design,


(DCC) NO. _____________________

procurement, supply, deliver / store, install, test, pre-commission, commissioning


assistance and Final Integrated Testing for UPS & DC system of the entire YDH
facility as described below:
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 115


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG UPS power supply system shall be provided for the E & M Building loads,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Operation building loads, RIO building loads, main Security Support building loads,
Tank Farm and other field Instrument Loads. Integrated AC UPS & DC Systems
ASH
ASH
ASH

c/w respective distribution panels to power critical loads such as Control, ESD,
LEADS

LEADS
LEADS
ALL

FGS and telecommunications system. Batteries for 8 hour back up installed in a


ALL
ALL

separate room within the E & M Building for Telecommunication Loads. Batteries
for 4 hour back up installed in a separate room within the Security Support Building
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

for Security Loads.


DESCRIPTION
ISSUED FOR 60% FEL3

UPS system shall be redundant as per Figure-2 of SAES-P-103 for


Telecommunication system. For Instrument System & Security System Loads
“Simplex UPS systems shall be used. The UPS system shall be complete with
charger rectifiers, inverters static switches, batteries, bypass switch, isolation
transformers and distribution panels, mimic panels, and smoke detection in the
UPS cabinet (Refer to drawing #EL-A10024 to EL-A10028). Ratings are as follows:

One (1) 5kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
JO/EWO

60Hz (X40- UPS-001).


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

One (1) 10kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40-UPS-010).
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER One (1) 20kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
C
A

60Hz (X40-UPS-002).
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 Three (3) 10kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
DATE: 60Hz (X40-UPS-007, X40-UPS-008 & X40-UPS-009).
CERTIFIED
A M ALMATROOK
09/08/16 One (1) 45kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
DATE:
CONSTRUCTION
AMR EL SHARKAWY
60Hz (X40-UPS-003).
AGENCY
09/08/16

DATE:
Two (2) 25kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W,
OPERATIONS
SHAHZAD YAZDANI
60Hz (X40-UPS-004 & X40-UPS-005).
09/08/16

DATE: CONTRACTOR shall provide complete battery set, battery chargers, DC


CONTROL NUMBER

ALI H GHAMDI
distribution panels required for 125VDC system as per one line diagram #EL-
VERIFICATION

09/08/16
A10029, EL-A10030 & EL-A10033) for receiving & utility substation. Each DC
EDSD

Power System shall include two (2) rectifier battery chargers and two set of
DATE:

batteries, battery racks and battery monitoring system. Ratings are as follows:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

One (1) 125 VDC, 350A Output, 480V, 3Ph, 60 Hz Input (X40-BC-001 & X40-BC-
(DCC) NO. _____________________

002).
One (1) 125 VDC, 250A Output, 480V, 3Ph, 60 Hz Input (X40-BC-003 & X40-BC-
004).
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 116


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG One (1) -48 VDC, 200A Output, 480V, 3Ph, 60 Hz Input (X40-BC-005 & X40-BC-
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH 006).
ASH
ASH

Cable, Cablebus & Cable Tray System


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR scope shall include but not be limited to Detail Design,


procurement, supply, deliver / store, install and test for Cables (power & control),
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Cable bus & Cable Tray but not limited to:


DESCRIPTION
ISSUED FOR 60% FEL3

About 3.85kM 115kV cabling from MARAFIQ Substation #9I to receiving substation
115kV Gas Insulated Switchgear (GIS) at YDH. Thrust Boring or Horizontal
Direction Drilling (HDD) cables installation method shall be used to cross main
highway as per Royal Commission (RC) & MARAFIQ Guidelines. (Refer sketch
SK-A10010.001)

13.8kV cabling from new 13.8kV Switchgear located inside the Receiving
Substation to Utility Substation power transforms, Pad Mounted Looped
JO/EWO

Transformers & Shipper Pumps. (Refer drawing # EL-A10103 sheet 001 to 004)
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

4.16kV cabling from new 4.16kV Switchgear located inside the Utility Substation to
Controlgear & Booster Pumps. (Refer drawing # EL-A10103 sheet 001 to 004.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER Buried Power and control cabling to all MV and LV loads. (Refer drawing # EL-
C
A

A10103 sheet 001 to 004.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 Cable Bus from Power Transformers to respective Switchgears at the receiving &
DATE: utility substation. (Refer drawing # EL-A10001 & EL-A10002)
CERTIFIED
A M ALMATROOK
09/08/16 Cable trays shall be provided inside receiving, utility substation and E & M building.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
(Refer drawing # EL-A10042, EL-A10043 & EL-A10044)
AGENCY
09/08/16

DATE:
Lighting System
OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: procurement, supply, deliver / store, install & test for lighting system.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
The Lighting designs for this project shall be in accordance with IESNA RP-7
EDSD

(practice for Industrial Lighting) and as supplemented by SAES-P-123. The lighting


DATE:

system shall be designed for energy efficient operation.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall design following types of lighting but not limited to; Buildings
(DCC) NO. _____________________

interior & exterior lighting, Area Lighting, Security Fence Lighting, Street Lighting,
Task Lighting, Emergency Lighting, Tank Lighting .
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 117


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall provide interior & exterior lighting for the below listed
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
buildings & Shelters. (Refer drawing # EL-A10034, EL-A10035, EL-A10047, EL-
A10050, EL-A10054, EL-A10057, EL-A10060, EL-A10063, EL-A10066, EL-
ASH
ASH
ASH

A10069, EL-A10072, EL-A10075, EL-A10078, EL-A10081, EL-A10084, EL-


LEADS

LEADS
LEADS
ALL

A10086, EL-A10088, EL-A10090 & EL-A10094).


ALL
ALL

 Receiving Substation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Utility Substation
DESCRIPTION

 E & M Building
ISSUED FOR 60% FEL3

 Security Support Buildings


 Operation Building
 Operator Shelter
 Remote I/O Buildings
 FSF Support Building
 Musallah
 Foam Skid Shelter
JO/EWO

 Chemical Shelter
 X-Ray Building
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 IDAS Shelter
 Guard House
09/08/16
08/04/16
06/01/16
NO.
REV

 Security Main Gate


DISCIPLINE
ENGINEER  Shipper, Booster and other Pump Shelters
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall provide outdoor plant and fence lighting. (Refer drawing #
09/08/16 EL-A10101)
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall provide tank lighting including cables, conduits, junction box,
09/08/16 cable trays etc. CONTRACTOR shall coordinate with Tank Package Contractor for
DATE:
CONSTRUCTION
AMR EL SHARKAWY the location of Tank lighting and develop detail design drawings as required.
AGENCY
09/08/16

DATE: Grounding & Lightning Protection System


OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: procurement, supply, deliver / store, install & test for grounding system as required
CONTROL NUMBER

ALI H GHAMDI
for the new Facilities in accordance with IEEE 142 and shall meet the requirements
VERIFICATION

09/08/16
of ANSI/NFPA 70 (NEC) and ANSI C2, as supplemented or amended by SAES-P-
EDSD

111 and SAES-J-902. Intrinsically Safe Systems shall be grounded in accordance


DATE:
BY:

with certification requirements and SAES-J-903. Calculations of allowable and


actual step & touch potentials for Substations shall be done in accordance with
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

IEEE 80.
(DCC) NO. _____________________

CONTRACTOR shall extend existing Plant Ground grid at YASREF, SAMREF and
Yanbu Refineries to bond the new electrical equipment, tanks, fence post,
REVISION

structural steel, etc. Grounding system shall utilize buried copper wire loops and
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 118


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG grounding rods for perimeter grids around the transformers, substation building and
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH all other electrical equipment.
ASH
ASH

CONTRACTOR shall provide grounding system for the substations, transformer


LEADS

LEADS
LEADS
ALL

yards, E&M Building, operation room, control building, security support buildings,
ALL
ALL

shelters, other supporting buildings and overall plant grounding. (Refer drawing #
EL-A10040, EL-A10041, EL-A10049, EL-A10051, EL-A10055, EL-A10058, EL-
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

A10061, EL-A10064, EL-A10067, EL-A10070, EL-A10073, EL-A10076, EL-


DESCRIPTION

A10079, EL-A10082, EL-A10085, EL-A10087, EL-A10089, EL-A10093, EL-A10095


ISSUED FOR 60% FEL3

& EL-A10102 )

CONTRACTOR shall provide and install additional ground rods and ground grid as
required to ensure that the ground resistance does not exceed safe values as
defined in IEEE 80 to comply with SAES-P-111.

CONTRACTOR scope shall include but not be limited to Detail Design,


procurement, supply, deliver / store, install & test for Lightning protection system of
JO/EWO

the buildings at YDH. The design and installation shall be based on: NFPA 780, UL
10-02399-

96A, and IEEE 998 or IEC 62305-1, 2, 3, 4.


10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall provide Lightning Protection System for Receiving


09/08/16
08/04/16
06/01/16
NO.
REV

Substation, Utility Substation, transformer yards and other buildings. (Refer


DISCIPLINE
ENGINEER drawing # EL-A10045 & EL-A10046)
C
A

DATE:
PROJECT
ALL LEADS
Cathodic Protection System:
ENGINEER
09/08/16

DATE: CONTRACTOR shall prepare Cathodic Protection Specialist (CPS)


A M ALMATROOK
CERTIFIED
CONTRACTOR scope of work. The CPS CONTRACTOR scope shall include one
09/08/16 complete package for the entire YDH underground pipeline & tanks Cathodic
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Protection. The complete CP system shall be in full compliance of SAES-X-400,
AGENCY
09/08/16 SAES-X-500 & SAES-X-600. For scope description refer to document # EL-
DATE:
E10067007.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 The CPS CONTRACTOR scope of work shall include but not limited to prepare a
DATE: detailed design package comprising of CP drawings, layouts, installations details,
CONTROL NUMBER

ALI H GHAMDI
detail material take offs, specifications, testing, pre-commissioning &
VERIFICATION

09/08/16
commissioning procedure, calculations for required voltage, amperage and life
EDSD

expectancy of anode, No of anodes, material type of anodes, weight of anodes,


DATE:

spacing between the anodes, minimum current density and consumption rate of
BY:

anode and required rating & number of rectifiers.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Fire Detection & Alarm System

CONTRACTOR scope shall include but not be limited to Detail Design duly
REVISION

endorsed by Certified Fire Protection Engineer, procurement, supply, deliver /


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 119


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG store, install & test for complete, microprocessor-based addressable fire detection
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and alarm system, featuring intelligent spot, linear beam detectors using multi-
sensor technology, Multi spectrum IR Flame detectors, a powerful networking
ASH
ASH
ASH

capability, with reliable peer-to-peer communication. The Fire Alarm System for this
LEADS

LEADS
LEADS
ALL

project comprises of plant system and the buildings systems.


ALL
ALL

The Fire Alarm system shall include but not limited to the following: Fire Alarm
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

control panel, multi spectrum flame detectors, beam detectors, automatic and
DESCRIPTION

manually activated alarm initiating device, indicating devices, isolating devices,


ISSUED FOR 60% FEL3

power supply modules, Battery Modules, Control Modules, Electro-Magnetic door


holders, fire and smoke dampers and their controls, remote indicators,
annunciators, network cards, along with RGS conduits, wires and accessories
required to furnish a complete operational system. All fire alarm system devices
and components shall be from one Manufacturer to avoid last minute compatibility
issues. All components employed in the Fire Alarm system and the Fire Protection
System shall be UL listed.
JO/EWO

CONTRACTOR shall provide Fire Detection & Alarm System for Receiving
10-02399-

Substation, Utility Substation, all other buildings and shelters (Refer drawing # EL-
10-02399-
10-02399-
0001

0001
0001
DATE

A10121, to EL-A10145, EL-A10147 & EL-A10148)


09/08/16
08/04/16
06/01/16
NO.
REV

CONTRACTOR shall provide Electronic Fire Detection (EFD) technology for


DISCIPLINE
ENGINEER Shipper pumps areas. Fire detection shall be cross zoned such that two detector
C
A

units must detect fire in order to activate an automatic fire suppression system.
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall coordinate & finalize interface requirements with Tank
DATE: Package Contractor for the Linear Heat Detection System for the external floating
A M ALMATROOK
CERTIFIED
roof tanks. Linear Heat Detection System shall be interface with the nearest Fire
09/08/16 Alarm Control Panel provided by CONTRACTOR (Refer drawing # EL-A10149 &
DATE:
CONSTRUCTION
AMR EL SHARKAWY
EL-E10068).
AGENCY
09/08/16

DATE:
Power System Automation (PSA)
OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: procurement, supply, deliver / store, install, test, pre-commission, commissioning
CONTROL NUMBER

ALI H GHAMDI
assistance and Final Integrated Testing for Power System Automation (PSA) at
VERIFICATION

09/08/16
YDH Receiving Substation. Information of Receiving Substation shall be linked to
EDSD

Power System Automation (PSA). (Refer document # EL-A10031 & EL-E10039)


DATE:
BY:

CONTRACTOR scope shall include but not be limited to Detail Design,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

procurement, supply, deliver / store, install, test, pre-commission, commissioning


(DCC) NO. _____________________

assistance and Final Integrated Testing for Power System Automation (PSA) at
YDH Utility Power Substation. Information of Utility Substation shall be linked to
Power System Automation (PSA). (Refer document # EL-A10032 & EL-E10039)
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 120


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall consider electrical interface to YDH control system as per
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
following:
 Interposing relay cabinet shall be provided in substation to control booster,
ASH
ASH
ASH

shipper and other utility pumps. Homerun cables between substation and
LEADS

LEADS
LEADS
ALL

ALL
ALL

respective RIB shall be laid. The pump status and control signals shall be
integrated to the remote I/O’s provided in the RIBs.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 PSA Server shall be interfaced to DCS via OPC or other open industry
DESCRIPTION

standard protocol.
ISSUED FOR 60% FEL3

CONTRACTOR shall consider electrical interface to MARAFIQ control system as


per following:
 Two (2) new Fiber optic patch panel (wall mounted) at MARAFIQ (SS-9I)
shall be interfaced to existing OSAS via existing RTU to provide the 115kV
breaker status to existing OSAS.
JO/EWO

Interconnections, Motor Controls & Instrument Relay Panels


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall design, supply, install, test, pre-commission and provide


09/08/16
08/04/16
06/01/16
NO.
REV

assistance in commissioning and integrated testing to insure fully operational


DISCIPLINE
ENGINEER systems. All Electrical Control Panels and Stop-Start Stations shall have Push-to-
C
A

Test Multi-Cluster LED’s for indication.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall design, supply and install and test Local Control Push Button
DATE: Stations appropriate for the areas of installation, Install control cables and conduits
A M ALMATROOK
CERTIFIED between control stations and the Interposing relay panels or Controlgear.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
CONTRACTOR shall design, supply and install and test Interposing Relay Panels
AGENCY
09/08/16 within the NEW Substations. The Interposing Relay Panels shall have separate
DATE:
relays for start and stop commands and other signals as per instrument ILD’s.
OPERATIONS
SHAHZAD YAZDANI
Refer to Instrumentation Section for interface details. If additional relay panels are
09/08/16 required, CONTRACTOR shall design provide and install and place into service.
DATE:
CONTROL NUMBER

ALI H GHAMDI
CONTRACTOR shall design, provide, install, and test control/signal cables
VERIFICATION

09/08/16
between Interposing relay panels and Controlgear and Instrument marshaling
EDSD

cabinets.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Control Panels & Power Associated with Skids and Vendor Packages
(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 121


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall design, supply, install, test, pre-commission and provide
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
assistance in commissioning the control panels associated with vendor supplied
skids such as Dye Injection skids, DPK Filtration skids, Conductivity Enhancer
ASH
ASH
ASH

Injection skids, Custody Metering skids, Static, Dissipative Agent Injection skids,
LEADS

LEADS
LEADS
ALL

Oily Water Treatment Package, Foam Skids, pump controllers, power


ALL
ALL

supplies/controls, etc. which shall be further defined by CONTRACTOR during


Detail Design development.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

CONTRACTOR shall supply any and all cabling required for Equipment, Skids and
ISSUED FOR 60% FEL3

Vendor Package integration and install and test and pre-commission and support
commissioning as required to insure fully functional integrated systems for YDH
Project.

CONTRACTOR shall be responsible for the supply, installation, and testing, pre-
commission and provide commissioning assistance for any other control panels
and systems not mentioned herein and are part of the mechanical, instrument or
piping equipment, but not limited too.
JO/EWO
10-02399-

CONTRACTOR shall be responsible for the interconnection between the skids and
10-02399-
10-02399-
0001

0001
0001
DATE

the parent equipment, and field instruments, Substations and Control Rooms and
shall develop interconnection wiring and piping drawings to SAUDI ARAMCO
09/08/16
08/04/16
06/01/16
NO.
REV

SACS standards for input in to IPlant. The drawings shall be submitted to SAUDI
DISCIPLINE
ENGINEER ARAMCO for acceptance.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
Oily Water Lift Station Control Panels
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall design, supply, install, test, pre-commission and provide
09/08/16
assistance in commissioning the Oily Water Lift station control panels for Normal
DATE:
OPERATIONS
Flow and Maximum Flow. The Oily Water Lift Station Control panel shall have two
SHAHZAD YAZDANI

09/08/16
independent power supply sources with auto transfer facility built into the local
DATE:
control panel, to provide a continuous source of power to the lift station. The
Control Panel shall be in full compliance with SAES-S-020.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

The enclosures shall be of dead front construction and shall have two doors and
DATE:

two compartments that are separated by a barrier. One compartment shall house
BY:

the motor starter package and the other shall house the controls for liquid level and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

alarms. The doors shall overlap to prevent them from being opened with the pump
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

motor disconnect devices in the “ON” position. The starters shall be complete with
(DCC) NO. _____________________

Start / Stop Push Buttons, Start / Stop Indications, local remote control and
indications; HOA switches etc. The starters shall be provided with dry run
protection relay to prevent the motors from dry run.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 122


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall be responsible for the design, supply, installation, and test,
pre-commission and provide assistance in commissioning of any other control
ASH
ASH
ASH

panels and systems not mentioned herein and are part of the mechanical,
LEADS

LEADS
LEADS
ALL

instrument or piping equipment.


ALL
ALL

Electrical and electronic equipment and associated wiring in Oily Water Lift Station
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

systems shall be suitable for the electrical area classification in accordance with
DESCRIPTION

SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
ISSUED FOR 60% FEL3

Electrical Area Classification Drawings.

Sanitary Lift Station Control Panel


JO/EWO

CONTRACTOR shall design, supply, install, test, pre-commission and provide


assistance in commissioning the sanitary lift station control panels. The Sanitary
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Lift Station Control Panel shall have two independent power supply sources with
auto transfer facility built into the panel, to provide a continuous source of power to
09/08/16
08/04/16
06/01/16

the lift station. The Control Panel shall be in full compliance with SAES-S-010.
NO.
REV

DISCIPLINE
ENGINEER
The enclosure shall be of dead front construction and shall have two doors and two
C
A

DATE: compartments that are separated by a barrier. One compartment shall house the
PROJECT
ALL LEADS
ENGINEER motor starter package and the other shall house the controls for liquid level and
09/08/16
alarms. The doors shall overlap to prevent them from being opened with the pump
DATE:
CERTIFIED motor disconnect devices in the “ON” position. The starters shall be complete with
A M ALMATROOK
09/08/16
Start / Stop Push Buttons, Start / Stop Indications, local remote control &
DATE: indications; HOA switches etc. The starters shall be provided with dry run
CONSTRUCTION
AMR EL SHARKAWY
AGENCY protection relay to prevent the motors from dry run.
09/08/16

DATE:
OPERATIONS
Electrical and electronic equipment and associated wiring in Oily Water Lift Station
SHAHZAD YAZDANI

09/08/16
systems shall be suitable for the electrical area classification in accordance with
DATE:
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
Electrical Area Classification Drawings.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

DATE:
BY:

Motor Space Heater Control Panel


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Within Switchgear and Controlgear switching assemblies and Starter Control


(DCC) NO. _____________________

panels for all motors 75 kW (100 HP) and larger, and all other motors where the
engineering documents indicate motor space heaters are installed, a contact shall
be wired to a terminal block in the low voltage compartment of the Switchgear
REVISION

Feeder or Controlgear bucket, as applicable, for connection to a 24VAC control


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 123


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG circuit (panel shall be designed and provided by THE CONTRACTOR) of a
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
remotely mounted motor space heater contactor. Contact shall be closed when the
main motor circuit contactor is de-energized. This is in accordance with SAES-P-
ASH
ASH
ASH

116 and shall be provided, installed, tested, pre commissioned, and with
LEADS

LEADS
LEADS
ALL

commissioning assistance, by THE CONTRACTOR.


ALL
ALL

ISSUED FOR 100% PROJECT PROPOSAL


ISSUED FOR 90% PROJECT PROPOSAL

Interconnection Wiring
DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall be responsible for design, supply, installation and testing of


the interconnection wiring between Vendor supplied Electrical Equipment and
Skids and the parent equipment, field instruments, etc. and CONTRACTOR shall
develop Wiring Interconnection Drawings, based on Actual Vendor Certified NMR
602 Drawings and NMR 603 Manuals, to SAUDI ARAMCO standards and submit
to SAUDI ARAMCO for acceptance prior to termination of cabling.
JO/EWO

Electrical Area Classification


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall develop Area Classification drawings at the beginning of


detailed design phase and obtain SAUDI ARAMCO Approval. Equipment installed
09/08/16
08/04/16
06/01/16
NO.
REV

in Bulk Plant area will be rated according to area classification layout drawings
DISCIPLINE
ENGINEER (Refer to drawing #EL-A10003). Attached drawings shall be used only as guide
C
A

actual drawings shall be developed by THE CONTRACTOR.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
General Building Notes
DATE:
CERTIFIED CONTRACTOR shall design all the Electrical rooms, battery rooms, UPS rooms,
A M ALMATROOK
09/08/16 based on the actual Vendor information as per the SAUDI ARAMCO Direct Charge
DATE:
NMR as available from SAPMT; under no circumstances the sizes shall fall short of
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
required spaces and clearances, to avoid future delays and expensive rework due
to SAUDI ARAMCO inspection group objections.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16 Buildings where Battery rooms are provided shall comply with all requirements of
DATE: SAES-P-103, Battery rooms shall be provided with an eye wash facility with
potable water connection & drain, and the drain shall be through acid neutralization
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
pit. The ventilation system shall be 100% redundant. Only direct driven exhaust
EDSD

fans shall be used. An interlock with the ventilation system shall be provided to
DATE:

stop the high-rate battery charging if the exhaust fan stops.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

CONTRACTOR scope shall include but not be limited to Detail Design,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

procurement, supply, deliver / store, install & test for Fire Stops wherever
(DCC) NO. _____________________

cable/conduit/cable trays pass through fire rated walls, Floor or Ceiling. The Fire
Stops shall be in compliance with UL and SAES-U-101.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 124


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR scope shall include but not be limited to Detail Design,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
procurement, supply, deliver / store, install & test for lighting fixtures, receptacles,
lighting panels, power panels, lighting circuits, power circuits and grounding for the
ASH
ASH
ASH

following buildings but not limited to:


LEADS

LEADS
LEADS
ALL

ALL
ALL

Receiving Substation, Utility Power Substation, Engineering & Maintenance (E &


M) Building, Operation Building, Operation Shelter, Chemical Shelter, Pump
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Shelters, Musalla, Security Gate House, Security Support Building, Security Guard
DESCRIPTION

Houses, RIO Building, IDAS Shelter, X-Ray Building, FSF Building & Foam Skid
ISSUED FOR 60% FEL3

Building.

CONTRACTOR shall design, supply, install test, pre-commission and provide


commissioning assistance for ALL Buildings under this scope of work to include but
not be limited to following electrical equipment:

Power Panels
JO/EWO

Power Circuits
Lighting Panels
10-02399-

10-02399-
10-02399-
0001

Lighting Circuits
0001
0001
DATE

Fire Alarm Detection


09/08/16
08/04/16

Disconnect Switches
06/01/16
NO.
REV

DISCIPLINE
Sockets / Receptacles
ENGINEER Dry Type Transformers
C
A

Control Panels
DATE:
PROJECT
Grounding
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
All in accordance with the detailed design Lighting Layouts, Power Layouts, Panel
A M ALMATROOK
Schedules, Fire Alarm Layouts and Grounding Layouts. Refer to project proposal
09/08/16
DATE: drawings as per DCL # GEN-D0001 for Lighting, Power, Grounding, Fire Alarm
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Layouts, Panel schedules and Electrical One Line Diagrams of respective
09/08/16
buildings.
DATE:
OPERATIONS
SHAHZAD YAZDANI
Electrical Major Deliverables
09/08/16

DATE:
Reference Documents attached to this PPN include but are NOT limited to the
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 following and shall be further developed by CONTRACTOR during the Detail
EDSD

Design:
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Electrical One Line Diagrams


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Protection & Metering Diagrams


(DCC) NO. _____________________

Electrical Area Classification


Substation Equipment Layouts
Lighting Layouts
Power Layouts
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 125


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Grounding Layouts
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Lightning Protection Layouts
Fire Detection & Alarm Layouts
ASH
ASH
ASH

Fire Detection & Alarm Riser Diagrams


Substation Automation Block Diagram
LEADS

LEADS
LEADS
ALL

ALL
ALL

Input / Output List for PSA & SCADA


Panelboard Schedules
Cable Routing Layouts
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Cable Tray Layouts


Equipment Data Sheets
DESCRIPTION

Cable & Conduit Schedule


ISSUED FOR 60% FEL3

Typical Installation Details

CONTRACTOR shall as a minimum develop the following Detail Design


Deliverables for utilization during procurement, construction and commissioning:

 Electrical Area Classification


JO/EWO

 General Electrical Notes and Symbols


 Power & Grounding Layouts
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Lightning Protection Layouts


 Installation Details – Duct Bank, Cable Trench, Cable Bldg Entrance, Power,
09/08/16
08/04/16
06/01/16
NO.
REV

Lighting, Grounding
DISCIPLINE
ENGINEER  Cable Routing Layouts
C
A

 Panelboard Schedules
DATE:
PROJECT  Major Equipment Specifications with Purchase Requisitions Development
ALL LEADS
ENGINEER
09/08/16  Buildings, Area, Access Road, Tanks Lighting Layouts
DATE:  Fire Alarm Detection Layouts, Riser Diagrams, Cause & Effect Logic
CERTIFIED
A M ALMATROOK  Substation Automation Input / Output List for PSA & SCADA
DATE:
09/08/16
 Substations Equipment Layout
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 Substation Equipment Section & Details
09/08/16
 Electrical Load List – including Process, Mechanical (HVAC, Rotating, Vessels),
DATE: Telecommunications, Security, Automation, Instrumentation Loads
OPERATIONS
SHAHZAD YAZDANI
 One Line Diagrams – Key and Protection & Metering
09/08/16
 Schematic & Interconnection drawings
DATE:
 Cable & Conduit Schedule
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Equipment Datasheets


EDSD

 Material Take-Off
DATE:

 ETAP Studies including Load Flow, Short Circuit, Relay Coordination, Arc Flash
BY:

 ETAP GPR & Ground Grid Calculations


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation and


Insulation Coordination studies
(DCC) NO. _____________________

 Lightning Protection Studies


 Calculations including Lighting LUX, Cable sizing, Transformer sizing, Battery
REVISION

Charger sizing, UPS sizing, Switchgear, Controlgear and Generator Sizing


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 126


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Smart Plant Electrical Outputs
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
 3D Model.
ASH
ASH

Detailed Design drawings shall include all necessary plans, elevations, arrangements,
LEADS

LEADS
LEADS
ALL

ALL
ALL

sections, profiles, views and details of all facilities.

CONTRACTOR develops the Detail Design Deliverables as necessary to insure a


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

fully functional operational facility.


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall incorporate ALL Vendor NMR’s into the IFC package as vendor
data becomes available and shall insure drawings utilized for construction have NMR
602 and NMR 603 data incorporated within, prior to site construction execution. Note
that this is critical path prior to pouring Concrete for Substation Floors, Precast Walls,
Transformer and Generator, Motor, Skids, Pole Foundations, etc.

Electrical Scope at Physical Interface Points with Pipelines & Refineries


JO/EWO

Yanbu to Jiddah Pipeline:


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall provide, install, test and terminate a 480V power cable to the
09/08/16

Scraper Launcher Area Power Panelboard. The Panelboard will be provided and
08/04/16
06/01/16
NO.
REV

DISCIPLINE
installed within the Scraper Launcher Area by BI-10-02155. (Refer drawing # EL-A10014
ENGINEER
sht. 001)
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
Electrical interfaces include power connection of 480V used to power the pipeline scraper
09/08/16 launcher facilities loads inside YDH perimeter fence. One (1) 480V, 150A, 3Ph, 3W, 60Hz
DATE: Outdoor Power Panel shall be provided by BI 10-02155 (Yanbu - North Jiddah Products
CERTIFIED
A M ALMATROOK Pipelines).
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY CONTRACTOR shall develop all required detailed design drawings as necessary to
AGENCY
09/08/16 construct the electrical power requirements for all the projects NEW and Existing
DATE: Electrical Equipment, in order to purchase the material and install, test and commission
OPERATIONS
SHAHZAD YAZDANI all equipment requiring electrical power and electrical equipment interfaces, for YDH.
09/08/16

DATE:
YASREF Refinery Connection:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

There is no physical interface within the facility; will be utilize the pipeline provided by BI-
00043. Therefore no electrical load has been anticipated.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAMREF Refinery Connection:


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SAMREF shall supply all electrical power and connections required for MOVs and other
miscellaneous loads.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 127


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
supply, deliver / store, install & test for Two (2nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
ASH
ASH
ASH

accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
LEADS

LEADS
LEADS
ALL

EL-A10052).
ALL
ALL

CONTRACTOR shall coordinate with SAMREF refinery to utilize the existing feeders of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAMREF substation to feed the power to newly added Surge relief pump (X40-X002A/B).
DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall utilize existing space in MCC-11-10-3 & MCC-11-20-3 and supply;
install three (3nos.) 100AF new circuit breakers to feed new MOV power panels & new
UPS, including feeder cables, conduits and other required accessories. (Refer sketch SK-
A10051 & SK-A10052)

CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
supply, deliver / store, install & test for 10kVA, Input voltage 480V 3ph 60Hz, Output
voltage 230 1ph 60Hz. The UPS system shall be complete with charger rectifiers,
JO/EWO

inverters static switches, batteries, bypass switch, transformers and distribution panels,
10-02399-

mimic panels, and smoke detection in the UPS cabinet in Substation # 12 at SAMREF.
10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall develop Area Classification drawings at the beginning of detailed


09/08/16
08/04/16
06/01/16
NO.
REV

design phase and obtain SAUDI ARAMCO Approval. Equipment installed in SAMREF
DISCIPLINE
ENGINEER area will be rated according to area classification (refer drawing # EL-A10004).
C
A

DATE:
PROJECT
ALL LEADS
CONTRACTOR shall provide Grounding to new equipment from existing SAMREF
ENGINEER
09/08/16 Grounding network.
DATE:

A M ALMATROOK
CERTIFIED
CONTRACTOR shall provide task lighting for new equipment from existing lighting
09/08/16 Panels.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Yanbu Refinery Connection:
DATE:
OPERATIONS
SHAHZAD YAZDANI Yanbu Refinery shall supply all electrical power and connections required MOVs and
09/08/16 other miscellaneous loads. Total electrical loads anticipated are about 25kVA.
DATE:
CONTROL NUMBER

ALI H GHAMDI
CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
VERIFICATION

09/08/16
supply, deliver / store, install & test for Three (3nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
EDSD

Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
DATE:

accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
BY:

EL-A10111).
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall utilize existing space in V21-MC71A, V21-MC81A & V21-MC91A


and supply; install three (3nos.) 100AF new circuit breakers to feed new MOV power
panels, including feeder cables, conduits and other required accessories. (Refer Drawing
REVISION

no# VA-240892.001, VA-240893.002, VA-240894.002)


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 128


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall coordinate with YANBU refinery to utilize the existing feeders of
YANBU substation to feed the power to newly added 150A, 480V, Switchrack at Tank
ASH
ASH
ASH

Farm area.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall supply and install One (1) No. 150A, 480V Switchrack near tank
farm area to feed the power to newly added Surge relief pump (X40-X004A/B).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

CONTRACTOR shall provide Grounding to new equipment from existing YANBU


ISSUED FOR 60% FEL3

REFINERY Grounding network.

CONTRACTOR shall provide task lighting for new equipment from existing lighting
Panels

Electrical Scope at MARAFIQ Substation # 9I Interface

CONTRACTOR shall coordinate with SAUDI ARAMCO and MARAFIQ for the portion of
JO/EWO

works under MARAFIQ scope and insure correct interface of all discipline’s i.e. Civil,
10-02399-

Electrical, Protection, Communication, etc.


10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall furnish electrical detailed drawings, documents and any calculation
requested by MARAFIQ / Yanbu Royal Commission (YRC) to fulfill the connection
09/08/16
08/04/16
06/01/16
NO.
REV

agreement requirements.
DISCIPLINE
ENGINEER
C
A

CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS to feed power to
DATE:
PROJECT
ALL LEADS
YDH. (Refer sketch # SK-A10011, SK-A10013 & SK-A10014)
ENGINEER
09/08/16

DATE: CONTRACTOR shall provide one (1) metering panel to accommodate two (2) revenue
CERTIFIED
A M ALMATROOK meters & two check meters for YDH feeders-1 & 2. (Refer sketch # SK-A10013 & SK-
09/08/16 A10014)
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide Four (4) protection relay panel to accommodate line
DATE:
differential relays & directional relays for YDH feeders-1 & 2. (Refer sketch # SK-A10013
OPERATIONS
SHAHZAD YAZDANI & SK-A10014)
09/08/16

DATE: CONTRACTOR shall provide one (1) 125VDC Power Panel to supply power to new relay
CONTROL NUMBER

ALI H GHAMDI
panels. (Refer sketch # SK-A10012)
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall provide two (2) fiber optic patch panel to be install in Substation 9I.
DATE:

(Refer sketch # SK-A10014)


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall design, supply, install, test and assist with commissioning of two
run, 3x1/C- 630 mm2, 115kV cables of 3.85km in length, from MARAFIQ Substation #9I to
YDH. (Refer sketch # SK-A10010 & SK-A10015)
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 129


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall design, supply, install, test and assist with commissioning of two (2)
run 12C Single Mode Fiber Optic Cables run along with each power feeder cable from
ASH
ASH
ASH

MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 & SK-A10015)


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide termination kits, including connectors, at the MARAFIQ end
and at the SAUDI ARAMCO 115kV GIS end. CONTRACTOR shall coordinate with
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

MARAFIQ and SAUDI ARAMCO for termination at the MARAFIQ end.


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall confirm MARAFIQ protection and metering requirements and reflect
accordingly within the Detail Design Drawings. Development of protection, control, fire
alarm, communication, etc., interface drawings shall be CONTRACTOR responsibility
including purchase, installation, termination and testing of the required cabling.

CONTRACTOR shall assist MARAFIQ as required with Manpower, and test equipment,
as necessary to complete MARAFIQ 115kV and SAUDI ARAMCO 115kV Interface
Testing including Protection, Metering, Controls, etc. including wiring interface drawing
JO/EWO

development. Test Results shall be signed by all relevant parties including POD, PID,
10-02399-

MARAFIQ, etc. and be included within the Project Test Results binders maintained and
10-02399-
10-02399-
0001

0001
0001
DATE

developed by CONTRACTOR as per SAEP-122.


09/08/16
08/04/16
06/01/16
NO.
REV

CONTRACTOR to consider Integration Philosophy between the MARAFIQ 115KV


DISCIPLINE
ENGINEER Substation # 9I and the New SAUDI ARAMCO 115kV Receiving Substation. Interface
C
A

philosophy will be finalized as per Connection Agreement between MARAFIQ & SAUDI
DATE:
PROJECT
ALL LEADS
ARAMCO. Initial communication has been established to finalize the scope segregation
ENGINEER
09/08/16 between SAUDI ARAMCO & MARAFIQ. Proposed interface requirements are as
DATE: followed:
CERTIFIED
A M ALMATROOK
09/08/16  MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays: =EB04
DATE:
CONSTRUCTION
AMR EL SHARKAWY
and =EA06 for SAUDI ARAMCO YDH project.
AGENCY
09/08/16

DATE:  MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
OPERATIONS
SHAHZAD YAZDANI control panel =EB04+S and =EA06+S.
09/08/16

DATE:
 A new metering panel is required, same model and configuration than existing
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
metering panels. This new metering panel shall be the combine metering
EDSD

panels for 2 feeders of YDH. Each YDH feeders shall have a separate
revenue meters and will be accommodated in this panel. Reserved available
DATE:
BY:

floor space for this panel. New Panel to be tagged as: =E+MP05 115KV
REVISIONCERTIFICATION

Service Cable/Revenue Metering panel.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 Protection Scope- Primary Protection: Two (2) new Relay Panels are required
based on ABB relays. Reserved available floor spaces for these two panels.
New panels to be tagged as: =EB04+R1 and =EA06+R1 115kV Service Line
REVISION

Aramco- YDH/ Primary Protection.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 130


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
 Protection Scope- Back Up Protection: Two (2) new relay Panels are required
ASH

based on Siemens relays. Available floor spaces for these 2 panels. New
ASH

Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV Service Line


LEADS

LEADS
LEADS
ALL

ALL
ALL

Aramco- YDH/ Back Up protection Panel.

 MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for Bus
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
DESCRIPTION
ISSUED FOR 60% FEL3

 DC System scope: Existing 125V DC Distribution Panel has not enough spare
breakers for new DC scope. MARAFIQ requested to provide new DC panel
same manufacturer than existing panels “Riyadh Factory For Panelboard”
Available floor space for this new DC panel. New Panel to be tagged as: 125V
DCDB 125V Main DCDB No. 3.

 AC System scope: Existing 220V AC Distribution Panel has required spare


JO/EWO

breakers for new AC scope. CONTRACTOR to utilize existing spare breakers


from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No 480V AC
10-02399-

10-02399-
10-02399-

panel available in MARAFIQ Substation.


0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16

 Power Cable Routing in Basement: CONTRACTOR to develop detailed cable


NO.
REV

DISCIPLINE routing drawings following existing cable routing at MARAFIQ Substation


ENGINEER
basement as much as possible:
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER  Cable trays have to be heavy duty 600mmx150mm for cable transition to
09/08/16 the wall.
DATE:  Cable trays support shall be unistrut type.
CERTIFIED
A M ALMATROOK  Cable structural support shall be Unistrut type similar design that existing
09/08/16
DATE:
ones.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  General requirements:
DATE:  Contractor/SAPMT shall include MARAFIQ in the Engineering Review
OPERATIONS
SHAHZAD YAZDANI Cycle during detail engineering.
09/08/16
 Contractor shall procure all equipment related to MARAFIQ Scope as per
DATE:
Royal Commissioning Standards.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

4.16Communication
DATE:
BY:

A. DATA NETWORK
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Scope of Work

The Yanbu Distribution Hub Data Network System will comprise of


REVISION

several physically separated LANs that includes the Enterprise LAN for
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 131


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG corporate systems including OSPAS, Security CCTV LAN and Process
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
LAN to mainly secure and independently transport, control and manage
their respective traffic. CCTV design shall be in full compliance with
ASH
ASH
ASH

SAES-T-555.
LEADS

LEADS
LEADS
ALL

ALL
ALL

The Security LAN may utilize the Enterprise LAN to transport the traffic
provided with adequate level of logical separation.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The Yanbu Distribution Hub Enterprise LAN shall manage and control
DESCRIPTION

all business related types of traffic that shall traverse through its own
ISSUED FOR 60% FEL3

physically dedicated network which can be Internet, E-mail, VoIP


telephony, and any other data services. It may also carry traffic of
Security CCTV that shall be assigned with a dedicated virtual LAN.

The Yanbu Distribution Hub Enterprise LAN shall consist of a PE Router


in Maintenance & Engineering Building, which shall connect to the
existing Juniper MX-960 in the Admin Building 1401 at Yanbu Refinery
and Communication Building 2 at Yanbu NGL.
JO/EWO

Access switches shall be located in Operation Building, Maintenance &


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Engineering Building, Utility Power Substation Building, Receiving


Substation Building, Operator Shelter, Security Support Building (Main
09/08/16
08/04/16
06/01/16
NO.
REV

Gate & Tank Farm) and will be uplinked to the Distribution switch using
DISCIPLINE
ENGINEER inter-building Outside Plant Fiber Optic cable.
C
A

DATE: CONTRACTOR shall install, test and commission the full functionality of
PROJECT
ALL LEADS
ENGINEER switch with required Power over Ethernet (PoE) ports. The access
09/08/16
switches with Redundant Power Supply shall be used for IP telephones
DATE:
CERTIFIED
and Wireless Access points within the Yanbu Distribution Hub.
A M ALMATROOK
09/08/16 The Wireless LAN System under this project will be provided at
DATE:
CONSTRUCTION
AMR EL SHARKAWY Operation Building, Maintenance & Engineering Building, Operator
AGENCY
09/08/16 Shelter and Security Support Building (Main Gate & Tank Farm) to
DATE: support mobile computing in the Yanbu Distribution Hub facilities.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTRACTOR shall provide and install the following wireless LAN
DATE: subsystems:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Wireless access points


EDSD

 Mounting kits for access points


DATE:
BY:

 Patch cords
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall provide and install the wireless LAN and ensure
the appropriate placement of wireless access points to provide excellent
radio coverage and mobility to all wireless IP devices.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 132


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG WLAN access point outlets shall not be installed more than 3.75 meters
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH above finished floor level.
ASH
ASH

The access point shall be connected to the PoE+ port of Access switch
using UTP CAT-6 cable and shall be powered through its power-over-
LEADS

LEADS
LEADS
ALL

ALL
ALL

Ethernet port.

All components and accessories required for the satisfactory operation


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

of the WLAN system shall be supplied and installed by the


DESCRIPTION

CONTRACTOR.
ISSUED FOR 60% FEL3

 CONTRACTOR shall install, test and commission the Data Network


System as per the following drawings:

 Schematic Diagram,
JO/EWO

Overall Data System CO-A10033.001


10-02399-

10-02399-
10-02399-

 Overall System Diagram


0001

0001
0001
DATE

Data Network System CO-A10036.001


09/08/16
08/04/16
06/01/16
NO.
REV

 Schematic Diagram,
DISCIPLINE
ENGINEER
Overall WLAN System CO-A10039.001
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
Maintenance & Engineering Building
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall procure, install, test and commission the one (1)
09/08/16
DATE:
Distribution switch equipped of 20-Port 1Gigabit Ethernet /2-Port
CONSTRUCTION
AMR EL SHARKAWY 10Gigabit Ethernet L2/L3 line card with SFP pluggable 1000Base-X
AGENCY
09/08/16 Mini-GBIC and 10GBE-XFP Transceivers that support single mode fiber
DATE: over 1310nm wavelength with LC connector. The 1000Base-X Mini-
OPERATIONS
SHAHZAD YAZDANI GBIC Transceiver supports 9 micron single mode fiber up to a
09/08/16 maximum distance of 10km.
DATE:
CONTROL NUMBER

ALI H GHAMDI CONTRACTOR shall provide a 4-Port 10-Gigabit Ethernet Enhanced


VERIFICATION

09/08/16
DPC module with 10Gigabit Ethernet XFP transceivers for the utilization
EDSD

of the existing Juniper MX-960 PPE Routers. CONTRACTOR shall


DATE:

utilize and reserve the slot 4 of the existing Juniper MX-960 on both
BY:

Communication Building 12 at Yanbu NGL and Admin Building 1401 at


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Yanbu Refinery
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

The CONTRACTOR shall procure, install, test and commission one (1)
Provider Edge (PE) router with redundant power supplies.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 133


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall procure, install, test and commission the one (1)
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Access Switch and one (1) Modular Access switch equipped with
redundant SFP pluggable 1000Base-X Mini-GBIC Transceivers that
ASH
ASH
ASH

support single mode fiber over 1310nm wavelength with LC connector.


LEADS

LEADS
LEADS
ALL

The 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode


ALL
ALL

fiber up to a maximum distance of 10km.

CONTRACTOR shall install Universal 19” Standard Rack to mount the


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

switches, Redundant Power Supply, fiber optic/UTP copper patch panel


DESCRIPTION

and ancillaries on each floor.


ISSUED FOR 60% FEL3

The PE Router and Access switch and Modular Access switch installed
in Maintenance & Engineering Building shall be powered from utility
power source and Telecoms-dedicated Uninterruptible Power Supply
(UPS) system

CONTRACTOR shall be responsible for the logical set-up of the


required VLAN/IP addressing and shall be followed based on the
JO/EWO

provided Data Configuration Sheet of Data Network and Engineering


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Operation Building
09/08/16
08/04/16
06/01/16

CONTRACTOR shall procure, install, test and commission the


NO.
REV

DISCIPLINE redundant power supply, one (1) Modular Access switch equipped with
ENGINEER
interface modules and SFP pluggable 1000Base-X Mini-GBIC
C
A

DATE: Transceivers that support single mode fiber over 1310nm wavelength
PROJECT
ALL LEADS
ENGINEER with LC connector. The 1000Base-X Mini-GBIC Transceiver supports 9
09/08/16
micron single mode fiber up to a maximum distance of 10km.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall install Universal 19” Standard Rack to mount the
09/08/16 Modular Access switch, Redundant Power Supply, fiber optic/UTP
DATE:
CONSTRUCTION
AMR EL SHARKAWY copper patch panel and ancillaries.
AGENCY
09/08/16
The Modular Access switch shall be powered from utility power source
DATE:
OPERATIONS
SHAHZAD YAZDANI
and dedicated Rack Mounted UPS systems installed in
09/08/16 Telecommunication Room.
DATE:
Receiving Substation Building
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
DATE:
BY:

SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single


REVISIONCERTIFICATION

mode fiber over 1310nm wavelength with LC connector. The


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

1000Base-X Mini-GBIC Transceiver supports 9 micron single mode


(DCC) NO. _____________________

fiber up to a maximum distance of 10km.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 134


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
access switch, Redundant Power Supply, fiber optic/UTP copper patch
panel and ancillaries.
ASH
ASH
ASH

The access switch shall be powered from utility power source and
LEADS

LEADS
LEADS
ALL

ALL
ALL

dedicated Rack Mounted UPS systems installed in Telecommunication


Room.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Utility Power Substation


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switch equipped with SFP
pluggable 1000Base-X Mini-GBIC Transceivers that support single
mode fiber over 1310nm wavelength with LC connector. The
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.

CONTRACTOR shall install Universal 19” Standard Rack to mount the


JO/EWO

access switch, Redundant Power Supply, fiber optic/UTP copper patch


panel and ancillaries.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

The access switch shall be powered from utility power source and
09/08/16
08/04/16
06/01/16

dedicated Rack Mounted UPS systems installed in Telecommunication


NO.
REV

DISCIPLINE Room.
ENGINEER
C
A

Operator Shelter
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall procure, install, test and commission the one (1)
09/08/16
Redundant Power Supply and one (1) Access switch equipped with SFP
DATE:
CERTIFIED pluggable 1000Base-X Mini-GBIC Transceivers that support single
A M ALMATROOK
09/08/16 mode fiber over 1310nm wavelength with LC connector. The
DATE: 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
fiber up to a maximum distance of 10km.

DATE: CONTRACTOR shall install Universal 19” Standard Rack to mount the
OPERATIONS
SHAHZAD YAZDANI
access switch, Redundant Power Supply, fiber optic/UTP copper patch
09/08/16
panel and ancillaries.
DATE:
CONTROL NUMBER

ALI H GHAMDI
The access switch shall be powered from utility power source and
VERIFICATION

09/08/16
dedicated Rack Mounted UPS systems installed in Telecommunication
EDSD

Cabinet (TC).
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Security Support Building Main Gate


(DCC) NO. _____________________

CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
REVISION

SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 135


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG mode fiber over 1310nm wavelength with LC connector. The
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.
ASH
ASH
ASH

CONTRACTOR shall install Universal 19” Standard Rack to mount the


LEADS

LEADS
LEADS
ALL

ALL
ALL

access switch, Redundant Power Supply, fiber optic/UTP copper patch


panel and ancillaries.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The access switch shall be powered from utility power source and
DESCRIPTION

dedicated Rack Mounted UPS systems installed in Telecommunication


ISSUED FOR 60% FEL3

Room.

Security Support Building Tank Farm Gate

CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switch equipped with SFP
JO/EWO

pluggable 1000Base-X Mini-GBIC Transceivers that support single


mode fiber over 1310nm wavelength with LC connector. The
10-02399-

10-02399-
10-02399-
0001

1000Base-X Mini-GBIC Transceiver supports 9 micron single mode


0001
0001
DATE

fiber up to a maximum distance of 10km.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGINEER
access switch, Redundant Power Supply, fiber optic/UTP copper patch
C
A

DATE:
panel and ancillaries.
PROJECT
ALL LEADS
ENGINEER
09/08/16
The access switch shall be powered from utility power source and
DATE:
dedicated Rack Mounted UPS systems installed in Telecommunication
A M ALMATROOK
CERTIFIED Room.
09/08/16
DATE: General
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 This document shall be constructed in concurrence with the data network
DATE: drawing CO-A00033 sheet 001.
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE: CONTRACTOR shall provide and commission the following subsystems:


CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Access and Distribution Switches


EDSD

 Firewalls
 Wireless Access points
DATE:
BY:

 UPS Equipment
REVISIONCERTIFICATION

 Grounding Kits
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Fiber optic transceivers


(DCC) NO. _____________________

 Fiber Patch cords


 UTP Patch cords
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 136


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG In addition to the Supply, Installation and Commissioning of the equipment,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall undertake a number of ancillary tasks to ensure
conformity of the equipment and System to the overall intent of Project
ASH
ASH
ASH

requirements. These additional tasks shall include, but not necessary limited
to, the following:
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Procure Commissioning spares


 Deliver accessories, equipment, installation and other materials, and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

commissioning spares to site.


DESCRIPTION

 Conduct factory, site and system acceptance tests.


ISSUED FOR 60% FEL3

 Provide installation drawings, wiring and cabling schedules, and


equipment location plans.
 Conduct link test to ensure maximum 1G or higher bandwidth
optimization.
 Installation of additional UTP cabling from the access points to the
appropriate data switches.
 Provide commissioning test plans, test schedules and test reports.
 Provide accommodation, transportation and all necessary permits,
JO/EWO

clearances and protective safety equipment for their In-Kingdom


personnel.

10-02399-

The logistics associated with the In-Kingdom Installation.


10-02399-
10-02399-
0001

0001
0001
DATE

 The provision of all materials, tools, test equipment, and other items of
equipment to effect the installation and commissioning.
09/08/16
08/04/16
06/01/16


NO.
REV

Project Management.
DISCIPLINE
ENGINEER
 CONTRACTOR shall obtain SAUDI ARAMCO approval for the design
prior to implementation.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER Drawings and Documents
09/08/16

DATE: CONTRACTOR shall ensure that the Engineering Drawings, Data Sheets,
A M ALMATROOK
CERTIFIED and configuration sheets are readily available in the facility where the
09/08/16 equipment indicated will be installed.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall deliver all documentation in both hardbound paper
09/08/16
format and also a CD-ROM based electronic file copy.
DATE:
OPERATIONS
SHAHZAD YAZDANI Materials
09/08/16

DATE: CONTRACTOR shall provide ample supply of ancillaries, patch cords as


the project requires, and to have a more viable system.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

Software
DATE:
BY:

All the software are the property of SAUDI ARAMCO, therefore


CONTRACTOR shall provide SAUDI ARAMCO with a complete list of all
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

software installed, complete with revisions, versions, installed locations,


migration path, maintenance agreement and related upgrades for
(DCC) NO. _____________________

maintenance and operation of the equipment as specified in this FSD.

CONTRACTOR shall provide SAUDI ARAMCO with software and related


REVISION

upgrades for maintenance and operation of the equipment as follow:


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 137


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 A complete list of all software installed, complete with revisions,
versions, etc.
ASH
ASH
ASH

 The locations where this software is installed.


 For each software package the migration path (when upgrades will be
LEADS

LEADS
LEADS
ALL

ALL
ALL

expected, how the upgrades will be delivered, loaded, patching, etc.).


 Upgrade/patching management should be part of a service or
maintenance agreement for a prolonged period of time.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Any sub-routine used to enhance the software shall be SAUDI


DESCRIPTION

ARAMCO property.
ISSUED FOR 60% FEL3

REFERENCE DRAWINGS

Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.

SHEET
JO/EWO

DRAWING NO. DRAWING TITLE


NO.
10-02399-

CO-A10033 001 Schematic Diagram, Overall Data System


10-02399-
10-02399-
0001

0001
0001
DATE

Overall System Diagram, Data Network


CO-A10036 001
System
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE CO-A10039 001 Schematic Diagram, Overall WLAN System


ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
B. TELEPHONE NETWORK
ENGINEER
09/08/16
Scope of Work
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
IP Telephony
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 CONTRACTOR shall provide, procure, install, configure and test an
09/08/16
IP Telephony System to be utilized as a primary medium for inbound
DATE: and outbound voice communications at the new Yanbu Distribution
OPERATIONS
SHAHZAD YAZDANI Hub. This shall include the provision and installation of fifty nine (59)
09/08/16
totals of new IP telephone handsets which includes one (1)
DATE:
Conference Telephone handset and seventeen (17) analog & ten
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 (10) hotline telephone handsets including all required accessories


EDSD

and materials. The IP Telephone System shall utilize the provided


Data Network System under this project for transmission and
DATE:
BY:

connection towards IP Telephone Core System located at SAUDI


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

ARAMCO Dhahran B-840 and Abqaiq Comm. Building. All new


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

telephone equipment shall comply with the equipment platform


(DCC) NO. _____________________

provided under BI-10-00246 Replace Telephone Switches


Kingdom Wide.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 138


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall install and commission the IP Telephone
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
System as per the following drawings:
ASH
ASH

 Schematic Diagram, - CO-A10028.001


LEADS

LEADS
LEADS
ALL

ALL
ALL

Overall IP Telephone System


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall provide the required IP telephone system as


DESCRIPTION

per below listed breakdown of numbers and IP phone types per


ISSUED FOR 60% FEL3

building.

Table 1 – IP Telephone Count and Types

Basic IP Office IP Conference


Location Subtotal
Phone Phone IP Phone
Engineering &
6 25 1 32
Maintenance Building
JO/EWO

Operations Shelter 0 4 -- 4
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Operation Building 5 7 -- 12
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
Receiving Substation 3 -- -- 3
C
A

DATE:
PROJECT Security Support Building
ALL LEADS
ENGINEER 1 -- -- 1
09/08/16 Main Gate
DATE:

A M ALMATROOK
CERTIFIED Security Main Gatehouse 1 -- -- 1
09/08/16
DATE: Security Support Building
1 -- -- 1
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Tank Farm
09/08/16
Security Guardhouse
1 -- -- 1
DATE: (Tank Farm)
OPERATIONS
SHAHZAD YAZDANI

09/08/16 Utility Power Substation 4 -- -- 4


DATE:
CONTROL NUMBER

ALI H GHAMDI
TOTAL 22 36 1 59
VERIFICATION

09/08/16
EDSD

DATE:

 CONTRACTOR shall provide approve Basic IP telephones for


BY:

Basic Users, Office IP telephones for all Office Class users and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

Conference IP phone.
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________________

 CONTRACTOR shall provide the required Port licenses for all new
IP telephones to expand the IP telephony platforms located in
Dhahran and Abqaiq provided under BI-10-00246.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 139


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall be responsible for all connection and
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
integration requirements of IP Phone endpoints going to the Access
ASH

Ethernet Switch located at the designated building.


ASH
LEADS

Analog / Hotline Telephone


LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide, procure, install, test and commission


one (1) new Line Access Gateway (LAG) including all required
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

accessories and materials. The LAG shall be utilized to provide


DESCRIPTION

analog telephone lines for the Yanbu Distribution Hub and provide
ISSUED FOR 60% FEL3

back-up outside access calls when the corporate telephone network


is unavailable. As a minimum, the LAG shall compose of the
following modules; two (2) FXO/FXS Interface Modules and an
active & standby Main Control Boards.

 CONTRACTOR shall provide the required Analog and Hotline


telephone system as listed in below Table.
JO/EWO

Table 2 – Analog and Hotline Telephone Count


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Analog Hotline
Location Subtotal
Phone Phone
09/08/16
08/04/16
06/01/16
NO.
REV

Engineering & Maintenance


DISCIPLINE 4 -- 4
ENGINEER Building
C
A

Operations Shelter 2 -- 2
DATE:
PROJECT
ALL LEADS
ENGINEER Operation Building 2 4 6
09/08/16
Remote Interface Unit Building 1 1 -- 1
DATE:
CERTIFIED
A M ALMATROOK Remote Interface Unit Building 2 1 -- 1
09/08/16
DATE: Security Support Building
1 -- 1
CONSTRUCTION
AMR EL SHARKAWY Main Gate
AGENCY
09/08/16
Security Main Gate 1 1 2
DATE:
OPERATIONS
SHAHZAD YAZDANI
X-Ray Building 1 -- 1
09/08/16 Security Support Building
1 -- 1
DATE: (Tank Farm)
Security Guardhouse
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

1 1 2
09/08/16 (Tank Farm)
EDSD

FSF Support Building -- 1 1


DATE:
BY:

Chemical Shelter 1 -- 1
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Metering Shelter 1 -- 1
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

YASREF -- 1 1

SAMREF -- 1 1
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 140


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

Analog Hotline
SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Location Subtotal
ASH
Phone Phone
ASH
ASH

Yanbu Refinery Terminal -- 1 1


LEADS

LEADS
LEADS
ALL

ALL
ALL

TOTAL 17 10 27
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall provide an approve telephones for all analog


DESCRIPTION

users and approve dial-less red phone for all hotline/emergency


ISSUED FOR 60% FEL3

telephone users.

 This project shall allocate the four (4) hotline circuits in Operation
Building to Yanbu Regional Security Command Centre (YRSCC).

 CONTRACTOR shall install and commission the Analog/Hotline


Telephony System as per the following drawings:
JO/EWO

 Schematic Diagram, - CO-A10029.001


Overall Analog Telephone System
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall provide, procure, install, test and commission


09/08/16
08/04/16
06/01/16

two (2) new Firewalls. The Firewall shall be utilized to provide


NO.
REV

DISCIPLINE security protection against threats such as DDoS attacks, malicious


ENGINEER
intrusions, and viruses.
C
A

DATE:
PROJECT  CONTRACTOR shall provide, procure, install, test and commission
ALL LEADS
ENGINEER
09/08/16 two (2) new Ethernet switches. The Ethernet Switch shall be utilized
DATE: to support the system 10/100/1000Base-T ports and GBE ports
A M ALMATROOK
CERTIFIED interface requirements.
09/08/16
DATE:  CONTRACTOR shall provide, procure, install and activate two (2)
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 1000 Base-TX SFP Modules on GE SFP port on each of the two
09/08/16
Huawei Firewalls.
DATE:
OPERATIONS
SHAHZAD YAZDANI
 CONTRACTOR shall provide, procure, install and activate two (2)
09/08/16
1000 Base-TX SFP Modules on Distribution Switch located at
DATE:
Engineering & Maintenance Building.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16

EDSD

CONTRACTOR shall provide, install and terminate two (2) Duplex


Fiber Optic Patch Cords, 10M with LC-LC connectors between
DATE:
BY:

system Firewalls to Distribution Switch.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide, install and terminate eighty six (86) 5


(DCC) NO. _____________________

Meters Systimax UTP Cat-6 Patch Cords with RJ-45 connectors.


UTP Patch Cords shall be utilized for telephone system equipment
network cabling as shown in drawing number CO-A10028 Sheet 001
REVISION

and CO-A10029 Sheet 001.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 141


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide, procure, install, test and commission
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
one Voice Recording System including all required accessories and
ASH

materials. The Voice Recorder shall be utilized to log and record all
ASH

hotlines/ emergency calls for 12 months as per HCIS requirement.


LEADS

LEADS
LEADS
ALL

ALL
ALL

See reference drawing CO-A10028 Sheet 001 and CO-A10029


Sheet 001 for details.


ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide and install one (1) 600mm (W) X


ISSUED FOR 90% PROJECT PROPOSAL

1000mm (D) X 1800mm (H) System Cabinet including all required


DESCRIPTION

accessories. The cabinet shall be utilized to house the telephone


ISSUED FOR 60% FEL3

system equipment and shall be located at Engineering &


Maintenance Building.

 Telephone system equipment shall be powered through a -


Distribution Power Panel located at Telecommunication Room.

 Telephone active equipment shall be grounded and bonded to the


JO/EWO

nearest telecommunications grounding system as per SAES-T-795


Para. 4.2.2.3.4.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 This project shall lease a telephone Trunk Lines from a local service
provider for its Backup/outside call access. Refer to CO-A10028
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
Sheet 001 for the trunk lines detail. This project shall also provide
ENGINEER four (4) hotline circuits going to Yanbu Regional Security Command
C
A

Centre (YRSCC).
DATE:
PROJECT
ALL LEADS
ENGINEER
A Main Distribution Frame (MDF) shall be provided to allow the orderly
09/08/16
and logical termination and interconnection of capable pairs to and from:
DATE:
CERTIFIED
A M ALMATROOK
 Line Access Gateway
09/08/16
DATE:  Analog Telephones
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 Public exchange trunk lines
09/08/16  Building distribution IDFs and structured cabling patch
DATE: panels
OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTRACTOR has to provide the equipment for Telephone Network


DATE: System and Unified Communications as per the System descriptions,
standards and System interfaces defined around each functional layer of the
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 conceptual design. The overall solution is expected to have availability and
EDSD

reliability of 99.99%.
DATE:
BY:

CONTRACTOR shall integrate the System to the COMPANY’s Telephone


Network System located in Dhahran and Abqaiq. CONTRACTOR shall
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ensure that integration shall be seamless. All the System services that are
available in the Yanbu Distribution Hub shall be accessible by the
(DCC) NO. _____________________

COMPANY in Dhahran and vice-versa.

The document also specified the CONTRACTOR’S obligations and will be


REVISION

finalized during detailed design.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 142


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall propose to the COMPANY the recommended training
courses for the System. CONTRACTOR shall price the courses according
ASH
ASH
ASH

to the software and equipment installed that make-up the entirety of the
System.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design, procure, construct, test and commission a


permanent, fully flexible, operational, and maintainable System.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall supply its latest hardware and software required to


DESCRIPTION

support the above capacities with consideration for the expansion.


ISSUED FOR 60% FEL3

CONTRACTOR shall supply the required port licenses for IP phones to


expand the IP telephony platforms located in Dhahran and Abqaiq provided
under BI-10-00246.

CONTRACTOR is responsible for designing, supplying, delivering, surveying


and installing, commissioning, developing test acceptance documents,
testing, acceptance testing, performing configuration and warranting all
JO/EWO

equipment.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

System Configuration
09/08/16
08/04/16
06/01/16
NO.
REV

The Yanbu Distribution Hub Telephone Network System shall be configured


DISCIPLINE
ENGINEER
as described on Schematic Diagrams.
C
A

DATE:  Overall IP Telephone System CO-A10028.001


PROJECT
ALL LEADS
ENGINEER
 Overall Analog Telephone System CO-A10029.001
09/08/16
Commercial off the Shelf (COTS) hardware, system software, application
DATE:
CERTIFIED software packages and firmware shall be configured to meet the stated
A M ALMATROOK
requirements.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY System performance, reliability, flexibility, upward compatibility and
AGENCY
09/08/16 expansion to meet future requirements shall be the basis of the design.
DATE:
OPERATIONS Power Systems
SHAHZAD YAZDANI

09/08/16
The System power shall be derived from a - 4 8 Vo l t D C p o w e r
DATE:
system.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
For equipment requiring other supply voltages, suitable transformers,
EDSD

inverters or AC/DC power supplies shall be provided.


DATE:
BY:

Equipment plugs shall be of a US “flat pin” design with grounding contact.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

EQUIPMENT SPECIFICATIONS
(DCC) NO. _____________________

IP TELEPHONE SETS
REVISION

Scope
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 143


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall engineer, procure, test and install with this
Specification, and the scope shall be as follows:
ASH
ASH
ASH

• Connectivity of IP phone at each communication service point


to 10/100/1000 Mbps switched Fast Ethernet ports shall be
LEADS

LEADS
LEADS
ALL

ALL
ALL

over Unshielded Twisted Pair (UTP) Category 6 cable.


• IP Phones shall have 2-port built-in switch in which
ISSUED FOR 100% PROJECT PROPOSAL

first port connects to the Access Layer in the TER/TR and


ISSUED FOR 90% PROJECT PROPOSAL

the second port connects towards the PC/mobile terminals in


DESCRIPTION

the work areas.


ISSUED FOR 60% FEL3

• IP Phones shall support existing and latest IEEE (Power-


over- Ethernet) standards.
• Procurement of Enterprise grade IP Phones to
meet the requirements of this project and to be installed in
each of the communication service points of Hail Distribution
Facility.
JO/EWO

• IP-Phone based terminals use for Hotline Communications


shall be equipped with add-on dialing module which has
10-02399-

programmable keys that includes easy identification of the


10-02399-
10-02399-
0001

0001
0001
DATE

functions and display on the LCD the name of the sites or


stations with Hotline IP-Phone terminals.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
• Configuration of all IP Phones procured and installed under
ENGINEER this project and to accommodate all new required software,
C
A

hardware and device licenses as required.


DATE:
PROJECT
ALL LEADS
ENGINEER • Testing and Commissioning the IP Phone endpoints
09/08/16 and completion of the installation.
DATE:

A M ALMATROOK
CERTIFIED • IP Phone shall be compatible with the existing Huawei IMS
09/08/16 Plat form.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
IP Phone Types
DATE:
OPERATIONS
SHAHZAD YAZDANI The project shall provide three (3) types of IP telephones which are to be
09/08/16 installed within the Yanbu Distribution Hub:
DATE:
CONTROL NUMBER

ALI H GHAMDI

VERIFICATION

Office Class IP Phone


09/08/16
EDSD

 Basic Class IP Phone


DATE:

 Conference IP Phone
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Analogue Telephone
(DCC) NO. _____________________

This project shall supply and install a Line Access Gateway (LAG) with
Analogue Telephone sets in the Engineering & Maintenance Building to
serve the Yanbu Distribution Hub. A Line Access Gateway (LAG) shall
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 144


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG be provided to serve locations where IP telephone handsets cannot be
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH provided.
ASH
ASH

This project shall supply and install Hotline Telephone between Main Gate,
Operation Building and FSF Support Building.
LEADS

LEADS
LEADS
ALL

ALL
ALL

This project shall supply and install analogue telephone handsets in the
various location of Yanbu Distribution Hub as listed in Table 2 of this
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

document.
DESCRIPTION
ISSUED FOR 60% FEL3

BANDWIDTH REQUIREMENTS

Introduction

The purpose of this section is to provide all the critical VoIP solution sizing
statistics and results that shall be used by CONTRACTOR to design their
solutions. The solution and equipment proposed by CONTRACTOR for
Yanbu Dist ribution Hub shall have the capability to support a minimum
JO/EWO

of 59 users.
10-02399-

10-02399-
10-02399-

The breakdown of the quantity of IP and Analog telephones types per


0001

0001
0001
DATE

building is listed in Table below.


09/08/16
08/04/16
06/01/16
NO.
REV

IP ANALOG
DISCIPLINE BUILDING NAME
ENGINEER TELEPHONE TELEPHONE
C
A

DATE: Maintenance & Engineering Building 32 4


PROJECT
ALL LEADS
ENGINEER
09/08/16
Operator Shelter 4 2
DATE: Operation Building 12 6
CERTIFIED
A M ALMATROOK
09/08/16 Security Support Building (Main Gate) 1 1
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Security Main Gate 1 2
09/08/16
X-Ray Building -- 1
DATE:
OPERATIONS
SHAHZAD YAZDANI
Security Support Building (Tank Farm) 1 1
09/08/16

DATE: Security Guardhouse 1 2


CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 FSF Support Building -- 1


EDSD

Receiving Substation 3 --
DATE:
BY:

Utility Power Substation 4 --


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

--
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Chemical Shelter 1
(DCC) NO. _____________________

Metering Shelter -- 1
Remote Interface Unit Building 1 -- 1
Remote Interface Unit Building 2 -- 1
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 145


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

IP ANALOG
SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BUILDING NAME
ASH
TELEPHONE TELEPHONE
ASH
ASH

YASREF -- 1
LEADS

--
LEADS
LEADS
ALL

ALL
ALL

SAMREF 1

Yanbu Refinery Terminal -- 1


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

TOTAL 59 27
DESCRIPTION
ISSUED FOR 60% FEL3

Standard Erlang and Erlang-B models shall be used to estimate the


required PSTN link capacity.

C. WIRELESS LAN NETWORK

Scope of Work

General
JO/EWO

This shall primarily provide wireless LAN connectivity for the users where the
wireless LAN installation shall be provided under BI-10-02399.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

The project shall provide and commission the following wireless LAN
09/08/16
08/04/16

subsystems:
06/01/16
NO.
REV

DISCIPLINE
ENGINEER  Wireless LAN indoor access points
C
A

 Mounting kits for access points


DATE:
PROJECT  UTP patch cords
ALL LEADS
ENGINEER
09/08/16
The wireless LAN network shall have a flexible configuration that enables it to
DATE:
CERTIFIED
be deployed at any location within the new Yanbu Distribution Hub and
A M ALMATROOK associated open areas with secured connectivity.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY The WLAN system shall consider providing coverage and connectivity for
AGENCY
09/08/16 802.11ac in addition to 802.11a/b/g and 802.11n users. This shall be designed
and implemented to provide the capability to work efficiently with high
DATE:
OPERATIONS performance in mix-mode without interference.
SHAHZAD YAZDANI

09/08/16
The WLAN shall share the data network infrastructure in terms of access
DATE:
switches to facilitate wireless connectivity.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
CONTRACTOR shall design, procure, install, test and commission a fully
EDSD

flexible and secure wireless LAN network to facilitate wireless data access for
DATE:

the users in Yanbu Distribution Hub facilities.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________

CONTRACTOR shall design and implement the System by using the latest
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

proven technology of wireless equipment hardware and software available to


(DCC) NO. _____________________

prevent product early obsolescence.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 146


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall develop a design that presents the appropriate
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
placement of wireless access points to provide excellent radio coverage and
mobility to all wireless IP devices.
ASH
ASH
ASH

The following indoor areas shall be provided with wireless LAN facilities:
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Maintenance and Engineering Building – Ground Floor & 1st Floor


 Operation Building
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Operation Shelter
DESCRIPTION

 Security Guardhouse
ISSUED FOR 60% FEL3

 Security Main Gate

CONTRACTOR shall be responsible for the complete system design to


ensure full coverage within Yanbu Distribution Hub facilities.

All components and accessories required for the completion and successful
operation of the proposed WLAN system, either specified in detail or not, shall
be supplied and installed by the CONTRACTOR. CONTRACTOR shall verify
all required quantities and provide the System “Fit for Purpose’, irrespective of
JO/EWO

estimated quantities given in this document.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Equipment Provision
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE This project shall provide, install, test and commission a permanent, scalable
ENGINEER and a complete WLAN system in accordance with the minimum requirement
C
A

as specified.
DATE:
PROJECT
ALL LEADS
ENGINEER
Installation
09/08/16

DATE:
CERTIFIED
The wireless LAN equipment shall be installed in areas as mentioned above.
A M ALMATROOK Wireless LAN access points shall be directly connected to the Power-over-
09/08/16
DATE:
Ethernet (PoE) ports of the access switches unless otherwise specified.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Wireless Controller
DATE:
OPERATIONS  CONTRACTOR shall utilize the existing Wireless LAN Controller in
SHAHZAD YAZDANI

09/08/16
the Yanbu NGL.
 The Wireless LAN Controller shall manage, secure, route and
DATE:
switching function for all wireless access points.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Access Points
EDSD

DATE:

 Wireless LAN access points shall employ two radios at 2.4 and
BY:

5GHz Frequency band


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

 Wireless LAN access points inside the building shall utilize UTP
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

copper connection to the assigned access switch.


(DCC) NO. _____________________

 Wireless access points shall be ceiling mounted unless otherwise


specified.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 147


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Wireless LAN access points shall be Power-over-Ethernet unless
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
used in a meshed configuration and utilizing fiber optic connection
which is powered independently through a power injector.
ASH
ASH
ASH

 Wireless LAN access point mounting assembly should be


ergonomically designed so that the aesthetic view of the area shall
LEADS

LEADS
LEADS
ALL

ALL
ALL

be preserved.

REFERENCE DRAWINGS
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

SHEET
DRAWING NO. DRAWING TITLE
NO.
ISSUED FOR 60% FEL3

CO-A10033 001 Schematic Diagram, Overall Data System


CO-A10039 001 Schematic Diagram, Overall WLAN System

D. STRUCTURED CABLING SYSTEM

SCOPE DESCRIPTION
JO/EWO

General
10-02399-

10-02399-
10-02399-

This describes the design requirement for the Building Structured Cabling
0001

0001
0001
DATE

System (SCS) for Yanbu Distribution Hub, to provide the communication


services for the new buildings.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER This technical specification shall be used as the basis in specifying and
defining the requirements for the design, supply, installation and
C
A

DATE: commissioning of the structured cabling system for the new building.
PROJECT
ALL LEADS
ENGINEER
09/08/16 Telecommunication services will be provided at the new Yanbu Distribution
DATE: Hub facilities.
CERTIFIED
A M ALMATROOK
09/08/16 All equipment and materials specified to be supplied will be of modern,
DATE: proven and reliable design which will comply with the applicable standards
CONSTRUCTION
AMR EL SHARKAWY
AGENCY or codes and embody the latest proven technology.
09/08/16

DATE: STANDARDS
OPERATIONS
SHAHZAD YAZDANI

09/08/16 General
DATE:

The materials and equipment provided for this System shall conform to the
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 requirements of the latest issues and most recent revisions and
EDSD

amendments of the standards listed below and the local laws and
regulations applicable to the site.
DATE:
BY:

This specification is to be read in conjunction with all relevant SAUDI


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ARAMCO Engineering and Material standards, codes, practices and


regulations, Ministry of PTT requirements, and Saudi Arabian Government
(DCC) NO. _____________________

Safety and Security Directives (SSD).

GENERAL SYSTEM REQUIREMENTS


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 148


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG General
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
All the materials and equipment provided for this System shall meet the
ASH
ASH
ASH

best commercial practices, reliability, maintainability and performance of


the systems defined in this specification.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Structured Cabling System shall comply with BICSI standards as well as


EIA/TIA 568, EIA/TIA-569, EIA/TIA-606, EIA/TIA-607 and all associated
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Technical Bulletins. The cables shall conform to the fire and safety codes
NEC Article 800- 51(b) or equivalent.
DESCRIPTION
ISSUED FOR 60% FEL3

BICSI certified RCDD shall be prerequisites for the designers of the


building cabling system.

Building Structured Cabling System shall be designed for at least a


minimum operating lifetime of 20 years.

Structured Cabling System shall be designed, procured, installed, tested


and commissioned as a complete, fully flexible system to facilitate
JO/EWO

communications services for voice and data of the buildings which


includes the following:
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Cableway infrastructure and termination inside the Telecom


Equipment Room /Telecom Room and enclosure which includes
09/08/16
08/04/16
06/01/16
NO.
REV

but not limited to cable runways, equipment racks, cross-connect


DISCIPLINE
ENGINEER terminals, grounding, horizontal and backbone cabling.
C
A

DATE:
 Cableway System (horizontal and backbone) which includes but
PROJECT
ALL LEADS
ENGINEER not limited to cable tray system, Rigid Steel Conduit (RSC) and
09/08/16
Electro Malleable Tubing (EMT) conduits, sleeves, pull boxes,
DATE: outlet boxes, cableway supports, etc.
CERTIFIED
A M ALMATROOK
09/08/16 The Work shall include but not limited to installation, termination and
DATE:
CONSTRUCTION
AMR EL SHARKAWY
testing of CAT6 modules and test all horizontal and backbone cabling.
AGENCY
09/08/16
TECHNICAL REQUIREMENTS
DATE:
OPERATIONS
SHAHZAD YAZDANI
Telecom Equipment Room (TER)/Telecom Rooms (TR)
09/08/16

DATE: CONTRACTOR shall design and provide a Telecom Equipment Room


CONTROL NUMBER

ALI H GHAMDI
(TER)/Telecommunications Rooms (TR) in the required buildings for the
VERIFICATION

09/08/16
co-location of data and voice termination equipment on each location of
EDSD

the buildings in accordance with EIA/TIA 569 & BICSI TDMM.


DATE:
BY:

CONTRACTOR shall design, procure, construct, test, and commission all


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

associated facilities within the TR to include but not limited to, cable splice
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

closure, grounding system, and cable tagging and relevant backboards.


(DCC) NO. _____________________

Telecommunications Room (TER/TR) in the required buildings shall house


the telecommunication equipment to serve the occupants of the building at
each floor.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 149


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall ensure that the TR arrangements, cable pathways
details shall meet the requirements per ANSI/TIA/EIA-569B and grounding
ASH
ASH
ASH

requirement per ANSI/TIA/EIA-607.


LEADS

LEADS
LEADS
ALL

ALL
ALL

If the total horizontal cabling length to any IO exceeds 90m from the patch
panels, additional TR and IDF’s shall be provided.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Physical Characteristics
DESCRIPTION

The environment and the physical features of the space of TER/TR


ISSUED FOR 60% FEL3

shall be as follows:

 HVAC system shall ensure that the TER/TR is maintained at a


temperature of 18-24 degrees centigrade indoor dry bulb
temperature.
 The HVAC system shall provide humidity control to keep the indoor
air relative humidity level at 30-55%.
 Each TER/TR shall have independent HVAC controls, i.e. a
JO/EWO

thermostat to regulate the temperature and humidity controls


located inside the TER/TR.
10-02399-

10-02399-
10-02399-
0001


0001
0001
DATE

Fire Alarm and Detection System shall be provided in each TER/TR.


 The Fire Detector shall have a remote light extended from its circuit
09/08/16
08/04/16
06/01/16

to a location outside the main entrance door.


NO.
REV

DISCIPLINE  All walls and doors in the TER/TR shall have a one-hour fire rating.
ENGINEER
 Minimum of one fire extinguisher of required type shall be installed.
C
A

DATE:
 A Wall Mounted Telephone shall be placed in the TER/TR.
PROJECT
ALL LEADS
ENGINEER
 The main entrance door shall have a combination door lock and
09/08/16 shall open outward if the building fire code allows.
DATE:
 Lighting and emergency lighting shall be provided in each TER/TR.
A M ALMATROOK
CERTIFIED  Electrical convenience duplex 230V AC outlet spaced at 1880mm
09/08/16 intervals around the perimeter of the walls at a height of 450mm
DATE: above floor level,
CONSTRUCTION
AMR EL SHARKAWY
AGENCY  A twist lock duplex 230V above each equipment rack ceiling
09/08/16
mounted AC outlet together with the dedicated power outlets shall
DATE: be provided.
OPERATIONS
SHAHZAD YAZDANI  Each Line circuit shall originate from the dedicated power panel
09/08/16 located in each TER/TR. For buildings with UPS power, the
DATE: dedicated power panel shall be powered from the Building UPS.
 Grounding - CONTRACTOR shall supply a #4/0 AWG grounding
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 conductor bonded to the building ground grid, for later connection to
EDSD

the TER/TR grounding system.


 Plywood boarding ¾ inch thick by eight (8) feet by four (4) feet shall
DATE:
BY:

be installed on at least two walls within the rooms and painted with
REVISIONCERTIFICATION

two (2) coats of fire retardant white paint.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 The cable support system inside the TER/TR shall be Ladder type
(DCC) NO. _____________________

trays. Cable Trays fittings and hardware include, but not limited to:
hangers, ground straps, fixtures etc. The size and layout of the
ladders and cable trays shall be determined and approved during
detail design.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 150


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 A full complement of mounting brackets shall be incorporated in the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
design which shall include but not limited to threaded rod bracket
kits, ladder rack bracket kits, wall bracket kits and all other
ASH
ASH
ASH

components necessary to make the system workable. The mounting


brackets shall be manufactured from cold rolled steel with zinc
LEADS

LEADS
LEADS
ALL

ALL
ALL

chromate, e-coating or painted black powder coat finish.


 Outside plant fiber optic feeder cable shall be fed onto the fiber optic
patch panel located inside the telecommunications equipment room.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Fire retardant tape shall be wrapped on to the outside Fiber Optic


DESCRIPTION

Cable Terminating on to the fiber patch panel on the run from the
ISSUED FOR 60% FEL3

Cable entry point inside the TER/TER to the Patch Panel.


 However , in places where it is mandatory to place the terminating
hardware more than 15 meters from the underground cable entry
point, suitable splice closure shall be provided for transition of
outdoor type cable to the indoor type cable.

Building Entrance/Entrance Facilities

The building entrance facilities shall consist of the telecommunication


JO/EWO

service entrance to the building, including the entrance point through the
building floor adjacent to an exterior wall and continuing to the entrance
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

room or space.
09/08/16
08/04/16
06/01/16

Entrance conduits – 4” diameter PVC concrete encased conduits shall be


NO.
REV

DISCIPLINE
extended from the TER to a point 1.5 meters from the building foundation.
ENGINEER Please refer to OSP documentation for additional details on the entrance
C
A

Conduits.
DATE:
PROJECT
ALL LEADS
ENGINEER
The entrance room/space is typically located within 15m (50ft) of the
09/08/16
outside cable entrance point. The entrance facilities shall contain the inter-
DATE:
CERTIFIED
building backbone cabling pathways that link a building to other buildings
A M ALMATROOK on site.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Equipment Racks
AGENCY
09/08/16
Cable management system shall be provided using the rack system that
DATE:
OPERATIONS
supports heavy equipment and high capacity cable for cross-connect or
SHAHZAD YAZDANI
interconnect applications in a telecommunication room.
09/08/16

DATE:
Equipment Racks shall be used for the installation of both passive and
CONTROL NUMBER

ALI H GHAMDI
active equipment required for their complete installation in all
VERIFICATION

09/08/16
communication rooms. In locations that require special security or where
EDSD

environmental requirements for the active equipment cannot be met, an


DATE:

enclosure may be required.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The racks system shall be modular and support copper and fiber cables.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The rack shall be constructed of steel material to accommodate 19”


(DCC) NO. _____________________

components.

The rack shall be UL listed for 800 pound load rating to accommodate
large networking equipment.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 151


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The rack shall supply space identification of quick and easy location of
rack mount items, double sided#12-24 EIA universal mounting-hole
ASH
ASH
ASH

spacing.
LEADS

LEADS
LEADS
ALL

ALL
ALL

The rack shall accept removable, hinged doors and fingers cable
management system. The rack system shall meet all EIA requirements as
defined in EIA-310-D.The standard racks shall be high strength aluminum
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

with heavy-duty base and top angle hardware.


DESCRIPTION

Standard Rack dimensions shall be 7 feet height x 19 inches width.


ISSUED FOR 60% FEL3

Minimum of two (2) 19” X 7” equipment racks and associated vertical &
horizontal cable management system is required per TR.

Each rack shall be bonded together with approved bonding jumpers to the
communications room ground bus bar.

Equipment Enclosures
JO/EWO

Communication equipment enclosures shall be designed and installed on


a case by case basis depending on the circumstance that would require a
10-02399-

10-02399-
10-02399-

change from the project standard equipment rack.


0001

0001
0001
DATE

Enclosures may be used in buildings where size may prohibit a


09/08/16
08/04/16
06/01/16
NO.
REV

communications room but still require voice and data connections to the
DISCIPLINE
ENGINEER LAN enclosures shall have a locking mechanism.
C
A

DATE: Fan units equipped with a fit for purpose filtration system shall be used,
PROJECT
ALL LEADS
ENGINEER where necessary, to ensure that the maximum enclosure temperature
09/08/16 does not exceed the manufacturer’s recommended operating temperature
DATE: for active equipment.
CERTIFIED
A M ALMATROOK
09/08/16 Cable Termination Hardware
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Each horizontal or backbone cabling run will be terminated to the patch
09/08/16
panels using appropriate connectors or connecting blocks depending upon
DATE: the cable type. Matching patch cords will be used to perform cross connect
OPERATIONS
SHAHZAD YAZDANI into the networking / voice hardware.
09/08/16

DATE: To ensure uniformity, all patch panels for their perspective application,
CONTROL NUMBER

ALI H GHAMDI
copper, fiber, etc. shall be from the same manufacturer and part number
VERIFICATION

09/08/16 throughout the job site. All copper patch panels shall support CAT6
EDSD

applications and facilitate cross-connection using modular CAT6 4-pair


patch cords with RJ-45 end plug.
DATE:
BY:
REVISIONCERTIFICATION

Patch panels shall be sized with a minimum 25 percent spare capacity for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

future growth and MAC (Moves, Adds & Changes) work. The patch panels
(DCC) NO. _____________________

design shall remove any tools involving MAC work.

Modular Patch Panel


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 152


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG All horizontal cables serving the information outlets (IO’s) at the IWAs shall
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH be terminated onto a patch panels in TER/TR/TC or data enclosures.
ASH
ASH

Patch Panels shall be, modular, CAT-6 UTP, with integral high density
punch down style connecting base. The connecting base shall employ
LEADS

LEADS
LEADS
ALL

ALL
ALL

deep channels to provide additional space for cable management. The


connecting block shall have a compatible footprint with installed 110
systems. The connecting block shall have rounded edge.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Four pair Category 6 UTP cabling shall be terminated onto four pair punch
DESCRIPTION

down style connecting hardware mounted to the rear (integral to the patch
ISSUED FOR 60% FEL3

panel) to the category 6 modules on the front face of the patch panel
wiring configuration shall conform to EIA/TIA 568B standard.

The wire strip and connecting block, shall be marked with a highly visible
color code and allow for termination of one full pair or four full pairs at a
time.

Port and panels shall be easy to identify with write on areas and optional
JO/EWO

label holder for color coded labels.


10-02399-

10-02399-
10-02399-

The patch panels shall be mountable to the standard EIA 19”


0001

0001
0001
DATE

racks/enclosures.
09/08/16
08/04/16
06/01/16
NO.
REV

Modular Patch Cords


DISCIPLINE
ENGINEER
C

Modular patch cords shall be used between patch panels configured as


A

DATE: cross-connect or between the patch panel and the networking hardware
PROJECT
ALL LEADS
ENGINEER when the patch is used as an interconnection.
09/08/16

DATE: The Patch cords shall be factory terminated with modular plugs featuring a
CERTIFIED
A M ALMATROOK one piece , tangle free latch design and black strain relief boots to support
09/08/16 easy moves , addition and changes .They shall be constructed with
DATE:
Category 6 24 AWG stranded UTP cable. Each patch cord shall be 100%
CONSTRUCTION
AMR EL SHARKAWY
AGENCY performance tested at the factory in a channel test to the Category 6
09/08/16
standards.
DATE:
OPERATIONS
SHAHZAD YAZDANI Punch Down System and Patch Cord Assemblies
09/08/16

DATE: Category 6 UTP patch cords shall be used between punch down style
CONTROL NUMBER

ALI H GHAMDI
connecting blocks when configured as a cross connect or between the
VERIFICATION

09/08/16 connecting block and networking hardware when the connecting block is
EDSD

used as a interconnect.
DATE:
BY:

Patch cords shall use 24 AWG stranded Category 6 cable. The cable shall
REVISIONCERTIFICATION

be terminated onto eight position punch down style plugs (R-J45 modular
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

plugs featuring a one piece, tangle free latch design and strain relief boots)
(DCC) NO. _____________________

and tested to exceed the Category 6 performances when used with the
specified Category 6 modular jacks.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 153


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The patch cords shall use grey cords with grey connectors, shall be field
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH terminable and shall employ a clear cap for wiring identification.
ASH
ASH

Fiber Patch Panels


LEADS

LEADS
LEADS
ALL

ALL
ALL

Fiber Patch Panels shall be equipped with SC connectors shall be


provided to terminate the cables. Patching within the cabinets /racks shall
be via dual SC-SC connector fiber patch cables.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Fiber Optic Patch Cords


DESCRIPTION
ISSUED FOR 60% FEL3

The fiber patch cords shall be pre-terminated patch cables with SC


connector.

The fiber patch cords and pigtails shall be constructed from high
performance single mode optical fiber cable with SC connectors.

Integral boots shall be provided to provide strain relief and help maintain
consistent polarity.
JO/EWO

The fiber Patch cords come in lengths of one, two and three meters.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Cable Management
09/08/16
08/04/16
06/01/16
NO.
REV

Cable management shall be used to provide a neat and efficient means for
DISCIPLINE
ENGINEER routing and protecting fiber and copper cables and patch cords on the
C

equipment racks and enclosures. The system shall be complete cable


A

DATE: management system comprised of vertical cable managers, horizontal


PROJECT
ALL LEADS
ENGINEER cable managers, and cable management accessories used throughout the
09/08/16 cabling system. The system shall protect network investment by
DATE: maintaining system performance, controlling cable bend radius and
CERTIFIED
A M ALMATROOK providing cable strain relief.
09/08/16
DATE:
Vertical Cable Manager
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Vertical cable mangers shall include components that aid in routing,
DATE: managing and organizing cable to and from patch panels and/or
OPERATIONS
SHAHZAD YAZDANI equipment. Managers shall protect network equipment by controlling cable
09/08/16 bend radius and providing cable strain relief .Managers shall be universal
DATE: design mounting to EIA 19” racks and constructed of base with plastic
CONTROL NUMBER

ALI H GHAMDI
fingers. The duct fingers shall include retaining tabs to retain the cables in
VERIFICATION

09/08/16 place during cover removal. The covers shall be easily removed or hinged
EDSD

to allow for quick moves, addition and changes.


DATE:
BY:

Horizontal Cable Manager


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Horizontal cable managers shall include components that aid in routing,


(DCC) NO. _____________________

managing and organizing cable to and from patch panels and/or


equipment. Panels shall protect network equipment by controlling cable
bend radius and providing cable strain relief. Panels shall be universal
design mounting to EIA 19” racks and constructed of steel base with
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 154


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG plastic fingers. The duct fingers shall include retaining tabs to retain the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cables in place during cover removal. The covers shall be easily removed
or hinged to allow for quick moves, addition and changes.
ASH
ASH
ASH

The cable mangers shall be provided with wire retainers to retain the
LEADS

LEADS
LEADS
ALL

ALL
ALL

cables during cover removal and # 12-24 English and M6 metric mounting
screws. The two rack unit space, horizontal cable management panel shall
be provided between two modular patch panels.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

In Cabinet Cable Manager


DESCRIPTION
ISSUED FOR 60% FEL3

In cabinet cable management system shall include components that aid in


routing, managing and organizing cable to and from patch panels and/or
equipment within a cabinet. Mangers shall protect network equipment by
controlling cable bend radius and providing cable strain relief. Panels shall
be a flexible design with adjustable mounting Panels shall be constructed
PVC duct with steel mounting brackets attached. Duct fingers shall have
score lines for easy removal.
JO/EWO

Backbone Cabling
10-02399-

10-02399-
10-02399-

The Backbone Cable Subsystem in a building is the part of the structured


0001

0001
0001
DATE

cabling system that provides connectivity between Equipment rooms,


telecommunication rooms and telecommunication service entrance
09/08/16
08/04/16
06/01/16
NO.
REV

facilities.
DISCIPLINE
ENGINEER
C

The Backbone fiber optic cable shall be glass cable, single mode fiber
A

DATE: optic cable conforming to G.652D standard.


PROJECT
ALL LEADS
ENGINEER
09/08/16 The optic core optical fibers armored distribution cable shall be used within
DATE: buildings. Applications include intra-building backbones, routing between
CERTIFIED
A M ALMATROOK telecommunication rooms and connectorized cables in riser and plenum
09/08/16 environments. The optical fiber is inside a spiral wrap of interlocking
DATE:
aluminum armor for ruggedness and superior crush resistance (Interlock
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Armored).Identification sheath marking shall provide positive identification
09/08/16
and length verification.
DATE:
OPERATIONS
SHAHZAD YAZDANI Cables shall be CSA-FT4 rated or an equivalent. The Optical Fiber cables
09/08/16 shall have water blocking, application specific fame / smoke rating high
DATE: density features.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 The optical fiber cable shall be suitable for riser and plenum applications.
EDSD

The optical fiber cables shall have riser and Plenum designs UL listed as
DATE:
BY:

CMR/OFNR (CSA-FT4) and CMP/OFNP (CSA-FT6) or an equivalent


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The indoor Fiber Optic cable shall be un-armored.


(DCC) NO. _____________________

The Fiber Optic cables shall be designed with Reverse Oscillated Lay
Stranding Method to facilitate mid-span access of fibers. All the Fiber Optic
Cables shall be terminated to a patch panel.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 155


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Patch cords of same specification shall be used for the indoor distribution
system from network switches to end devices throughout the building, as
ASH
ASH
ASH

well as the interfaces between various systems and networks.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The type of Backbone copper cable shall be 100 ohms unshielded twisted
pair multi-pair cable.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Copper Cable: In cases where copper cables shall be utilized to provide


analogue telephone service or any other voice communication service,
DESCRIPTION

following shall be the minimum standard required for the cable to be used:
ISSUED FOR 60% FEL3

 All cables shall meet or exceed Category 6 or Cat 3 UTP


 These requirements are for multi-pair 25 pair or more UTP 24 AWG
copper cables.
 All cables shall conform to the requirements for communication
circuits defined by local electrical code equivalent to NEC.
 The cable manufacturer shall be ISO 9001 registered.
JO/EWO

Voice Termination Hardware


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Punch down 110 base and system, Cat-6 ( Cat3) UTP cable shall be
terminated upon a standard density 110 style cat-6 connecting block,
09/08/16
08/04/16
06/01/16

providing for termination of four pair cables.


NO.
REV

DISCIPLINE
ENGINEER Protection Units
C
A

DATE:
PROJECT
All copper circuits shall be protected between each building with a
ALL LEADS
ENGINEER
protector unit at the demarcation point of every building. All protector units
09/08/16
shall be grounded according to the manufactures recommendations.
DATE:
CERTIFIED
A M ALMATROOK Cross Connecting Hardware
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Category 6 UTP patch cord shall be used between 110 style connecting
AGENCY
09/08/16 bases when configured as a cross-connect or between connecting block
and networking hardware when the connecting block is used as an
DATE:
OPERATIONS
interconnect. Patch cords shall be 24 AWG stranded Category 6 cable.
SHAHZAD YAZDANI
The cable shall be terminated onto 110 style plugs tested to exceed CAT-6
09/08/16
performance when used in a channel with the specified category 6
DATE:
modules.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
The patch cords shall be factory terminated with modular plugs featuring a
EDSD

one piece, tangle free latch design and black strain relief boots. No field
DATE:

terminated patch cords or cross-connects shall be used for the permanent


BY:

installation.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Horizontal Cable System


(DCC) NO. _____________________

The horizontal cabling system is the portion of the telecommunication


cabling system that extends from the work area telecommunication
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 156


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG outlet/connector to the horizontal cross-connect in the Telecommunication
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Room/Telecommunication Equipment Room/Telecom Closet.
ASH
ASH

General
LEADS

LEADS
LEADS
ALL

ALL
ALL

All horizontal cabling shall be CAT6 UTP, plenum rated, 24 AWG 100 Ohm,
4-pair cables to create a truly structured cable environment where each
horizontal link can be used for either voice or data as required.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The horizontal cabling shall utilize a physical star-wired configuration. It


DESCRIPTION

shall comprise of uninterrupted cable runs terminated at the user


ISSUED FOR 60% FEL3

information outlets and within the Telecommunications Room.

Plenum cable shall be utilized for the horizontal cable distribution network
where cables are subjected to airflow and are not totally enclosed in steel
conduit. Other areas shall use non-plenum grade in NEC & UL.

Bridged taps and splices are not permitted as part of the copper horizontal
cabling.
JO/EWO

The maximum distance of the horizontal cable shall be 90 meters. The


10-02399-

10-02399-
10-02399-

maximum distance for cross-connect jumpers and patch cords, jumpers


0001

0001
0001
DATE

and patch cords that connect horizontal cabling with equipment or


backbone cabling shall not exceed 6 meters in length.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER All horizontal cables shall be terminated onto punch down style UTP, CAT-
C

6 modular patch panels or punch down style connecting blocks in


A

DATE: TER/TR/TC / DATA enclosure at one end and at CAT- 6 outlet using
PROJECT
ALL LEADS
ENGINEER EIA/TIA 568-B at the IWA at the other end.
09/08/16

DATE: Each telecommunication outlet location shall have at a minimum three (3)
CERTIFIED
A M ALMATROOK Category 6 cables.
09/08/16
DATE:
Horizontal Cable Management
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
All major runs of the horizontal cable shall be installed in a
DATE: communications cable tray C-profile perforated, metallic, 75 mm deep and
OPERATIONS
SHAHZAD YAZDANI width as per the calculated sizing depending upon the usable area served
09/08/16 by them.
DATE:
CONTROL NUMBER

ALI H GHAMDI
Communication cables or wires shall not be strapped, taped or attached by
VERIFICATION

09/08/16 any means to the exterior of any conduit or raceway as a means of


EDSD

support. All trays shall be installed with the proper bend radius and support
for maximum loading.
DATE:
BY:
REVISIONCERTIFICATION

The maximum fill ratio shall not exceed 40% of the cable installed. A full
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

complement of fittings must be available including, but not limited to 45


(DCC) NO. _____________________

degree and 90 degree flat, vertical inside and outside elbows, tee and
cross fittings, reducers, end caps and all other components necessary to
make the system workable. Snap-on or split covers shall be available for
all directional fittings.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 157


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The fitting shall be capable of maintaining a 2” minimum cable bend
radius. The communications cable tray shall not be shared with building
ASH
ASH
ASH

electrical cable. Communications wires and cables shall be separated by


at least 50.8mm (2 in) from conductors of any electric light or power.
LEADS

LEADS
LEADS
ALL

ALL
ALL

In each section of tray, a bonding jumper shall be installed as required.


When combination utility poles are used from the ceiling for power and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

communication cable, the poles shall be specifically listed for the


application.
DESCRIPTION
ISSUED FOR 60% FEL3

A full complement of mounting brackets shall be incorporated in the design


which shall include but not limited to Threaded rod bracket kits, Ladder
rack bracket kits, wall bracket kits and all other components necessary to
make the system workable. The mounting brackets shall be manufactured
from cold rolled steel with zinc chromate, e-coating or painted black
powder coat finish.

Horizontal Cable Types


JO/EWO

Cables installed in ducts, plenums and other spaces for environmental air
10-02399-

10-02399-
10-02399-

shall be Communication Plenum Cable Type (CMP). Listed plenum


0001

0001
0001
DATE

communications raceways shall be installed in ducts and plenums. Cables


installed in vertical runs and penetrating more than one floor, or cables
09/08/16
08/04/16
06/01/16
NO.
REV

installed in vertical runs in a shaft, shall be Communication Riser Cable


DISCIPLINE
ENGINEER Type (CMR). Floor penetrations requiring Type CMR shall contain only
C

cables suitable for riser or plenum use. Listed riser communications


A

DATE: raceways shall be installed in vertical riser runs in a shaft from floor to
PROJECT
ALL LEADS
ENGINEER floor.
09/08/16

DATE: Only Type CMP and CMR cables shall be installed in these raceways.
CERTIFIED
A M ALMATROOK Communications cables Types CMP, CMR, Communications General
09/08/16 Purpose Cable (CMG) shall be used in distribution frames and cross-
DATE:
connect arrays.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Work Area Subsystems
DATE:
OPERATIONS
SHAHZAD YAZDANI The work area shall consist of the connectivity equipment used to connect
09/08/16 the horizontal cabling subsystem and the equipment in the work area. The
DATE: connectivity equipment might include the following options:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 Patch(equipment cords) and modular connectors
EDSD

 Outlet and surface mount boxes


DATE:

 Surface raceway and outlet poles


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Information Outlets (IO) and surface mount boxes


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Each building shall be pre-wired for voice/data and Wireless Local Area
Network (WLAN) access point connection in accordance with TIA/EIA-
568B wiring standard. Dual Port RJ-45 Information Outlets shall be
provided for each room. Two (2) CAT6 4-pair horizontal cables shall be
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 158


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG routed, terminated and certified from the Information Outlet to the patch
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH panels within the building’s Telecommunication Room (TER/TR).
ASH
ASH

The maximum CAT6 cable length between the IO and patch panels shall
be 90 meters.
LEADS

LEADS
LEADS
ALL

ALL
ALL

All insert modules shall be 8P8C, non-keyed, modular RJ45 jack with
pin/pair assignments wired per T568B standard termination.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

All outlets shall be manufactured from high impact thermoplastic material


DESCRIPTION

UL flammability rating of 94 HB or better. All outlets and surface mount


ISSUED FOR 60% FEL3

boxes shall be available in four colors including off-white (IW), Electrical


Ivory (EI), White (WH) and international Grey (IG).

Each gang box shall be connected to 1” diameter conduit. In cases of false


ceiling installation, the conduit shall begin from the cable tray (installed in
the space between the Ceiling and the false ceiling) and terminate at the
outlet gang box.
JO/EWO

The conduits installed underground flushed with floor shall be 1” diameter


PVC.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

A 1” diameter coupling shall be provided at the transition point of 1”


diameter EMT to 1” diameter PVC. In cases where conduits originate
09/08/16
08/04/16
06/01/16
NO.
REV

directly from the Data Cabinet feed to the outlet directly whole run being
DISCIPLINE
ENGINEER above ground, 1” diameter EMT conduit shall be provided.
C
A

DATE: In cases where the conduits originate from the data cabinet but partial run
PROJECT
ALL LEADS
ENGINEER is flushed floor before serving the outlet, the amount of run above ground
09/08/16 shall be 1” diameter EMT and that under the ground shall be 1” diameter
DATE: PVC coated RSC. At each end of the conduits, bushings shall be provided
CERTIFIED
A M ALMATROOK for protection of the cables.
09/08/16
DATE:
Surface mount boxes shall be provided in 4 ports low profile boxes. Boxes
CONSTRUCTION
AMR EL SHARKAWY
AGENCY shall accept all fiber, copper and miscellaneous audio/video modules. The
09/08/16
Boxes shall mount with screws, adhesives or optional magnets. The box
DATE: covers include breakouts for use with surface raceway. Cable tie slots shall
OPERATIONS
SHAHZAD YAZDANI be included to prove strain relief to the cables.
09/08/16

DATE: The information outlet openings shall be standard NEMA-equivalent


CONTROL NUMBER

ALI H GHAMDI
opening .This size shall provide openings that are dimensionally equivalent
VERIFICATION

09/08/16 to standard (NEMA OS 1 WD-6) openings. In addition, a minimum depth of


EDSD

30.5mm (1.2 in) should be provided.


DATE:
BY:

Face plates shall be two ports as required, single gang with painted
REVISIONCERTIFICATION

combination head screw. The face plates shall mount to standard US


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

NEMA boxes and adapters .Dedicated sloped versions shall be provided


(DCC) NO. _____________________

for improved bend radius control and decreased requirements in wall


depths. Each faceplate shall accept outlet modules that can be individually
inserted and removed as required.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 159


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Power poles can be used as pathways for the horizontal cable from the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ceiling to the work areas. Power poles that are used for voice, data and
power cable shall be listed for the applications with a divider for
ASH
ASH
ASH

separation. The poles shall be installed as per the manufacture installation


instructions and following the local applicable codes.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Fire Stopping
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Fire stopping material and procedures shall conform to the international


BICSI TDMM standard
DESCRIPTION
ISSUED FOR 60% FEL3

Communications Grounding

CONTRACTOR shall provide communications grounding and bonding


system in all locations that utilize communications equipment, both passive
and active. Telecommunications Main Grounding Busbar (TMGB), the
Telecommunications Grounding Busbar (TGB), the Telecommunications
Bonding Backbone (TBB), the Telecommunications Bonding Backbone
Interconnecting Bonding Conductor (TBBIBC) and the conductors used to
JO/EWO

bond the components together are the components for the communication
grounding and bonding infrastructure.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

The TMGB is generally located in the entrance facility, where the


communication service enters the building. Its primary function is to
09/08/16
08/04/16
06/01/16
NO.
REV

conduct lightning and AC fault currents from the primary protectors. The
DISCIPLINE
ENGINEER conductor for the TMGB shall be a minimum of 300 mm (1 ft.) from any
C

power cables, even when isolated by metallic conduits. The location of the
A

DATE: bus bar shall be designed for attaching entrance facility equipment and
PROJECT
ALL LEADS
ENGINEER other grounding bars.
09/08/16

DATE: The TGB is the bar used to ground the passive and active components
CERTIFIED
A M ALMATROOK inside the communications room. The TGB shall be a predrilled electro tin
09/08/16 plated copper bus bar provided with standard NEMA bolt hole sizing and
DATE:
spacing. Minimum dimensions for the TGB are 6 mm (1/4 in) thickness x
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 50 mm (2 in) width. Length can vary as required in each communications
09/08/16
room.
DATE:
OPERATIONS
SHAHZAD YAZDANI All bonding conductors shall be a minimum of No. 6 AWG insulated copper
09/08/16 using listed 2-hole compression connectors. Each bonding conductor shall
DATE: be labeled per ANSI/TIA/EIA 606. All bonding conductors shall be marked
CONTROL NUMBER

ALI H GHAMDI
by a distinctive green color and be tagged with the label.
VERIFICATION

09/08/16
EDSD

EXPANSION CAPABILITIES
DATE:
BY:

Unless specified otherwise, the following shall apply.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SCS horizontal cabling shall have two (2) or three (3) UTP cables wired to
(DCC) NO. _____________________

the information outlets of each quadplex plate.

The backbone cable system shall be sized with a minimum of 50% spare
capacity, allowing for future expansion.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 160


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH COMMUNICATIONS DISTRIBUTION DESIGNER
ASH
ASH

All building telecommunications cable system design must be done under


the design authority of a valid/current BICSI Registered Communications
LEADS

LEADS
LEADS
ALL

ALL
ALL

Distribution Design (BICSI RCDD) to ensure that a minimum level of


competency has been provided in the telecommunication office building
infrastructure and cable system.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

INSTALLATION AND COMMISSIONING


DESCRIPTION
ISSUED FOR 60% FEL3

Installation

CONTRACTOR shall install all equipment required by this specification to


produce a fully functional system ready for handling over to SAUDI
ARAMCO.

Quality
JO/EWO

CONTRACTOR shall ensure that the installation is to be carried out by


fully trained personnel, with installation techniques who are familiar with
10-02399-

10-02399-
10-02399-

the system and the equipment.


0001

0001
0001
DATE

CONTRACTOR shall ensure installation work shall be performed in a


09/08/16
08/04/16
06/01/16
NO.
REV

workmanlike manner using best practices, and adhering to the


DISCIPLINE
ENGINEER requirements of SAUDI ARAMCO standards.
C
A

DATE: CONTRACTOR shall label each wire and cable in each end indicating the
PROJECT
ALL LEADS
ENGINEER wire designation. The labeling shall be identical in nomenclature and all
09/08/16 labels shall be typed and covered with transparent heat-shrinkable tubing.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall neatly arrange all cables on the cable ladder rack,
09/08/16 cable tray, or supports to prevent twisting and unnecessary crossover of
DATE:
cables. All signal cables and wiring shall be secured.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Plant Tagging
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall be responsible for tagging all equipment and the
09/08/16 verification of proper tagging shall be carried out as part of the mechanical
DATE: completion inspection.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Testing and Inspection of UTP Cables


EDSD

Manufacturer’s Data
DATE:
BY:
REVISIONCERTIFICATION

 Test data shall be provided by the manufacturer for each purchase


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

order of copper premises distribution system cables, complying with


(DCC) NO. _____________________

the TIA/EIA 568B.2-1, ISO/IEC 11801 (2002) and CENELEC


EN50173-1 (2002) specifications for UTP Cat. 6 cables.

Test To Be Performed By CONTRACTOR before Installation


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 161


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 In addition to the test data provided by the manufacturer, the
Category 6 cables shall be measured for attenuation (insertion loss)
ASH
ASH
ASH

and near end cross talk (NEXT) at the following frequencies: 1 MHz,
4.0 MHz, 25 MHz and 250 MHz as a minimum. Insertion loss and
LEADS

LEADS
LEADS
ALL

ALL
ALL

cross talk must be measured with a cable length of at least 305


meters (1000 ft). If the cable lengths are greater than 305 m, the
results must be normalized to 305 m for comparison with the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

manufacturer’s data.
DESCRIPTION

 Figures 18-D and 18-E show the test set up for insertion loss and
ISSUED FOR 60% FEL3

NEXT respectively. The frequency oscillator must be set to the


correct frequency, level (0 dBm), and source impedance (100 ohm).
The level of meter must cover the required range of frequencies and
a wide range of sensitivity down to 100 dBm. Test cords must be
 short and calibrated according to ANSI/EIA/TIA-5
JO/EWO

Cable Crosstalk between pairs


Insertion
Freq.
10-02399-

Loss (dB) (dB)


10-02399-
10-02399-
0001

(MHz)
0001
0001
DATE

1-2 1-3 1-4 2-3 2-4 3-4


1
09/08/16
08/04/16
06/01/16
NO.
REV

4
DISCIPLINE
ENGINEER 16
C
A

25
DATE:
PROJECT
100
ALL LEADS
ENGINEER 200
09/08/16
250
DATE:
CERTIFIED
A M ALMATROOK Use this table to record the measure value as a result of testing on the cable.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
On the basis that an estimated 360 cable reels of 305 meters each will be used, it is
AGENCY
09/08/16 proposed to select 50 random samples for measurement. If the measured values exceed
(in the case of insertion loss) or are less than (in the case of NEXT) the manufacturer’s
DATE:
OPERATIONS specifications by more than 5% at any frequency, the results must be reported to the
SHAHZAD YAZDANI
SAUDI ARAMCO Representative and another lot of samples will be chosen for testing. If
09/08/16
the second lot of samples fails again, the batch must be rejected.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

After installation, all copper cable pairs shall be tested for circuit continuity (end to end),
09/08/16
split pairs, pair-to-pair short, attenuation and noise as specified in SAES-T-634. The
EDSD

recommended test set is fluke Omni scanner.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 162


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG All horizontal cabling must be tested in accordance with TIA/EIA TSB 67 known as
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
“Transmission Performance Specification for Field Testing of Unshielded Twisted Pair
Cabling”.
ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

ISSUED FOR 100% PROJECT PROPOSAL


ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
ISSUED FOR 60% FEL3
JO/EWO
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16

DATE:
OPERATIONS The SCS installation and testing shall be performed by Category 6 cable
SHAHZAD YAZDANI

09/08/16
manufacturer certified installer.
DATE:
Test results shall be signed by the Category 6 cable manufacturer certified
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
installer in each sheet and witnessed by SAUDI ARAMCO Representative.
EDSD

Copy of calibration certificate shall be attached to test results document.


DATE:
BY:

Testing shall be done in the presence of SAUDI ARAMCO Representative.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Test results shall be submitted at least two copies (both hard & soft copy)
(DCC) NO. _____________________

Test to be performed by UTP cable Manufacturer for Certification


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 163


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 After CONTRACTOR has carried out installation, certified UTP
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cable Manufacturer Structured Cabling Engineer will carry out the
following tests on-site before the service is cut over.
ASH
ASH
ASH

1. Wire map (Continuity)


LEADS

LEADS
LEADS
ALL

ALL
ALL

2. Length
3. NEXT
4. Attenuation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

5. ELFEXT
6. Delay & Delay Skew
DESCRIPTION

7. Return Loss
ISSUED FOR 60% FEL3

8. Power Sum Cross talk (PS Next & PS Elfext)

 Fluke Omni scanner is to be used for these tests. Records for every
cable shall be printed out and kept for future reference.

Test Record Forms

Acceptance Test Record Forms will be used for Exchanged Cable,


JO/EWO

Digital Test Data. Refer to Section 4 or to the SAES-T-634.


10-02399-

10-02399-
10-02399-
0001

Supplemental electronic data file will be made on diskette or CD


0001
0001
DATE

attached to the associated Test Record Form.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
Test Report Format
ENGINEER
C
A

The Field Test Report will consist of the following information in order:
DATE:
PROJECT
ALL LEADS
ENGINEER  Type of test and name of systems tested.
09/08/16
 Copy of the Test Procedure(s) that have been followed.
DATE:
CERTIFIED
 Copies of the completed and signed test Record Forms.
A M ALMATROOK  Summary discussion of the test performed and the overall results.
09/08/16
DATE:
 Discussion of any problems encountered and how they were
CONSTRUCTION
AMR EL SHARKAWY resolved.
AGENCY
09/08/16  Test Equipment List.
DATE:
OPERATIONS
SHAHZAD YAZDANI
Quality Control
09/08/16

DATE:
The installation team chief on a daily basis performs QA/QC inspections
during the equipment installation. Monitoring may also be conducted by
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 SAUDI ARAMCO Operations personnel on their own and notify the
EDSD

installation team of findings.


DATE:

Design Drawings
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Two sets of design drawings are available during each site installation.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

On-site modifications will be legibly marked on two drawing sets. After


(DCC) NO. _____________________

installation, one set will be returned for as-built drawing preparation.


The remaining set is kept with the SAUDI ARAMCO Operations
personnel for plant-in-place records until the corrected as-built set is
REVISION

developed.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 164


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Safety Equipment
ASH
ASH

First aid kits, fire extinguisher, hard hats, safety shoes, and other safety
devices will be prepared for safety personnel before testing.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Proof of Performance
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

After mechanical completion, official demonstration will be performed


with the installed cabling to show the system installed means the
DESCRIPTION

designed criteria.
ISSUED FOR 60% FEL3

Field Test Procedure

General

This test plan describes the requirements for testing copper cables for
voice and data circuits.
JO/EWO

Test Equipment Requirement


10-02399-

10-02399-
10-02399-


0001

Volt Ohmmeter
0001
0001
DATE

 Megger (Insulation tester)



09/08/16
08/04/16
06/01/16

PCM - 23 (VF tester)


NO.
REV

DISCIPLINE
ENGINEER
C
A

Reference Documents
DATE:
PROJECT
ALL LEADS
ENGINEER
 As-Built Drawings
09/08/16
 Approved Test Procedures
DATE:
CERTIFIED
 SAUDI ARAMCO Standards : SAES-T-634
A M ALMATROOK
 Test Equipment Manuals for Volt-Ohmmeter, Megger
09/08/16
DATE:
(Insulation tester), and PCM - 23 (VF tester)
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16

DATE:
DESIGN DRAWINGS
OPERATIONS
SHAHZAD YAZDANI

09/08/16
General
DATE:
CONTRACTOR shall list all required drawings in the Non-Material
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Requirement (NMR).
EDSD

All drawings shall be prepared and submitted in accordance with SAUDI


DATE:

ARAMCO Standards.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

All drawings specifically prepared for this project shall be prepared


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

using CADD and submitted on removable mass storage media in


(DCC) NO. _____________________

accordance with the SAUDI ARAMCO Drafting Manual.

Use of common drawings whenever practicable shall be acceptable,


REVISION

provided that there is no loss of clarity.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 165


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For each drawing created via a CADD system, the relevant CADD
computer files shall be provided to SAUDI ARAMCO in the form of
ASH
ASH
ASH

portable removable mass storage media (CD-ROM, tape cartridge,


diskette, etc.).
LEADS

LEADS
LEADS
ALL

ALL
ALL

Review Drawings – Preliminary Design Review (PDR)


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall submit PDR package with system drawings in two


(2) weeks after contract award.
DESCRIPTION
ISSUED FOR 60% FEL3

Purchase order shall be placed immediately for long lead items. All Non-
Material Requirements (NMR) shall be reviewed during the PDR. The
detailed drawings shall have sufficient detail for fabrication of the
system.

Review Drawings – Final Design Review

Three (3) weeks after contract award, CONTRACTOR shall submit


JO/EWO

Final Design Review Package with all final “build to” drawings for
SAUDI ARAMCO final review and approval.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

All “NMRs” that have changed since the PDR and all new “NMRs” shall
be shown during the CDR and confirmed as part of the design.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER As-Built Drawings
C
A

DATE: After completion of the Site Acceptance Test (SAT), pre-commissioning


PROJECT
ALL LEADS
ENGINEER and commissioning, CONTRACTOR shall update the drawings to reflect
09/08/16 any changes. These drawings shall be clearly marked “As-Built” and
DATE: dated.
CERTIFIED
A M ALMATROOK
09/08/16 System Manuals
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall provide System Manuals for operation,
09/08/16
preventative maintenance and repair of the System.
DATE:
OPERATIONS
SHAHZAD YAZDANI Appropriate Quality Assurance procedures for each application shall be
09/08/16 provided including all validation tests procedures and project
DATE: maintenance techniques.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Certificates of Acceptance


EDSD

CONTRACTOR shall prepare Certificates of Acceptance for each major


DATE:
BY:

phase of factory/site testing. Any noted exceptions to the test phases


REVISIONCERTIFICATION

shall be attached to the document that then finalizes completion of that


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

particular phase. There shall be no outstanding exception items


(DCC) NO. _____________________

remaining at the time of Site Acceptance Test (SAT) certification.

E. OUTSIDE PLANT SYSTEM


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 166


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG SCOPE DESCRIPTION
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GENERAL
ASH
ASH
ASH

 This project shall provide 24-core single mode fiber optic cables 8/125
LEADS

LEADS
LEADS
ALL

ALL
ALL

microns 1310 nanometer in Star Topology from the E & M Bldg to the
Operation Building, Utility Substation, Operator Shelter, Receiving
Substation, Security Support building Main Gate and Security Support
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Building Tank Farm. All terminations will be done on proposed 24-core


fiber patch panels in every building.
DESCRIPTION
ISSUED FOR 60% FEL3

 In addition, this project shall provide 2-24 core single mode fiber optic
cable infrastructures to be installed for communication systems from
Engineering & Maintenance Bldg. to Yanbu refinery. All terminations will
be done on proposed 24-ports fiber patch panels.

 In addition, this project shall provide FO cable infrastructure to be


installed for process automation systems (ESD) for two (2) RIO
buildings. All terminations will be done on proposed 24-core FOC and
JO/EWO

fiber patch panels.


10-02399-

10-02399-
10-02399-

 In addition, this project shall provide 4-12 core single mode fiber optic
0001

0001
0001
DATE

cable infrastructures to be installed for control and communication


systems from Receiving Substation to MARAFIQ-91 Substation. All
09/08/16
08/04/16
06/01/16
NO.
REV

terminations will be done on proposed 24-ports fiber patch panels.


DISCIPLINE
ENGINEER
C
A

 In addition, this project shall provide FO cable infrastructure to be


DATE: installed for Metering System connectivity to YASREF Control System,
PROJECT
ALL LEADS
ENGINEER SAMREF Control System, and YRT Control System All terminations will
09/08/16 be done on proposed 12-core fiber patch panels except for Yanbu
DATE: Refinery where 48-core fiber will be used.
CERTIFIED
A M ALMATROOK
09/08/16  The design of the fiber optic cable shall be such that the performance
DATE:
objectives of the System are achieved when the cable has been
CONSTRUCTION
AMR EL SHARKAWY
AGENCY manufactured, installed, spliced and terminated. The performance of the
09/08/16
terminal, transmission and ancillary equipment covered by this scope of
DATE: works shall be taken into account under this obligation.
OPERATIONS
SHAHZAD YAZDANI

09/08/16  The System shall provide permanent cabling for Local Area Network
DATE: (LAN Enterprise) and Process Control System (PCS). These cables shall
CONTROL NUMBER

ALI H GHAMDI
consist of single-mode nonmetallic fiber optics. Cable installation will
VERIFICATION

09/08/16 include the underground conduit system. Also all associated facilities,
EDSD

such as pedestals, pedestal guards, marker posts, grounding protection,


and FOC fiber patch panels shall be provided
DATE:
BY:
REVISIONCERTIFICATION

OUTSIDE PLANT COPPER CABLES


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 This project shall provide 200-pair copper cables from the Operation
Building and to be distributed to the following buildings:

1. E & M Building
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 167


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 2. Operation Building
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. Operator Shelter
4. Remote Interface Building - RIB-XXX1
ASH
ASH
ASH

5. Remote Interface Building – RIB-XXX2


LEADS

LEADS
LEADS
ALL

6. Metering Shelter
ALL
ALL

7. Security Support Building Tank Farm


8. Chemical Shelter
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

9. Security Support Building Main Gate


DESCRIPTION

10. Government Security Facility


ISSUED FOR 60% FEL3

 CONTRACTOR shall provide 25-pairs x 22 gauge copper cables to the


aforementioned buildings. Likewise, CONTRACTOR shall provide
protected terminal block 489ACC 1-25 to each building for cable
termination.

 The proposed copper cable shall be used for analog telephones for
JO/EWO

emergency purposes.
10-02399-

10-02399-
10-02399-

 The X-RAY Bldg. and Security Gatehouse of Main Gate & Tank Farm,
0001

0001
0001
DATE

Voice & data requirements can be served through the proposed POE
Ethernet switch and analog line via proposed 1571 OSP cable from the
09/08/16
08/04/16
06/01/16
NO.
REV

main protector in the Security Support building to the remote protector in


DISCIPLINE
ENGINEER
the Security Gatehouse. Such cable will be installed through PVC 2-4’’Ø
PVC duct to be encased in concrete.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
The design of the copper cable network shall be such that the
09/08/16 performance objectives of the System are achieved when the cables
DATE:
have been manufactured, installed, spliced and terminated.
CERTIFIED
A M ALMATROOK
09/08/16 The System shall provide permanent cabling for local distribution (Analog
DATE: and special services) to the designated locations in the Yanbu Distribution
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Hub Plant areas. The copper cable shall be designed for direct buried or
09/08/16 underground duct application. Conductors shall be solid annealed multi-
DATE: pair copper conductors in 22 AWG. Individual conductors are twisted into
OPERATIONS
SHAHZAD YAZDANI pairs with varying lay lengths to minimize crosstalk and specific color
09/08/16 combinations to provide pair identification. Cables larger than 25 pairs are
DATE: assembled into units, which are then used to assemble the core. Units are
individually identifiable by color coded unit binders. The core assembly is
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 filled with an 80 ºC (198 ºF) ETPR (External Thermal Plastic Rubber)
EDSD

compound, completely filling the interstices between the pairs and under
the core wrap. A corrugated steel wrap, is applied over the core assembly
DATE:
BY:

to provide protection for the core. North American color coded insulation. A
corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

linear low-density polyethylene jacket is applied overall with surface


marked information such as manufacturer’s identification, pair count,
(DCC) NO. _____________________

AWG, product, identification, and sequential footage. Cable shall


conform to (REA U.S.) specification PE-39.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 168


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The exact cable routings shall be field verified by CONTRACTOR during
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
detailed design. If required, alternative routings shall be recommended
by the CONTRACTOR. In addition, the exact cable lengths shall be
ASH
ASH
ASH

determined by CONTRACTOR during detailed design.


LEADS

LEADS
LEADS
ALL

ALL
ALL

UNDERGROUND CONDUIT SYSTEM

This project shall provide 4-4ӯ PVC underground conduit encased in


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

concrete to accommodate the proposed fiber optic and copper cables.


The trench will end on the proposed pedestals and building entrance
DESCRIPTION

walls.
ISSUED FOR 60% FEL3

All conduits shall be designed to accommodate fiber optic and copper


paired type of cables.

A pedestal is an enclosure providing an accessible cable splice point or


terminal above ground. Refer to standard drawing AA-036748. A
pedestal guard shall be installed and secured by concrete footings
around pedestals as per design drawing standards.
JO/EWO

The underground duct-bank system shall be designed, procured,


10-02399-

10-02399-
10-02399-

constructed and Commissioned by the CONTRACTOR. The exact


0001

0001
0001
DATE

underground conduit routings shall be field verified by the


CONTRACTOR. If required, alternative routings shall be recommended
09/08/16
08/04/16
06/01/16
NO.
REV

by the CONTRACTOR. In addition, the exact duct-bank section lengths


DISCIPLINE
ENGINEER shall be determined by CONTRACTOR during detailed design.
C
A

DATE: Additional Requirements


PROJECT
ALL LEADS
ENGINEER
09/08/16 DOCUMENTATION
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall supply the following documentation:
09/08/16
DATE:
CONSTRUCTION
 A System design manual
AMR EL SHARKAWY
AGENCY
09/08/16
 Construction drawings and documentation
 Red-lined and As-built drawing

DATE:
OPERATIONS
Factory Acceptance Test Procedures
SHAHZAD YAZDANI
 Commissioning and Performance Acceptance Test procedures
09/08/16
 Equipment manuals
DATE:
 Operating and Maintenance (O&M) manuals and handbooks
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Spare parts data package for cataloguing and standardization


EDSD

CONTRACTOR shall be responsible for completing plant tagging of


DATE:

capital equipment in accordance with SAUDI ARAMCO requirements.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Installation Materials, Installation and Commissioning Services


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall install the equipment to ensure that requirements


for a complete, fully operational, integrated and maintainable turnkey
System is provided.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 169


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The installation shall comply with SAUDI ARAMCO standards, Saudi
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Arabia Government standards, and/or International standards as
applicable.
ASH
ASH
ASH

CONTRACTOR shall Commission the System. Once the System is on-


LEADS

LEADS
LEADS
ALL

ALL
ALL

stream, CONTRACTOR shall hand over the operational System to


SAUDI ARAMCO.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Tools and Test Equipment


DESCRIPTION

CONTRACTOR shall make available, as part of the System, any


ISSUED FOR 60% FEL3

specialist tools that are required to operate and maintain the test
equipment.

Spares

Start-up Spares shall be supplied in accordance with Contract.

Copper Cable
JO/EWO

Copper Cable Specifications


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

The design of copper cables shall be such that the performance


objectives of the system are achieved when the cables have been
09/08/16
08/04/16
06/01/16
NO.
REV

manufactured, installed, spliced and terminated.


DISCIPLINE
ENGINEER
C

The system shall provide permanent cabling for local distribution (Analog
A

DATE: and special services) to the designated locations. The copper cable shall
PROJECT
ALL LEADS
ENGINEER be designed for direct buried or underground duct application. Conductor
09/08/16 shall be solid annealed multi pair copper conductors are in 22 and 26
DATE: AWG. Individual conductors are twisted into pairs with varying lay
CERTIFIED
A M ALMATROOK lengths to minimized crosstalk and specific color combinations to provide
09/08/16 pair identification. Cables larger than 25 pairs are assembled into units,
DATE:
which are then used to assemble the core. Units are individually
CONSTRUCTION
AMR EL SHARKAWY
AGENCY identifiable by color coded unit binders. The core assembly is filled with
09/08/16
80ºC (198ºF) ETPR (External Thermal Plastic Rubber) compound,
DATE: completely filling the interstices between the pairs and under the core
OPERATIONS
SHAHZAD YAZDANI wrap. A corrugated steel wrap, is applied over the core assembly to
09/08/16 provide protection for the core. North American color coded insulation. A
DATE: corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,
CONTROL NUMBER

ALI H GHAMDI
linear low-density polyethylene jacket is applied overall with surface
VERIFICATION

09/08/16 marked information such as manufacture’s identification, pair count,


EDSD

AWG, product identification and sequential footage. Cable shall conform


to (REA U.S.) specification PE-39.
DATE:
BY:
REVISIONCERTIFICATION

The exact cable routings shall be field verified by CONTRACTOR during


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

detailed design. If required, alternative routings shall be recommended


(DCC) NO. _____________________

by THE CONTRACTOR. In addition, the exact cable lengths shall be


determined by CONTRACTOR during detail design.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 170


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Copper cable will be installed from the Operation Building branch spliced
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH to different buildings. Buildings to be served are the following.
ASH
ASH

BUILDING NAME NUMBER OF COPPER PAIRS


LEADS

LEADS
LEADS
ALL

ALL
ALL

E & M Building 200


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Operation Building 25
DESCRIPTION

Operator Shelter 25
ISSUED FOR 60% FEL3

Remote Interface Building – RIB-1 25

Remote Interface Building – RIB-2 25

Metering Shelter 25

Security Support Building, Tank Farm 25


JO/EWO

Chemical Shelter 25
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Security Support Building, Main Gate 25


09/08/16
08/04/16
06/01/16
NO.
REV

Government Security Facility 25


DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT For further details on the fiber optic cable routing, refer to the following
ALL LEADS
ENGINEER
drawings:
09/08/16

DATE:
CERTIFIED DRAWING NO. SHEET NO. DRAWING TITLE
A M ALMATROOK
09/08/16 CO-A10067 001-002 COPPER SCHEMATIC DIAGRAM -YDH
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Fiber Optic Cable
DATE:
OPERATIONS
The design of the fiber optic cable shall be such that the performance
SHAHZAD YAZDANI
objectives of the System are achieved when the cable has been
09/08/16
manufactured, installed, spliced and terminated. The performance of the
DATE:
terminal, transmission and ancillary equipment covered by this scope of
CONTROL NUMBER

ALI H GHAMDI
work shall be taken into account under this obligation.
VERIFICATION

09/08/16
EDSD

The cable shall be ITU-G.652D single-mode non-metallic fiber optics and


DATE:

meet all requirements of 18-SAMSS-625. Also, all associated facilities, such


BY:

as splice closures, marker posts, grounding protection and the fiber


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

distribution panels.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

The above fiber optic system shall be used to link those buildings that
require data type service in the proposed Yanbu Distribution Hub.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 171


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG For further details on the fiber optic cable routing, refer to the following
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH drawings:
ASH
ASH

DRAWING NO. SHEET NO. DRAWING TITLE


LEADS

LEADS
LEADS
ALL

ALL
ALL

CO-A10066 001 FOC SCHEMATIC DIAGRAM- YDH TO YREF

CO-A10068 001-002 FOC SCHEMATIC DIAGRAM- YDH


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

INSTRUMENT INTERCON DIAGRAM – YREF,


DESCRIPTION

CO-A10003 001 YASREF & SAMREF


ISSUED FOR 60% FEL3

INST CONN/INTERCONNECTION DIAG – OB,


CO-A10005 001
RIB1, RIB2, RS & METERING SHELTER
INST CONN/INTERCONNECTION DIAG – ESD
CO-A10074 001
FOC-OPERATION BLDG, RIB1, RIB2

The exact cable routings shall be verified by CONTRACTOR during detailed


JO/EWO

design, and, if required, alternative routings shall be recommended by


CONTRACTOR.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Exact cable lengths shall be determined by CONTRACTOR during detailed


design.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER Four (4) 1-inch, multi-color, corrugated sub-ducts and pull rope shall be
installed in one duct of each of the underground duct banks (per SAES-T-624
C
A

DATE: Section 4.3.1).


PROJECT
ALL LEADS
ENGINEER
09/08/16 Fiber Optic Cable Specifications
DATE:
CERTIFIED
A M ALMATROOK All dielectric, Loose Buffered, Filled for underground and direct buried
09/08/16 environment.
DATE:
Non Zero Dispersion shifted
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Non-metallic, including strength member
09/08/16
Tensile strength: >= 10N
DATE: Mode field diameter: 8.6 – 9.5 Microns
OPERATIONS
SHAHZAD YAZDANI Cladding Diameter: 125.0 microns
09/08/16 Concentricity error <1 micron
DATE: Attenuation @ wavelength: 1550 nm – 0.35dB/km
CONTROL NUMBER

ALI H GHAMDI Variation of attenuation between 0 deg. C & 70 deg. C: -0.01 dB


VERIFICATION

09/08/16 Cable cut off wavelength <1260nM


EDSD

Attenuation discontinuities at 13100nm <0.1 dB


Attenuation change 1300 to 1324 nm <0.09 dB/km
DATE:
BY:

Proof test stress 0.69 Gpa (Minimum)


REVISIONCERTIFICATION

Zero dispersion wavelength 1540 nm (zero dispersion cable)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Expected fiber life span: 20 years


(DCC) NO. _____________________

Cable Design

General
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 172


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The structure of the cable core shall permit high cable flexibility with minimum
stress to the individual fibers.
ASH
ASH
ASH

One or more strength members shall be an integral part of the cable


LEADS

LEADS
LEADS
ALL

ALL
ALL

construction. The strength members shall be sufficient to support the stress of


installation and protect the cable in service.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall use a loose, fiber bundle (tube) or a slotted core type
cable with multiple fibers per tube or slot.
DESCRIPTION
ISSUED FOR 60% FEL3

The core shall be filled with a compound to inhibit water migration and wrapped
with a barrier tape.

The filling compound shall be homogenous and uniformly mixed. The


compound will at least be sufficiently translucent for fiber identification.

The filling compound shall not affect the color of the individual fibers.
JO/EWO

The filling compound shall be non-toxic and present no dermal hazards.


10-02399-

10-02399-
10-02399-

The drop point of the filling compound shall not be less than 80 deg. C.
0001

0001
0001
DATE

The filling compound shall remain stable and unaffected by long term exposure
09/08/16
08/04/16
06/01/16
NO.
REV

to weather.
DISCIPLINE
ENGINEER
C

The filling compound shall have chemical and mechanical compatibility with
A

DATE: other cable components and splicing hardware.


PROJECT
ALL LEADS
ENGINEER
09/08/16 Cable Jacket
DATE:
CERTIFIED
A M ALMATROOK The outer jacket shall provide the cable with a tough, flexible, protective
09/08/16 covering which can withstand exposure to sunlight, to atmospheric
DATE:
temperatures and to stresses that can be expected in the installation of this
CONSTRUCTION
AMR EL SHARKAWY
AGENCY cable.
09/08/16

DATE: The cable jacket shall be of a high molecular weight, black polyethylene with a
OPERATIONS
SHAHZAD YAZDANI thickness that is suitable for the proposed environment, but not less than 3.0
09/08/16 mm.
DATE:
CONTROL NUMBER

ALI H GHAMDI
The cable jacket shall be resistant to crude oil, hydrocarbons, sulfur
VERIFICATION

09/08/16 compounds and salt water.


EDSD

The cable jacket shall have permanent surface printed sequentially numbered
DATE:
BY:

length markers at one meter intervals.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The cable jacket shall have permanent surface printed marks at regular
(DCC) NO. _____________________

intervals consisting of Manufacturer, (number of fibers) Fiber Optic Cable and


the Actual Year of Manufacture.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 173


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Fiber Optic Cable for Inside Use
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Upon entering a building all fiber cables shall have a transition splice to
ASH
ASH

convert the cable from outside rated cable to internal rated cable. All
ASH

internal cables will comply with (SAES-T-624 Para 4.2.2). Under no


LEADS

LEADS
LEADS

circumstances shall outside rated cable be terminated at the equipment.


ALL

ALL
ALL

Local Area Network (LAN)


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Single mode fiber optic cables using a non-dispersion-shifted fiber G.652D


DESCRIPTION

will be installed from OME building to various building as follows:


ISSUED FOR 60% FEL3

1. Engineering & Maintenance Building


2. Operation Building
3. Security Support Building, Tank Farm
4. Utility Substation
5. Operator Shelter
6. Receiving Substation
JO/EWO

7. Security Support Building, Main Gate


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Process Control System (PCS)


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
Single mode fiber optic cables 24 strands will be installed from the
ENGINEER instrument rack room at the new Operation building to RIO Building 1 (RIB-
C
A

1) under this BI for the ESD System. The route of the fiber should be
DATE:
PROJECT
redundant and diverse. Process control System will assign dedicated fiber
ALL LEADS
ENGINEER strands assignment for the ESD system.
09/08/16

DATE: Single mode fiber optic cables 24 strands will be installed from the
CERTIFIED
A M ALMATROOK instrument rack room at the new Operation building to RIO Building 1 (RIB-
09/08/16 1) under this BI for the DCS System. The route of the fiber should be
DATE:
CONSTRUCTION
AMR EL SHARKAWY
redundant and diverse. Process control System will assign dedicated fiber
AGENCY
09/08/16
strands assignment for the DCS system.
DATE:
OPERATIONS
Single mode fiber optic cables 24 strands will be installed from the
SHAHZAD YAZDANI
instrument rack room at the new Operation building to RIO Building 2 (RIB-
09/08/16
2) under this BI for the ESD System. The route of the fiber should be
DATE:
redundant and diverse. Process control System will assign dedicated fiber
CONTROL NUMBER

ALI H GHAMDI
strands assignment for the ESD system.
VERIFICATION

09/08/16
EDSD

Single mode fiber optic cables 24 strands will be installed from the
DATE:

instrument rack room at the new Operation building to RIO Building 2 (RIB-
BY:

2) under this BI for the DCS System. The route of the fiber should be
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

redundant and diverse. Process control System will assign dedicated fiber
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

strands assignment for the DCS system.


(DCC) NO. _____________________

Single mode fiber optic cables 12 strands will be installed from the new
Operation building to YASREF Control System under this BI. Process
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 174


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG control System will assign dedicated fiber strands assignment for various
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH control system.
ASH
ASH

Single mode fiber optic cables 12 strands will be installed from the new
Operation building to SAMREF Control System under this BI. Process
LEADS

LEADS
LEADS
ALL

ALL
ALL

control System will assign dedicated fiber strands assignment for various
control system.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Single mode fiber optic cables 48 strands will be installed from the new
Operation building to Yanbu Refinery Control System under this BI.
DESCRIPTION

Process control System will assign dedicated fiber strands assignment for
ISSUED FOR 60% FEL3

various control system.

The PCS fiber optic cables will be routed underground.

PCS and communications ducts shall have separate building entries, IT


and NON-IT, respectively.

PCS fiber optic patch panels will be provided by this BI.


JO/EWO

Temporary Requirements
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Temporary communication services required during construction shall be


provided by this BI. This includes the installation and removal of all
09/08/16
08/04/16
06/01/16
NO.
REV

temporary facilities required by CONTRACTOR and SAPMT. Final location


DISCIPLINE
ENGINEER of the site offices shall be provided during detailed design stage.
C
A

DATE: System Design Life and Reliability


PROJECT
ALL LEADS
ENGINEER
09/08/16 The conduit system shall be designed and engineered to retain usable for
DATE: 75 to 100 years and fulfill design requirements and specifications
CERTIFIED
A M ALMATROOK
09/08/16 Other Materials
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY All other materials that might be required during the course of the work will
09/08/16
be procured by SAUDI ARAMCO on a Field Material Request (FMR)
DATE: generated by THE CONTRACTOR.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 Transportation, Handling and Delivery


DATE:
CONTROL NUMBER

ALI H GHAMDI
All materials are to be inspected upon delivery by the SAUDI ARAMCO
VERIFICATION

09/08/16 Representative for signs of damage during transport, handling and


EDSD

delivery. Reports of damage are to be compiled immediately and new


materials procured.
DATE:
BY:
REVISIONCERTIFICATION

CABLE PLACEMENT
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

General

The fiber optic cable minimum bending radius and maximum pulling
tensions shall be in accordance with SAES-T-624 (Sections 4.1.10 and
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 175


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 4.1.11) and the fiber optic cable manufacturer’s specifications. The optical
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
fiber cable shall not be cut for convenience during placement. Splices shall
be located in accordance with the design drawing provided by
ASH
ASH
ASH

CONTRACTOR and approved by SAUDI ARAMCO.


LEADS

LEADS
LEADS
ALL

ALL
ALL

This Specification covers the expected types of cable and civil construction
work normally required to prepare the fiber optic cable facilities up to and
including cable splicing and work as required.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

All Work including design drawings, cable splicing, terminating, testing,


DESCRIPTION

and Commissioning shall be evaluated and accepted as defined within all


ISSUED FOR 60% FEL3

applicable requirements and standards.

All specification rely on the referenced standards, standard drawings,


codes of practice, industry standards, general instructions, operating
instructions, safety policy, Saudi Arabian Government standards and
policies and the other requirements listed in this Specification Document.

If there is a conflict between the requirements of the various reference


JO/EWO

documents, the matter shall be brought to the attention of the SAUDI


ARAMCO representative for resolution.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Each Work category of this Specification includes a broad description of


the Work, variables and options (depending on the design drawing and
09/08/16
08/04/16
06/01/16
NO.
REV

field condition), prime reference documents for broad scope and/or


DISCIPLINE
ENGINEER guidance, principal requirements and precautions and a listing of
C

inspection items. Mandatory SAUDI ARAMCO witnessed inspection items


A

DATE: are specifically noted.


PROJECT
ALL LEADS
ENGINEER
09/08/16 The design drawings are intended to show the estimated design and
DATE: material requirement for the construction of the facilities. The drawings are
CERTIFIED
A M ALMATROOK to be marked up in the field to reflect as- built construction, which is in any
09/08/16 way different from the original design.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY To ensure uninterrupted installation and start up all tools, equipment,
09/08/16
machinery and installation materials shall be provided in sufficient
DATE: quantities by CONTRACTOR.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 All CONTRACTOR provided materials shall be subject to SAUDI ARAMCO


DATE: inspection and evaluation for quality. All reasonable precautions shall be
CONTROL NUMBER

ALI H GHAMDI
taken to ensure that damage to buildings, furnishing, structures, utilities,
VERIFICATION

09/08/16 pipelines and other facilities be avoided. SAUDI ARAMCO shall be


EDSD

promptly notified, with written follow-up, of any damage that occurs during
construction.
DATE:
BY:
REVISIONCERTIFICATION

Some Work may be performed adjacent to, or in conjunction with existing,


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

operational communication systems. CONTRACTOR shall ensure that the


(DCC) NO. _____________________

operational integrity of the existing system is maintained while performing/


commissioning this work.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 176


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall ensure that after conduit and/or cable laying
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
operations, roads, streets, sidewalks and curbing, paved areas, walls,
foundations, fencing, or any other structural, civil or landscaped facilities
ASH
ASH
ASH

are returned to their original condition. This shall be at no additional cost to


SAUDI ARAMCO and subject to the satisfaction of SAUDI ARAMCO
LEADS

LEADS
LEADS
ALL

ALL
ALL

and/or representative(s) of the Saudi Arabian government, as applicable.

Special permit and Work methods may be specified by Saudi Arabian


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Government authorities within the area of, or at the boundary of,


government property or facilities such as roads and highways, military
DESCRIPTION

reservations, public utilities. The permit shall be obtained by


ISSUED FOR 60% FEL3

CONTRACTOR with the help of SAUDI ARAMCO as needed.

Installation work shall not commence before the relevant permits have
been obtained by CONTRACTOR construction crew.

Excavation and Site Preparation

Excavation may be required in sand, marl (natural and/or compacted),


JO/EWO

loose rock and solid rock. Backfill of the excavated material or bringing-in
of new fill may be required. The hauling away of excavated material and
10-02399-

10-02399-
10-02399-

removal of above-grade debris/soil to an approved SAUDI ARAMCO site


0001

0001
0001
DATE

may be required. . The filling materials shall comply with SAES A 114.
09/08/16
08/04/16
06/01/16
NO.
REV

Excavation may be performed by machine or by hand, depending on the


DISCIPLINE
ENGINEER field condition and/or requirements of this Specification, as determined by
C

the SAUDI ARAMCO representative(s) and detail design. As a general


A

DATE: rule, at all Plant facilities, pipeline crossing, and utility crossings, hand
PROJECT
ALL LEADS
ENGINEER excavation is the only method permitted.
09/08/16

DATE: Prior to the start of any excavation Work, all underground facilities (i.e. oil,
CERTIFIED
A M ALMATROOK gas and/or water pipes, telephone or power cables, etc.), shall be
09/08/16 positively identified by CONTRACTOR. This shall be verified by the SAUDI
DATE:
ARAMCO and by operating department of the facility. CONTRACTOR
CONSTRUCTION
AMR EL SHARKAWY
AGENCY shall use underground facility detection equipment that must be of recent
09/08/16
manufacture and suitable for performing surveys to locate all types of
DATE: communication cables, and other utilities. The locating equipment must be
OPERATIONS
SHAHZAD YAZDANI able to locate metallic backed warning tape where non-metallic cables
09/08/16 have been placed. The exact location of the identified underground facility
DATE: shall be properly marked for easy identification by CONTRACTOR
CONTROL NUMBER

ALI H GHAMDI
construction crew.
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall employ the most cost efficient equipment and


machinery within his control to perform the Work.
DATE:
BY:
REVISIONCERTIFICATION

For the safety of personnel and for purposes of maintaining stability of the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

excavation, the excavation work shall include all necessary timbering,


(DCC) NO. _____________________

sheet pilling and shoring.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 177


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG In no case shall the width of trench excavated in a roadway or under a
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipeline be greater than what is reasonably necessary for completion of
the Work.
ASH
ASH
ASH

Open excavation shall be guarded by highly visible barricade. Adequate


LEADS

LEADS
LEADS
ALL

ALL
ALL

flashing lights and warning signs must be provided if excavation is


performed in or near any roadway.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Excavations shall not be kept open any longer than reasonably necessary
to perform the intended Work.
DESCRIPTION
ISSUED FOR 60% FEL3

The detail design drawing shall specify the scope, location and deep of
excavation. If a survey marker and/or a monument is damaged as a
consequence of the Work, CONTRACTOR shall be responsible for any
fines, where applicable, repairing such marker and/or monument and
returning the same to its original place without any additional
compensation.

Site leveling, filling and compaction shall be performed as specified in


JO/EWO

conformance with all applicable standards.


10-02399-

10-02399-
10-02399-

Trenching
0001

0001
0001
DATE

Trench excavation is required, to lay direct buried cable or place conduits


09/08/16
08/04/16
06/01/16
NO.
REV

in the core area, plant area and open desert area. All kinds of soil
DISCIPLINE
ENGINEER conditions may be encountered. These Specifications are intended to
C

cover the various approved methods of trenching and laying cables or


A

DATE: conduits under the expected range of soil and field conditions.
PROJECT
ALL LEADS
ENGINEER
09/08/16 The detail design drawings shall describe the required location, alignment,
DATE: length and depth of cable or conduits to be placed by the trenching
CERTIFIED
A M ALMATROOK method.
09/08/16
DATE:
The reference standards and drawing shall detail the requirements of
CONSTRUCTION
AMR EL SHARKAWY
AGENCY construction.
09/08/16

DATE: Trenching may be performed by machine or by hand, depending on the


OPERATIONS
SHAHZAD YAZDANI field situation and/or requirements of this Specification or as determined by
09/08/16 the SAUDI ARAMCO representative.
DATE:
CONTROL NUMBER

ALI H GHAMDI
Typical trenching machines are backhoe, wheel excavator, rock breaker or
VERIFICATION

09/08/16 rock saw.


EDSD

Machine excavation is not permitted either near or under hydrocarbon,


DATE:
BY:

water or other pipelines and telephone/ power cable facilities and such
REVISIONCERTIFICATION

excavation shall be accordance with the standards SAES-T-911 and


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-B-064.
(DCC) NO. _____________________

When authorized to open-cut road, CONTRACTOR shall cut the pavement


and excavate the trench as narrow as possible and place 4” PVC concrete
encased conduits as per SAES-T-928 Para 6.1.5. The disturbed roadbed
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 178


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG shall be restored with the original type of fill and compacted to the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
requirements of the relevant Road Authority. Hot mix asphalt shall be used
to restore the pavement to original condition.
ASH
ASH
ASH

Shoring or sloping shall be required for safety, depending on soil


LEADS

LEADS
LEADS
ALL

ALL
ALL

conditions and depth of trench.

Dewatering may be required to permit the intended construction and to


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

enable compaction of the trench bottom and/or the backfill in accordance


with the reference standards and drawings.
DESCRIPTION
ISSUED FOR 60% FEL3

Warning tape (terra tape) shall always be installed above the cable or
conduits. Refer to standard Drawing AA-036748.

A trench shall not be left open any longer than necessary. Cables or
conduits shall be placed concurrently with trench work, inspected and
backfill performed promptly.

F. TETRA RADIO SYSTEM (RFDT)


JO/EWO

SCOPE DESCRIPTION
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

General
09/08/16
08/04/16
06/01/16
NO.
REV

This defines the scope of CONTRACTOR to procure, design, install,


DISCIPLINE
ENGINEER integrate, test and commission a TETRA base station at the new Operation
C
A

and Maintenance Engineering building and associated radio terminals and


DATE: accessories.
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall provide indoor and outdoor coverage in Yanbu
DATE: Distribution Hub operational area. This new TETRA base station and
CERTIFIED
A M ALMATROOK TETRA Dispatch Workstations shall be integrated to the existing Saudi
09/08/16 Aramco TETRA network in Yanbu NGL SCN network. All interfaces, cards
DATE:
and services required for integration with existing TETRA Network shall be
CONSTRUCTION
AMR EL SHARKAWY
AGENCY provided by CONTRACTOR.
09/08/16

DATE: CONTRACTOR shall design, install, test and commission new antenna
OPERATIONS
SHAHZAD YAZDANI and transmission line system for the TETRA base station. The antenna and
09/08/16 transmission line system shall be installed on the proposed 25M Self-
DATE: Supported Tower beside new Operation and Maintenance Engineering
CONTROL NUMBER

ALI H GHAMDI
building.
VERIFICATION

09/08/16
EDSD

Contractor shall perform all necessary radio coverage analysis and


frequency study to determine the optimum antenna type, transmission line
DATE:
BY:

system, antenna system configuration that assure radio coverage at Yanbu


REVISIONCERTIFICATION

Distribution Hub.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall install complete TETRA desktop radio at a fixed


location at the Operation Center & Control Room with separate radio
transceiver and control head at Operations and Engineering Maintenance
building.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 179


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR’s responsibilities shall include design, procure, install and
commission indoor repeater system to enhanced radio signal with the
ASH
ASH
ASH

following key buildings.


LEADS

LEADS
LEADS
ALL

ALL
ALL

No Building number Building Name

1 12 DAS-SHELTER-1
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

2 13 DAS-SHELTER-2
DESCRIPTION

3 18 METERING ROOM-MARAFIQ
ISSUED FOR 60% FEL3

4 SS-XXX1 RECEIVING STATION TRANSFORMER YARD


5 SS-XXX2 REMOTE I/O BUILDING

CONTRACTOR shall be install complete TETRA desktop radio at the


Security gatehouse with complete outdoor antenna and its ancillaries.

CONTRACTOR shall design, install, test and commission TETRA desktop


radio antenna and ancillaries. Antenna mast height is dependent on the
result of RF coverage required for suitable radio and indoor amplifier study.
JO/EWO

In addition, antenna mast support, lightning arrestor and grounding system


should be included.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall install antenna grounding and feeder system, and all
09/08/16
08/04/16
06/01/16

its ancillaries as per SAES-T-795 and SAES-T-887.


NO.
REV

DISCIPLINE
ENGINEER CONTRACTOR shall be install outdoor antenna with 5 db gain or better.
C
A

An undistorted radiation pattern shall be ensured by optimal placement of


DATE:
PROJECT
the antenna. All materials required for the complete installation of RFDT,
ALL LEADS
ENGINEER
including the radio, transmission line, connectors, antenna, conduits,
09/08/16
grounding, electrostatic protection, and wall penetration port shall be
DATE:
CERTIFIED
provided.
A M ALMATROOK
09/08/16
DATE:
CONTRACTOR shall perform all necessary Indoor signal coverage
CONSTRUCTION
AMR EL SHARKAWY
analysis in all buildings, frequency study to determine the optimum
AGENCY
09/08/16 antenna type, transmission line system, antenna height, and antenna
system configuration that assure radio coverage at Yanbu operational
DATE:
OPERATIONS area.
SHAHZAD YAZDANI

09/08/16
The CONTRACTOR’s responsibilities shall include design, procurement,
DATE:
installation, upgrades, integrations, testing and commissioning of the
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

Mobile Radio System which includes, Antenna System, Dispatch Work


09/08/16
Stations, Radio Frequency Dispatch Terminals.
EDSD

DATE:

CONTRACTOR shall install the Dispatch Work Stations inside the Room
BY:

204 of Yanbu Distribution Hub Maintenance & Engineering building.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide HPR encryption and authentication keys.


(DCC) NO. _____________________

Dispatcher Work Station (DWS)


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 180


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Voice Logging Recorder
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This project shall utilize the existing Logging Recorder in building
ASH
ASH
ASH

Communication Building 12 at YANBU NGL. CONTRACTOR shall upgrade


the logging recorder and provide licenses as required to accommodate this
LEADS

LEADS
LEADS
ALL

ALL
ALL

project’s requirement.

The number of Talk groups shall be determined by the proponent and


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

check the logging recorder at YANBU NGL, if it can accommodate the


project requirements otherwise, an upgrade shall be done by the project.
DESCRIPTION
ISSUED FOR 60% FEL3

End-User Terminal

This section presents the type of Radio Frequency Dispatch Terminals


(RFDTs) and the associated accessories.

a. Programming Tools

RFUT PC programming kits shall be provided for the configuration, fleet


JO/EWO

mapping, profiling and maintenance of the end-user terminals. Each


programming kit shall include suitable software, programming cable, and
10-02399-

10-02399-
10-02399-

interface data port to configure the radio terminals.


0001

0001
0001
DATE

Tools for remote and centralized multi-programming of end-user radios


09/08/16
08/04/16
06/01/16
NO.
REV

shall be provided to enable off-site programming. The remote programming


DISCIPLINE
ENGINEER kit shall be interconnected to the master terminal through the SAUDI
C

ARAMCO corporate data network.


A

DATE:
PROJECT
ALL LEADS
ENGINEER Dispatcher Work Station (DWS)
09/08/16

DATE:
CONTRACTOR shall install the Dispatch Work Stations inside Room 204
CERTIFIED of Yanbu Distribution Hub Maintenance & Engineering. Specifications are
A M ALMATROOK
09/08/16
provided in terms of the workstation features, network interfacing,
DATE: equipment hardware and accessories.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 The table below identifies the key buildings to be equipped with DWS:-
DATE:
OPERATIONS
SHAHZAD YAZDANI
DWS Location Quantity
09/08/16 Room-204, E&M Bldg 01
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 a. Network Interfacing


EDSD

Dispatcher workstations shall be interconnected through E1 circuits to


DATE:

the SCN. For details refer to Block and Level Diagram-TETRA DWS
BY:

drawing number CO-A10049.Sheet 001


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

b. Power
(DCC) NO. _____________________

The Dispatcher Work Station (DWS) shall be powered from the


available 230VAC Uninterruptable Power Supply (UPS).
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 181


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Hand-Portable Radios (HPR)
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10 HPRs will be provided under BI-02399. However, the exact quantity of
ASH
ASH
ASH

HPRs will be finalized during the detailed design.


LEADS

LEADS
LEADS
ALL

ALL
ALL

HPR Transmit / Receive Specification:

Frequency 410-430 MHz


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Transmitter RF Power Minimum of 0.6 Watt with adaptive


DESCRIPTION

power control of 3 steps of 5 dB


ISSUED FOR 60% FEL3

RF Channel Bandwidth 25 KHz


Receiver Static Sensitivity -112 dBm or better
Receiver Dynamic Sensitivity -103 dBm or better

a. Locating Feature

For location-type of applications, HPRs shall have built-in GPS


receivers and antennas and support Location Information Protocol.
JO/EWO

b. Hazardous Classified Area Requirements


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

The minimum Equipment Protection Level for handheld radios and its
09/08/16
08/04/16
06/01/16

portables accessories shall be:


NO.
REV

DISCIPLINE
ENGINEER Class 1, Zone 1, Gas Groups IIC (Acetylene, Hydrogen, Ethylene &
C
A

Propane).
DATE:
PROJECT
ALL LEADS
ENGINEER
All handheld and portable Digital Trunked radio devices shall be
09/08/16
intrinsically safe “ib” or “ia”.
DATE:
CERTIFIED
A M ALMATROOK All handheld devices shall adhere to the requirement of GI-0006.008 in
09/08/16 terms of restriction, labelling and use.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 The Hand held radios (HPRs) shall be certified intrinsically Safe and
adhere to Hazardous and Environmental classified areas requirement
DATE:
OPERATIONS
under SAES-P-100, SAES-B-068 and SAES-T-493 paragraph 6.5.
SHAHZAD YAZDANI

09/08/16
c. Environmental Specifications
DATE:
CONTROL NUMBER

ALI H GHAMDI
HPRs shall be capable of operating in temperatures ranging from 0 to
VERIFICATION

09/08/16
+50 degrees Celsius and have protection against humidity, water and
EDSD

dust. The HPR shall have loud voice which can operate in noisy areas.
DATE:
BY:

d. Size and Ergonomics


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The weight of an HPR shall be less than 450 grams its dimensions
(DCC) NO. _____________________

within the 165x65x45mm limits.

e. Batteries and Chargers


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 182


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 The battery shall be capable of an operational duty cycle of
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5/5/90 (Transmit/Receive/Idle for eight hours of continual use. Each
portable radio shall be provided with two batteries, one for
ASH
ASH
ASH

operational use and the other as spare battery. Batteries shall be


intrinsically safe.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Single unit battery chargers shall be provided with each radio


unit. Multiple unit battery chargers (5-slot minimum) shall be
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

provided in limited quantities.


DESCRIPTION


ISSUED FOR 60% FEL3

The battery chargers shall operate from 230VAC, 60 Hz. Battery


chargers shall be provided with an electrical cord that has a US-
Type end plug. Adapters for a European 230VAC type plug shall be
provided in limited quantities.

- All accessories shall be intrinsically safe and interoperable.

Certificates for intrinsically safe rating and interoperability shall be


provided.
JO/EWO

- Each HPR's shall be supplied with carrying aids/accessories including


10-02399-

10-02399-
10-02399-
0001

0001

carrying cases, belt clips and belt clips attachment. Some HPR's
0001
DATE

shall be equipped with Remote Speaker Microphone.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
Vehicle Mounted Radios (VMR)
ENGINEER
C
A

Six(6) VMRs will be provided under BI-02399. The exact quantity of VMRs
DATE:
PROJECT
will be finalized during the radio coverage analysis and traffic study.
ALL LEADS
ENGINEER
09/08/16
VMR Transmitter/Receiver Specifications:
DATE:
CERTIFIED
A M ALMATROOK Frequency 410-430 MHz
09/08/16 Transmitter RF Power 3 Watt or higher
DATE: RF Channel Bandwidth 25 KHz
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
RF Power Control Steps 5 dB
09/08/16 Receiver Static Sensitivity -112 dBm or better
Receiver Dynamic Sensitivity -103 dBm or better
DATE: Input Power 13.8 VDC +/- 10%
OPERATIONS
SHAHZAD YAZDANI Temperature Range -100C to +550C Operating
09/08/16 -200C to +700C Storage
DATE:
For details, refer to VMR Block Diagram Drawing No. CO-A00006 sheet
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 001.
EDSD

Radio Frequency Dispatch Terminals (RFDT)


DATE:
BY:

General Specification
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Three(3) RFDT shall be provided under this project. The RFDT is


(DCC) NO. _____________________

a radio terminal device at a fixed location, such as an office or


control room, that interfaces to and operates on the System in a
similar way as a handheld Portable Radio (HPR) or Vehicle
REVISION

Mounted Radio (VMR) does, i.e. over the air.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 183


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 The RFDT shall be powered from a 230VAC Uninterruptable
Power Supply (UPS).
ASH
ASH
ASH

 For details, refer to RFDT Block Diagram Drawing No.CO-A10050


LEADS

LEADS
LEADS
ALL

ALL
ALL

Sheet 001.

Features and Accessories


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 RFDTs shall have separate transceiver bodies and control heads.


ISSUED FOR 60% FEL3

 Multiple desktop remote control functionality with PTT shall be


supported. The remote control heads shall be connected to the
RFDT via the buildings internal copper wiring or by installing
separate lines. Each RFDT shall be capable to support at least six
remote control heads controllable from a maximum distance of 100
meters. The necessary hardware to support up to six remote
control heads shall be provided and installed.
JO/EWO

 Loudspeakers and speaker/microphone with PTT type of audio


10-02399-

10-02399-
10-02399-

accessories shall be provided for all RFDTs.


0001

0001
0001
DATE

 Security gates shall be provided and installed with outdoor


09/08/16
08/04/16
06/01/16
NO.
REV

speakers to support personnel operations.


DISCIPLINE
ENGINEER
RFDT Installation
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER RFDTs shall be provided with all the required hardware including
09/08/16 mounting brackets, RF feeder cables, data cables and connectors,
DATE: Equipment rack and rack mounting kits shall be provided to mount
A M ALMATROOK
CERTIFIED RFDTs inside Telecommunications Equipment Rooms. Surge protectors
09/08/16 and grounding kit shall also be provided.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
RFDT Antenna Systems
09/08/16

DATE: RFDTs shall be provided with outdoor antenna, the antenna shall be 5 dBi
OPERATIONS
SHAHZAD YAZDANI
gain or better. An undistorted radiation pattern shall be ensured by optimal
09/08/16 placement of the antennas.
DATE:
RFDT antennas shall be provided with built-in ground plate for grounding.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

The antenna size and BUC power shall be based on the link budget
analysis specified for the TETRA scope to ensure the minimum BER
DATE:

threshold required by the TETRA to not lose the MCCH.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

All materials required for the complete installation of RFDT's, including the
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

radio, transmission line, connectors, antenna, conduits (as required),


(DCC) NO. _____________________

grounding, electrostatic surge protection, and wall/roof penetration port shall


be provided.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 184


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Refer to the Radio Frequency Report under subcontract studies section of
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH this package for details.
ASH
ASH

REFERENCE DRAWINGS
LEADS

LEADS
LEADS
ALL

ALL
ALL

Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

DRAWING NO. SHEET NO. DRAWING TITLE


ISSUED FOR 60% FEL3

CO-A10049 001 BLOCK & LEVEL TETRA DWS, RM 204, E&M


CO-A10050 001 BLOCK & LEVEL TETRA RFDT, SECURITY GH

G. TRANSMISSION SYSTEM

SCOPE DESCRIPTION
JO/EWO

SDH Equipment
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

BI-02399 shall provide new Alcatel 1646 SDH node at Yanbu Distribution
Hub. The proposed SDH node shall be STM-4 and shall be connected to
09/08/16
08/04/16
06/01/16

Yanbu Refinery (60YREF0A


NO.
REV

DISCIPLINE
ENGINEER New STM-4 interface card shall be provided by this BI in Yanbu Refinery to
C
A

connect the new 1646 SDH at Yanbu Distribution Hub as a spur of


DATE:
PROJECT 60YREF0A in Yanbu Refinery.
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
CONTRACTOR shall provide one (1) New ES1-8FE Integrated Services
A M ALMATROOK Adapter (ISA) card with 8 Fast Ethernet interface port shall be provided.
09/08/16
DATE:
Necessary port and interface cards shall also be provided for E1 interface
CONSTRUCTION
AMR EL SHARKAWY
port. Necessary DDF shall also be provided by the CONTRACTOR.
AGENCY
09/08/16
The following circuits require connectivity through the new SDH:
DATE:
OPERATIONS  TETRA Basetation – 2E1
SHAHZAD YAZDANI

09/08/16
 Dispatcher Workstation – 2E1
DATE:
 Power System Automation (PSA) – 2E1
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Communications Supervisory Alarm System (CSAS)


EDSD

 CONTRACTOR shall provide and install new CSAS remote


DATE:
BY:

Terminal Unit at the Telecom Equipment Room of the Operations


REVISIONCERTIFICATION

and Maintenance Building.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 CONTRACTOR shall wire all facility and equipment alarms to the


CSAS RTU and shall be transmitted to the Dhahran Network
Operations Center.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 185


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CSAS System shall be equipped with data display, 20-60VDC, 32
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
digital input, 16 Control Output, with necessary software for Aramco
and with Ethernet interface.
ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

DRAWING NO. SHEET NO. DRAWING TITLE


CO-A10051 001 SDH TRANSMISSION SYSTEM
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

H. TEMPORARY COMMUNICATION REQUIREMENTS


ISSUED FOR 60% FEL3

SCOPE DESCRIPTION

 CONTRACTOR shall provide and install all temporary


communications services required during construction. This shall
include, Outside Plant Cabling System, Structured Cabling System,
Data Network and Telephone System.
JO/EWO

 All temporary communications facilities shall be decommissioned


and removed after the completion of the project.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall coordinate and obtain approval from Saudi


09/08/16
08/04/16

Aramco for IT services (data and voice) provided through service


06/01/16
NO.
REV

DISCIPLINE
provider. CONTRACTOR should ensure this service provides
ENGINEER Layer-2 supporting SSL-VPN connectivity. CONTRACTOR shall
C
A

send the service provider quotation to Aramco IT group for review.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
DRAWING NO. SHEET NO. DRAWING TITLE
DATE:

A M ALMATROOK
CERTIFIED COA00060 001 BLOCK & LEVEL DIAGRAM - TELEPHONY
09/08/16 COA00061 001 OVERALL LOGICAL DIAGRAM - DATA
DATE:
CONSTRUCTION
AMR EL SHARKAWY COA00062 001 TRENCH AND CONDUIT LAYOUT
AGENCY
09/08/16
COA00063 001 COPPER CABLE SCHEMATIC DIAGRAM
DATE:
OPERATIONS COA00064 001 HORIZONTAL OUTLET LAYOUT
SHAHZAD YAZDANI

09/08/16 COA00065 001 HORIZONTAL RISER DIAGRAM


DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

 All temporary communications facilities shall be decommissioned


DATE:

and removed after the completion of the project.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

I. EMERGENCY SIREN SYSTEM (ESS)


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall design, procure, construct, test and commission a


permanent, fully flexible, operational and maintainable Emergency Siren
System (ESS). The ESS shall facilitate alarm broadcasting and notification
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 186


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG service for the entire Yanbu Distribution Hub and shall follow SAES-B-071
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH standard.
ASH
ASH

CONTRACTOR shall provide the ESS at Yanbu Distribution Hub in


accordance with applicable SAUDI ARAMCO Standards. CONTRACTOR
LEADS

LEADS
LEADS
ALL

ALL
ALL

shall ensure that the provided System shall meet the best commercial
practices, reliability, maintainability and performance.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide and install ESS Control Station (CS) which
DESCRIPTION

shall be composed but not to be limited to:


ISSUED FOR 60% FEL3

 Communication Control Unit


 Noise Cancelling Microphone
 Computer Workstation
 MassAlert Software (Customized for this project)
 Battery (12VD, 7AH)
 Antenna (w/ bracket)
JO/EWO

 Antenna Cable
 Antenna Polyphasor – Lightning Strike Protector
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Advance Communication Board


 Radio – Conventional UHF radio to be used for system
09/08/16
08/04/16
06/01/16
NO.
REV

communication
DISCIPLINE
ENGINEER  Remote Status View
C
A

DATE:
PROJECT
CONTRACTOR shall provide and install the above Control Station at Yanbu
ALL LEADS
ENGINEER
09/08/16
Distribution Hub in Operation Building. Activation of the sounders from the
Control Station shall be realized through wireless
DATE:
CERTIFIED communication/connectivity which shall utilize commercial operating
A M ALMATROOK
09/08/16 frequency between 330-360 Mhz Radio.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall provide and install Stationary Electronic Sirens which
09/08/16
shall be composed but not to be limited to:
DATE:
OPERATIONS
SHAHZAD YAZDANI  3200 Watt High Powered Speaker Station
09/08/16
 Digitized Pre-Recorded voice Message Board/ACB
DATE:
 Antenna (w/ bracket)
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Antenna Cable


EDSD

 Antenna Polyphasor – Lightning Strike Protector


 Radio – Conventional UHF radio to be used for system
DATE:
BY:

communication
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide and install the Stationary Electronics Sirens


(DCC) NO. _____________________

based on site-specific computer-based modeling provided by Siren


Manufacturer/Vendor to ensure all areas are covered at the minimum
required sound level.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 187


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall ensure that the sounders for plants alerting shall be
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
placed at a minimum of 15 meters above local grade. The loudspeakers
shall emit horizontally.
ASH
ASH
ASH

CONTRACTOR shall provide, install and ensure that the sounders not be
LEADS

LEADS
LEADS
ALL

ALL
ALL

closer than 15 meters to the windows of normally occupied buildings.

CONTRACTOR shall provide the mounting poles, foundations, including all


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

required mounting accessories that shall be utilized by the sounders to


DESCRIPTION

meet its full functionality.


ISSUED FOR 60% FEL3

The ESS system shall be powered from a nearest uninterruptible power


supply (UPS) system.

CONTRACTOR shall ensure that all installation shall follow all applicable SAUDI
ARAMCO Standards and/or the recommended vendor/manufacturer procedures and details
as stipulated in the user’s manual that is provided along with the equipment/devices.
JO/EWO

DRAWING NO. SHEET NO. DRAWING TITLE


CO-A100054 001 SYSTEM DIAGRAM, EMERGENCY SIREN SYS.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16

J. PAGING SYSTEM
NO.
REV

DISCIPLINE
ENGINEER
CONTRACTOR shall design, procure, construct, test and commission a
C
A

DATE:
permanent, fully flexible, operational, and maintainable In-Plant Paging
PROJECT
ALL LEADS
System (IPPS).
ENGINEER
09/08/16

DATE:
This IPPS shall facilitate voice and alarm broadcasting services for the
CERTIFIED Yanbu Distribution Hub in accordance with SAES-T-481 (In-Plant Voice
A M ALMATROOK
09/08/16
Paging System) and all SAUDI ARAMCO applicable standards.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Equipment to be provided as part of the System shall meet the best
09/08/16
commercial practices, reliability, maintainability and performance of the
DATE: System.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 For the System, all equipment shall be located within the battery limits of
DATE: the process area of the plant with desktop access units and switching
CONTROL NUMBER

ALI H GHAMDI
equipment to be installed in the Operation Building.
VERIFICATION

09/08/16
EDSD

The In-Plant Paging System (IPPS) shall consist of the following:


DATE:
BY:

 Master Call Station/Access Units


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Controller or Master Control Unit


(DCC) NO. _____________________

 Audio Messenger

 Telephone Interface Unit


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 188


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH  Line Supervisory Unit
ASH
ASH

 Audio Power Amplifier


LEADS

LEADS
LEADS
ALL

ALL
ALL

 Signaling Devices (beacons)


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The In-Plant Paging System (IPPS) shall also consist of the following:
DESCRIPTION
ISSUED FOR 60% FEL3

 Equipment cabinets

 Access Panels/Call Stations, Tone & speech generator, Amplifiers


and Inter cabling within junction boxes/enclosures.

 Loudspeakers and loudspeaker drivers

 Mounting Assemblies and accessories


JO/EWO

 Power Supplies
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Uninterruptible Power Supply


09/08/16
08/04/16
06/01/16

 Miscellaneous items where necessary to complete the System


NO.
REV

DISCIPLINE design e.g. acoustic booths, enclosures etc.


ENGINEER
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
Final locations of field devices shall be determined during detailed design;
09/08/16 however they shall typically cover the main process buildings/plant areas,
DATE:
together with the Operation buildings and Control Rooms.
CERTIFIED
A M ALMATROOK
09/08/16 In-Plant Communications equipment shall be able to operate under
DATE: environmental conditions stated in the SAES-J-003.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
All field equipment shall be suitable for use in its designated area
DATE: classification. Where applicable, equipment used in hazardous areas shall
OPERATIONS
SHAHZAD YAZDANI be certified as Intrinsically Safe.
09/08/16

DATE: The System shall operate in high noise areas up to 80dBA with the support
CONTROL NUMBER

ALI H GHAMDI
and augmentation of Signaling Devices such as beacons or flashing lights.
VERIFICATION

09/08/16
EDSD

Each indoor, outdoor or hazardous area loudspeakers and horns shall be


DATE:

supported by a remote power amplifier for driving the loudspeakers.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The Cabling shall consist of the following as a minimum:


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 System cable from system distribution equipment to the field devices


with ground conductor and spare conductors (recommended cable
by manufacturer).
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 189


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Loudspeaker/Flashing Light cable shall contain two (2) or three (3)
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH conductors whichever is applicable per vendor recommendation.
ASH
ASH

 Cables shall be UL listed for indoor and outdoor applications.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 Cables installed within a building shall be listed as being resistant to


the spread of fire in accordance with the National Electrical Code
(NEC) Article 800-50 and Article 800-51.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 Outer jacket of the cables shall be made of flame retardant, moisture


ISSUED FOR 60% FEL3

and ultraviolet resistant material to provide protection from oil,


chemical, mechanical and other environmental abuse.

 Loudspeaker/Flashing Light cable shall be installed in ¾ inch Rigid


Steel Conduit from amplifier enclosures as required. All fittings,
enclosures and plugs shall be suitably certified for the hazardous
area.
JO/EWO

The power for the In-Plant Communications equipment shall be supplied from the UPS
located in either of the Bulk Plant Control Room or Jetty Control Room and shall operate
from a 230 VAC.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

DRAWING NO. SHEET NO. DRAWING TITLE


09/08/16
08/04/16
06/01/16
NO.
REV

CO-A10047 001 BLOCK & LEVEL DIAGRAM, IN-PLANT PAGING


DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT 4.14.1 IT NETWORK ENGINEER APPLICATION REQUIREMENT
ALL LEADS
ENGINEER
09/08/16
IT physical infrastructure shall be fully documented in the geographic
DATE:
CERTIFIED
information system (GIS) based IT Network Engineer (NE) application. The
A M ALMATROOK CONTRACTOR shall include as part of his estimate the cost for Network
09/08/16
DATE:
Engineer updates and documentation. The updates and documentation
CONSTRUCTION
AMR EL SHARKAWY
shall include:
AGENCY
09/08/16
a) Reservation of IT physical infrastructure: IT physical infrastructures that
DATE:
OPERATIONS are planned to be used as part of the project must be reserved in NE
SHAHZAD YAZDANI
application. These reservations shall be renewed by the project every
09/08/16
six (6) months. IT physical infrastructures that are required to be
DATE:
reserved in NE include:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 Power
EDSD

 Space (floor space, rack space, wall space) in any IT Building or


DATE:

IT controlled space (Telecommunication Rooms, etc.)


BY:

 Connections to any existing IT equipment


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

 Connections to any existing In Side Plant (ISP) cables and/or floor


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

outlets
(DCC) NO. _____________________

 Connections to any existing IT Communications Grounding


system
 Use of existing Outside Plant (OSP) ducts or sub-ducts
 Use of existing Outside Plant (OSP) cable pairs/strands
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 190


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG  Placement of Antennas on existing Towers
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
b) Project Proposal Design Package: IT physical infrastructure (both
ASH
ASH
ASH

Inside Plant (ISP) and Outside Plant (OSP)) engineering design shall
be entered into NE upon the completion of the Project Proposal Phase.
LEADS

LEADS
LEADS
ALL

ALL
ALL

c) Issued for Construction Design Package: IT physical infrastructure


(both Inside Plant (ISP) and Outside Plant (OSP)) engineering design
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

shall be entered into NE application upon the completion of Issued for


Construction (IFC) engineering design package.
DESCRIPTION
ISSUED FOR 60% FEL3

d) As-Built Drawings: Actual "redline/as-built" updates of IT physical


infrastructure shall be updated in NE application upon the completion
of the project as part of the As-built Design package.

It shall be noted that the IT Network Engineer Access Policy only allows
user accounts for regular SAUDI ARAMCO employees or contractor
employees working under the direct supervision of IT/Engineering Tools
and Documentation Group. Also, the application can only be accessed via
JO/EWO

the SAUDI ARAMCO corporate Network.


10-02399-

10-02399-
10-02399-

This requirement does NOT change or supersede any existing e- review or


0001

0001
0001
DATE

IPlant drawings project submittal requirements.


09/08/16
08/04/16
06/01/16
NO.
REV

4.17Fire Protection
DISCIPLINE
ENGINEER
A. GENERAL
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER This Project shall provide Fire water System to provide the required fire protection
09/08/16 for the proposed facilities. The Fire water system shall consist of new fire water
DATE: storage, New Fire Pumps and New dedicated Fire Water Network (Underground)
A M ALMATROOK
CERTIFIED for the proposed facilities. Water supply from MARAFIQ shall be used as the feed
09/08/16 source to the new fire water storage tanks.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Companies selected for Design and Installation of Fire Water Systems shall have
09/08/16
Certified Fire Protection Engineer, Qualified Engineers and Designers to Design,
DATE: Install and Test Fire Water Systems and execute all other work requirements
OPERATIONS
SHAHZAD YAZDANI competently in accordance with SAES-B-017.
09/08/16

DATE: Fire Water Systems shall be Designed and Installed under the Supervision of a
Registered Professional Engineer in the specialty of Fire Protection Engineering
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 with at least five (5) years of experience in the design of Fire Water Systems.
EDSD

Design Drawings and Hydraulic Calculations shall be submitted according to


SAUDI ARAMCO procedures for Plan and Equipment submittals.
DATE:
BY:
REVISIONCERTIFICATION

All Tests of Fire Suppression System Shall be witnessed by designated


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

representative of Loss Prevention and Fire Protection Department as per SAES-


B-070, Section 7.5
(DCC) NO. _____________________

Hydraulic Calculations shall be performed using only software that complies with
requirements of SAUDI ARAMCO and calculations of NFPA 13. Software to be
REVISION

utilized shall be the latest version.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 191


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Design, Drawings and Calculations for Fire Water and Foam System(s) shall be
supervised by a Registered Professional Engineer in the specialty of Fire
ASH
ASH
ASH

Protection in accordance with SAES-B-070. All Drawings shall bear the seal of
that Registered Engineer. The Systems Detailed Design shall be Reviewed and
LEADS

LEADS
LEADS
ALL

ALL
ALL

Approved by Chief Fire Prevention Engineers Representative.

B. FIRE PROTECTION CONCEPT


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Fire Water Demand: Fire Water Demand shall be considered as a minimum


DESCRIPTION

1000 gpm and maximum of 4000 gpm based on the design basis requirement
ISSUED FOR 60% FEL3

specified in SAES-B-017, Clause 5.19.5 for Medium Risk Areas.

 Firewater demand shall be based on the single largest fire hazard within the
facility.

 Fire Water Storage: Two (2) Fire Water Storage Tanks equal in Size and
dedicated only for firewater service shall be provided with total storage capacity
of 12 hours in accordance with SAUDI ARAMCO requirement for Hydrocarbon
JO/EWO

storage Facilities.
10-02399-

10-02399-
10-02399-
0001


0001
0001
DATE

Fire Water Supply: Fire Water supply shall be provided by MARAFIQ – ROYAL
COMMISSION as the primary source. Truck Filling Connection will also be
09/08/16
08/04/16
06/01/16

provided as a backup.
NO.
REV

DISCIPLINE
ENGINEER  Firewater Pumping System: Dedicated Two (2) no. of Electric Driven Fire
C
A

Pumps as primary Fire pumps, One (1) no. of Diesel Driven Fire Pumps as
DATE:
PROJECT 100% backup Fire Pumps and Two (2) no. of Jockey Pumps (1-Duty & 1-
ALL LEADS
ENGINEER
Standby) to maintain the required pressure in the Fire Water Network. The
09/08/16
design of firewater pumps shall be in accordance with NFPA 20 and SAES-B-
DATE:
CERTIFIED
017.
A M ALMATROOK
09/08/16
DATE:
 Fire Water Distribution: A fire water distribution main shall be looped around the
CONSTRUCTION
AMR EL SHARKAWY plant areas. Firewater main ring shall be located underground to protect it from
AGENCY
09/08/16 mechanical damage. Where the main cannot be buried, it shall be suitably
DATE:
protected from vehicle impacts and the effects of fires and explosions. All
OPERATIONS Buried Piping are considered to be RTR, as per SAES-L-105, Line Class:
SHAHZAD YAZDANI

09/08/16
1FE0U and Above Ground Piping are considered to be FBE Lined Carbon
Steel, as per SAES-L-105, Line Class: 1LE0U. The Fire Water Ring main shall
DATE:
be hydraulically sized for the maximum Demand Flow Rates on the basis of
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Dual Feed.
EDSD

 Fire Water Hydrants: Fire Hydrants shall be located throughout the facility.
DATE:

Hydrants shall be located not less than 15m from the protected risk and shall
BY:

be spaced not more than 75m apart. Fire Hydrants shall be Wet Barrel type
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Hydrants that meet ANSI/AWWA C503 requirements. The Wet Barrel Hydrant
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

shall be a Listed Commercial Unit that complies with AWWA and has a working
(DCC) NO. _____________________

Pressure of 1380 kPag (200 PSIG). The Inlet shall be 6 inches in diameter with
approved Flat Face ANSI Flange.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 192


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Fixed Foam System: Fixed Deluge Foam Water System shall be provided to
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
protect Product Transfer Pumps and Shipper pumps with Two (2) no. of Foam
Skid package for Product Transfer pumps areas. Foam System shall be
ASH
ASH
ASH

provided in accordance with SAES-B-018 & NFPA 16 requirements. Transfer


pumps shall cover the pump casing and the floor or area at least 0.6 m (2 ft)
LEADS

LEADS
LEADS
ALL

ALL
ALL

from the periphery of the casing. The suction and discharge flanges, casing
drain valves, gauge connections, balance lines, and pump seals shall be
included in the spray area.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL


DESCRIPTION

Semi Fixed Foam System: Semi Fixed Foam System to be provided for Open-
ISSUED FOR 60% FEL3

Top Floating Roof Tanks. This is a vendor Item and will be part of the Tank
Vendor package that will be responsible for the entire semi-fixed foam system
from top of tank to hose connection outside of the dike area.

 Portable Fire Fighting Equipment: Hand Held and Mobile Fire Extinguishers
shall be provided for the Facilities. The Extinguishers shall be Selected and
Positioned in areas of Risk relevant to their application as per SAES-B-019
requirements. Where extinguishers are protecting individual equipment, they
shall be located at least 7.5m from the equipment’s.
JO/EWO

 Barriers for Protection of Exposed Fire Fighting Equipment: CONTRACTOR


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

shall provide and install Vertical Traffic Posts (Bollards) to protect all end
devices. The Bollards shall be designed such that access to Equipment is not
09/08/16
08/04/16
06/01/16

impaired. The Bollards shall have the following requirements;


NO.
REV

DISCIPLINE
ENGINEER o Constructed of Steel not less than 100 mm in diameter and Concrete
C
A

filled.
DATE:
PROJECT
ALL LEADS
ENGINEER
o Spaced not more than 1200 mm between posts on center.
09/08/16

DATE:
CERTIFIED o Set not less than 900 mm deep in a Concrete Footing of not less than a
A M ALMATROOK
400 mm diameter.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY o Set with the Top of the ports not less than 914 mm Above Ground.
AGENCY
09/08/16

DATE:
o Horizontal Cross-Bars between Vertical Posts are prohibited.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 o Located not less than 900 mm from any part of the Hydrant or Fire
DATE: Protection Equipment protected.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 o Guard Post shall not be installed in-line (directly in front of) with any of
EDSD

the Hydrant or Fire Protection Equipment outlets where the Fire Hose is
attached and where the Posts could contact the Hose when it gets
DATE:
BY:

pressurized and gets stiff in a straightened position.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Hydro – Testing Requirements:


(DCC) NO. _____________________

o Hydro-Testing of complete Fire Protection System shall be performed in


accordance with SAES-B-017 and SAES-A-004 requirements.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 193


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG o Prior to Hydro-Testing, the System shall be flushed in accordance with
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH NFPA 24.
ASH
ASH

o For Above Ground Piping or for Under Ground Piping prior to Burial, newly
installed Fire Protection Systems in Water Service, regardless of materials,
LEADS

LEADS
LEADS
ALL

ALL
ALL

shall be Hydrostatically Tested to 1,380 kPag (200 PSIG) or 345 kPag (50
PSIG) in excess of maximum operating pressure, whichever is greater, and
held without pressure loss for 4 hours. All Piping is required to be Hydro-
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Tested, including that of open ended piping for Deluge Systems.


DESCRIPTION
ISSUED FOR 60% FEL3

o For Underground installations, Test Duration shall be 24 hours if piping


welds and joints cannot be left exposed during Testing. All Hydrostatic Tests
of Fire Water Systems shall be recorded continuously. Partially Buried
Systems shall be treated as Underground Installations. For Fire Water
Systems not Hydro-Tested as a single system during Construction, a Final
Full System Hydro-Test is required to be made before Final Acceptance.

o Safety Procedures in accordance with GI-0002.102 shall be followed during


Pressure Testing.
JO/EWO

o Dry Pipe Fire Protection System shall be Hydro-Tested in accordance with


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

NFPA 13 and SAES-B-017.


09/08/16
08/04/16
06/01/16

C. FIRE PROTECTION CONCEPT


NO.
REV

DISCIPLINE
ENGINEER
 CONTRACTOR scope of work shall include but not limited to the, detailed
C
A

DATE:
engineering design, procurement, quality control and quality assurance
PROJECT documentation, construction, as-built documentation, inspection, testing, pre-
ALL LEADS
ENGINEER
09/08/16
commissioning, assistance to commissioning and start-up for all Fire Protection
Work associated with this project.
DATE:
CERTIFIED
A M ALMATROOK
 CONTRACTOR shall Design and Construct the New Fire Piping System
09/08/16
DATE: (Underground) in the new expansion Area, in accordance with applicable
CONSTRUCTION
AMR EL SHARKAWY SAUDI ARAMCO Engineering Standards - SAES-B-017, SAES-B-018, SAES-
AGENCY
09/08/16 B-019, SAES-B-070, SAUDI ARAMCO Engineering Specifications and
DATE:
applicable NFPA standards.
OPERATIONS
SHAHZAD YAZDANI

09/08/16  CONTRACTOR shall provide and install New Fire Water Network
DATE:
(Underground) with Piping, Fittings, Fire Hydrant, Fire Monitor, Live Hose reel
and Post Indicator Valves as show on Fire Protection drawing FI-A00011-001
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 and FIA00016-001 .


EDSD

 CONTRACTOR shall provide and install Two (2) new Electric Driven Fire
DATE:
BY:

Pumps, One (1) new Diesel Driven Fire Pump along with One (1) Diesel Tank
and Two (2) new Jockey Pumps as shown on drawings # FIA00011-003.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 CONSTRUCTION CONTRACTON shall provide Two (2) New Foam Skids for
(DCC) NO. _____________________

Product Pumps as show on the Fire Protection drawings FIA0012-001 and


FIA00013-001.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 194


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall provide Deluge Foam Water Spray system with all Piping,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Fittings, Air Aspirated Foam Nozzles, Deluge Valves, Gate Vales, Y-Strainers
for the Product pumps as per SAES-B-017 and SAES-B-070, as shown on Fire
ASH
ASH
ASH

Protection drawings FIA00012-002, FI-A00013-002, FIA00018.001, FIA00019-


001, FIA00019-002, FIA00019-003, FIA00019-007.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide necessary Caution / Identification Signs for the


Fire Protection System components as per SAUDI ARAMCO and NFPA
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

requirements.
DESCRIPTION


ISSUED FOR 60% FEL3

CONTRACTOR shall Paint all Above-ground Fire Protection Piping and


Components in Safety Red Color.

 CONTRACTOR shall Provide One Monitor Coverage for Custody Metering


Skids for YDH and SAMREF Area.

 CONTRACTOR shall perform Hydro-Testing of complete Fire Protection


System as per SAES-B-017 & SAES-A-004 requirements.
JO/EWO

 CONTRACTOR shall install two-wheel, cart type dry chemical, 68 kg size BC


extinguisher units as specified in Table -1, SAES-B-019, They shall be covered
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

with the manufacture’s cover or housed inside a roofed, noncombustible shed,


with access door facing in the opposite direction of hydrocarbon handling
09/08/16
08/04/16
06/01/16

equipment.
NO.
REV

DISCIPLINE
ENGINEER
 CONTRACTOR shall install 12.5 Kg BC type dry chemical hand fire
C
A

extinguisher shall be provided at least 7.5m for the protect pumps being
DATE:
PROJECT protected.
ALL LEADS
ENGINEER
09/08/16
 All Fire Protection Equipment and Appurtenances shall be purchased as
DATE:
CERTIFIED specified in the SAUDI ARAMCO Materials System and SAES-U-101.
A M ALMATROOK
09/08/16
DATE:  All Below Grade Valves in Fire Protection Systems shall be listed for use in Fire
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Service.
09/08/16

DATE:  All Below Grade Block Valves in Main or Branch Service shall be Listed Post
OPERATIONS
SHAHZAD YAZDANI
Indicator Type Valve with Position Indicators above Grade to meet the
09/08/16 requirements of NFPA 24.
DATE:
 All Manual Block Valves in Fire Protection Service shall be Car-Sealed in their
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Normal Operating Position or shall be otherwise supervised per NFPA 24.
EDSD

 Block Valves located on Above Grade Piping shall be Accessible as per SAES-
DATE:
BY:

B-054.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Commissioning and Testing Procedures for Foam Spray System shall meet the
requirements of NFPA 16. All Tests shall be witnessed by Designated SAUDI
(DCC) NO. _____________________

ARAMCO Representatives of the Loss Prevention and Fire Protection


Departments.
REVISION

D. INSTRUMENTATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 195


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Fire Water System:
ASH
ASH

 CONTRACTOR shall provide and install field instruments such as pressure


indicator, level transmitters, motor operated valves (MOV) for fire water
LEADS

LEADS
LEADS
ALL

ALL
ALL

tanks as indicated in P &ID drawing FIA00011-002.


 CONTRACTOR shall provide and install field instruments such pressure
indicators, pressure transmitters, flow meters, pressure control valves as
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

depicted in P & ID FIA00011-002 & FIA00011-003.


DESCRIPTION


ISSUED FOR 60% FEL3

As a minimum two (2) junction shall be provided, one each for analog and
digital signals as per SAES-J-902.
 CONTRACTOR shall provide and install homerun cables from fire water
tanks X40-D-0701/702 to DCS cabinet located in rack room of O & M
Building.
Foam Generating Skid 1 & 2:
Foam skid vendor shall provide skid instrumentation and control,
JO/EWO

CONTRACTOR shall provide and install data communication cables from


Foam Skid Control Panel to DCS as per block diagram IN-A00001.010.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Reference drawings
09/08/16
08/04/16
06/01/16

Drawing # Description
NO.
REV

DISCIPLINE IN-A00001 System Block Diagrams


ENGINEER
IN-A00002 Instrument Block Diagrams
C
A

DATE: IN-A00027 Instrument Points & Lines


PROJECT
ALL LEADS
ENGINEER IN-D00201 Instrument Installation Schedule-Flow
09/08/16
IN-D00202 Instrument Installation Schedule-Pressure
DATE:
CERTIFIED IN-D00203 Instrument Installation Schedule-Level
A M ALMATROOK
09/08/16
IN-D00204 Instrument Installation Schedule-Temperature
DATE: IN-D00205 Instrument Installation Schedule-Misc
CONSTRUCTION
AMR EL SHARKAWY
AGENCY IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
09/08/16
IN-D00207 Instrument Installation Schedule-Relief Valves
DATE:
OPERATIONS IN-A00004 Equipment Layouts
SHAHZAD YAZDANI

09/08/16 IN-A00003 Cable Routing Plan


DATE: IN-D00005 Cable and Conduit Schedule
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

E. MECHANICAL - ROTATING EQUIPMENT


DATE:
BY:

 Contractor shall provide following sets of Fire Water Pumps at YDH.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 Diesel Engine Driven Fire Water Pump – 1 No. (X40-G-0035,


Datasheet No. RE-E00119)
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 196


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG  Electric Motor Driven Fire Water Pump – 2 Nos. (X40-G-0034 A/B,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Datasheet No. RE-E00118)
ASH
ASH

 Fire Water Jockey Pumps – 2 Nos. (X40-G-0036 A/B, Datasheet No.


RE-E00120)
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Reference shall be made to individual pump datasheets included in index-G.

Fire Water pumps shall be selected in accordance with SAES-G-005 and


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-B-017. Fire Water Jockey pumps shall be in accordance with ASME


DESCRIPTION

B73.1. Fire Water Main Pumps (Diesel Engine Driven and Electric Motor
ISSUED FOR 60% FEL3

Driven) shall be in accordance with NFPA 20 and are of axial split, between
bearing design due to their high flow requirement. This design is also
maintenance friendly at site as top half of the pumps can easily be open to
access the internal components without disturbing the piping connections.

MISCELLANEOUS REQUIREMENTS
JO/EWO

 Reference shall be made to technical specifications for pumps included in


Index-A for further details of these pumps.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Pump Datasheets provided in this package are preliminary only. These will be
09/08/16
08/04/16
06/01/16

further verified by CONTRACTOR during detailed design phase of the project


NO.
REV

DISCIPLINE before issuing for procurement activities.


ENGINEER
C
A

 CONTRACTOR shall be responsible for producing equipment datasheet, SIS


DATE:
PROJECT
ALL LEADS
sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms
ENGINEER
09/08/16 and datasheets.
DATE:

A M ALMATROOK
CERTIFIED  All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved
09/08/16 manufacturer for each Commodity Classification Code (CCC). SAUDI
DATE:
CONSTRUCTION
ARAMCO will provide the list of approved manufacturers after award of
AMR EL SHARKAWY
AGENCY
09/08/16
Contract.
DATE:
OPERATIONS
 CONTRACTOR shall prepare Material Requisition Package for all the pumps
SHAHZAD YAZDANI

09/08/16
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
DATE:
issuing to Vendors.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Material take-offs have been prepared for reference only and will not be
EDSD

considered as contractual documents and cannot be used as a basis for any


change order.
DATE:
BY:

 Technical quotations obtained from vendors will list all exceptions and /or,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

additions to applicable project Drawings and SAUDI ARAMCO Specifications. If


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

there is no exception to specifications, CONTRACTOR will make a statement


(DCC) NO. _____________________

to that effect.

 CONTRACTOR shall be responsible for Technical Bid Evaluation, placing the


REVISION

Purchase Order to technically approved Vendors.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 197


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
and 603.
ASH
ASH
ASH


LEADS

Inspection and Testing of CONTRACTOR supplied materials will be performed


LEADS
LEADS
ALL

ALL
ALL

as per applicable SAUDI ARAMCO Inspection Requirement form A-175.


CONTRACTOR will arrange with his sub suppliers to comply with these
ISSUED FOR 100% PROJECT PROPOSAL

requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s


ISSUED FOR 90% PROJECT PROPOSAL

intention to inspect material.


DESCRIPTION
ISSUED FOR 60% FEL3

 Equipment installation and Commissioning shall be in accordance with


approved Vendor’s installation and commissioning procedures.

 Supply of Commissioning and Start-up spares and first fill of all the lubricants
and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
approval of Aramco Operations before filling of lubricants and chemicals.


JO/EWO

CONTRACTOR will provide all Non Material Requirement (NMR-602/603),


Operation and Instruction Manuals of CONTRACTOR supplied material in
10-02399-

10-02399-
10-02399-

electronic format (Latest Acrobat Reader).


0001

0001
0001
DATE

 CONTRACTOR will provide critical spare parts for CONTRACTOR supplied


09/08/16
08/04/16
06/01/16
NO.
REV

items in accordance with SAEP-3101. Contractor will develop list of critical


DISCIPLINE
ENGINEER plant equipment spares and identification
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 4.18 Industrial Drainage System
DATE:

A M ALMATROOK
CERTIFIED A. GENERAL
09/08/16
DATE: CONTRACTOR shall connect the industrial drain generated within the facility to the
CONSTRUCTION
AMR EL SHARKAWY
AGENCY MARAFIQ network. All industrial drainages shall be treated in the oily water treatment
09/08/16
system. The industrial oily water treatment system shall consist of but not limited to an
DATE: oily water equalization tank, CPI separator, water break tank, two effluent water pumps
OPERATIONS
SHAHZAD YAZDANI (one operating, one spare), two skimmed oil pumps (one operating, one spare) and
09/08/16 necessary instrumentation and interconnecting piping.
DATE:

The oily water treatment system shall be of a complete vendor skid design and the
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 treatment system shall receive the effluent from the oily water sump via normal flow
EDSD

pump, main source of oily water will be dewatered effluent from the product storage
tanks. CONTRACTOR shall route the dewatered effluent from the tanks to the oily
DATE:
BY:

water lift stations and then effluent will transfer from normal flow pumps to the
REVISIONCERTIFICATION

equalization tank.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The CPI vendor shall provide the pump to transfer the recovered oil from the CPI to
(DCC) NO. _____________________

the slop tank while effluent water to be transferred to the MARAFIQ network.

CONTRACTOR and CPI system vendor shall ensure that the treated water meets the
REVISION

effluent water quality requirement for MARAFIQ.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 198


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH CONTRACTOR shall connect the treated oily water discharge to the evaporation pond.
ASH
ASH

The current design considers a permanent drain connection to MARAFIQ industrial


water network; however at a later stage this connection is no longer required. LSTK
LEADS

LEADS
LEADS
ALL

ALL
ALL

Contractor shall delete the industrial drainage from YDH to MARAFIQ outlined in PFD
VA-247846.001 & VA-247848.001 and P&ID VA-247921.001 to VA-247923.001, and
downside the drain pump.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

B. CIVIL
DESCRIPTION

 Storm water inside the tank farm dikes, plinth areas of pumps and other
ISSUED FOR 60% FEL3

process areas, are considered contaminated water. Contaminated water shall


be collected by standard oily catch basin and will pass through RTR pipe
connected to the oily water sewer network and conveyed to OWLS.

 Contaminated water from the tank farm dikes will be controlled by a 10”
diameter gate valve connected to the oily water sewer network. Further, in
case of Major flood/raptor an additional 4” gate valve and 4” pipe branch line
with vacuum truck connection shall be provided outside the dike oily water
JO/EWO

pipe.
10-02399-

10-02399-
10-02399-
0001

 Dewatering from Diesel tanks shall be connected to the Oily water system
0001
0001
DATE

from the diked areas. Dewatering from the Kerosene and Gasoline tanks shall
09/08/16
08/04/16
06/01/16

be connected to a separate oily water system and conveyed to OWLS.


NO.
REV

DISCIPLINE
ENGINEER  CONTRACTOR shall provide two (2) Oily water Lift Station wherein the OWS
C
A

inlet pipe will be connected. CONTRACTOR shall assess and re-validate the
DATE:
PROJECT
design of the OWS drainage system. The internal wall of the lift stations shall
ALL LEADS
ENGINEER
be coated with APCS-3 or better and while the exterior wall shall be coated
09/08/16
with APCS-10 on below ground and exterior coating above ground shall be
DATE:
CERTIFIED
APCS-1B.
A M ALMATROOK

DATE:
09/08/16
 Contractor shall construct a sand separator /trap tank properly designed to
CONSTRUCTION
AMR EL SHARKAWY
retain sand particles from reaching the sump pumps. The oily water network
AGENCY
09/08/16 will discharge to the sand separator tank before the OWLS. The inlet pipe to
the sand separator will include a gate valve indicator O&Y for the purposes of
DATE:
OPERATIONS controlling water entering to the sand separator while maintenance is
SHAHZAD YAZDANI
performing.
09/08/16

DATE:
 Each oily water lift station shall be provided with two pumps for normal flow
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
(one operating, one spare) and two pumps for maximum flow (one
operating, one spare). The normal flow pumps will discharge to an oily water
EDSD

treatment system whereas the maximum flow pump shall discharge to the
DATE:

Evaporation pond.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

 CONTRACTOR shall provide sealed oily catch basin as per standard


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

drawing no. AB-036402 and /or drawing no. AC-036078 inside pump house,
(DCC) NO. _____________________

scraper area and transformer area. Provide customize sealed catch basin
inside dike area.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 199


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide an 8”, 10”, 12” and 16” diameter RTR pipe,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IFE0U, 01-SAMSS-034 for underground oily water gravity sewer.
CONTRACTOR shall re-validate the propose size during detail design stage.
ASH
ASH
ASH

CONTRACTOR shall provide required fittings to complete the system.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 To prevent fire transferring from an area to another area, the Oily water
network will be connected using sealed inlet oily water manholes following
standards and drawings details supplied in civil drawings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 To prevent that oily water manholes will collapse by sand sedimentation, the
ISSUED FOR 60% FEL3

contractor shall construct catch basin lids/grates with means to retain sand
from reaching the pipe network.

 Provide underground oily water sewer pressure line from oily separation to
evaporation pond.

 Provide oily water sewer connection from transformer retention channel to


oily water sewer network.
JO/EWO

 Provide neutralization pit for all battery acid wash water which shall be
connected to oily water sewer network. Neutralization pit shall be coated
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

with, acid resistant material. The pit shall be sized for the expected waste
acid flow and dilution or wash-down water. The pit shall be in a readily
09/08/16
08/04/16
06/01/16

accessible location, and shall be vented to the outside. The minimum vent
NO.
REV

DISCIPLINE size shall be 63 mm (2 in) OD as per SAES-S-060 para. 811.9C.


ENGINEER
C
A

DATE:
 Provide oily water connection from foam skid, fire water pump house,
PROJECT metering skid, CPI separator and all pumps containment area.
ALL LEADS
ENGINEER
09/08/16
 Provide clean out at maximum spacing of 30 meter distance and in every
DATE:
CERTIFIED change of direction.
A M ALMATROOK
09/08/16
DATE:  CONTRACTOR shall consider the latest revision of the Royal Commission
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Environmental Regulations (RCER) in validating the design for Industrial
09/08/16 Waste.
DATE:
OPERATIONS
SHAHZAD YAZDANI
 Refer to drawing: CI-A00119 sheet 001-015
09/08/16

DATE:  The lift station construction shall be in accordance with ACI 350 as a water
tight structure. Concrete compressive strength shall be 34.474 MPa (5000
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 PSI) minimum


EDSD

C. MECHANICAL – ROTATING EQUIPMENT


DATE:
BY:

Oily water sumps at YDH will be provided with following sets of pumps:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

1. Oily Water Normal Flow


(DCC) NO. _____________________

Pumps for OWS -1 & 2


2. Oily Water Maximum Flow
Pump for OWS-1 & 2
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 200


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Each Oily Water Sump will be provided with 02 sets of normal flow pumps and 01
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
maximum flow pumps. Vertical discharge through column type pumps in
accordance with 31-SAMSS-004 shall be selected for this service. This is due to
ASH
ASH
ASH

the reason that latest update of SAES-G-005 prohibits the use of self-priming
pumps for Oily Water Sump services if flammable liquids are going to be drained to
LEADS

LEADS
LEADS
ALL

ALL
ALL

these sumps.

Reference shall be made to Index-G of FEL-3 package for pump datasheets.


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Below are the pump tag numbers and datasheet numbers.


DESCRIPTION
ISSUED FOR 60% FEL3

OWS LIFT STATION NO.1 -


X40-G-0027 A/B RE-E00110 NORMAL FLOW
OWS LIFT STATION NO.1 -
X40-G-0028 RE-E00111 MAXIMUM FLOW
OWS LIFT STATION NO.2 -
X40-G-0033 A/B RE-E00116 NORMAL FLOW
OWS LIFT STATION NO.2 -
JO/EWO

X40-G-0017 RE-E00117 MAXIMUM FLOW


.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

MISCELLANEOUS REQUIREMENTS
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE  Reference shall be made to technical specifications for pumps included in


ENGINEER
Index-A of FEL-3 package for further details of these pumps.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
 Pump Datasheets provided in FEL-3 package are preliminary only. These will
09/08/16 be further verified by CONTRACTOR during detailed design phase of the
DATE: project before issuing for procurement activities.
CERTIFIED
A M ALMATROOK
09/08/16  CONTRACTOR shall be responsible for producing equipment datasheet, SIS
DATE:
CONSTRUCTION
AMR EL SHARKAWY
sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms
AGENCY
09/08/16 and datasheets.
DATE:
OPERATIONS  All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved
SHAHZAD YAZDANI

09/08/16 manufacturer for each Commodity Classification Code (CCC). SAUDI


DATE: ARAMCO will provide the list of approved manufacturers after award of
Contract.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 a
EDSD

 CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
DATE:
BY:

issuing to Vendors.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Material take-offs have been prepared for reference only and will not be
(DCC) NO. _____________________

considered as contractual documents and cannot be used as a basis for any


change order.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 201


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Technical quotations obtained from vendors will list all exceptions and /or,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
ASH

there is no exception to specifications, CONTRACTOR will make a statement


ASH

to that effect.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall be responsible for Technical Bid Evaluation, placing the


Purchase Order to technically approved Vendors.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
DESCRIPTION

and 603.
ISSUED FOR 60% FEL3

 Inspection and Testing of CONTRACTOR supplied materials will be performed


as per applicable SAUDI ARAMCO Inspection Requirement form A-175.
CONTRACTOR will arrange with his sub suppliers to comply with these
requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s
intention to inspect material.
JO/EWO

 Equipment installation and Commissioning shall be in accordance with


approved Vendor’s installation and commissioning procedures.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Supply of Commissioning and Start-up spares and first fill of all the lubricants
and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
approval of Aramco Operations before filling of lubricants and chemicals.
ENGINEER
C
A

 CONTRACTOR will provide all Non Material Requirement (NMR-602/603),


DATE:
PROJECT Operation and Instruction Manuals of CONTRACTOR supplied material in
ALL LEADS
ENGINEER
09/08/16
electronic format (Latest Acrobat Reader).
DATE:
CERTIFIED  CONTRACTOR will provide critical spare parts for CONTRACTOR supplied
A M ALMATROOK
09/08/16 items in accordance with SAEP-3101. Contractor will develop list of critical
DATE: plant equipment spares and identification
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
D. MECHANICAL- STATIC EQUIPMENT
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall be responsible for supply, procurement, fabrication,
09/08/16 transportation handling, storage at site, erection, inspection, testing and
DATE: commissioning of all equipment and packages.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 CONTRACTOR shall take necessary precautions in handling the equipment to


EDSD

prevent any damage during transportation and loading/unloading.


DATE:
BY:

CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance rigging
plans and transportation calculations for all major equipment.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting of
(DCC) NO. _____________________

equipment.

All equipment shall be installed and commissioned as per SAUDI ARAMCO


REVISION

Standards and Manufacturer recommendations.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 202


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall be responsible for insulation (where specified on the data
sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
ASH
ASH
ASH

All skid packages design shall be vendor proven design. Skid packages shall be
LEADS

LEADS
LEADS
ALL

ALL
ALL

suitable for the specific application by meeting all the process design requirements
and environmental, safety and Industry standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Reference Documents for Oily Water Treatment System


DESCRIPTION

Document # Description
ISSUED FOR 60% FEL3

EQ-E00030 Datasheet for Oily Water Treatment System


EQ-E00009 Technical Specification for Oily Water Treatment
System

CONTRACTOR shall provide oily water treatment package as per above


reference documents.
JO/EWO

E. INSTRUMENTATION
10-02399-

10-02399-
10-02399-

CONTRACTOR shall provide and install oil-in-water analyzer at the inlet and outlet
0001

0001
0001
DATE

of CPI Separator skid as indicated in P & ID and IPL. The skid instrumentation shall
be provided by skid vendor.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE CONTRACTOR shall provide and install field junction boxes to connect CPI skid
ENGINEER
instrument to DCS for remote monitoring and control.
C
A

DATE: Provide and install homerun cables from CPI skid X40-X-1101 to remote I/O
PROJECT
ALL LEADS
ENGINEER cabinet located in RIB-2. The cable shall be routed on the cable trays.
09/08/16
Hydro carbon detectors to be provided at the sump for the oily water sumps.
DATE:

A M ALMATROOK
CERTIFIED
 Reference drawings
09/08/16
DATE: Drawing # Description
CONSTRUCTION
AMR EL SHARKAWY
AGENCY IN-A00001 System Block Diagrams
09/08/16
IN-A00002 Instrument Block Diagrams
DATE:
OPERATIONS
IN-A00027 Instrument Points & Lines
SHAHZAD YAZDANI

09/08/16
IN-D00201 Instrument Installation Schedule-Flow
DATE:
IN-D00202 Instrument Installation Schedule-Pressure
IN-D00203 Instrument Installation Schedule-Level
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 IN-D00204 Instrument Installation Schedule-Temperature


EDSD

IN-D00205 Instrument Installation Schedule-Misc


DATE:

IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV


BY:

IN-D00207 Instrument Installation Schedule-Relief Valves


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

IN-A00004 Equipment Layouts


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

IN-A00003 Cable Routing Plan


(DCC) NO. _____________________

IN-D00005 Cable and Conduit Schedule


.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 203


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG 4.19GRADING & STORM WATER DRAINAGE
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. CIVIL
ASH
ASH
ASH

A. CONTRACTOR shall achieve the finish grade level as per required


LEADS

LEADS
LEADS
ALL

ALL
ALL

design in all the proposed tank farm, all access road areas with fill
as per the requirements specified under SAES-A-114.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

B. CONTRACTOR shall prepare finish grade level in reference to the


latest rough grading drawing.
DESCRIPTION
ISSUED FOR 60% FEL3

C. CONTRACTOR shall re-evaluate/validate the design requirement


and possible improvement on layout design storm water drainage
system. CONTRACTOR shall evaluate the cost with possible
provision of concrete channel and box culvert, if necessary in
accordance with SAUDI ARAMCO Engineering Standard, SAES-S-
030.

D. CONTRACTOR shall consider data of rain fall intensity to be used


JO/EWO

as reference for the propose storm water drainage design based on


the requirements as per SAES- A-112.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

E. CONTRACTOR shall provide storm water open drain concrete


channel trapezoidal/rectangular type to collect surface water outside
09/08/16
08/04/16
06/01/16
NO.
REV

the tank farm and other unpaved non-process area. The water shall
DISCIPLINE
ENGINEER flow thru gravity open drain direct the new drain channel outside the
plant and tie-in to the future RC storm drain channel.
C
A

DATE: CONTRACTOR shall assess the final disposal of the accumulated


PROJECT
ALL LEADS
ENGINEER storm water considering the Royal Commission Environmental
09/08/16 Regulations.
DATE:

A M ALMATROOK
CERTIFIED F. CONTRACTOR shall provide box culvert and junction box as
09/08/16 required where channel passes thru road and security fence.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY G. CONTRACTOR shall establish finished grade and invert elevation of
09/08/16
drain and box culvert as per the project requirements that will
DATE: provide more economical concept.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 H. Refer to drawing: CI-A00111 sheet 001-021


DATE:

I. Storm water inside the tank farm area is considered contaminated


CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 water and will be collected by a separated oily water pipe system
EDSD

network
DATE:
BY:
REVISIONCERTIFICATION

4.20UTILITY WATER SUPPLY


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

A. CONTRACTOR shall install the utility water pipe network from the
equipment pumps to each building, eye washers, and other
locations where utility water is required. The utility water pipe
REVISION

network shall be installed with RTR pipe, 12FEOU, using


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 204


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG appropriate manufacture fittings, valves, connections, reducers, and
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH manufacturer recommendations for a proper installation.
ASH
ASH

B. A control gate valve shall be installed before the connection to each


building or supply point.
LEADS

LEADS
LEADS
ALL

ALL
ALL

C. The Utility water pipe network shall have gate valves for appropriate
maintenance for the main pipe and for each section.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

D. Installation of utility water shall follow SAES S 40, SAES S 70 and


DESCRIPTION

pipe line classification.


ISSUED FOR 60% FEL3

E. The water pipe network shall be tested using the methodology and
guidelines of SAES S 70.

4.21SANITARY WASTE WATER

A. CONTRACTOR shall install the sanitary waste water network from


JO/EWO

each building to the lift stations and from the lift stations to the tie-in
point connection to MARAFIQ.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

B. The gravity sanitary waste water network to lift stations will be


constructed with 8” diameter RTR pipe, 80FEOD. These will include
09/08/16
08/04/16
06/01/16
NO.
REV

the provision of sanitary manholes, cleanouts and other fixtures.


DISCIPLINE
ENGINEER
C

C. The forced sanitary waste water pipes from the lift stations will be
A

DATE: constructed with 3” diameter RTR pipe, 12FEOU. These will include
PROJECT
ALL LEADS
ENGINEER the provision of fittings, valves, and flanges.
09/08/16

DATE: D. Installation of sanitary waste water shall follow SAES S 10 and SAES
CERTIFIED
A M ALMATROOK S 104 where applicable.
09/08/16
DATE:
4.22OVERALL SITE DEVELOPMENT AND FACILITIES:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
 CONTRACTOR shall re-evaluate/validate the design requirement and include
DATE:
any other possible improvement / requirements not spelled out but are
OPERATIONS
SHAHZAD YAZDANI essential on layout design of civil works for bulk plant area, access roads, traffic
09/08/16 scheme, main gate layout and temporary construction facility that includes but
DATE: not limited to the following:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  CONTRACTOR shall revalidate and re-establish all the finish grade elevations
EDSD

in reference to the latest existing topographic survey drawing and to the latest
rough grading drawing.
DATE:
BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall provide concrete sidewalks inside the parking area, Gate
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

House, E&M Building and other Support Building Facilities as provided and
(DCC) NO. _____________________

shown on architectural drawings and site development plan as shown in


drawing no. CI-A00106. The sidewalk shall be 100mm thick concrete provided
with 150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 205


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG accordance with SAUDI ARAMCO Standard drawing no. AB-036260 sheet 001
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH rev. 05.
ASH
ASH

 CONTRACTOR provide 500 mm thick marl capping inside dike area and 150
mm thick marl capping outside the dike peripheral at all non-paved areas
LEADS

LEADS
LEADS
ALL

ALL
ALL

including the sleeper areas. Dike fill material shall comply with SAES-Q-006,
sub-base material Class, placement and compaction shall be in accordance
with SAES-Q-006.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL


DESCRIPTION

CONTRACTOR shall provide and develop a total of forty five (45) shaded
ISSUED FOR 60% FEL3

parking slots at E&M building and six (6) parking slots at operation building as
shown on the drawing CI-A00106. Likewise, a total of thirty (30) shaded
parking slots shall be provided for visitors outside the security fence. Structural
design detailed calculation of the sunshades shall be submitted by the vendor.
Refer to DA-950182-001

 CONTRACTOR shall provide HCIS Category I around the tank farm as shown
in drawing CI-A00105. Fence shall be in accordance to the requirements as per
SAES-O-202 and SEC-02.
JO/EWO

 CONTRACTOR shall provide HCIS Category IV around the Support Facility as


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

shown in the drawing CI-A00105. Fence shall be in accordance to the


requirements as per SAES-O-202 and SEC-02.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE  The CONTRACTOR shall provide two (2) access gates.


ENGINEER
C
A

 Provide two (2) 9.0 meters wide double leaf decorative metal gates provided
DATE:
PROJECT with four (4) units of 4.3 meters long hydraulic crash barrier and 8 inches
ALL LEADS
ENGINEER
09/08/16
diameter bollards at main security gate house and Tank Farm Gate. Each gate
is designed to have a two (2) lanes security access road. Also, provide two (2)
DATE:
CERTIFIED 1.20 meters single leaf decorative metal gates to be utilized as walkway gate
A M ALMATROOK
where each located at main entrance and exit gates. Four (4) Drop arms shall
09/08/16
DATE:
be provided also in each gate. Two (2) shall be installed at the entry lane and
CONSTRUCTION
AMR EL SHARKAWY the other Two (2) shall be installed at the exit lane.
AGENCY
09/08/16

DATE:
 CONTRACTOR shall provide turnstile for pedestrian entry and exit access.
OPERATIONS
SHAHZAD YAZDANI

09/08/16  Provide type IV perimeter fence with 4.0 meters wide double leaf drive gate for
DATE:
each heel recovery drum location. The perimeter fences shall be in accordance
with all the requirements specified in SAES-M-006 and referenced as per
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 SAUDI ARAMCO Standard drawing no. AB-036677 sheet 001 rev. no. 002.
EDSD

 Provide 5.0m wide lay bay for heel recovery drum/product recovery drum for
DATE:

truck access.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

 Provide non-mountable curb and curb & gutter. curb & gutter shall be in
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

reference to standard drawing AB-036260-001 rev. 005


(DCC) NO. _____________________

 Pavement arrow markings shall be in reference as per standard drawing no.


AD-036512 sheet 001 rev. 00.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 206


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall provide Facility Security Forces (FSF) before the SAUDI
ARAMCO main gate. FSF facility shall comply all the Security requirements,
ASH
ASH
ASH

not limited to the following:


LEADS

LEADS
LEADS
ALL

ALL
ALL

1. FSF Support Building


2. FSF Sunshade
3. FSF shaded parking for FSF guards
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

4. Armor Vehicle shed


5. Non-Electrical Utility (Water & Sanitary)
DESCRIPTION
ISSUED FOR 60% FEL3

VISITOR PARKING ASPHALT PAVEMENT:

CONTRACTOR shall develop design traffic scheme for adequate


maneuvering and clearances at the parking area.

a. CONTRACTOR shall develop detail design of storm water flow in all the
asphalt paved area including applicable storm drain system and surface
JO/EWO

drain with proper slope.


10-02399-

10-02399-
10-02399-

b. Provide 100mm thick concrete side walk provided with


0001

0001
0001
DATE

150x150xMW9xMW9 welded wire fabric (WWF) and shall be in


accordance, as applicable, as per SAUDI ARAMCO Standard drawing
09/08/16
08/04/16
06/01/16
NO.
REV

no. AB-036260 sheet 001 rev. 05.


DISCIPLINE
ENGINEER
c. Provide curb stone with gutter as per SAUDI ARAMCO standard
C
A

DATE: drawing as stated above.


PROJECT
ALL LEADS
ENGINEER
09/08/16 d. Provide adequate standard traffic regulatory signs (stop signs,
DATE: prohibited signs, yield signs, speed limit signs) and informative signs
CERTIFIED
A M ALMATROOK showing the direction of bulk plant and access road. Use thermoplastic
09/08/16 paint for road markings.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 1. Yellow paint line with 200mm wide on walkway edge paint line
09/08/16
2. White paint line with 120mm wide for car parking interval
DATE: (separation)
OPERATIONS
SHAHZAD YAZDANI 3. White paint line with 500mm wide for stop line
09/08/16 4. Regulatory/directional sign board shall be 1.10 meter diameter with
DATE: steel post which approximately 2.0 meters high with respect to the
CONTROL NUMBER

ALI H GHAMDI finish grade/road level and to include its foundation.


VERIFICATION

09/08/16 5. Informative sign board shall be 1.20mx1.20m boards with steel post
EDSD

which approximately 2.0 meters high with respect to the finish


grade/road level and to include its foundation.
DATE:
BY:
REVISIONCERTIFICATION

Parking stall layout and wheel stop detail and pavement arrows and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

cross walk markings shall be in reference as per standard drawing nos.


(DCC) NO. _____________________

DD-950107 sheet 001 rev. 00 and AD-036512 sheet 001 rev. 00


respectively. Likewise, miscellaneous parking related work like
installation of parking bumpers etc. shall refer to standard drawing no.
AE-036254-001
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 207


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH MAIN ACCESS AND IN-PLANT ROAD:
ASH
ASH

The Plant Access Road traffic scheme shall include but not limited to the
following:
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide access to the bulk plant that includes necessary
traffic signs, road markings and sign board as per standard. Plant access roads
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

shall refer to all applicable requirements as per SAES-Q-006, SAES-A-114 and


AASHTO requirements as required.
DESCRIPTION
ISSUED FOR 60% FEL3

 CONTRACTOR shall provide drop gates (drop arms) for vehicles control for
both entrance and exit road lines

 The road asphalt structure for 8.0 meter internal road is comprises of the
following materials as per SAES-Q-006;

1. 50mm thick asphalt concrete wearing/surface course, Class B,


2. 90mm thick asphalt concrete binder course, Class B, and provided with
JO/EWO

Tack Coat, RC-250, on top surface of the binder course


3. 230mm thick aggregate base course with provision of prime coat, MC-
10-02399-

10-02399-
10-02399-
0001

70, on top surface of the aggregate base course


0001
0001
DATE

 CONTRACTOR shall Utilize CBR test values given in geotechnical report 2015/104
09/08/16
08/04/16
06/01/16

in order to finalize the road structure.


NO.
REV

DISCIPLINE
ENGINEER  Filling materials for road subgrade shall comply with SAES Q 006 chapter 5.
C
A


DATE:
PROJECT
Pavement materials shall comply with SAES Q 006 chapter 5.
ALL LEADS
ENGINEER
09/08/16
 Adequate soil stabilization methods and drainage shall be provided for all
DATE:
CERTIFIED
access roadways in order to prevent the erosion or flooding of project road
A M ALMATROOK ways.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY  Provide adequate standard traffic regulatory signs (stop signs, over-taking
AGENCY
09/08/16 prohibited signs, yield signs, speed limit signs) and informative signs showing
DATE:
the direction of bulk plant and access road. Use thermoplastic Paint for road
OPERATIONS markings.
SHAHZAD YAZDANI

09/08/16
1. Yellow paint line with 200mm wide on edge line
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
2. Regulatory/directional sign board shall be 0.90 meter diameter with
steel post which approximately 2.0 meters high with respect to the finish
EDSD

grade/road level and to include its foundation.


DATE:
BY:

 Pavement arrow markings shall be in reference as per standard drawing no.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

AD-036512 sheet 001 rev. 00.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 Provide adequate standard traffic regulatory signs (stop signs, over-taking


prohibited signs, yield signs, speed limit signs) and informative signs showing
the direction of bulk plant and access road. Use thermoplastic Paint for road
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 208


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG markings. Pavement arrow markings shall be in reference as per standard
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH drawing no. AD-036512 sheet 001 rev. 00.
ASH
ASH

 Provide 6.0m wide access ramps crossing the dike wall to all tanks.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Provide ramp for culvert crossing with adequate slope.


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

EXTERNAL PATROL Road


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall re-evaluate/validate the design requirement and include


any other possible improvement/ requirements on layout design of access
road, in plant road traffic scheme that includes but not limited to the following:

 Provide 4.6 meters wide external asphalt concrete patrol road shall comprise of
the following structure.

1. 50mm thick asphalt concrete wearing/surface course, Class B,


2. 70mm thick asphalt concrete binder course, Class B, and provided with
JO/EWO

Tack Coat, RC-250, on top surface of the binder course


150mm thick aggregate base course with provision of prime coat, MC-
10-02399-

10-02399-
10-02399-
0001

0001

70, on top surface of the aggregate base course.


0001
DATE

09/08/16
08/04/16
06/01/16

4.23Process Automation & Controls


NO.
REV

DISCIPLINE
ENGINEER Process Automation shall ensure safe and reliable operation of YDH operations. The
C
A

PCS overview is shown in System Block Diagram IN-A00001.001/002 and Equipment


DATE:
layout IN-A00004.
PROJECT
ALL LEADS
ENGINEER
09/08/16
The functionality of the major process automation is summarized below:
DATE:
CERTIFIED
A M ALMATROOK
TMS System
09/08/16
DATE:
 The project shall provide the YDH with a TMS system installed in the
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Operation Building, complete with operator workstations, engineering
workstations, servers, and printers, in compliance with SAES-Z-008.
DATE:
OPERATIONS  The TMS system shall be capable of monitoring and controlling
SHAHZAD YAZDANI

09/08/16 operations associated with product storage tanks, products receipt from
DATE: refineries and product transfer via pipeline, pumping manifolds, shipper
pumps, booster pumps, and auxiliary systems.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  The TMS shall be interfaced to DCS, ESD, CMS, VMS and RTG
EDSD

systems.

DATE:

The TMS shall include Human-Machine Interface (HMI) and software


BY:

capable of providing functions such as; graphic displays with real-time


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

process data, alarm summaries, trends and displays of historical data.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 The TMS system comprising of DCS & ESD shall be as per the
(DCC) NO. _____________________

Function Specification IN-E00017.


REVISION

TMS-Distributed Control System (DCS)


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 209


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide a DCS for control and monitoring of YDH
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
facility.
 The DCS system cabinet, I/O and marshalling cabinets shall be
ASH
ASH
ASH

installed in the rack room of O &M building, and in addition the project
LEADS

LEADS
LEADS
ALL

shall provide remote I/O cabinets in remote instrument buildings (RIB).


ALL
ALL

 The DCS shall provide regulatory control and supervisory monitoring


YDH operations including product pipeline batch receipts, sequencing of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

manifold valve line-ups, pump permissive/interlocks, tankage operations


and batch management operations.
DESCRIPTION


ISSUED FOR 60% FEL3

The DCS shall provide interface to PLC and Third Party Packages, in
accordance with SAES-Z-001.
 PCS components that require time synchronization shall be time
synchronized with a master Network Time Protocol (NTP) server such
as GPS server.
 Refer system block diagram IN-A00001.001 details.
JO/EWO

TMS-Emergency Shutdown System (ESD)


 A stand-alone ESD shall be provided for safe start-up, operation and
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

shutdown of the plant.


 ESD pushbuttons station shall be provided on Operator console.
09/08/16
08/04/16
06/01/16

 The ESD system, I/O, and marshaling cabinets shall be installed in the
NO.
REV

DISCIPLINE
ENGINEER
rack room of O& M building and in addition the project shall provide
remote I/O cabinets in remote instrument buildings (RIB)
C
A

DATE:  The ESD shall provide for the safe and orderly shutdown and isolation
PROJECT
ALL LEADS
ENGINEER of processes in the event of pre-determined conditions. YDH storage
09/08/16
tanks shall be equipped with independent high-high level instruments
DATE:
CERTIFIED hardwired to the ESD. The ESD shall be capable of providing storage
A M ALMATROOK
09/08/16
tank isolation via the tank inlet valves.
DATE:  Activation of ESD system shall not cause activation of any fire
CONSTRUCTION
AMR EL SHARKAWY
AGENCY protection system at the respective area.
09/08/16
 The communication between ESD-DCS shall be via dedicated
DATE: redundant communication paths.
OPERATIONS
SHAHZAD YAZDANI  Refer system block diagram IN-A00001.001 details.
09/08/16

DATE:
Data Interface with Third-Party Process Automation Systems
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 The DCS shall interface with the third-party Process Automation
EDSD

systems to view data points from (a) YASREF, (b) SAMREF, (c) Yanbu
DATE:

Refinery Terminal. CONTRACTOR shall be responsible for


BY:

modifications of third party Process Automation systems at the Source.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The CONTRACTOR shall utilize the FOC that is been laid between the
Refineries and YDH, to transfer the data points related to CMS, Pumps
(DCC) NO. _____________________

and valve status and tank status.


 This Contractor shall provide PCS hardware and services required to
integrate new instrumentation in the respective refinery control system.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 210


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 The proper selection of TMS-DCS for the control and logic functions is
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
required to operate YDH in order to interface with the PCS system at
ASH

source refineries, keeping in mind that SAMREF has Invensys I/A


ASH

series, YASREF has Yokogawa DCS system and Yanbu Refinery is


LEADS

LEADS
LEADS
ALL

ALL
ALL

using Honeywell DCS system. It is the responsibility of LSTK Contractor


to make sure that an appropriate system is selected for YDH which can
be integrated with the existing systems in other refineries.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

This will require a dedicated effort by the LSTK vendor to bring on board
Yokogawa and Honeywell and discuss with them if their systems is
DESCRIPTION
ISSUED FOR 60% FEL3

capable of integrating with the existing systems currently in operation in


other refineries.
 The data connection with respective refinery is shown in block diagrams
IN-A00001.004/007/008. LSTK in conjunction with respective PCS
vendor shall further evaluate the data interface during detail design
phase
JO/EWO

Fire Detection System


Addressable fire alarm system shall be provided consisting of smoke
10-02399-

10-02399-
10-02399-

detectors, heat sensors, and manual pull stations wired through to Local
0001

0001
0001
DATE

Fire Alarm Panels (LFAP) in each building. Zone alarms and trouble
alarms shall be wired from each LFAP to a Master Fire Alarm Control
09/08/16
08/04/16
06/01/16
NO.
REV

Panel (MFACP) located in YDH control room. Common fire, ground fault
DISCIPLINE
ENGINEER indication and common fault alarms shall be transmitted from the
C

MFACP to the DCS via redundant communication interface such as


A

DATE: MODBUS or TCP/IP. Interiors of floor-mounted Input/Output, DCS,


PROJECT
ALL LEADS
ENGINEER ESD, uninterrupted power supply (UPS), and other digital cabinets
09/08/16 containing power supplies shall be monitored by an addressable high-
DATE: sensitivity air-sampling or point-type smoke detection system. Design
CERTIFIED
A M ALMATROOK and drawings shall be duly endorsed by Certified Fire Protection
09/08/16 Engineer.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Vibration Monitoring System (VMS)
DATE:
OPERATIONS The shipper and booster pumps and motors shall be provided with a VMS
SHAHZAD YAZDANI

09/08/16
consistent with SA standards and operating practice. The project shall meet
the below requirements as a minimum:
DATE:


CONTROL NUMBER

ALI H GHAMDI Vibration and temperature sensors, wiring and appropriate VMS
VERIFICATION

09/08/16
monitoring cards shall be provided.
EDSD

 Shutdown outputs from the VMS shall be hardwired to the ESD to


DATE:

protect the rotating equipment operation.


BY:

 The new VMS equipment shall have Modbus serial or TCP/IP


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

communication links with DCS for monitoring and control.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 The VMS racks with cabinets shall be installed in RIB-1 & 2 to


(DCC) NO. _____________________

monitoring VMS signals from shipper and booster pump stations. VMS
workstation shall be installed in Operation building engineering room
 Refer system block diagram IN-A00001.006 details.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 211


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 VMS shall be as per IN-E00018 FSD
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH

Radar Tank Gauging System (RTG)


LEADS

LEADS
LEADS
ALL

ALL
ALL

 Radar Tank Gauging shall be provided for tank level measurements,


temperature data, and total tank inventory calculations. The RTG shall
ISSUED FOR 100% PROJECT PROPOSAL

include Human Machine Interfaces (HMI) located in the O & M building,


ISSUED FOR 90% PROJECT PROPOSAL

and shall include a redundant interface with the DCS.


DESCRIPTION

 Radar tank gauging system shall be provided with temperature


ISSUED FOR 60% FEL3

compensated level measurement. Pressure transmitters shall be


provided to compute the product density.
 Field Communication Units and RTG network devices shall be designed
considering the future expansions and the RTG network components
installed in rack room of OME building.
 Refer system block diagram IN-A00001.005 details.
 RTG shall be as per IN-E00019 FSD
JO/EWO
10-02399-

10-02399-
10-02399-

Batch Transfer Metering System


0001

0001
0001
DATE

 Batch Detection system shall be part of TMS-DCS to detect the grades


09/08/16
08/04/16
06/01/16

of gasoline that is being transferred to/from the YDH. The requirement


NO.
REV

DISCIPLINE of standalone Batch tracking system shall be further evaluated during


ENGINEER
detail design.
C
A

DATE:  This project shall incorporate best automation practice for the product
PROJECT
ALL LEADS
ENGINEER transfer to/from YDH. The process automation systems will provide for
09/08/16
automated transfer of product batches to/from YDH.
DATE:  This project shall optimize interfaces to provide a safe, reliable, and
CERTIFIED
A M ALMATROOK cost-effective means of managing batch transfers. This application
09/08/16
DATE: allows control over motorized valves, pumps, and other equipment
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
associated with control of products receipt and transfer. It shall also
09/08/16
interface with the historian server for long-term data retention
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16 Custody Metering Systems (CMS)


DATE:
BI-10-02399 CONSTRUCTION CONTRACTOR shall provide for custody
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
metering systems to measure refined product transfers involving third party.
This project shall make the following provisions:
EDSD

 YASREF products transfer to YDH: Custody transfer metering shall be


DATE:
BY:

provided by BI-10-00043. This project shall provide interface with


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

custody metering system (CMS) located at YASREF CCR.


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 SAMREF products transfer to YDH:. The CMS shall include a complete


(DCC) NO. _____________________

packaged flow computer, PLC, and metering supervisory computer


(MSC).
 Yanbu’ Distribution Hub : This project shall provide complete CMS flow
REVISION

computers, PLC’s, and MSC. The detailed requirement of MSC shall be


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 212


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG determined during detail design, however, the following provides the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
basis for detailed requirement.
o The MSC shall be a packaged unit consisting of MSC Operator
ASH
ASH
ASH

workstations, flow computer (FC), PLC’s, and system printers.


LEADS

LEADS
LEADS
ALL

The MSC shall be designed such that it permits easy addition of


ALL
ALL

future flow meters, flow computers, logic controller input/output


cards, etc. The system shall be composed, to the maximum
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

extent possible, of standard hardware, systems software, and


firmware that can be configured to meet the stated objectives.
DESCRIPTION
ISSUED FOR 60% FEL3

The system shall allow for upgrade of system operating software


on all redundant modules of the system without impact on
process operations.
The custody metering system shall comprise of the following:
a) FC’s
b) PLC
c) MSC
JO/EWO

d) MSC Operator workstations


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

o The redundancy of MSC system shall comply with SA standards.


o The flow measurement elements, meter run size, and number of
09/08/16
08/04/16
06/01/16
NO.
REV

runs should be optimum based on the requirement of flow rate


DISCIPLINE
ENGINEER and duty.
C
A

o Densitometer skid shall be provided.


DATE:
PROJECT
o This project shall provide a common meter prover for P91/95,
ALL LEADS
ENGINEER
09/08/16
DO and a separate prover for DPK at the Sources.
o This project shall install new flow computers with the latest
DATE:
CERTIFIED technology flow meters suitable for process fluid and required
A M ALMATROOK
09/08/16 delivery flow rates.
DATE: o The PLC provided by this project shall be redundant and at a
CONSTRUCTION
AMR EL SHARKAWY
AGENCY minimum perform the following functions:
09/08/16

DATE:
 Operation of all the meter system’s MOV’s
OPERATIONS
SHAHZAD YAZDANI
 Various functions pertaining to interlocks, line-up logic,
09/08/16
valve sequencing control and monitoring alarm points
DATE:
 Redundant I/O and devices that execute control
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 interlocks
EDSD

 The HMI provided by this project shall have a configurable Graphic


User Interface (GUI) comprising of video displays and accessories,
DATE:
BY:

operator control selections, report printing, trending and alarm


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

capabilities. At a minimum, the MSC’s shall provide the following


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

functions:
(DCC) NO. _____________________

a) Be capable of reading and collecting all metering and


process data and valve status from the flow computer, PLC,
and sampling system via MODBUS or TCP/IP protocol link.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 213


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG b) The HMI’s shall automatically initiate all the valve
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
sequencing operations and associated activities after a
meter is selected for proving by the operator,
ASH
ASH
ASH

c) Configurable color video displays with accessories shall


LEADS

LEADS
LEADS

provide the required graphics for display of the meter runs,


ALL

ALL
ALL

automatic sampling system, and (when required) additional


piping process piping and valves.
ISSUED FOR 100% PROJECT PROPOSAL

d) Shall be capable of integrating to Refinery Control system for


ISSUED FOR 90% PROJECT PROPOSAL

monitoring the metering parameters.


DESCRIPTION

 Refer system block diagram IN-A00001.003 details.


ISSUED FOR 60% FEL3

Management Information Systems


 The MIS shall be comprised of a Plant Information (PI) Server that runs
Oil System Incorporation (OSI) PI software. The PI Servers shall act as
a data buffer/storage device and is interfaced to the DCS HMI for data
retrieval. The PI Server shall be located in the rack room and connected
JO/EWO

to OSPAS through the Saudi Aramco corporate backbone.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Enterprise Systems
09/08/16
08/04/16
06/01/16
NO.
REV

 The project shall provide an OSI PI system with an interface to the


DISCIPLINE
ENGINEER DCS. The OSI PI system shall obtain data from the DCS for
C
A

transmission to OSPAS over the Saudi Aramco Wide Area Network.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
Process Automation Networks (PAN) & Systems Security
DATE:

A M ALMATROOK
CERTIFIED  The project shall provide all security systems required to protect the
09/08/16 process automation networks and systems against cyber threats. The
DATE:
CONSTRUCTION
security systems shall comply with SA standards.
AMR EL SHARKAWY
AGENCY
09/08/16
 The project shall provide DMZ in compliance with SAES-T-566/SAEP-
99. Data diodes shall be provided for data security for every
DATE:
OPERATIONS
interface with third parties and Corporate network.
SHAHZAD YAZDANI

09/08/16

DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Equipment Rack Room
EDSD

Equipment Rack room shall be located in Operation building. Rack room shall
serve as the termination and internal distribution point for field instrumentation
DATE:
BY:

wiring. The rack room shall be unmanned and shall be equipped with HVAC
systems and UPS systems. The rack room shall house the following
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

equipment:
(DCC) NO. _____________________

 TMS-DCS Servers (Redundant)


 DCS System, FTA & Marshalling Cabinets
 ESD System, FTA & Marshalling Cabinets
REVISION

 Cabinets for RTG network components and server


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 214


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 PSA System Cabinets
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 LAN cabinets etc.
 Other Servers as shown in drawing IN-A00001.001.
ASH
ASH
ASH

Cabinet mounted workstations (where applicable) with KVM switches shall be


LEADS

LEADS
LEADS
ALL

ALL
ALL

utilized. All field wiring with the exception of Automation communication links
shall be terminated inside marshaling cabinets in accordance with SAES-J-902;
and, all incoming cables must be sealed in accordance with Section 15.4 of
ISSUED FOR 100% PROJECT PROPOSAL

SAES-P-104. Refer drawing IN-A00004.002 for preliminary cabinet layout.


ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
ISSUED FOR 60% FEL3

Engineering Room
All Engineering workstation shall be located in engineering room of Operations
building. The engineering workstations such as DCS/ESD/VMS/RTG are to be
installed in this room as shown in drawing IN-A00001.001
Operations Room
The process automation requirements of the Operations Room, Equipment
Rack Room and Engineering Room are as follows:
JO/EWO

The Operations Room shall be designed within the Operations building. The
10-02399-

HMI console shall be provided to control the facility. The Operations Room shall
10-02399-
10-02399-
0001

0001
0001
DATE

house operator workstations, Printers, FACP, PSA workstation, RTG


workstation etc.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
The Operations Room shall be designed so that only activities associated with
ENGINEER plant control are performed there. The operation room shall be engineered to
C
A

accommodate future planned expansion.


DATE:
PROJECT
ALL LEADS
ENGINEER
The building shall be located to minimize the risk of external damage from fires,
09/08/16 explosions, or toxic releases per SAES-B-014 and shall provide essential
DATE:
administrative facilities necessary to support the continuous operation of the
CERTIFIED YDH.
A M ALMATROOK
09/08/16 Refer drawing IN-A00004.001 for preliminary layout.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Remote Instrument Building (RIB)
DATE:
OPERATIONS The project shall provide minimum two (2) remote instrument buildings at the
SHAHZAD YAZDANI
location indicated in the Plot Plan. The RIB shall house the following as
09/08/16
minimum:
DATE:

 Remote I/O with FTA & marshalling cabinets for DCS.


CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Remote I/O with FTA & marshalling cabinets for ESD.
EDSD

 Vibration Monitoring System (VMS) racks in cabinets.



DATE:

F & G instrumentation & UPS


BY:

The buildings shall be designed considering the future expansions. All incoming
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

cables must be sealed in accordance with Section 15.4 of SAES-P-104. The


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

number of cabinets and I/O required for each RIB shall be defined during FEL-
(DCC) NO. _____________________

3 stage.

Refer drawing IN-A00004.003/004 for preliminary cabinet layout.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 215


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH 4.24INTEGRATED SECURITY SYSTEM
ASH
ASH

Purpose
LEADS

LEADS
LEADS
ALL

ALL
ALL

The purpose of this budget item is to provide an integrated Security System at


the new Yanbu Distribution Hub. The Security System is composed of the
following sub-systems:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

a) Security Access Control System (SACS)


DESCRIPTION
ISSUED FOR 60% FEL3

b) Plate Recognition System (PRS)

c) Intrusion Detection and Assessment System (IDAS) / Long Range


Detection and Assessment System (LRDAS)

The PRS System equipment shall be installed at the YDH Main Gatehouse;
The SACS systems shall be installed at the YDH Tank Farm Gatehouse. The
JO/EWO

IDAS cameras and field sensors shall be installed in the Yanbu Distribution Hub
perimeter to provide full perimeter fence coverage intrusion detection and
assessment. CCTV will also encompass the monitoring of Main Gatehouse,
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Computer Gatehouse and Security Support Building.


09/08/16
08/04/16
06/01/16

Present Situation
NO.
REV

DISCIPLINE
ENGINEER
Yanbu Distribution is a grass-root plant with no existing interconnection to any
C
A

DATE:
existing facilities. The combined IDAS/LRDAS system shall be installed along
PROJECT
ALL LEADS
the approximately 5.5 km perimeter fence.
ENGINEER
09/08/16
The Yanbu Distribution Hub IDAS/LRDAS system remote monitoring and
DATE:
CERTIFIED control equipment will be installed in the existing Yanbu Regional Security
A M ALMATROOK
Control Center (RSCC).
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Related Documents
09/08/16

DATE: The following Functional Specification Document (FSD) describes the design
OPERATIONS
SHAHZAD YAZDANI
requirements and equipment characteristics for each of the security system as
09/08/16 stated above:
DATE:
a) GENE0006067 Functional Specification Document - IDAS/LRDAS
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
b) GENE0007042 Functional Specification Document - PRS
EDSD

DATE:

c) GENE0008041 Functional Specification Document - SACS


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROJECT OBJECTIVES

General
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 216


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG This project shall provide a Security Access Control System (SACS) for access
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
control functions, sensor management and monitoring functions. The system
shall interface to the SAUDI ARAMCO Identification System, SAUDI ARAMCO
ASH
ASH
ASH

Active Directory and IDAS.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The SACS system automatically controls access to the processing facilities.


The SACS is located at the Tank Farm Gatehouse entrance. The system is
ISSUED FOR 100% PROJECT PROPOSAL

comprised of card readers on the turnstiles and drop gate for vehicles, SACS
ISSUED FOR 90% PROJECT PROPOSAL

servers and storage equipment, display and logging devices, single entry
DESCRIPTION

device interfaces/controllers. Intercoms and communications interfaces,


ISSUED FOR 60% FEL3

relational databases and data extraction and reporting capabilities.

The SACS system shall be connected to the central SAUDI ARAMCO SACS
system located in Dhahran through the corporate data network.

This project shall provide a Plate Recognition System (PRS) and CCTV camera
will also be provided. The PRS also monitors public vehicles accessing the
JO/EWO

outer Main Gatehouse. The system consists of fixed cameras, illuminators,


detector sensors, and computer software for intelligent vehicle license plate
10-02399-

10-02399-
10-02399-

recognition capabilities.
0001

0001
0001
DATE

The project shall provide an Intrusion Detection and Assessment System


09/08/16
08/04/16
06/01/16
NO.
REV

(IDAS)/ Long Range Detection and Assessment System (LRDAS) to monitor,


DISCIPLINE
ENGINEER detect, assess, trace and video record intrusion alarm situations.
C
A

DATE:
PROJECT
The IDAS/LRDAS equipment shall be remotely controlled by Yanbu RSCC and
ALL LEADS
ENGINEER
locally controlled in Tank Farm Gatehouse of YDH. The system includes control
09/08/16
and monitoring of all the IDAS/LRDAS field equipment.
DATE:
CERTIFIED
A M ALMATROOK
The IDAS system provided shall monitor the approximately 5.5 kilometer
09/08/16
DATE: perimeter fence and critical gates. The IDAS/LRDAS shall be integrated with
CONSTRUCTION
AMR EL SHARKAWY
AGENCY the existing C2I system of the existing Yanbu Regional Security Center.
09/08/16

DATE: The CCTV and MIDS sensors shall detect intrusion and transmit data to Yanbu
OPERATIONS
SHAHZAD YAZDANI Regional Security Control Center (YNBRSCC). Failure of one of the field
09/08/16 devices connected to the communications network shall not affect the ability of
DATE:
the system. Communication network shall be supplied in one-to-one redundant
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
configuration with automatic changeover.
EDSD

The project shall design Shelters and Field Equipment Cabinets to house the
DATE:

IDAS/LRDAS electronics and network interface equipment. The Security


BY:

Equipment Building shall house the Security System Servers, recorders,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Workstations, Fiber Optic Network termination and related security equipment


for IDAS/LRDAS, SACS and PRS.
(DCC) NO. _____________________

DESIGN OBJECTIVES
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 217


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Intrusion Detection & Assessment System (IDAS)/ Long Range
ASH
ASH
ASH

Detection and Assessment System (LRDAS)


LEADS

LEADS
LEADS
ALL

ALL
ALL

The IDAS system has different types of distinct field sensor technologies for
intrusion detection:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CCTV which consists of Fixed and PTZ cameras installed along the
DESCRIPTION

perimeter fence to ensure full coverage of the plant so as to secure it from


ISSUED FOR 60% FEL3

possible intruders.

 Microwave Intrusion Detection System (MIDS) which is installed in the


“sterile” area between the Category 1/Outer fence and the SAUDI
ARAMCO Type III/Inner fence. Sterile area measures 8 meters from the
Outer fence to the Inner fence.

The distance between the poles will be reduced for areas in the site where
JO/EWO

there are curves and/or corners to ensure no “dead” zones within the area. The
final number of MIDS pairs shall be determined during the detail design.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

For the assessment part, fixed color day/night cameras with at least 5 meter
09/08/16
08/04/16
06/01/16
NO.
REV

high poles with vari-focal lens located in parallel to the perimeter fence and
DISCIPLINE
ENGINEER
spaced at a maximum distance 75 meters apart for straight line fence. The
distance between the poles will be reduced for areas in the site where there are
C
A

DATE: curves and/or corners to ensure no “dead” zones of the “sterile” area. Based on
PROJECT
ALL LEADS
ENGINEER this, it is estimated that the project will utilize approximately 82 fixed cameras.
09/08/16
The final number of fixed cameras will be determined during the detail design
DATE:
CERTIFIED phase.
A M ALMATROOK
09/08/16
DATE: Pan Tilt Zoom (PTZ) day/night cameras with at least 7 meter high poles facing
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
perpendicularly to the perimeter fence, set at approximately 300m apart, no
09/08/16
“dead” zones between the camera coverage. Based on this, it is estimated that
DATE: the project will utilize approximately 18 PTZ cameras. The final number of
OPERATIONS
SHAHZAD YAZDANI
cameras will be determined during the detail design.
09/08/16

DATE: For the traceability part of the IDAS/LRDAS, the project shall provide the
CONTROL NUMBER

ALI H GHAMDI
following:
VERIFICATION

09/08/16
 Network Video Recorders (NVR) with Raid 5 hard disks to
EDSD

record in real time all video signals from fixed and PTZ cameras.
DATE:

The Video Recording systems shall record 5-60 seconds of pre


BY:

alarm and 5-60 seconds of post alarm video for the


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

corresponding cameras.
(DCC) NO. _____________________

For integrating all these technologies, the project shall provide the following:
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 218


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Alarm Management Software (AMS) with Servers to be installed
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
at the Security Support Building.
ASH
ASH

 Approximately 94 Field Equipment foundations and 94 cabinets


LEADS

LEADS
LEADS

IP 66/NEMA 4X type with ancillary hardware for mounting.


ALL

ALL
ALL

 Industrial grade Ethernet switches with dual fiber optic uplink for
communications redundancy.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 Digital Input/output units for signal aggregation and onward


ISSUED FOR 60% FEL3

processing.

 Patch panels, racks and other ancillary hardware.

Provide Alarm Management Software (AMS) system with redundant servers


and applications located in the Security Support Building. The AMS shall
function as follows:
JO/EWO

 It shall integrate different IDAS sensors subsystem technologies


to manage the alarms such as intrusion/detection, fault and
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

tamper.
09/08/16
08/04/16
06/01/16

 It shall integrate the relevant site Graphical User Interface (GUI),


NO.
REV

DISCIPLINE
ENGINEER
NVR’s, PTZ control and Video Wall display for operator
functionality.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER  It shall provide the infrastructure to function in a real time
09/08/16
environment by being capable to report an alarm within 1
DATE:
CERTIFIED
second of the detection system resulting from a sensor and/or
A M ALMATROOK
communications equipment digital output (DO) such as a relay
09/08/16
DATE: or an alarm data packet.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  It shall have the capability to monitor its sensor subsystems and
DATE: related communication hardware via Simple Network
OPERATIONS
SHAHZAD YAZDANI Management Protocol (SNMP) or similar function and report in a
09/08/16
log.
DATE:
CONTROL NUMBER

ALI H GHAMDI
 It shall have the capability for the application to switch-over from
VERIFICATION

09/08/16
the primary to the secondary server at a maximum 1 second
EDSD

with no loss of field alarms.


DATE:
BY:

 Given proper communication hardware, the AMS application and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

its servers shall be redundant and able to switch-over from the


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

primary to the secondary server at a maximum 1 second. The


(DCC) NO. _____________________

redundancy doesn’t apply to the Operating system since a fault


in one will render the secondary server also non-functional.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 219


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The perimeter fence shall be divided into physical zones. The zone size
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be adjusted within a range of 30-150 meters to accommodate
optimum detection by field sensor systems while remaining within minimum
ASH
ASH
ASH

assessment requirements. The architecture and zone size shall be


LEADS

LEADS
LEADS
ALL

determined during the preliminary design stage. The larger the zone size
ALL
ALL

the lesser the Probability of Detection (PD) and the higher the expected
Nuisance Alarm Rate (NAR).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Individual field sensor sub-system coverage shall be designed so that there


DESCRIPTION

are no “dead zones” along the perimeter fence.


ISSUED FOR 60% FEL3

All IDAS day/night Fixed and PTZ Cameras shall run at 25fps PAL or 30fps
NTSC requiring approximately 8 Mbps bandwidth per camera. Each
camera shall have a minimum of 525 TVL and run in MJPEG, MPEG-4, and
H.264 format.
JO/EWO

The radar shall be fully solid state and have a modular construction
allowing for a limited workshop repair.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

All components of the radar shall be installed in one assembly with


09/08/16
08/04/16
06/01/16

enclosure ready for installation in the field. The antenna with drive motor
NO.
REV

DISCIPLINE
ENGINEER
can be part of the assembly but can also be detachable for the ease of
transportation and installation.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER The System shall be able to detect the vehicles or personnel at the
09/08/16 minimum specified range and at a specified speed (to be finalized during
DATE: detailed design).
CERTIFIED
A M ALMATROOK
09/08/16 The System shall interface with the Long Range Surveillance System. It
DATE:
CONSTRUCTION
AMR EL SHARKAWY shall trigger alarms and activate the long range cameras on receipt of a
AGENCY
09/08/16 possible intrusion.
DATE:
OPERATIONS
SHAHZAD YAZDANI
The IDAS/LRDAS AMS servers shall include a “hot” back up master
09/08/16 computer with automatic switch over capability within a 1 second. No loss
DATE: of IDAS functionality from the field sensor subsystem shall occur during or
CONTROL NUMBER

ALI H GHAMDI after automatic switch over.


VERIFICATION

09/08/16
EDSD

Primary IDAS/LRDAS AMS Servers shall have an availability of 99.99%.


DATE:

Standby or redundant IDAS Servers shall have an availability of 99.99%.


BY:

The combined availability of the Primary and Standby IDAS/LRDAS shall


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

be at least 99.999%.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

The IDAS/LRDAS AMS and sensor subsystems shall be provided based on


an “open architecture” concept that allows for future inter-operability of
other security systems that use standardized systems interfaces and
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 220


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Commercial off the shelf products (COTS). The system shall have the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH capability to remotely monitor and manage with these parameters.
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

This project shall provide shelters, typically 32 m2 in size consisting of one


security room and one electrical room, approximately positioned one every
two (2) km for the following reasons:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 It shall house the IDAS and its field sensors systems for this
ISSUED FOR 60% FEL3

particular area of the fence including the video signals from all
cameras, control and alarm signals, convert them to IP and
transfer them to Security Equipment Building where they would
be ultimately accessed by the AMS software.

 It shall provide UPS based 230VAC power to the IDAS field


sensors systems for this particular area of the fence. Each
shelter shall have dual independent power feeds from the
JO/EWO

nearby transformer/substations, an ATS and the UPS to regulate


10-02399-

with two (2) hour battery back-up. The UPS shall also function in
10-02399-
10-02399-
0001

0001
0001
DATE

the always “on” mode.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE CCTV Camera Main Gate and Tank Farm Gate


ENGINEER
C
A

DATE: Main Entry gates shall use IP Fixed cameras for surveillance
PROJECT
ALL LEADS
ENGINEER and are exclusively use for inbound and outbound vehicles.
09/08/16
These cameras shall be at least 82 degree angle to achieved
DATE:
CERTIFIED maximum view for the entrance and exit lanes.
A M ALMATROOK
09/08/16
DATE:
All CCTV system traffic that is directly connected to an IT
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
managed switch shall be mapped to a dedicated video VLAN as
09/08/16 per SAES-T-555 Section 6.1.5
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16
Security Access Control System
DATE:
CONTROL NUMBER

ALI H GHAMDI
The Security Access Control System (SACS) which shall be installed at the
VERIFICATION

09/08/16
Yanbu Distribution Hub’s Computer Gatehouse’s vehicle lanes drop gates,
EDSD

turnstiles entrance shall be configured as follows:


DATE:
BY:

 Proximity card readers shall be provided at each drop arm gate


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and turnstile. Proximity Readers shall be capable of reading from


up to 4 centimeters.
(DCC) NO. _____________________

 Access controlled drop gates and turnstiles will be provided with


electronically controlled locks or opening mechanism. The drop
gate and turnstile shall be provided with a secure mechanical
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 221


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG override to allow operation of the turnstile/drop gate in the event of
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
system or power failure
 The System shall offer consistent read range unaffected by body
ASH
ASH
ASH

shielding or variable environment conditions.


LEADS


LEADS
LEADS

The System shall be capable of preventing repeated entries


ALL

ALL
ALL

except when an entry is followed by an exit.

Provide Access Control Proximity Card with contact smart chip modules
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

used for gate card readers. Must have at least 1 second approve or cancel
DESCRIPTION

reaction time on smart chip modules.


ISSUED FOR 60% FEL3

The system Administrative Client Work Server, Local Client Server and
Main Server should be located so that both remote support and local
operation is made available. Except for the client workstation with an
independent card reader and all ancillary equipment necessary to stay in
the gatehouse for the efficient operation of the RFID system, all other
equipment or devices are to be located in the Security Equipment Building.
JO/EWO

Administration should be made available from Yanbu Regional Security


Control Center (YNBRSCC) and YNB Identification (ID) office.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Plate Recognition System


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER The PRS shall have a minimum 95% Arabic and 95% Latin character
C
A

recognition accuracy.
DATE:
PROJECT
ALL LEADS
ENGINEER System availability shall be in the order of 98% subject to a mean time
09/08/16
repair of 3 hours.
DATE:
CERTIFIED
A M ALMATROOK Failure of any component or system must be automatically notified to the
09/08/16
DATE:
staff in the gatehouse and in Yanbu Regional Security Control Center
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
(RSCC).
09/08/16

DATE:
The PRS System shall capture all vehicles entering and leaving at a rate of
OPERATIONS
SHAHZAD YAZDANI 100%. These images shall be of the front license plates, together with the
09/08/16 front of the vehicle.
DATE:

The characters recognized by the system will be stored in ASCII (American


CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Standard Code for Information Interchange), Unicode or USC (Universal


EDSD

Character Set) format. Only one character format will be used throughout
DATE:

the system.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The PRS shall read all types of rectangular Saudi number plates (Short and
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

long). The PRS shall also be capable of Saudi license plate (Red, Blue,
(DCC) NO. _____________________

White, Yellow, Black and Green) and shall be capable of distinguishing


similar alphanumeric license plates with different background colors.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 222


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The PRS shall read the newly released types of rectangular Saudi number
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
plates, four (4) numbers and three (3) alphabet and added features. The
PRS shall also be capable of recognizing all six (6) different colors
ASH
ASH
ASH

representing different classes of Saudi License plate (Blue, White, Yellow,


LEADS

LEADS
LEADS
ALL

Black, Grey and Green), and shall be capable of distinguishing similar


ALL
ALL

alphanumeric license plates with different background colors. In addition,


the system shall have the capability of reading the newly added shapes
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

(triangle, circle) with all direction and configuration.


DESCRIPTION

The system shall have the capability of capturing images of all retro-
ISSUED FOR 60% FEL3

reflective number plates. Such functionality shall be provided with the


capability of this installation.

The PRS shall provide full time image capturing capability by use of color
cameras in addition to the OCR capable cameras.

The PRS shall be able to read any plate tilted or mounted away from a
JO/EWO

normal vertical position at an angle of 15º or less.


10-02399-

The PRS may use additional external system triggers to detect vehicles.
10-02399-
10-02399-
0001

0001
0001
DATE

White light illuminators shall be provided for the automatic number plate
09/08/16
08/04/16
06/01/16
NO.
REV

recognition (ANPR) cameras.


DISCIPLINE
ENGINEER
Cameras and illuminators shall be fixed and housed together to be
C
A

DATE: protected from deliberate or accidental movement from position.


PROJECT
ALL LEADS
ENGINEER
09/08/16 The Cameras will be positioned in the area below the sunshade/canopy at
DATE: the maximum possible distance outward from the security inspection point
CERTIFIED
A M ALMATROOK subject to illumination levels.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Illuminators matched to the characteristics of the color cameras shall be
AGENCY
09/08/16 provided as necessary.
DATE:
OPERATIONS The PRS shall recognize number plates of vehicles traveling at speeds up
SHAHZAD YAZDANI

09/08/16
to 80Km/h at the capture point.
DATE:
The width of the camera footprint for the color cameras is to be no greater
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 than 1.6 meters at the optimum capture point.


EDSD

The PRS shall display all characters of a number plate.


DATE:
BY:

The PRS should be based on optical character recognition (OCR)


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

processing with the capacity to “learn” variation in characters through


system input.
(DCC) NO. _____________________

The PRS shall provide both monochrome and color images of the number
plate for OCR identification and license color verification purposes.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 223


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The system shall process color images to allow the color background of
vehicle licensing class to be determines automatically and a corresponding
ASH
ASH
ASH

ASCII, Unicode or UCS reference added to the relevant vehicle record.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The PRS software shall be implemented on an open architecture operating


system and permit multitasking.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The PRS shall be compatible with TCP/IP communications architecture.


DESCRIPTION
ISSUED FOR 60% FEL3

The PRS shall have the capability to alert staff of the approach of a suspect
vehicle by comparing the number plates of approaching vehicles with those
installed in a local or centralized database. This alert will be generated
within one second of the number plate image being captured by the PRS
Camera.

An alarm shall be triggered if an unrecognized or flagged vehicle is


detected by the system.
JO/EWO

The alarm signal shall be both visual and audible, and shall indicate in
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

which lane the vehicle is traveling.


09/08/16
08/04/16
06/01/16

The alarm type for each category of suspect vehicle (unrecognized or


NO.
REV

DISCIPLINE flagged) shall be different and the system shall allow the alarm notification
ENGINEER
for unrecognized vehicles to be disabled from YNB RSCC and not from the
C
A

DATE: gatehouse.
PROJECT
ALL LEADS
ENGINEER
09/08/16 The PRS shall be able to simultaneously monitor; process and store the
DATE: information from all lanes approaching the Gates. The system shall be
CERTIFIED
A M ALMATROOK designed so as to maximize the read performance in each lane.
09/08/16
DATE:
CONSTRUCTION
The local PRS Processing/ Storage Equipment shall fully monitor, store,
AMR EL SHARKAWY
AGENCY
09/08/16
and send PRS Alarms and Transaction Events to a centralized database.
The processing unit shall integrate (OCR) information and license plate
DATE:
OPERATIONS
SHAHZAD YAZDANI
color information from each vehicle plate.
09/08/16

DATE:
CONTRACTORS shall refer to the provided drawings to identify the position
and space requirements for the local PRS Processing Equipment. The form
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 factor of the equipment at Gatehouse should reflect the limited space at
EDSD

these locations. All ancillary equipment necessary for the proper operation
DATE:

of the PRS system shall remain in the gatehouse including the PRS
BY:

workstation for the local monitoring & control of PRS system. The PRS
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

system shall be able to work independently when a breakdown occurs in


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

the corporate network connectivity.


(DCC) NO. _____________________

The Fault Tolerant PRS Main Server shall be provided and installed by
CONTRACTOR as approved and procured thru the specifications of SAUDI
REVISION

ARAMCO; CONTRACTOR is to provide a Full Specification and


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 224


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG configuration of the PRS Main Server. It is this project responsibility to
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
configure and utilize the existing SAUDI ARAMCO server as required by the
PRS system.
ASH
ASH
ASH
LEADS

The Fault Tolerant Main Server shall have redundancy in terms of storage
LEADS
LEADS
ALL

ALL
ALL

failures.

The PRS Main Server shall be interconnected with all the Local PRS
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Processing Equipment located at the gatehouse, Security Equipment


DESCRIPTION

Building and with PRS monitoring workstation located0 at Yanbu RSCC via
ISSUED FOR 60% FEL3

existing SAUDI ARAMCO corporate network.

The PRS main Server shall distribute the updated hot list inputs concerning
flagged vehicles within (60) seconds to the new local PRS Processing
Equipment automatically.

The PRS Main Server shall have sufficient storage capacity to store
information for the following periods of time:
JO/EWO

- Text database of events in Oracle or SQL or PL/SQL ASCII


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Format- 3months
09/08/16
08/04/16
06/01/16

The PRS Main Server shall have an option to automatically archive records,
NO.
REV

DISCIPLINE and to provide records on Write Once-Read Many (WO-RM) format


ENGINEER
medium.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
The PRS Main Server shall maintain an accurate clock set to local time
09/08/16 using Coordinated Universal Time (UTC) information derived from the
DATE: SAUDI ARAMCO Master Clock. The local time will be synchronized to all
CERTIFIED
A M ALMATROOK Local Processor from the Main Server, by the use of a Network Time
09/08/16
DATE:
Protocol (NTP). All system transactions will be appended with a tamper-
CONSTRUCTION
AMR EL SHARKAWY proof time-stamp.
AGENCY
09/08/16

DATE:
The Local PRS Processing Equipment shall distribute its database
OPERATIONS
SHAHZAD YAZDANI
transactions events to the PRS Main Server automatically within not more
09/08/16 than thirty (30) minutes and upon request from local machine at gatehouse.
DATE: The local PRS Processing Equipment shall automatically distribute its
CONTROL NUMBER

ALI H GHAMDI
database Alarm within no more than one (1) second to the PRS Main
VERIFICATION

09/08/16
Server.
EDSD

DATE:

The Local PRS Processing Equipment shall have sufficient storage


BY:

capacity to store information for the following periods of time (based upon
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

throughput of 2000 vehicles per lane per day).


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

– Database transactions events and Alarms in Oracle or SQL or


PL/SQL ASCII Format – 30 days.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 225


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG – PRS monochrome and color images linked to above database
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH entries – 30 days.
ASH
ASH

System Users shall be able to query the PRS System which shall be
LEADS

capable of generating, saving and printing Local and Site Global reports
LEADS
LEADS
ALL

ALL
ALL

listing:

- Quantity of Vehicles processed


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

- Number of Vehicles with unrecognized/flagged plates


DESCRIPTION

(Recorded Alarms)
ISSUED FOR 60% FEL3

- Mean processing time


- Time, Date, Location, and Direction of travel for each
transaction.
- The relevant color image and a monochrome number plate
image shall be linked to each vehicle transaction

The PRS system shall ensure that there is a clear view of each vehicle’s
license plate and shall propose measures to ensure vehicle license plates
JO/EWO

are captured and processed in all traffic conditions, which may require
traffic calming measures.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

The PRS System shall be expandable and able to accommodate up to 25%


09/08/16
08/04/16
06/01/16

additional locations without changes to the Main Server.


NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT Outside Plant System (OSP)
ALL LEADS
ENGINEER
09/08/16
The Outside Plant Cable and Conduit System shall support the Security Cabling
DATE:
CERTIFIED connectivity from Security Support Building to various locations of Field
A M ALMATROOK
09/08/16
Equipment Cabinets (FECs) through Shelter #1 and Shelter #2 along the
DATE: perimeter fence.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 The works includes excavation, installation of buried and underground (in
DATE: conduit) fiber optic cables, construction of conduit facilities, installation of
OPERATIONS
SHAHZAD YAZDANI pedestal with guard post, cable splicing, installation of fiber optic patch panels,
09/08/16
cutting and replacing of paved and asphalt areas to original condition,
DATE:
installation of marker post, installation of electronic marker, termination of fiber
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
cables, cable testing and tagging.
EDSD

INTERFACE WITH OTHER SYSTEMS


DATE:
BY:

Interface to External Systems


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The security system shall be capable to interface with external systems.


(DCC) NO. _____________________

The Systems design shall use industry standard Application Programming


Interface (API) that permit easy upgrade to new versions of Operating
Systems, data bases and device drivers.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 226


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The security systems provided by this project shall provide inter-connection
to the C2I platform to integrate with the different Security systems installed
ASH
ASH
ASH

under BI-10-00555.
LEADS

LEADS
LEADS
ALL

ALL
ALL

The C2I as compared to an Alarm Management System is the “master”


because it provides situational awareness such as location and status of an
adversary from a top level view. It is a necessary component in achieving
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

superiority in decision making by integrating diverse technologies such as


DESCRIPTION

IDAS, PRS, SACS and others. By combining these technologies into a


ISSUED FOR 60% FEL3

comprehensive solution, it takes the mundane tasks of Alarm Management


System from each subsystem, quantifies the risks, minimizes decision
making (such as fatigue, judgment and difficult to assess situation) and
provides plausible outcomes and actions. In addition, it minimizes the
number of facilities that require viewing while allowing for efficient
deployment of Security personnel.
JO/EWO

The C2I application software installed in the Dhahran RSCC under BI-10-
00555 shall have the capability to view each site and when required, a
10-02399-

10-02399-
10-02399-
0001

password protection scheme to take over the application of this site. The
0001
0001
DATE

maximum capability is now dependent on the Video Wall which has


09/08/16
08/04/16
06/01/16

allocated space for the sites that normally report to other RSCCs.
NO.
REV

DISCIPLINE
ENGINEER
C
A

SAUDI ARAMCO Corporate Network


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
The security system platform shall be capable of utilizing a high-
DATE:
performance standard IP-based network to establish internal
A M ALMATROOK
CERTIFIED communications between the systems components and to interface with
09/08/16 SAUDI ARAMCO Corporate Data Network.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY The proposed system shall be connected to the IP-Data network. The
09/08/16
connection shall utilize Gigabit Ethernet Local Area Network.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE:
CONTROL NUMBER

ALI H GHAMDI
ENVIRONMENTAL IMPACT
VERIFICATION

09/08/16
EDSD

All work under the Scope of this project shall conform to all SAUDI
DATE:

ARAMCO and Saudi Government environmental standards and


BY:

requirements. In general, any disturbance to the environment caused by


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

this project shall be restored to the original condition at project completion.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

4.25STRUCTURAL
REVISION

GENERAL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 227


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR SHALL NOTE that all construction works shall be done in
accordance with latest international and Saudi Aramco Engineering standards
ASH
ASH
ASH

and procedures.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall perform excavation and backfill as per SAES-A-114, and


remove the debris and surplus material to the Saudi Aramco designated site. If
any underground utility encounters during excavation, CONTRACTOR shall
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

inform Saudi Aramco representative and re-route the facility in agreement of


SAUDI ARAMCO representative.
DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall provide transportation, storage, conservation, operation,


inspection and maintenance of construction equipment, tools, lifting devices,
scaffolding, temporary facilities, consumable materials, etc. necessary to
execute the Work safely.

CONTRACTOR shall ensure achieving high safety and security standards and
levels of control throughout all phases of the project. CONTRACTOR shall
JO/EWO

perform any other activity, not specifically mentioned above, but necessary to
achieve Completion of the Work.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall provide earthquake-resistant design and associated


09/08/16
08/04/16
06/01/16
NO.
REV

detailing to enable designated structures and/or architectural, mechanical,


DISCIPLINE
ENGINEER electrical and nonstructural components and their supporting structures to
respond satisfactory to seismic effects recognizing site seismic hazards such
C
A

DATE: as ground motion adjusted for site class amplification, soil


PROJECT
ALL LEADS
ENGINEER liquefaction/foundation settlement, etc. Satisfactory performance objectives
09/08/16 shall achieved by protecting human life, avoiding structural collapses and
DATE: damages to neighboring facilities, maintaining functionality of essential
A M ALMATROOK
CERTIFIED facilities, controlling loss of containment/toxic releases/fire and minimizing
09/08/16 damages to non-structural components.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY The mapped Maximum Considered Earthquake (MCE) spectral response
09/08/16
accelerations for the Yanbu area are documented in SAES-A-112 as follows:
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE:
Criteria Parameter
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Short Period Acceleration (Ss) in %g
EDSD

20.4
DATE:

1-Sec Period Acceleration (S1) in %g 5.8


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Peak Ground Acceleration in %g 4


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Site Class as per geotechnical D


(DCC) NO. _____________________

investigation report 2015/104.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 228


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
Importance factor for seismic design 1.5
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH

CONTRACTOR shall utilize geotechnical recommendations given in


geotechnical report (Saudi Aramco File Number- 2015/104) for foundation
LEADS

LEADS
LEADS
ALL

ALL
ALL

design, for any change in location of equipment, building or facility away from
the given test location contractor shall utilize the nearest test location and
prepare standalone report for utilization of nearest test location and submit it to
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAUDI ARAMCO for approval.


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall be responsible for the correctness of all Drawings and


Documents and Software provided from vendors / manufactures / suppliers /
sub-contractors, etc. Approval or Acceptance of these Drawings and
Documents and Software by SAUDI ARAMCO does not relive CONTRACTOR
of the responsibility of correct design, right equipment, proper installation,
testing and commissioning.

CONTRACTOR shall check and verify all Sub-Contractor and Vendor design
JO/EWO

and drawings provided comply with the Scope of Work, and documents
provided with this Scope, relevant SAUDI ARAMCO and International
10-02399-

10-02399-
10-02399-
0001

Standards and are in keeping with “Good Engineering Practices”.


0001
0001
DATE

CONTRACTOR shall refer project proposal drawing ST-A00002.001/002 for


09/08/16
08/04/16
06/01/16
NO.
REV

general notes on concrete work. CONTRACTOR shall execute all concrete


DISCIPLINE
ENGINEER work in accordance with SAUDI ARAMCO standards.
C
A

DATE: CONTRACTOR shall refer project proposal drawing ST-A00100.001 for general
PROJECT
ALL LEADS
ENGINEER notes on structural steel work. CONTRACTOR shall execute all structural steel
09/08/16 work in accordance with SAUDI ARAMCO standards.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall note that all structural drawings of project proposal are
09/08/16 indicative; CONTRACTOR shall perform detailed structural calculations during
DATE:
CONSTRUCTION
detailed design as per vendor data and in accordance with SAUDI ARAMCO
AMR EL SHARKAWY
AGENCY standards.
09/08/16

DATE:
CONTRACTOR shall finalize all building design incorporating
OPERATIONS
SHAHZAD YAZDANI recommendations given in BRA report for all buildings. Blast resistant design
09/08/16 shall be performed where deemed necessary by using the project Building Risk
DATE: Assessment (BRA) report.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

Yanbu distribution hub (YDH) scope


DATE:
BY:

Receipt pipeline and connection


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Equipment Foundations
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall provide concrete foundations for dye injection skid, SDA
injection skid, conductivity enhancer skid, custody metering skid, meter prover
REVISION

and custody metering shelter (vendor package).


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 229


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall design foundations as per vendor requirement of size and
loading in accordance with SAUDI ARAMCO standards.
ASH
ASH
ASH

CONTRACTOR shall provide slab on grade and toe wall as per vendor
LEADS

LEADS
LEADS
ALL

ALL
ALL

requirement for equipment’s.

CONTRACTOR shall provide anchor bolts as per vendor requirement in


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

accordance with SAUDI ARAMCO standards.


DESCRIPTION

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
ISSUED FOR 60% FEL3

IFC drawing for all equipment foundations.

Spur rack, platforms and pipe supports

CONTRACTOR shall provide structural spur rack, platforms, pipe supports at


manifold location as per piping plans and design in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all structural calculations for
SAUDI ARAMCO approval.
JO/EWO

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


10-02399-

10-02399-
10-02399-

approval.
0001

0001
0001
DATE

CONTRACTOR shall provide concrete foundations for spur rack, platforms,


09/08/16
08/04/16
06/01/16
NO.
REV

pipe supports at manifold location as per piping plans. CONTRACTOR shall


DISCIPLINE
ENGINEER design foundations as per stress analysis load data in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all foundation design
C
A

DATE: calculations for SAUDI ARAMCO approval.


PROJECT
ALL LEADS
ENGINEER
09/08/16 Tank farm and support infrastructure
DATE:
CERTIFIED Equipment Foundations
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall provide concrete foundations for diesel day tank, 2 No’s
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
of emergency generator set, DPK filtration skid, surge skid (DO/DPK), surge
09/08/16 skid (GASOLINE), utility water tank, fire water tank, 2 No’s of foam skid, pumps
DATE:
and OWS treatment package.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTRACTOR shall design foundations as per vendor requirement of size and
DATE:
loading in accordance with SAUDI ARAMCO standards.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 CONTRACTOR shall provide slab on grade and toe wall as per vendor
EDSD

requirement for equipment’s.


DATE:

CONTRACTOR shall provide anchor bolts as per vendor requirement in


BY:

accordance with SAUDI ARAMCO standards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 230


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Shelters
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide following Shelter in YDH facility
ASH
ASH
ASH

Foam skid shelter (2 No’s)


LEADS

LEADS
LEADS
ALL

ALL
ALL

Fire water and Utility water pump shelter


Sanitary metering shelter-MARAFIQ
Utility water metering shelter-MARAFIQ
ISSUED FOR 100% PROJECT PROPOSAL

Oily waste water metering shelter-MARAFIQ


ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

CONTRACTOR shall design and detail shelter structures in accordance with


ISSUED FOR 60% FEL3

12-SAMSS-014 through Pre Engineering building PEB vendor. PEB structures


shall be designed and fabricated by approved SAUDI ARAMCO vendors.
CONTRACTOR shall coordinate with PEB Vendors for design and fabrication.

CONTRACTOR shall submit the structural calculation for PEB shelters to


SAUDI ARAMCO for review.
JO/EWO

CONTRACTOR shall design shelter foundations as per PEB- vendor load data
and provide anchor bolts as per vendor requirement.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall provide slab on grade for foam skid shelter with isolation
joint between major foundations and miscellaneous pipe supports shall be
09/08/16
08/04/16
06/01/16
NO.
REV

provided based on load data and piping plans.


DISCIPLINE
ENGINEER
Oily water lift stations (2 No’s)
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall design and detail reinforced cement concrete oily water
09/08/16 lift station as per sizing requirement with appropriate coating on inside and
DATE:
outside face as per SAUDI ARAMCO standards.
CERTIFIED
A M ALMATROOK
09/08/16
CONTRACTOR shall provide dewatering system based on the depth of lift
DATE: station and water table level and shall dispose the water to an approved
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
location by SAUDI ARAMCO.
09/08/16

DATE: CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO


OPERATIONS
SHAHZAD YAZDANI
standards for deep soil excavations.
09/08/16

DATE:
Sanitary lift stations
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
CONTRACTOR shall design and detail reinforced cement concrete sanitary lift
EDSD

station as per sizing requirement with appropriate coating on inside and outside
DATE:

face as per SAUDI ARAMCO standards.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

CONTRACTOR shall provide dewatering system based on the depth of lift


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

station and water table level and shall dispose the water to an approved
(DCC) NO. _____________________

location by SAUDI ARAMCO.

CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO


REVISION

standards for deep soil excavations.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 231


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
If required CONTRACTOR shall provide steel structure and monorail to handle
sanitary pump.
ASH
ASH
ASH

Dike wall
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design dike wall in accordance with Saudi Aramco


Standard.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
DESCRIPTION

of SAES-B-005.
ISSUED FOR 60% FEL3

CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face.

CONTRACTOR shall weld 1.5 mm thick HDPE liner for dike area with HDPE
liner provided by other CONTRACTOR around the tank foundations.

CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces


JO/EWO

below grade.
10-02399-

10-02399-
10-02399-

CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces


0001

0001
0001
DATE

above grade.
09/08/16
08/04/16
06/01/16
NO.
REV

CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
DISCIPLINE
ENGINEER
provided inside dike area.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
Steel pipe support, pipe sleepers, structural platforms and crossovers
09/08/16

DATE:
CONTRACTOR shall provide structural pipe support, structural platforms and
CERTIFIED crossovers as per piping plans and design in accordance with SAUDI ARAMCO
A M ALMATROOK
09/08/16 standards. CONTRACTOR shall provide all structural calculations for SAUDI
DATE: ARAMCO approval.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
DATE: approval.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
DATE: crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
foundations as per stress analysis load data in accordance with SAUDI
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 ARAMCO standards. CONTRACTOR shall provide all foundation design


EDSD

calculations for SAUDI ARAMCO approval.


DATE:
BY:

Culvert
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

CONTRACTOR shall provide reinforcement cement concrete culvert inside


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

plant for pipe way crossing the plant roads.


(DCC) NO. _____________________

CONTRACTOR shall provide clearance from pipe to concrete edges as per


SAES-L-460. CONTRACTOR shall provide minimum 750 mm wide access on
REVISION

either side of sleeper inside the culvert.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 232


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall design RCC culvert for all possible load cases and load
combinations as per SAUDI ARAMCO and AASHTO standards requirement.
ASH
ASH
ASH

CONTRACTOR shall provide culvert design calculations to SAUDI ARAMCO


LEADS

LEADS
LEADS
ALL

ALL
ALL

for review and approval.

Buildings
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Main Gate/Tank farm gate House


DESCRIPTION
ISSUED FOR 60% FEL3

CONTRACTOR shall pre-engineer space frame structural sunshade as per


SAUDI ARAMCO standard drawing AA-036024-001 for main gate and tank
farm gate.

CONTRACTOR shall provide PEB vendor space frame structural design


calculation for SAUDI ARAMCO review and approval. Space frame design shall
be in accordance with SAUDI ARAMCO standards.
JO/EWO

CONTRACTOR shall provide foundation size as per vendor data. Design of


foundation shall be as per foundation load data provided by vendor. Anchor
10-02399-

10-02399-
10-02399-

bolts shall be specified by vendor and selection of anchor bolt shall be as per
0001

0001
0001
DATE

SAUDI ARAMCO standards.


09/08/16
08/04/16
06/01/16
NO.
REV

Musallah
DISCIPLINE
ENGINEER
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
C
A

DATE:
as per architectural plans, sections and elevations.
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTACTOR shall perform structural design of Musallah building in
accordance with SAUDI ARAMCO standards and submit design calculations to
DATE:
CERTIFIED SAUDI ARAMCO for review and approval.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall refer to BRA report recommendation during detailed
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
design of building and shall prepare blast resistant design.
09/08/16

DATE:
Security Guard house (2 No’s)
OPERATIONS
SHAHZAD YAZDANI

09/08/16
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
CONTACTOR shall perform structural design of security guard house building
in accordance with SAUDI ARAMCO standards and submit design calculations
EDSD

to SAUDI ARAMCO for review and approval.


DATE:
BY:

CONTRACTOR shall refer to BRA report recommendation during detailed


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

design of building.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Operator shelter (2 No’s)

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 233


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTACTOR shall perform structural design of operator shelter building in
accordance with SAUDI ARAMCO standards and submit design calculations to
ASH
ASH
ASH

SAUDI ARAMCO for review and approval.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Smoking shelter
DESCRIPTION

CONTRACTOR shall provide structural steel smoking shelter as per


ISSUED FOR 60% FEL3

architectural plans, sections and elevations

CONTACTOR shall perform structural design of smoking shelter in accordance


with SAUDI ARAMCO standards and submit design calculations to SAUDI
ARAMCO for review and approval.

CONTRACTOR shall provide foundation for smoking shelter as per load data
for structural steel shelter and providing anchor bolts as per SAUDI ARAMCO
JO/EWO

standards.
10-02399-

10-02399-
10-02399-

FSF Support building and Facility Security Forces (FSF) sunshade


0001

0001
0001
DATE

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
09/08/16
08/04/16
06/01/16
NO.
REV

as per architectural plans, sections and elevations.


DISCIPLINE
ENGINEER
CONTACTOR shall perform structural design of FSF support building in
C
A

DATE: accordance with SAUDI ARAMCO standards and submit design calculations to
PROJECT
ALL LEADS
ENGINEER
SAUDI ARAMCO for review and approval.
09/08/16

DATE:
CONTRACTOR shall refer to BRA report recommendation during detailed
CERTIFIED design of building.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall pre-engineered space frame structural sunshade for FSF
CONSTRUCTION
AMR EL SHARKAWY
AGENCY sunshade.
09/08/16

DATE: CONTRACTOR shall provide PEB vendor space frame structural design
OPERATIONS
SHAHZAD YAZDANI calculation for SAUDI ARAMCO review and approval. Space frame design shall
09/08/16 be in accordance with SAUDI ARAMCO standards.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 CONTRACTOR shall provide foundation size as per vendor data. Design of
EDSD

foundation shall be as per foundation load data provided by vendor. Anchor


bolts shall be specified by vendor and selection of anchor bolt shall be as per
DATE:
BY:

SAUDI ARAMCO standards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

Receiving substation
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________________

CONTRACTOR during detail design shall validate the use of SAUDI ARAMCO
library drawing for receiving substation and adopt appropriate structural
arrangement to support overhead crane for GIS room.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 234


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall perform structural design as per SAUDI ARAMCO
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
standards and provide design calculations to SAUDI ARAMCO for review and
approval.
ASH
ASH
ASH

CONTRACTOR shall co-ordinate with SAUDI ARAMCO approved precast


LEADS

LEADS
LEADS
ALL

ALL
ALL

vendors for the design and fabrication of precast walls and double tee slabs.
Necessary loading on roof shall be considered for the design of double tee.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide transformer foundation as per Vendor data.


DESCRIPTION

CONTRACTOR shall provide reinforced cement concrete fire walls for


ISSUED FOR 60% FEL3

transformers as per vendor data, per SAES-P-119.

CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
on grade with required slopes towards oily water catch basins.

Utility power substation

CONTRACTOR shall provide substation as per SAUDI ARAMCO library


JO/EWO

drawings.
10-02399-

10-02399-
10-02399-

CONTRACTOR shall co-ordinate with SAUDI ARAMCO approved precast


0001

0001
0001
DATE

vendors for the design and fabrication of precast walls and double tee slabs.
Necessary loading on roof shall be considered for the design of double tee.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
CONTRACTOR shall provide transformer foundation as per Vendor data.
C
A

DATE: CONTRACTOR shall provide reinforced cement concrete fire walls for
PROJECT
ALL LEADS
ENGINEER transformers as per vendor data.
09/08/16

DATE: CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
A M ALMATROOK
CERTIFIED on grade with required slopes towards oily water catch basins.
09/08/16
DATE: Engineering & Maintenance (E & M) building
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE: as per architectural plans, sections and elevations.
OPERATIONS
SHAHZAD YAZDANI

09/08/16 CONTACTOR shall perform structural design of E & M building in accordance


DATE:
with SAUDI ARAMCO standards and submit design calculations to SAUDI
ARAMCO for review and approval.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building and shall prepare blast resistant design.
DATE:
BY:

Security support building (2 No’s)


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
(DCC) NO. _____________________

as per architectural plans, sections and elevations.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 235


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTACTOR shall perform structural design of security support building in
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
accordance with SAUDI ARAMCO standards and submit design calculations to
SAUDI ARAMCO for review and approval.
ASH
ASH
ASH

CONTRACTOR shall refer to BRA report recommendation during detailed


LEADS

LEADS
LEADS
ALL

ALL
ALL

design of building and shall prepare blast resistant design for main gate
security support building.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Temporary construction facility


DESCRIPTION

CONTRACTOR shall provide all required foundations for facilities, equipment’s,


ISSUED FOR 60% FEL3

structural pipe supports and structural platform in accordance with SAUDI


ARAMCO standards.

CONTRACTOR shall provide structural pipe support and platforms for TCF
facility as required in accordance with SAUDI ARAMCO standards.

X-Ray Building
JO/EWO

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
10-02399-

as per architectural plans, sections and elevations.


10-02399-
10-02399-
0001

0001
0001
DATE

CONTACTOR shall perform structural design of X-Ray building in accordance


09/08/16
08/04/16
06/01/16

with SAUDI ARAMCO standards and submit design calculations to SAUDI


NO.
REV

DISCIPLINE ARAMCO for review and approval.


ENGINEER
C
A

DATE: CONTRACTOR shall refer to BRA report recommendation during detailed


PROJECT
ALL LEADS
ENGINEER
design of building.
09/08/16
Covered car parking sheds
DATE:
CERTIFIED
A M ALMATROOK
CONTRACTOR shall provide structural framing for covered car parking as per
09/08/16
DATE:
SAUDI ARAMCO library drawings DA-950182.001, DA-950183.001 and DA-
CONSTRUCTION
AMR EL SHARKAWY 950185.001.
AGENCY
09/08/16

DATE:
CONTRACTOR shall provide foundation for covered car parking as per SAUDI
OPERATIONS ARAMCO library drawings DA-950184.001, DA-950185.001.
SHAHZAD YAZDANI

09/08/16

DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Chemical shelter
EDSD

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE:

as per architectural plans, sections and elevations.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTACTOR shall perform structural design of Chemical shelter building in


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

accordance with SAUDI ARAMCO standards and submit design calculations to


(DCC) NO. _____________________

SAUDI ARAMCO for review and approval.

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building and shall prepare blast resistant design.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 236


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Remote I/O Buildings (2 No’s)
ASH
ASH

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTACTOR shall perform structural design of Remote I/O building in


accordance with SAUDI ARAMCO standards and submit design calculations to
ISSUED FOR 100% PROJECT PROPOSAL

SAUDI ARAMCO for review and approval.


ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

CONTRACTOR shall refer to BRA report recommendation during detailed


ISSUED FOR 60% FEL3

design of building.

IDAS Shelter (2 No’s)

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.

CONTACTOR shall perform structural design of IDAS shelter building in


JO/EWO

accordance with SAUDI ARAMCO standards and submit design calculations to


SAUDI ARAMCO for review and approval.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

CONTRACTOR shall refer to BRA report recommendation during detailed


design of building.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
Operation building
C
A

DATE:
PROJECT CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ALL LEADS
ENGINEER
09/08/16
as per architectural plans, sections and elevations.
DATE:
CERTIFIED CONTACTOR shall perform structural design of Operation building in
A M ALMATROOK
accordance with SAUDI ARAMCO standards and submit design calculations to
09/08/16
DATE:
SAUDI ARAMCO for review and approval.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall refer to BRA report recommendation during detailed
DATE:
design of building.
OPERATIONS
SHAHZAD YAZDANI
Security Support foundations
09/08/16

DATE:
CONTRACTOR shall provide continuous concrete anchor constructed
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

according to Standard Drawing AC-036680.001 for SAUDI ARAMCO General


09/08/16
Purpose Fencing.
EDSD

DATE:

CONTRACTOR shall provide foundations for fixed camera, PTZ camera, field
BY:

equipment cabinet, MIDS poles and PRS supports.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Lighting pole foundations


(DCC) NO. _____________________

CONTRACTOR shall provide concrete foundations as per vendor data for


lighting pole and design of foundation shall be done as per vendor load data
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 237


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG and shall be in compliance with SAUDI ARAMCO standards. Anchor bolts shall
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH be specified by vendor in accordance with SAUDI ARAMCO standards.
ASH
ASH

Electrical switch racks and junction box foundations


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide concrete foundations as per vendor data for


switch racks and junction box. Design of foundation shall be done as per
vendor load data and shall be in compliance with SAUDI ARAMCO standards.
ISSUED FOR 100% PROJECT PROPOSAL

Anchor bolts shall be specified by vendor in accordance with SAUDI ARAMCO


ISSUED FOR 90% PROJECT PROPOSAL

standards.
DESCRIPTION
ISSUED FOR 60% FEL3

Miscellaneous Structural Works

CONTRACTOR shall construct concrete paving slab at entrance near Security


Guardhouse and wherever indicated on civil drawings. CONTRACTOR shall
provide construction, contraction and isolation/expansion joints as per ACI 224
in order to transfer traffic loads across the joints.

CONTRACTOR shall construct concrete duct banks for cable routing as shown
JO/EWO

in electrical drawings.
10-02399-

10-02399-
10-02399-

CONTRACTOR shall construct crash rated barriers, crash rated beams and
0001

0001
0001
DATE

valve boxes.
09/08/16
08/04/16
06/01/16
NO.
REV

CONTRACTOR shall construct all required concrete sanitary manholes and


DISCIPLINE
ENGINEER
catch basins.
C
A

DATE: CONTRACTOR shall construct all required oily water manholes.


PROJECT
ALL LEADS
ENGINEER
09/08/16 SAMREF refinery scope
DATE:
CERTIFIED General
A M ALMATROOK
09/08/16
DATE:
CONTRACTOR shall conduct detailed geotechnical investigation for all
CONSTRUCTION
AMR EL SHARKAWY foundation required inside SAMREF refinery, as per SAES-A-113.
AGENCY
09/08/16

DATE:
CONTRACTOR shall conduct site survey to finalize the locations of
OPERATIONS equipment’s and routing of piping, location of pipe supports, platforms and
SHAHZAD YAZDANI

09/08/16
crossovers inside SAMREF refinery.
DATE:
Equipment Foundations
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
CONTRACTOR shall provide concrete foundations for surge relief pumps,
EDSD

custody metering skid, meter prover and custody metering shelter (vendor
DATE:

package).
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall design foundations as per vendor requirement of size and


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

loading in accordance with SAUDI ARAMCO standards.


(DCC) NO. _____________________

CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 238


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall provide anchor bolts as per vendor requirement in
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH accordance with SAUDI ARAMCO standards.
ASH
ASH

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Surge relief tank


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall conduct detailed geotechnical investigation at tank


location to access tank settlement (immediate and long term) and soil bearing
DESCRIPTION

capacity for foundation design.


ISSUED FOR 60% FEL3

Foundation sizes shown in project proposal drawings are indicative and


CONTRACTOR shall design tank foundations for all loadings as per final IFC
load data. IFC load data shall cover all loadings for tank including tank shell,
tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
corroded weight, wind load and seismic loading etc. and all loading shall be
reported as per API-650 standard.
JO/EWO

CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
of foundation, materials, quantities etc. the drawings those are being provided
10-02399-

10-02399-
10-02399-

to CONTRACTOR are for their reference and for cost estimate purpose. It is
0001

0001
0001
DATE

CONTRACTOR’s responsibility to ensure that adequate tank foundations are


designed and built, including any soil improvement/replacement resulting from
09/08/16
08/04/16
06/01/16
NO.
REV

soil investigation/geotechnical report.


DISCIPLINE
ENGINEER
In case anchor bolts are required for tank anchorage to the foundations, then
C
A

DATE: anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
PROJECT
ALL LEADS
ENGINEER of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
09/08/16 fluoropolymer/ceramic; galvanized bolts shall not be used.
DATE: Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107.
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall work in close coordination with cathodic protection and
DATE: leak detection sub-contractor regarding the scheduling and sequence of
CONSTRUCTION
AMR EL SHARKAWY
AGENCY construction.
09/08/16

DATE: CONTRACTOR shall submit allowable settlement limits for tanks foundations
OPERATIONS
SHAHZAD YAZDANI as per tank vendor specifications for SAUDI ARAMCO review and approval. In
09/08/16 case actual settlements are more than recommended and not acceptable to
DATE: Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
differential settlements are within the limits concurred by SAUDI ARAMCO.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

CONTRACTOR shall coordinate with his Cathodic Protection Subcontractor


(CPS) to keep sleeves for conduits.
DATE:
BY:

CONTRACTOR shall fulfill all requirements specified in Appendix B of 32-


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAMSS-005 for foundation design and construction.


(DCC) NO. _____________________

CONTRACTOR shall provide complete system for leak detection. Tanks in


services other than water shall be provided with an under tank leak detection
and sub-grade protection according to API STD 650, Appendix I.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 239


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall develop procedure and monitor tank settlement as per
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
API 650 standard and shall submit method statement to Saudi Aramco for
approval.
ASH
ASH
ASH

Dike wall for surge relief tank


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall design dike wall in accordance with Saudi Aramco


ISSUED FOR 100% PROJECT PROPOSAL

Standard.
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
ISSUED FOR 60% FEL3

of SAES-B-005.

CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face and outer face of
tank ring beam.

CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces


below grade.
JO/EWO

CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces


10-02399-

10-02399-
10-02399-

above grade.
0001

0001
0001
DATE

CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
09/08/16
08/04/16
06/01/16
NO.
REV

provided inside dike area.


DISCIPLINE
ENGINEER
C
A

DATE: Steel pipe support, pipe sleepers, structural platforms and crossovers
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall provide structural pipe support, structural platforms and
DATE:
crossovers as per piping plans and design in accordance with SAUDI ARAMCO
CERTIFIED standards. CONTRACTOR shall provide all structural calculations for SAUDI
A M ALMATROOK
09/08/16
ARAMCO approval.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
09/08/16 approval.
DATE:
OPERATIONS
SHAHZAD YAZDANI
CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
09/08/16 crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
DATE:
foundations as per stress analysis load data in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all foundation design
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 calculations for SAUDI ARAMCO approval.


EDSD

Yanbu refinery scope


DATE:
BY:

General
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall conduct detailed geotechnical investigation for all


(DCC) NO. _____________________

foundation required inside Yanbu refinery as per SAES-A-113.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 240


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall conduct site survey to finalize the locations of
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
equipment’s and routing of piping, location of pipe supports, platforms and
crossovers inside Yanbu refinery.
ASH
ASH
ASH

CONTRACTOR shall conduct site visits to finalize the piping road crossing
LEADS

LEADS
LEADS
ALL

ALL
ALL

inside Yanbu refinery plant as per piping plans. CONTRACTOR shall check
available space inside existing culverts to cross pipes for proposed lines and if
space is not adequate to cross the proposed lines CONTRACTOR shall
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

propose modifications of Existing culvert or new culverts with prior approval


from SAUDI ARAMCO.
DESCRIPTION
ISSUED FOR 60% FEL3

Equipment Foundations

CONTRACTOR shall provide concrete foundations for surge relief pumps.

CONTRACTOR shall design foundations as per vendor requirement of size and


loading in accordance with SAUDI ARAMCO standards.

CONTRACTOR shall provide slab on grade and toe wall as per vendor
JO/EWO

requirement for equipment’s.


10-02399-

10-02399-
10-02399-

CONTRACTOR shall provide anchor bolts as per vendor requirement in


0001

0001
0001
DATE

accordance with SAUDI ARAMCO standards.


09/08/16
08/04/16
06/01/16
NO.
REV

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
DISCIPLINE
ENGINEER
IFC drawing for all equipment foundations.
C
A

DATE: Surge relief tank


PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall conduct detailed geotechnical investigation at tank
DATE:
location to access tank settlement (immediate and long term) and soil bearing
CERTIFIED capacity for foundation design.
A M ALMATROOK
09/08/16
DATE: Foundation sizes shown in project proposal drawings are indicative and
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall design tank foundations for all loadings as per final IFC
09/08/16 load data. IFC load data shall cover all loadings for tank including tank shell,
DATE: tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
OPERATIONS
SHAHZAD YAZDANI corroded weight, wind load and seismic loading etc. and all loading shall be
09/08/16 reported as per API-650 standard.
DATE:
CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 of foundation, materials, quantities etc. the drawings those are being provided
EDSD

to CONTRACTOR are for their reference and for cost estimate purpose. It is
CONTRACTOR’s responsibility to ensure that adequate tank foundations are
DATE:
BY:

designed and built, including any soil improvement/replacement resulting from


soil investigation/geotechnical report.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

In case anchor bolts are required for tank anchorage to the foundations, then
(DCC) NO. _____________________

anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
fluoropolymer/ceramic; galvanized bolts shall not be used.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 241


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107. All
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH anchor bolts shall be torqued to specified requirements.
ASH
ASH

CONTRACTOR shall work in close coordination with cathodic protection and


leak detection sub-contractor regarding the scheduling and sequence of
LEADS

LEADS
LEADS
ALL

ALL
ALL

construction.

CONTRACTOR shall submit allowable settlement limits for tanks foundations


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

as per tank vendor specifications for SAUDI ARAMCO review and approval. In
case actual settlements are more than recommended and not acceptable to
DESCRIPTION

Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
ISSUED FOR 60% FEL3

differential settlements are within the limits concurred by SAUDI ARAMCO.

CONTRACTOR shall coordinate with his Cathodic Protection Subcontractor


(CPS) to keep sleeves for conduits.

CONTRACTOR shall fulfill all requirements specified in Appendix B of 32-


SAMSS-005 for foundation design and construction.
JO/EWO

CONTRACTOR shall provide complete system for leak detection. Tanks in


services other than water shall be provided with an under tank leak detection
10-02399-

10-02399-
10-02399-

and sub-grade protection according to API STD 650, Appendix I.


0001

0001
0001
DATE

CONTRACTOR shall develop procedure and monitor tank settlement as per


09/08/16
08/04/16
06/01/16
NO.
REV

API 650 standard and shall submit method statement to Saudi Aramco for
DISCIPLINE
ENGINEER approval.
C
A

DATE: Dike wall for surge relief tank


PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CONTRACTOR shall design dike wall in accordance with Saudi Aramco
A M ALMATROOK
CERTIFIED Standard.
09/08/16
DATE: CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
CONSTRUCTION
AMR EL SHARKAWY
AGENCY of SAES-B-005.
09/08/16

DATE: CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
OPERATIONS
SHAHZAD YAZDANI appropriate HDPE insert on concrete dike wall inside face and outer face of
09/08/16 tank ring beam.
DATE:
CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 below grade.


EDSD

CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces


DATE:
BY:

above grade.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
BY DRAWING COMPLETION CERTIFICATE

provided inside dike area.


(DCC) NO. _____________________

Steel pipe support, pipe sleepers, structural platforms and crossovers


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 242


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall provide structural pipe support, structural platforms and
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
crossovers as per piping plans and design in accordance with SAUDI ARAMCO
standards. CONTRACTOR shall provide all structural calculations for SAUDI
ASH
ASH
ASH

ARAMCO approval.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


approval.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR shall provide concrete foundations for pipe supports, platforms,


crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
DESCRIPTION

foundations as per stress analysis load data in accordance with SAUDI


ISSUED FOR 60% FEL3

ARAMCO standards. CONTRACTOR shall provide all foundation design


calculations for SAUDI ARAMCO approval.

Pipeline from SAMREF and Yanbu refinery to YDH scope

General
JO/EWO

CONTRACTOR shall conduct site survey to finalize the pipeline routing


10-02399-

10-02399-
10-02399-

proposed during detailed design.


0001

0001
0001
DATE

CONTRACTOR shall provide all adequate civil /structural arrangements for


09/08/16
08/04/16
06/01/16
NO.
REV

road crossings as proposed in pipeline drawings and this shall include but not
DISCIPLINE
ENGINEER
limited to soil excavation, backfilling, concrete lining, dewatering if required and
detour for open cut road crossings.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall conduct detailed geotechnical investigation at road
09/08/16 crossing location to assess soil condition to determine methodology to be used
DATE:
for thrust boring option.
CERTIFIED
A M ALMATROOK
09/08/16 If CONTRACTOR intends to use existing geotechnical report for sleeper
DATE: foundation designs along the route of pipelines, CONTRACTOR shall take prior
CONSTRUCTION
AMR EL SHARKAWY
AGENCY approval from SAUDI ARAMCO and prepare standalone report indicating use
09/08/16 of existing borehole for deriving bearing capacity for foundation design.
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall utilize project proposal geotechnical report 2015/104 for
09/08/16 assessing soil conditions for Yanbu –Jiddah Highway crossing and Yanbu
DATE: refinery exit crossing.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Steel pipe support, pipe sleepers, structural platforms and crossovers
EDSD

CONTRACTOR shall provide structural pipe support, structural platforms and


DATE:
BY:

crossovers as per piping plans and design in accordance with SAUDI ARAMCO
standards. CONTRACTOR shall provide all structural calculations for SAUDI
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

ARAMCO approval.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


approval.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 243


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
foundations as per stress analysis load data in accordance with SAUDI
ASH
ASH
ASH

ARAMCO standards. CONTRACTOR shall provide all foundation design


calculations for SAUDI ARAMCO approval.
LEADS

LEADS
LEADS
ALL

ALL
ALL

SECTION 5.0 – BUILDINGS


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

GENERAL DESCRIPTION
DESCRIPTION
ISSUED FOR 60% FEL3

 All Fire Protection Equipment and Appurtenances shall be purchased as


specified in the SAUDI ARAMCO Materials System and SAES-U-101

GENERAL ARCHITECTURAL BASIS OF DESIGN

 All exterior walls will be CMU and insulated and cladded with drywalls from
inside the buildings (Except Substation Building which will have precast panels
JO/EWO

walls as per SA standards) as per the BRA recommendations.


10-02399-

10-02399-
10-02399-

 All interior walls will be CMU and drywalls as per the standards and codes
0001

0001
0001
DATE

requirements.
09/08/16
08/04/16
06/01/16
NO.
REV

 All exterior walls (Except Substation Building) will have plaster with paint
DISCIPLINE
ENGINEER finish.
C
A

 All interior wall surfaces and exposed structures shall be painted and finished
DATE:
PROJECT
in accordance with SAES-H-101V.
ALL LEADS
ENGINEER
09/08/16
 Buildings will have acoustical ceiling tiles where allowed by standards and
DATE: codes.
CERTIFIED
A M ALMATROOK
09/08/16
 All roofs shall have waterproofing membrane system including complete
DATE:
CONSTRUCTION
AMR EL SHARKAWY
insulation and roof accessories in compliance with SAES-M-100.
AGENCY
09/08/16
 All buildings will have finishing materials as per Building Design and Finishing
DATE:
OPERATIONS Guidelines (SAES-R-004) and as per the applicable standards.
SHAHZAD YAZDANI

09/08/16
 Smoking Shelter is open (No walls) covered by steel structure shelter and
DATE:
including 4 wooden bench.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16

EDSD

Substation Building design (Precast concrete Structure) shall be as per SAES-


M-009.
DATE:
BY:

 Fire barriers shall be provided to separate different use area. Fire walls shall
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

be provided to the Control room, equipment Room, Rack/Server room,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Telecom, HVAC, Electrical /UPS and Battery rooms. All fire barriers shall be
(DCC) NO. _____________________

extending up to the underside of the roof.

 Interior framing, members, finishes, partition, cabinets, doors, and trim, shall
REVISION

be non-combustible.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 244


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 Provide gypsum board (fire rated and moisture resistant) drywall partitions
with insulation on metal studs with painted finish and ceramic tiles at wet
ASH
ASH
ASH

areas where required.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 All ceramic wall tiles finished shall be full height extended to under face of
ceiling. Ceramic wall base shall be cove and rounded edges at exposed
corner angles.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 All separating wall shall be constructed to achieve a giving fire rating where
ISSUED FOR 60% FEL3

necessary exposed internal concrete surfaces shall be paint finished.

 Provide 19 mm thick plywood and finished with 2 coats of fire retardant paint
to Telecommunication Room. Plywood shall be installed on a fire resistive wall
assembly such as type ‘X’ fire rated gypsum board or concrete wall.

 Raised Access Floor shall be heavy grade access floor system with coated
steel and durable anti-static pressure laminate floor. Where required this shall
be chemical resistant and anti-static floor compound.
JO/EWO

 Provide anti-static vinyl tiles to Telecommunication Room and Electrical Room.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Provide non-slip acid resistant quarry tiles to Battery Room.


09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE  The ceiling at the Telecommunication Room, Mechanical and


ENGINEER
Electrical/Instrument Workshop shall be exposed smooth surface structure
C
A

DATE:
and paint finished.
PROJECT
ALL LEADS
ENGINEER
09/08/16  Battery Room shall be exposed smooth surface concrete structure with acid
DATE:
resistant paint finished.
CERTIFIED
A M ALMATROOK
09/08/16
 All fire rated doors assemblies shall be labeled by an approved international
DATE: testing agency. The labels shall comply with NFPA-80 and shall be permanently
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
affixed to the door frame. The label shall be applied at the factory and shall
09/08/16 show the following:
DATE:
OPERATIONS
SHAHZAD YAZDANI
 Name of manufacturer.
09/08/16  Trademark of the third-party inspection agency.
DATE:  Fire-protection rating.
 Maximum transmitted temperature end point for fire door exit enclosure and
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 exit passageway.


EDSD

 Smoke and draft control door shall show the letter “S” on the label.
DATE:
BY:

 All fire rated doors shall be provided with required fire rating including smoke
and draft seals in accordance with IBC Chapter 7, and UL listed, with
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

complete door assemblies and shutters according to IBC, under Section


715.3, and NFPA 80. Fire rated door shall not be provided with stoppers.
(DCC) NO. _____________________

Double door shall be provided with dust proof and astragal, weather strip and
door bottom sweep.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 245


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Provide all exit doors with panic devices as per IBC 2009, Section 1008.1.10
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH and SAES-B-014, Section 5.13 and SAES-P-103 , Section 6.2.4
ASH
ASH

 All fire rated doors shall be provided with door closers and with smoke/in
tumescent seals to heads and both sides. Closer shall be specified to operate
LEADS

LEADS
LEADS
ALL

ALL
ALL

for individual door size/weight and for particular internal and external.

 Provide all internal door sets paint finished galvanized steel and providing fire
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

and sound resistance where necessary. Doors with vision glass panel shall be
DESCRIPTION

wired-glass. All ironmongery shall be stainless steel.


ISSUED FOR 60% FEL3

 Provide all external door paint finished, thermally insulated and fire-resistant
galvanized steel door with gas, dust and weather seals. Entrance door to air
lock shall be safety tempered clear glass on powder coated aluminum
finished.

 Provide handrail and guard or combination of handrail and guard in


accordance with all requirements set forth in IBC-2009, Section 1012 and
1013 respectively.
JO/EWO

 Provide Emergency eyewash and shower to each Battery Room according to


SAES-B-069. (Typical for all the buildings which include Battery Room)
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 All buildings windows must have, LOW-E (on 2nd. Face) double glazed (6mm,
09/08/16
08/04/16
06/01/16

16mm, 6mm), reflective heat strengthen exterior & clear tempered interior
NO.
REV

DISCIPLINE glazing set in powder-coated (PVDF)-Thermally Broken aluminum window


ENGINEER
C
A

DATE:
5.1. MAIN GATEHOUSE
PROJECT
ALL LEADS
ENGINEER
09/08/16
CIVIL


DATE:
CERTIFIED For civil scope refer to section 4.22.
A M ALMATROOK
09/08/16
DATE:
STRUCTURAL
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  For structural scope refer to section 4.25.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16 FIRE PROTECTION


DATE:
 Placement of portable extinguisher in building shall comply with section
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 906, SAES-M-100.


EDSD

 Hand-type portable extinguisher shall be mounted in easily accessible


DATE:
BY:

locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

6.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 CONTRACTOR shall provide and Install Portable type Fire Extinguisher


inside the Buildings as per Table -1, SAES-B-019.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 246


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
be mounted so that the extinguisher top is not more than 1.5 m above the
floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
ASH
ASH
ASH

extinguisher top is not more than 1.0 m above the floor level.
LEADS

LEADS
LEADS
ALL

ALL
ALL

TELECOMMUNICATION

 CONTRACTOR shall procure, install, test and commission 1 basic IP phone


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

and 2 analog phones.


DESCRIPTION


ISSUED FOR 60% FEL3

CONTRACTOR shall provide this building 4 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
RJ45 modules in each faceplate outlets.

 CONTRACTOR shall procure, install, test and commission one (1) Radio
Frequency Dispatch Terminal (RFDT) at the Guardhouse. The transceiver
shall be located at the Security Support Building and the control head at the
Guardhouse.
JO/EWO

 Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support
Facility building for the connectivity required in the gatehouse. Cat 6
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

protector modules shall be provided by the Contactor.


09/08/16
08/04/16
06/01/16

ELECTRICAL
NO.
REV

DISCIPLINE  For Building electrical scope refer to section 4.15.


ENGINEER
5.2. MUSALLAH
C
A

DATE:
PROJECT CIVIL
ALL LEADS
ENGINEER
09/08/16
 Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste water from the
DATE:
CERTIFIED support buildings toilet sanitary pipe and shall be connected to sanitary
A M ALMATROOK
sewer network then heading to the sanitary lift station area. These will
09/08/16
DATE: include the provision of sanitary manholes, cleanouts and other fixtures.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop
DATE: to support building facilities toilet.
OPERATIONS
SHAHZAD YAZDANI

09/08/16  Provide concrete sidewalks as required around the Support Building


DATE: Facilities as shown site development plan. The sidewalk shall be 100mm
thick concrete provided with 150x150xMW9xMW9 welded wire fabric
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 (WWF) and shall be in accordance, as applicable, as per SAUDI


EDSD

ARAMCO Standard drawing no. AB-036260 sheet 001 rev. 05.


DATE:
BY:

ARCHITECTURAL
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide a 110 m2 air-conditioned building with


ablution, janitor store and toilets which shall be constructed to serve as the
(DCC) NO. _____________________

main Musallah near the E & M building. The proposed Musallah capacity
shall be for approximately 45 persons with an ablution area and toilets.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 247


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 The proposed building shall be CMU external wall, concrete frame structure
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
and concrete roof slab with all utilities to be provided. For the proposed
ASH

building floor plan refer to drawing # ARA00002-001


ASH
LEADS

LEADS
LEADS
ALL

STRUCTURAL
ALL
ALL

 For structural scope refer to section 4.25.


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

HVAC
DESCRIPTION
ISSUED FOR 60% FEL3

 CONTRACTOR shall provide & install Packaged Air-conditioning Units


(PACU-1 – Duty) outside the building to serve the building along with
Sand trap louvers, ductwork, insulation, supports, vibration isolators and
accessories. Refer to drawings HV-A00002-001 and 002 for HVAC
Layout and System design data and performance requirement of the
units.
JO/EWO

 CONTRACTOR shall provide HVAC Equipment foundation of minimum


10-02399-

10-02399-
10-02399-

150mm height to mount HVAC Equipment.


0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER  The condensate drain line from each HVAC Equipment shall be routed
C
A

to a nearby drain line with proper slope and P trap.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED  CONTRACTOR shall provide and install supply and return GI ductwork
A M ALMATROOK
along with fiberglass insulation (50mm thick – Indoor, Density: 48 kg/m3
09/08/16
DATE:
& 100mm thick – Outdoor, Density: 48kg/m3) along with supports and
CONSTRUCTION
AMR EL SHARKAWY all accessories such as motorized volume dampers, volume control
AGENCY
09/08/16 dampers and Air terminal devices such as diffuser’s and grilles.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE:  All Electrical Devices provided by CONTRACTOR such as the


Motorized isolation dampers, Exhaust Fans, Fire smoke dampers & Fan
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 Motors shall be UL Listed.


EDSD

DATE:
BY:
REVISIONCERTIFICATION

 CONTRACTOR shall ensure that all HVAC Equipment selected for the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

project are as per the EER requirements tabulated under Chapter 7 of


(DCC) NO. _____________________

SAES-K-001.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 248


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide cladding for all externally exposed
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH ductwork with 0.9mm thick Aluminum sheet.
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide and install Exhaust Fans for the different
areas listed in the building as per HVAC Layouts along with all
accessories such as back draft dampers and disconnect switch.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
ISSUED FOR 60% FEL3

 Fire & Smoke Dampers shall be installed on all fire rated walls and
these fire & smoke dampers shall be manufactured according to UL555
and UL 555S standard and shall bear a seal from UL.

 CONTRACTOR shall provide and install a Direct Digital Control Panel


JO/EWO

to sequence the HVAC Equipment and Exhaust Fans along with


necessary field devices such as temperature sensors, transmitters,
10-02399-

10-02399-
10-02399-

pressure differential switches, damper actuators, duct smoke detectors


0001

0001
0001
DATE

and air-flow switches as per the requirements of SAUDI ARAMCO


standards.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER
C
A

DATE:
PROJECT
 The DDC Panel shall provide following alarms (Audio & visual) as a
ALL LEADS
ENGINEER minimum:
09/08/16

DATE:
CERTIFIED
- Unit Trip Alarm
A M ALMATROOK - Dirty Filter Alarm
09/08/16
DATE:
- Low Airflow Alarm
CONSTRUCTION
AMR EL SHARKAWY
- High Temperature Alarm
AGENCY
09/08/16

DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16  CONTRACTOR shall provide necessary termination details, interfacing


DATE:
and wiring details and programming of DDC Panels to initiate alarms
and to sequence or shutdown HVAC Equipment.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

DATE:
BY:

 CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
Panel & DCS.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 CONTRACTOR shall provide Common Trouble alarm to DCS.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 249


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
ASH
ASH
ASH

Intake duct as per layout drawing and shall be connected to DDC and
DCS System.
LEADS

LEADS
LEADS
ALL

ALL
ALL

ISSUED FOR 100% PROJECT PROPOSAL


ISSUED FOR 90% PROJECT PROPOSAL

 The Testing and Air - Balancing requirements shall be provided for the
DESCRIPTION

building as per the SAES-K-001 through an independent 3rd Party. THE


ISSUED FOR 60% FEL3

3rd Party CONTRACTOR shall be approved by SAUDI ARAMCO.

PLUMBING
JO/EWO

WATER SUPPLY SYSTEM


10-02399-

10-02399-
10-02399-


0001

CONTRACTOR shall provide and install complete water distribution


0001
0001
DATE

piping system to serve toilet fixtures, Lavatories, Janitor sinks of the


09/08/16
08/04/16
06/01/16

building. The water supply system shall provide both Cold and Hot
NO.
REV

DISCIPLINE water requirements to the building utility areas. For water supply layout,
ENGINEER
refer to drawing PL-A00002.001.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
 CONTRACTOR shall provide and install hose bib with vacuum breaker
09/08/16 within close proximity of PACU unit for periodic washing.
DATE:

A M ALMATROOK
CERTIFIED  CONTRACTOR shall ensure that the installation of water supply system
09/08/16 shall be in accordance with SAUDI ARAMCO Engineering Standards
DATE:
CONSTRUCTION
(SAES-S-060) and Uniform Plumbing Code (UPC).
AMR EL SHARKAWY
AGENCY
09/08/16
 CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot
DATE:
OPERATIONS
water above ground pipes and CPVC Schedule 80 Pipe for the below
SHAHZAD YAZDANI

09/08/16
ground water supply pipes. The hot water pipes shall be provided with
DATE:
closed cell fiberglass insulation of density 64 kg/m3.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Domestic hot water will be generated by point of use water heaters.
EDSD

Point of use or “instantaneous” types will be provided for remote, single


fixture applications and will be mounted on the wall below the fixture
DATE:
BY:

being served.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 CONTRACTOR shall provide tie –in to the building water supply lines
(DCC) NO. _____________________

along with standard accessories such as Isolation valves and back flow
preventer. For details regarding the building tie-ins relevant civil
drawings shall be referred.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 250


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG DRAIN & VENT SYSTEM
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall provide and install complete drainage system
ASH
ASH
ASH

including their piping, fittings, vents and fixtures. The design of


LEADS

drainage system shall be in accordance with SAUDI ARAMCO


LEADS
LEADS
ALL

ALL
ALL

Engineering Standards (SAES-S-060) and Uniform Plumbing Code


(UPC). For drain and vent layout, refer to drawing PL-A00002.001.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage &
DESCRIPTION

vent lines inside the building. The outside building underground drain
ISSUED FOR 60% FEL3

and vent lines shall be with RTR pipes.

 CONTRACTOR shall provide Venting for all fixtures, including Floor


Drains. Venting systems will terminate through the roof with minimal
roof penetrations.

FIRE PROTECTION
JO/EWO

 Placement of portable extinguisher in building shall comply with section


906, SAES-M-100.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 Hand-type portable extinguisher shall be mounted in easily accessible


09/08/16
08/04/16
06/01/16

locations at grade. Their location shall be marked in RED in a way that


NO.
REV

DISCIPLINE
ENGINEER
will attract attention, and otherwise meet the requirements of NFPA 10,
Chapter 6.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER  CONTRACTOR shall provide and Install Portable type Fire Extinguisher
09/08/16 inside the Buildings as per Table -1, SAES-B-019.
DATE:

A M ALMATROOK
CERTIFIED
 CONTRACTOR shall install all fire Extinguisher units less than 18 kg
09/08/16 shall be mounted so that the extinguisher top is not more than 1.5 m
DATE:
CONSTRUCTION
AMR EL SHARKAWY
above the floor level. Extinguisher units weighing over 18 Kg shall be
AGENCY
09/08/16 mounted so that extinguisher top is not more than 1.0 m above the floor
DATE:
level.
OPERATIONS
SHAHZAD YAZDANI

09/08/16  For the proposed Fire Protection layout refer to drawing # FI-A00026-
DATE: 001
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 ELECTRICAL
EDSD

 For Building electrical scope refer to section 4.15.


5.3. SECURITY GUARD HOUSE (2 Nos.)
DATE:
BY:

FIRE PROTECTION
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Placement of portable extinguisher in building shall comply with section


(DCC) NO. _____________________

906, SAES-M-100.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 251


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Hand-type portable extinguisher shall be mounted in easily accessible
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
locations at grade. Their location shall be marked in RED in a way that
ASH

will attract attention, and otherwise meet the requirements of NFPA 10,
ASH

Chapter 6.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide and Install Portable type Fire Extinguisher


inside the Buildings as per Table -1, SAES-B-019.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall install all fire Extinguisher units less than 18 kg


DESCRIPTION

shall be mounted so that the extinguisher top is not more than 1.5 m
ISSUED FOR 60% FEL3

above the floor level. Extinguisher units weighing over 18 Kg shall be


mounted so that extinguisher top is not more than 1.0 m above the floor
level

 For the proposed Fire Protection layout refer to drawing # FI-A00030-


001.

ARCHITECTURAL
JO/EWO

 CONTRACTOR shall provide a 24 SM (two-man) security guard house


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

with 360 degree vision to control the access to the facility and to house
SAUDI ARAMCO security personnel. This guard-house will be provided
09/08/16
08/04/16
06/01/16
NO.
REV

one at the main entrance gate and one in tank farm area gate, between
DISCIPLINE
ENGINEER two lanes at each entrance and exit access. Main entrance gate will
C
A

have a space frame structure sunshade.


DATE:
PROJECT
ALL LEADS
ENGINEER  The proposed building shall be concrete external wall, concrete frame
09/08/16
structure and concrete roof slab with all utilities and communication
DATE:
CERTIFIED systems to be provided.
A M ALMATROOK
09/08/16
DATE:
 For the proposed building floor plans refer to drawing # ARA00006-001.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 STRUCTURAL
DATE:
OPERATIONS  For structural scope refer to section 4.25.
SHAHZAD YAZDANI

09/08/16

DATE:
HVAC
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16

EDSD

CONTRACTOR shall provide and Install Wall Mounted Split A/c Units
(FCU-01 & FCU-02 both Duty) along with their corresponding Condensing
DATE:
BY:

Units (ACCU-1 & ACCU-2). For HVAC layout, refer to drawing HV-A00007-
REVISIONCERTIFICATION

001 for Security Guard House at Main Gate and HV-A000016-001 for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Security Guard House at Tank Farm.


(DCC) NO. _____________________

 CONTRACTOR shall provide and Install refrigerant pipes between Indoor


and Outdoor units with Insulation and cladding.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 252


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide & install vibration isolators etc. for the HVAC
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
equipment so that the installation is as per manufacturer’s
ASH

recommendation.
ASH
LEADS

 CONTRACTOR shall provide & install the condensate drain line from
LEADS
LEADS
ALL

ALL
ALL

HVAC Equipment up to the nearest drain pit with proper slope and P trap.

 CONTRACTOR shall comply with EER Requirements as specified in


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

SAES-K-001 for the supply of HVAC Equipment.


DESCRIPTION
ISSUED FOR 60% FEL3

TELECOMMUNICATION

 CONTRACTOR shall procure, install, test and commission 1 basic IP phone


and 2 analog phones.

 CONTRACTOR shall provide this building 4 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
JO/EWO

RJ45 modules in each faceplate outlets.

 CONTRACTOR shall procure, install, test and commission one (1) Radio
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Frequency Dispatch Terminal (RFDT) at the Guardhouse. The transceiver


shall be located at the Security Support Building and the control head at the
09/08/16
08/04/16
06/01/16
NO.
REV

Guardhouse.
DISCIPLINE
ENGINEER
 Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support
C
A

DATE:
PROJECT
Facility building for the connectivity required in the gatehouse. Cat 6
ALL LEADS
ENGINEER
protector modules shall be provided by the Contactor
09/08/16

DATE:
CERTIFIED
ELECTRICAL
A M ALMATROOK  For Building electrical scope refer to section 4.15.
09/08/16
DATE:
5.4. OPERATOR SHELTER (2 Nos.)
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 ARCHITECTURE
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16
 Provide Two (2) 54 m2 air conditioned shelter within the operating area.
The shelter shall include lunch area, lockers, storage room, toilet and two
DATE:
offices: one for the field operators and the other for the area Supervising
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
Operator. The building shall be designed to accommodate a total of eight
users (building occupancy group B).
EDSD

DATE:

 The proposed building shall be CMU external wall, concrete frame structure
BY:

and concrete roof slab with all utilities and communication systems to be
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

provided.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 For the proposed building floor plans refer to drawing # ARA00004-001


(DCC) NO. _____________________

CIVIL
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 253


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Provide 8” diameter RTR pipe, 80FEOD, for sanitary wastes from the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
support buildings toilet sanitary pipe and shall be connected to the sanitary
lift station which will pump the sanitary water to the lift station #1 in the
ASH
ASH
ASH

buildings area. These will include the provision of sanitary manholes,


cleanouts and other fixtures.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop to
the plumbing pipes to supply building facilities toilet.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 Provide concrete sidewalks as required around the Support Building


ISSUED FOR 60% FEL3

Facilities as shown site development plan. The sidewalk shall be 100mm


thick concrete provided with 150x150xMW9xMW9 welded wire fabric
(WWF) and shall be in accordance, as applicable, as per SAUDI ARAMCO
Standard drawing no. AB-036260 sheet 001 rev. 05.

FIRE PROTECTION

 Placement of portable extinguisher in building shall comply with section


906, SAES-M-100.
JO/EWO

 Hand-type portable extinguisher shall be mounted in easily accessible


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
09/08/16
08/04/16
06/01/16

6.
NO.
REV

DISCIPLINE
ENGINEER
 Dry chemical extinguisher shall be located on the building exterior of the
C
A

control building and electrical substations, near entrance.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
 CONTRACTOR shall provide and Install Portable type Fire Extinguisher
inside the Buildings as per Table -1, SAES-B-019.
DATE:
CERTIFIED
A M ALMATROOK
 CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
09/08/16
DATE: be mounted so that the extinguisher top is not more than 1.5 m above the
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
09/08/16 extinguisher top is not more than 1.0 m above the floor level.
DATE:
OPERATIONS
SHAHZAD YAZDANI
 For the proposed Fire Protection layout refer to drawing # FI-A00027-001
09/08/16

DATE:
STRUCTURAL
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

 For structural scope refer to section 4.25.


DATE:
BY:

HVAC
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

CONTRACTOR shall provide & install Package air conditioning Unit


BY DRAWING COMPLETION CERTIFICATE

(PACU-01 Duty outside the building on a foundation pad as shown on the


(DCC) NO. _____________________

HVAC layout drawings HV-A00005.001 and 002.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 254


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide & install vibration isolators, flexible
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
connections etc. for the HVAC equipment so that the installation is as per
manufacturer’s recommendation.
ASH
ASH
ASH

 CONTRACTOR shall provide & install the condensate drain line from HVAC
LEADS

LEADS
LEADS
ALL

ALL
ALL

Equipment up to the nearest drain pit with proper slope and P trap.

 CONTRACTOR in general shall provide and install supply and Return GI


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

ductwork with their fiber glass insulation along with supports and all
DESCRIPTION

accessories such as motorized volume dampers, volume control dampers


ISSUED FOR 60% FEL3

and Air terminal devices as shown on the Layout drawings.

 CONTRACTOR shall provide cladding for all externally exposed ductwork


with 0.9mm thick Aluminum sheet.

 CONTRACTOR shall provide and install Exhaust Fans for Toilet as per the
HVAC drawings.

 CONTRACTOR shall provide and install a Direct Digital Control Panel to


JO/EWO

sequence the HVAC Equipment and Exhaust Fans along with necessary
field devices such as temperature sensors, transmitters, pressure
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

differential switches, damper actuators, duct smoke detectors and air-flow


switches as per the requirements of SAUDI ARAMCO standards.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE  The DDC Panel shall provide following alarms (Audio & visual) as a
ENGINEER
minimum:
C
A

DATE:
 Unit Trip Alarm
PROJECT
ALL LEADS
ENGINEER
 Dirty Filter Alarm
09/08/16  Low Airflow Alarm
DATE:
 High Temperature Alarm
CERTIFIED
A M ALMATROOK
09/08/16  CONTRACTOR shall provide necessary termination details, interfacing and
DATE: wiring details and programming of DDC Panels to initiate alarms and to
CONSTRUCTION
AMR EL SHARKAWY
AGENCY sequence or shutdown HVAC Equipment.
09/08/16

DATE:  CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
OPERATIONS
SHAHZAD YAZDANI Panel & DCS.
09/08/16

DATE:  CONTRACTOR shall provide Common Trouble alarm to DCS.


CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
EDSD

Intake duct as per layout drawing and shall be connected to DDC and DCS
System.
DATE:
BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

All necessary installation, pre-commissioning and termination works shall


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

be undertaken in compliance to SAUDI ARAMCO standards.


(DCC) NO. _____________________

 The Testing and Air - Balancing requirements shall be provided for the
building as per the SAES-K-001 through an independent 3rd Party
CONTRACTOR approved by SAUDI ARAMCO.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 255


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
ASH
ASH
ASH

SAES-K-001.
LEADS

LEADS
LEADS
ALL

ALL
ALL

PLUMBING
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

WATER SUPPLY SYSTEM


 CONTRACTOR shall provide and install complete water distribution piping
DESCRIPTION
ISSUED FOR 60% FEL3

system to serve toilet fixtures, Lavatories, Janitor sinks of the building. The
water supply system shall provide both Cold and Hot water requirements to
the building utility areas. For water supply layout, refer to drawing PL-
A00005.001.

 CONTRACTOR shall provide and install hose bib with vacuum breaker
JO/EWO

within close proximity of PACU unit for periodic washing.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16
NO.
REV

 CONTRACTOR shall ensure that the installation of water supply system


DISCIPLINE
ENGINEER shall be in accordance with SAUDI ARAMCO Engineering Standards
C
A

(SAES-S-060) and Uniform Plumbing Code (UPC).


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:

A M ALMATROOK
CERTIFIED  CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot water
09/08/16 above ground pipes and CPVC Schedule 80 Pipe for the below ground
DATE:
CONSTRUCTION
AMR EL SHARKAWY
water supply pipes. The hot water pipes shall be provided with closed cell
AGENCY
09/08/16 fiberglass insulation of density 64 kg/m3.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16

DATE:  Domestic hot water will be generated by point of use water heaters. Point of
CONTROL NUMBER

ALI H GHAMDI
use or “instantaneous” types will be provided for remote, single fixture
VERIFICATION

09/08/16
applications and will be mounted on the wall below the fixture being served.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide tie –in to the building water supply lines along
with standard accessories such as Isolation valves and back flow preventer.
(DCC) NO. _____________________

For details regarding the building tie-ins relevant civil drawings shall be
referred.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 256


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG DRAIN & VENT SYSTEM
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall provide and install complete drainage system
including their piping, fittings, vents and fixtures. The design of drainage
ASH
ASH
ASH

system shall be in accordance with SAUDI ARAMCO Engineering


LEADS

LEADS
LEADS
ALL

Standards (SAES-S-060) and Uniform Plumbing Code (UPC). For drain


ALL
ALL

and vent layout, refer to drawing PL-A00005.002.


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
ISSUED FOR 60% FEL3

 CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage & vent
lines inside the building. The outside building underground drain and vent
lines shall be with RTR pipes.

 CONTRACTOR shall provide Venting for all fixtures, including Floor Drains.
Venting systems will terminate through the roof with minimal roof
JO/EWO

penetrations.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

TELECOMMUNICATION
 CONTRACTOR shall procure, install, test and commission the two (2)
09/08/16
08/04/16
06/01/16
NO.
REV

12VDC 250W 100-240VAC Power Supply and one (1) Ethernet Access
DISCIPLINE
ENGINEER Switch 24G POE+ 1-slot switch equipped with SFP pluggable 1000Base-LX
C
A

Mini-GBIC Transceivers that support single mode fiber over 1310nm


DATE:
PROJECT
wavelength with LC connector. The 1000Base-LX Mini-GBIC Transceiver
ALL LEADS
ENGINEER
09/08/16
supports 9 micron single mode fiber up to a maximum distance of 10km.
DATE:
 CONTRACTOR shall install Cube IT cabinet to mount the Ethernet Access
A M ALMATROOK
CERTIFIED Switch 24G POE+ 1-slot switch, 12VDC 250W 100-240VAC Power Supply,
09/08/16 fiber optic/UTP copper patch panel and ancillaries.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 The Ethernet Access Switch 24G POE+ 1-slot switch shall be powered from
09/08/16 utility power source and dedicated Rack Mounted UPS systems installed in
DATE: Telecommunication Cabinet (TC).
OPERATIONS
SHAHZAD YAZDANI

09/08/16  CONTRACTOR shall procure, install, test and commission 1 Basic IP


DATE: Phone, 4 Office IP phone, and 1 analog phone.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 CONTRACTOR shall provide the required UTP Cat. 6 Patch Cords for the
EDSD

Data and IP telephone connections.


DATE:

 CONTRACTOR shall supply and install one (1) Distribution patch panel and
BY:

5 outlets for voice and data communication. UTP Cat 6 4-pr x 23 ga. Cable
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

will be used going to each RJ45 modules in each faceplate


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

ELECTRICAL
 For Building electrical scope refer to section 4.15.
5.5. SMOKING SHELTER
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 257


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ARCHITECTURE
ASH
ASH
ASH

CONTRACTOR shall provide a non-air-conditioned smoking shelter with an


LEADS

LEADS
LEADS
ALL

ALL
ALL

approximate area of 09 SM shall be provided in the vicinity of the proposed


Operator Shelter.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

The proposed shelter shall be steel framed structure and single skin steel roof.
DESCRIPTION

For the floor plan refer to drawing # ARA00010.001


ISSUED FOR 60% FEL3

FIRE PROTECTION

 Placement of portable extinguisher in building shall comply with section


906, SAES-M-100.

 Hand-type portable extinguisher shall be mounted in easily accessible


locations at grade. Their location shall be marked in RED in a way that
JO/EWO

will attract attention, and otherwise meet the requirements of NFPA 10,
Chapter 6.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall provide and Install Portable type Fire Extinguisher


09/08/16

inside the Buildings as per Table -1, SAES-B-019.


08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER  CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
C
A

be mounted so that the extinguisher top is not more than 1.5 m above the
DATE:
PROJECT
floor level. Extinguisher units weighing over 18 Kg shall be mounted so
ALL LEADS
ENGINEER that extinguisher top is not more than 1.0 m above the floor level
09/08/16

DATE:
CERTIFIED
 For the proposed Fire Protection layout refer to drawing # FI-A00034-001.
A M ALMATROOK
09/08/16
STRUCTURAL
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  For structural scope refer to section 4.25.
DATE:
OPERATIONS 5.6. FSF SUPPORT BUILDING
SHAHZAD YAZDANI

09/08/16
ARCHITECTURE
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 CONTRACTOR shall provide FSF Support Building of an approximate
area of 50 SM shall be located in-front of the new security gate house.
EDSD

The support facility will be utilized by government security personnel


DATE:

and shall consist of one break room, office, kitchenette, weapon store
BY:

and a toilet.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 The proposed building shall be CMU external wall, concrete frame


structure and concrete roof slab with all utilities and communication
(DCC) NO. _____________________

systems to be provided.

 For the proposed building floor plan refer to drawing # ARA00008-001


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 258


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG The current FSF Support building area is 50 SM as indicated in FSF Layout
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
drawing ARA00008-001. LSTK Contractor shall revise and submit all
affected deliverables based on 50 SM during detail design.
ASH
ASH
ASH

STRUCTURAL
LEADS

LEADS
LEADS
ALL

ALL
ALL

 For structural scope refer to section 4.25.


ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CIVIL
DESCRIPTION

A Preliminary Inspection Checkpoint shall be included in the facility design


ISSUED FOR 60% FEL3

and be provided with in 300 meter front of the bulk plant main gatehouse to
allow preliminary inspection by Facility Security Forces (FSF) government
agency.

 Provide five (5) car parking lots for the FSF people working at the FSF.
Parking stall layout and wheel stop detail and pavement arrows and
cross walk markings shall be in reference as per standard drawing nos.
DD-950107 sheet 001 rev.00 and AD-036512 sheet 001 rev. 00
JO/EWO

respectively. Likewise, miscellaneous parking related work like


installation of parking bumpers etc. shall refer to standard drawing no.
10-02399-

10-02399-
10-02399-
0001

AE-036254-001 sheet 001 rev. no. 05.


0001
0001
DATE


09/08/16
08/04/16
06/01/16

Sunshade shall be provided for armed vehicle and provided with


NO.
REV

DISCIPLINE
concrete pavement.
ENGINEER
C
A

 Additional lane for laid bay to be provided on both sides, entry/exit, in


DATE:
PROJECT
order to minimize traffic flow disturbance.
ALL LEADS
ENGINEER
09/08/16
 Provide 8” diameter RTR pipe, 80FE0D, for sanitary waste from support
DATE:
CERTIFIED
building toilet and shall be connected to sanitary sewer network as
A M ALMATROOK shown on drawing no. CI- A00116 sheet 001.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  Provide 2“diameter RTR pipe, 12FEOU, from water supply network loop
DATE:
to support building toilet as shown on drawing no. CI-A00006 sheet 001.
OPERATIONS
SHAHZAD YAZDANI

09/08/16
FIRE PROTECTION
DATE:
 Placement of portable extinguisher in building shall comply with section
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
906, SAES-M-100.
EDSD

 Hand-type portable extinguisher shall be mounted in easily accessible


DATE:

locations at grade. Their location shall be marked in RED in a way that


BY:

will attract attention, and otherwise meet the requirements of NFPA 10,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Chapter 6.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 Dry chemical extinguisher shall be located on the building exterior of the


control building and electrical substations, near entrance.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 259


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide and Install Portable type Fire Extinguisher
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH inside the Buildings as per Table -1, SAES-B-019.
ASH
ASH

 CONTRACTOR shall install all fire Extinguisher units less than 18 kg


shall be mounted so that the extinguisher top is not more than 1.5 m
LEADS

LEADS
LEADS
ALL

ALL
ALL

above the floor level. Extinguisher units weighing over 18 Kg shall be


mounted so that extinguisher top is not more than 1.0 m above the floor
level
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 For the proposed Fire Protection layout refer to drawing # FI-A00033-


ISSUED FOR 60% FEL3

001

HVAC

 CONTRACTOR shall provide & install Package Air conditioning unit


(PACU-01 Duty) as shown on the HVAC layout drawing HV-A00009-001
and 002.

 CONTRACTOR shall provide & install vibration isolators, flexible


JO/EWO

connections etc. for the HVAC equipment so that the installation is as


per manufacturer’s recommendation.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall provide & install the condensate drain line from
09/08/16
08/04/16
06/01/16

HVAC Equipment up to the nearest drain pit with proper slope and P
NO.
REV

DISCIPLINE trap.
ENGINEER
C
A

DATE:
 CONTRACTOR in general shall provide and install supply and Return
PROJECT GI ductwork with their fiber glass insulation along with supports and all
ALL LEADS
ENGINEER
09/08/16
accessories such as motorized volume damper, volume control
dampers and Air terminal devices as shown on the drawings.
DATE:
CERTIFIED
A M ALMATROOK
 CONTRACTOR shall provide cladding for all externally exposed
09/08/16
DATE: ductwork with 0.9 mm thick Aluminum sheet.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16  CONTRACTOR shall provide and install Exhaust Fans as per the HVAC
DATE: drawings.
OPERATIONS
SHAHZAD YAZDANI

09/08/16  CONTRACTOR shall provide and install a Direct Digital Control Panel
DATE: to sequence the HVAC Equipment and Exhaust Fans along with
necessary field devices such as temperature sensors, transmitters,
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 pressure differential switches, damper actuators, duct smoke detectors


EDSD

and air-flow switches as per the requirements of SAUDI ARAMCO


standards.
DATE:
BY:

 The DDC Panel shall provide following alarms (Audio & visual) as a
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

minimum:
(DCC) NO. _____________________

 Unit Trip Alarm


 Dirty Filter Alarm
 Low Airflow Alarm
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 260


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 High Temperature Alarm
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall provide necessary termination details, interfacing
ASH
ASH
ASH

and wiring details and programming of DDC Panels to initiate alarms


and to sequence or shutdown HVAC Equipment.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
Panel & DCS.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 CONTRACTOR shall provide Common Trouble alarm to DCS.


ISSUED FOR 60% FEL3

 CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
Intake duct as per layout drawing and shall be connected to DDC and
DCS System.

 All necessary installation, pre-commissioning and termination works


shall be undertaken in compliance to SAUDI ARAMCO standards.


JO/EWO

The Testing and Air - Balancing requirements shall be provided for the
building as per the SAES-K-001 through an independent 3rd Party
CONTRACTOR approved by SAUDI ARAMCO.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall ensure that all HVAC Equipment selected for the
09/08/16
08/04/16
06/01/16

project are as per the EER requirements tabulated under Chapter 7 of


NO.
REV

DISCIPLINE SAES-K-001.
ENGINEER
C
A

DATE:
PLUMBING
PROJECT
ALL LEADS
ENGINEER
09/08/16 WATER SUPPLY SYSTEM
DATE:
CERTIFIED  CONTRACTOR shall provide and install complete water distribution
A M ALMATROOK
09/08/16
piping system to serve toilet fixtures, Lavatories, Janitor sinks of the
DATE: building. The water supply system shall provide both Cold and Hot
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
water requirements to the building utility areas. For water supply layout,
09/08/16 refer to drawing PL-A00007.001.
DATE:
OPERATIONS
SHAHZAD YAZDANI
 CONTRACTOR shall provide and install hose bib with vacuum breaker
09/08/16 within close proximity of PACU unit for periodic washing.
DATE:
 CONTRACTOR shall ensure that the installation of water supply system
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 shall be in accordance with SAUDI ARAMCO Engineering Standards


EDSD

(SAES-S-060) and Uniform Plumbing Code (UPC).


DATE:
BY:

 CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot
water above ground pipes and CPVC Schedule 80 Pipe for the below
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ground water supply pipes. The hot water pipes shall be provided with
closed cell fiberglass insulation of density 64 kg/m3.
(DCC) NO. _____________________

 Domestic hot water will be generated by point of use water heaters.


Point of use or “instantaneous” types will be provided for remote, single
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 261


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG fixture applications and will be mounted on the wall below the fixture
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH being served.
ASH
ASH

 CONTRACTOR shall provide tie –in to the building water supply lines
along with standard accessories such as Isolation valves and back flow
LEADS

LEADS
LEADS
ALL

ALL
ALL

preventer. For details regarding the building tie-ins relevant civil


drawings shall be referred.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

DRAIN & VENT SYSTEM


DESCRIPTION
ISSUED FOR 60% FEL3

 CONTRACTOR shall provide and install complete drainage system


including their piping, fittings, vents and fixtures. The design of
drainage system shall be in accordance with SAUDI ARAMCO
Engineering Standards (SAES-S-060) and Uniform Plumbing Code
(UPC). For drain and vent layout, refer to drawing PL-A00007-002

 CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage &
vent lines inside the building. The outside building underground drain
and vent lines shall be with RTR pipes.
JO/EWO

 CONTRACTOR shall provide Venting for all fixtures, including Floor


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Drains. Venting systems will terminate through the roof with minimal
roof penetrations.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE TELECOMMUNICATION
ENGINEER
 CONTRACTOR shall procure, install, test and commission 1 analog
C
A

DATE:
phone.
PROJECT
ALL LEADS
ENGINEER
09/08/16

DATE:
CERTIFIED
A M ALMATROOK  CONTRACTOR shall provide this building 1 outlet for voice
09/08/16
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to
DATE:
CONSTRUCTION
AMR EL SHARKAWY each RJ45 modules in each faceplate outlets.
AGENCY
09/08/16

DATE: ELECTRICAL
OPERATIONS
SHAHZAD YAZDANI  For Building electrical scope refer to section 4.15.
09/08/16 5.7. RECEIVING SUBSTATION
DATE:
ARCHITECTURE
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

 CONTRACTOR shall provide a Receiving Substation Building of an


DATE:
BY:

approximate area of 798 SM which shall be provided to accommodate


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

switch gear, GIS room, battery room and mechanical room.


THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 The proposed building shall be precast concrete external wall, precast


concrete frame structure and precast concrete roof slab with all utilities and
communication systems to be provided.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 262


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
 For the proposed building floor plan refer to drawing # ARA00003-001
ASH
ASH
LEADS

CIVIL
LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide 8” RTR pipe, IFE0U oily water sewer


connection from Transformer yard to OWS system.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 CONTRACTOR shall provide standard sealed catch basin in transformer


ISSUED FOR 60% FEL3

yard and diked retention area to content spillage from transformers.

 CONTRACTOR shall provide neutralization Pit collecting discharge water


from battery room. The discharge water from neutralization pit shall be
connected to OWS system.

 CONTRACTOR shall provide 2” RTR pipe, IFE0U water supply to battery


JO/EWO

room.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall provide SAUDI ARAMCO General Purpose Fence


type IV around transformer yard. CONTRACTOR shall provide 2 nos.
09/08/16
08/04/16
06/01/16

1.20m wide walk gate and one 4.0m wide drive gate.
NO.
REV

DISCIPLINE
ENGINEER
STRUCTURAL
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER
 For structural scope refer to section 4.25.
09/08/16

DATE:
HVAC
CERTIFIED
A M ALMATROOK
09/08/16  CONTRACTOR shall provide & install Air Handling Units (AHU-01 Duty &
DATE: AHU-02 Standby) inside Mechanical Room. These Air Handling Units
CONSTRUCTION
AMR EL SHARKAWY
AGENCY (AHU-01 & AHU-02) are connected to their corresponding outdoor
09/08/16 Condensing units – ACCU-01 & ACCU-02 through refrigerant pipes
DATE: between these units as indicated on the HVAC Layout and route these
OPERATIONS
SHAHZAD YAZDANI pipes inside the trench from Condensing unit to the Mechanical Room. For
09/08/16 HVAC layout, refer to drawing HV-A00003.001 & 002.
DATE:
 CONTRACTOR shall provide & install vibration isolators, flexible
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 connections etc. for the HVAC equipment so that the installation is as per
EDSD

manufacturer’s recommendation.
DATE:
BY:

 CONTRACTOR shall provide and install bleed air fan and inertial filter and
fresh air intake stack at the fresh air system.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 CONTRACTOR shall provide & install vibration isolators, flexible


(DCC) NO. _____________________

connections etc. for the HVAC equipment so that the installation is as per
manufacturer’s recommendation.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 263


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide & install the condensate drain line from
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH HVAC Equipment up to the nearest drain pit with proper slope and P trap.
ASH
ASH

 CONTRACTOR in general shall provide and install supply and Return GI


ductwork with their fiber glass insulation along with supports and all
LEADS

LEADS
LEADS
ALL

ALL
ALL

accessories such as motorized volume dampers, fire& smoke dampers,


backdraft dampers, volume control dampers and Air terminal devices as
shown on the Layout drawings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 CONTRACTOR shall provide cladding for all externally exposed ductwork


ISSUED FOR 60% FEL3

with 0.9mm thick Aluminum sheet.

 CONTRACTOR shall provide and install Exhaust Fans for battery room as
per the HVAC drawings.

 CONTRACTOR shall provide Explosion Proof motor for the Battery Room
Exhaust fans. Stainless steel ductwork & accessories shall be provided
inside Battery Room.
JO/EWO

 Fire & Smoke Dampers shall be installed on all fire rated walls and these
fire dampers shall be manufactured according to UL 555 & UL555S
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

standard and shall bear a seal from UL.


09/08/16
08/04/16
06/01/16

 CONTRACTOR shall provide and install a Direct Digital Control Panel to


NO.
REV

DISCIPLINE sequence the HVAC Equipment and Exhaust Fans along with necessary
ENGINEER
field devices such as temperature sensors, transmitters, pressure
C
A

DATE:
differential switches, damper actuators, duct smoke detectors and air-flow
PROJECT switches as per the requirements of SAUDI ARAMCO standards.
ALL LEADS
ENGINEER
09/08/16
 The DDC Panel shall provide following alarms (Audio & visual) as a
DATE:
CERTIFIED minimum:
 Unit Trip Alarm
A M ALMATROOK
09/08/16
DATE:  Dirty Filter Alarm
CONSTRUCTION
AMR EL SHARKAWY
AGENCY  Low Airflow Alarm
09/08/16
 High Temperature Alarm
DATE:
OPERATIONS
SHAHZAD YAZDANI  CONTRACTOR shall provide necessary termination details, interfacing
09/08/16 and wiring details and programming of DDC Panels to initiate alarms and
DATE: to sequence or shutdown HVAC Equipment.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
EDSD

Panel & DCS.


DATE:
BY:

 CONTRACTOR shall provide wiring for the high Temperature alarms


REVISIONCERTIFICATION

emanating from Battery Room to DCS for alarm and to provide interfacing
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

between battery charger and battery room exhaust fans to trip the high
(DCC) NO. _____________________

rate battery charge in case of failure of HVAC Equipment.

 CONTRACTOR shall provide high temperature alarm, common trouble


alarm to DCS.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 264


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
Intake duct as per layout drawing and shall be connected to DDC and DCS
ASH
ASH
ASH

System.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 All necessary installation, pre-commissioning and termination works shall


be undertaken in compliance to SAUDI ARAMCO standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 The Testing and Air - Balancing requirements shall be provided for the
DESCRIPTION

building as per the SAES-K-001 through an independent 3rd Party


ISSUED FOR 60% FEL3

CONTRACTOR approved by SAUDI ARAMCO.

 CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
SAES-K-001.

PLUMBING

WATER SUPPLY SYSTEM


JO/EWO
10-02399-


10-02399-

CONTRACTOR shall provide and install complete water distribution piping


10-02399-
0001

0001
0001
DATE

system to serve eye wash and shower station. For water supply layout,
refer to drawing PL-A00003-001.
09/08/16
08/04/16
06/01/16
NO.
REV


DISCIPLINE
ENGINEER
 CONTRACTOR shall provide and install hose bib with vacuum breaker
within close proximity of ACCU and AHU unit for periodic washing.
C
A

DATE:
PROJECT
ALL LEADS
ENGINEER  CONTRACTOR shall ensure that the installation of water supply system
09/08/16 shall be in accordance with SAUDI ARAMCO Engineering Standards
DATE: (SAES-S-060) and Uniform Plumbing Code (UPC).
CERTIFIED
A M ALMATROOK
09/08/16  CONTRACTOR shall use PVC Schedule 80 Pipe for water supply of
DATE: above ground pipes and CPVC Schedule 80 Pipe for the below ground
CONSTRUCTION
AMR EL SHARKAWY
AGENCY water supply pipes..
09/08/16

DATE:  CONTRACTOR shall provide tie –in to the building water supply lines
OPERATIONS
SHAHZAD YAZDANI along with standard accessories such as Isolation valves and back flow
09/08/16 preventer. For details regarding the building tie- in relevant civil drawings
DATE: shall be referred.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
DRAIN & VENT SYSTEM
EDSD

DATE:

 CONTRACTOR shall provide and install complete drainage system


BY:

including their piping, fittings, vents and fixtures. The design of drainage
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

system shall be in accordance with SAUDI ARAMCO Engineering


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Standards (SAES-S-060) and Uniform Plumbing Code (UPC). For drain


(DCC) NO. _____________________

and vent layout, refer to drawing PL-A00003-002.


REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 265


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage & vent
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lines inside the building. The outside building underground drain and vent
lines shall be with RTR pipes.
ASH
ASH
ASH

 CONTRACTOR shall provide and install Floor Drains with vented deep
LEADS

LEADS
LEADS
ALL

ALL
ALL

seal traps for battery rooms and mechanical rooms. All Mechanical Room
shall be provided with Floor Drains complete in place with Funnel and
Strainer assembly.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

 CONTRACTOR shall provide Venting for all fixtures, including Floor


ISSUED FOR 60% FEL3

Drains. Venting systems will terminate through the roof with minimal roof
penetrations.

 CONTRACTOR shall provide seal trapped and vented floor drains in


Battery rooms to serve emergency shower and eye wash fixtures Drain,
waste and vent piping shall be acid resistant type and shall be
independent of other drainage systems.

 CONTRACTOR shall provide piping for waste to an acid neutralization


JO/EWO

tank in a readily accessible location just outside the facility. Venting serving
the acid waste system shall be extended to roof terminations through acid
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

resistant piping and shall be dedicated to the acid waste system according
to SAUDI ARAMCO Standards.
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
ENGINEER FIRE PROTECTION
C
A

DATE:
PROJECT  Placement of portable extinguisher in building shall comply with section
ALL LEADS
ENGINEER
09/08/16
906, SAES-M-100.
DATE:
CERTIFIED  Hand-type portable extinguisher shall be mounted in easily accessible
A M ALMATROOK
locations at grade. Their location shall be marked in RED in a way that will
09/08/16
DATE:
attract attention, and otherwise meet the requirements of NFPA 10,
CONSTRUCTION
AMR EL SHARKAWY Chapter 6.
AGENCY
09/08/16

DATE:
 Dry chemical extinguisher shall be located on the building exterior of the
OPERATIONS
SHAHZAD YAZDANI
control building and electrical substations, near entrance.
09/08/16

DATE:
 Carbon dioxide (CO2) extinguisher shall be located inside control room
building and electrical substation.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
EDSD

 In electrical substations, switchgear rooms, motor control centers, GOSP


control rooms, and PIBs, install two fire blankets and one basket type litter
DATE:
BY:

as required by SAES-B-014.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

Provide water spray system in accordance with NFPA 15 for Transformer,


BY DRAWING COMPLETION CERTIFICATE

refer to Fire Protection Dwg FIA00032-003.


(DCC) NO. _____________________

 All Fire Protection Equipment and Appurtenances shall be purchased as


specified in the SAUDI ARAMCO Materials System and SAES-U-101
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 266


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide and Install Portable type Fire Extinguisher
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH inside the Buildings as per Table -1, SAES-B-019.
ASH
ASH

 CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
LEADS

LEADS
LEADS
ALL

ALL
ALL

floor level. Extinguisher units weighing over 18 Kg shall be mounted so


that extinguisher top is not more than 1.0 m above the floor level.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 For the proposed Fire Protection layout refer to drawing # FI-A00032-001


DESCRIPTION
ISSUED FOR 60% FEL3

TELECOMMUNICATION

 CONTRACTOR shall procure, install, test and commission the two (2)
12VDC 250W 100-240VAC Power Supply and one (1) Ethernet Access
Switch 24G POE+ 1-slot switch equipped with SFP pluggable 1000Base-
LX Mini-GBIC Transceivers that support single mode fiber over 1310nm
wavelength with LC connector. The 1000Base-LX Mini-GBIC Transceiver
supports 9 micron single mode fiber up to a maximum distance of 10km.
JO/EWO

 CONTRACTOR shall install Cube IT Rack to mount the Ethernet Access


Switch 24G POE+ 1-slot switch, 12VDC 250W 100-240VAC Power
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

Supply, fiber optic/UTP copper patch panel and ancillaries.


09/08/16
08/04/16
06/01/16

 The Ethernet Access Switch 24G POE+ 1-slot switch shall be powered
NO.
REV

DISCIPLINE from utility power source and UPS.


ENGINEER
C
A

DATE:
 CONTRACTOR shall procure, install, test and commission 3 IP phones.
PROJECT
ALL LEADS
ENGINEER
09/08/16
 CONTRACTOR shall provide this building 3 outlets for voice
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
DATE:
CERTIFIED RJ45 modules in each faceplate outlets.
A M ALMATROOK
09/08/16
DATE:  CONTRACTOR shall provide outlet at the PSA cabinet to terminate one
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
VOIP telephone. One wall outlet shall also be provided for PSA
09/08/16 requirement.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16  Redundant fiber cable to rack room of new operation building shall be
DATE: provided by the CONTRACTOR. In the Substation, separate entrance
facility for the fiber cable and separate cube IT cabinet shall be provided
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 for the PSA


EDSD

DATE:
BY:

ELECTRICAL
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

For Building electrical scope refer to section 4.15.


(DCC) NO. _____________________

5.8. UTILITY POWER SUBSTATION

ARCHITECTURE
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 267


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall provide Utility Power Substation Building of an
approximate area of 473 SM which shall be provided to accommodate
ASH
ASH
ASH

switch gear, battery room and mechanical room.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 The proposed building shall be precast concrete external wall, precast


concrete frame structure and precast concrete roof slab with all utilities and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

communication systems to be provided.


DESCRIPTION
ISSUED FOR 60% FEL3

 For the proposed building floor plan refer to drawing # ARA00003-003

CIVIL

 CONTRACTOR shall provide 8” RTR pipe, IFE0U oily water sewer


connection from Transformer yard to OWS system.

 CONTRACTOR shall provide standard sealed catch basin in transformer


JO/EWO

yard.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall provide neutralization Pit collecting discharge water


from battery room. The discharge water from neutralization pit shall be
09/08/16
08/04/16
06/01/16
NO.
REV

connected to OWS system.


DISCIPLINE
ENGINEER
C
A

 CONTRACTOR shall provide 2” RTR pipe, IFE0U water supply to battery


DATE:
PROJECT room.
ALL LEADS
ENGINEER
09/08/16

DATE:
 CONTRACTOR shall provide SAUDI ARAMCO General Purpose Fence
A M ALMATROOK
CERTIFIED type IV around transformer yard. CONTRACTOR shall provide 2 nos.
09/08/16 1.20m wide walk gate and one 4.0m wide drive gate.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
STRUCTURAL


DATE:
OPERATIONS
For structural scope refer to section 4.25.
SHAHZAD YAZDANI

09/08/16

DATE:
HVAC
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 CONTRACTOR shall provide & install Air Handling Units (AHU-01 Duty &
EDSD

AHU-02 Standby) inside Mechanical Room. These Air Handling Units


DATE:
BY:

(AHU-01 & AHU-02) are connected to their corresponding outdoor


Condensing units – ACCU-01 & ACCU-02 through refrigerant pipes
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

between these units as indicated on the HVAC Layout and route these
(DCC) NO. _____________________

pipes inside the trench from Condensing unit to the Mechanical Room. For
HVAC layout, refer to drawing HV-A00004.001 & 002.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 268


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide & install vibration isolators, flexible
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
connections etc. for the HVAC equipment so that the installation is as per
ASH

manufacturer’s recommendation.
ASH
LEADS

LEADS
LEADS
ALL

ALL


ALL

CONTRACTOR shall provide and install bleed air fan and inertial filter and
fresh air intake stack at the fresh air system.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall provide & install vibration isolators, flexible


DESCRIPTION

connections etc. for the HVAC equipment so that the installation is as per
ISSUED FOR 60% FEL3

manufacturer’s recommendation.

 CONTRACTOR shall provide & install the condensate drain line from HVAC
Equipment up to the nearest drain pit with proper slope and P trap.

 CONTRACTOR in general shall provide and install supply and Return GI


ductwork with their fiber glass insulation along with supports and all
JO/EWO

accessories such as motorized volume dampers, fire& smoke dampers,


backdraft dampers, volume control dampers and Air terminal devices as
10-02399-

10-02399-
10-02399-

shown on the Layout drawings.


0001

0001
0001
DATE

09/08/16
08/04/16
06/01/16

 CONTRACTOR shall provide cladding for all externally exposed ductwork


NO.
REV

DISCIPLINE with 0.9mm thick Aluminum sheet.


ENGINEER
C
A

DATE:  CONTRACTOR shall provide and install Exhaust Fans for battery room as
PROJECT
ALL LEADS
ENGINEER per the HVAC drawings.
09/08/16

DATE:
CERTIFIED
 CONTRACTOR shall provide Explosion Proof motor for the Battery Room
A M ALMATROOK
Exhaust fans. Stainless steel ductwork & accessories shall be provided
09/08/16
DATE: inside Battery Room.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
 Fire & Smoke Dampers shall be installed on all fire rated walls and these
DATE:
fire dampers shall be manufactured according to UL 555 & UL555S
OPERATIONS
SHAHZAD YAZDANI
standard and shall bear a seal from UL.
09/08/16

DATE:
 CONTRACTOR shall provide and install a Direct Digital Control Panel to
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 sequence the HVAC Equipment and Exhaust Fans along with necessary
EDSD

field devices such as temperature sensors, transmitters, pressure


DATE:

differential switches, damper actuators, duct smoke detectors and air-flow


BY:

switches as per the requirements of SAUDI ARAMCO standards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 The DDC Panel shall provide following alarms (Audio & visual) as a
(DCC) NO. _____________________

minimum:
 Unit Trip Alarm
 Dirty Filter Alarm
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 269


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Low Airflow Alarm
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
 High Temperature Alarm
ASH
ASH

 CONTRACTOR shall provide necessary termination details, interfacing and


LEADS

LEADS
LEADS
ALL

ALL
ALL

wiring details and programming of DDC Panels to initiate alarms and to


sequence or shutdown HVAC Equipment.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
DESCRIPTION

Panel & DCS.


ISSUED FOR 60% FEL3

 CONTRACTOR shall provide wiring for the high Temperature alarms


emanating from Battery Room to DCS for alarm and to provide interfacing
between battery charger and battery room exhaust fans to trip the high rate
battery charge in case of failure of HVAC Equipment.

 CONTRACTOR shall provide high temperature alarm, common trouble


JO/EWO

alarm to DCS.
10-02399-

10-02399-
10-02399-

 CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
0001

0001
0001
DATE

Intake duct as per layout drawing and shall be connected to DDC and DCS
09/08/16
08/04/16
06/01/16

System.
NO.
REV

DISCIPLINE
ENGINEER
 All necessary installation, pre-commissioning and termination works shall
C
A

DATE: be undertaken in compliance to SAUDI ARAMCO standards.


PROJECT
ALL LEADS
ENGINEER
09/08/16
 The Testing and Air - Balancing requirements shall be provided for the
DATE:
CERTIFIED
building as per the SAES-K-001 through an independent 3rd Party
A M ALMATROOK
CONTRACTOR approved by SAUDI ARAMCO.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 CONTRACTOR shall ensure that all HVAC Equipment selected for the
09/08/16
project are as per the EER requirements tabulated under Chapter 7 of
DATE: SAES-K-001.
OPERATIONS
SHAHZAD YAZDANI

09/08/16
PLUMBING
DATE:
CONTROL NUMBER

ALI H GHAMDI
WATER SUPPLY SYSTEM
VERIFICATION

09/08/16
EDSD

 CONTRACTOR shall provide and install complete water distribution piping


DATE:

system to serve eye wash and shower station. For water supply layout,
BY:

refer to drawing PL-A00004-001.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

 CONTRACTOR shall provide and install hose bib with vacuum breaker
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

within close proximity of ACCU and AHU unit for periodic washing.
(DCC) NO. _____________________

 CONTRACTOR shall ensure that the installation of water supply system


shall be in accordance with SAUDI ARAMCO Engineering Standards
(SAES-S-060) and Uniform Plumbing Code (UPC).
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 270


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall use PVC Schedule 80 Pipe for water supply of above
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ground pipes and CPVC Schedule 80 Pipe for the below ground water
ASH

supply pipes.
ASH

 CONTRACTOR shall provide tie –in to the building water supply lines along
LEADS

LEADS
LEADS
ALL

ALL
ALL

with standard accessories such as Isolation valves and back flow preventer.
For details regarding the building tie- in relevant civil drawings shall be
referred.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

DRAIN & VENT SYSTEM


ISSUED FOR 60% FEL3

 CONTRACTOR shall provide and install complete drainage system


including their piping, fittings, vents and fixtures. The design of drainage
system shall be in accordance with SAUDI ARAMCO Engineering
Standards (SAES-S-060) and Uniform Plumbing Code (UPC). For drain
and vent layout, refer to drawing PL-A00004-002.
 CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage & vent
JO/EWO

lines inside the building. The outside building underground drain and vent
lines shall be with RTR pipes.
10-02399-

10-02399-
10-02399-

 CONTRACTOR shall provide and install Floor Drains with vented deep seal
0001

0001
0001
DATE

traps for battery rooms and mechanical rooms. All Mechanical Room shall
09/08/16
08/04/16
06/01/16

be provided with Floor Drains complete in place with Funnel and Strainer
NO.
REV

DISCIPLINE assembly.
ENGINEER
 CONTRACTOR shall provide Venting for all fixtures, including Floor Drains.
C
A

DATE: Venting systems will terminate through the roof with minimal roof
PROJECT
ALL LEADS
ENGINEER penetrations.
09/08/16  CONTRACTOR shall provide seal trapped and vented floor drains in
DATE: Battery rooms to serve emergency shower and eye wash fixtures Drain,
CERTIFIED
A M ALMATROOK waste and vent piping shall be acid resistant type and shall be independent
09/08/16
DATE: of other drainage systems.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
 CONTRACTOR shall provide piping for waste to an acid neutralization tank
09/08/16
in a readily accessible location just outside the facility. Venting serving the
DATE: acid waste system shall be extended to roof terminations through acid
OPERATIONS
SHAHZAD YAZDANI
resistant piping and shall be dedicated to the acid waste system according
09/08/16
to SAUDI ARAMCO Standards.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

FIRE PROTECTION
09/08/16
EDSD

 Placement of portable extinguisher in building shall comply with section


DATE:

906, SAES-M-100.
BY:

 Hand-type portable extinguisher shall be mounted in easily accessible


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

locations at grade. Their location shall be marked in RED in a way that will
(DCC) NO. _____________________

attract attention, and otherwise meet the requirements of NFPA 10, Chapter
6.
 Dry chemical extinguisher shall be located on the building exterior of the
REVISION

control building and electrical substations, near entrance.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 271


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 Carbon dioxide (CO2) extinguisher shall be located inside control room
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
building and electrical substation.

ASH

In electrical substations, switchgear rooms, motor control centers, GOSP


ASH

control rooms, and PIBs, install two fire blankets and one basket type litter
LEADS

LEADS
LEADS
ALL

ALL
ALL

as required by SAES-B-014.
 Provide water spray system in accordance with NFPA 15 since this
substation is considered critical.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 All Fire Protection Equipment and Appurtenances shall be purchased as


DESCRIPTION

specified in the SAUDI ARAMCO Materials System and SAES-U-101


ISSUED FOR 60% FEL3

 CONTRACTOR shall provide and Install Portable type Fire Extinguisher


inside the Buildings as per Table -1, SAES-B-019.
 CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
extinguisher top is not more than 1.0 m above the floor level.
 For the proposed Fire Protection layout refer to drawing # FI-A00032-002.
JO/EWO

TELECOMMUNICATION
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall procure, install, test and commission the two (2)
12VDC 250W 100-240VAC Power Supply and one (1) Ethernet Access
09/08/16
08/04/16
06/01/16
NO.
REV

DISCIPLINE
Switch 24G POE+ 1-slot switch equipped with SFP pluggable 1000Base-LX
ENGINEER Mini-GBIC Transceivers that support single mode fiber over 1310nm
C
A

DATE:
wavelength with LC connector. The 1000Base-LX Mini-GBIC Transceiver
PROJECT
ALL LEADS
ENGINEER
supports 9 micron single mode fiber up to a maximum distance of 10km.
09/08/16  CONTRACTOR shall install Cube IT Rack to mount the Ethernet Access
DATE: Switch 24G POE+ 1-slot switch, 12VDC 250W 100-240VAC Power Supply,
CERTIFIED
A M ALMATROOK fiber optic/UTP copper patch panel and ancillaries.
DATE:
09/08/16
 The Ethernet Access Switch 24G POE+ 1-slot switch shall be powered from
CONSTRUCTION
AMR EL SHARKAWY utility power source and UPS.
AGENCY
09/08/16  CONTRACTOR shall procure, install, test and commission 4 IP phones.
DATE:  CONTRACTOR shall provide this building 2 outlets for voice
OPERATIONS
SHAHZAD YAZDANI communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
09/08/16
RJ45 modules in each faceplate outlets.
DATE:
 CONTRACTOR shall provide outlet at the PSA cabinet to terminate one
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 VOIP telephone. One wall outlet shall also be provided for PSA
EDSD

requirement.
 Redundant fiber cable to rack room of new operation building shall be
DATE:
BY:

provided by the CONTRACTOR. In the Substation, separate entrance


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

facility for the fiber cable and separate cube IT cabinet shall be provided for
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

the PSA.
(DCC) NO. _____________________

 Redundant and separate 12 core fiber cable (separate for Control System
and Communication) from Utility Substation in YDH to Relay Room of
MARAFIQ Substation 91 shall be provided by the CONTRACTOR. In
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 272


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Substation 91, wall mounted fiber patch panel shall be provided by the
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH CONTRACTOR
ASH
ASH

ELECTRICAL
LEADS

LEADS
LEADS
ALL

ALL
ALL

For Building electrical scope refer to section 4.15.


ISSUED FOR 100% PROJECT PROPOSAL

5.9. ENGINEERING & MAINTENANCE (E & M) BUILDING


ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

CIVIL
ISSUED FOR 60% FEL3

 Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste from this
building toilet sanitary pipe and shall be connected to sanitary sewer
network then heading to the sanitary lift station area. These will include
the provision of sanitary manholes, cleanouts and other fixtures.

 Provide 2” diameter RTR pipe, 1FE0U water supply to all toilet and wash
area.
JO/EWO

 Provide concrete sidewalks as required around Building as shown site


10-02399-

10-02399-
10-02399-

development plan. The sidewalk shall be 100mm thick concrete provided


0001

0001
0001
DATE

with 150x150xMW9xMW9 welded wire fabric (WWF) and shall be in


accordance, as applicable, as per SAUDI ARAMCO Standard drawing no.
09/08/16
08/04/16
06/01/16
NO.
REV

AB-036260 sheet 001 rev. 05.


DISCIPLINE
ENGINEER
 CONTRACTOR shall provide neutralization Pit collecting discharge water
C
A

DATE: from battery room. The discharge water from neutralization pit shall be
PROJECT
ALL LEADS
ENGINEER connected to OWS system.
09/08/16

DATE:  CONTRACTOR shall provide 8” RTR pipe, IFE0U oily water sewer
CERTIFIED
A M ALMATROOK connection from Workshop room to OWS system.
09/08/16
DATE:
CONSTRUCTION
FIRE PROTECTION
AMR EL SHARKAWY
AGENCY
09/08/16
 Placement of portable extinguisher in building shall comply with section
DATE:
906, SAES-M-100.
OPERATIONS
SHAHZAD YAZDANI

09/08/16
 Hand-type portable extinguisher shall be mounted in easily accessible
DATE:
locations at grade. Their location shall be marked in RED in a way that will
CONTROL NUMBER

ALI H GHAMDI
attract attention, and otherwise meet the requirements of NFPA 10,
VERIFICATION

09/08/16
Chapter 6.
EDSD

DATE:

 Dry chemical extinguisher shall be located on the building exterior of the


BY:

control building and electrical substations, near entrance.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Carbon dioxide (CO2) extinguisher shall be located inside control room


(DCC) NO. _____________________

building and electrical substation.

 CONTRACTOR shall provide and Install Portable type Fire Extinguisher


REVISION

inside the Buildings as per Table -1, SAES-B-019.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 273


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
ASH
ASH
ASH

floor level. Extinguisher units weighing over 18 Kg shall be mounted so


that extinguisher top is not more than 1.0 m above the floor level.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide Fire Hose Cabinets System with all Piping,
Fittings, Cabinets, Gate Vales, Y-Strainers as per NFPA and as shown on
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

proposed Fire Protection drawings.


DESCRIPTION


ISSUED FOR 60% FEL3

For the proposed Fire Protection layout refer to drawing # FI-A00028-001


& FIA00028-002

ARCHITECTURE

 CONTRACTOR Shall provide a two story E and M building of


approximately 1343 SM near the main gate of the YDH The building shall
include the required offices for engineering and maintenance personnel,
maintenance workshop, electrical room, mechanical room, telecom room,
JO/EWO

battery room, E-learning room, library, meeting room, break room, store,
locker room, tea room and toilets. The building will accommodate a total of
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

23 employees per shift based on the required manpower for YDH.


09/08/16
08/04/16
06/01/16

 The proposed building shall be CMU external wall, concrete frame


NO.
REV

DISCIPLINE structure and concrete roof slab, with all utilities and communication
ENGINEER systems to be provided. For the proposed building floor plans refer to
C
A

drawings # ARA00001-001 and ARA00001.002.


DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
STRUCTURAL
DATE:
CERTIFIED
A M ALMATROOK  For structural scope refer to section 4.25.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 HVAC
DATE:
OPERATIONS  CONTRACTOR shall provide & install Air Handling Units (AHU-01 Duty &
SHAHZAD YAZDANI

09/08/16
AHU-02 Standby) inside Mechanical Room on Ground Floor to serve the
offices and essential service rooms provided on the ground floor and first
DATE:
floor. These Air Handling Units (AHU-01 & AHU-02) are connected to their
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
corresponding outdoor Condensing units ACCU-01 & ACCU-02 through
EDSD

refrigerant pipes between these units as indicated on the HVAC Layout


and route these pipes inside the trench from Condensing unit to the
DATE:

Mechanical Room. For HVAC layout, refer to drawing HV-A00001-001 to


BY:

004.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 CONTRACTOR shall provide & install Package Air Conditioning Unit


(DCC) NO. _____________________

(PACU-01 Duty) located outdoor to serve the Workshop.

 CONTRACTOR shall provide & install humidifiers inside the common


REVISION

supply duct of Air Handling Units (AHU-01 & AHU-02) in order to meet
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 274


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG design comfort humidity requirements and humidity control requirements of
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Telecom rooms (GF & FF).
ASH
ASH

 CONTRACTOR shall provide and install Fresh Air Stack complete with all
accessories at locations shown on the HVAC layout drawings.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide and install inertial filter and Bleed fan to
remove sand particles in Fresh Air before the duct work is connected to the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Air Handling Units.


DESCRIPTION


ISSUED FOR 60% FEL3

CONTRACTOR shall provide and install sand trap louver for the fresh air
intake of PACU unit.

 CONTRACTOR shall provide & install ceiling mounted split type HVAC unit
as standby serving the Telecom Rooms (FCU-01/ACCU-01 and FCU-
02/ACCU-02 for Telecom Room GF and FCU-03/ACCU-03 for Telecom
Room FF) respectively along with interconnecting refrigerant pipes and
ductwork to serve these rooms.
JO/EWO

 CONTRACTOR shall provide & install vibration isolators, flexible


connections etc. for the HVAC equipment so that the installation is as per
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

manufacturer’s recommendation.
09/08/16
08/04/16
06/01/16

 CONTRACTOR shall provide & install the condensate drain line from
NO.
REV

DISCIPLINE HVAC Equipment up to the nearest drain pit with proper slope and P trap.
ENGINEER
C
A

DATE:
 CONTRACTOR in general shall provide and install supply and Return GI
PROJECT ductwork with their fiber glass insulation along with supports and all
ALL LEADS
ENGINEER
09/08/16
accessories such as motorized volume dampers, fire/smoke dampers,
backdraft dampers, volume control dampers and air terminal devices as
DATE:
CERTIFIED shown on the drawings.
A M ALMATROOK
09/08/16
DATE:  CONTRACTOR shall provide and Install VAV terminal units with Heaters
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
for the office areas as mentioned in the HVAC Layouts to maintain the
09/08/16 comfort conditions.
DATE:
OPERATIONS
SHAHZAD YAZDANI
 CONTRACTOR shall provide and install Exhaust fans for the Battery
09/08/16 Room with explosion proof motor. Stainless steel ductwork & accessories
DATE:
shall be provided inside Battery Room.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  CONTRACTOR shall provide cladding for all externally exposed ductwork
EDSD

with 0.9 mm thick Aluminum sheet.


DATE:
BY:

 CONTRACTOR shall provide and install Exhaust Fans for the Toilet, Tea
room and Lunch room as per the HVAC drawings.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Fire & Smoke Dampers shall be installed on all fire rated walls and these
(DCC) NO. _____________________

fire & smoked dampers shall be manufactured according to UL555 &


UL555S standard and shall bear a seal from UL.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 275


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide and install a Direct Digital Control Panel to
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
sequence the HVAC Equipment and Exhaust Fans along with necessary
field devices such as temperature sensors, transmitters, pressure
ASH
ASH
ASH

differential switches, damper actuators, duct smoke detectors and air-flow


switches as per the requirements of SAUDI ARAMCO standards.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 The DDC Panel shall provide following alarms (Audio & visual) as a
minimum:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 Unit Trip Alarm


DESCRIPTION

 Dirty Filter Alarm


ISSUED FOR 60% FEL3

 Low Airflow Alarm


 High Temperature Alarm

 CONTRACTOR shall provide necessary termination details, interfacing


and wiring details and programming of DDC Panels to initiate alarms and
to sequence or shutdown HVAC Equipment.

 CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
JO/EWO

Panel & DCS.


10-02399-

CONTRACTOR shall provide wiring for the high Temperature alarms


10-02399-
10-02399-
0001

0001
0001
DATE

emanating from Battery Room to DCS for alarm and to provide interfacing
between battery charger and battery room exhaust fans to trip the high
09/08/16
08/04/16
06/01/16

rate battery charge in case of failure of HVAC Equipment.


NO.
REV

DISCIPLINE
ENGINEER
 CONTRACTOR shall provide high temperature alarm, common trouble
C
A

DATE: alarm to DCS.


PROJECT
ALL LEADS
ENGINEER
09/08/16  CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
DATE:
Intake duct as per layout drawing and shall be connected to DDC and DCS
A M ALMATROOK
CERTIFIED System.
09/08/16
DATE:  All necessary installation, pre-commissioning and termination works shall
CONSTRUCTION
AMR EL SHARKAWY
AGENCY be undertaken in compliance to SAUDI ARAMCO standards.
09/08/16

DATE:  The Testing and Air - Balancing requirements shall be provided for the
OPERATIONS
SHAHZAD YAZDANI building as per the SAES-K-001 through an independent 3rd Party
09/08/16 CONTRACTOR approved by SAUDI ARAMCO.
DATE:

 CONTRACTOR shall ensure that all HVAC Equipment selected for the
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 project are as per the EER requirements tabulated under Chapter 7 of
EDSD

SAES-K-001.
DATE:
BY:

PLUMBING
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

WATER SUPPLY SYSTEM


(DCC) NO. _____________________

 CONTRACTOR shall provide and install complete water distribution piping


system to serve toilet fixtures, Lavatories, Janitor sinks & Eye wash and
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 276


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Shower of the building. The water supply system shall provide both Cold
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and Hot water requirements to the building utility areas. For water supply
layout, refer to drawing PL-A00001-001.
ASH
ASH
ASH

 CONTRACTOR shall provide and install hose bib with vacuum breaker
LEADS

LEADS
LEADS
ALL

ALL
ALL

within close proximity of ACCU & AHU and PACU units for periodic
washing.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

 CONTRACTOR shall ensure that the installation of water supply system


DESCRIPTION

shall be in accordance with SAUDI ARAMCO Engineering Standards


ISSUED FOR 60% FEL3

(SAES-S-060) and Uniform Plumbing Code (UPC).

 CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot water
above ground pipes and CPVC Schedule 80 Pipe for the below ground
water supply pipes. The hot water pipes shall be provided with closed cell
fiberglass insulation of density 64 kg/m3.

 Domestic hot water will be generated by point of use water heaters. Point
of use or “instantaneous” types will be provided for remote, single fixture
JO/EWO

applications and will be mounted on the wall below the fixture being
served.
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 CONTRACTOR shall provide tie –in to the building water supply lines
09/08/16
08/04/16
06/01/16

along with standard accessories such as Isolation valves and back flow
NO.
REV

DISCIPLINE preventer. For details regarding the building tie-ins relevant civil drawings
ENGINEER shall be referred.
C
A

DATE:
PROJECT DRAIN & VENT SYSTEM
ALL LEADS
ENGINEER
09/08/16
 CONTRACTOR shall provide and install complete drainage system
DATE:
CERTIFIED including their piping, fittings, vents and fixtures. The design of drainage
A M ALMATROOK
system shall be in accordance with SAUDI ARAMCO Engineering
09/08/16
DATE:
Standards (SAES-S-060) and Uniform Plumbing Code (UPC). For drain
CONSTRUCTION
AMR EL SHARKAWY and vent layout, refer to drawing PL-A00001-002.
AGENCY
09/08/16

DATE:
 CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage & vent
OPERATIONS
SHAHZAD YAZDANI
lines inside the building. The outside building underground drain and vent
09/08/16
lines shall be with RTR pipes.
DATE:
 CONTRACTOR shall provide Floor Drains with vented deep seal traps in
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 all toilet rooms, kitchen and mechanical rooms. All Mechanical Room shall
EDSD

be provided with Floor Drains complete in place with Funnel and Strainer
assembly.
DATE:
BY:

 CONTRACTOR shall provide Venting for all fixtures, including Floor


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Drains. Venting systems will terminate through the roof with minimal roof
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

penetrations.
(DCC) NO. _____________________

 CONTRACTOR shall provide seal trapped and vented floor drains in


Battery rooms to serve emergency shower and eye wash fixtures drain.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 277


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG Waste and vent piping shall be acid resistant type and shall be
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH independent of other drainage systems.
ASH
ASH

 CONTRACTOR shall provide piping for waste to an acid neutralization


tank in a readily accessible location just outside the facility. Venting serving
LEADS

LEADS
LEADS
ALL

ALL
ALL

the acid waste system shall be extended to roof terminations through acid
resistant piping and shall be dedicated to the acid waste system according
to SAUDI ARAMCO Standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

TELECOMMUNICATION
ISSUED FOR 60% FEL3

 CONTRACTOR shall procure, install, test and commission Provider Edge


(PE) Router at Telecommunication Room, Ground Floor. This shall
aggregate all Ethernet Access Switches of the buildings proposed under
this project. The proposed PE Router shall be tie-in to the existing PPE
Routers at Yanbu Refinery and Yanbu NGL respectively.

 CONTRACTOR shall procure, install, test and commission the two (2)
JO/EWO

12VDC 250W 100-240VAC Power Supply and one (1) 24G POE+ 1-slot
switch equipped with SFP pluggable 1000Base-LX Mini-GBIC
10-02399-

10-02399-
10-02399-
0001

0001

Transceivers that support single mode fiber over 1310nm wavelength with
0001
DATE

LC connector. The 1000Base-LX Mini-GBIC Transceiver supports 9


09/08/16
08/04/16
06/01/16

micron single mode fiber up to a maximum distance of 10km.


NO.
REV

DISCIPLINE
ENGINEER  CONTRACTOR shall procure, install, test and commission the Redundant
C
A

Power Supply and one (1) Modular access switch equipped of 24-port
DATE:
PROJECT
10/100/1000Base-T and 20-Port 10/100/1000Base-T/4-SFP combo ports
ALL LEADS
ENGINEER
with SFP pluggable 1000Base-LX Mini-GBIC Transceivers that support
09/08/16
single mode fiber over 1310nm wavelength with LC connector. The
DATE:
CERTIFIED
1000Base-LX Mini-GBIC Transceiver supports 9 micron single mode fiber
A M ALMATROOK up to a maximum distance of 10km.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
 CONTRACTOR shall install Universal 19” Standard Rack to mount the
AGENCY
09/08/16 Access Switch, redundant Power Supply, fiber optic/UTP copper patch
panel and ancillaries.
DATE:
OPERATIONS
SHAHZAD YAZDANI

09/08/16
 The Modular Access switch and Access Switch 24G POE+ 1-slot switch
shall be powered from utility power source and UPS.
DATE:
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16
 CONTRACTOR shall procure, install, test and commission 6 Basic IP
EDSD

Phones, 25 Office IP Phones, 1 Conference IP Phone and 4 Analog


phones.
DATE:
BY:

 CONTRACTOR shall provide the required UTP Cat. 6 Patch Cords for the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

Data and IP telephone connections.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

 The TR on the ground floor of this building shall be provided with two (2)
Distribution UTP patch panels and 13 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
REVISION

RJ45 modules in each faceplate outlets.


PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 278


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 The TR on the first floor of this building shall be provided with two (2)
Distribution UTP patch panel and 28 outlets for voice and data
ASH
ASH
ASH

communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
RJ45 modules in each faceplate outlets.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall procure, install, test and commission One (1) Radio
Frequency Dispatch Terminal (RFDT) at the Foreman Room of E & M
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

Building. The transceiver shall be located at the TR room and the control
DESCRIPTION

head at the Control room


ISSUED FOR 60% FEL3

ELECTRICAL

For Building electrical scope refer to section 4.15.

5.10. SECURITY SUPPORT BUILDING (2 Nos)


JO/EWO

CIVIL

 Provide 8” diameter RTR pipe, 80FEOD, for sanitary wastes from this
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

building toilet sanitary pipe and shall be connected to sanitary sewer


network then heading to the sanitary lift station area. These will include the
09/08/16
08/04/16
06/01/16

provision of sanitary manholes, cleanouts and other fixtures.


NO.
REV

DISCIPLINE
ENGINEER
 Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop to
C
A

DATE: support building facilities toilet.


PROJECT
ALL LEADS
ENGINEER
09/08/16  Provide concrete sidewalks as required around Building as shown site
DATE:
development plan. The sidewalk shall be 100mm thick concrete provided
CERTIFIED with 150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
A M ALMATROOK
09/08/16
accordance, as applicable, as per SAUDI ARAMCO Standard drawing no.
DATE: AB-036260 sheet 001 rev. 05.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16

DATE: FIRE PROTECTION


OPERATIONS
SHAHZAD YAZDANI

09/08/16  Placement of portable extinguisher in building shall comply with section 906,
DATE: SAES-M-100.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  Hand-type portable extinguisher shall be mounted in easily accessible


EDSD

locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
DATE:
BY:

6.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Dry chemical extinguisher shall be located on the building exterior of the


control building and electrical substations, near entrance.
(DCC) NO. _____________________

 CONTRACTOR shall provide and Install Portable type Fire Extinguisher


inside the Buildings as per Table -1, SAES-B-019.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 279


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
 CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
ASH
ASH
ASH

floor level. Extinguisher units weighing over 18 Kg shall be mounted so that


extinguisher top is not more than 1.0 m above the floor level
LEADS

LEADS
LEADS
ALL

ALL
ALL

 For the proposed Fire Protection layout refer to drawing # FI-A00031-001 &
FIA00031-002.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION

ARCHITECTURE
ISSUED FOR 60% FEL3

 CONTRACTOR shall provide a Security Support Building of an


approximate area of 110 SM shall be provided at the security main
gatehouse area and approximately area of 184 SM one near the tank farm
gate. The support facility will be utilized by security personnel and shall
consist of one prayer room, one break room, and a toilet. This building will
have also Security Equipment room, Telecommunication room, battery
room and electrical room.
JO/EWO

 The proposed building shall be CMU external wall, concrete frame structure
and concrete roof slab with all utilities and communication systems to be
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

provided.
09/08/16
08/04/16
06/01/16

 For the proposed building floor plan refer to drawing # ARA00007-001 and
NO.
REV

DISCIPLINE ARA00007-004
ENGINEER
C
A

STRUCTURAL
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
 For structural scope refer to section 4.25.
DATE:
CERTIFIED HVAC
A M ALMATROOK
09/08/16
DATE:
 CONTRACTOR shall provide & install Package Air conditioning Units
CONSTRUCTION
AMR EL SHARKAWY (PACU-01 Duty & PACU-02 Standby) outside the building as per the location
AGENCY
09/08/16 shown on the HVAC layout drawings HV-A00008-001 & 002 for Security
DATE:
Support Building at Main Gate and HV-A00017-001 & 002 for Security
OPERATIONS
SHAHZAD YAZDANI
Support Building at Tank Farm.
09/08/16

DATE:
 CONTRACTOR shall provide & install vibration isolators, flexible
connections etc. for the HVAC equipment so that the installation is as per
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16 manufacturer’s recommendation.


EDSD

 CONTRACTOR shall provide & install the condensate drain line from HVAC
DATE:

Equipment up to the nearest drain pit with proper slope and P trap.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

 CONTRACTOR in general shall provide and install supply and Return GI


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ductwork with their fiber glass insulation along with supports and all
(DCC) NO. _____________________

accessories such as motorized volume dampers, fire & smoke dampers,


backdraft dampers, sand trap louvers, volume control dampers and air
terminal devices as shown on the drawings.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 280


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 CONTRACTOR shall provide cladding for all externally exposed ductwork
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH with 0.9 mm thick Aluminum sheet.
ASH
ASH

 CONTRACTOR shall provide and install Exhaust Fans for the Toilet as per
the HVAC drawings.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide and install Exhaust fans for the Battery Room
with explosion proof motor and shall be UL listed. Stainless steel ductwork &
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

accessories shall be provided inside Battery Room (for Security Support


DESCRIPTION

Building at Tank Farm only)


ISSUED FOR 60% FEL3

 Fire & Smoke Dampers shall be installed on all fire rated walls and these fire
& smoked dampers shall be manufactured according to UL555S standard
and shall bear a seal from UL.

 CONTRACTOR shall provide and install a Direct Digital Control Panel to


sequence the HVAC Equipment and Exhaust Fans along with necessary
field devices such as temperature sensors, transmitters, pressure differential
switches, damper actuators, duct smoke detectors and air-flow switches as
JO/EWO

per the requirements of SAUDI ARAMCO standards.


10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

 The DDC Panel shall provide following alarms (Audio & visual) as a
minimum:
09/08/16
08/04/16
06/01/16

 Unit Trip Alarm


NO.
REV

DISCIPLINE  Dirty Filter Alarm


ENGINEER
 Low Airflow Alarm
C
A

DATE:  High Temperature Alarm


PROJECT
ALL LEADS
ENGINEER
09/08/16  CONTRACTOR shall provide necessary termination details, interfacing and
DATE:
wiring details and programming of DDC Panels to initiate alarms and to
A M ALMATROOK
CERTIFIED sequence or shutdown HVAC Equipment.
09/08/16
DATE:  CONTRACTOR shall interface the DDC Panel with Fire Alarm Control Panel
CONSTRUCTION
AMR EL SHARKAWY
AGENCY & DCS.
09/08/16

DATE:  CONTRACTOR shall provide wiring for the high Temperature alarms
OPERATIONS
SHAHZAD YAZDANI emanating from Battery Room to DCS for alarm and to provide interfacing
09/08/16 between battery charger and battery room exhaust fans to trip the high rate
DATE: battery charge in case of failure of HVAC Equipment.
CONTROL NUMBER

ALI H GHAMDI
VERIFICATION

09/08/16  CONTRACTOR shall provide high temperature alarm, common trouble


EDSD

alarm to DCS.
DATE:
BY:

 CONTRACTOR shall provide & install Gas Detectors on the Fresh Air Intake
REVISIONCERTIFICATION

duct as per layout drawing and shall be connected to DDC and DCS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

System.
(DCC) NO. _____________________

 All necessary installation, pre-commissioning and termination works shall be


undertaken in compliance to SAUDI ARAMCO standards.
REVISION

PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

YDH & NJBP EXPANSION DOC 281


X40 A GEN-E0102
YANBU DISTRIBUTION HUB PORTION Of C
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 307
EDSD/2616-0399.doc
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

AHG
AHG
AHG
 For CONTRACTOR shall provide wiring for the high Temperature alarms
ENGG CERT

SAY
SAY
SAY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
emanating from Battery Room to DCS for alarm and to provide interfacing
between battery charger and battery room exhaust fans to trip the high rate
ASH
ASH
ASH

battery charge in case of failure of HVAC Equipment (For Security Support


Building at Tank Farm only).
LEADS

LEADS
LEADS
ALL

ALL
ALL

 The Testing and Air - Balancing requirements shall be provided for the
building as per the SAES-K-001 through an independent 3rd Party
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL

CONTRACTOR approved by SAUDI ARAMCO.


DESCRIPTION


ISSUED FOR 60% FEL3

CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
SAES-K-001.

PLUMBING

WATER SUPPLY SYSTEM


JO/EWO

 CONTRACTOR shall provide and install complete water distribution piping


system to serve toilet fixtures, Lavatories, Janitor sinks & Eyewash with
10-02399-

10-02399-
10-02399-
0001

0001
0001
DATE

shower of the building. The water supply system shall provide both Cold
and Hot water requirements to the building utility areas. For water supply
09/08/16
08/04/16
06/01/16

layout, refer to drawing PL-A00006-001 for Security Support Building at


NO.
REV

DISCIPLINE
Main Gate and PL-A00013-001 for Security Support Building at Tank Farm.
ENGINEER
C
A

 CONTRACTOR shall ensure that the installation of water supply system


DATE:
PROJECT shall be in accordance with SAUDI ARAMCO Engineering Standards
ALL LEADS
ENGINEER
(SAES-S-060) and Uniform Plumbing Code (UPC).
09/08/16

DATE:
CERTIFIED
 CONTRACTOR shall provide and install hose bib with vacuum breaker
A M ALMATROOK
within close proximity of and PACU units for periodic washing.
09/08/16
DATE:
CONSTRUCTION