Académique Documents
Professionnel Documents
Culture Documents
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PIPELINES, DISTRIBUTION & TERMINAL
ASH
ASH
ASH
PROJECTS DEPARTMENT
LEADS
LEADS
LEADS
ALL
ALL
ALL
BI-10-02399
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
DATE:
DATE:
OPERATIONS
09/08/16
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PREPARED BY:
(DCC) NO. _____________________
MUSTANG-HDP,
AL-KHOBAR, SAUDI ARABIA.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH TABLE OF CONTENTS
ASH
ASH
LEADS
LEADS
ALL
1.1 PREFACE......................................................................................................................4
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DISCIPLINE
4.4 PROJECT OPERATING INTERFACES......................................................................42
ENGINEER
4.5 DEMOLITION ACTIVITIES..........................................................................................42
C
A
DATE:
PROJECT 4.6 RECEIPT PIPELINE AND CONNECTIONS..........................................................................44
ALL LEADS
ENGINEER
09/08/16 4.7 YANBU’ DISTRIBUTION HUB TANK FARM AND SUPPORT INFRASTRUCTURE.......................50
DATE:
CERTIFIED 4.8 YANBU TO JIDDAH PIPELINE 1 & 2 SUPPORT INFRASTRUCTURE......................................71
A M ALMATROOK
09/08/16 4.9 PUMPS AND MOTORS FOR THE YANBU TO JIDDAH PIPELINE...........................................73
DATE:
CONSTRUCTION
AMR EL SHARKAWY 4.10 PUMP OPERATIONS FOR THE YANBU TO JIDDAH PIPELINE..............................................79
AGENCY
09/08/16
4.11 PIPELINE CONNECTION FROM GRASSROOTS-YANBU ARAMCO REFINERY.........................80
DATE:
OPERATIONS
SHAHZAD YAZDANI
4.12 PIPELINE CONNECTION FROM SAMREF REFINERY........................................................81
09/08/16 4.13 PIPELINE CONNECTION FROM YASREF REFINERY.........................................................87
DATE:
4.14 PIPELINE CONNECTION FROM YANBU REFINERY TERMINAL.............................................90
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
4.15 ELECTRICAL..............................................................................................................96
EDSD
4.16 COMMUNICATION........................................................................................................120
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG 4.22 OVERALL SITE DEVELOPMENT AND FACILITIES:...............................................194
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.23 PROCESS AUTOMATION & CONTROLS..........................................................................198
ASH
ASH
ASH
LEADS
LEADS
ALL
4.25 STRUCTURAL..........................................................................................................217
ALL
ALL
5.2. MUSALLAH...............................................................................................................237
5.3. SECURITY GUARD HOUSE (2 NOS.).....................................................................240
5.4. OPERATOR SHELTER (2 NOS.).............................................................................242
5.5. SMOKING SHELTER................................................................................................246
5.6. FSF SUPPORT BUILDING.......................................................................................247
5.7. RECEIVING SUBSTATION.......................................................................................251
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
PROJECT 5.13. FIRE WATER UTILITY WATER PUMP SHELTER....................................................279
ALL LEADS
ENGINEER
09/08/16 5.14. CHEMICAL SHELTER...............................................................................................279
DATE:
CERTIFIED 5.15. REMOTE I/O BUILDINGS (2 UNITS)........................................................................283
A M ALMATROOK
09/08/16 5.16. IDAS SHELTER (2 UNITS)........................................................................................286
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
5.17. OPERATION BUILDING............................................................................................289
09/08/16
SECTION 6.0 – MATERIALS REQUIREMENT.......................................................................294
DATE:
OPERATIONS
SHAHZAD YAZDANI
SECTION 7.0 – HIGH COMMISSION FOR INDUSTRIAL SECURITY....................................294
09/08/16
SECTION 8.0 – VALUE PRACTICES / WORKSHOPS...........................................................294
DATE:
SECTION 9.0 – OTHER ENGINEERING STUDIES / ASSESSMENTS / ANALYSIS..............294
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
SECTION 10.0 – APPENDICES..............................................................................................295
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 1.0 – INTRODUCTION
ASH
ASH
ASH
1.1 PREFACE
LEADS
LEADS
LEADS
ALL
ALL
ALL
The purpose of the proposed facilities is to efficiently meet the Kingdom’s refined product
demand in Makkah Province through the construction of the Yanbu Distribution Hub
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
(YDH). This project will aggregate refined product from the three local refineries
(SAMREF, YASREF, and Yanbu Terminal) to facilitate shipment via two connecting
DESCRIPTION
pipelines: the (a) Yanbu to Jiddah pipeline and the (b) Yanbu to Central Region pipeline,
ISSUED FOR 60% FEL3
The Yanbu-Jiddah Pipeline, BI-10-02155, initially included the Yanbu to Jiddah pipeline
scope, NJBP scope, YDH scope, and the SSSP-5 supply pipeline scope. As the scope
for BI-10-2155 increased, it was decided to split and segregate the pipelines scope from
the in-plant scope.
JO/EWO
BI-10-02399, Additional Capacity – North Jiddah Bulk Plant, has been introduced to the
10-02399-
10-02399-
10-02399-
2016-2018 Business Plan to handle the below major scope elements from BI-10-2155:
0001
0001
0001
DATE
DISCIPLINE
2. Yanbu Distribution Hub (YDH), this Project Proposal Narrative (PPN)
ENGINEER
C
A
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
This document, the “Project Proposal Narrative” (PPN), is intended to describe the
BY:
overall scope for YDH project. CONTRACTOR shall read this document and its
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
attachments carefully and determine all the Materials, Equipment and other
OF THIS DRAWING IS COVERED, FOR ALL
requirements of the entire project for supply, installation and successful commissioning
(DCC) NO. _____________________
The PPN shall be treated as construction scope of work. It provides overall requirements
REVISION
of the systems in a comprehensive way and is not intended to cover the work in detail.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG This document (PPN) describes the overall and major equipment, material and the work
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to be provided for YDH project and it is deemed to be the responsibility of
CONTRACTOR to supply, fabricate, install, inspect, test, pre-commissioning,
ASH
ASH
ASH
commissioning support, and hand over the project to SAUDI ARAMCO, on time, in a full
operating condition in compliance with the relevant SAUDI ARAMCO standards,
LEADS
LEADS
LEADS
ALL
ALL
ALL
The term “Provide” used in the document in different sections by various engineering
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
entire facility. This also includes, but is not limited to, all other sundry materials, products,
ISSUED FOR 60% FEL3
consumables and all other necessary items including labor to build the facilities/ project
safely and make it operational and deliver the expected results.
Any equipment/system/materials and efforts that are missing, not fully covered in this
document, but are required to complete the systems shall be identified by
CONTRACTOR during the bidding process and shall be provided.
CONTRACTOR shall conduct field surveys & testing and other engineering studies
JO/EWO
10-02399-
10-02399-
0001
CONTRACTOR shall address all project proposal comments which were closed and
0001
0001
DATE
reflected in drawings during the detail design and construction phases as applicable.
09/08/16
08/04/16
06/01/16
CONTRACTOR shall address and consider in the detail design package all the
NO.
REV
ALI H GHAMDI
complete and functional.
VERIFICATION
09/08/16
EDSD
effective internal control for prompt receipt, review, approval, and return of such
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
ARAMCO.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall follow relevant guidelines and Standards mandated by Yanbu
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Royal Commission (YRC) for setting up YDH facility and its operation.
CONTRACTOR shall systematically check his design and drawings to ensure they
ASH
ASH
comply with the Scope of Work, relevant SAUDI ARAMCO, YRC standards and
LEADS
LEADS
ALL
ALL
CONTRACTOR shall consider the SAUDI ARAMCO Design and Engineering Standards
DESCRIPTION
as per the cut-off date of September 2016. CONTRACTOR shall meet all the
ISSUED FOR 60% FEL3
Contractor shall use the latest edition, revision, addenda, errata of the applicable local
and international codes and standards, unless otherwise explicitly specified.
In case of conflict between requirements mentioned in different documents, the most
stringent interpretation shall be followed.
JO/EWO
The following are the latest applicable Design and Engineering Standards and
international Codes and Standards, available for the project design.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Any changes during execution of the project will be informed by SAUDI ARAMCO.
09/08/16
08/04/16
06/01/16
NO.
REV
ALI H GHAMDI
VERIFICATION
09/08/16 SAES-B-005 Spacing and Diking for Atmospheric Low Pressure Tanks
EDSD
Buildings
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
AHG
AHG
AHG SAES-B-058 Emergency Shutdown, Isolation and Depressurizing
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-B-067 Safety Identification and Safety Colors
SAES-B-068 Electrical area classification
ASH
ASH
ASH
LEADS
LEADS
ALL
SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling
ALL
ALL
Piping
10-02399-
10-02399-
0001
0001
0001
DATE
Coatings
DISCIPLINE
ENGINEER SAES-J-002 List of Inspectable Instruments
C
A
ALI H GHAMDI
SAES-J-605 Surge Relief Protection System
VERIFICATION
09/08/16
SAES-J-902 Electrical Systems for Instrumentation
EDSD
Conditioning Systems
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Facilities
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG SAES-L-100 Applicable Codes and Standards for Pressure Piping
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Systems
SAES-K-101 Regulated Vendors List for Heating, Ventilating and Air
ASH
ASH
ASH
LEADS
LEADS
ALL
0001
0001
DATE
ALI H GHAMDI
SAES-P-104 Wiring Methods and Materials
VERIFICATION
09/08/16
SAES-P-107 Overhead Distribution System
EDSD
SAES-P-111 Grounding
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG SAES-Q-001 Criteria for design and construction of
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
concrete structures
SAES-Q-005 Concrete Foundations
ASH
ASH
ASH
LEADS
LEADS
ALL
Machinery
SAES-Q-009 Concrete Retaining Walls
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Equipment Grouting
ISSUED FOR 60% FEL3
0001
0001
DATE
ALI H GHAMDI
SAES-T-633 Communications Splice Closures
VERIFICATION
09/08/16
SAES-T-634 Telecommunications – Cable Testing and Acceptance
EDSD
Towers
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG SAES-T-916 Telecommunications Building Cable Systems
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-T-920 Telecommunications Cable Information
SAES-T-928 Telecommunications – OSP Buried Plant
ASH
ASH
ASH
LEADS
LEADS
ALL
Royalty/Custody Transfers
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
1.4.2 SAUDI ARAMCO Inspection Requirements
CERTIFIED
A M ALMATROOK
09/08/16
175-000003 Instructions & Explanations of Inspection Requirements
DATE: 175-321900 Pressure Vessels
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 175-343100 Panels and Cabinets for Outdoor Area
09/08/16
175-013100 Fabricated Carbon Steel Piping
DATE:
OPERATIONS
175-019800 Auxiliary Piping for Mechanical Equipment
SHAHZAD YAZDANI
09/08/16
175-022500 Flanges, Spectacle Plates, Spacers & Blinds
DATE:
175-022501 Flanges; Weld Neck, Forged Steel
175-091900 Inspection and Testing Requirements
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Motors to 500 HP
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG 175-120150 Spreader Beam
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
175-310200 Mechanical Seals for Pumps
175-130900 Coupling Shaft Special Purpose
ASH
ASH
ASH
LEADS
LEADS
ALL
Systems
10-02399-
0001
0001
DATE
09/08/16
01-SAMSS-038 Small quantity purchase and Approved pipe mills
DATE:
01-SAMSS-091 Oil Field Chemical Injection Skid System
02-SAMSS-005 Butt Welding Pipe Fittings
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG 09-SAMSS-021 Qualification Requirements for Alkyd Enamel Coating
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
System (APCS-6)
09-SAMSS-060 Packaging Requirements for Coatings
ASH
ASH
ASH
LEADS
LEADS
ALL
FBE Coatings
09-SAMSS-097 Ready-Mixed Concrete
09-SAMSS-107 Qualification Requirements and Application of Composite
Fluoro-polymer/Ceramic Coatings to Fasteners
12-SAMSS-005 Marking of Metal Products
12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
12-SAMSS-008 Erection of Structural and Miscellaneous Steel
12-SAMSS-014 Pre-Engineered Metal Buildings
JO/EWO
0001
0001
DATE
Assemblies
DISCIPLINE
ENGINEER 16-SAMSS-503 Indoor Control gear-Low Voltage
C
A
ALI H GHAMDI
17-SAMSS-017 Impressed Current Cathodic protection Cables
VERIFICATION
09/08/16
17-SAMSS-018 Remote Monitoring System for Cathodic protection
EDSD
Motors to 500 HP
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG 17-SAMSS-518 Diesel Generator Sets
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
26-SAMSS-059 Insulating Oil Uninterruptible Power Supply System
18-SAMSS-625 Outside Plant – Fiber optic cable specifications (single
ASH
ASH
ASH
LEADS
LEADS
ALL
Pumps
10-02399-
10-02399-
0001
0001
0001
DATE
Tanks
DATE:
PROJECT
ALL LEADS
32-SAMSS-038 manufacture of Skid Mounted units
ENGINEER
09/08/16 34-SAMSS-117 Turbine Flow Meters in Liquid Service
DATE: 34-SAMSS-118 Positive Displacement Meters
A M ALMATROOK
CERTIFIED
34-SAMSS-119 Bi-Directional Meter Prover
09/08/16 34-SAMSS-120 Uni-Directional Meter Prover
DATE:
CONSTRUCTION
AMR EL SHARKAWY
34-SAMSS-121 Small Volume Prover
AGENCY
09/08/16 34-SAMSS-167 Truck Loading Metering Systems
DATE:
34-SAMSS-319 Radar Tank Gauging Equipment
OPERATIONS
SHAHZAD YAZDANI
34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors
09/08/16 34-SAMSS-318 Automatic Tank Gauging Equipment
DATE: 34-SAMSS-321 Radar Tank Gauging Systems for Royalty/Custody
CONTROL NUMBER
ALI H GHAMDI
Measurement of Hydrocarbon Liquids
VERIFICATION
09/08/16
34-SAMSS-010 Quality Requirement for Pressure Retaining
EDSD
Instruments
DATE:
Types
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
34-SAMSS-718 Electric Motor Operated Valve Actuators
34 SAMSS 820 Instrument Control Panel Indoors
ASH
ASH
ASH
LEADS
LEADS
ALL
Hydrocarbon Liquids
DESCRIPTION
Systems
34-SAMSS-913 Instrumentation and Thermocouple Cable
10-02399-
10-02399-
0001
DATE:
SAEP-318 Pressure Relief Valve Program Authorization for
PROJECT Installation, Deletion and Changes
ALL LEADS
ENGINEER
09/08/16
SAEP-319 Pressure Relief Devices - Testing and Inspection
Requirements
DATE:
CERTIFIED SAEP-747 Pipelines Leak Detection Systems
A M ALMATROOK
09/08/16
DATE: SAEP-1152 Approval procedure for Ready-Mixed concrete mix
CONSTRUCTION
AMR EL SHARKAWY
AGENCY design
09/08/16
SAEP-1624 Preparation of System Design Document
DATE:
SAEP-1630 Preparation of Integration Test Procedure
OPERATIONS
SHAHZAD YAZDANI
SAEP-1634 Factory Acceptance Test
09/08/16
SAEP-1638 Site Acceptance Test
DATE:
SAEP-3101 Equipment & Spare Parts Data Requirement for
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG AA-036051 Site Layout-Computer Gate House Fac. 4 lanes
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AA-036678 SAUDI ARAMCO Security and General Purpose Fencing
AA-036755-001 Details-Drive Gate & Walk Gate
ASH
ASH
ASH
LEADS
LEADS
ALL
and Platforms.
AB-036106-002 Assembly and Details of Type "A" Stairs for Walkways
and Platforms-Metric
AB-036227 Standard Symbols for Piping Orthographic Drawings
AB-036386 Hardness Testing for Welding Procedure Qualifications
AB-036521 Bridge Weld and Typical Brace Seal Welded and Socket
Welded Valves On Process Lines
AC-036045 Detail Vent, Drain and Sample Connections
JO/EWO
0001
0001
DATE
ALI H GHAMDI
AE-036254 Parking Bumpers Precast Concrete Block
VERIFICATION
09/08/16
AE-036412 Guard Post and Guardrail details
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Details
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG DC-950043 Electrical Connections for Field-Mounted Instruments
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DD-950022-006 Details of Ground Connections, Switchboard/Control
Panels Ground Bus to Ground Grid
ASH
ASH
ASH
LEADS
LEADS
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE Construction Safety Manual and the minimum behavioral safety standards
ENGINEER
detailed in the SAUDI ARAMCO Safety Handbook. Furthermore, the project
C
A
DATE: shall provide Safety and Hazard Identification Plans (HIP) for Loss Prevention
PROJECT
ALL LEADS
ENGINEER approval.
09/08/16
09/08/16
G.I.6.030 Traffic and Vehicle Safety
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG 1.4.10 Yanbu Royal Commission Standards
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This project is within YRC jurisdictions and CONTRACTOR shall adhere to all
ASH
ASH
ASH
YRC applicable standards. For full list of applicable standards See Appendix 9.
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
DATE:
PROJECT
ALL LEADS
ENGINEER 1.4.12 INTERNATIONAL CODES AND STANDARDS
09/08/16
ALI H GHAMDI
VERIFICATION
09/08/16
API 541 Form-wound Squirrel-Cage Induction Motors—500
EDSD
AHG
AHG
AHG API STD 682 Shaft Sealing Systems for Centrifugal and Rotary
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Pumps
API STD 671 Special purpose coupling for petroleum, chemical
ASH
ASH
ASH
LEADS
LEADS
ALL
(MPMS)
10-02399-
10-02399-
0001
0001
0001
DATE
Installation Design
DISCIPLINE
ENGINEER B30.10 Hooks
C
A
DATE:
American National Standards Institute (ANSI)/National Fire Protection
Association (NFPA)
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
Spray Systems
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
NFPA 90A Installation of Air Conditioning and Ventilating System
American Society of Heating, refrigerating & Air-Conditioning Engineers,
ASH
ASH
ASH
Inc. (ASHRAE)
LEADS
LEADS
LEADS
ALL
ALL
ALL
Comfort
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
DATE
ALI H GHAMDI
VERIFICATION
09/08/16
SMACNA 2002 Fire, Smoke and Radiation damper Installation Guide
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AMS/ANSI B31.3 Process Piping
CMAA SPEC # 70 Specification for Top Running & Gantry Type Multiple
ASH
ASH
ASH
LEADS
LEADS
CMAA SPEC #74 Specification for Top Running and Under Running Single
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
09/08/16
1.5 LIST OF ABBREVIATIONS AND ACRONYMS
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Process
BBL Barrels
EDSD
DO Diesel oil
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
MB 1000 barrel
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG TBD To be decided
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ULSD Ultra-low Sulphur diesel
YNJ-1 Yanbu Jiddah pipeline -1
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
TELECOM
ARS Automatic Route Selection
AUTH Authorization Code
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
BI Budget Item
BS Base Station
DESCRIPTION
CAT Category
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
DATE
ALI H GHAMDI
ITU International Telecommunications Union
VERIFICATION
Km Kilometers
LAG Line Access Gateway
DATE:
BY:
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG MDPE Medium Density Polyethylene
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MGCP Media Gateway Control Protocol
MH Maintenance Hole
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
P/L Pipeline
0001
0001
0001
DATE
ALI H GHAMDI
SAT Site Acceptance Test
VERIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG TETRA Terrestrial Trunk Radio
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TGB Telecommunications Ground Bar
TIA Telecommunications Industry Association
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
INSTRUMENTATION
10-02399-
10-02399-
10-02399-
0001
0001
DATE
ALI H GHAMDI
UPS Uninterruptible Power Supply
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG SECTION 2.0 – PROJECT DESCRIPTION
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.1 PLANT LOCATION
ASH
ASH
ASH
This project is located near the city of Yanbu and the Yanbu area refineries. This plot of
LEADS
LEADS
LEADS
ALL
ALL
ALL
land is approximately 2 km2 in size and is located east of the SAUDI ARAMCO Yanbu
Refinery (YR), adjacent to the east side of King Abdulaziz Road, and within the Yanbu
Royal Commission (YRC) Industrial City.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
This project requires Land Use Permits (LUP) for both the work areas in and around
NJBP and YDH, including: YDH plant, MARAFIQ to YDH corridor for Electrical & FO
cables, Yanbu refinery/YDH Interconnecting pipelines corridor, SAMREF/YDH
Interconnecting pipeline corridor, Access road for YDH and Temporary Construction
Facility
3.1 The Project Proposal Narrative with all its attachments and drawings shall be the basis
10-02399-
10-02399-
10-02399-
0001
and serve the purpose of defining the overall scope of this project.
0001
0001
DATE
09/08/16
08/04/16
06/01/16
3.2 In addition, the SAUDI ARAMCO engineering procedures, practices, and general
NO.
REV
DISCIPLINE instructions are also considered as part of the design basis for the development of
ENGINEER
CONTRACTOR’s bid.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
3.3 Any conflict between various design basis documents shall be highlighted to SAUDI
09/08/16 ARAMCO for their review and resolution.
DATE:
A M ALMATROOK
CERTIFIED 3.4 This document shall be read in conjunction with relevant contract documents.
09/08/16
DATE:
CONSTRUCTION
3.5 CONTRACTOR shall prepare detail design package as per latest Saudi Aramco
AMR EL SHARKAWY
AGENCY
09/08/16 Engineering Standards, procedures and material specifications. Yanbu Royal
Commission standards & guidelines shall be considered for the detail design package.
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16 3.6 CONTRACTOR shall prepare the earthquake resistant design and detailing per
DATE: requirements of AISC-341, Seismic Design Manual of AISC, ACI-318 and ASCE-05.
Geotech report of the project shall be utilized for the determination of Seismic Design
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH SECTION 4.0 – DETAILED SCOPE OF WORK
ASH
ASH
Section 4 is included in this PPN to provide design basis and an overall picture of the total
project associated with BI-10-02399. This is specifically intended to provide CONTRACTOR
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall commit dedicated manpower, equipment and all necessary resources to
perform the Works activities.
CONTRACTOR shall assign a dedicated full-time team to work on the Yanbu Distribution Hub
for the entire project duration which includes but not limited to the engineering design office
and construction site office. The team shall be located in the same floor as the SAUDI
ARAMCO PMT assigned offices.
JO/EWO
10-02399-
10-02399-
The proposed facilities shall interface with the related budget items (BI’s) and other
0001
0001
0001
DATE
components of this BI. Work for this project shall be coordinated with the respective
projects as noted below. Each respective BI below shall address interconnections
09/08/16
08/04/16
06/01/16
NO.
REV
between the other related BI’s and existing facilities. To the extent possible, any
DISCIPLINE
ENGINEER physical tie-ins shall be made without affecting operations. Any changes in the
approved Testing and Inspection (T&I) schedules shall be coordinated with Oil Supply
C
A
A M ALMATROOK
CERTIFIED Related Budget Items
09/08/16
DATE:
4.2.1 BI-10-02155, Yanbu – Jiddah Refined Product Pipeline
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
This project shall construct refined product pipelines to deliver products from
Yanbu to the North Jiddah Bulk Plant. The current scope transports 576 MBD
DATE:
of refined petroleum products. These pipeline systems will deliver Diesel,
OPERATIONS
SHAHZAD YAZDANI
Kerosene, Premium 91, and Premium 95 Gasoline designated for the Makkah
09/08/16
province.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
The project must consider the origin pipeline pump station and origin storage
tank requirements into the facility design.
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
region.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The project must consider the origin pipeline pump station and origin storage
tank requirements into the facility design. Additional storage tanks at YDH shall
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This project expands the Yanbu Refinery to increase Western Region’s refined
DESCRIPTION
products supply and increase the integration between the refinery and
ISSUED FOR 60% FEL3
The refined product production resulting from this project will be a significant
amount of product supply for YDH.
10-02399-
10-02399-
0001
(ULSD, PG91, and PG95) from the YASREF Refinery to the Yanbu Refinery.
0001
0001
DATE
The proposed pipeline route shall follow the Royal Commission Corridor
between the YASREF Refinery and the Yanbu Refinery.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER
The custody metering shall be located inside YDH battery limit along with
C
A
A M ALMATROOK
CERTIFIED ERA: 2/16, ERC: 5/19
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 4.3 PROJECT PHYSICAL INTERFACES
09/08/16
DATE:
OPERATIONS
The project scope for the YNJ-1/2 pipelines, BI-10-02155 & YDH and North Jiddah
SHAHZAD YAZDANI
Bulk Plant (NJBP) Expansion & Upgrade, BI-10-02399 will contain elements that shall
09/08/16
be interfaced to achieve project purpose and intend.
DATE:
CONTROL NUMBER
ALI H GHAMDI
This project has very complicated interfaces as listed below; it is highly recommended
VERIFICATION
09/08/16
that the CONTRACTOR assign a dedicated Interfaces Manager to handle those
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall consider the interfaces when studying the Project Risk
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall consider all the relevant Reservation forms and interface
packages used in the Project Proposal package for the detail design.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG BI-10-02155 is comprised of:
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Yanbu-North Jiddah Pipeline System
ASH
ASH
ASH
LEADS
LEADS
LEADS
This BI also provides for The YNJ-1/2 Pipeline System to transport 576 MBD of refined
ALL
ALL
ALL
product from YDH to the NJBP. This pipeline system will deliver Diesel, Kerosene,
Premium 91, and Premium 95 Gasoline designated for the Makkah province.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The existing bulk plant at North Jiddah shall be upgraded and expanded to
10-02399-
10-02399-
10-02399-
0001
0001
DATE
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Figure 1. Project boundaries for BI-10-02155 and BI-10-02399
AGENCY
09/08/16
DATE:
4.3.1 Refinery Connections:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
Refer to Appendix 2 Project Proposal Interface Packages.
DATE:
Appendix 2 contains all reservation forms, 90% comment logs, documents and
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
drawings related to the interfaces with MARAFIQ, Yanbu Royal Commissioning,
Yanbu NGL, Yanbu refinery, SAMREF, and YASREF. The drawings included in
EDSD
YDH shall construct multiple pipelines to tie into the tank farm of each respective
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
refinery. The tie-in location shall be downstream of any tankage and booster
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
pumps within the respective refinery tank farm and YRT discharge lines from
(DCC) NO. _____________________
YASREF
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG YDH shall receive PG 91/95 and DO products from the YASREF via two
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipelines. Part of the pipeline supply from YASREF to YDH will be provided by BI-
10-00043, for the supply of clean transportation fuel to Yanbu refinery. Two (2)
ASH
ASH
ASH
pipelines (one for DO and one for PG 91/95) between YASREF & Yanbu refinery
shall be provided under BI-10-00043. This project will tie-in to the isolation valve
LEADS
LEADS
LEADS
ALL
ALL
ALL
downstream provided on the pipeline and shall be the connecting points for the
pipelines leading to YDH. BI-10-00043 will provide a manual valve on both
pipelines for tie-ins to YDH.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
A. Instrumentation:
The YDH control system shall be interfaced to YASREF control system to
have READ ONLY access to the data points such as the CMS, EIV status
and Pump status. The data is to be exchanged via plant DMZ through PI
system at both the facilities.
Contractor shall provide new fiber optic cable from YASREF to YDH for the
data exchange. The interface is shown in preliminary block # IN-A00001.004
JO/EWO
Contractor shall coordinate with Refinery Control System Vendor for the
interface requirements.
10-02399-
10-02399-
10-02399-
0001
A00001.004
09/08/16
08/04/16
06/01/16
NO.
REV
B. Telecom
DISCIPLINE
ENGINEER Provide 12 core Fiber optic cable from Yanbu Distribution Hub to YASREF
C
A
ALI H GHAMDI
VERIFICATION
09/08/16
at SAMREF. These tie-ins will be taken from the SAMREF export lines going to
their terminal near to the fence at King Fahad Road (RC Corridor). All new
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
A. Piping:
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Installation of 01 surge tank & 02 pumps
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Using the existing pumps.
ASH
ASH
ASH
B. Instrumentation:
LEADS
LEADS
Provide and install Three (3) custody metering skids PG91/95, DO and DPK
LEADS
ALL
ALL
ALL
with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall
be as per SAES-Y-103. The metering skids field instrumentation shall be
integrated to metering and control cabinets such as flow computer cabinet,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
PLC cabinet and MSC cabinet. A vendor supplied metering shelter shall be
DESCRIPTION
TCP/IP, OPC etc. Refer block diagram IN-A00001.009 for Custody Metering
System.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
The contractor shall provide redundant fiber optic cables between metering
shelter and nearest OMS control building in the tank farm area of SAMREF.
09/08/16
08/04/16
06/01/16
The new DCS shall be tied to the existing plant control network at OMS
NO.
REV
DISCIPLINE control room. The HMI station at OMS control room will be updated with the
ENGINEER
new instrumentation added by BI-10-02399.
C
A
DATE: The new ESD valves added by BI-10-02399 at the battery limit of SAMREF
PROJECT
ALL LEADS
ENGINEER facility shall be integrated to existing ESD system. The contractor shall
09/08/16 provide new junction boxes and cables. The ESD marshalling cabinet
DATE: OMMRS01 shall be used to terminate ESD cables at OMS Rack-room.
CERTIFIED
A M ALMATROOK The contractor shall provide junction boxes and field homerun cables as
09/08/16 indicated in block diagram# IN-A00001.007
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
The YDH control system shall be interfaced to SAMREF control system to
09/08/16 have READ ONLY access to the data points such as the CMS, EIV status
DATE:
and Pump status and tank status. The data is to be exchanged via plant DMZ
OPERATIONS
SHAHZAD YAZDANI
through PI system at both the facilities. New fiber optic cable is to be laid from
09/08/16 SAMREF to YDH for the data exchange.
DATE: Contractor shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 A00435/36/37/38. Provide and install Junction boxes and lay homerun cable
EDSD
Contractor shall provide and install ZV-1112/1212/1312 and install cable IC-
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Contractor shall utilize existing cable tray to run home cable from junction to
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Drawing Description
ASH
ASH
ASH
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 C. Telecom
DATE: Provide 12 core Fiber optic cable from Yanbu Distribution Hub to SAMREF
CERTIFIED
A M ALMATROOK new Metering Shelter.
09/08/16
DATE: Provide 12 core Fiber optic cable from SAMREF new Metering Shelter to
CONSTRUCTION
AMR EL SHARKAWY OMS Control Room.
AGENCY
09/08/16
Provide VOIP hotline in SAMREF OMS Control Room.
DATE:
OPERATIONS
SHAHZAD YAZDANI D. Electrical:
09/08/16 Provide and Install two 480V, 3phase, 3wire MOVs Panels feeding from
DATE: SAMREF existing Substation No. 12.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Provide and Install new rack mounted 10kVA UPS with 60 mins back up time
09/08/16
in Substation No. 12 to feed Metering Skids.
EDSD
Run and terminate power cables for Panels and metering skids etc.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
network.
Provide task lighting for new equipment from existing lighting Panels.
REVISION
E. Structural:
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
LSTK contractor shall perform required geotechnical investigation inside
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH SAMREF refinery during detailed design.
ASH
All necessary structures and foundations for MOV’s and metering skids.
ASH
LEADS
Yanbu Refinery
LEADS
LEADS
ALL
ALL
ALL
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
through three pipelines extending from YRT through Yanbu refinery tank farm
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
existing marine loading pumps. These pumps will take suction from ship pump.
ISSUED FOR 60% FEL3
Provisions shall be provided in the receiving manifold for the future connection
of PG 91/95, DO & DPK from Yanbu grass root refinery.
A. Piping:
Construct 4 tie-ins with YR pipelines, including MOVs, and ZVs.
10-02399-
10-02399-
10-02399-
0001
B. Instrumentation:
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
Contractor shall provide and install Motor Operated and Electrohydraulic ESD
ENGINEER valves at the battery limit of Yanbu Refinery, MOVs shall also be provide at
C
A
ALI H GHAMDI
integrated to YR plant network.
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
system to YDH provides View only signals related to product transfer. The
data points shall be the status of product pumps and EIVs such as running,
(DCC) NO. _____________________
stopped, tripped etc. The requirements of data from Yanbu Refinery shall be
further evaluated during detailed design in coordination with YDH and YREF
operations.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
The interface shall be through PI system installed at both the facility, DMZ
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be used in order to make the data exchange highly secured. Contractor
shall provide fiber cables between YREF and YDH. The possible option of
ASH
ASH
ASH
interfacing both the facilities shall be further evaluated during detailed design.
LEADS
LEADS
Contractor shall provide and install new junction boxes, branch cables,
LEADS
ALL
ALL
ALL
utilizing existing cable trays. Refer drawing VA-549870.001 for cable routing.
Reference Drawings:
JO/EWO
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
33
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
34
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
35
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
36
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
37
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
38
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
39
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
40
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
41
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
42
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
AMR
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV.CNO.__________ 10-02399- ALL
A
ALL
06/01/16 0001 ISSUED FOR 60% FEL3 LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER 10-02399- ALL
APPROVAL/CERTIFICATION REQUIREMENTS, B 08/04/16 ISSUED FOR 90% PROJECT PROPOSAL LEADS ASH SAY AHG
0001
AGENCY
BY:
LEADS
PROJECT
BY DRAWING COMPLETION CERTIFICATE
09/08/16
ENGINEER
09/08/16
ENGINEER
10-02399-
09/08/16
09/08/16
DISCIPLINE
ALL
ALI H GHAMDI
09/08/16
CERTIFIED
ASH AHG
EL SHARKAWY
ISSUED FOR 100% PROJECT PROPOSAL
OPERATIONS
LEADS SAY
CONSTRUCTION
A M ALMATROOK
C
SHAHZAD YAZDANI
(DCC) NO. _____________________ 09/08/16 0001
DATE:
YANBU
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
X40
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-02399-0001
DRAWING NO.
GEN-E0102
43
Of
307
SHT.NO.
C
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
Saudi Aramco 2616-ENG (03/99)
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Telecom
ASH
ASH
ASH
Provide two(2) 48 core Fiber optic cable from Yanbu Distribution Hub to
Yanbu Refinery Admin Bldg 1401. One fiber is for IT and the other for
LEADS
LEADS
LEADS
ALL
ALL
ALL
Process connectivity.
Provide hotline circuits in Operation Bldg. at Yanbu Distribution Hub to
connect in the Yanbu RSCC.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
DATE
D. Electrical:
Provide and Install three 480V, 3phase, 3wire MOVs Panels feeding from
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER
Empty spaces of existing MCCs in Substation No. 7, 8 and 9 shall be utilized
to feed MOVs Panels.
C
A
DATE:
Run and terminate power cables for MOV.
PROJECT
ALL LEADS
ENGINEER
09/08/16
Provide Grounding to new MOV panels from existing YANBU refinery
Grounding network.
DATE:
A M ALMATROOK
CERTIFIED Provide task/area lighting for new equipment from existing nearby lighting
09/08/16 Panels.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY E. Structural:
09/08/16
LSTK contractor shall use geotechnical report recommendation from proposal
DATE: geotechnical report 2015/104 and existing geotechnical report 93/90 for
OPERATIONS
SHAHZAD YAZDANI foundation design requirement during detailed design.
09/08/16
All necessary structures and foundations for MOV’s and Pipe Supports.
DATE:
CONTROL NUMBER
ALI H GHAMDI
Other Connection: MARAFIQ
VERIFICATION
09/08/16
EDSD
THE CONTRACTOR shall coordinate with Saudi Aramco and MARAFIQ for
BY:
the portion of works under MARAFIQ scope and insure correct interface of all
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
THE CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to feed power to Yanbu Distribution Hub (YDH). (Refer sketch # SK-A10011,
SK-A10013 & SK-A10014)
ASH
ASH
ASH
LEADS
two (2) revenue meters & two check meters for YDH feeders-1 & 2. (Refer
LEADS
ALL
ALL
ALL
accommodate line differential relays & directional relays for YDH feeders-1 &
ISSUED FOR 90% PROJECT PROPOSAL
THE CONTRACTOR shall provide one (1) 125VDC Power Panel to supply
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
DISCIPLINE requirements and reflect accordingly within the Detail Design Drawings.
ENGINEER
Development of protection, control, fire alarm, communication, etc., interface
C
A
DATE:
drawings shall be THE CONTRACTOR responsibility including purchase,
PROJECT installation, termination and testing of the required cabling.
ALL LEADS
ENGINEER
09/08/16 THE CONTRACTOR shall assist MARAFIQ as required with Manpower, and
DATE: test equipment, as necessary to complete MARAFIQ 115kV and Saudi
A M ALMATROOK
CERTIFIED Aramco 115kV Interface Testing including Protection, Metering, Controls, etc.
09/08/16 including wiring interface drawing development. Test Results shall be signed
DATE: by all relevant parties including POD, PID, MARAFIQ, etc. and be included
CONSTRUCTION
AMR EL SHARKAWY
AGENCY within the Project Test Results binders maintained and developed by THE
09/08/16
CONTRACTOR as per SAEP-122.
DATE:
OPERATIONS
THE CONTRACTOR to consider Integration Philosophy between the
SHAHZAD YAZDANI
MARAFIQ 115KV Substation # 9I and the New Saudi Aramco 115kV
09/08/16
Receiving Substation. Interface philosophy will be finalized as per Connection
DATE:
Agreement between MARAFIQ & Saudi Aramco. Initial communication has
CONTROL NUMBER
ALI H GHAMDI
been established to finalize the scope segregation between Saudi Aramco &
VERIFICATION
09/08/16
MARAFIQ. Proposed interface requirements are as followed:
EDSD
- MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays:
DATE:
=EB04 and =EA06 for Saudi Aramco YDH project. MARAFIQ requested
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
- MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
(DCC) NO. _____________________
combine metering panels for 2 feeders of YDH. Each YDH feeders shall
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG have a separate revenue meters and will be accommodated in this panel.
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Reserved available floor space for this panel. New Panel to be tagged as:
=E+MP05 115KV Service Cable/Revenue Metering panel.
ASH
ASH
ASH
- Protection Scope- Primary Protection: Two (2) new Relay Panels are
LEADS
LEADS
LEADS
ALL
required based on ABB relays. Reserved available floor spaces for these
ALL
ALL
- Protection Scope- Back Up Protection: Two (2) new relay Panels are
DESCRIPTION
0001
0001
DATE
ALI H GHAMDI
VERIFICATION
DATE:
B. Telecom:
BY:
THE CONTRACTOR shall design, supply, install, test and assist with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
commissioning of two (2) x 2 run 12C Single Mode Fiber Optic Cables run
OF THIS DRAWING IS COVERED, FOR ALL
along with each power feeder cable from MARAFIQ Substation #9I to YDH.
(DCC) NO. _____________________
(Refer sketch # SK-A10010 & ELA10130-001-003). Each of the two (2) fiber
run will have one 12 core fiber for Control and one 12 core fiber for
Communication connectivity.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
The fiber patch panel in Substation #91 shall be wall type and in YDH the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH fiber patch panel shall be rack mounted type.
ASH
ASH
C. Instrumentation:
THE CONTRACTOR shall provide and install the following for Water metering
LEADS
LEADS
LEADS
ALL
ALL
ALL
UTILITY WATER
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
- Provide metering skid for utility water system as indicated in the drawing
DESCRIPTION
SANITARY WATER
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16 - Provide connection of Utility Water at the approved tie-in point for Potable
DATE: water system as indicated in the drawing CIA00110-002 and CIA00116-
CONTROL NUMBER
ALI H GHAMDI
001, using the standard typical connections of RC.
VERIFICATION
09/08/16
- Contractor shall coordinate with MARAFIQ for the time to make the
EDSD
operation. Requesting the close down of the pipe section if applicable and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
- Provided with pipes, fittings and flanges for a proper connection and leave
the connection uncovered until a water test verifies there are not spills at
(DCC) NO. _____________________
SANITARY WATER
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG - Provide connection of Sanitary Water at the approved tie- in point for
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Sanitary water system as indicated in the drawing CIA00110-002 and
CIA00116-001, using the standard typical connections of RC.
ASH
ASH
ASH
- Contractor shall coordinate with MARAFIQ for the time to make the
LEADS
LEADS
LEADS
ALL
operation.
- Provided with pipes, fittings and flanges for a proper connection and leave
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
the connection uncovered until a water test verifies there are not spills at
DESCRIPTION
The interface point shall be at the flange face at each respective product
10-02399-
header line downstream of any tankage, booster pumps, process piping, and
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Manifolds shall be constructed to allow for dedicated product service and
DATE: dedicated receipt and delivery of product (2-PG91, 2-PG95, 2-DO, 2-
OPERATIONS
SHAHZAD YAZDANI
DPK, and slop).
09/08/16
DATE: A product dedicated receipt manifold shall connect all of the refinery
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
supply pipelines to each tank in that respective service including the T&I
09/08/16
tank with dual product service.
EDSD
DATE:
respective service including the T&I tank with dual product service with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG and manifolds shall be designed to minimize product cross
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH contamination.
ASH
ASH
ALL
ALL
reduced loading rates for low sulfur diesel and aromatic products.
Two separate red and green color dye injection systems shall be installed in
ISSUED FOR 60% FEL3
YDH facility. The dye injection must inject dye at the inlet header of storage
tanks (at the downstream of receiving manifold) so that a single skid of green
dye and single skid for red dye can provide adequate coloration for PG-91 and
PG-95 from all the source. The color dye injection system shall be a complete
vendor skid with tank and injection pumps.
The scope for the color dye injection Skid is outlined in PFD VA247835-001
and P&IDs VA247891-001. CONTRACTOR shall develop a detailed P&ID after
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
09/08/16
08/04/16
06/01/16
NO.
REV
DATE: empty DPK tank as per the operation requirement. DPK filtration skids shall be
PROJECT
ALL LEADS
ENGINEER
sized to handle a capacity of 45 to 200 MBD and will be a completely vendor
09/08/16 designed skid
DATE:
CERTIFIED The scope for Filtration Skid is outlined in PFD VA-247843.001 and P&IDs VA-
A M ALMATROOK
09/08/16
247915.001. CONTRACTOR shall develop a detailed P&ID after vendor
DATE: information during detail design and CONTRACTOR shall make sure the
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
design shall meet the requirement of SAES-A-302 Aviation fuel quality
09/08/16 assurance design requirement
DATE:
OPERATIONS
SHAHZAD YAZDANI Conductivity Enhancer Injection Skid
09/08/16
DATE:
Conductivity enhancer injection skid shall be provided at YDH to enhance
CONTROL NUMBER
ALI H GHAMDI
conductivity of DPK. The conductivity enhancer injection skid is proposed to be
VERIFICATION
09/08/16
a complete vendor skid. The injection shall be provided on the inlet line to DPK
EDSD
storage tanks from receiving manifold. Provision shall also be provided for
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
system shall be a complete vendor skid with tank and injection pumps.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The scope for the conductivity enhancer injection Skid is outlined in PFD
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Static Dissipative Additive (SDA) Injection Skid
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
proposed to be a complete vendor skid. The injection shall be done on the inlet
line to DO storage tanks from distribution manifold. The static dissipative
additive injection system shall be a complete vendor skid with tank and
ISSUED FOR 100% PROJECT PROPOSAL
injection pumps.
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
The scope for the static dissipative additive injection Skid is outlined in PFD
ISSUED FOR 60% FEL3
TMS with Distributed Control System (DCS) shall be provided for the control
and logic functions required to operate YDH. The TMS-DCS shall also be
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
other Third party controls within YDH. All the relevant communication, process
parameters and status shall be interlinked between Yanbu, YASREF, SAMREF
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER
4.3.2 Yanbu to Jiddah Pipeline
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
The YNJ-1/2 pipeline system shall tie-in with YDH at downstream of shipper
09/08/16 pump after the PCVs. The battery limit will be the tie-in flange provided by YDH
DATE:
in the scraper launcher lateral line for YNJ-1 / YNJ-2 and the flanges provided
CERTIFIED in the delivery manifold for the central region pipeline. As YDH is a greenfield
A M ALMATROOK
09/08/16
development, the planning of both the YNJ-1/2 pipeline system and YDH shall
DATE: consider each other in the design as well as future plans for the facilities within
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
YDH.
09/08/16
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
4.3.2.1 Mechanical
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 The project construction interface point shall be a flange connection at the
EDSD
pipeline scraper launcher. The design interface point shall be at the tank outlet
flange because the system hydraulic modelling shall be included in the scope
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
4.3.2.2 Electrical
(DCC) NO. _____________________
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG YDH 480V systems shall provide power to the panel board located at the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Scraper Launcher area within YDH battery limit. The 480V panel board shall
be provided by BI-10-02155.
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
for the sizing, not design, of the non-electrical facilities included in YDH project
ISSUED FOR 90% PROJECT PROPOSAL
scope, BI-10-02399. The non-electrical utility systems include, but are not
DESCRIPTION
limited to:
ISSUED FOR 60% FEL3
4.3.2.4 Buildings
JO/EWO
10-02399-
0001
0001
DATE
DISCIPLINE
ENGINEER Process Automation systems for YDH and YNJ-1/2 pipelines should synergize
C
A
09/08/16
DATE:
4.3.4 Communications / IT
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
Corporate IT, data centers, mobile radio and security. The project shall provide
REVISIONCERTIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
The YDH Package shall reserve rack space location at Engineering
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and Maintenance Building for Pipeline FOC patch panel provided
under BI-10-2155
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
2155
The process automation traffic shall be transmitted through dedicated
fiber strands, PDN segregated from the corporate IT data network.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
requirement.
The telephone services shall be IP based and provided through the
VoIP call control systems core servers in Dhahran and Abqaiq.
Mobile radio shall be based on Terrestrial Trunked Radio (TETRA)
technology.
The security systems will be interfaced to Yanbu Regional Security
Control Center (YRSCC).
JO/EWO
4.3.5 MARAFIQ
10-02399-
Electrical
10-02399-
10-02399-
0001
0001
0001
DATE
MARAFIQ’s Substation #9I, which is located about 3.85 km away from the
NO.
REV
DATE:
PROJECT
ALL LEADS
ENGINEER
Non-Electrical Utilities
09/08/16
DATE:
This BI will also interface with MARAFIQ utilities. The scope development
CERTIFIED design activities will coordinate with MARAFIQ to finalize a formal agreement.
A M ALMATROOK
09/08/16
DATE: The non-electrical utility Interfaces include:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Potable water system
09/08/16 Fire protection system
DATE: Sanitary sewer
OPERATIONS
SHAHZAD YAZDANI Storm water drainage (MARAFIQ channels)
09/08/16
DATE:
4.3.6 Yanbu Royal Commission (YRC)
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
All pipelines, power cables and fiber optic cables connecting YDH to the
previously mentioned interfaces (SAMREF, YASREF, YR, MARAFIQ and
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG This project shall coordinate construction activities with the respective refineries,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipeline construction, OSPAS and Domestic Sales & Logistics (DS&LD) departments.
Scheduling for refinery shutdowns and other critical operations shall be developed
ASH
ASH
ASH
during the detail design and shall be included in the Project Execution Plan. Pre-
commissioning, shutdown, commissioning and startup procedures shall be
LEADS
LEADS
LEADS
ALL
ALL
ALL
A. GENERAL
The demolition activities in this project will be limited to the demolition required
for tie-in to the existing piping in:
Yanbu refinery for the terminal unloading line and existing pump
headers.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
08/04/16
06/01/16
CONTRACTOR shall identify the required demolitions for tie-in during detail
NO.
REV
DATE: B. PIPING
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall be responsible for demolishing the following facility
DATE: components:
CERTIFIED
A M ALMATROOK
09/08/16 YANBU REFINERY
DATE: Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m
CONSTRUCTION
AMR EL SHARKAWY
AGENCY length) for new tie-in connection for Product pipelines from YR Terminal per
09/08/16
SAUDI ARAMCO standards.
DATE: To install new feed line for Gasoline(PG91/PG95) to YDH ,Tie-in at the 18”
OPERATIONS
SHAHZAD YAZDANI common header of Gasoline loading and Transfer pumps(V25-P-P17 A-E)to
09/08/16 be taken at Yanbu Refinery near Pump Station-C
DATE: To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
CONTROL NUMBER
ALI H GHAMDI
common header of Kerosene loading and Transfer pumps(V25-P22 A/B/C)
VERIFICATION
To install new feed line for Diesel (DO) to YDH ,Tie-in at the 20”MDO
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
VA236960D-002.
SAMREF REFINERY
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
length) for new tie-in connection for product pipelines from SAMREF
Refinery per SAUDI ARAMCO standards.
ASH
ASH
ASH
These tie-ins are required to transfer products from SAMREF to YDH from
LEADS
LEADS
LEADS
ALL
ALL
ALL
existing product export pumps (DO, PG 91, 95 & DPK) at the SAMREF
refinery.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
YASREF REFINERY
These tie-ins are required to transfer products from YASREF to YDH from
existing product export pumps (DO & PG 91,95) at the YASREF refinery.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
General Requirement:
DISCIPLINE
ENGINEER
Tie-in connections:
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER CONTRACTOR to provide construction tie-in package with regard to location,
09/08/16 orientation, dimensions, etc., prior to final fabrication.
DATE:
A M ALMATROOK
CERTIFIED CONTRACTOR shall verify each tie-in with regard to location, orientation,
09/08/16 dimensions, etc., prior to final fabrication.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall assist SAUDI ARAMCO to isolate product lines & re-
09/08/16
commission each system to be tied into.
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall submit to SAUDI ARAMCO, for approval specific
09/08/16 procedures and sequences for tie-ins to existing facilities and to new facilities.
DATE: The tie-in procedures are to be submitted fourteen (14) days in advance of the
planned tie-in date.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
mandated to closely co-ordinate with other BI’s to ensure that all agreed
REVISIONCERTIFICATION
interfaces are covered and performed. Refer to interfaces are covered and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
performed.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. CIVIL
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
asphalt road and paving and or concrete paving in location where pipelines
redundant in open cut road crossings are to be installed.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide civil and structural drawings for all the required
DESCRIPTION
road crossings and fence penetration for laying the product pipelines, electrical
ISSUED FOR 60% FEL3
Roads that are demolished for the above reasons will be backfilling following
SAES-A-114 and reinstated after the under pavement work is completed. Work
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER
A. GENERAL
C
A
DATE:
PROJECT CONTRACTOR shall design and install the product receiving station in YDH
ALL LEADS
ENGINEER
09/08/16
including, but not limited to the following facilities:
DATE:
CERTIFIED Four product receiving and distribution manifolds, one each for PG 95,
A M ALMATROOK
PG 91, DO & DPK
09/08/16
DATE: One Slop manifold
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Provision for connections in the receiving manifolds for two product
09/08/16 pipelines from YASREF
DATE: Provision for connections in the receiving manifolds for three product
OPERATIONS
SHAHZAD YAZDANI
pipelines from SAMREF
09/08/16 Provision for connections in the receiving manifolds for three product
DATE: pipelines from Yanbu Refinery Terminal (YRT) via Yanbu Refinery (YR)
Provision in the receiving manifolds for future connection of PG 91/95,
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Three custody metering skids with two provers (1 for PF/DO & 1 for
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Surge relief protection for all eight inbound pipelines from all 3 sources
(SAMREF, YASREF & YR)
Interface management system
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The receipt manifolds shall be sized for the maximum flow rate of a single
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
refinery supply and the manifold is not expected to receive the same
product from two sources simultaneously. The manifolds shall be connected
ASH
ASH
ASH
to all the three product sources at the upstream and to respective storage
tanks at the downstream. CONTRACTOR shall provide Process interlocks
LEADS
LEADS
LEADS
ALL
ALL
ALL
to the manifold valves to receive the product from one source at a time.
Provision for connecting the future GR refinery shall be provided in all
receipt manifolds.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
The product and slop manifolds shall be of 30” size and for each manifold
ISSUED FOR 60% FEL3
DPK main line from DPK storage tanks to booster pumps. Details of
Conductivity enhancer injection skid shall be finalized after vendor
10-02399-
10-02399-
10-02399-
0001
09/08/16
08/04/16
06/01/16
Static Dissipative Additive (SDA) injection skid shall be installed to inject the
NO.
REV
DISCIPLINE chemical to reduce the static charge of DO. The additives shall be injected
ENGINEER
to the main line from the DO receiving manifold to the DO storage tanks.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER Three custody metering skids each dedicated for PG95/PG91, DO and
09/08/16 DPK shall also be installed at YDH for YRT products. Each metering skid
DATE: shall consist of 4 meter runs (3 operating and 1 standby), prover assembly
CERTIFIED
A M ALMATROOK and densitometer. Prover shall be common for PG 91 , PG 95 and diesel,
09/08/16
DATE:
whereas one prover will be dedicated for DPK.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Red and green dye injection skids shall be installed at YDH for the coloring
DATE: of PG 95 and PG 91 products from all sources. The red and green dye shall
OPERATIONS
SHAHZAD YAZDANI be injected to the main line from the PG-95/91 receiving manifold to the
09/08/16
PG-95/91 storage tanks respectively.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 All eight inbound pipelines from all 3 sources (SAMREF, YASREF & YR)
EDSD
shall be protected for surge relief and will relief into surge relief tank at
YDH. Each inlet line shall have two SRVs with its isolation valves and a
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The scope for the product receiving station is outlined in PFD VA-
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The details of the batch management system are outlined in Section B
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH instrumentation.
ASH
ASH
B. INSTRUMENTATION
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
247894.001 and Block Diagram IN-A00002.017
ENGINEER
C
A
DATE:
CERTIFIED
THE CONTRACTOR shall provide and install homerun cables IC-
A M ALMATROOK
0790/0797/0798/0805/0806 from junction boxes X40-AJB-
09/08/16
DATE:
2033/DJB-1037/EAJB-4027/EDJB-3022 to DCS/ESD Remote I/O
CONSTRUCTION
AMR EL SHARKAWY Marshalling Cabinets located in RIB-1 as per Block Diagram IN-
AGENCY
09/08/16 A00002.017.
DATE:
OPERATIONS THE CONTRACTOR shall provide and install field instruments for
SHAHZAD YAZDANI
09/08/16
DO/DPK at receiving manifold as indicated in P & ID# VA-
247895.001/ VA-247896.001/ VA-247897.001 and Block Diagram
DATE:
IN-A00002.018
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
THE CONTRACTOR shall provide and install field instruments for
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
slop manifold as indicated in P & ID# VA-247897.001 and Block
Diagram IN-A00002.019.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
DATE
Refer block diagram IN-A00001.003 for YDH CMS overview and IN-
09/08/16
08/04/16
06/01/16
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IN-D00207 Instrument Installation Schedule-Relief Valves
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
C. COMMUNICATION
DESCRIPTION
ISSUED FOR 60% FEL3
Drawing # Description
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
PROJECT
D. CIVIL
ALL LEADS
ENGINEER
09/08/16
DATE:
CERTIFIED
CONTRACTOR shall provide Oily water system to collect oily water
A M ALMATROOK from this facility.
09/08/16
DATE: CONTRACTOR shall provide Utility/potable water connection for
CONSTRUCTION
AMR EL SHARKAWY
AGENCY washing, eye wash and shower.
09/08/16
DATE:
CONTRACTOR shall provide sealed catch basin.
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall provide storm water system.
09/08/16
DATE:
E. PIPING
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
No.PI-A00001-001)
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
This manifold connected to all the three product sources on the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
upstream side of the facility to respective storage tanks on the
ASH
LEADS
LEADS
ALL
ALL
ALL
The pipeline for three custody metering skids each is dedicated for
PG95/PG91, DO and DPK, also two provers shall be provided near
Receipt manifold.
Pipeline for Red and Green dye injection skids shall be installed at
YDH for product identification for products received from all source
refineries
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
The piping layout for Receipt manifold, Custody metering skids are
shown in Piping plan as per Drawing control sheet.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE Piping layout for Dye injection, SDA & Conductivity enhancer skid are
ENGINEER
mainly small bore lines, which to be carried during detail design.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall design and install the product receiving manifold in YDH
DATE: as per drawings issued DCL.no.GEN-D0001 including, but not limited to the
CERTIFIED
A M ALMATROOK following facilities:
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall perform Piping Design, Procurement,
DATE: Fabrication, Transportation, Erection, Installation, Testing, Inspection,
OPERATIONS
SHAHZAD YAZDANI Pre commissioning and Commissioning support for the following
09/08/16 piping system in accordance with the latest edition of SAUDI
DATE: ARAMCO Engineering Standards & Specifications and other
CONTROL NUMBER
ALI H GHAMDI
applicable International Codes and Standards:
VERIFICATION
09/08/16
Distribution manifold of four products and slops shall be routed to
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
All new piping from Battery limit of RC Corridor to New storage Tank
OF THIS DRAWING IS COVERED, FOR ALL
feeding to the booster pumps as per Project P&IDs and Piping Plans
(DCC) NO. _____________________
listed in DCL.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Hydraulics & surge analysis of the pipeline system shall be provided
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
by the contractor and approved prior to laying and installation of the
ASH
pipeline system.
ASH
Surge relief system for the pipelines along with associated pumps
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
Yanbu’ distribution hub tank farm and support infrastructure consists of the
09/08/16
08/04/16
06/01/16
NO.
REV
following facilities:
DISCIPLINE
ENGINEER
GENERAL
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER Product storage tanks
09/08/16 Slop System
DATE: Surge Relief System
CERTIFIED
A M ALMATROOK DPK Filtration Skid
09/08/16
Hydrocarbon Drain System
DATE:
CONSTRUCTION
AMR EL SHARKAWY Metering System
AGENCY
09/08/16
NON-ELECTRICAL UTILITIES
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
Potable water system
DATE:
Fire protection system
Industrial drainage (oily water) system
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
A. GENERAL
REVISION
AHG
AHG
AHG The product tanks shall be constructed as a separate construction package in the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
distribution hub (YDH) and is not included in this scope of THE CONTRACTOR;
however CONTRACTOR shall provide automatic tank dewatering system, the
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The product split, the type and the capacities for the tanks to be constructed in
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Tank Size-
ISSUED FOR 60% FEL3
Total Capacity
Working Number Design Design MDMT
Tank Type Working
Volume m³ of Tanks Pressure Temp. (⁰C) (⁰C)
Volume m³ (MB)
(MB)
External
PG 91 27,658 (174) 3 82,974 (522) Atm 75 0
Floating roof
External
PG 95 27,658 (174) 3 82,974 (522) Atm 75 0
Floating roof
JO/EWO
Fixed Dome
DO 40,842 (256.9) 3 122,526 (770.7) Atm 75 0
roof
10-02399-
10-02399-
10-02399-
0001
Internal
0001
0001
DATE
Floating roof
DISCIPLINE Internal
ENGINEER DO/DPK 53,132 (334.2) 1 53,132 (334.2) Atm 75 0
C
Floating Roof
A
DATE:
PROJECT
ALL LEADS
ENGINEER Note: The tank capacities are provided to meet the 85% of nominal volume
09/08/16
specified per the project scoping paper.
DATE:
CERTIFIED
A M ALMATROOK
09/08/16 Slop System
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Slop system shall be consisting of two slop tanks (by others) and two slop pumps
(one operating, one spare) with necessary instrumentation and piping. Two slop
DATE:
tanks each of 13,514 m³ (85 MB) working capacity shall be provided to handle the
OPERATIONS
SHAHZAD YAZDANI
intermix products from the pipeline, slops from the oily water treatment and surge
09/08/16
relief tank. The design parameters for the slop tank shall be as follows:
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
Total Capacity,
DATE:
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
(MB)
OF THIS DRAWING IS COVERED, FOR ALL
Internal
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The slop tanks shall be constructed as separate construction package in YDH
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
along with product storage tanks and is not included in this scope of The
CONTRACTOR; however CONTRACTOR shall provide tank dewatering system,
ASH
ASH
ASH
the required instrumentation and piping requirements as specified in the piping and
instrumentation sections of this document. Refer to Appendix 6 for YDH Storage
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide pumps to empty the slop tanks to product tanks and
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
the slop product shall be blended with the finished product in in storage tanks
without affecting the quality of the product. CONTRACTOR shall connect the slop
DESCRIPTION
tank pump discharge to individual tank inlet to avoid any product contamination
ISSUED FOR 60% FEL3
during transfer. Slop tank shall also be provided with a provision to connect to the
DO /DPK booster pump suction, which enables YDH to pump the slop product to
NJBP along with the intermix products.
The scope for the slop system is outlined in PFD VA-247842.001 and P&IDs VA-
247912.001 to VA-247914.001.
Surge Relief System
JO/EWO
The following is a general scope narrative for the surge relief system:
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall design and install surge relief systems for the YNJ-1 & YNJ-2
pipelines per surge requirement from BI-10-02155 and for all the inbound pipelines
09/08/16
08/04/16
06/01/16
NO.
REV
from each source. A surge relief system consisting of a surge relief tank (by others)
DISCIPLINE
ENGINEER
and pumps shall be installed. The surge tank pump will transfer the surge volume
to the slop tank. The central pipeline flowrate (400 MBD) is used as the basis for
C
A
DATE: the surge relief tank volume & line sizing. Accordingly, 30 minutes holdup of 400
PROJECT
ALL LEADS
ENGINEER
MBD has been taken for surge tank sizing and 400 MBD for its inlet line sizing. The
09/08/16 surge relief system shall include the surge relief valves, the piping to the surge
DATE:
relief tank and the instrumentations. The surge relief tank shall be of 1,351 m³ (8.5
CERTIFIED MB) capacity as specified below to cater the requirement of both YNJ-1 & YNJ-2
A M ALMATROOK
09/08/16 and future central region pipeline.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Total Capacity,
09/08/16
Tank Size- Working Number of Working Design Design MDMT
Tank Type
DATE: Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
OPERATIONS
SHAHZAD YAZDANI (MB)
09/08/16
Surge Internal
DATE: 1351 (8.5) 1 1351 (8.5) Atm 75 0
Relief Floating roof
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
of this document.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
OF THIS DRAWING IS COVERED, FOR ALL
transfer the surge volumes to the slop tanks as necessary. The details of the pump
(DCC) NO. _____________________
and piping requirements are specified in piping and mechanical rotating sections of
this document. The scope for the surge relief system is outlined in PFD VA-
247849.001 and P&IDs VA-247929.001 to VA-247930.001.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Similarly, like surge relief system at YDH, same systems shall also be provided at
SAMREF and YR.
ASH
ASH
ASH
At SAMREF, CONTRACTOR shall design and install surge relief systems for the
LEADS
LEADS
LEADS
ALL
ALL
ALL
SAMREF pipeline protection. A surge relief system consisting of a surge relief tank
and pumps shall be installed. The surge tank pump will transfer the surge volume
to YDH via respective inbound pipeline from SAMREF to YDH. The SAMREF PG
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
pipeline flowrate (554 MBD) is used as the basis for the surge relief tank volume &
line sizing. Accordingly, 30 minutes holdup of 554 MBD has been taken for surge
DESCRIPTION
tank sizing and 554 MBD for its inlet line sizing. The surge relief system shall
ISSUED FOR 60% FEL3
include the surge relief valves, the piping to the surge relief tank and the
instrumentations. The surge relief tank shall be of 1849 m³ (11.6 MB) capacity as
specified below.
Total Capacity,
Tank Size- Working Number of Working Design Design MDMT
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
JO/EWO
(MB)
Surge Internal
Relief (at Floating 1849 (11.6) 1 1849 (11.6) Atm 75 0
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
SAMREF) roof
09/08/16
08/04/16
06/01/16
DISCIPLINE piping and pumps as specified in instrumentation, piping and mechanical sections
ENGINEER of this document.
C
A
DATE:
PROJECT CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
ALL LEADS
ENGINEER
transfer the surge volumes to YDH via respective inbound pipeline from SAMREF
09/08/16
to YDH. The details of the pump and piping requirements are specified in piping
DATE:
CERTIFIED
and mechanical rotating sections of this document. The scope for the surge relief
A M ALMATROOK system is outlined in PFD VA-247849.001 and P&IDs VA-247934.001 to VA-
09/08/16
DATE:
247934.002.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 At YR, CONTRACTOR shall design and install surge relief systems for the
YASREF and YR pipeline protection. A surge relief system consisting of a surge
DATE:
OPERATIONS relief tank and pumps shall be installed. The surge tank pump will transfer the
SHAHZAD YAZDANI
surge volume to YDH via respective inbound pipeline from YR to YDH. The
09/08/16
YASREF DO pipeline flowrate (650 MBD) is used as the basis for the surge relief
DATE:
tank volume & line sizing. Accordingly, 30 minutes holdup of 650 MBD has been
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
taken for surge tank sizing and 650 MBD for its inlet line sizing. The surge relief
system shall include the surge relief valves, the piping to the surge relief tank and
EDSD
the instrumentations. The surge relief tank shall be of 2,180 m³ (13.7 MB) capacity
DATE:
as specified below.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Total Capacity,
OF THIS DRAWING IS COVERED, FOR ALL
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Surge Internal
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Relief (at Floating 2180 (13.7) 1 2180 (13.7) Atm 75 0
SAMREF) roof
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide two transfer pumps (one operating, one spare) to
transfer the surge volumes to YDH via respective inbound pipeline from YR to
DESCRIPTION
YDH. The details of the pump and piping requirements are specified in piping and
ISSUED FOR 60% FEL3
mechanical rotating sections of this document. The scope for the surge relief
system is outlined in PFD PR-A00004.001 and P&IDs PR-A00001.001 to PR-
A00001.002.
The CONTRACTOR shall provide a DPK filtration system to filter the off spec DPK
from the tanks. The DPK filtration is proposed to be a complete vendor skid with
JO/EWO
circulation pumps, pre filters and after filters. Normally, the filtration skid circulates
into the same product tanks or to an empty DPK tank as per the operation
10-02399-
10-02399-
10-02399-
0001
0001
DATE
The preliminary scope for Filtration Skid is outlined in PFD VA-247843.001 and
DISCIPLINE
ENGINEER P&IDs VA-247915.001. CONTRACTOR shall develop detailed P&ID after vendor
C
information during detail design and CONTRACTOR shall make sure the design
A
DATE: shall meet the requirement of SAES-A-302 Aviation fuel quality assurance design
PROJECT
ALL LEADS
ENGINEER requirement.
09/08/16
DATE:
CERTIFIED
A M ALMATROOK B. NON-ELECTRICAL UTILITIES
09/08/16
DATE: The MARAFIQ battery limit will be the tie-in point at the RC corridor for potable
CONSTRUCTION
AMR EL SHARKAWY
AGENCY water and sanitary waste water. MARAFIQ will be supplying the required quantity
09/08/16
of potable water and YDH will be discharging the industrial waste and sanitary
DATE: waste water to MARAFIQ network. CONTRACTOR shall make sure that the
OPERATIONS
SHAHZAD YAZDANI receipt and discharge from / to MARAFIQ network is provided with the metering
09/08/16 system as per the requirement of MARAFIQ.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 The non-electrical utility systems include, but are not limited to:
EDSD
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall provide utility water tank for the storage and supply of utility
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
water. The utility water tank and pressure equipment pumps shall be separated
from the Fire protection water tanks and equipment.
ASH
ASH
ASH
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
LEADS
LEADS
LEADS
ALL
ALL
ALL
metering system per the requirement of MARAFIQ will be provided for the metering
of utility water inflow.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Utility water will be supplied to the buildings, eyewash / safety showers, and YNJ-1
& YNJ-2 pipeline scraper launchers through utility water pumps (one operating,
DESCRIPTION
one spare).
ISSUED FOR 60% FEL3
CONTRACTOR shall provide Metering system required for the receipt of utility
water per the requirement of MARAFIQ. The scope for the utility water system is
outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.
CONTRACTOR shall install two (2) oily water lift stations in Yanbu’ distribution hub
to facilitate the gravity drain of oily water from all sources.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Oily water discharge from all identified sources shall be routed to the oily water lift
stations.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER The rainfall water within the tank farm dikes is considered contaminated water and
C
it will be collected by an oily water pipe system towards the oily water lift stations.
A
DATE:
PROJECT
ALL LEADS
ENGINEER In addition to the oily water drains from catch basins in the process area and storm
09/08/16 water inside of the tank dike, Oily water & DO storage tanks, sump shall also
DATE: receive flammable tank dewatering, pure hydrocarbon drains from process areas,
CERTIFIED
A M ALMATROOK and pumps. The details of hydrocarbon drain network are specified below under
09/08/16 utilities section.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Before water entering into the lift stations, the water shall pass through a sand
09/08/16
separator /trap which properly designed will retain sand particles from the sump
DATE: pumps
OPERATIONS
SHAHZAD YAZDANI
09/08/16 Each oily water lift station shall be provided with two pumps for normal flow (one
DATE: operating, one spare) and two pumps for maximum flow (one operating, one
CONTROL NUMBER
ALI H GHAMDI
spare). The normal flow pumps will discharge to an oily water treatment system
VERIFICATION
09/08/16 whereas the maximum flow pump shall discharge to the Evaporation pond.
EDSD
The details of the oily water lift station, instrumentation and details of pumps are
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall provide an Oily water treatment system for the treatment of
oily water. The oily water treatment system shall be of a complete vendor skid
(DCC) NO. _____________________
design and the treatment system shall receive the effluent from the oily water sump
via normal flow pump.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall route the effluent from normal flow pumps to an equalization
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH tank which will discharge into the CPI Oily water treatment.
ASH
ASH
The oily water treatment system shall receive the effluent from the normal flow
pump and the dewatered effluent from the product storage tanks. Before oily water
LEADS
LEADS
LEADS
ALL
ALL
ALL
entering into the oily water treatment unit, it shall pass through an equalization
tank.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The oily water treatment system shall be of a complete vendor skid design. The
oily water treatment system shall consist of but is not limited to an oily water
DESCRIPTION
equalization tank, CPI separator, water break tank, two effluent water pumps (one
ISSUED FOR 60% FEL3
operating, one spare), two skimmed oil pumps (one operating, one spare) and
necessary instrumentation and interconnecting piping. Pumps shall be provided to
transfer the recovered oil to the slop tank while effluent water to be transferred to
the MARAFIQ network.
The detail for the skid is outlined in mechanical section below. CONTRACTOR
shall provide the pump to transfer the recovered oil to the slop tank while effluent
water to be transferred to the evaporation pond.
JO/EWO
The scope for the oily water system is outlined in PFD VA-247846.001 & VA-
10-02399-
10-02399-
10-02399-
0001
DISCIPLINE
ENGINEER Hydrocarbon Drain System
C
A
DATE:
PROJECT
CONTRACTOR shall make sure that a separate drain network Drains from the
ALL LEADS
ENGINEER product tanks, manifolds, scraper launchers and pump stations will be routed to
09/08/16
the oily water lift stations in a separated network from the other oily water
DATE: resources.
CERTIFIED
A M ALMATROOK
09/08/16 Utility water system
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the
DATE:
OPERATIONS
metering of utility water inflow. CONTRACTOR shall provide utility water tank
SHAHZAD YAZDANI
for the storage and supply of utility water. Utility water will be supplied to
09/08/16
eyewash / safety showers, YNJ-1 & YNJ-2 pipeline scraper launchers and to
DATE: the buildings through utility water pumps (one operating, one spare).
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall provide Metering system required for the receipt of utility
EDSD
water per the requirement of MARAFIQ. The scope for the utility water system
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
Instrumentation for the collection and discharge of sewage from the buildings to
the MARAFIQ network.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Sewage discharged from buildings will be routed to a common sump and
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
transported by two lift pumps (one operating, one spare) to the MARAFIQ
sewage water network.
ASH
ASH
ASH
Sanitary sewage pipes from Operator shelters in the tank farm area will be
LEADS
LEADS
LEADS
ALL
ALL
ALL
discharge in two separate lift stations. The further lift station will discharge in
the other which will pump the waste water to the main lift station located close
to the main buildings area.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
for the metering of discharge effluent. The scope for the sanitary system is
ISSUED FOR 60% FEL3
The drainage system considers an adequate and consistent finish floor slope
towards channels and catch basins. Channels will be sloped properly to
10-02399-
10-02399-
10-02399-
0001
0001
DATE
ALI H GHAMDI
VERIFICATION
09/08/16 Provide 300mm thick marl capping bed inside evaporation pond includes 60mil
EDSD
rough surface HDPE (UV Resistant) liner above the marl capping.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
YDH Tank Farm and Support structure will have following sets of pumps.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Slop tanks will be emptied through Slop Tank Pumps (X40-G-0022 A/B) to
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
product tanks. These pumps shall be of Vertical Can Type due to low NPSH
available as per hydraulic calculations. Pumps shall be in accordance with 31-
ASH
ASH
ASH
LEADS
LEADS
ALL
Apart from above following sets of pumps shall also be provided as part of YDH
DESCRIPTION
Tank Farm and Support structure. Reference shall be made to Index-G for
ISSUED FOR 60% FEL3
Utility Water Pumps (X40-G-0030 A/B) for eyewash, safety showers and
drinking water – Datasheet No. RE-E00113
10-02399-
10-02399-
0001
0001
0001
DATE
CPI Separator Skim Oil Pumps (X40-G-0025 A/B) – Datasheet No. RE-
E00108 and effluent water pumps (X40-G-0026 A/B) – Datasheet No.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
RE-E00109. These will be part of CPI Separator package and shall be
ENGINEER
finalized by CPI Package vendor.
C
A
DATE:
PROJECT
In addition to above following sets of pumps are required at Yanbu Refinery
ALL LEADS
ENGINEER
09/08/16
and SAMREF.
DATE:
CERTIFIED
Surge Relief Pumps (V25-G-X004 A/B) at Yanbu Refinery – Datasheet
A M ALMATROOK
No. RE-E00147.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY Surge Relief Pumps at SAMREF (X40-G-X002 A/B) – Datasheet No.
AGENCY
09/08/16 RE-E00148.
DATE:
OPERATIONS
SHAHZAD YAZDANI
MISCELLANEOUS REQUIREMENTS
09/08/16
DATE:
Reference shall be made to technical specifications for pumps included
in Index-A for further details of these pumps.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG All pumps will be procured by CONTRACTOR from SAUDI ARAMCO
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
approved manufacturer for each Commodity Classification Code (CCC).
SAUDI ARAMCO will provide the list of approved manufacturers after
ASH
ASH
ASH
award of Contract.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Material take-offs have been prepared for reference only and will not be
ISSUED FOR 60% FEL3
Technical quotations obtained from vendors will list all exceptions and
/or, additions to applicable project Drawings and SAUDI ARAMCO
Specifications. If there is no exception to specifications, CONTRACTOR
will make a statement to that effect.
JO/EWO
0001
0001
DATE
DATE:
Supply of Commissioning and Start-up spares and first fill of all the
OPERATIONS
SHAHZAD YAZDANI
lubricants and chemicals is in the scope of CONTRACTOR.
09/08/16 CONTRACTOR shall obtain approval of Aramco Operations before
DATE: filling of lubricants and chemicals.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall be responsible to complete the Novation
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
procurement process for the Gasoline and Diesel shipper pumps.
CONTRACTOR will be provided with all relevant details of the purchase
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This section describes the Contractor’s scope of work for the design,
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
SR NO
EQUIPMENT TAG NO. QTY SERVICE
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
PROJECT 5 V25-D-0003 1 SURGE TANK
ALL LEADS
ENGINEER
09/08/16
ALI H GHAMDI 2 1
VERIFICATION
X40-U-0002
09/08/16 INJECTION SKID
EDSD
X40-U-0003
BY:
INJECTION SKID
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
X40-U-0004
PACKAGE
(DCC) NO. _____________________
5 1 CONDUCTIVITY ENHANCER
X40-U-0005
INJECTION SKID
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
X40-U-0011
INJECTION SKID
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
Below are the reference documents for all Mechanical Static equipment
and Packages.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
REFERENCE DOCUMENTS:
DESCRIPTION
TECHNICAL SPECIFICATION:
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG DATA SHEETS:
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EQE00027004 DATA SHEET FOR FIRE WATER TANKS (X40-D-0028 A/B)
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
EQE00033001 DATA SHEET FOR P95 RED DYE INJECTION SKIDS (X40-U-0002)
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
EQE00034001 DATA SHEET FOR P91 GREEN DYE INJECTION SKIDS (X40-U-0003)
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE DATASHEET FOR OVERHEAD CRANE FOR FIRE WATER PUMP SHELTER
ENGINEER
EQE00051002 (X40-U-0021)
C
A
DATE: EQE00052002 DATASHEET FOR OVERHEAD CRANE FOR GIS ROOM (X40-U-0024)
PROJECT
ALL LEADS
ENGINEER DATASHEET FOR OVERHEAD CRANE FOR ENGG. & MAINTENANCE
09/08/16
EQE00053002 BUILDING (X40-U-0025)
DATE:
CERTIFIED EQE00057004 DATA SHEET FOR SURGE TANK (X40-D-X001)
A M ALMATROOK
09/08/16 EQE00058004 DATA SHEET FOR SURGE TANK (V25-D-X003)
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
CONTRACTOR shall be responsible for supply, procurement, fabrication,
DATE: transportation handling, storage at site, erection, inspection, testing and Pre-
OPERATIONS
SHAHZAD YAZDANI commissioning, Commissioning support of all equipment and packages.
09/08/16
ALI H GHAMDI
prevent any damage during transportation and loading/unloading.
VERIFICATION
09/08/16
EDSD
CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
of equipment.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall be responsible for insulation (where specified on the data
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
ASH
ASH
All skid packages design shall be vendor proven design. Skid packages shall
be suitable for the specific application by meeting all the process design
LEADS
LEADS
LEADS
ALL
ALL
ALL
E. INSTRUMENTATION
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
mentioned below:
ISSUED FOR 60% FEL3
Provide and install cable between RTG instruments, the cables shall run
through conduits.
10-02399-
10-02399-
10-02399-
0001
Provide RTG junction boxes at the tanks as indicated in block diagram IN-
0001
0001
DATE
A00001.005.
09/08/16
08/04/16
06/01/16
NO.
REV
Provide and install fieldbus cables from RTG level transmitters to RTG
DISCIPLINE
ENGINEER
junction boxes through conduit.
C
A
Provide and install RTG fieldbus homerun cables between RTG junction
DATE:
PROJECT
boxes and Field Communication Units located in Rack room of Operation
ALL LEADS
ENGINEER building.
09/08/16
DATE: Refer block diagram IN-A00001.005 for fieldbus cabling and FCU
A M ALMATROOK
CERTIFIED assignments. The assignment shown is preliminary and shall be finalized
09/08/16 during detail design phase.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
All RTG components inside the rack room shall be supplied within a
AGENCY
09/08/16 cabinet. The RTG shall be interfaced to DCS over industry standard open
protocols.
DATE:
OPERATIONS
SHAHZAD YAZDANI Product Storage & Slop Tanks Field Instrumentation
09/08/16
DATE: Provide and install field instruments in the tank farm area as per P & IDs
VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-247912/
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Provide and install branch cables from field instruments to junction boxes.
DATE:
BY:
A00002.001/002/003/004.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Provide and install homerun cables from field junction boxes to DCS/ESD
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
To include product quantity measuring system from YDH to
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH
LEADS
LEADS
ALL
CONTRACTOR shall
ALL
ALL
DESCRIPTION
Provide and install field junction box X40-AJB-2032 & X40-EAJB-X032 lay
ISSUED FOR 60% FEL3
DPK Filtration Skid vendor shall provide and install field instruments as
JO/EWO
10-02399-
10-02399-
DPK Filtration Skid vendor shall provide and install junction boxes.
0001
0001
0001
DATE
Contractor shall provide and install homerun cables from skid junction
09/08/16
08/04/16
06/01/16
boxes to DCS marshaling cabinet located in RIB-2. The cables laying shall
NO.
REV
DISCIPLINE
be as per block diagram IN-A00002.022.
ENGINEER
Contractor shall integrate skid pumps to IRP panel located in substation
C
A
DATE: XXX2. Provide and install homerun cables DCS marshaling cabinet located
PROJECT
ALL LEADS
ENGINEER in RIB-2 to MCC. The cables laying shall be as per block diagram IN-
09/08/16 A00002.022.
DATE:
CERTIFIED
Field instruments for all the skids to be included
A M ALMATROOK
09/08/16 Oily Water Collection and Treatment system
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Contractor shall provide and install field instruments as indicated in P &IDs
09/08/16
VA-247921, VA-247922 & VA-247923 and as per block diagram IN-
DATE: A00002.011, IN-A00002.012 & IN-A00002.021
OPERATIONS
SHAHZAD YAZDANI
09/08/16
Provide and install branch cables from field instruments to junction boxes.
DATE: Provide and install junction boxes as per block diagrams IN-A00002.011,
CONTROL NUMBER
ALI H GHAMDI
IN-A00002.012 & IN-A00002.021
VERIFICATION
09/08/16
EDSD
Provide and install homerun cables from field junction boxes to DCS/ESD
marshalling cabinets located in Rack room of Operations Building and
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Provide and install cables between MCC IRP to DCS/ESD cabinets located
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Utilities
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a) Utility Water/Waste Water/Sanitary water
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
Contractor shall supply metering skid for Utility water, Waste water
and sanitary water.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Reference drawings
JO/EWO
Drawing # Description
IN-A00001 System Block Diagrams
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
IN-D00203 Instrument Installation Schedule-Level
PROJECT
ALL LEADS
ENGINEER
IN-D00204 Instrument Installation Schedule-Temperature
09/08/16 IN-D00205 Instrument Installation Schedule-Misc
DATE: IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
CERTIFIED
A M ALMATROOK IN-D00207 Instrument Installation Schedule-Relief Valves
09/08/16
DATE:
IN-A00004 Equipment Layouts
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
IN-A00003 Cable Routing Plan
09/08/16 IN-D00005 Cable and Conduit Schedule
DATE:
OPERATIONS
SHAHZAD YAZDANI
F. PIPING
09/08/16
DATE:
Piping plans have been developed showing the conceptual routing of all
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
major pipes with proper configuration in order to meet process objectives.
Pipe supports, platform and elevated structures shown in this submittal are
EDSD
preliminary. All major instruments such as MOVs, ZVs, PZVs and control
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
The preliminary stress analysis has been done for only the critical
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lines connected to pump systems. Any re-adjustment of the pipe
routing if needed and provision proper supports such as guides,
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
All the Facility shall be design & constructed with adequate space to
facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
All New piping (Only 2” & above) from Source refinery to receipt
10-02399-
0001
0001
DATE
DATE:
PROJECT
Line sizes 1.5” & below are not considered in during the Project
ALL LEADS
ENGINEER Proposal, MTO will be factored for small bore lines for estimation
09/08/16
purpose.
DATE:
A M ALMATROOK
CERTIFIED Future space considered for extension of sleepers in Pipe way &
09/08/16 Pipe trench.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
The requirement of surge tank, surge skid, surge tank pump are
AGENCY
09/08/16 tentatively shown in SAMREF and Yanbu refinery overall plot plan
Yanbu refinery. The location & feasibility study to be carry after
DATE:
OPERATIONS
confirmation from client.
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16
General Requirement for Piping
EDSD
DATE:
BY:
CONTRACTOR shall implement and comply with all the requirements below, in
full.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
CONTRACTOR shall provide the detailed construction drawing package
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
required to complete the facility and shall comply with all applicable codes
and standards.
ASH
ASH
ASH
LEADS
LEADS
ALL
CONTRACTOR shall also perform the stress calculations and readjust the
DESCRIPTION
stoppers, spring supports in order to limit the stresses within the acceptable
code limits.
CONTRACTOR shall design and construct the Facility with adequate space
to facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
CONTRACTOR shall perform Piping Design, Procurement, Fabrication,
Transportation, Erection, Installation, Testing, Inspection, Pre
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
DISCIPLINE
applicable SAUDI ARAMCO Standards and Specifications and the
ENGINEER American Society of Mechanical Engineers (ASME) Code ASME B31.4.
C
A
DATE: CONTRACTOR shall carry out all piping work in close liaison with the
PROJECT
ALL LEADS
ENGINEER SAUDI ARAMCO Representative to meet the project requirements.
09/08/16
CONTRACTOR shall be responsible for verifying all dimensions, angles,
DATE:
CERTIFIED and elevations prior to fabrication and installation.
A M ALMATROOK
09/08/16 CONTRACTOR shall provide all necessary vehicles for transportation of
DATE: personnel, utilities equipment and materials to and from the job site.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall be responsible for the security and protection of all
DATE:
equipment, tools and materials at the job site until installation is complete
OPERATIONS
SHAHZAD YAZDANI
and accepted by SAUDI ARAMCO.
09/08/16 Materials that are removed from the job site shall be hauled back to the
DATE: materials storage yard. Any of the materials left at the end of the job shall
CONTROL NUMBER
ALI H GHAMDI
be transported to designated yard or stored as directed by SAUDI
VERIFICATION
09/08/16 ARAMCO.
EDSD
CONTRACTOR shall provide all labor and support equipment including, but
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall field verify all the dimensions and elevations shown
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall follow all safety precautions required by SAUDI
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ARAMCO Standards and those suggested by the Loss Prevention Engineer
to ensure safe construction works.
ASH
ASH
ASH
LEADS
LEADS
ALL
109.
ALL
ALL
Bolts and studs shall extend completely through their nuts. As a minimum,
three (3) bolt threads shall extend through the nuts.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
required for the project and ensure that pipe support attachments to piping
ISSUED FOR 60% FEL3
are included during fabrication of piping spools and prior to any hydrostatic
testing of the system. Pipes shall be provided with necessary guides,
springs, clamps, anchors, etc. as required. Pipe shoe shall be provided for
insulated lines. Height of shoe for different lines shall be adjusted as per the
thickness of insulation. Pipe Support number shall be marked in relevant
piping drawings
CONTRACTOR shall fabricate and install field pipe supports, dummy legs,
guides, saddles, slide bearing plates, shoes and shims.
JO/EWO
CONTRACTOR shall provide high point vent and low point drain at suitable
10-02399-
10-02399-
10-02399-
0001
0001
DATE
DISCIPLINE
supplies and consumables required to procure, construct, install, test and
ENGINEER commission, the NJBP expansion facility in accordance with the Project
C
A
ALI H GHAMDI
VERIFICATION
designing piperacks.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
fabrication and construction of piping works for North Jiddah Bulk Plant
Expansion.
CONTRACTOR shall ensure that all piping materials shall conform to the
REVISION
AHG
AHG
AHG piping material specification and other related applicable SAUDI ARAMCO
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Standards and Specifications.
ASH
ASH
LEADS
LEADS
ALL
WELDING WORK
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
shall counter bore the larger wall thickness prior to welding in accordance
0001
0001
0001
DATE
06/01/16
Before welding pipe joints, CONTRACTOR shall inspect each joint or spool
NO.
REV
DISCIPLINE
to ensure that it is free of sand, debris or other foreign materials. Each pipe
ENGINEER string or section shall be internally cleaned before welding, coupling or
C
A
DATE:
RADIOGRAPHY AND NDT
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall perform radiography of all piping joints as per clauses
DATE: 17.2 and 17.5 of SAES-W-011.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Magnetic Particle Testing and Liquid Penetrant Testing requirements for
pressure containing welds other than butt welds (including sockolets,
DATE:
OPERATIONS weldolets and welded bosses) shall be per clause 17.5.3 of SAES-W-011.
SHAHZAD YAZDANI
09/08/16 Upon approval of waiver, spool pieces which cannot be hydro tested are to
DATE: be 100% radio graphed.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Radiography of welds shall be in accordance with SAEP-1143.
EDSD
complete the Piping work, including radiography and other NDT methods
REVISIONCERTIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall supply and apply painting and coating material in
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
accordance with vendor's recommended practice and as outlined in SAUDI
ARAMCO Engineering Standards Index-H series.
ASH
ASH
ASH
LEADS
LEADS
ALL
debris associated with painting at the jobsite at the end of each working
ISSUED FOR 60% FEL3
day.
CONTRACTOR shall ensure that no paint shall be placed within 2 inches of
areas to be welded prior to welding. Weld areas can only be painted after
the successful completion of required testing.
CONTRACTOR shall adhere to safety identification and color coding as
specified in SAES-B-067.
CONTRACTOR shall supply insulation for piping system. CONTRACTOR
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
Special Requirements:
DISCIPLINE
ENGINEER
Prior to start of construction, CONTRACTOR shall perform field verification
C
A
DATE: of all existing hazards that may jeopardize the safety of personnel and
PROJECT
ALL LEADS
ENGINEER property.
09/08/16
DATE:
CERTIFIED
CONTRACTOR shall submit Loss Prevention Program and Hazard
A M ALMATROOK Identification Plan for SAUDI ARAMCO approval no later than thirty (30)
09/08/16
DATE:
days after the effective date of the contract.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Prior to start of construction activities, CONTRACTOR shall identify the
DATE: existing pipeway/pipe culverts to be extend in SAMREF/YASREF & submit
OPERATIONS
SHAHZAD YAZDANI safe execution plan to SAUDI ARAMCO representative to work nearer to
09/08/16 active product/utility lines
DATE:
CONTRACTOR shall comply with all SAUDI ARAMCO safety regulations
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall dispose wastes associated with this scope of work in
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH accordance with G.I. 430. 001 “Waste Management” and Cat-3 EIA report.
ASH
ASH
LEADS
LEADS
ALL
A. GENERAL
ISSUED FOR 60% FEL3
CONTRACTOR shall design and install the YNJ-1 & YNJ-2 support infrastructure
including, but not limited to the following facilities:
The battery limit will be the tie-in flange provided by YDH in the scraper launcher
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
lateral line for YNJ-1 / YNJ-2. Utility Water supply from YDH shall also be provided
for YNJ-1 & YNJ-2 pipeline scrapers and accordingly drain from YNJ-1 & YNJ-2
09/08/16
08/04/16
06/01/16
pipeline scrapers shall also be received into oily water lift station.
NO.
REV
DISCIPLINE
ENGINEER The following are the interfaces with BI-10-02155 and CONTRACTOR shall re-
C
A
DATE: 2 Nos. pipelines, one of 20” ND (YNJ-1) and the other of 24” ND (YNJ-2) of
CERTIFIED
A M ALMATROOK following specs:
09/08/16
DATE: Pipeline Material = API 5L Gr.X65
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Flange Rating = 900#
DATE: MAOP = 15513.2 kPag (2250 PSIG)
OPERATIONS
SHAHZAD YAZDANI
Design Temperature = 60 °C
09/08/16
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
b) Utilities:
EDSD
- Utility water supply from YDH to YNJ-1/2 pipeline scraper launchers via two
DATE:
4” connections.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The scope for the YNJ-1 & YNJ-2 support infrastructure is outlined in PFDs VA-
(DCC) NO. _____________________
B. PIPING
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The scope of work includes design and construction of two pipelines ,YNJ-1
& 2 inside battery limit of YDH, but not limited to, the following activities:
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The design and installation of YNJ-1 20” Gasoline Pipeline & YNJ-2 24”
DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to Scraper
Launcher Facility constructed under BI-10-02155. Design and Installation of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
the Scraper launcher shall be the part of BI-10-02155 YDH Scope will start
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
DATE
following activities:
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
DATE:
CERTIFIED
A M ALMATROOK
CONTRACTOR shall design and install YNJ-1 20” Gasoline Pipeline &
09/08/16
DATE:
YNJ-2 24” DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to
CONSTRUCTION
AMR EL SHARKAWY Scraper Launcher Facility constructed under BI-10-02155. Design and
AGENCY
09/08/16 Installation of Scraper launcher shall be the part of BI-10-02155; YDH
DATE:
Scope will start at a flange upstream of Scraper launcher.
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG edition of SAUDI ARAMCO Engineering Standards & Specifications and
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH other applicable International Codes and Standards.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
A. GENERAL
JO/EWO
CONTRACTOR shall design and install the booster and shipper pumps for YNJ-1
10-02399-
10-02399-
10-02399-
0001
and YNJ-2 pipelines including, but not limited to the following facilities:
0001
0001
DATE
09/08/16
08/04/16
06/01/16
DISCIPLINE
Three (3) shipper pumps for YNJ-1 pipeline
ENGINEER Three (3) booster pumps for YNJ-2 pipeline
C
A
09/08/16
YNJ-2. Pumps shall be electric motor driven and fixed speed. The motors shall be
sized to accommodate the pump loads for the full spectrum of the pump curve. The
DATE:
pumps shall be fitted with all necessary instrumentation to protect the pump
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
(including seal leak detection) and to prevent overpressure.
EDSD
The following design parameters are established for the pipeline booster pumps.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
AHG
AHG
AHG The following design parameters are established for the pipeline shipper pumps.
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Rated flow Diff. Pressure Design Temp
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The scope for the YNJ-1 & YNJ-2 pumps is outlined in PFDs VA-247844.001 &
DESCRIPTION
availability. These pumps are provided to meet the high NPSHR of shipper pumps.
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
DIESEL/DPK BOOSTER PUMPS (X40-G-0018 A/B/C)
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
Diesel/DPK booster pumps shall be in accordance with 31-SAMSS-004 and shall
09/08/16 be of between bearings, horizontal split casing type Centrifugal pumps (API BB1).
DATE:
These pumps are provided to meet the high NPSHR of shipper pumps. Pump
CERTIFIED materials, mechanical seals shall be in accordance with SAES-G-005. Reference
A M ALMATROOK
09/08/16
shall be made to datasheet no. RE-E00101 included in Index-G.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
MISCELLANEOUS REQUIREMENTS
09/08/16
DATE: Pump Datasheets provided in this package are preliminary only. These
will be further verified by CONTRACTOR during detailed design phase
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
of the project before issuing for procurement activities.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
award of Contract.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall prepare Material Requisition Package for all the
pumps and shall obtain approvals from relevant SAUDI ARAMCO
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
Technical quotations obtained from vendors will list all exceptions and
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
comply with these requirements by stating on all sub suppliers’
purchase order SAUDI ARAMCO’s intention to inspect material.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER Equipment installation and Commissioning shall be in accordance with
09/08/16 approved Vendor’s installation and commissioning procedures.
DATE:
CERTIFIED
A M ALMATROOK Supply of Commissioning and Start-up spares and first fill of all the
09/08/16 lubricants and chemicals is in the scope of CONTRACTOR.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
CONTRACTOR shall obtain approval of Aramco Operations before
AGENCY
09/08/16 filling of lubricants and chemicals.
DATE:
OPERATIONS
SHAHZAD YAZDANI
CONTRACTOR will provide all Non Material Requirement (NMR-
09/08/16 602/603), Operation and Instruction Manuals of CONTRACTOR
DATE: supplied material in electronic format (Latest Acrobat Reader).
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Gasoline Shipper pumps shall be in accordance with 31-SAMSS-004 and shall be
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
of between bearing, vertical split casing type centrifugal pumps (API BB5). Pump
materials, mechanical seals are in accordance with SAES-G-005. Reference shall
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Shipper pumps shall be provided with forced type lubrication system i-e lube oil
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
Each shipper pump will also have a Vibration Monitoring System in accordance
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Gasoline Shipper Pumps have gone through Novation Procurement by the design
ISSUED FOR 60% FEL3
contractor. These pumps shall be novated to the LSTK Contractor upon award of
the contract and all relevant details of the purchase order and Novation terms will
be handed over to the successful LSTK contractor. The purchase requisition is
attached for reference in Appendix 11.
be of between bearing, vertical split casing design centrifugal pumps (API BB5).
Pump materials, mechanical seals shall also be in accordance with SAES-G-005.
10-02399-
10-02399-
10-02399-
0001
0001
DATE
Shipper pumps will be provided with forced type lubrication system i-e lube oil
09/08/16
08/04/16
06/01/16
NO.
REV
DATE:
PROJECT
ALL LEADS
ENGINEER Diesel Shipper Pumps have gone through Novation Procurement by the design
09/08/16 contractor. These pumps shall be novated to the LSTK Contractor upon award of
DATE: the contract and all relevant details of the purchase order and Novation terms will
CERTIFIED
A M ALMATROOK be handed over to the successful LSTK contractor. The purchase requisition is
09/08/16 attached for reference in Appendix 11.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
MISCELLANEOUS REQUIREMENTS
DATE: Reference shall be made to technical specifications for pumps included
OPERATIONS
SHAHZAD YAZDANI
in Index-A for further details of these pumps.
09/08/16
DATE:
Pump Datasheets provided in this package are preliminary only. These
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
will be further verified by CONTRACTOR during detailed design phase
EDSD
of the project.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Inspection and Testing of CONTRACTOR supplied materials will be
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
performed as per applicable SAUDI ARAMCO Inspection Requirement
form A-175. CONTRACTOR will arrange with his sub suppliers to
ASH
ASH
ASH
LEADS
LEADS
ALL
Supply of Commissioning and Start-up spares and first fill of all the
ISSUED FOR 60% FEL3
0001
0001
DATE
DISCIPLINE
ENGINEER
C. INSTRUMENTATION
C
A
ALI H GHAMDI
VERIFICATION
DATE:
BY:
A00002.005/006/007/008.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Provide and install cables from DCS/ESD IRP panels located in
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Substations to RIBs as indicated in IN-A00002.005/006/007/008.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Reference drawings:
Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
IN-A00027 Instrument Points & Lines
IN-D00201 Instrument Installation Schedule-Flow
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16 CONTRACTOR shall use induction motors for all shipper pumps. Design of
DATE: induction motors shall be such that to achieve power factor equal or greater
than 0.95.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Shipper pump motors power supply shall be from 13.8kV switchgear (Refer
EDSD
REVISIONCERTIFICATION
Booster pump motors power supply shall be from 4.16kV switchgear (Refer
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG operational systems. All Electrical Control Panels and Stop-Start Stations
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH shall have Push-to-Test Multi-Cluster LED’s for indication.
ASH
ASH
CONTRACTOR shall design, supply and install and test Local Control Push
Button Stations appropriate for the areas of installation, Install control
LEADS
LEADS
LEADS
ALL
cables and conduits between control stations and the Interposing relay
ALL
ALL
Control panels for all motors 75 kW (100 HP) and larger, and all other
motors where the engineering documents indicate motor space heaters are
DESCRIPTION
Equipment and Skids and the parent equipment, field instruments, etc. and
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
CONTRACTOR shall ensure the pump operation of the YNJ-1 and YNJ-2 pipelines
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
including, but not limited to the following facilities:
EDSD
Three (3) Booster and Three (3) shipper pumps shall be designed for YNJ-1 and
DATE:
YNJ-2. (Fourth pump shall be installed in phase-2) Pumps shall be electric motor
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
The pipeline booster and shipper pumps shall be controlled locally from YDH but
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
philosophy shall be based on the start-up of a single shipper pump at a time and
not two or more shipper pumps simultaneously. CONTRACTOR shall co-ordinate
with BI-10-02155 for the operation philosophy required by the pipeline prior to
detail design and construction.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The scope for the YNJ-1 & YNJ-2 pumps’ operation is outlined in PFDs VA-
247844.001 & VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
A. GENERAL
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide provision in the receiving manifolds for the future
connections of PG 91/95, DO & DPK from Yanbu grass root refinery. A valve with a
DESCRIPTION
same size as of manifold (30”) shall be kept as provision in each of the product
ISSUED FOR 60% FEL3
manifold.
The scope for the pipeline connections from Yanbu Grass root refinery is outlined
in PFD VA-247835.001 and P&IDs VA-247894.001 to VA-247897.001.
B. PIPING
All pumps are located centrally with respective storage tanks, so that the pressure
JO/EWO
reduction due to pipe length from tank outlet to pump inlet is minimized to meet
process requirement.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Pumps are grouped to permit economical pipe routing with free space for future
pumps & possible extension of main pipe header for future expansion.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER Space for laydown areas has been considered for all pump bays which will be
C
A
ALI H GHAMDI
during detail design phase. No piping plan and MTO considered in 90% submittal.
VERIFICATION
09/08/16
EDSD
A. GENERAL
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
YDH is designed to receive gasoline, diesel, and kerosene products from the
SAMREF refinery via three pipelines extending from the SAMREF tank farm to
YDH product manifolds. SAMREF existing export Pumps shall be utilized to supply
products (PG95/91, DO and DPK) to YDH.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The three pipelines will extend from the SAMREF manifold to YDH manifold of the
relevant product type. SAMREF export pumps shall supply the pressure to move
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall design and install the three product pipelines from SAMREF
and their connections into YDH receiving manifolds including, but not limited to the
following facilities:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
ISSUED FOR 60% FEL3
Three product pipelines each for PG95/91, DO and DPK from SAMREF to
YDH.
Three metering skids with two provers (1 for PG/DO and 1 for DPK) at
SAMREF
Connections in YDH receiving manifolds for three product pipelines from
SAMREF.
Surge relief system at SAMREF including SRVs, surge tank & pump.
Fire water system connection
JO/EWO
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
pipelines extending from the SAMREF tank farm to YDH receiving manifolds. The
SAMREF supply connection to YDH shall be taken from downstream of existing
09/08/16
08/04/16
06/01/16
export pumps at SAMREF. The required new metering skids shall be installed at
NO.
REV
DISCIPLINE SAMREF. The tie-ins will be taken from the SAMREF export lines going to their
ENGINEER
terminal near to the fence at King Fahad Road (RC Corridor). All new equipment
C
A
DATE:
shall also be installed at space available near to tie-ins.
PROJECT
ALL LEADS
ENGINEER
09/08/16
CONTRACTOR shall design and install three product pipelines each of 30” size for
PG95/PG91, DO and DPK. These pipelines will be connected at the discharge of
DATE:
CERTIFIED SAMREF export pumps. Accordingly, tie-ins will be taken from 24” existing pipes to
A M ALMATROOK
SAMREF terminal. CONTRACTOR shall design and install three custody metering
09/08/16
DATE:
skids each dedicated for PG95/PG91, DO and DPK at SAMREF. Each metering
CONSTRUCTION
AMR EL SHARKAWY skid shall consists of 3 meter runs (2 operating and 1 standby), two prover
AGENCY
09/08/16 assembly (1 for PG/DO and 1 for DPK) and a densitometer. These metering skids
DATE:
shall be interfaced with YDH through SAMREF.
OPERATIONS
SHAHZAD YAZDANI
09/08/16
CONTRACTOR shall install surge relief system for the new pipeline at SAMREF.
The surge relief system shall consist of surge relief valves discharging to a
DATE:
common tank from all pipelines. The product collected in the tank to be emptied to
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
the pipeline with the pump provided along with surge relief tank. Details of surge
EDSD
Connections of oily water drain from metering skids and surge relief tank & pump
BY:
shall be finalized during detailed design. CONTRACTOR shall verify the tie-ins to
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
the drain / oily water system and shall connect the drains accordingly.
OF THIS DRAWING IS COVERED, FOR ALL
The scope for the SAMREF pipelines and their connections into YDH receiving
manifolds is outlined in PFD VA-247834.001 and P&IDs VA-247878.001 to VA-
247885.001.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG B. PIPING
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
ASH
ASH
ASH
pipelines extending from the SAMREF tank farm to YDH product receiving
manifolds.
LEADS
LEADS
LEADS
ALL
ALL
ALL
DESCRIPTION
The main interface connection between this BI-10-02399 and others is at the
ISSUED FOR 60% FEL3
existing headers itself, i.e., from the SAMREF export lines going to their
terminal near to the fence at King Fahad Road (RC Corridor. Inside plant,
piping team will bring the connection to battery limit where inside plant piping
and these 3 YR - YDH pipelines interfaces.
The tie-in details and routing of three pipelines are shown in piping plans, Tie-
in Index as per DCL No GEN-D0001. The drawings mentioned here are only
for reference; however these drawing to be verify during detail design.
JO/EWO
New metering skid to be installed inside SAMREF refinery. (Ref. Plot plan
Drawing PIA00430-001). This drawing indicates tentative location only; it will
10-02399-
10-02399-
10-02399-
0001
09/08/16
08/04/16
06/01/16
Based on surge study, new Surge tank & associated facilities inside SAMREF
NO.
REV
DISCIPLINE
refinery were added, exact location and feasibility study to be conducted after
ENGINEER confirmation during detail design phase.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER C. PIPELINE
09/08/16
DATE:
CERTIFIED
C.01 PURPOSE
A M ALMATROOK The following design basis has been established for YDH to be constructed by this
09/08/16 project.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 C.02 PIPELINE DESIGN BASIS
DATE:
OPERATIONS
Three product pipelines shall be constructed from SAMREF refinery to YDH receipt
SHAHZAD YAZDANI
manifolds. These pipelines shall handle diesel, DPK/kerosene and gasoline. The
09/08/16
gasoline pipeline shall transfer both PG91 and PG95 products in a batching
DATE:
operation.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
C.03 PIPELINE PHYSICAL INTERFACES
EDSD
DATE:
The main interface connection between this BI-10-02399 and SAMREF is at the
BY:
existing lines (SAMREF to Marine Terminal). Inside plant piping team will bring the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
connection to battery limit where inside plant piping and these 3 SAMREF - YDH
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
pipelines interfaces
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The pipeline to be constructed for this project shall be routed through existing RC
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipeline corridors. Pipeline route from SAMREF is through pipeline corridor at BB
Avenue, going to the 4th street corridor and to the pipeline corridor in between
ASH
ASH
ASH
King Abdul-Aziz road and Haul road of the refineries. Each product pipeline is
approximately 11.0 km long from SAMREF to YDH. Each pipeline shall be design
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
*Other Flow conditions are shown in the Line Designation Table see PID00442
0001
0001
0001
DATE
DATE:
The three (3) 30” pipelines will cross eleven (11) roads as follow:
PROJECT
ALL LEADS
ENGINEER
09/08/16
Item Road Name PROPOSED Length (M) REF. DWG
No. CROSSING Approx.
DATE:
CERTIFIED TYPE
A M ALMATROOK
09/08/16
1 #1-King Fahd Road Thrust Boring 90 PP-
DATE: A00130.001
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
2 #2-Main Berth Access Road Thrust Boring 21 PP-
09/08/16 A00131.001
DATE: 3 #3-Causeway Road and piping Thrust Boring 45 PP-
OPERATIONS
SHAHZAD YAZDANI
Corridor A00131.002
09/08/16 4 #4-NGL Main Facilities Open Cut 23 PP-
DATE: A00132.001
5 #5-NGL Plant Entrance Road Thrust Boring 37 PP-
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 A00133.001
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Item Road Name PROPOSED Length (M) REF. DWG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
No. CROSSING Approx.
TYPE
ASH
ASH
ASH
A00138.001
11 #11-Shareh Al Awel Thrust Boring 126 PP-
LEADS
LEADS
LEADS
ALL
ALL
ALL
A00139.001
Thrust boring procedure shall be done by the approved SAUDI ARAMCO Thrust boring
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
contractor and pipe shall be coated as per SAES-H-002 Para. 5.1.2. and 5.4.4.
DESCRIPTION
ISSUED FOR 60% FEL3
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.
CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required and detour for open cut
road crossings.
location to assess soil condition to determine methodology to be used for thrust boring
option.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
09/08/16
08/04/16
06/01/16
for above & underground transitions at road crossings and interface points (between
NO.
REV
DISCIPLINE
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO Standard
ENGINEER requirements for cathodic protection.
C
A
DATE:
PROJECT
CONTRACTOR shall review the proposed road crossing techniques and prepare a
ALL LEADS
ENGINEER complete construction packages and seek approval from SAUDI ARAMCO, YRC and
09/08/16
relevant local authorities at early stage of project design.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
09/08/16 pipeline road crossings, wherever it entails time and safety advantages to the project..
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
SAMREF pipeline drawings submitted to YRC for road crossings are attached under
Appendix 2.
DATE:
OPERATIONS
SHAHZAD YAZDANI
D. INSTRUMENTATION
09/08/16
DATE:
CONTRACTOR shall perform the following activities in SAMREF
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Provide and install Three (3) custody metering skids for PG91/95, DO and DPK
EDSD
with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall be
DATE:
metering and control cabinets such as flow computer cabinet, PLC cabinet and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
MSC cabinet. A vendor supplied metering shelter shall be provided to house these
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
cabinets.
(DCC) NO. _____________________
The CONTRACTOR shall supply the Gas detection sensors field mounted beacon
and horns in the metering shelter.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Skid Vendor/LSTK shall supply prefab air-conditioned Metering Shelter constructed
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
in compliance with electrical area classification requirements and Saudi Aramco
/SAMREF Standards.
ASH
ASH
ASH
The CONTRACTOR shall provide a new DCS Controller with input-output modules
LEADS
LEADS
LEADS
ALL
ALL
ALL
DCS via open industry standard protocol such as Modbus TCP/IP, OPC etc. Refer
block diagram IN-A00001.009 for Custody Metering System.
DESCRIPTION
ISSUED FOR 60% FEL3
The CONTRACTOR shall provide redundant fiber optic cables between metering
shelter and nearest OMS control building in the tank farm area of SAMREF. The
new DCS shall be tied to the existing plant control network at OMS control room.
The HMI station at OMS control room will be updated with the new instrumentation
added by BI-10-02399.
The new ESD valves added by BI-10-02399 at the battery limit of SAMREF facility
shall be integrated to existing ESD system. The contractor shall provide new
JO/EWO
junction boxes and cables. The ESD marshalling cabinet OMMRS01 shall be used
to terminate ESD cables at OMS Rack-room.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
The CONTRACTOR shall provide junction boxes and field homerun cables as
indicated in block diagram# IN-A00001.007
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER The YDH control system shall be interfaced to SAMREF control system to have
C
A
READ ONLY access to the data points such as the CMS, EIV status and Pump
DATE: status and tank status. The data is to be exchanged via plant DMZ through PI
PROJECT
ALL LEADS
ENGINEER system at both the facilities. New fiber optic cable is to be laid from SAMREF to
09/08/16
YDH for the data exchange.
DATE:
CERTIFIED
A M ALMATROOK As alternate method, LSTK CONTRACTOR shall evaluate the
DATE:
09/08/16
implementation of the MODBUS TOFINO Firewall method within P&CSD
CONSTRUCTION
AMR EL SHARKAWY concurrence once PCS vendor is selected.
AGENCY
09/08/16
CONTRACTOR shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
DATE:
OPERATIONS 1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
SHAHZAD YAZDANI
09/08/16
A00435/36/37/38. Provide and install Junction boxes and lay homerun cable IC-
0116/117/124/125 up to new DCS Marshalling Cabinet in located in metering
DATE:
shelter.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall provide and install ZV-1112/1212/1312 and install cable IC-
EDSD
0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
DATE:
Contractor shall utilize existing cable tray to run home cable from junction to OMS
BY:
control room.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
THE CONTRACTOR shall provide and install field instruments such as surge relief
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG THE CONTRACTOR shall Provide and install field junction box X40-AJB-001 &
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
X40-EAJB-001 and DJB-003 lay homerun cable IC-3029,IC-3032,IC-3039 from JB
to OMS control room.
ASH
ASH
ASH
LEADS
LEADS
LEADS
THE CONTRACTOR shall provide and install cables between IRP panels located
ALL
ALL
ALL
0001
0001
DATE
09/08/16
08/04/16
06/01/16
NO.
REV
E. ELECTRICAL
DISCIPLINE
ENGINEER
SAMREF shall supply all electrical power and connections required for MOVs and
C
A
DATE: CONTRACTOR shall Provide Lighting and Grounding system in compliance with
SAUDI ARAMCO Standards by utilizing existing system.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
F. CIVIL
DATE:
BY:
A 6.0m wide asphalt access road shall be provided. Road structure shall be as per
section 4.20 (In-Plant roads).
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Oily water drainage system shall be provided and tie-in the new oily water line to
OF THIS DRAWING IS COVERED, FOR ALL
E. Telecom
REVISION
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH 4.13 Pipeline Connection from YASREF Refinery
ASH
ASH
A. GENERAL
LEADS
LEADS
LEADS
ALL
ALL
ALL
YDH is designed to receive gasoline and diesel products from the YASREF refinery
via two pipelines. The pipeline connection will be downstream of the YASREF
pumps to utilize the pump as the pressure source to move the product into a full
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
tank at YDH. YDH pipeline connection shall not interfere with the transfer operation
of product flowing from YASREF to Yanbu as per the project BI-10-00043, Yanbu
DESCRIPTION
CONTRACTOR shall design and install the two product pipelines from YASREF
and their connections into YDH receiving manifolds including, but not limited to the
following facilities:
10-02399-
10-02399-
0001
0001
0001
DATE
Two pipelines (one for DO and one for PG 95/91) along with metering skids at
09/08/16
08/04/16
06/01/16
YASREF shall be provided under BI-10-00043. This project will tie-in to the
NO.
REV
DISCIPLINE
downstream of the metering skid and isolation valve (outside YASREF battery limit,
ENGINEER inside the Yanbu refinery ) to utilize the existing export pumps and new metering
C
A
skids provided by BI-10-00043, for the supply to YDH. The tie-in locations to the
DATE:
PROJECT
pipeline will be inside the Yanbu refinery and BI-10-00043 will provide a manual
ALL LEADS
ENGINEER valve on both pipelines for tie-ins to YDH. CONTRACTOR shall co-ordinate with
09/08/16
BI-10-00043 for the tie-in location before detail design.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall design and install two product pipelines each of 30” size for
09/08/16 PG95/PG91 and DO. Tie-ins will be taken accordingly in the 30” pipeline to YR
DATE:
CONSTRUCTION
AMR EL SHARKAWY
under BI-10-00043 scope. Two custody metering skids to be installed under BI-10-
AGENCY
09/08/16
00043 shall be interfaced with YDH.
DATE:
OPERATIONS
The scope for the YASREF pipelines and their connections into YDH receiving
SHAHZAD YAZDANI
manifolds is outlined in PFD VA-247833.001 and P&IDs VA-247876.001 & VA-
09/08/16
247877.001.
DATE:
CONTROL NUMBER
ALI H GHAMDI
B. PIPING
VERIFICATION
09/08/16
EDSD
YDH shall receive PG 91/95 and DO products from the YASREF via two pipelines.
DATE:
The pipeline supply to YDH will connect to the pipeline provided by BI-10-00043.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The location of Tie in connection of PG91/95 (Tie-in No. V25-023) & DO (Tie-in No.
(DCC) NO. _____________________
V25-025) from YASREF will be taken near the entrance of YR or inside the YR.
The exact location will be decided during detail design stage & co-ordination with
BI-10-00043.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The tie-in details and routing of two pipelines are shown in PIB00451.001 & piping
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
plan dwg no. PI-A00403.004 located in DCL no GEN-D0001. The drawing
mentioned here are only for reference.
ASH
ASH
ASH
The dye injection skid & associated facilities for YASREF product pipeline for
LEADS
LEADS
LEADS
ALL
ALL
ALL
Based on surge study, new Surge lines & associated facilities were added inside
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
C. PIPELINE
C.01 PURPOSE
The following design basis has been established for YDH to be constructed by this
project.
JO/EWO
10-02399-
10-02399-
The two new 30-inch product pipelines shall tie-in to the existing YASREF refinery
0001
0001
0001
DATE
lines going to the YDH receipt manifolds. The pipeline shall handle diesel and
gasoline. The gasoline pipeline shall transfer both PG91 and PG 95 products in a
09/08/16
08/04/16
06/01/16
NO.
REV
batching operation.
DISCIPLINE
ENGINEER
C
DATE:
PROJECT
ALL LEADS
ENGINEER These products, diesel and gasoline, shall be transferred from YASREF to YANBU
09/08/16 refinery as part of BI-10-00043. The tie-in to these two pipelines will be to manual
DATE: Tie-in Globe Valves (provided by BI-10-00043) located inside the perimeter fence
CERTIFIED
A M ALMATROOK of YANBU refinery, the physical interface shall be at the flange provided by plant
09/08/16 piping team.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY C.04 PRODUCT PIPELINE CORRIDOR
09/08/16
DATE: The pipeline to be constructed for this project shall be routed through new pipeline
OPERATIONS
SHAHZAD YAZDANI corridors. Pipeline route from YANBU refinery is through a thrust boring starting
09/08/16 from inside YANBU refinery and going to cross SSD fence, Haul Road, King
DATE: Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
CONTROL NUMBER
ALI H GHAMDI
approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
VERIFICATION
09/08/16 Each pipeline shall be designed to have elevated horizontal U-Loops for flexibility.
EDSD
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Pipe Specification = API-5L Grade X60
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Flange Rating = ASME Class 150
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
*Other Flow conditions are shown in the Line Designation Table see PID0450
ALL
ALL
The two (2) pipelines will cross Three (3) roads as follows:
ISSUED FOR 60% FEL3
Refinery
10-02399-
10-02399-
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall provide all adequate civil /structural arrangements for road
DISCIPLINE
ENGINEER
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall conduct detailed geotechnical investigation at road crossing
09/08/16 location to assess soil condition to determine methodology to be used for thrust boring
DATE:
option.
CERTIFIED
A M ALMATROOK
09/08/16
CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
DATE: for above and underground transitions at road crossings and interface points (between
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO
09/08/16 Standard requirements for cathodic protection.
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall review the proposed road crossing techniques and prepare a
09/08/16 complete construction packages and seek approval from SAUDI ARAMCO, YRC and
DATE: relevant local authorities at early stage of project design.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
EDSD
pipeline road crossings, wherever it entails time and safety advantages to the project..
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
D. INSTRUMENTATION
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG status. The data is to be exchanged via plant DMZ through PI system at both
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH the facilities.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Contractor shall provide new fiber optic cable from YASREF to YDH for the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Contractor shall coordinate with Refinery Control System Vendor for the
ISSUED FOR 60% FEL3
interface requirements.
F. Telecom
A. GENERAL
10-02399-
10-02399-
10-02399-
YDH is designed to receive PG 91, PG 95, Diesel, and Kerosene from the Yanbu
0001
0001
0001
DATE
Refinery Terminal. Three pipelines will connect into the Yanbu Refinery Terminal
offload pipelines at a location just upstream of the Existing Aramco refinery tank
09/08/16
08/04/16
06/01/16
NO.
REV
farm to utilize the vessel offload pump as the primary pressure source and the
DISCIPLINE
ENGINEER existing marine loading & transfer pumps as booster pumps to move the product
into a full tank at YDH. The new connections shall be designed not to interfere with
C
A
ALI H GHAMDI
VERIFICATION
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
DATE:
through three pipelines extending from Yanbu refinery tank farm to YDH. The
BY:
interface to the terminal unloading lines will be at Yanbu refinery tank farm. The
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
primary source for the supply of products to YDH shall be the pumps on the ship
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
and the existing marine loading & transfer pumps shall be used as booster pumps
(DCC) NO. _____________________
CONTRACTOR shall design and install three product pipelines each of 24” size for
PG95/PG91, DPK and DO. These pipelines will be connected at the discharge of
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG existing marine loading & transfer pumps. Pump suction side shall be connected to
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
new lines that are tied into existing lines coming from YRT. Accordingly, tie-ins will
be taken from the existing pipes at existing pump suction & discharge side and
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall install surge relief system for the new pipelines of YASREF
and YR at Yanbu refinery. The surge relief system shall consist of surge relief
valves discharging to a common tank from all pipelines. The product collected in
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
the tank to be emptied to the pipeline with the pump provided along with surge
relief tank. Details of surge relief system at SAMREF are mentioned in section 4.7.
DESCRIPTION
<This requirement is on hold until approval of surge analysis report from P&CSD>
ISSUED FOR 60% FEL3
Connection of oily water drain from surge relief tank & pump shall be finalized
during detailed design. CONTRACTOR shall verify the tie-ins to the oily water
system and shall connect the drain accordingly.
The scope for the YRT pipelines and their connections into YDH receiving
manifolds is outlined in PFDs VA-239708.002, VA-250323.001, VA-250324.002 &
VA-250325.002 and P&IDs VA-239739.001, VA-234308.015, VA-234308.020, VA-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
B. PIPING
09/08/16
08/04/16
06/01/16
NO.
REV
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
DISCIPLINE
ENGINEER through three pipelines extending from Yanbu refinery tank farm to YDH. The
C
interface to the terminal unloading lines will be at Yanbu refinery tank farm.
A
DATE:
PROJECT
ALL LEADS
ENGINEER The primary source for the supply of products to YDH shall be by utilizing the
09/08/16 existing pumps installed at Yanbu Refinery Tank farm near to available space
DATE: towards YRT fence to feed to YDH.
CERTIFIED
A M ALMATROOK
09/08/16 To install new feed line for Gasoline (PG91/PG95) to YDH, tie-in at the 18”
DATE:
CONSTRUCTION
AMR EL SHARKAWY
common header of Gasoline loading and Transfer pumps (V25-P-P17 A-E)
AGENCY
09/08/16 to be taken at Yanbu Refinery near Pump Station-C.
DATE:
OPERATIONS To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
SHAHZAD YAZDANI
09/08/16
common header of Kerosene loading and Transfer pumps (V25-P22 A/B/C)
to be taken at Yanbu Refinery near Pump Station-B.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 To install new feed line for Diesel(DO) to YDH ,Tie-in at the 20”MDO
EDSD
The Layout of feed lines from existing header lines to Interface connection
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
with pipeline near YR battery limit, refer to section C.03 for detailed
OF THIS DRAWING IS COVERED, FOR ALL
description.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH C. PIPELINE
ASH
ASH
C.01 PURPOSE
LEADS
LEADS
LEADS
ALL
ALL
ALL
The following design basis has been established for YDH to be constructed by this
project.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Three product pipelines shall be constructed from YANBU refinery terminal to YDH
ISSUED FOR 60% FEL3
receipt manifolds. The pipeline shall handle diesel, both grades of gasoline, and
DPK/kerosene. The gasoline pipeline shall transfer both PG91 and PG 95
products in a batching operation.
The main interface connection between this BI-10-02399 and others is at the
existing headers itself and not elsewhere. Inside plant piping team will bring the
JO/EWO
connection to battery limit where inside plant piping and these 3 YR - YDH
pipelines interfaces
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
The pipeline to be constructed for this project shall be routed through new pipeline
DISCIPLINE
ENGINEER corridors. Pipeline route from YANBU refinery is through Thrust Boring starting
C
from inside YANBU refinery and going to cross existing SSD fence, Haul Road,
A
DATE: King Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
PROJECT
ALL LEADS
ENGINEER approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
09/08/16 Each pipeline shall be design to have elevated horizontal U-Loops for flexibility.
DATE: CONTRACTOR shall verify the Pipeline route according to the Overall Pipeline
CERTIFIED
A M ALMATROOK route DWG PP-A00005.001 and Piping Plans.
09/08/16
DATE:
C.05 PIPELINE PARAMETERS
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)
DATE:
OPERATIONS
SHAHZAD YAZDANI
Design Temperature = 75°C
09/08/16 Corrosion Allowance = 1.6mm
DATE:
Pipeline Diameter (D) = 24 inch
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
*Other Flow conditions are shown in the Line Designation Table see PID00402
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The three (3) pipelines will cross three (3) roads as follow:
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Item Road Name CROSSING TYPE Length(M) REF. DWG
ASH
ASH
ASH
No. Approx.
1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001
LEADS
LEADS
LEADS
ALL
ALL
ALL
Road
2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001
3 #12-Haul Road Thrust Boring 69 PP-A00150.001
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
(Yanbu Refinery
DESCRIPTION
ISSUED FOR 60% FEL3
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.
CONTRACTOR shall provide all adequate civil /structural arrangements for road
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required.
option.
10-02399-
10-02399-
10-02399-
0001
0001
CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
0001
DATE
for above & underground transitions at road crossings and interface points (between
09/08/16
08/04/16
06/01/16
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO
NO.
REV
DISCIPLINE
STANDARD requirements for cathodic protection.
ENGINEER
C
A
CONTRACTOR can consider thrust boring thru the Micro-Tunneling Method (MTM) for
DATE:
PROJECT
pipeline road crossings, wherever it entails cost, time and safety advantages to the
ALL LEADS
ENGINEER project with previous SAUDI ARAMCO approval.
09/08/16
DATE: SAMREF pipeline drawings submitted to YRC for road crossings to be attached.
CERTIFIED
A M ALMATROOK
09/08/16 D. INSTRUMENTATION
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide and install field instruments, Motor Operated
DATE:
and Electrohydraulic ESD valves at the battery limit of Yanbu Refinery,
OPERATIONS
SHAHZAD YAZDANI
MOVs shall also be provide at the tie-in locations.
09/08/16
DATE:
CONTRACTOR shall provide and install new homerun cables from valves
up to the existing SIH-1590 (Satellite Instrument House) in tank farm area.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 SIH-1590 is expanded under BI-10-00043, the project shall coordinate with
EDSD
BI-10-00043 shall to reserve the space required by this BI. All new EIVs will
be connected to new ESD Marshalling Cabinet provided by BI-10-00043. BI-
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
SIH-1590 will be expanded under BI-10-00043 to accommodate the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
expansions under this BI. The DCS/ESD provided under BI-10-00043 will be
integrated to YR plant network.
ASH
ASH
ASH
LEADS
ALL
ALL
tank farm control room and the HMIs at tank farm control room will be
updated accordingly.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
system to YDH provides View only signals related to product transfer. The
ISSUED FOR 60% FEL3
data points shall be the status of product pumps and EIVs such as running,
stopped, tripped etc. The requirements of data from Yanbu Refinery shall be
further evaluated during Detail design phase in coordination with YDH and
YREF operations.
The interface shall be through PI system installed at both the facility, DMZ
shall be used in order to make the data exchange highly secured.
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
DISCIPLINE
ENGINEER CONTRACTOR shall provide and install new junction boxes, branch cables,
C
A
DATE:
CONTRACTOR shall Provide and install field junction box X40-AJB-001 &
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
CONTRACTOR shall provide and install cables between IRP panels located
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Reference Drawings:
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
Drawing# Description
ASH
LEADS
LEADS
ALL
ALL
ALL
G. ELECTRICAL
Yanbu’ Refinery shall supply all electrical power and connections required for
MOVs and other miscellaneous loads. Total electrical loads anticipated are about
JO/EWO
78.5kVA Two (2) 480V, 150A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X)
shall be provided to feed power to MOVs and other miscellaneous loads. (Refer to
10-02399-
10-02399-
10-02399-
drawing # EL-A10111).
0001
0001
0001
DATE
MC91A at Substation no-7, 8 & 9 for three (3nos.) 100AF new circuit breakers to
DISCIPLINE
ENGINEER feed new MOV power panels (Refer drawing # VA-240892-001, VA-240893.002 &
C
VA-240894.002).
A
DATE:
PROJECT
ALL LEADS
ENGINEER CONTRACTOR shall coordinate with YANBU refinery to utilize the existing feeders
09/08/16
of YANBU substation to feed the power to newly added 150A, 480V, Switchrack at
DATE:
CERTIFIED
Tank Farm area.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall supply and install One (1) No. 150A, 480V Switchrack near
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
tank farm area to feed the power to newly added Surge relief pump (X40-
09/08/16
X004A/B).
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall Provide Lighting and Grounding system in compliance with
09/08/16 SAUDI ARAMCO Standards by utilizing existing system.
DATE:
CONTROL NUMBER
ALI H GHAMDI
H. Telecom
VERIFICATION
09/08/16
EDSD
4.15 ELECTRICAL
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
A. GENERAL
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall implement and comply with all the requirements as stated but
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH not limited to following:
ASH
ASH
LEADS
LEADS
ALL
assistance and Final Integrated Testing, with New and Existing Systems, for all the
equipment provided by CONTRACTOR and all the equipment provided by SAUDI
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
ARAMCO under this BI / Project, as required for a Fully Functional and Operational
DESCRIPTION
Facility.
ISSUED FOR 60% FEL3
CONTRACTOR shall include MARAFIQ on the Engineering Review Cycle for any
job related to MARAFIQ.
CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards and
regulations for any scope related to YRC and MARAFIQ.
CONTRACTOR shall comply with SAMREF and YASREF refineries Standards and
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER CONTRACTOR shall be responsible for the correctness of all Drawings and
C
A
ALI H GHAMDI
requirements shall be arranged by THE CONTRACTOR.
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall be responsible for the proper function and safe operation of
REVISION
all the equipment and systems. The design criteria and contract documents
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG included are not all-inclusive and represent minimum requirements. Any additional
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
elements or items required to achieve the correct and safe operation of the system
shall be engineered, designed, supplied and installed in place to render a complete
ASH
ASH
ASH
functional system.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall utilize the Metric System measurement in all documents and
drawings unless specifically directed otherwise by SAUDI ARAMCO.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
design, specifications and other documents for conformity to this Contract and
institute effective internal control for prompt receipt, review, approval and return of
such documents. CONTRACTOR shall incorporate all such applicable Vendor and
Subcontractor information in THE CONTRACTOR’S submittals to SAUDI
ARAMCO.
equipment Certified NMR 602 & NMR 603 data) shall include all necessary plans,
10-02399-
0001
0001
DATE
The Project SOW as conveyed herein and the documents and drawings provided
09/08/16
08/04/16
06/01/16
NO.
REV
with this Scope of Work document are Coherent and NOT to be utilized separately.
DISCIPLINE
ENGINEER Any item mentioned in this document and not indicated on drawings or indicated on
C
A
drawings or not mentioned in other documents provided with this PPN, shall be of
DATE:
PROJECT
ALL LEADS
like effect as if indicated or mentioned in both and vice versa.
ENGINEER
09/08/16
DATE: CONTRACTOR shall check and verify all Sub-Contractor and Vendor design and
A M ALMATROOK
CERTIFIED
drawings provided comply with the Scope of Work, and documents provided with
09/08/16 this Scope, relevant SAUDI ARAMCO and International Standards and are in
DATE:
CONSTRUCTION
AMR EL SHARKAWY
keeping with “Good Engineering Practices”.
AGENCY
09/08/16
DATE:
CONTRACTOR shall comply with SAUDI ARAMCO Standards and seek SAUDI
OPERATIONS
SHAHZAD YAZDANI
ARAMCO advice for any potential Waivers. CONTRACTOR shall prepare such
09/08/16 Waivers as per SAEP-302, as required by SAUDI ARAMCO.
DATE:
CONTROL NUMBER
ALI H GHAMDI
CONTRACTOR shall note that “CLOUDS” on the drawings indicate a HOLD point
VERIFICATION
09/08/16
due to unavailability of information or indicates a REQUIRED Tie-in from Existing
EDSD
Equipment and Systems into New Equipment and Systems. This Tie-in is part of
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall verify the power source of all equipment supplied under this
project by installing a Label on or near each equipment or device receiving power.
Switchgear, Controlgear, Power Panels, Motors, Receptacles, Light Switches, each
REVISION
Light, HVAC Panel, Communication Cabinet, Security Cabinet, Fire Alarm Panel,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG etc. shall have a Phenolic Label with Black text on a White background attached
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
with stainless steel screws identifying the upstream power source. For example,
for each Receptacle, Light Switch and Light, the label shall indicate the Upstream
ASH
ASH
ASH
Panelboard Number and Circuit Breaker Number and indicate if a GFCI circuit.
LEADS
LEADS
LEADS
ALL
ALL
ALL
acceptable.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
contain at least one (1) or more Switchgear, Controlgear, ATS, Battery Charger,
DISCIPLINE
ENGINEER Stand Alone UPS, Panelboard, etc. A copy of the applicable Certified NMR-602
C
A
shall be provided in the applicable electrical equipment room and with a metal book
DATE:
PROJECT
ALL LEADS
case within each room in which an NMR is provided. These shall be provided
ENGINEER
09/08/16 before energization of the equipment.
DATE:
A M ALMATROOK
CERTIFIED
CONTRACTOR shall carry out all Electrical work in close liaison with the SAPMT
09/08/16 to meet the project requirements.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE:
procurement, supply, deliver / store, install, test, pre-commission, commissioning
OPERATIONS
SHAHZAD YAZDANI
assistance and Final Integrated Testing, with New and Existing Systems, including
09/08/16 required ETAP studies, Plant Distribution system, Plant & buildings internal &
DATE: external Lighting System, Plant & Buildings Grounding & Lightning System,
CONTROL NUMBER
ALI H GHAMDI
Security & Fence Lighting System, Plant & Buildings Fire Alarm System,
VERIFICATION
09/08/16
Emergency Power supply System by installing Generators, UPS power supply
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
the Buildings and for all External Lights (except substation exterior & fence lighting)
(DCC) NO. _____________________
Protection(CP).
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Electrical Studies
ASH
ASH
CONTRACTOR shall perform and validate all the Electrical studies as per SAES-
LEADS
LEADS
LEADS
ALL
P-100 and obtain SAUDI ARAMCO approval in order to finalize and freeze the long
ALL
ALL
lead electrical items to facilitate timely procurement. The purpose of the electrical
studies is to verify the ability of the plant electrical power distribution components
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
are adequately sized and perform as designed during normal steady state
DESCRIPTION
operation, with stand allowable transients and isolate faulty sections during faults.
ISSUED FOR 60% FEL3
Following Electrical studies shall be perform as a minimum but not limited to:
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
Cathodic protection study
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall perform the ETAP study and give recommendations to
09/08/16
improve overall power factor as per SAES-P-100. Based on preliminary ETAP
DATE:
CERTIFIED study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
A M ALMATROOK
09/08/16 required to achieve power factor above 0.95 at PCC. It shall be further evaluated
DATE: with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
CONSTRUCTION
AMR EL SHARKAWY
AGENCY requirement.
09/08/16
DATE:
OPERATIONS For each of the above studies, the final study shall be completed to confirm that all
SHAHZAD YAZDANI
09/08/16
electrical equipment including all transformers, switchgear, all controlgear and all
DATE:
large motors, are adequately rated and properly specified. The study and report
shall be issued for review and approval to SAUDI ARAMCO.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
DATE:
All electrical loads and equipment ratings indicated on the project proposal
BY:
drawings and documents are preliminary and shall be verified and updated as part
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
of the detailed design engineering phase. These load values are intended only for
OF THIS DRAWING IS COVERED, FOR ALL
CONTRACTOR shall define jointly with Saudi Aramco the electrical substation ID
number.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Electrical Overall Power Distribution System – Design Basis
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
Total power demand for the proposed YDH facility is estimated to be 46 MVA, with
ALL
ALL
a first phase of approximately 23.0 MVA by 2019. Adequate spare space at all
levels of power distribution shall be considered in order to accommodate future
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
proposed shipper pumps for Yanbu to Central Region pipeline planned from this
DESCRIPTION
facility. The power system shall be suitable to start larger shipper pumps without
ISSUED FOR 60% FEL3
any voltage drop impact when started direct on line. For detailed electrical load list
refer to document # CAL- EL121.
Electrical Load Summary – Estimation electrical load include the demand load till
2040.
10-02399-
10-02399-
0001
0001
0001
10% growth)
NO.
REV
DISCIPLINE
ENGINEER
The normal power supply to the proposed facility shall be from ‘MARAFIQ’s
C
A
DATE: Substation # 9I’ which is located about 3.85km from YDH facility fence. Two (2) 115
PROJECT
ALL LEADS
ENGINEER kV feeder from the GIS at MARAFIQ’s Substation #9I, shall be used to supply
09/08/16 power to YDH facility.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall coordinate with MARAFIQ and implement the connection
09/08/16
DATE:
agreement requirements between MARAFIQ & SAUDI ARAMCO during detail
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
design & construction phase of the project.
09/08/16
DATE: MARAFIQ substation is connected to a reliable and strong grid point, the SSBB
OPERATIONS
SHAHZAD YAZDANI 115 kV substation of Yanbu-II power plant (by 2018 this new power plant will be
09/08/16
available to generate 800 MW electricity, a strong reliable power source of this
DATE:
region).
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
Two (2) new substations (Receiving & Utility Substation) shall be built at YDH to
receive & distribute the power within YDH.
DATE:
BY:
REVISIONCERTIFICATION
Receiving Substation shall house 115kV Gas Insulated Circuit Breaker bay, 13.8kV
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
& 480V Metal Clad Switchgear and 480V Controlgear as main electrical equipment
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall perform the ETAP study and give recommendations to
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
improve overall power factor as per SAES-P-100. Based on preliminary ETAP
study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
ASH
ASH
ASH
required to achieve power factor above 0.95 at PCC. It shall be further evaluated
LEADS
LEADS
LEADS
ALL
with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
ALL
ALL
requirement.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Utility Substation shall house 4.16kV & 480V Metal Clad Switchgear and 480V
DESCRIPTION
Refer to Document Control Log (GEN-D0001) for the Overall Electrical System
Design and proposed Power Distribution to YDH facilities.
Power is stepped down from 115kV to 13.8kV and from 13.8kV to 4.16kV, 480V
and 400V by installing appropriate Power and Pad Mounted Transformers, refers to
Key Single Line Diagram EL-A10006.
JO/EWO
motors, booster pump motors, fire pumps motors, power transformers & loop feed
10-02399-
10-02399-
0001
0001
0001
DATE
LV MCC, Switchracks and local panels for power supply to auxiliary pump motors,
DISCIPLINE
ENGINEER MOVs, auxiliary power and lighting power requirements, etc.
C
A
DATE:
PROJECT
ALL LEADS
Plant Emergency backup generator c/w emergency distribution panel/MCC shall be
ENGINEER
09/08/16 provided to power the critical loads and all vital service loads and infrastructure in
DATE: order to enable safe shutdown of the facility in the event of loss of Utility Power.
A M ALMATROOK
CERTIFIED
Generator shall be provided with an acoustic enclosure suitable for outdoor
09/08/16 environment.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Dry type transformers, sub distribution power panels, lighting control panel, control
DATE:
wiring, power receptacles, indoor/outdoor lighting, and grounding, for all buildings.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 Additionally, existing MV and LV power networks associated with Yanbu area
DATE: refineries (Yanbu Terminal, SAMREF & YASREF) will be utilized for any new loads
CONTROL NUMBER
ALI H GHAMDI
to be added in the respective facilities. Refer to Appendix 2 Interface packages.
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
during the Detail Engineering based on latest vendor data, current site conditions,
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall apply optimization techniques in the following areas, but not
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH limited to:
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
and submit all affected deliverables based on this equipment layout during detail
design.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
policy remaining the electrical system optimized around the desired criteria (cost,
NO.
REV
DATE: CONTRACTOR shall re-check all electrical drawings provided in this Project
PROJECT
ALL LEADS
ENGINEER Proposal in order to identify the possible Optimization with appropriate solutions as
09/08/16
well as discuss with SAUDI ARAMCO its implementation.
DATE:
CERTIFIED
A M ALMATROOK
Electrical Detailed Description
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR scope shall include but not be limited to Detail Design,
09/08/16
procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE:
assistance and Final Integrated Testing, for the following items but is not limited to:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
One (1) Lot 115kV, 1250A, 3Ph, 3W, 60Hz, Gas Insulated Switchgear in receiving
DATE:
substation as well as the Gas Insulated Bus (GIB) in GIS Room (Refer to drawing #
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
One (1) 13.8kV, 3000A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz, Outdoor type, detuned switched capacitor
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH (Refer to drawing # EL-A10009).
ASH
ASH
One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
LEADS
LEADS
LEADS
ALL
One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10010).
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10011).
Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in receiving substation (Refer to
drawing # EL-A10014 to EL-A10015).
JO/EWO
10-02399-
Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
10-02399-
10-02399-
0001
0001
0001
DATE
One (1) 400V, 1250A, 3Ph, 4W, 60Hz, switchboard in E & M building (Refer to
DISCIPLINE
ENGINEER drawing # EL-A10018).
C
A
DATE:
PROJECT
ALL LEADS
One (1) 480V, 600A, 3Ph, 3W, 60Hz, emergency controlgear in Security Support
ENGINEER
09/08/16 building (Refer to drawing # EL-A10020).
DATE:
A M ALMATROOK
CERTIFIED
Three (3) 480V, 100A, 3Ph, 3W, 60Hz, switchracks, strategically located inside
09/08/16 YDH to feed power to tank farms auxiliary motors, area lighting power panels,
DATE:
CONSTRUCTION
AMR EL SHARKAWY
MOVs power panels, Cathodic Protection power panels and other facilities loads
AGENCY
09/08/16 (Refer to drawing # EL-A10021 to EL-A10023).
DATE:
OPERATIONS
SHAHZAD YAZDANI
Two (2) 50/66.6 MVA OA/FA, 115kV/13.8kV, power transformer located at receiving
09/08/16 substation feeding 13.8kV switchgear (Refer to drawing # EL-A10006).
DATE:
CONTROL NUMBER
ALI H GHAMDI
Two (2) 3.75/4.68 MVA OA/FA, 13.8kV/4.16kV, power transformer located at utility
VERIFICATION
09/08/16
substation feeding 4.16kV switchgear (Refer to drawing #EL-A10006).
EDSD
DATE:
Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at receiving substation
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at utility substation
feeding 480V switchgear (Refer to drawing #EL-A10006).
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG One (1) 500KVA, 13.8kV/0.48kV, pad mounted transformer strategically located
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
inside YDH to feed power to emergency controlgear in control room (Refer to
drawing #EL-A10006)
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
One (1) 1000 KVA, 13.8kV/0.4kV, pad mounted transformer strategically located
ALL
ALL
inside YDH to feed power to switchboard in E & M building (Refer to drawing #EL-
A10006).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
ISSUED FOR 60% FEL3
container with motorized louvers, complete with lighting, Fire Alarm and grounding
for the container. The Emergency Diesel Generator 160kW, 400V, 3Ph, 4W, 60Hz,
200kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
Generator (Refer to drawing# EL-A10019).
One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
JO/EWO
for the container. The Emergency Diesel Generator 400kW, 480V, 3Ph, 3W, 60Hz,
10-02399-
500kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER One (1), 400V, 400A, 3Ph, 4W, 60Hz Automatic Transfer Switch (Refer to drawing#
C
A
EL-A10019).
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 One (1), 480V, 600A, 3Ph, 3W, 60Hz Automatic Transfer Switch (Refer to drawing#
DATE: EL-A10020).).
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall design Local Control Push Button Stations appropriate for
DATE:
CONSTRUCTION
AMR EL SHARKAWY
the areas of installation, Install control cables and conduits between control
AGENCY
09/08/16 stations and the Interposing relay panels or MCC.
DATE:
OPERATIONS
SHAHZAD YAZDANI
Convenience Outlets: 480 VAC welding receptacles shall be installed at locations
09/08/16 where mobile welding sets or power water wash equipment use is required. In
DATE: addition, 230 VAC convenience outlets shall be placed throughout the plant at all
CONTROL NUMBER
ALI H GHAMDI
location where hand tools would be required for maintenance and inside the
VERIFICATION
09/08/16
buildings.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG UPS power supply system shall be provided for the E & M Building loads,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Operation building loads, RIO building loads, main Security Support building loads,
Tank Farm and other field Instrument Loads. Integrated AC UPS & DC Systems
ASH
ASH
ASH
c/w respective distribution panels to power critical loads such as Control, ESD,
LEADS
LEADS
LEADS
ALL
separate room within the E & M Building for Telecommunication Loads. Batteries
for 4 hour back up installed in a separate room within the Security Support Building
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
One (1) 5kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
One (1) 10kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40-UPS-010).
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER One (1) 20kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
C
A
60Hz (X40-UPS-002).
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 Three (3) 10kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
DATE: 60Hz (X40-UPS-007, X40-UPS-008 & X40-UPS-009).
CERTIFIED
A M ALMATROOK
09/08/16 One (1) 45kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
DATE:
CONSTRUCTION
AMR EL SHARKAWY
60Hz (X40-UPS-003).
AGENCY
09/08/16
DATE:
Two (2) 25kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W,
OPERATIONS
SHAHZAD YAZDANI
60Hz (X40-UPS-004 & X40-UPS-005).
09/08/16
ALI H GHAMDI
distribution panels required for 125VDC system as per one line diagram #EL-
VERIFICATION
09/08/16
A10029, EL-A10030 & EL-A10033) for receiving & utility substation. Each DC
EDSD
Power System shall include two (2) rectifier battery chargers and two set of
DATE:
batteries, battery racks and battery monitoring system. Ratings are as follows:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
One (1) 125 VDC, 350A Output, 480V, 3Ph, 60 Hz Input (X40-BC-001 & X40-BC-
(DCC) NO. _____________________
002).
One (1) 125 VDC, 250A Output, 480V, 3Ph, 60 Hz Input (X40-BC-003 & X40-BC-
004).
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG One (1) -48 VDC, 200A Output, 480V, 3Ph, 60 Hz Input (X40-BC-005 & X40-BC-
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH 006).
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
About 3.85kM 115kV cabling from MARAFIQ Substation #9I to receiving substation
115kV Gas Insulated Switchgear (GIS) at YDH. Thrust Boring or Horizontal
Direction Drilling (HDD) cables installation method shall be used to cross main
highway as per Royal Commission (RC) & MARAFIQ Guidelines. (Refer sketch
SK-A10010.001)
13.8kV cabling from new 13.8kV Switchgear located inside the Receiving
Substation to Utility Substation power transforms, Pad Mounted Looped
JO/EWO
Transformers & Shipper Pumps. (Refer drawing # EL-A10103 sheet 001 to 004)
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
4.16kV cabling from new 4.16kV Switchgear located inside the Utility Substation to
Controlgear & Booster Pumps. (Refer drawing # EL-A10103 sheet 001 to 004.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER Buried Power and control cabling to all MV and LV loads. (Refer drawing # EL-
C
A
DATE:
Lighting System
OPERATIONS
SHAHZAD YAZDANI
09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: procurement, supply, deliver / store, install & test for lighting system.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
The Lighting designs for this project shall be in accordance with IESNA RP-7
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall design following types of lighting but not limited to; Buildings
(DCC) NO. _____________________
interior & exterior lighting, Area Lighting, Security Fence Lighting, Street Lighting,
Task Lighting, Emergency Lighting, Tank Lighting .
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall provide interior & exterior lighting for the below listed
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
buildings & Shelters. (Refer drawing # EL-A10034, EL-A10035, EL-A10047, EL-
A10050, EL-A10054, EL-A10057, EL-A10060, EL-A10063, EL-A10066, EL-
ASH
ASH
ASH
LEADS
LEADS
ALL
Receiving Substation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Utility Substation
DESCRIPTION
E & M Building
ISSUED FOR 60% FEL3
Chemical Shelter
X-Ray Building
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
IDAS Shelter
Guard House
09/08/16
08/04/16
06/01/16
NO.
REV
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall provide outdoor plant and fence lighting. (Refer drawing #
09/08/16 EL-A10101)
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall provide tank lighting including cables, conduits, junction box,
09/08/16 cable trays etc. CONTRACTOR shall coordinate with Tank Package Contractor for
DATE:
CONSTRUCTION
AMR EL SHARKAWY the location of Tank lighting and develop detail design drawings as required.
AGENCY
09/08/16
09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: procurement, supply, deliver / store, install & test for grounding system as required
CONTROL NUMBER
ALI H GHAMDI
for the new Facilities in accordance with IEEE 142 and shall meet the requirements
VERIFICATION
09/08/16
of ANSI/NFPA 70 (NEC) and ANSI C2, as supplemented or amended by SAES-P-
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
IEEE 80.
(DCC) NO. _____________________
CONTRACTOR shall extend existing Plant Ground grid at YASREF, SAMREF and
Yanbu Refineries to bond the new electrical equipment, tanks, fence post,
REVISION
structural steel, etc. Grounding system shall utilize buried copper wire loops and
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG grounding rods for perimeter grids around the transformers, substation building and
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH all other electrical equipment.
ASH
ASH
LEADS
LEADS
ALL
yards, E&M Building, operation room, control building, security support buildings,
ALL
ALL
shelters, other supporting buildings and overall plant grounding. (Refer drawing #
EL-A10040, EL-A10041, EL-A10049, EL-A10051, EL-A10055, EL-A10058, EL-
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
& EL-A10102 )
CONTRACTOR shall provide and install additional ground rods and ground grid as
required to ensure that the ground resistance does not exceed safe values as
defined in IEEE 80 to comply with SAES-P-111.
the buildings at YDH. The design and installation shall be based on: NFPA 780, UL
10-02399-
0001
0001
DATE
DATE:
PROJECT
ALL LEADS
Cathodic Protection System:
ENGINEER
09/08/16
09/08/16 The CPS CONTRACTOR scope of work shall include but not limited to prepare a
DATE: detailed design package comprising of CP drawings, layouts, installations details,
CONTROL NUMBER
ALI H GHAMDI
detail material take offs, specifications, testing, pre-commissioning &
VERIFICATION
09/08/16
commissioning procedure, calculations for required voltage, amperage and life
EDSD
spacing between the anodes, minimum current density and consumption rate of
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR scope shall include but not be limited to Detail Design duly
REVISION
AHG
AHG
AHG store, install & test for complete, microprocessor-based addressable fire detection
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and alarm system, featuring intelligent spot, linear beam detectors using multi-
sensor technology, Multi spectrum IR Flame detectors, a powerful networking
ASH
ASH
ASH
capability, with reliable peer-to-peer communication. The Fire Alarm System for this
LEADS
LEADS
LEADS
ALL
The Fire Alarm system shall include but not limited to the following: Fire Alarm
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
control panel, multi spectrum flame detectors, beam detectors, automatic and
DESCRIPTION
CONTRACTOR shall provide Fire Detection & Alarm System for Receiving
10-02399-
Substation, Utility Substation, all other buildings and shelters (Refer drawing # EL-
10-02399-
10-02399-
0001
0001
0001
DATE
units must detect fire in order to activate an automatic fire suppression system.
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall coordinate & finalize interface requirements with Tank
DATE: Package Contractor for the Linear Heat Detection System for the external floating
A M ALMATROOK
CERTIFIED
roof tanks. Linear Heat Detection System shall be interface with the nearest Fire
09/08/16 Alarm Control Panel provided by CONTRACTOR (Refer drawing # EL-A10149 &
DATE:
CONSTRUCTION
AMR EL SHARKAWY
EL-E10068).
AGENCY
09/08/16
DATE:
Power System Automation (PSA)
OPERATIONS
SHAHZAD YAZDANI
09/08/16 CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: procurement, supply, deliver / store, install, test, pre-commission, commissioning
CONTROL NUMBER
ALI H GHAMDI
assistance and Final Integrated Testing for Power System Automation (PSA) at
VERIFICATION
09/08/16
YDH Receiving Substation. Information of Receiving Substation shall be linked to
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
assistance and Final Integrated Testing for Power System Automation (PSA) at
YDH Utility Power Substation. Information of Utility Substation shall be linked to
Power System Automation (PSA). (Refer document # EL-A10032 & EL-E10039)
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall consider electrical interface to YDH control system as per
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
following:
Interposing relay cabinet shall be provided in substation to control booster,
ASH
ASH
ASH
shipper and other utility pumps. Homerun cables between substation and
LEADS
LEADS
LEADS
ALL
ALL
ALL
respective RIB shall be laid. The pump status and control signals shall be
integrated to the remote I/O’s provided in the RIBs.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
PSA Server shall be interfaced to DCS via OPC or other open industry
DESCRIPTION
standard protocol.
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
ALI H GHAMDI
CONTRACTOR shall design, provide, install, and test control/signal cables
VERIFICATION
09/08/16
between Interposing relay panels and Controlgear and Instrument marshaling
EDSD
cabinets.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Control Panels & Power Associated with Skids and Vendor Packages
(DCC) NO. _____________________
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall design, supply, install, test, pre-commission and provide
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
assistance in commissioning the control panels associated with vendor supplied
skids such as Dye Injection skids, DPK Filtration skids, Conductivity Enhancer
ASH
ASH
ASH
Injection skids, Custody Metering skids, Static, Dissipative Agent Injection skids,
LEADS
LEADS
LEADS
ALL
CONTRACTOR shall supply any and all cabling required for Equipment, Skids and
ISSUED FOR 60% FEL3
Vendor Package integration and install and test and pre-commission and support
commissioning as required to insure fully functional integrated systems for YDH
Project.
CONTRACTOR shall be responsible for the supply, installation, and testing, pre-
commission and provide commissioning assistance for any other control panels
and systems not mentioned herein and are part of the mechanical, instrument or
piping equipment, but not limited too.
JO/EWO
10-02399-
CONTRACTOR shall be responsible for the interconnection between the skids and
10-02399-
10-02399-
0001
0001
0001
DATE
the parent equipment, and field instruments, Substations and Control Rooms and
shall develop interconnection wiring and piping drawings to SAUDI ARAMCO
09/08/16
08/04/16
06/01/16
NO.
REV
SACS standards for input in to IPlant. The drawings shall be submitted to SAUDI
DISCIPLINE
ENGINEER ARAMCO for acceptance.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
DATE:
Oily Water Lift Station Control Panels
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall design, supply, install, test, pre-commission and provide
09/08/16
assistance in commissioning the Oily Water Lift station control panels for Normal
DATE:
OPERATIONS
Flow and Maximum Flow. The Oily Water Lift Station Control panel shall have two
SHAHZAD YAZDANI
09/08/16
independent power supply sources with auto transfer facility built into the local
DATE:
control panel, to provide a continuous source of power to the lift station. The
Control Panel shall be in full compliance with SAES-S-020.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
The enclosures shall be of dead front construction and shall have two doors and
DATE:
two compartments that are separated by a barrier. One compartment shall house
BY:
the motor starter package and the other shall house the controls for liquid level and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
alarms. The doors shall overlap to prevent them from being opened with the pump
OF THIS DRAWING IS COVERED, FOR ALL
motor disconnect devices in the “ON” position. The starters shall be complete with
(DCC) NO. _____________________
Start / Stop Push Buttons, Start / Stop Indications, local remote control and
indications; HOA switches etc. The starters shall be provided with dry run
protection relay to prevent the motors from dry run.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall be responsible for the design, supply, installation, and test,
pre-commission and provide assistance in commissioning of any other control
ASH
ASH
ASH
panels and systems not mentioned herein and are part of the mechanical,
LEADS
LEADS
LEADS
ALL
Electrical and electronic equipment and associated wiring in Oily Water Lift Station
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
systems shall be suitable for the electrical area classification in accordance with
DESCRIPTION
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
Lift Station Control Panel shall have two independent power supply sources with
auto transfer facility built into the panel, to provide a continuous source of power to
09/08/16
08/04/16
06/01/16
the lift station. The Control Panel shall be in full compliance with SAES-S-010.
NO.
REV
DISCIPLINE
ENGINEER
The enclosure shall be of dead front construction and shall have two doors and two
C
A
DATE: compartments that are separated by a barrier. One compartment shall house the
PROJECT
ALL LEADS
ENGINEER motor starter package and the other shall house the controls for liquid level and
09/08/16
alarms. The doors shall overlap to prevent them from being opened with the pump
DATE:
CERTIFIED motor disconnect devices in the “ON” position. The starters shall be complete with
A M ALMATROOK
09/08/16
Start / Stop Push Buttons, Start / Stop Indications, local remote control &
DATE: indications; HOA switches etc. The starters shall be provided with dry run
CONSTRUCTION
AMR EL SHARKAWY
AGENCY protection relay to prevent the motors from dry run.
09/08/16
DATE:
OPERATIONS
Electrical and electronic equipment and associated wiring in Oily Water Lift Station
SHAHZAD YAZDANI
09/08/16
systems shall be suitable for the electrical area classification in accordance with
DATE:
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
Electrical Area Classification Drawings.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
panels for all motors 75 kW (100 HP) and larger, and all other motors where the
engineering documents indicate motor space heaters are installed, a contact shall
be wired to a terminal block in the low voltage compartment of the Switchgear
REVISION
AHG
AHG
AHG circuit (panel shall be designed and provided by THE CONTRACTOR) of a
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
remotely mounted motor space heater contactor. Contact shall be closed when the
main motor circuit contactor is de-energized. This is in accordance with SAES-P-
ASH
ASH
ASH
116 and shall be provided, installed, tested, pre commissioned, and with
LEADS
LEADS
LEADS
ALL
Interconnection Wiring
DESCRIPTION
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
in Bulk Plant area will be rated according to area classification layout drawings
DISCIPLINE
ENGINEER (Refer to drawing #EL-A10003). Attached drawings shall be used only as guide
C
A
09/08/16 Buildings where Battery rooms are provided shall comply with all requirements of
DATE: SAES-P-103, Battery rooms shall be provided with an eye wash facility with
potable water connection & drain, and the drain shall be through acid neutralization
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
pit. The ventilation system shall be 100% redundant. Only direct driven exhaust
EDSD
fans shall be used. An interlock with the ventilation system shall be provided to
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
procurement, supply, deliver / store, install & test for Fire Stops wherever
(DCC) NO. _____________________
cable/conduit/cable trays pass through fire rated walls, Floor or Ceiling. The Fire
Stops shall be in compliance with UL and SAES-U-101.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR scope shall include but not be limited to Detail Design,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
procurement, supply, deliver / store, install & test for lighting fixtures, receptacles,
lighting panels, power panels, lighting circuits, power circuits and grounding for the
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Shelters, Musalla, Security Gate House, Security Support Building, Security Guard
DESCRIPTION
Houses, RIO Building, IDAS Shelter, X-Ray Building, FSF Building & Foam Skid
ISSUED FOR 60% FEL3
Building.
Power Panels
JO/EWO
Power Circuits
Lighting Panels
10-02399-
10-02399-
10-02399-
0001
Lighting Circuits
0001
0001
DATE
Disconnect Switches
06/01/16
NO.
REV
DISCIPLINE
Sockets / Receptacles
ENGINEER Dry Type Transformers
C
A
Control Panels
DATE:
PROJECT
Grounding
ALL LEADS
ENGINEER
09/08/16
DATE:
CERTIFIED
All in accordance with the detailed design Lighting Layouts, Power Layouts, Panel
A M ALMATROOK
Schedules, Fire Alarm Layouts and Grounding Layouts. Refer to project proposal
09/08/16
DATE: drawings as per DCL # GEN-D0001 for Lighting, Power, Grounding, Fire Alarm
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Layouts, Panel schedules and Electrical One Line Diagrams of respective
09/08/16
buildings.
DATE:
OPERATIONS
SHAHZAD YAZDANI
Electrical Major Deliverables
09/08/16
DATE:
Reference Documents attached to this PPN include but are NOT limited to the
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 following and shall be further developed by CONTRACTOR during the Detail
EDSD
Design:
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Grounding Layouts
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Lightning Protection Layouts
Fire Detection & Alarm Layouts
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
Lighting, Grounding
DISCIPLINE
ENGINEER Cable Routing Layouts
C
A
Panelboard Schedules
DATE:
PROJECT Major Equipment Specifications with Purchase Requisitions Development
ALL LEADS
ENGINEER
09/08/16 Buildings, Area, Access Road, Tanks Lighting Layouts
DATE: Fire Alarm Detection Layouts, Riser Diagrams, Cause & Effect Logic
CERTIFIED
A M ALMATROOK Substation Automation Input / Output List for PSA & SCADA
DATE:
09/08/16
Substations Equipment Layout
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Substation Equipment Section & Details
09/08/16
Electrical Load List – including Process, Mechanical (HVAC, Rotating, Vessels),
DATE: Telecommunications, Security, Automation, Instrumentation Loads
OPERATIONS
SHAHZAD YAZDANI
One Line Diagrams – Key and Protection & Metering
09/08/16
Schematic & Interconnection drawings
DATE:
Cable & Conduit Schedule
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Material Take-Off
DATE:
ETAP Studies including Load Flow, Short Circuit, Relay Coordination, Arc Flash
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
AHG
AHG
AHG
Smart Plant Electrical Outputs
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
3D Model.
ASH
ASH
Detailed Design drawings shall include all necessary plans, elevations, arrangements,
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall incorporate ALL Vendor NMR’s into the IFC package as vendor
data becomes available and shall insure drawings utilized for construction have NMR
602 and NMR 603 data incorporated within, prior to site construction execution. Note
that this is critical path prior to pouring Concrete for Substation Floors, Precast Walls,
Transformer and Generator, Motor, Skids, Pole Foundations, etc.
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall provide, install, test and terminate a 480V power cable to the
09/08/16
Scraper Launcher Area Power Panelboard. The Panelboard will be provided and
08/04/16
06/01/16
NO.
REV
DISCIPLINE
installed within the Scraper Launcher Area by BI-10-02155. (Refer drawing # EL-A10014
ENGINEER
sht. 001)
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
Electrical interfaces include power connection of 480V used to power the pipeline scraper
09/08/16 launcher facilities loads inside YDH perimeter fence. One (1) 480V, 150A, 3Ph, 3W, 60Hz
DATE: Outdoor Power Panel shall be provided by BI 10-02155 (Yanbu - North Jiddah Products
CERTIFIED
A M ALMATROOK Pipelines).
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY CONTRACTOR shall develop all required detailed design drawings as necessary to
AGENCY
09/08/16 construct the electrical power requirements for all the projects NEW and Existing
DATE: Electrical Equipment, in order to purchase the material and install, test and commission
OPERATIONS
SHAHZAD YAZDANI all equipment requiring electrical power and electrical equipment interfaces, for YDH.
09/08/16
DATE:
YASREF Refinery Connection:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
There is no physical interface within the facility; will be utilize the pipeline provided by BI-
00043. Therefore no electrical load has been anticipated.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
SAMREF shall supply all electrical power and connections required for MOVs and other
miscellaneous loads.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
supply, deliver / store, install & test for Two (2nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
ASH
ASH
ASH
accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
LEADS
LEADS
LEADS
ALL
EL-A10052).
ALL
ALL
CONTRACTOR shall coordinate with SAMREF refinery to utilize the existing feeders of
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
SAMREF substation to feed the power to newly added Surge relief pump (X40-X002A/B).
DESCRIPTION
ISSUED FOR 60% FEL3
CONTRACTOR shall utilize existing space in MCC-11-10-3 & MCC-11-20-3 and supply;
install three (3nos.) 100AF new circuit breakers to feed new MOV power panels & new
UPS, including feeder cables, conduits and other required accessories. (Refer sketch SK-
A10051 & SK-A10052)
CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
supply, deliver / store, install & test for 10kVA, Input voltage 480V 3ph 60Hz, Output
voltage 230 1ph 60Hz. The UPS system shall be complete with charger rectifiers,
JO/EWO
inverters static switches, batteries, bypass switch, transformers and distribution panels,
10-02399-
mimic panels, and smoke detection in the UPS cabinet in Substation # 12 at SAMREF.
10-02399-
10-02399-
0001
0001
0001
DATE
design phase and obtain SAUDI ARAMCO Approval. Equipment installed in SAMREF
DISCIPLINE
ENGINEER area will be rated according to area classification (refer drawing # EL-A10004).
C
A
DATE:
PROJECT
ALL LEADS
CONTRACTOR shall provide Grounding to new equipment from existing SAMREF
ENGINEER
09/08/16 Grounding network.
DATE:
A M ALMATROOK
CERTIFIED
CONTRACTOR shall provide task lighting for new equipment from existing lighting
09/08/16 Panels.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Yanbu Refinery Connection:
DATE:
OPERATIONS
SHAHZAD YAZDANI Yanbu Refinery shall supply all electrical power and connections required MOVs and
09/08/16 other miscellaneous loads. Total electrical loads anticipated are about 25kVA.
DATE:
CONTROL NUMBER
ALI H GHAMDI
CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
VERIFICATION
09/08/16
supply, deliver / store, install & test for Three (3nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
EDSD
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
DATE:
accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
BY:
EL-A10111).
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall coordinate with YANBU refinery to utilize the existing feeders of
YANBU substation to feed the power to newly added 150A, 480V, Switchrack at Tank
ASH
ASH
ASH
Farm area.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall supply and install One (1) No. 150A, 480V Switchrack near tank
farm area to feed the power to newly added Surge relief pump (X40-X004A/B).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
CONTRACTOR shall provide task lighting for new equipment from existing lighting
Panels
CONTRACTOR shall coordinate with SAUDI ARAMCO and MARAFIQ for the portion of
JO/EWO
works under MARAFIQ scope and insure correct interface of all discipline’s i.e. Civil,
10-02399-
0001
0001
DATE
CONTRACTOR shall furnish electrical detailed drawings, documents and any calculation
requested by MARAFIQ / Yanbu Royal Commission (YRC) to fulfill the connection
09/08/16
08/04/16
06/01/16
NO.
REV
agreement requirements.
DISCIPLINE
ENGINEER
C
A
CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS to feed power to
DATE:
PROJECT
ALL LEADS
YDH. (Refer sketch # SK-A10011, SK-A10013 & SK-A10014)
ENGINEER
09/08/16
DATE: CONTRACTOR shall provide one (1) metering panel to accommodate two (2) revenue
CERTIFIED
A M ALMATROOK meters & two check meters for YDH feeders-1 & 2. (Refer sketch # SK-A10013 & SK-
09/08/16 A10014)
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide Four (4) protection relay panel to accommodate line
DATE:
differential relays & directional relays for YDH feeders-1 & 2. (Refer sketch # SK-A10013
OPERATIONS
SHAHZAD YAZDANI & SK-A10014)
09/08/16
DATE: CONTRACTOR shall provide one (1) 125VDC Power Panel to supply power to new relay
CONTROL NUMBER
ALI H GHAMDI
panels. (Refer sketch # SK-A10012)
VERIFICATION
09/08/16
EDSD
CONTRACTOR shall provide two (2) fiber optic patch panel to be install in Substation 9I.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall design, supply, install, test and assist with commissioning of two
run, 3x1/C- 630 mm2, 115kV cables of 3.85km in length, from MARAFIQ Substation #9I to
YDH. (Refer sketch # SK-A10010 & SK-A10015)
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall design, supply, install, test and assist with commissioning of two (2)
run 12C Single Mode Fiber Optic Cables run along with each power feeder cable from
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide termination kits, including connectors, at the MARAFIQ end
and at the SAUDI ARAMCO 115kV GIS end. CONTRACTOR shall coordinate with
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall confirm MARAFIQ protection and metering requirements and reflect
accordingly within the Detail Design Drawings. Development of protection, control, fire
alarm, communication, etc., interface drawings shall be CONTRACTOR responsibility
including purchase, installation, termination and testing of the required cabling.
CONTRACTOR shall assist MARAFIQ as required with Manpower, and test equipment,
as necessary to complete MARAFIQ 115kV and SAUDI ARAMCO 115kV Interface
Testing including Protection, Metering, Controls, etc. including wiring interface drawing
JO/EWO
development. Test Results shall be signed by all relevant parties including POD, PID,
10-02399-
MARAFIQ, etc. and be included within the Project Test Results binders maintained and
10-02399-
10-02399-
0001
0001
0001
DATE
philosophy will be finalized as per Connection Agreement between MARAFIQ & SAUDI
DATE:
PROJECT
ALL LEADS
ARAMCO. Initial communication has been established to finalize the scope segregation
ENGINEER
09/08/16 between SAUDI ARAMCO & MARAFIQ. Proposed interface requirements are as
DATE: followed:
CERTIFIED
A M ALMATROOK
09/08/16 MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays: =EB04
DATE:
CONSTRUCTION
AMR EL SHARKAWY
and =EA06 for SAUDI ARAMCO YDH project.
AGENCY
09/08/16
DATE: MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
OPERATIONS
SHAHZAD YAZDANI control panel =EB04+S and =EA06+S.
09/08/16
DATE:
A new metering panel is required, same model and configuration than existing
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
metering panels. This new metering panel shall be the combine metering
EDSD
panels for 2 feeders of YDH. Each YDH feeders shall have a separate
revenue meters and will be accommodated in this panel. Reserved available
DATE:
BY:
floor space for this panel. New Panel to be tagged as: =E+MP05 115KV
REVISIONCERTIFICATION
Protection Scope- Primary Protection: Two (2) new Relay Panels are required
based on ABB relays. Reserved available floor spaces for these two panels.
New panels to be tagged as: =EB04+R1 and =EA06+R1 115kV Service Line
REVISION
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
Protection Scope- Back Up Protection: Two (2) new relay Panels are required
ASH
based on Siemens relays. Available floor spaces for these 2 panels. New
ASH
LEADS
LEADS
ALL
ALL
ALL
MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for Bus
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
DESCRIPTION
ISSUED FOR 60% FEL3
DC System scope: Existing 125V DC Distribution Panel has not enough spare
breakers for new DC scope. MARAFIQ requested to provide new DC panel
same manufacturer than existing panels “Riyadh Factory For Panelboard”
Available floor space for this new DC panel. New Panel to be tagged as: 125V
DCDB 125V Main DCDB No. 3.
10-02399-
10-02399-
0001
0001
DATE
09/08/16
08/04/16
06/01/16
DATE:
PROJECT
ALL LEADS
ENGINEER Cable trays have to be heavy duty 600mmx150mm for cable transition to
09/08/16 the wall.
DATE: Cable trays support shall be unistrut type.
CERTIFIED
A M ALMATROOK Cable structural support shall be Unistrut type similar design that existing
09/08/16
DATE:
ones.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 General requirements:
DATE: Contractor/SAPMT shall include MARAFIQ in the Engineering Review
OPERATIONS
SHAHZAD YAZDANI Cycle during detail engineering.
09/08/16
Contractor shall procure all equipment related to MARAFIQ Scope as per
DATE:
Royal Commissioning Standards.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
4.16Communication
DATE:
BY:
A. DATA NETWORK
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Scope of Work
several physically separated LANs that includes the Enterprise LAN for
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG corporate systems including OSPAS, Security CCTV LAN and Process
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
LAN to mainly secure and independently transport, control and manage
their respective traffic. CCTV design shall be in full compliance with
ASH
ASH
ASH
SAES-T-555.
LEADS
LEADS
LEADS
ALL
ALL
ALL
The Security LAN may utilize the Enterprise LAN to transport the traffic
provided with adequate level of logical separation.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
The Yanbu Distribution Hub Enterprise LAN shall manage and control
DESCRIPTION
all business related types of traffic that shall traverse through its own
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
Gate & Tank Farm) and will be uplinked to the Distribution switch using
DISCIPLINE
ENGINEER inter-building Outside Plant Fiber Optic cable.
C
A
DATE: CONTRACTOR shall install, test and commission the full functionality of
PROJECT
ALL LEADS
ENGINEER switch with required Power over Ethernet (PoE) ports. The access
09/08/16
switches with Redundant Power Supply shall be used for IP telephones
DATE:
CERTIFIED
and Wireless Access points within the Yanbu Distribution Hub.
A M ALMATROOK
09/08/16 The Wireless LAN System under this project will be provided at
DATE:
CONSTRUCTION
AMR EL SHARKAWY Operation Building, Maintenance & Engineering Building, Operator
AGENCY
09/08/16 Shelter and Security Support Building (Main Gate & Tank Farm) to
DATE: support mobile computing in the Yanbu Distribution Hub facilities.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 CONTRACTOR shall provide and install the following wireless LAN
DATE: subsystems:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Patch cords
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall provide and install the wireless LAN and ensure
the appropriate placement of wireless access points to provide excellent
radio coverage and mobility to all wireless IP devices.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG WLAN access point outlets shall not be installed more than 3.75 meters
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH above finished floor level.
ASH
ASH
The access point shall be connected to the PoE+ port of Access switch
using UTP CAT-6 cable and shall be powered through its power-over-
LEADS
LEADS
LEADS
ALL
ALL
ALL
Ethernet port.
CONTRACTOR.
ISSUED FOR 60% FEL3
Schematic Diagram,
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
Schematic Diagram,
DISCIPLINE
ENGINEER
Overall WLAN System CO-A10039.001
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
Maintenance & Engineering Building
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall procure, install, test and commission the one (1)
09/08/16
DATE:
Distribution switch equipped of 20-Port 1Gigabit Ethernet /2-Port
CONSTRUCTION
AMR EL SHARKAWY 10Gigabit Ethernet L2/L3 line card with SFP pluggable 1000Base-X
AGENCY
09/08/16 Mini-GBIC and 10GBE-XFP Transceivers that support single mode fiber
DATE: over 1310nm wavelength with LC connector. The 1000Base-X Mini-
OPERATIONS
SHAHZAD YAZDANI GBIC Transceiver supports 9 micron single mode fiber up to a
09/08/16 maximum distance of 10km.
DATE:
CONTROL NUMBER
09/08/16
DPC module with 10Gigabit Ethernet XFP transceivers for the utilization
EDSD
utilize and reserve the slot 4 of the existing Juniper MX-960 on both
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Yanbu Refinery
OF THIS DRAWING IS COVERED, FOR ALL
The CONTRACTOR shall procure, install, test and commission one (1)
Provider Edge (PE) router with redundant power supplies.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall procure, install, test and commission the one (1)
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Access Switch and one (1) Modular Access switch equipped with
redundant SFP pluggable 1000Base-X Mini-GBIC Transceivers that
ASH
ASH
ASH
LEADS
LEADS
ALL
The PE Router and Access switch and Modular Access switch installed
in Maintenance & Engineering Building shall be powered from utility
power source and Telecoms-dedicated Uninterruptible Power Supply
(UPS) system
10-02399-
10-02399-
0001
0001
0001
DATE
Operation Building
09/08/16
08/04/16
06/01/16
DISCIPLINE redundant power supply, one (1) Modular Access switch equipped with
ENGINEER
interface modules and SFP pluggable 1000Base-X Mini-GBIC
C
A
DATE: Transceivers that support single mode fiber over 1310nm wavelength
PROJECT
ALL LEADS
ENGINEER with LC connector. The 1000Base-X Mini-GBIC Transceiver supports 9
09/08/16
micron single mode fiber up to a maximum distance of 10km.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall install Universal 19” Standard Rack to mount the
09/08/16 Modular Access switch, Redundant Power Supply, fiber optic/UTP
DATE:
CONSTRUCTION
AMR EL SHARKAWY copper patch panel and ancillaries.
AGENCY
09/08/16
The Modular Access switch shall be powered from utility power source
DATE:
OPERATIONS
SHAHZAD YAZDANI
and dedicated Rack Mounted UPS systems installed in
09/08/16 Telecommunication Room.
DATE:
Receiving Substation Building
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
DATE:
BY:
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
access switch, Redundant Power Supply, fiber optic/UTP copper patch
panel and ancillaries.
ASH
ASH
ASH
The access switch shall be powered from utility power source and
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switch equipped with SFP
pluggable 1000Base-X Mini-GBIC Transceivers that support single
mode fiber over 1310nm wavelength with LC connector. The
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.
10-02399-
10-02399-
0001
0001
0001
DATE
The access switch shall be powered from utility power source and
09/08/16
08/04/16
06/01/16
DISCIPLINE Room.
ENGINEER
C
A
Operator Shelter
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall procure, install, test and commission the one (1)
09/08/16
Redundant Power Supply and one (1) Access switch equipped with SFP
DATE:
CERTIFIED pluggable 1000Base-X Mini-GBIC Transceivers that support single
A M ALMATROOK
09/08/16 mode fiber over 1310nm wavelength with LC connector. The
DATE: 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
fiber up to a maximum distance of 10km.
DATE: CONTRACTOR shall install Universal 19” Standard Rack to mount the
OPERATIONS
SHAHZAD YAZDANI
access switch, Redundant Power Supply, fiber optic/UTP copper patch
09/08/16
panel and ancillaries.
DATE:
CONTROL NUMBER
ALI H GHAMDI
The access switch shall be powered from utility power source and
VERIFICATION
09/08/16
dedicated Rack Mounted UPS systems installed in Telecommunication
EDSD
Cabinet (TC).
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switches equipped with
REVISION
AHG
AHG
AHG mode fiber over 1310nm wavelength with LC connector. The
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The access switch shall be powered from utility power source and
DESCRIPTION
Room.
CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switch equipped with SFP
JO/EWO
10-02399-
10-02399-
0001
DISCIPLINE
CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGINEER
access switch, Redundant Power Supply, fiber optic/UTP copper patch
C
A
DATE:
panel and ancillaries.
PROJECT
ALL LEADS
ENGINEER
09/08/16
The access switch shall be powered from utility power source and
DATE:
dedicated Rack Mounted UPS systems installed in Telecommunication
A M ALMATROOK
CERTIFIED Room.
09/08/16
DATE: General
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 This document shall be constructed in concurrence with the data network
DATE: drawing CO-A00033 sheet 001.
OPERATIONS
SHAHZAD YAZDANI
09/08/16
ALI H GHAMDI
VERIFICATION
Firewalls
Wireless Access points
DATE:
BY:
UPS Equipment
REVISIONCERTIFICATION
Grounding Kits
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG In addition to the Supply, Installation and Commissioning of the equipment,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall undertake a number of ancillary tasks to ensure
conformity of the equipment and System to the overall intent of Project
ASH
ASH
ASH
requirements. These additional tasks shall include, but not necessary limited
to, the following:
LEADS
LEADS
LEADS
ALL
ALL
ALL
0001
0001
DATE
The provision of all materials, tools, test equipment, and other items of
equipment to effect the installation and commissioning.
09/08/16
08/04/16
06/01/16
NO.
REV
Project Management.
DISCIPLINE
ENGINEER
CONTRACTOR shall obtain SAUDI ARAMCO approval for the design
prior to implementation.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER Drawings and Documents
09/08/16
DATE: CONTRACTOR shall ensure that the Engineering Drawings, Data Sheets,
A M ALMATROOK
CERTIFIED and configuration sheets are readily available in the facility where the
09/08/16 equipment indicated will be installed.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall deliver all documentation in both hardbound paper
09/08/16
format and also a CD-ROM based electronic file copy.
DATE:
OPERATIONS
SHAHZAD YAZDANI Materials
09/08/16
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
Software
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A complete list of all software installed, complete with revisions,
versions, etc.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
ARAMCO property.
ISSUED FOR 60% FEL3
REFERENCE DRAWINGS
Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.
SHEET
JO/EWO
0001
0001
DATE
DATE:
PROJECT
ALL LEADS
B. TELEPHONE NETWORK
ENGINEER
09/08/16
Scope of Work
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
IP Telephony
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
CONTRACTOR shall provide, procure, install, configure and test an
09/08/16
IP Telephony System to be utilized as a primary medium for inbound
DATE: and outbound voice communications at the new Yanbu Distribution
OPERATIONS
SHAHZAD YAZDANI Hub. This shall include the provision and installation of fifty nine (59)
09/08/16
totals of new IP telephone handsets which includes one (1)
DATE:
Conference Telephone handset and seventeen (17) analog & ten
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall install and commission the IP Telephone
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
System as per the following drawings:
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
building.
Operations Shelter 0 4 -- 4
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Operation Building 5 7 -- 12
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER
Receiving Substation 3 -- -- 3
C
A
DATE:
PROJECT Security Support Building
ALL LEADS
ENGINEER 1 -- -- 1
09/08/16 Main Gate
DATE:
A M ALMATROOK
CERTIFIED Security Main Gatehouse 1 -- -- 1
09/08/16
DATE: Security Support Building
1 -- -- 1
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Tank Farm
09/08/16
Security Guardhouse
1 -- -- 1
DATE: (Tank Farm)
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
TOTAL 22 36 1 59
VERIFICATION
09/08/16
EDSD
DATE:
Basic Users, Office IP telephones for all Office Class users and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Conference IP phone.
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________________
CONTRACTOR shall provide the required Port licenses for all new
IP telephones to expand the IP telephony platforms located in
Dhahran and Abqaiq provided under BI-10-00246.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall be responsible for all connection and
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
integration requirements of IP Phone endpoints going to the Access
ASH
ALL
ALL
analog telephone lines for the Yanbu Distribution Hub and provide
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
Analog Hotline
Location Subtotal
Phone Phone
09/08/16
08/04/16
06/01/16
NO.
REV
Operations Shelter 2 -- 2
DATE:
PROJECT
ALL LEADS
ENGINEER Operation Building 2 4 6
09/08/16
Remote Interface Unit Building 1 1 -- 1
DATE:
CERTIFIED
A M ALMATROOK Remote Interface Unit Building 2 1 -- 1
09/08/16
DATE: Security Support Building
1 -- 1
CONSTRUCTION
AMR EL SHARKAWY Main Gate
AGENCY
09/08/16
Security Main Gate 1 1 2
DATE:
OPERATIONS
SHAHZAD YAZDANI
X-Ray Building 1 -- 1
09/08/16 Security Support Building
1 -- 1
DATE: (Tank Farm)
Security Guardhouse
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
1 1 2
09/08/16 (Tank Farm)
EDSD
Chemical Shelter 1 -- 1
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Metering Shelter 1 -- 1
OF THIS DRAWING IS COVERED, FOR ALL
YASREF -- 1 1
SAMREF -- 1 1
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
Analog Hotline
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Location Subtotal
ASH
Phone Phone
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
TOTAL 17 10 27
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
telephone users.
This project shall allocate the four (4) hotline circuits in Operation
Building to Yanbu Regional Security Command Centre (YRSCC).
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
PROJECT CONTRACTOR shall provide, procure, install, test and commission
ALL LEADS
ENGINEER
09/08/16 two (2) new Ethernet switches. The Ethernet Switch shall be utilized
DATE: to support the system 10/100/1000Base-T ports and GBE ports
A M ALMATROOK
CERTIFIED interface requirements.
09/08/16
DATE: CONTRACTOR shall provide, procure, install and activate two (2)
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 1000 Base-TX SFP Modules on GE SFP port on each of the two
09/08/16
Huawei Firewalls.
DATE:
OPERATIONS
SHAHZAD YAZDANI
CONTRACTOR shall provide, procure, install and activate two (2)
09/08/16
1000 Base-TX SFP Modules on Distribution Switch located at
DATE:
Engineering & Maintenance Building.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
AHG
AHG
AHG
CONTRACTOR shall provide, procure, install, test and commission
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
one Voice Recording System including all required accessories and
ASH
materials. The Voice Recorder shall be utilized to log and record all
ASH
LEADS
LEADS
ALL
ALL
ALL
ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
DATE
This project shall lease a telephone Trunk Lines from a local service
provider for its Backup/outside call access. Refer to CO-A10028
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
Sheet 001 for the trunk lines detail. This project shall also provide
ENGINEER four (4) hotline circuits going to Yanbu Regional Security Command
C
A
Centre (YRSCC).
DATE:
PROJECT
ALL LEADS
ENGINEER
A Main Distribution Frame (MDF) shall be provided to allow the orderly
09/08/16
and logical termination and interconnection of capable pairs to and from:
DATE:
CERTIFIED
A M ALMATROOK
Line Access Gateway
09/08/16
DATE: Analog Telephones
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Public exchange trunk lines
09/08/16 Building distribution IDFs and structured cabling patch
DATE: panels
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16 conceptual design. The overall solution is expected to have availability and
EDSD
reliability of 99.99%.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
ensure that integration shall be seamless. All the System services that are
available in the Yanbu Distribution Hub shall be accessible by the
(DCC) NO. _____________________
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall propose to the COMPANY the recommended training
courses for the System. CONTRACTOR shall price the courses according
ASH
ASH
ASH
to the software and equipment installed that make-up the entirety of the
System.
LEADS
LEADS
LEADS
ALL
ALL
ALL
equipment.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
System Configuration
09/08/16
08/04/16
06/01/16
NO.
REV
09/08/16
The System power shall be derived from a - 4 8 Vo l t D C p o w e r
DATE:
system.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
For equipment requiring other supply voltages, suitable transformers,
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
EQUIPMENT SPECIFICATIONS
(DCC) NO. _____________________
IP TELEPHONE SETS
REVISION
Scope
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall engineer, procure, test and install with this
Specification, and the scope shall be as follows:
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
0001
0001
DATE
DISCIPLINE
• Configuration of all IP Phones procured and installed under
ENGINEER this project and to accommodate all new required software,
C
A
A M ALMATROOK
CERTIFIED • IP Phone shall be compatible with the existing Huawei IMS
09/08/16 Plat form.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
IP Phone Types
DATE:
OPERATIONS
SHAHZAD YAZDANI The project shall provide three (3) types of IP telephones which are to be
09/08/16 installed within the Yanbu Distribution Hub:
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Conference IP Phone
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Analogue Telephone
(DCC) NO. _____________________
This project shall supply and install a Line Access Gateway (LAG) with
Analogue Telephone sets in the Engineering & Maintenance Building to
serve the Yanbu Distribution Hub. A Line Access Gateway (LAG) shall
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG be provided to serve locations where IP telephone handsets cannot be
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH provided.
ASH
ASH
This project shall supply and install Hotline Telephone between Main Gate,
Operation Building and FSF Support Building.
LEADS
LEADS
LEADS
ALL
ALL
ALL
This project shall supply and install analogue telephone handsets in the
various location of Yanbu Distribution Hub as listed in Table 2 of this
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
document.
DESCRIPTION
ISSUED FOR 60% FEL3
BANDWIDTH REQUIREMENTS
Introduction
The purpose of this section is to provide all the critical VoIP solution sizing
statistics and results that shall be used by CONTRACTOR to design their
solutions. The solution and equipment proposed by CONTRACTOR for
Yanbu Dist ribution Hub shall have the capability to support a minimum
JO/EWO
of 59 users.
10-02399-
10-02399-
10-02399-
0001
0001
DATE
IP ANALOG
DISCIPLINE BUILDING NAME
ENGINEER TELEPHONE TELEPHONE
C
A
ALI H GHAMDI
VERIFICATION
Receiving Substation 3 --
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
--
OF THIS DRAWING IS COVERED, FOR ALL
Chemical Shelter 1
(DCC) NO. _____________________
Metering Shelter -- 1
Remote Interface Unit Building 1 -- 1
Remote Interface Unit Building 2 -- 1
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
IP ANALOG
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BUILDING NAME
ASH
TELEPHONE TELEPHONE
ASH
ASH
YASREF -- 1
LEADS
--
LEADS
LEADS
ALL
ALL
ALL
SAMREF 1
TOTAL 59 27
DESCRIPTION
ISSUED FOR 60% FEL3
Scope of Work
General
JO/EWO
This shall primarily provide wireless LAN connectivity for the users where the
wireless LAN installation shall be provided under BI-10-02399.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
The project shall provide and commission the following wireless LAN
09/08/16
08/04/16
subsystems:
06/01/16
NO.
REV
DISCIPLINE
ENGINEER Wireless LAN indoor access points
C
A
09/08/16
The WLAN shall share the data network infrastructure in terms of access
DATE:
switches to facilitate wireless connectivity.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall design, procure, install, test and commission a fully
EDSD
flexible and secure wireless LAN network to facilitate wireless data access for
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CONTRACTOR shall design and implement the System by using the latest
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall develop a design that presents the appropriate
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
placement of wireless access points to provide excellent radio coverage and
mobility to all wireless IP devices.
ASH
ASH
ASH
The following indoor areas shall be provided with wireless LAN facilities:
LEADS
LEADS
LEADS
ALL
ALL
ALL
Operation Shelter
DESCRIPTION
Security Guardhouse
ISSUED FOR 60% FEL3
All components and accessories required for the completion and successful
operation of the proposed WLAN system, either specified in detail or not, shall
be supplied and installed by the CONTRACTOR. CONTRACTOR shall verify
all required quantities and provide the System “Fit for Purpose’, irrespective of
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
Equipment Provision
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE This project shall provide, install, test and commission a permanent, scalable
ENGINEER and a complete WLAN system in accordance with the minimum requirement
C
A
as specified.
DATE:
PROJECT
ALL LEADS
ENGINEER
Installation
09/08/16
DATE:
CERTIFIED
The wireless LAN equipment shall be installed in areas as mentioned above.
A M ALMATROOK Wireless LAN access points shall be directly connected to the Power-over-
09/08/16
DATE:
Ethernet (PoE) ports of the access switches unless otherwise specified.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Wireless Controller
DATE:
OPERATIONS CONTRACTOR shall utilize the existing Wireless LAN Controller in
SHAHZAD YAZDANI
09/08/16
the Yanbu NGL.
The Wireless LAN Controller shall manage, secure, route and
DATE:
switching function for all wireless access points.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Access Points
EDSD
DATE:
Wireless LAN access points shall employ two radios at 2.4 and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Wireless LAN access points inside the building shall utilize UTP
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Wireless LAN access points shall be Power-over-Ethernet unless
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
used in a meshed configuration and utilizing fiber optic connection
which is powered independently through a power injector.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
be preserved.
REFERENCE DRAWINGS
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
SHEET
DRAWING NO. DRAWING TITLE
NO.
ISSUED FOR 60% FEL3
SCOPE DESCRIPTION
JO/EWO
General
10-02399-
10-02399-
10-02399-
This describes the design requirement for the Building Structured Cabling
0001
0001
0001
DATE
DISCIPLINE
ENGINEER This technical specification shall be used as the basis in specifying and
defining the requirements for the design, supply, installation and
C
A
DATE: commissioning of the structured cabling system for the new building.
PROJECT
ALL LEADS
ENGINEER
09/08/16 Telecommunication services will be provided at the new Yanbu Distribution
DATE: Hub facilities.
CERTIFIED
A M ALMATROOK
09/08/16 All equipment and materials specified to be supplied will be of modern,
DATE: proven and reliable design which will comply with the applicable standards
CONSTRUCTION
AMR EL SHARKAWY
AGENCY or codes and embody the latest proven technology.
09/08/16
DATE: STANDARDS
OPERATIONS
SHAHZAD YAZDANI
09/08/16 General
DATE:
The materials and equipment provided for this System shall conform to the
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 requirements of the latest issues and most recent revisions and
EDSD
amendments of the standards listed below and the local laws and
regulations applicable to the site.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG General
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
All the materials and equipment provided for this System shall meet the
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Technical Bulletins. The cables shall conform to the fire and safety codes
NEC Article 800- 51(b) or equivalent.
DESCRIPTION
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
Cableway System (horizontal and backbone) which includes but
PROJECT
ALL LEADS
ENGINEER not limited to cable tray system, Rigid Steel Conduit (RSC) and
09/08/16
Electro Malleable Tubing (EMT) conduits, sleeves, pull boxes,
DATE: outlet boxes, cableway supports, etc.
CERTIFIED
A M ALMATROOK
09/08/16 The Work shall include but not limited to installation, termination and
DATE:
CONSTRUCTION
AMR EL SHARKAWY
testing of CAT6 modules and test all horizontal and backbone cabling.
AGENCY
09/08/16
TECHNICAL REQUIREMENTS
DATE:
OPERATIONS
SHAHZAD YAZDANI
Telecom Equipment Room (TER)/Telecom Rooms (TR)
09/08/16
ALI H GHAMDI
(TER)/Telecommunications Rooms (TR) in the required buildings for the
VERIFICATION
09/08/16
co-location of data and voice termination equipment on each location of
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
associated facilities within the TR to include but not limited to, cable splice
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall ensure that the TR arrangements, cable pathways
details shall meet the requirements per ANSI/TIA/EIA-569B and grounding
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
If the total horizontal cabling length to any IO exceeds 90m from the patch
panels, additional TR and IDF’s shall be provided.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Physical Characteristics
DESCRIPTION
shall be as follows:
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE All walls and doors in the TER/TR shall have a one-hour fire rating.
ENGINEER
Minimum of one fire extinguisher of required type shall be installed.
C
A
DATE:
A Wall Mounted Telephone shall be placed in the TER/TR.
PROJECT
ALL LEADS
ENGINEER
The main entrance door shall have a combination door lock and
09/08/16 shall open outward if the building fire code allows.
DATE:
Lighting and emergency lighting shall be provided in each TER/TR.
A M ALMATROOK
CERTIFIED Electrical convenience duplex 230V AC outlet spaced at 1880mm
09/08/16 intervals around the perimeter of the walls at a height of 450mm
DATE: above floor level,
CONSTRUCTION
AMR EL SHARKAWY
AGENCY A twist lock duplex 230V above each equipment rack ceiling
09/08/16
mounted AC outlet together with the dedicated power outlets shall
DATE: be provided.
OPERATIONS
SHAHZAD YAZDANI Each Line circuit shall originate from the dedicated power panel
09/08/16 located in each TER/TR. For buildings with UPS power, the
DATE: dedicated power panel shall be powered from the Building UPS.
Grounding - CONTRACTOR shall supply a #4/0 AWG grounding
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 conductor bonded to the building ground grid, for later connection to
EDSD
be installed on at least two walls within the rooms and painted with
REVISIONCERTIFICATION
The cable support system inside the TER/TR shall be Ladder type
(DCC) NO. _____________________
trays. Cable Trays fittings and hardware include, but not limited to:
hangers, ground straps, fixtures etc. The size and layout of the
ladders and cable trays shall be determined and approved during
detail design.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
A full complement of mounting brackets shall be incorporated in the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
design which shall include but not limited to threaded rod bracket
kits, ladder rack bracket kits, wall bracket kits and all other
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Cable Terminating on to the fiber patch panel on the run from the
ISSUED FOR 60% FEL3
service entrance to the building, including the entrance point through the
building floor adjacent to an exterior wall and continuing to the entrance
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
room or space.
09/08/16
08/04/16
06/01/16
DISCIPLINE
extended from the TER to a point 1.5 meters from the building foundation.
ENGINEER Please refer to OSP documentation for additional details on the entrance
C
A
Conduits.
DATE:
PROJECT
ALL LEADS
ENGINEER
The entrance room/space is typically located within 15m (50ft) of the
09/08/16
outside cable entrance point. The entrance facilities shall contain the inter-
DATE:
CERTIFIED
building backbone cabling pathways that link a building to other buildings
A M ALMATROOK on site.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Equipment Racks
AGENCY
09/08/16
Cable management system shall be provided using the rack system that
DATE:
OPERATIONS
supports heavy equipment and high capacity cable for cross-connect or
SHAHZAD YAZDANI
interconnect applications in a telecommunication room.
09/08/16
DATE:
Equipment Racks shall be used for the installation of both passive and
CONTROL NUMBER
ALI H GHAMDI
active equipment required for their complete installation in all
VERIFICATION
09/08/16
communication rooms. In locations that require special security or where
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
The racks system shall be modular and support copper and fiber cables.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
components.
The rack shall be UL listed for 800 pound load rating to accommodate
large networking equipment.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The rack shall supply space identification of quick and easy location of
rack mount items, double sided#12-24 EIA universal mounting-hole
ASH
ASH
ASH
spacing.
LEADS
LEADS
LEADS
ALL
ALL
ALL
The rack shall accept removable, hinged doors and fingers cable
management system. The rack system shall meet all EIA requirements as
defined in EIA-310-D.The standard racks shall be high strength aluminum
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Minimum of two (2) 19” X 7” equipment racks and associated vertical &
horizontal cable management system is required per TR.
Each rack shall be bonded together with approved bonding jumpers to the
communications room ground bus bar.
Equipment Enclosures
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
communications room but still require voice and data connections to the
DISCIPLINE
ENGINEER LAN enclosures shall have a locking mechanism.
C
A
DATE: Fan units equipped with a fit for purpose filtration system shall be used,
PROJECT
ALL LEADS
ENGINEER where necessary, to ensure that the maximum enclosure temperature
09/08/16 does not exceed the manufacturer’s recommended operating temperature
DATE: for active equipment.
CERTIFIED
A M ALMATROOK
09/08/16 Cable Termination Hardware
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Each horizontal or backbone cabling run will be terminated to the patch
09/08/16
panels using appropriate connectors or connecting blocks depending upon
DATE: the cable type. Matching patch cords will be used to perform cross connect
OPERATIONS
SHAHZAD YAZDANI into the networking / voice hardware.
09/08/16
DATE: To ensure uniformity, all patch panels for their perspective application,
CONTROL NUMBER
ALI H GHAMDI
copper, fiber, etc. shall be from the same manufacturer and part number
VERIFICATION
09/08/16 throughout the job site. All copper patch panels shall support CAT6
EDSD
Patch panels shall be sized with a minimum 25 percent spare capacity for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
future growth and MAC (Moves, Adds & Changes) work. The patch panels
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG All horizontal cables serving the information outlets (IO’s) at the IWAs shall
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH be terminated onto a patch panels in TER/TR/TC or data enclosures.
ASH
ASH
Patch Panels shall be, modular, CAT-6 UTP, with integral high density
punch down style connecting base. The connecting base shall employ
LEADS
LEADS
LEADS
ALL
ALL
ALL
Four pair Category 6 UTP cabling shall be terminated onto four pair punch
DESCRIPTION
down style connecting hardware mounted to the rear (integral to the patch
ISSUED FOR 60% FEL3
panel) to the category 6 modules on the front face of the patch panel
wiring configuration shall conform to EIA/TIA 568B standard.
The wire strip and connecting block, shall be marked with a highly visible
color code and allow for termination of one full pair or four full pairs at a
time.
Port and panels shall be easy to identify with write on areas and optional
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
racks/enclosures.
09/08/16
08/04/16
06/01/16
NO.
REV
DATE: cross-connect or between the patch panel and the networking hardware
PROJECT
ALL LEADS
ENGINEER when the patch is used as an interconnection.
09/08/16
DATE: The Patch cords shall be factory terminated with modular plugs featuring a
CERTIFIED
A M ALMATROOK one piece , tangle free latch design and black strain relief boots to support
09/08/16 easy moves , addition and changes .They shall be constructed with
DATE:
Category 6 24 AWG stranded UTP cable. Each patch cord shall be 100%
CONSTRUCTION
AMR EL SHARKAWY
AGENCY performance tested at the factory in a channel test to the Category 6
09/08/16
standards.
DATE:
OPERATIONS
SHAHZAD YAZDANI Punch Down System and Patch Cord Assemblies
09/08/16
DATE: Category 6 UTP patch cords shall be used between punch down style
CONTROL NUMBER
ALI H GHAMDI
connecting blocks when configured as a cross connect or between the
VERIFICATION
09/08/16 connecting block and networking hardware when the connecting block is
EDSD
used as a interconnect.
DATE:
BY:
Patch cords shall use 24 AWG stranded Category 6 cable. The cable shall
REVISIONCERTIFICATION
be terminated onto eight position punch down style plugs (R-J45 modular
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
plugs featuring a one piece, tangle free latch design and strain relief boots)
(DCC) NO. _____________________
and tested to exceed the Category 6 performances when used with the
specified Category 6 modular jacks.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The patch cords shall use grey cords with grey connectors, shall be field
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH terminable and shall employ a clear cap for wiring identification.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The fiber patch cords and pigtails shall be constructed from high
performance single mode optical fiber cable with SC connectors.
Integral boots shall be provided to provide strain relief and help maintain
consistent polarity.
JO/EWO
The fiber Patch cords come in lengths of one, two and three meters.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Cable Management
09/08/16
08/04/16
06/01/16
NO.
REV
Cable management shall be used to provide a neat and efficient means for
DISCIPLINE
ENGINEER routing and protecting fiber and copper cables and patch cords on the
C
ALI H GHAMDI
fingers. The duct fingers shall include retaining tabs to retain the cables in
VERIFICATION
09/08/16 place during cover removal. The covers shall be easily removed or hinged
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG plastic fingers. The duct fingers shall include retaining tabs to retain the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cables in place during cover removal. The covers shall be easily removed
or hinged to allow for quick moves, addition and changes.
ASH
ASH
ASH
The cable mangers shall be provided with wire retainers to retain the
LEADS
LEADS
LEADS
ALL
ALL
ALL
cables during cover removal and # 12-24 English and M6 metric mounting
screws. The two rack unit space, horizontal cable management panel shall
be provided between two modular patch panels.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Backbone Cabling
10-02399-
10-02399-
10-02399-
0001
0001
DATE
facilities.
DISCIPLINE
ENGINEER
C
The Backbone fiber optic cable shall be glass cable, single mode fiber
A
ALI H GHAMDI
VERIFICATION
09/08/16 The optical fiber cable shall be suitable for riser and plenum applications.
EDSD
The optical fiber cables shall have riser and Plenum designs UL listed as
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The Fiber Optic cables shall be designed with Reverse Oscillated Lay
Stranding Method to facilitate mid-span access of fibers. All the Fiber Optic
Cables shall be terminated to a patch panel.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Patch cords of same specification shall be used for the indoor distribution
system from network switches to end devices throughout the building, as
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The type of Backbone copper cable shall be 100 ohms unshielded twisted
pair multi-pair cable.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
following shall be the minimum standard required for the cable to be used:
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
Punch down 110 base and system, Cat-6 ( Cat3) UTP cable shall be
terminated upon a standard density 110 style cat-6 connecting block,
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER Protection Units
C
A
DATE:
PROJECT
All copper circuits shall be protected between each building with a
ALL LEADS
ENGINEER
protector unit at the demarcation point of every building. All protector units
09/08/16
shall be grounded according to the manufactures recommendations.
DATE:
CERTIFIED
A M ALMATROOK Cross Connecting Hardware
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
Category 6 UTP patch cord shall be used between 110 style connecting
AGENCY
09/08/16 bases when configured as a cross-connect or between connecting block
and networking hardware when the connecting block is used as an
DATE:
OPERATIONS
interconnect. Patch cords shall be 24 AWG stranded Category 6 cable.
SHAHZAD YAZDANI
The cable shall be terminated onto 110 style plugs tested to exceed CAT-6
09/08/16
performance when used in a channel with the specified category 6
DATE:
modules.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
The patch cords shall be factory terminated with modular plugs featuring a
EDSD
one piece, tangle free latch design and black strain relief boots. No field
DATE:
installation.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG outlet/connector to the horizontal cross-connect in the Telecommunication
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Room/Telecommunication Equipment Room/Telecom Closet.
ASH
ASH
General
LEADS
LEADS
LEADS
ALL
ALL
ALL
All horizontal cabling shall be CAT6 UTP, plenum rated, 24 AWG 100 Ohm,
4-pair cables to create a truly structured cable environment where each
horizontal link can be used for either voice or data as required.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Plenum cable shall be utilized for the horizontal cable distribution network
where cables are subjected to airflow and are not totally enclosed in steel
conduit. Other areas shall use non-plenum grade in NEC & UL.
Bridged taps and splices are not permitted as part of the copper horizontal
cabling.
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
DISCIPLINE
ENGINEER All horizontal cables shall be terminated onto punch down style UTP, CAT-
C
DATE: TER/TR/TC / DATA enclosure at one end and at CAT- 6 outlet using
PROJECT
ALL LEADS
ENGINEER EIA/TIA 568-B at the IWA at the other end.
09/08/16
DATE: Each telecommunication outlet location shall have at a minimum three (3)
CERTIFIED
A M ALMATROOK Category 6 cables.
09/08/16
DATE:
Horizontal Cable Management
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
All major runs of the horizontal cable shall be installed in a
DATE: communications cable tray C-profile perforated, metallic, 75 mm deep and
OPERATIONS
SHAHZAD YAZDANI width as per the calculated sizing depending upon the usable area served
09/08/16 by them.
DATE:
CONTROL NUMBER
ALI H GHAMDI
Communication cables or wires shall not be strapped, taped or attached by
VERIFICATION
support. All trays shall be installed with the proper bend radius and support
for maximum loading.
DATE:
BY:
REVISIONCERTIFICATION
The maximum fill ratio shall not exceed 40% of the cable installed. A full
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
degree and 90 degree flat, vertical inside and outside elbows, tee and
cross fittings, reducers, end caps and all other components necessary to
make the system workable. Snap-on or split covers shall be available for
all directional fittings.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The fitting shall be capable of maintaining a 2” minimum cable bend
radius. The communications cable tray shall not be shared with building
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Cables installed in ducts, plenums and other spaces for environmental air
10-02399-
10-02399-
10-02399-
0001
0001
DATE
DATE: raceways shall be installed in vertical riser runs in a shaft from floor to
PROJECT
ALL LEADS
ENGINEER floor.
09/08/16
DATE: Only Type CMP and CMR cables shall be installed in these raceways.
CERTIFIED
A M ALMATROOK Communications cables Types CMP, CMR, Communications General
09/08/16 Purpose Cable (CMG) shall be used in distribution frames and cross-
DATE:
connect arrays.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Work Area Subsystems
DATE:
OPERATIONS
SHAHZAD YAZDANI The work area shall consist of the connectivity equipment used to connect
09/08/16 the horizontal cabling subsystem and the equipment in the work area. The
DATE: connectivity equipment might include the following options:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Patch(equipment cords) and modular connectors
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
Each building shall be pre-wired for voice/data and Wireless Local Area
Network (WLAN) access point connection in accordance with TIA/EIA-
568B wiring standard. Dual Port RJ-45 Information Outlets shall be
provided for each room. Two (2) CAT6 4-pair horizontal cables shall be
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG routed, terminated and certified from the Information Outlet to the patch
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH panels within the building’s Telecommunication Room (TER/TR).
ASH
ASH
The maximum CAT6 cable length between the IO and patch panels shall
be 90 meters.
LEADS
LEADS
LEADS
ALL
ALL
ALL
All insert modules shall be 8P8C, non-keyed, modular RJ45 jack with
pin/pair assignments wired per T568B standard termination.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
DATE
directly from the Data Cabinet feed to the outlet directly whole run being
DISCIPLINE
ENGINEER above ground, 1” diameter EMT conduit shall be provided.
C
A
DATE: In cases where the conduits originate from the data cabinet but partial run
PROJECT
ALL LEADS
ENGINEER is flushed floor before serving the outlet, the amount of run above ground
09/08/16 shall be 1” diameter EMT and that under the ground shall be 1” diameter
DATE: PVC coated RSC. At each end of the conduits, bushings shall be provided
CERTIFIED
A M ALMATROOK for protection of the cables.
09/08/16
DATE:
Surface mount boxes shall be provided in 4 ports low profile boxes. Boxes
CONSTRUCTION
AMR EL SHARKAWY
AGENCY shall accept all fiber, copper and miscellaneous audio/video modules. The
09/08/16
Boxes shall mount with screws, adhesives or optional magnets. The box
DATE: covers include breakouts for use with surface raceway. Cable tie slots shall
OPERATIONS
SHAHZAD YAZDANI be included to prove strain relief to the cables.
09/08/16
ALI H GHAMDI
opening .This size shall provide openings that are dimensionally equivalent
VERIFICATION
Face plates shall be two ports as required, single gang with painted
REVISIONCERTIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Power poles can be used as pathways for the horizontal cable from the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ceiling to the work areas. Power poles that are used for voice, data and
power cable shall be listed for the applications with a divider for
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Fire Stopping
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Communications Grounding
bond the components together are the components for the communication
grounding and bonding infrastructure.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
conduct lightning and AC fault currents from the primary protectors. The
DISCIPLINE
ENGINEER conductor for the TMGB shall be a minimum of 300 mm (1 ft.) from any
C
power cables, even when isolated by metallic conduits. The location of the
A
DATE: bus bar shall be designed for attaching entrance facility equipment and
PROJECT
ALL LEADS
ENGINEER other grounding bars.
09/08/16
DATE: The TGB is the bar used to ground the passive and active components
CERTIFIED
A M ALMATROOK inside the communications room. The TGB shall be a predrilled electro tin
09/08/16 plated copper bus bar provided with standard NEMA bolt hole sizing and
DATE:
spacing. Minimum dimensions for the TGB are 6 mm (1/4 in) thickness x
CONSTRUCTION
AMR EL SHARKAWY
AGENCY 50 mm (2 in) width. Length can vary as required in each communications
09/08/16
room.
DATE:
OPERATIONS
SHAHZAD YAZDANI All bonding conductors shall be a minimum of No. 6 AWG insulated copper
09/08/16 using listed 2-hole compression connectors. Each bonding conductor shall
DATE: be labeled per ANSI/TIA/EIA 606. All bonding conductors shall be marked
CONTROL NUMBER
ALI H GHAMDI
by a distinctive green color and be tagged with the label.
VERIFICATION
09/08/16
EDSD
EXPANSION CAPABILITIES
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
SCS horizontal cabling shall have two (2) or three (3) UTP cables wired to
(DCC) NO. _____________________
The backbone cable system shall be sized with a minimum of 50% spare
capacity, allowing for future expansion.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH COMMUNICATIONS DISTRIBUTION DESIGNER
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Installation
Quality
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
DATE: CONTRACTOR shall label each wire and cable in each end indicating the
PROJECT
ALL LEADS
ENGINEER wire designation. The labeling shall be identical in nomenclature and all
09/08/16 labels shall be typed and covered with transparent heat-shrinkable tubing.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall neatly arrange all cables on the cable ladder rack,
09/08/16 cable tray, or supports to prevent twisting and unnecessary crossover of
DATE:
cables. All signal cables and wiring shall be secured.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Plant Tagging
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall be responsible for tagging all equipment and the
09/08/16 verification of proper tagging shall be carried out as part of the mechanical
DATE: completion inspection.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Manufacturer’s Data
DATE:
BY:
REVISIONCERTIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
In addition to the test data provided by the manufacturer, the
Category 6 cables shall be measured for attenuation (insertion loss)
ASH
ASH
ASH
and near end cross talk (NEXT) at the following frequencies: 1 MHz,
4.0 MHz, 25 MHz and 250 MHz as a minimum. Insertion loss and
LEADS
LEADS
LEADS
ALL
ALL
ALL
manufacturer’s data.
DESCRIPTION
Figures 18-D and 18-E show the test set up for insertion loss and
ISSUED FOR 60% FEL3
(MHz)
0001
0001
DATE
4
DISCIPLINE
ENGINEER 16
C
A
25
DATE:
PROJECT
100
ALL LEADS
ENGINEER 200
09/08/16
250
DATE:
CERTIFIED
A M ALMATROOK Use this table to record the measure value as a result of testing on the cable.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
On the basis that an estimated 360 cable reels of 305 meters each will be used, it is
AGENCY
09/08/16 proposed to select 50 random samples for measurement. If the measured values exceed
(in the case of insertion loss) or are less than (in the case of NEXT) the manufacturer’s
DATE:
OPERATIONS specifications by more than 5% at any frequency, the results must be reported to the
SHAHZAD YAZDANI
SAUDI ARAMCO Representative and another lot of samples will be chosen for testing. If
09/08/16
the second lot of samples fails again, the batch must be rejected.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
After installation, all copper cable pairs shall be tested for circuit continuity (end to end),
09/08/16
split pairs, pair-to-pair short, attenuation and noise as specified in SAES-T-634. The
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG All horizontal cabling must be tested in accordance with TIA/EIA TSB 67 known as
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
“Transmission Performance Specification for Field Testing of Unshielded Twisted Pair
Cabling”.
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
DATE:
CERTIFIED
A M ALMATROOK
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
DATE:
OPERATIONS The SCS installation and testing shall be performed by Category 6 cable
SHAHZAD YAZDANI
09/08/16
manufacturer certified installer.
DATE:
Test results shall be signed by the Category 6 cable manufacturer certified
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
installer in each sheet and witnessed by SAUDI ARAMCO Representative.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Test results shall be submitted at least two copies (both hard & soft copy)
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
After CONTRACTOR has carried out installation, certified UTP
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cable Manufacturer Structured Cabling Engineer will carry out the
following tests on-site before the service is cut over.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
2. Length
3. NEXT
4. Attenuation
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
5. ELFEXT
6. Delay & Delay Skew
DESCRIPTION
7. Return Loss
ISSUED FOR 60% FEL3
Fluke Omni scanner is to be used for these tests. Records for every
cable shall be printed out and kept for future reference.
10-02399-
10-02399-
0001
DISCIPLINE
Test Report Format
ENGINEER
C
A
The Field Test Report will consist of the following information in order:
DATE:
PROJECT
ALL LEADS
ENGINEER Type of test and name of systems tested.
09/08/16
Copy of the Test Procedure(s) that have been followed.
DATE:
CERTIFIED
Copies of the completed and signed test Record Forms.
A M ALMATROOK Summary discussion of the test performed and the overall results.
09/08/16
DATE:
Discussion of any problems encountered and how they were
CONSTRUCTION
AMR EL SHARKAWY resolved.
AGENCY
09/08/16 Test Equipment List.
DATE:
OPERATIONS
SHAHZAD YAZDANI
Quality Control
09/08/16
DATE:
The installation team chief on a daily basis performs QA/QC inspections
during the equipment installation. Monitoring may also be conducted by
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 SAUDI ARAMCO Operations personnel on their own and notify the
EDSD
Design Drawings
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Two sets of design drawings are available during each site installation.
OF THIS DRAWING IS COVERED, FOR ALL
developed.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Safety Equipment
ASH
ASH
First aid kits, fire extinguisher, hard hats, safety shoes, and other safety
devices will be prepared for safety personnel before testing.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Proof of Performance
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
designed criteria.
ISSUED FOR 60% FEL3
General
This test plan describes the requirements for testing copper cables for
voice and data circuits.
JO/EWO
10-02399-
10-02399-
0001
Volt Ohmmeter
0001
0001
DATE
DISCIPLINE
ENGINEER
C
A
Reference Documents
DATE:
PROJECT
ALL LEADS
ENGINEER
As-Built Drawings
09/08/16
Approved Test Procedures
DATE:
CERTIFIED
SAUDI ARAMCO Standards : SAES-T-634
A M ALMATROOK
Test Equipment Manuals for Volt-Ohmmeter, Megger
09/08/16
DATE:
(Insulation tester), and PCM - 23 (VF tester)
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
DATE:
DESIGN DRAWINGS
OPERATIONS
SHAHZAD YAZDANI
09/08/16
General
DATE:
CONTRACTOR shall list all required drawings in the Non-Material
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Requirement (NMR).
EDSD
ARAMCO Standards.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For each drawing created via a CADD system, the relevant CADD
computer files shall be provided to SAUDI ARAMCO in the form of
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Purchase order shall be placed immediately for long lead items. All Non-
Material Requirements (NMR) shall be reviewed during the PDR. The
detailed drawings shall have sufficient detail for fabrication of the
system.
Final Design Review Package with all final “build to” drawings for
SAUDI ARAMCO final review and approval.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
All “NMRs” that have changed since the PDR and all new “NMRs” shall
be shown during the CDR and confirmed as part of the design.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER As-Built Drawings
C
A
ALI H GHAMDI
VERIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG SCOPE DESCRIPTION
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GENERAL
ASH
ASH
ASH
This project shall provide 24-core single mode fiber optic cables 8/125
LEADS
LEADS
LEADS
ALL
ALL
ALL
microns 1310 nanometer in Star Topology from the E & M Bldg to the
Operation Building, Utility Substation, Operator Shelter, Receiving
Substation, Security Support building Main Gate and Security Support
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
In addition, this project shall provide 2-24 core single mode fiber optic
cable infrastructures to be installed for communication systems from
Engineering & Maintenance Bldg. to Yanbu refinery. All terminations will
be done on proposed 24-ports fiber patch panels.
10-02399-
10-02399-
In addition, this project shall provide 4-12 core single mode fiber optic
0001
0001
0001
DATE
09/08/16 The System shall provide permanent cabling for Local Area Network
DATE: (LAN Enterprise) and Process Control System (PCS). These cables shall
CONTROL NUMBER
ALI H GHAMDI
consist of single-mode nonmetallic fiber optics. Cable installation will
VERIFICATION
09/08/16 include the underground conduit system. Also all associated facilities,
EDSD
This project shall provide 200-pair copper cables from the Operation
Building and to be distributed to the following buildings:
1. E & M Building
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG 2. Operation Building
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3. Operator Shelter
4. Remote Interface Building - RIB-XXX1
ASH
ASH
ASH
LEADS
LEADS
ALL
6. Metering Shelter
ALL
ALL
The proposed copper cable shall be used for analog telephones for
JO/EWO
emergency purposes.
10-02399-
10-02399-
10-02399-
The X-RAY Bldg. and Security Gatehouse of Main Gate & Tank Farm,
0001
0001
0001
DATE
Voice & data requirements can be served through the proposed POE
Ethernet switch and analog line via proposed 1571 OSP cable from the
09/08/16
08/04/16
06/01/16
NO.
REV
DATE:
PROJECT
ALL LEADS
ENGINEER
The design of the copper cable network shall be such that the
09/08/16 performance objectives of the System are achieved when the cables
DATE:
have been manufactured, installed, spliced and terminated.
CERTIFIED
A M ALMATROOK
09/08/16 The System shall provide permanent cabling for local distribution (Analog
DATE: and special services) to the designated locations in the Yanbu Distribution
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Hub Plant areas. The copper cable shall be designed for direct buried or
09/08/16 underground duct application. Conductors shall be solid annealed multi-
DATE: pair copper conductors in 22 AWG. Individual conductors are twisted into
OPERATIONS
SHAHZAD YAZDANI pairs with varying lay lengths to minimize crosstalk and specific color
09/08/16 combinations to provide pair identification. Cables larger than 25 pairs are
DATE: assembled into units, which are then used to assemble the core. Units are
individually identifiable by color coded unit binders. The core assembly is
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 filled with an 80 ºC (198 ºF) ETPR (External Thermal Plastic Rubber)
EDSD
compound, completely filling the interstices between the pairs and under
the core wrap. A corrugated steel wrap, is applied over the core assembly
DATE:
BY:
to provide protection for the core. North American color coded insulation. A
corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The exact cable routings shall be field verified by CONTRACTOR during
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
detailed design. If required, alternative routings shall be recommended
by the CONTRACTOR. In addition, the exact cable lengths shall be
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
walls.
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
DATE
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The installation shall comply with SAUDI ARAMCO standards, Saudi
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Arabia Government standards, and/or International standards as
applicable.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
specialist tools that are required to operate and maintain the test
equipment.
Spares
Copper Cable
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
The system shall provide permanent cabling for local distribution (Analog
A
DATE: and special services) to the designated locations. The copper cable shall
PROJECT
ALL LEADS
ENGINEER be designed for direct buried or underground duct application. Conductor
09/08/16 shall be solid annealed multi pair copper conductors are in 22 and 26
DATE: AWG. Individual conductors are twisted into pairs with varying lay
CERTIFIED
A M ALMATROOK lengths to minimized crosstalk and specific color combinations to provide
09/08/16 pair identification. Cables larger than 25 pairs are assembled into units,
DATE:
which are then used to assemble the core. Units are individually
CONSTRUCTION
AMR EL SHARKAWY
AGENCY identifiable by color coded unit binders. The core assembly is filled with
09/08/16
80ºC (198ºF) ETPR (External Thermal Plastic Rubber) compound,
DATE: completely filling the interstices between the pairs and under the core
OPERATIONS
SHAHZAD YAZDANI wrap. A corrugated steel wrap, is applied over the core assembly to
09/08/16 provide protection for the core. North American color coded insulation. A
DATE: corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,
CONTROL NUMBER
ALI H GHAMDI
linear low-density polyethylene jacket is applied overall with surface
VERIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Copper cable will be installed from the Operation Building branch spliced
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH to different buildings. Buildings to be served are the following.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Operation Building 25
DESCRIPTION
Operator Shelter 25
ISSUED FOR 60% FEL3
Metering Shelter 25
Chemical Shelter 25
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
PROJECT For further details on the fiber optic cable routing, refer to the following
ALL LEADS
ENGINEER
drawings:
09/08/16
DATE:
CERTIFIED DRAWING NO. SHEET NO. DRAWING TITLE
A M ALMATROOK
09/08/16 CO-A10067 001-002 COPPER SCHEMATIC DIAGRAM -YDH
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Fiber Optic Cable
DATE:
OPERATIONS
The design of the fiber optic cable shall be such that the performance
SHAHZAD YAZDANI
objectives of the System are achieved when the cable has been
09/08/16
manufactured, installed, spliced and terminated. The performance of the
DATE:
terminal, transmission and ancillary equipment covered by this scope of
CONTROL NUMBER
ALI H GHAMDI
work shall be taken into account under this obligation.
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
distribution panels.
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The above fiber optic system shall be used to link those buildings that
require data type service in the proposed Yanbu Distribution Hub.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG For further details on the fiber optic cable routing, refer to the following
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH drawings:
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER Four (4) 1-inch, multi-color, corrugated sub-ducts and pull rope shall be
installed in one duct of each of the underground duct banks (per SAES-T-624
C
A
Cable Design
General
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The structure of the cable core shall permit high cable flexibility with minimum
stress to the individual fibers.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall use a loose, fiber bundle (tube) or a slotted core type
cable with multiple fibers per tube or slot.
DESCRIPTION
ISSUED FOR 60% FEL3
The core shall be filled with a compound to inhibit water migration and wrapped
with a barrier tape.
The filling compound shall not affect the color of the individual fibers.
JO/EWO
10-02399-
10-02399-
The drop point of the filling compound shall not be less than 80 deg. C.
0001
0001
0001
DATE
The filling compound shall remain stable and unaffected by long term exposure
09/08/16
08/04/16
06/01/16
NO.
REV
to weather.
DISCIPLINE
ENGINEER
C
The filling compound shall have chemical and mechanical compatibility with
A
DATE: The cable jacket shall be of a high molecular weight, black polyethylene with a
OPERATIONS
SHAHZAD YAZDANI thickness that is suitable for the proposed environment, but not less than 3.0
09/08/16 mm.
DATE:
CONTROL NUMBER
ALI H GHAMDI
The cable jacket shall be resistant to crude oil, hydrocarbons, sulfur
VERIFICATION
The cable jacket shall have permanent surface printed sequentially numbered
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The cable jacket shall have permanent surface printed marks at regular
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Fiber Optic Cable for Inside Use
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Upon entering a building all fiber cables shall have a transition splice to
ASH
ASH
convert the cable from outside rated cable to internal rated cable. All
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
Single mode fiber optic cables 24 strands will be installed from the
ENGINEER instrument rack room at the new Operation building to RIO Building 1 (RIB-
C
A
1) under this BI for the ESD System. The route of the fiber should be
DATE:
PROJECT
redundant and diverse. Process control System will assign dedicated fiber
ALL LEADS
ENGINEER strands assignment for the ESD system.
09/08/16
DATE: Single mode fiber optic cables 24 strands will be installed from the
CERTIFIED
A M ALMATROOK instrument rack room at the new Operation building to RIO Building 1 (RIB-
09/08/16 1) under this BI for the DCS System. The route of the fiber should be
DATE:
CONSTRUCTION
AMR EL SHARKAWY
redundant and diverse. Process control System will assign dedicated fiber
AGENCY
09/08/16
strands assignment for the DCS system.
DATE:
OPERATIONS
Single mode fiber optic cables 24 strands will be installed from the
SHAHZAD YAZDANI
instrument rack room at the new Operation building to RIO Building 2 (RIB-
09/08/16
2) under this BI for the ESD System. The route of the fiber should be
DATE:
redundant and diverse. Process control System will assign dedicated fiber
CONTROL NUMBER
ALI H GHAMDI
strands assignment for the ESD system.
VERIFICATION
09/08/16
EDSD
Single mode fiber optic cables 24 strands will be installed from the
DATE:
instrument rack room at the new Operation building to RIO Building 2 (RIB-
BY:
2) under this BI for the DCS System. The route of the fiber should be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
redundant and diverse. Process control System will assign dedicated fiber
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Single mode fiber optic cables 12 strands will be installed from the new
Operation building to YASREF Control System under this BI. Process
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG control System will assign dedicated fiber strands assignment for various
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH control system.
ASH
ASH
Single mode fiber optic cables 12 strands will be installed from the new
Operation building to SAMREF Control System under this BI. Process
LEADS
LEADS
LEADS
ALL
ALL
ALL
control System will assign dedicated fiber strands assignment for various
control system.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Single mode fiber optic cables 48 strands will be installed from the new
Operation building to Yanbu Refinery Control System under this BI.
DESCRIPTION
Process control System will assign dedicated fiber strands assignment for
ISSUED FOR 60% FEL3
Temporary Requirements
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
ALI H GHAMDI
All materials are to be inspected upon delivery by the SAUDI ARAMCO
VERIFICATION
CABLE PLACEMENT
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
General
The fiber optic cable minimum bending radius and maximum pulling
tensions shall be in accordance with SAES-T-624 (Sections 4.1.10 and
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG 4.1.11) and the fiber optic cable manufacturer’s specifications. The optical
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
fiber cable shall not be cut for convenience during placement. Splices shall
be located in accordance with the design drawing provided by
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This Specification covers the expected types of cable and civil construction
work normally required to prepare the fiber optic cable facilities up to and
including cable splicing and work as required.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
DATE
ALI H GHAMDI
taken to ensure that damage to buildings, furnishing, structures, utilities,
VERIFICATION
promptly notified, with written follow-up, of any damage that occurs during
construction.
DATE:
BY:
REVISIONCERTIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall ensure that after conduit and/or cable laying
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
operations, roads, streets, sidewalks and curbing, paved areas, walls,
foundations, fencing, or any other structural, civil or landscaped facilities
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Installation work shall not commence before the relevant permits have
been obtained by CONTRACTOR construction crew.
loose rock and solid rock. Backfill of the excavated material or bringing-in
of new fill may be required. The hauling away of excavated material and
10-02399-
10-02399-
10-02399-
0001
0001
DATE
may be required. . The filling materials shall comply with SAES A 114.
09/08/16
08/04/16
06/01/16
NO.
REV
DATE: rule, at all Plant facilities, pipeline crossing, and utility crossings, hand
PROJECT
ALL LEADS
ENGINEER excavation is the only method permitted.
09/08/16
DATE: Prior to the start of any excavation Work, all underground facilities (i.e. oil,
CERTIFIED
A M ALMATROOK gas and/or water pipes, telephone or power cables, etc.), shall be
09/08/16 positively identified by CONTRACTOR. This shall be verified by the SAUDI
DATE:
ARAMCO and by operating department of the facility. CONTRACTOR
CONSTRUCTION
AMR EL SHARKAWY
AGENCY shall use underground facility detection equipment that must be of recent
09/08/16
manufacture and suitable for performing surveys to locate all types of
DATE: communication cables, and other utilities. The locating equipment must be
OPERATIONS
SHAHZAD YAZDANI able to locate metallic backed warning tape where non-metallic cables
09/08/16 have been placed. The exact location of the identified underground facility
DATE: shall be properly marked for easy identification by CONTRACTOR
CONTROL NUMBER
ALI H GHAMDI
construction crew.
VERIFICATION
09/08/16
EDSD
For the safety of personnel and for purposes of maintaining stability of the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG In no case shall the width of trench excavated in a roadway or under a
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
pipeline be greater than what is reasonably necessary for completion of
the Work.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Excavations shall not be kept open any longer than reasonably necessary
to perform the intended Work.
DESCRIPTION
ISSUED FOR 60% FEL3
The detail design drawing shall specify the scope, location and deep of
excavation. If a survey marker and/or a monument is damaged as a
consequence of the Work, CONTRACTOR shall be responsible for any
fines, where applicable, repairing such marker and/or monument and
returning the same to its original place without any additional
compensation.
10-02399-
10-02399-
Trenching
0001
0001
0001
DATE
in the core area, plant area and open desert area. All kinds of soil
DISCIPLINE
ENGINEER conditions may be encountered. These Specifications are intended to
C
DATE: conduits under the expected range of soil and field conditions.
PROJECT
ALL LEADS
ENGINEER
09/08/16 The detail design drawings shall describe the required location, alignment,
DATE: length and depth of cable or conduits to be placed by the trenching
CERTIFIED
A M ALMATROOK method.
09/08/16
DATE:
The reference standards and drawing shall detail the requirements of
CONSTRUCTION
AMR EL SHARKAWY
AGENCY construction.
09/08/16
ALI H GHAMDI
Typical trenching machines are backhoe, wheel excavator, rock breaker or
VERIFICATION
water or other pipelines and telephone/ power cable facilities and such
REVISIONCERTIFICATION
SAES-B-064.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG shall be restored with the original type of fill and compacted to the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
requirements of the relevant Road Authority. Hot mix asphalt shall be used
to restore the pavement to original condition.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Warning tape (terra tape) shall always be installed above the cable or
conduits. Refer to standard Drawing AA-036748.
A trench shall not be left open any longer than necessary. Cables or
conduits shall be placed concurrently with trench work, inspected and
backfill performed promptly.
SCOPE DESCRIPTION
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
General
09/08/16
08/04/16
06/01/16
NO.
REV
DATE: CONTRACTOR shall design, install, test and commission new antenna
OPERATIONS
SHAHZAD YAZDANI and transmission line system for the TETRA base station. The antenna and
09/08/16 transmission line system shall be installed on the proposed 25M Self-
DATE: Supported Tower beside new Operation and Maintenance Engineering
CONTROL NUMBER
ALI H GHAMDI
building.
VERIFICATION
09/08/16
EDSD
Distribution Hub.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR’s responsibilities shall include design, procure, install and
commission indoor repeater system to enhanced radio signal with the
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
1 12 DAS-SHELTER-1
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
2 13 DAS-SHELTER-2
DESCRIPTION
3 18 METERING ROOM-MARAFIQ
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall install antenna grounding and feeder system, and all
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER CONTRACTOR shall be install outdoor antenna with 5 db gain or better.
C
A
09/08/16
The CONTRACTOR’s responsibilities shall include design, procurement,
DATE:
installation, upgrades, integrations, testing and commissioning of the
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
DATE:
CONTRACTOR shall install the Dispatch Work Stations inside the Room
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Voice Logging Recorder
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This project shall utilize the existing Logging Recorder in building
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
project’s requirement.
End-User Terminal
a. Programming Tools
10-02399-
10-02399-
0001
0001
DATE
DATE:
PROJECT
ALL LEADS
ENGINEER Dispatcher Work Station (DWS)
09/08/16
DATE:
CONTRACTOR shall install the Dispatch Work Stations inside Room 204
CERTIFIED of Yanbu Distribution Hub Maintenance & Engineering. Specifications are
A M ALMATROOK
09/08/16
provided in terms of the workstation features, network interfacing,
DATE: equipment hardware and accessories.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 The table below identifies the key buildings to be equipped with DWS:-
DATE:
OPERATIONS
SHAHZAD YAZDANI
DWS Location Quantity
09/08/16 Room-204, E&M Bldg 01
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
the SCN. For details refer to Block and Level Diagram-TETRA DWS
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
b. Power
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Hand-Portable Radios (HPR)
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10 HPRs will be provided under BI-02399. However, the exact quantity of
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
a. Locating Feature
10-02399-
10-02399-
0001
0001
0001
DATE
The minimum Equipment Protection Level for handheld radios and its
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER Class 1, Zone 1, Gas Groups IIC (Acetylene, Hydrogen, Ethylene &
C
A
Propane).
DATE:
PROJECT
ALL LEADS
ENGINEER
All handheld and portable Digital Trunked radio devices shall be
09/08/16
intrinsically safe “ib” or “ia”.
DATE:
CERTIFIED
A M ALMATROOK All handheld devices shall adhere to the requirement of GI-0006.008 in
09/08/16 terms of restriction, labelling and use.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 The Hand held radios (HPRs) shall be certified intrinsically Safe and
adhere to Hazardous and Environmental classified areas requirement
DATE:
OPERATIONS
under SAES-P-100, SAES-B-068 and SAES-T-493 paragraph 6.5.
SHAHZAD YAZDANI
09/08/16
c. Environmental Specifications
DATE:
CONTROL NUMBER
ALI H GHAMDI
HPRs shall be capable of operating in temperatures ranging from 0 to
VERIFICATION
09/08/16
+50 degrees Celsius and have protection against humidity, water and
EDSD
dust. The HPR shall have loud voice which can operate in noisy areas.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The weight of an HPR shall be less than 450 grams its dimensions
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
The battery shall be capable of an operational duty cycle of
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5/5/90 (Transmit/Receive/Idle for eight hours of continual use. Each
portable radio shall be provided with two batteries, one for
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
carrying cases, belt clips and belt clips attachment. Some HPR's
0001
DATE
DISCIPLINE
Vehicle Mounted Radios (VMR)
ENGINEER
C
A
Six(6) VMRs will be provided under BI-02399. The exact quantity of VMRs
DATE:
PROJECT
will be finalized during the radio coverage analysis and traffic study.
ALL LEADS
ENGINEER
09/08/16
VMR Transmitter/Receiver Specifications:
DATE:
CERTIFIED
A M ALMATROOK Frequency 410-430 MHz
09/08/16 Transmitter RF Power 3 Watt or higher
DATE: RF Channel Bandwidth 25 KHz
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
RF Power Control Steps 5 dB
09/08/16 Receiver Static Sensitivity -112 dBm or better
Receiver Dynamic Sensitivity -103 dBm or better
DATE: Input Power 13.8 VDC +/- 10%
OPERATIONS
SHAHZAD YAZDANI Temperature Range -100C to +550C Operating
09/08/16 -200C to +700C Storage
DATE:
For details, refer to VMR Block Diagram Drawing No. CO-A00006 sheet
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 001.
EDSD
General Specification
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The RFDT shall be powered from a 230VAC Uninterruptable
Power Supply (UPS).
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Sheet 001.
10-02399-
10-02399-
0001
0001
DATE
DATE:
PROJECT
ALL LEADS
ENGINEER RFDTs shall be provided with all the required hardware including
09/08/16 mounting brackets, RF feeder cables, data cables and connectors,
DATE: Equipment rack and rack mounting kits shall be provided to mount
A M ALMATROOK
CERTIFIED RFDTs inside Telecommunications Equipment Rooms. Surge protectors
09/08/16 and grounding kit shall also be provided.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
RFDT Antenna Systems
09/08/16
DATE: RFDTs shall be provided with outdoor antenna, the antenna shall be 5 dBi
OPERATIONS
SHAHZAD YAZDANI
gain or better. An undistorted radiation pattern shall be ensured by optimal
09/08/16 placement of the antennas.
DATE:
RFDT antennas shall be provided with built-in ground plate for grounding.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
The antenna size and BUC power shall be based on the link budget
analysis specified for the TETRA scope to ensure the minimum BER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
All materials required for the complete installation of RFDT's, including the
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Refer to the Radio Frequency Report under subcontract studies section of
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH this package for details.
ASH
ASH
REFERENCE DRAWINGS
LEADS
LEADS
LEADS
ALL
ALL
ALL
Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
G. TRANSMISSION SYSTEM
SCOPE DESCRIPTION
JO/EWO
SDH Equipment
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
BI-02399 shall provide new Alcatel 1646 SDH node at Yanbu Distribution
Hub. The proposed SDH node shall be STM-4 and shall be connected to
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER New STM-4 interface card shall be provided by this BI in Yanbu Refinery to
C
A
DATE:
CERTIFIED
CONTRACTOR shall provide one (1) New ES1-8FE Integrated Services
A M ALMATROOK Adapter (ISA) card with 8 Fast Ethernet interface port shall be provided.
09/08/16
DATE:
Necessary port and interface cards shall also be provided for E1 interface
CONSTRUCTION
AMR EL SHARKAWY
port. Necessary DDF shall also be provided by the CONTRACTOR.
AGENCY
09/08/16
The following circuits require connectivity through the new SDH:
DATE:
OPERATIONS TETRA Basetation – 2E1
SHAHZAD YAZDANI
09/08/16
Dispatcher Workstation – 2E1
DATE:
Power System Automation (PSA) – 2E1
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CSAS System shall be equipped with data display, 20-60VDC, 32
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
digital input, 16 Control Output, with necessary software for Aramco
and with Ethernet interface.
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
SCOPE DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
provider. CONTRACTOR should ensure this service provides
ENGINEER Layer-2 supporting SSL-VPN connectivity. CONTRACTOR shall
C
A
A M ALMATROOK
CERTIFIED COA00060 001 BLOCK & LEVEL DIAGRAM - TELEPHONY
09/08/16 COA00061 001 OVERALL LOGICAL DIAGRAM - DATA
DATE:
CONSTRUCTION
AMR EL SHARKAWY COA00062 001 TRENCH AND CONDUIT LAYOUT
AGENCY
09/08/16
COA00063 001 COPPER CABLE SCHEMATIC DIAGRAM
DATE:
OPERATIONS COA00064 001 HORIZONTAL OUTLET LAYOUT
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG service for the entire Yanbu Distribution Hub and shall follow SAES-B-071
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH standard.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
shall ensure that the provided System shall meet the best commercial
practices, reliability, maintainability and performance.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide and install ESS Control Station (CS) which
DESCRIPTION
Antenna Cable
Antenna Polyphasor – Lightning Strike Protector
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
communication
DISCIPLINE
ENGINEER Remote Status View
C
A
DATE:
PROJECT
CONTRACTOR shall provide and install the above Control Station at Yanbu
ALL LEADS
ENGINEER
09/08/16
Distribution Hub in Operation Building. Activation of the sounders from the
Control Station shall be realized through wireless
DATE:
CERTIFIED communication/connectivity which shall utilize commercial operating
A M ALMATROOK
09/08/16 frequency between 330-360 Mhz Radio.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY CONTRACTOR shall provide and install Stationary Electronic Sirens which
09/08/16
shall be composed but not to be limited to:
DATE:
OPERATIONS
SHAHZAD YAZDANI 3200 Watt High Powered Speaker Station
09/08/16
Digitized Pre-Recorded voice Message Board/ACB
DATE:
Antenna (w/ bracket)
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
communication
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall ensure that the sounders for plants alerting shall be
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
placed at a minimum of 15 meters above local grade. The loudspeakers
shall emit horizontally.
ASH
ASH
ASH
CONTRACTOR shall provide, install and ensure that the sounders not be
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall ensure that all installation shall follow all applicable SAUDI
ARAMCO Standards and/or the recommended vendor/manufacturer procedures and details
as stipulated in the user’s manual that is provided along with the equipment/devices.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
08/04/16
06/01/16
J. PAGING SYSTEM
NO.
REV
DISCIPLINE
ENGINEER
CONTRACTOR shall design, procure, construct, test and commission a
C
A
DATE:
permanent, fully flexible, operational, and maintainable In-Plant Paging
PROJECT
ALL LEADS
System (IPPS).
ENGINEER
09/08/16
DATE:
This IPPS shall facilitate voice and alarm broadcasting services for the
CERTIFIED Yanbu Distribution Hub in accordance with SAES-T-481 (In-Plant Voice
A M ALMATROOK
09/08/16
Paging System) and all SAUDI ARAMCO applicable standards.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Equipment to be provided as part of the System shall meet the best
09/08/16
commercial practices, reliability, maintainability and performance of the
DATE: System.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 For the System, all equipment shall be located within the battery limits of
DATE: the process area of the plant with desktop access units and switching
CONTROL NUMBER
ALI H GHAMDI
equipment to be installed in the Operation Building.
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Audio Messenger
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Line Supervisory Unit
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The In-Plant Paging System (IPPS) shall also consist of the following:
DESCRIPTION
ISSUED FOR 60% FEL3
Equipment cabinets
Power Supplies
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
PROJECT
ALL LEADS
ENGINEER
Final locations of field devices shall be determined during detailed design;
09/08/16 however they shall typically cover the main process buildings/plant areas,
DATE:
together with the Operation buildings and Control Rooms.
CERTIFIED
A M ALMATROOK
09/08/16 In-Plant Communications equipment shall be able to operate under
DATE: environmental conditions stated in the SAES-J-003.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
All field equipment shall be suitable for use in its designated area
DATE: classification. Where applicable, equipment used in hazardous areas shall
OPERATIONS
SHAHZAD YAZDANI be certified as Intrinsically Safe.
09/08/16
DATE: The System shall operate in high noise areas up to 80dBA with the support
CONTROL NUMBER
ALI H GHAMDI
and augmentation of Signaling Devices such as beacons or flashing lights.
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Loudspeaker/Flashing Light cable shall contain two (2) or three (3)
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH conductors whichever is applicable per vendor recommendation.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The power for the In-Plant Communications equipment shall be supplied from the UPS
located in either of the Bulk Plant Control Room or Jetty Control Room and shall operate
from a 230 VAC.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
PROJECT 4.14.1 IT NETWORK ENGINEER APPLICATION REQUIREMENT
ALL LEADS
ENGINEER
09/08/16
IT physical infrastructure shall be fully documented in the geographic
DATE:
CERTIFIED
information system (GIS) based IT Network Engineer (NE) application. The
A M ALMATROOK CONTRACTOR shall include as part of his estimate the cost for Network
09/08/16
DATE:
Engineer updates and documentation. The updates and documentation
CONSTRUCTION
AMR EL SHARKAWY
shall include:
AGENCY
09/08/16
a) Reservation of IT physical infrastructure: IT physical infrastructures that
DATE:
OPERATIONS are planned to be used as part of the project must be reserved in NE
SHAHZAD YAZDANI
application. These reservations shall be renewed by the project every
09/08/16
six (6) months. IT physical infrastructures that are required to be
DATE:
reserved in NE include:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Power
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
outlets
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Placement of Antennas on existing Towers
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
b) Project Proposal Design Package: IT physical infrastructure (both
ASH
ASH
ASH
Inside Plant (ISP) and Outside Plant (OSP)) engineering design shall
be entered into NE upon the completion of the Project Proposal Phase.
LEADS
LEADS
LEADS
ALL
ALL
ALL
It shall be noted that the IT Network Engineer Access Policy only allows
user accounts for regular SAUDI ARAMCO employees or contractor
employees working under the direct supervision of IT/Engineering Tools
and Documentation Group. Also, the application can only be accessed via
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
4.17Fire Protection
DISCIPLINE
ENGINEER
A. GENERAL
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER This Project shall provide Fire water System to provide the required fire protection
09/08/16 for the proposed facilities. The Fire water system shall consist of new fire water
DATE: storage, New Fire Pumps and New dedicated Fire Water Network (Underground)
A M ALMATROOK
CERTIFIED for the proposed facilities. Water supply from MARAFIQ shall be used as the feed
09/08/16 source to the new fire water storage tanks.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Companies selected for Design and Installation of Fire Water Systems shall have
09/08/16
Certified Fire Protection Engineer, Qualified Engineers and Designers to Design,
DATE: Install and Test Fire Water Systems and execute all other work requirements
OPERATIONS
SHAHZAD YAZDANI competently in accordance with SAES-B-017.
09/08/16
DATE: Fire Water Systems shall be Designed and Installed under the Supervision of a
Registered Professional Engineer in the specialty of Fire Protection Engineering
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 with at least five (5) years of experience in the design of Fire Water Systems.
EDSD
Hydraulic Calculations shall be performed using only software that complies with
requirements of SAUDI ARAMCO and calculations of NFPA 13. Software to be
REVISION
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Design, Drawings and Calculations for Fire Water and Foam System(s) shall be
supervised by a Registered Professional Engineer in the specialty of Fire
ASH
ASH
ASH
Protection in accordance with SAES-B-070. All Drawings shall bear the seal of
that Registered Engineer. The Systems Detailed Design shall be Reviewed and
LEADS
LEADS
LEADS
ALL
ALL
ALL
1000 gpm and maximum of 4000 gpm based on the design basis requirement
ISSUED FOR 60% FEL3
Firewater demand shall be based on the single largest fire hazard within the
facility.
Fire Water Storage: Two (2) Fire Water Storage Tanks equal in Size and
dedicated only for firewater service shall be provided with total storage capacity
of 12 hours in accordance with SAUDI ARAMCO requirement for Hydrocarbon
JO/EWO
storage Facilities.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Fire Water Supply: Fire Water supply shall be provided by MARAFIQ – ROYAL
COMMISSION as the primary source. Truck Filling Connection will also be
09/08/16
08/04/16
06/01/16
provided as a backup.
NO.
REV
DISCIPLINE
ENGINEER Firewater Pumping System: Dedicated Two (2) no. of Electric Driven Fire
C
A
Pumps as primary Fire pumps, One (1) no. of Diesel Driven Fire Pumps as
DATE:
PROJECT 100% backup Fire Pumps and Two (2) no. of Jockey Pumps (1-Duty & 1-
ALL LEADS
ENGINEER
Standby) to maintain the required pressure in the Fire Water Network. The
09/08/16
design of firewater pumps shall be in accordance with NFPA 20 and SAES-B-
DATE:
CERTIFIED
017.
A M ALMATROOK
09/08/16
DATE:
Fire Water Distribution: A fire water distribution main shall be looped around the
CONSTRUCTION
AMR EL SHARKAWY plant areas. Firewater main ring shall be located underground to protect it from
AGENCY
09/08/16 mechanical damage. Where the main cannot be buried, it shall be suitably
DATE:
protected from vehicle impacts and the effects of fires and explosions. All
OPERATIONS Buried Piping are considered to be RTR, as per SAES-L-105, Line Class:
SHAHZAD YAZDANI
09/08/16
1FE0U and Above Ground Piping are considered to be FBE Lined Carbon
Steel, as per SAES-L-105, Line Class: 1LE0U. The Fire Water Ring main shall
DATE:
be hydraulically sized for the maximum Demand Flow Rates on the basis of
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Dual Feed.
EDSD
Fire Water Hydrants: Fire Hydrants shall be located throughout the facility.
DATE:
Hydrants shall be located not less than 15m from the protected risk and shall
BY:
be spaced not more than 75m apart. Fire Hydrants shall be Wet Barrel type
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Hydrants that meet ANSI/AWWA C503 requirements. The Wet Barrel Hydrant
OF THIS DRAWING IS COVERED, FOR ALL
shall be a Listed Commercial Unit that complies with AWWA and has a working
(DCC) NO. _____________________
Pressure of 1380 kPag (200 PSIG). The Inlet shall be 6 inches in diameter with
approved Flat Face ANSI Flange.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Fixed Foam System: Fixed Deluge Foam Water System shall be provided to
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
protect Product Transfer Pumps and Shipper pumps with Two (2) no. of Foam
Skid package for Product Transfer pumps areas. Foam System shall be
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
from the periphery of the casing. The suction and discharge flanges, casing
drain valves, gauge connections, balance lines, and pump seals shall be
included in the spray area.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
Semi Fixed Foam System: Semi Fixed Foam System to be provided for Open-
ISSUED FOR 60% FEL3
Top Floating Roof Tanks. This is a vendor Item and will be part of the Tank
Vendor package that will be responsible for the entire semi-fixed foam system
from top of tank to hose connection outside of the dike area.
Portable Fire Fighting Equipment: Hand Held and Mobile Fire Extinguishers
shall be provided for the Facilities. The Extinguishers shall be Selected and
Positioned in areas of Risk relevant to their application as per SAES-B-019
requirements. Where extinguishers are protecting individual equipment, they
shall be located at least 7.5m from the equipment’s.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
shall provide and install Vertical Traffic Posts (Bollards) to protect all end
devices. The Bollards shall be designed such that access to Equipment is not
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER o Constructed of Steel not less than 100 mm in diameter and Concrete
C
A
filled.
DATE:
PROJECT
ALL LEADS
ENGINEER
o Spaced not more than 1200 mm between posts on center.
09/08/16
DATE:
CERTIFIED o Set not less than 900 mm deep in a Concrete Footing of not less than a
A M ALMATROOK
400 mm diameter.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY o Set with the Top of the ports not less than 914 mm Above Ground.
AGENCY
09/08/16
DATE:
o Horizontal Cross-Bars between Vertical Posts are prohibited.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 o Located not less than 900 mm from any part of the Hydrant or Fire
DATE: Protection Equipment protected.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 o Guard Post shall not be installed in-line (directly in front of) with any of
EDSD
the Hydrant or Fire Protection Equipment outlets where the Fire Hose is
attached and where the Posts could contact the Hose when it gets
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG o Prior to Hydro-Testing, the System shall be flushed in accordance with
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH NFPA 24.
ASH
ASH
o For Above Ground Piping or for Under Ground Piping prior to Burial, newly
installed Fire Protection Systems in Water Service, regardless of materials,
LEADS
LEADS
LEADS
ALL
ALL
ALL
shall be Hydrostatically Tested to 1,380 kPag (200 PSIG) or 345 kPag (50
PSIG) in excess of maximum operating pressure, whichever is greater, and
held without pressure loss for 4 hours. All Piping is required to be Hydro-
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
CONTRACTOR scope of work shall include but not limited to the, detailed
C
A
DATE:
engineering design, procurement, quality control and quality assurance
PROJECT documentation, construction, as-built documentation, inspection, testing, pre-
ALL LEADS
ENGINEER
09/08/16
commissioning, assistance to commissioning and start-up for all Fire Protection
Work associated with this project.
DATE:
CERTIFIED
A M ALMATROOK
CONTRACTOR shall Design and Construct the New Fire Piping System
09/08/16
DATE: (Underground) in the new expansion Area, in accordance with applicable
CONSTRUCTION
AMR EL SHARKAWY SAUDI ARAMCO Engineering Standards - SAES-B-017, SAES-B-018, SAES-
AGENCY
09/08/16 B-019, SAES-B-070, SAUDI ARAMCO Engineering Specifications and
DATE:
applicable NFPA standards.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 CONTRACTOR shall provide and install New Fire Water Network
DATE:
(Underground) with Piping, Fittings, Fire Hydrant, Fire Monitor, Live Hose reel
and Post Indicator Valves as show on Fire Protection drawing FI-A00011-001
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
CONTRACTOR shall provide and install Two (2) new Electric Driven Fire
DATE:
BY:
Pumps, One (1) new Diesel Driven Fire Pump along with One (1) Diesel Tank
and Two (2) new Jockey Pumps as shown on drawings # FIA00011-003.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONSTRUCTION CONTRACTON shall provide Two (2) New Foam Skids for
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall provide Deluge Foam Water Spray system with all Piping,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Fittings, Air Aspirated Foam Nozzles, Deluge Valves, Gate Vales, Y-Strainers
for the Product pumps as per SAES-B-017 and SAES-B-070, as shown on Fire
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
requirements.
DESCRIPTION
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
equipment.
NO.
REV
DISCIPLINE
ENGINEER
CONTRACTOR shall install 12.5 Kg BC type dry chemical hand fire
C
A
extinguisher shall be provided at least 7.5m for the protect pumps being
DATE:
PROJECT protected.
ALL LEADS
ENGINEER
09/08/16
All Fire Protection Equipment and Appurtenances shall be purchased as
DATE:
CERTIFIED specified in the SAUDI ARAMCO Materials System and SAES-U-101.
A M ALMATROOK
09/08/16
DATE: All Below Grade Valves in Fire Protection Systems shall be listed for use in Fire
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Service.
09/08/16
DATE: All Below Grade Block Valves in Main or Branch Service shall be Listed Post
OPERATIONS
SHAHZAD YAZDANI
Indicator Type Valve with Position Indicators above Grade to meet the
09/08/16 requirements of NFPA 24.
DATE:
All Manual Block Valves in Fire Protection Service shall be Car-Sealed in their
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 Normal Operating Position or shall be otherwise supervised per NFPA 24.
EDSD
Block Valves located on Above Grade Piping shall be Accessible as per SAES-
DATE:
BY:
B-054.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
Commissioning and Testing Procedures for Foam Spray System shall meet the
requirements of NFPA 16. All Tests shall be witnessed by Designated SAUDI
(DCC) NO. _____________________
D. INSTRUMENTATION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Fire Water System:
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
ISSUED FOR 60% FEL3
As a minimum two (2) junction shall be provided, one each for analog and
digital signals as per SAES-J-902.
CONTRACTOR shall provide and install homerun cables from fire water
tanks X40-D-0701/702 to DCS cabinet located in rack room of O & M
Building.
Foam Generating Skid 1 & 2:
Foam skid vendor shall provide skid instrumentation and control,
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
Reference drawings
09/08/16
08/04/16
06/01/16
Drawing # Description
NO.
REV
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Electric Motor Driven Fire Water Pump – 2 Nos. (X40-G-0034 A/B,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Datasheet No. RE-E00118)
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
B73.1. Fire Water Main Pumps (Diesel Engine Driven and Electric Motor
ISSUED FOR 60% FEL3
Driven) shall be in accordance with NFPA 20 and are of axial split, between
bearing design due to their high flow requirement. This design is also
maintenance friendly at site as top half of the pumps can easily be open to
access the internal components without disturbing the piping connections.
MISCELLANEOUS REQUIREMENTS
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
Pump Datasheets provided in this package are preliminary only. These will be
09/08/16
08/04/16
06/01/16
A M ALMATROOK
CERTIFIED All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved
09/08/16 manufacturer for each Commodity Classification Code (CCC). SAUDI
DATE:
CONSTRUCTION
ARAMCO will provide the list of approved manufacturers after award of
AMR EL SHARKAWY
AGENCY
09/08/16
Contract.
DATE:
OPERATIONS
CONTRACTOR shall prepare Material Requisition Package for all the pumps
SHAHZAD YAZDANI
09/08/16
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
DATE:
issuing to Vendors.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 Material take-offs have been prepared for reference only and will not be
EDSD
Technical quotations obtained from vendors will list all exceptions and /or,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
to that effect.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
and 603.
ASH
ASH
ASH
LEADS
ALL
ALL
Supply of Commissioning and Start-up spares and first fill of all the lubricants
and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
approval of Aramco Operations before filling of lubricants and chemicals.
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16 4.18 Industrial Drainage System
DATE:
A M ALMATROOK
CERTIFIED A. GENERAL
09/08/16
DATE: CONTRACTOR shall connect the industrial drain generated within the facility to the
CONSTRUCTION
AMR EL SHARKAWY
AGENCY MARAFIQ network. All industrial drainages shall be treated in the oily water treatment
09/08/16
system. The industrial oily water treatment system shall consist of but not limited to an
DATE: oily water equalization tank, CPI separator, water break tank, two effluent water pumps
OPERATIONS
SHAHZAD YAZDANI (one operating, one spare), two skimmed oil pumps (one operating, one spare) and
09/08/16 necessary instrumentation and interconnecting piping.
DATE:
The oily water treatment system shall be of a complete vendor skid design and the
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 treatment system shall receive the effluent from the oily water sump via normal flow
EDSD
pump, main source of oily water will be dewatered effluent from the product storage
tanks. CONTRACTOR shall route the dewatered effluent from the tanks to the oily
DATE:
BY:
water lift stations and then effluent will transfer from normal flow pumps to the
REVISIONCERTIFICATION
equalization tank.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The CPI vendor shall provide the pump to transfer the recovered oil from the CPI to
(DCC) NO. _____________________
the slop tank while effluent water to be transferred to the MARAFIQ network.
CONTRACTOR and CPI system vendor shall ensure that the treated water meets the
REVISION
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH CONTRACTOR shall connect the treated oily water discharge to the evaporation pond.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Contractor shall delete the industrial drainage from YDH to MARAFIQ outlined in PFD
VA-247846.001 & VA-247848.001 and P&ID VA-247921.001 to VA-247923.001, and
downside the drain pump.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
B. CIVIL
DESCRIPTION
Storm water inside the tank farm dikes, plinth areas of pumps and other
ISSUED FOR 60% FEL3
Contaminated water from the tank farm dikes will be controlled by a 10”
diameter gate valve connected to the oily water sewer network. Further, in
case of Major flood/raptor an additional 4” gate valve and 4” pipe branch line
with vacuum truck connection shall be provided outside the dike oily water
JO/EWO
pipe.
10-02399-
10-02399-
10-02399-
0001
Dewatering from Diesel tanks shall be connected to the Oily water system
0001
0001
DATE
from the diked areas. Dewatering from the Kerosene and Gasoline tanks shall
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER CONTRACTOR shall provide two (2) Oily water Lift Station wherein the OWS
C
A
inlet pipe will be connected. CONTRACTOR shall assess and re-validate the
DATE:
PROJECT
design of the OWS drainage system. The internal wall of the lift stations shall
ALL LEADS
ENGINEER
be coated with APCS-3 or better and while the exterior wall shall be coated
09/08/16
with APCS-10 on below ground and exterior coating above ground shall be
DATE:
CERTIFIED
APCS-1B.
A M ALMATROOK
DATE:
09/08/16
Contractor shall construct a sand separator /trap tank properly designed to
CONSTRUCTION
AMR EL SHARKAWY
retain sand particles from reaching the sump pumps. The oily water network
AGENCY
09/08/16 will discharge to the sand separator tank before the OWLS. The inlet pipe to
the sand separator will include a gate valve indicator O&Y for the purposes of
DATE:
OPERATIONS controlling water entering to the sand separator while maintenance is
SHAHZAD YAZDANI
performing.
09/08/16
DATE:
Each oily water lift station shall be provided with two pumps for normal flow
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
(one operating, one spare) and two pumps for maximum flow (one
operating, one spare). The normal flow pumps will discharge to an oily water
EDSD
treatment system whereas the maximum flow pump shall discharge to the
DATE:
Evaporation pond.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
drawing no. AB-036402 and /or drawing no. AC-036078 inside pump house,
(DCC) NO. _____________________
scraper area and transformer area. Provide customize sealed catch basin
inside dike area.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide an 8”, 10”, 12” and 16” diameter RTR pipe,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IFE0U, 01-SAMSS-034 for underground oily water gravity sewer.
CONTRACTOR shall re-validate the propose size during detail design stage.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
To prevent fire transferring from an area to another area, the Oily water
network will be connected using sealed inlet oily water manholes following
standards and drawings details supplied in civil drawings.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
To prevent that oily water manholes will collapse by sand sedimentation, the
ISSUED FOR 60% FEL3
contractor shall construct catch basin lids/grates with means to retain sand
from reaching the pipe network.
Provide underground oily water sewer pressure line from oily separation to
evaporation pond.
Provide neutralization pit for all battery acid wash water which shall be
connected to oily water sewer network. Neutralization pit shall be coated
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
with, acid resistant material. The pit shall be sized for the expected waste
acid flow and dilution or wash-down water. The pit shall be in a readily
09/08/16
08/04/16
06/01/16
accessible location, and shall be vented to the outside. The minimum vent
NO.
REV
DATE:
Provide oily water connection from foam skid, fire water pump house,
PROJECT metering skid, CPI separator and all pumps containment area.
ALL LEADS
ENGINEER
09/08/16
Provide clean out at maximum spacing of 30 meter distance and in every
DATE:
CERTIFIED change of direction.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall consider the latest revision of the Royal Commission
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Environmental Regulations (RCER) in validating the design for Industrial
09/08/16 Waste.
DATE:
OPERATIONS
SHAHZAD YAZDANI
Refer to drawing: CI-A00119 sheet 001-015
09/08/16
DATE: The lift station construction shall be in accordance with ACI 350 as a water
tight structure. Concrete compressive strength shall be 34.474 MPa (5000
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Oily water sumps at YDH will be provided with following sets of pumps:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Each Oily Water Sump will be provided with 02 sets of normal flow pumps and 01
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
maximum flow pumps. Vertical discharge through column type pumps in
accordance with 31-SAMSS-004 shall be selected for this service. This is due to
ASH
ASH
ASH
the reason that latest update of SAES-G-005 prohibits the use of self-priming
pumps for Oily Water Sump services if flammable liquids are going to be drained to
LEADS
LEADS
LEADS
ALL
ALL
ALL
these sumps.
10-02399-
10-02399-
0001
0001
0001
DATE
MISCELLANEOUS REQUIREMENTS
09/08/16
08/04/16
06/01/16
NO.
REV
DATE:
PROJECT
ALL LEADS
ENGINEER
Pump Datasheets provided in FEL-3 package are preliminary only. These will
09/08/16 be further verified by CONTRACTOR during detailed design phase of the
DATE: project before issuing for procurement activities.
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall be responsible for producing equipment datasheet, SIS
DATE:
CONSTRUCTION
AMR EL SHARKAWY
sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms
AGENCY
09/08/16 and datasheets.
DATE:
OPERATIONS All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16 a
EDSD
CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
DATE:
BY:
issuing to Vendors.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Material take-offs have been prepared for reference only and will not be
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Technical quotations obtained from vendors will list all exceptions and /or,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
ASH
to that effect.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
DESCRIPTION
and 603.
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
0001
DATE
Supply of Commissioning and Start-up spares and first fill of all the lubricants
and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
approval of Aramco Operations before filling of lubricants and chemicals.
ENGINEER
C
A
ALI H GHAMDI
VERIFICATION
CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance rigging
plans and transportation calculations for all major equipment.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting of
(DCC) NO. _____________________
equipment.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall be responsible for insulation (where specified on the data
sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
ASH
ASH
ASH
All skid packages design shall be vendor proven design. Skid packages shall be
LEADS
LEADS
LEADS
ALL
ALL
ALL
suitable for the specific application by meeting all the process design requirements
and environmental, safety and Industry standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Document # Description
ISSUED FOR 60% FEL3
E. INSTRUMENTATION
10-02399-
10-02399-
10-02399-
CONTRACTOR shall provide and install oil-in-water analyzer at the inlet and outlet
0001
0001
0001
DATE
of CPI Separator skid as indicated in P & ID and IPL. The skid instrumentation shall
be provided by skid vendor.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE CONTRACTOR shall provide and install field junction boxes to connect CPI skid
ENGINEER
instrument to DCS for remote monitoring and control.
C
A
DATE: Provide and install homerun cables from CPI skid X40-X-1101 to remote I/O
PROJECT
ALL LEADS
ENGINEER cabinet located in RIB-2. The cable shall be routed on the cable trays.
09/08/16
Hydro carbon detectors to be provided at the sump for the oily water sumps.
DATE:
A M ALMATROOK
CERTIFIED
Reference drawings
09/08/16
DATE: Drawing # Description
CONSTRUCTION
AMR EL SHARKAWY
AGENCY IN-A00001 System Block Diagrams
09/08/16
IN-A00002 Instrument Block Diagrams
DATE:
OPERATIONS
IN-A00027 Instrument Points & Lines
SHAHZAD YAZDANI
09/08/16
IN-D00201 Instrument Installation Schedule-Flow
DATE:
IN-D00202 Instrument Installation Schedule-Pressure
IN-D00203 Instrument Installation Schedule-Level
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG 4.19GRADING & STORM WATER DRAINAGE
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. CIVIL
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
design in all the proposed tank farm, all access road areas with fill
as per the requirements specified under SAES-A-114.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
DATE
the tank farm and other unpaved non-process area. The water shall
DISCIPLINE
ENGINEER flow thru gravity open drain direct the new drain channel outside the
plant and tie-in to the future RC storm drain channel.
C
A
A M ALMATROOK
CERTIFIED F. CONTRACTOR shall provide box culvert and junction box as
09/08/16 required where channel passes thru road and security fence.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY G. CONTRACTOR shall establish finished grade and invert elevation of
09/08/16
drain and box culvert as per the project requirements that will
DATE: provide more economical concept.
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16 water and will be collected by a separated oily water pipe system
EDSD
network
DATE:
BY:
REVISIONCERTIFICATION
A. CONTRACTOR shall install the utility water pipe network from the
equipment pumps to each building, eye washers, and other
locations where utility water is required. The utility water pipe
REVISION
AHG
AHG
AHG appropriate manufacture fittings, valves, connections, reducers, and
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH manufacturer recommendations for a proper installation.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
C. The Utility water pipe network shall have gate valves for appropriate
maintenance for the main pipe and for each section.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
E. The water pipe network shall be tested using the methodology and
guidelines of SAES S 70.
each building to the lift stations and from the lift stations to the tie-in
point connection to MARAFIQ.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
C. The forced sanitary waste water pipes from the lift stations will be
A
DATE: constructed with 3” diameter RTR pipe, 12FEOU. These will include
PROJECT
ALL LEADS
ENGINEER the provision of fittings, valves, and flanges.
09/08/16
DATE: D. Installation of sanitary waste water shall follow SAES S 10 and SAES
CERTIFIED
A M ALMATROOK S 104 where applicable.
09/08/16
DATE:
4.22OVERALL SITE DEVELOPMENT AND FACILITIES:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
CONTRACTOR shall re-evaluate/validate the design requirement and include
DATE:
any other possible improvement / requirements not spelled out but are
OPERATIONS
SHAHZAD YAZDANI essential on layout design of civil works for bulk plant area, access roads, traffic
09/08/16 scheme, main gate layout and temporary construction facility that includes but
DATE: not limited to the following:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 CONTRACTOR shall revalidate and re-establish all the finish grade elevations
EDSD
in reference to the latest existing topographic survey drawing and to the latest
rough grading drawing.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall provide concrete sidewalks inside the parking area, Gate
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
House, E&M Building and other Support Building Facilities as provided and
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG accordance with SAUDI ARAMCO Standard drawing no. AB-036260 sheet 001
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH rev. 05.
ASH
ASH
CONTRACTOR provide 500 mm thick marl capping inside dike area and 150
mm thick marl capping outside the dike peripheral at all non-paved areas
LEADS
LEADS
LEADS
ALL
ALL
ALL
including the sleeper areas. Dike fill material shall comply with SAES-Q-006,
sub-base material Class, placement and compaction shall be in accordance
with SAES-Q-006.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
CONTRACTOR shall provide and develop a total of forty five (45) shaded
ISSUED FOR 60% FEL3
parking slots at E&M building and six (6) parking slots at operation building as
shown on the drawing CI-A00106. Likewise, a total of thirty (30) shaded
parking slots shall be provided for visitors outside the security fence. Structural
design detailed calculation of the sunshades shall be submitted by the vendor.
Refer to DA-950182-001
CONTRACTOR shall provide HCIS Category I around the tank farm as shown
in drawing CI-A00105. Fence shall be in accordance to the requirements as per
SAES-O-202 and SEC-02.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
Provide two (2) 9.0 meters wide double leaf decorative metal gates provided
DATE:
PROJECT with four (4) units of 4.3 meters long hydraulic crash barrier and 8 inches
ALL LEADS
ENGINEER
09/08/16
diameter bollards at main security gate house and Tank Farm Gate. Each gate
is designed to have a two (2) lanes security access road. Also, provide two (2)
DATE:
CERTIFIED 1.20 meters single leaf decorative metal gates to be utilized as walkway gate
A M ALMATROOK
where each located at main entrance and exit gates. Four (4) Drop arms shall
09/08/16
DATE:
be provided also in each gate. Two (2) shall be installed at the entry lane and
CONSTRUCTION
AMR EL SHARKAWY the other Two (2) shall be installed at the exit lane.
AGENCY
09/08/16
DATE:
CONTRACTOR shall provide turnstile for pedestrian entry and exit access.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 Provide type IV perimeter fence with 4.0 meters wide double leaf drive gate for
DATE:
each heel recovery drum location. The perimeter fences shall be in accordance
with all the requirements specified in SAES-M-006 and referenced as per
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 SAUDI ARAMCO Standard drawing no. AB-036677 sheet 001 rev. no. 002.
EDSD
Provide 5.0m wide lay bay for heel recovery drum/product recovery drum for
DATE:
truck access.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Provide non-mountable curb and curb & gutter. curb & gutter shall be in
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide Facility Security Forces (FSF) before the SAUDI
ARAMCO main gate. FSF facility shall comply all the Security requirements,
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
a. CONTRACTOR shall develop detail design of storm water flow in all the
asphalt paved area including applicable storm drain system and surface
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
09/08/16 5. Informative sign board shall be 1.20mx1.20m boards with steel post
EDSD
Parking stall layout and wheel stop detail and pavement arrows and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH MAIN ACCESS AND IN-PLANT ROAD:
ASH
ASH
The Plant Access Road traffic scheme shall include but not limited to the
following:
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide access to the bulk plant that includes necessary
traffic signs, road markings and sign board as per standard. Plant access roads
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide drop gates (drop arms) for vehicles control for
both entrance and exit road lines
The road asphalt structure for 8.0 meter internal road is comprises of the
following materials as per SAES-Q-006;
10-02399-
10-02399-
0001
CONTRACTOR shall Utilize CBR test values given in geotechnical report 2015/104
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER Filling materials for road subgrade shall comply with SAES Q 006 chapter 5.
C
A
DATE:
PROJECT
Pavement materials shall comply with SAES Q 006 chapter 5.
ALL LEADS
ENGINEER
09/08/16
Adequate soil stabilization methods and drainage shall be provided for all
DATE:
CERTIFIED
access roadways in order to prevent the erosion or flooding of project road
A M ALMATROOK ways.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY Provide adequate standard traffic regulatory signs (stop signs, over-taking
AGENCY
09/08/16 prohibited signs, yield signs, speed limit signs) and informative signs showing
DATE:
the direction of bulk plant and access road. Use thermoplastic Paint for road
OPERATIONS markings.
SHAHZAD YAZDANI
09/08/16
1. Yellow paint line with 200mm wide on edge line
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
2. Regulatory/directional sign board shall be 0.90 meter diameter with
steel post which approximately 2.0 meters high with respect to the finish
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG markings. Pavement arrow markings shall be in reference as per standard
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH drawing no. AD-036512 sheet 001 rev. 00.
ASH
ASH
Provide 6.0m wide access ramps crossing the dike wall to all tanks.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Provide 4.6 meters wide external asphalt concrete patrol road shall comprise of
the following structure.
10-02399-
10-02399-
0001
0001
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER Process Automation shall ensure safe and reliable operation of YDH operations. The
C
A
09/08/16 operations associated with product storage tanks, products receipt from
DATE: refineries and product transfer via pipeline, pumping manifolds, shipper
pumps, booster pumps, and auxiliary systems.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 The TMS shall be interfaced to DCS, ESD, CMS, VMS and RTG
EDSD
systems.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The TMS system comprising of DCS & ESD shall be as per the
(DCC) NO. _____________________
AHG
AHG
AHG
CONTRACTOR shall provide a DCS for control and monitoring of YDH
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
facility.
The DCS system cabinet, I/O and marshalling cabinets shall be
ASH
ASH
ASH
installed in the rack room of O &M building, and in addition the project
LEADS
LEADS
LEADS
ALL
ISSUED FOR 60% FEL3
The DCS shall provide interface to PLC and Third Party Packages, in
accordance with SAES-Z-001.
PCS components that require time synchronization shall be time
synchronized with a master Network Time Protocol (NTP) server such
as GPS server.
Refer system block diagram IN-A00001.001 details.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
The ESD system, I/O, and marshaling cabinets shall be installed in the
NO.
REV
DISCIPLINE
ENGINEER
rack room of O& M building and in addition the project shall provide
remote I/O cabinets in remote instrument buildings (RIB)
C
A
DATE: The ESD shall provide for the safe and orderly shutdown and isolation
PROJECT
ALL LEADS
ENGINEER of processes in the event of pre-determined conditions. YDH storage
09/08/16
tanks shall be equipped with independent high-high level instruments
DATE:
CERTIFIED hardwired to the ESD. The ESD shall be capable of providing storage
A M ALMATROOK
09/08/16
tank isolation via the tank inlet valves.
DATE: Activation of ESD system shall not cause activation of any fire
CONSTRUCTION
AMR EL SHARKAWY
AGENCY protection system at the respective area.
09/08/16
The communication between ESD-DCS shall be via dedicated
DATE: redundant communication paths.
OPERATIONS
SHAHZAD YAZDANI Refer system block diagram IN-A00001.001 details.
09/08/16
DATE:
Data Interface with Third-Party Process Automation Systems
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
The DCS shall interface with the third-party Process Automation
EDSD
systems to view data points from (a) YASREF, (b) SAMREF, (c) Yanbu
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
The CONTRACTOR shall utilize the FOC that is been laid between the
Refineries and YDH, to transfer the data points related to CMS, Pumps
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
The proper selection of TMS-DCS for the control and logic functions is
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
required to operate YDH in order to interface with the PCS system at
ASH
LEADS
LEADS
ALL
ALL
ALL
This will require a dedicated effort by the LSTK vendor to bring on board
Yokogawa and Honeywell and discuss with them if their systems is
DESCRIPTION
ISSUED FOR 60% FEL3
10-02399-
10-02399-
detectors, heat sensors, and manual pull stations wired through to Local
0001
0001
0001
DATE
Fire Alarm Panels (LFAP) in each building. Zone alarms and trouble
alarms shall be wired from each LFAP to a Master Fire Alarm Control
09/08/16
08/04/16
06/01/16
NO.
REV
Panel (MFACP) located in YDH control room. Common fire, ground fault
DISCIPLINE
ENGINEER indication and common fault alarms shall be transmitted from the
C
09/08/16
consistent with SA standards and operating practice. The project shall meet
the below requirements as a minimum:
DATE:
CONTROL NUMBER
ALI H GHAMDI Vibration and temperature sensors, wiring and appropriate VMS
VERIFICATION
09/08/16
monitoring cards shall be provided.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
monitoring VMS signals from shipper and booster pump stations. VMS
workstation shall be installed in Operation building engineering room
Refer system block diagram IN-A00001.006 details.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
VMS shall be as per IN-E00018 FSD
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
DATE
DATE: This project shall incorporate best automation practice for the product
PROJECT
ALL LEADS
ENGINEER transfer to/from YDH. The process automation systems will provide for
09/08/16
automated transfer of product batches to/from YDH.
DATE: This project shall optimize interfaces to provide a safe, reliable, and
CERTIFIED
A M ALMATROOK cost-effective means of managing batch transfers. This application
09/08/16
DATE: allows control over motorized valves, pumps, and other equipment
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
associated with control of products receipt and transfer. It shall also
09/08/16
interface with the historian server for long-term data retention
DATE:
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16
metering systems to measure refined product transfers involving third party.
This project shall make the following provisions:
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
AHG
AHG
AHG determined during detail design, however, the following provides the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
basis for detailed requirement.
o The MSC shall be a packaged unit consisting of MSC Operator
ASH
ASH
ASH
LEADS
LEADS
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
Operation of all the meter system’s MOV’s
OPERATIONS
SHAHZAD YAZDANI
Various functions pertaining to interlocks, line-up logic,
09/08/16
valve sequencing control and monitoring alarm points
DATE:
Redundant I/O and devices that execute control
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 interlocks
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
functions:
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG b) The HMI’s shall automatically initiate all the valve
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
sequencing operations and associated activities after a
meter is selected for proving by the operator,
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
DATE
Enterprise Systems
09/08/16
08/04/16
06/01/16
NO.
REV
A M ALMATROOK
CERTIFIED The project shall provide all security systems required to protect the
09/08/16 process automation networks and systems against cyber threats. The
DATE:
CONSTRUCTION
security systems shall comply with SA standards.
AMR EL SHARKAWY
AGENCY
09/08/16
The project shall provide DMZ in compliance with SAES-T-566/SAEP-
99. Data diodes shall be provided for data security for every
DATE:
OPERATIONS
interface with third parties and Corporate network.
SHAHZAD YAZDANI
09/08/16
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Equipment Rack Room
EDSD
Equipment Rack room shall be located in Operation building. Rack room shall
serve as the termination and internal distribution point for field instrumentation
DATE:
BY:
wiring. The rack room shall be unmanned and shall be equipped with HVAC
systems and UPS systems. The rack room shall house the following
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
equipment:
(DCC) NO. _____________________
AHG
AHG
AHG
PSA System Cabinets
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
LAN cabinets etc.
Other Servers as shown in drawing IN-A00001.001.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
utilized. All field wiring with the exception of Automation communication links
shall be terminated inside marshaling cabinets in accordance with SAES-J-902;
and, all incoming cables must be sealed in accordance with Section 15.4 of
ISSUED FOR 100% PROJECT PROPOSAL
Engineering Room
All Engineering workstation shall be located in engineering room of Operations
building. The engineering workstations such as DCS/ESD/VMS/RTG are to be
installed in this room as shown in drawing IN-A00001.001
Operations Room
The process automation requirements of the Operations Room, Equipment
Rack Room and Engineering Room are as follows:
JO/EWO
The Operations Room shall be designed within the Operations building. The
10-02399-
HMI console shall be provided to control the facility. The Operations Room shall
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
The Operations Room shall be designed so that only activities associated with
ENGINEER plant control are performed there. The operation room shall be engineered to
C
A
ALI H GHAMDI
VERIFICATION
09/08/16 Remote I/O with FTA & marshalling cabinets for ESD.
EDSD
The buildings shall be designed considering the future expansions. All incoming
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
number of cabinets and I/O required for each RIB shall be defined during FEL-
(DCC) NO. _____________________
3 stage.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH 4.24INTEGRATED SECURITY SYSTEM
ASH
ASH
Purpose
LEADS
LEADS
LEADS
ALL
ALL
ALL
The PRS System equipment shall be installed at the YDH Main Gatehouse;
The SACS systems shall be installed at the YDH Tank Farm Gatehouse. The
JO/EWO
IDAS cameras and field sensors shall be installed in the Yanbu Distribution Hub
perimeter to provide full perimeter fence coverage intrusion detection and
assessment. CCTV will also encompass the monitoring of Main Gatehouse,
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Present Situation
NO.
REV
DISCIPLINE
ENGINEER
Yanbu Distribution is a grass-root plant with no existing interconnection to any
C
A
DATE:
existing facilities. The combined IDAS/LRDAS system shall be installed along
PROJECT
ALL LEADS
the approximately 5.5 km perimeter fence.
ENGINEER
09/08/16
The Yanbu Distribution Hub IDAS/LRDAS system remote monitoring and
DATE:
CERTIFIED control equipment will be installed in the existing Yanbu Regional Security
A M ALMATROOK
Control Center (RSCC).
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
Related Documents
09/08/16
DATE: The following Functional Specification Document (FSD) describes the design
OPERATIONS
SHAHZAD YAZDANI
requirements and equipment characteristics for each of the security system as
09/08/16 stated above:
DATE:
a) GENE0006067 Functional Specification Document - IDAS/LRDAS
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
b) GENE0007042 Functional Specification Document - PRS
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT OBJECTIVES
General
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG This project shall provide a Security Access Control System (SACS) for access
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
control functions, sensor management and monitoring functions. The system
shall interface to the SAUDI ARAMCO Identification System, SAUDI ARAMCO
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
comprised of card readers on the turnstiles and drop gate for vehicles, SACS
ISSUED FOR 90% PROJECT PROPOSAL
servers and storage equipment, display and logging devices, single entry
DESCRIPTION
The SACS system shall be connected to the central SAUDI ARAMCO SACS
system located in Dhahran through the corporate data network.
This project shall provide a Plate Recognition System (PRS) and CCTV camera
will also be provided. The PRS also monitors public vehicles accessing the
JO/EWO
10-02399-
10-02399-
recognition capabilities.
0001
0001
0001
DATE
DATE:
PROJECT
The IDAS/LRDAS equipment shall be remotely controlled by Yanbu RSCC and
ALL LEADS
ENGINEER
locally controlled in Tank Farm Gatehouse of YDH. The system includes control
09/08/16
and monitoring of all the IDAS/LRDAS field equipment.
DATE:
CERTIFIED
A M ALMATROOK
The IDAS system provided shall monitor the approximately 5.5 kilometer
09/08/16
DATE: perimeter fence and critical gates. The IDAS/LRDAS shall be integrated with
CONSTRUCTION
AMR EL SHARKAWY
AGENCY the existing C2I system of the existing Yanbu Regional Security Center.
09/08/16
DATE: The CCTV and MIDS sensors shall detect intrusion and transmit data to Yanbu
OPERATIONS
SHAHZAD YAZDANI Regional Security Control Center (YNBRSCC). Failure of one of the field
09/08/16 devices connected to the communications network shall not affect the ability of
DATE:
the system. Communication network shall be supplied in one-to-one redundant
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
configuration with automatic changeover.
EDSD
The project shall design Shelters and Field Equipment Cabinets to house the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
DESIGN OBJECTIVES
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Intrusion Detection & Assessment System (IDAS)/ Long Range
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The IDAS system has different types of distinct field sensor technologies for
intrusion detection:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CCTV which consists of Fixed and PTZ cameras installed along the
DESCRIPTION
possible intruders.
The distance between the poles will be reduced for areas in the site where
JO/EWO
there are curves and/or corners to ensure no “dead” zones within the area. The
final number of MIDS pairs shall be determined during the detail design.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
For the assessment part, fixed color day/night cameras with at least 5 meter
09/08/16
08/04/16
06/01/16
NO.
REV
high poles with vari-focal lens located in parallel to the perimeter fence and
DISCIPLINE
ENGINEER
spaced at a maximum distance 75 meters apart for straight line fence. The
distance between the poles will be reduced for areas in the site where there are
C
A
DATE: curves and/or corners to ensure no “dead” zones of the “sterile” area. Based on
PROJECT
ALL LEADS
ENGINEER this, it is estimated that the project will utilize approximately 82 fixed cameras.
09/08/16
The final number of fixed cameras will be determined during the detail design
DATE:
CERTIFIED phase.
A M ALMATROOK
09/08/16
DATE: Pan Tilt Zoom (PTZ) day/night cameras with at least 7 meter high poles facing
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
perpendicularly to the perimeter fence, set at approximately 300m apart, no
09/08/16
“dead” zones between the camera coverage. Based on this, it is estimated that
DATE: the project will utilize approximately 18 PTZ cameras. The final number of
OPERATIONS
SHAHZAD YAZDANI
cameras will be determined during the detail design.
09/08/16
DATE: For the traceability part of the IDAS/LRDAS, the project shall provide the
CONTROL NUMBER
ALI H GHAMDI
following:
VERIFICATION
09/08/16
Network Video Recorders (NVR) with Raid 5 hard disks to
EDSD
record in real time all video signals from fixed and PTZ cameras.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
corresponding cameras.
(DCC) NO. _____________________
For integrating all these technologies, the project shall provide the following:
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Alarm Management Software (AMS) with Servers to be installed
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
at the Security Support Building.
ASH
ASH
LEADS
LEADS
ALL
ALL
Industrial grade Ethernet switches with dual fiber optic uplink for
communications redundancy.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
processing.
10-02399-
10-02399-
0001
0001
0001
DATE
tamper.
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER
NVR’s, PTZ control and Video Wall display for operator
functionality.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER It shall provide the infrastructure to function in a real time
09/08/16
environment by being capable to report an alarm within 1
DATE:
CERTIFIED
second of the detection system resulting from a sensor and/or
A M ALMATROOK
communications equipment digital output (DO) such as a relay
09/08/16
DATE: or an alarm data packet.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 It shall have the capability to monitor its sensor subsystems and
DATE: related communication hardware via Simple Network
OPERATIONS
SHAHZAD YAZDANI Management Protocol (SNMP) or similar function and report in a
09/08/16
log.
DATE:
CONTROL NUMBER
ALI H GHAMDI
It shall have the capability for the application to switch-over from
VERIFICATION
09/08/16
the primary to the secondary server at a maximum 1 second
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The perimeter fence shall be divided into physical zones. The zone size
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
shall be adjusted within a range of 30-150 meters to accommodate
optimum detection by field sensor systems while remaining within minimum
ASH
ASH
ASH
LEADS
LEADS
ALL
determined during the preliminary design stage. The larger the zone size
ALL
ALL
the lesser the Probability of Detection (PD) and the higher the expected
Nuisance Alarm Rate (NAR).
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
All IDAS day/night Fixed and PTZ Cameras shall run at 25fps PAL or 30fps
NTSC requiring approximately 8 Mbps bandwidth per camera. Each
camera shall have a minimum of 525 TVL and run in MJPEG, MPEG-4, and
H.264 format.
JO/EWO
The radar shall be fully solid state and have a modular construction
allowing for a limited workshop repair.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
enclosure ready for installation in the field. The antenna with drive motor
NO.
REV
DISCIPLINE
ENGINEER
can be part of the assembly but can also be detachable for the ease of
transportation and installation.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER The System shall be able to detect the vehicles or personnel at the
09/08/16 minimum specified range and at a specified speed (to be finalized during
DATE: detailed design).
CERTIFIED
A M ALMATROOK
09/08/16 The System shall interface with the Long Range Surveillance System. It
DATE:
CONSTRUCTION
AMR EL SHARKAWY shall trigger alarms and activate the long range cameras on receipt of a
AGENCY
09/08/16 possible intrusion.
DATE:
OPERATIONS
SHAHZAD YAZDANI
The IDAS/LRDAS AMS servers shall include a “hot” back up master
09/08/16 computer with automatic switch over capability within a 1 second. No loss
DATE: of IDAS functionality from the field sensor subsystem shall occur during or
CONTROL NUMBER
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
be at least 99.999%.
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Commercial off the shelf products (COTS). The system shall have the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH capability to remotely monitor and manage with these parameters.
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
It shall house the IDAS and its field sensors systems for this
ISSUED FOR 60% FEL3
particular area of the fence including the video signals from all
cameras, control and alarm signals, convert them to IP and
transfer them to Security Equipment Building where they would
be ultimately accessed by the AMS software.
with two (2) hour battery back-up. The UPS shall also function in
10-02399-
10-02399-
0001
0001
0001
DATE
DATE: Main Entry gates shall use IP Fixed cameras for surveillance
PROJECT
ALL LEADS
ENGINEER and are exclusively use for inbound and outbound vehicles.
09/08/16
These cameras shall be at least 82 degree angle to achieved
DATE:
CERTIFIED maximum view for the entrance and exit lanes.
A M ALMATROOK
09/08/16
DATE:
All CCTV system traffic that is directly connected to an IT
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
managed switch shall be mapped to a dedicated video VLAN as
09/08/16 per SAES-T-555 Section 6.1.5
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
Security Access Control System
DATE:
CONTROL NUMBER
ALI H GHAMDI
The Security Access Control System (SACS) which shall be installed at the
VERIFICATION
09/08/16
Yanbu Distribution Hub’s Computer Gatehouse’s vehicle lanes drop gates,
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG override to allow operation of the turnstile/drop gate in the event of
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
system or power failure
The System shall offer consistent read range unaffected by body
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
Provide Access Control Proximity Card with contact smart chip modules
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
used for gate card readers. Must have at least 1 second approve or cancel
DESCRIPTION
The system Administrative Client Work Server, Local Client Server and
Main Server should be located so that both remote support and local
operation is made available. Except for the client workstation with an
independent card reader and all ancillary equipment necessary to stay in
the gatehouse for the efficient operation of the RFID system, all other
equipment or devices are to be located in the Security Equipment Building.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER The PRS shall have a minimum 95% Arabic and 95% Latin character
C
A
recognition accuracy.
DATE:
PROJECT
ALL LEADS
ENGINEER System availability shall be in the order of 98% subject to a mean time
09/08/16
repair of 3 hours.
DATE:
CERTIFIED
A M ALMATROOK Failure of any component or system must be automatically notified to the
09/08/16
DATE:
staff in the gatehouse and in Yanbu Regional Security Control Center
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
(RSCC).
09/08/16
DATE:
The PRS System shall capture all vehicles entering and leaving at a rate of
OPERATIONS
SHAHZAD YAZDANI 100%. These images shall be of the front license plates, together with the
09/08/16 front of the vehicle.
DATE:
ALI H GHAMDI
VERIFICATION
Character Set) format. Only one character format will be used throughout
DATE:
the system.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The PRS shall read all types of rectangular Saudi number plates (Short and
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
long). The PRS shall also be capable of Saudi license plate (Red, Blue,
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The PRS shall read the newly released types of rectangular Saudi number
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
plates, four (4) numbers and three (3) alphabet and added features. The
PRS shall also be capable of recognizing all six (6) different colors
ASH
ASH
ASH
LEADS
LEADS
ALL
The system shall have the capability of capturing images of all retro-
ISSUED FOR 60% FEL3
The PRS shall provide full time image capturing capability by use of color
cameras in addition to the OCR capable cameras.
The PRS shall be able to read any plate tilted or mounted away from a
JO/EWO
The PRS may use additional external system triggers to detect vehicles.
10-02399-
10-02399-
0001
0001
0001
DATE
White light illuminators shall be provided for the automatic number plate
09/08/16
08/04/16
06/01/16
NO.
REV
09/08/16
to 80Km/h at the capture point.
DATE:
The width of the camera footprint for the color cameras is to be no greater
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The PRS shall provide both monochrome and color images of the number
plate for OCR identification and license color verification purposes.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The system shall process color images to allow the color background of
vehicle licensing class to be determines automatically and a corresponding
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The PRS shall have the capability to alert staff of the approach of a suspect
vehicle by comparing the number plates of approaching vehicles with those
installed in a local or centralized database. This alert will be generated
within one second of the number plate image being captured by the PRS
Camera.
The alarm signal shall be both visual and audible, and shall indicate in
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE flagged) shall be different and the system shall allow the alarm notification
ENGINEER
for unrecognized vehicles to be disabled from YNB RSCC and not from the
C
A
DATE: gatehouse.
PROJECT
ALL LEADS
ENGINEER
09/08/16 The PRS shall be able to simultaneously monitor; process and store the
DATE: information from all lanes approaching the Gates. The system shall be
CERTIFIED
A M ALMATROOK designed so as to maximize the read performance in each lane.
09/08/16
DATE:
CONSTRUCTION
The local PRS Processing/ Storage Equipment shall fully monitor, store,
AMR EL SHARKAWY
AGENCY
09/08/16
and send PRS Alarms and Transaction Events to a centralized database.
The processing unit shall integrate (OCR) information and license plate
DATE:
OPERATIONS
SHAHZAD YAZDANI
color information from each vehicle plate.
09/08/16
DATE:
CONTRACTORS shall refer to the provided drawings to identify the position
and space requirements for the local PRS Processing Equipment. The form
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 factor of the equipment at Gatehouse should reflect the limited space at
EDSD
these locations. All ancillary equipment necessary for the proper operation
DATE:
of the PRS system shall remain in the gatehouse including the PRS
BY:
workstation for the local monitoring & control of PRS system. The PRS
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The Fault Tolerant PRS Main Server shall be provided and installed by
CONTRACTOR as approved and procured thru the specifications of SAUDI
REVISION
AHG
AHG
AHG configuration of the PRS Main Server. It is this project responsibility to
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
configure and utilize the existing SAUDI ARAMCO server as required by the
PRS system.
ASH
ASH
ASH
LEADS
The Fault Tolerant Main Server shall have redundancy in terms of storage
LEADS
LEADS
ALL
ALL
ALL
failures.
The PRS Main Server shall be interconnected with all the Local PRS
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Building and with PRS monitoring workstation located0 at Yanbu RSCC via
ISSUED FOR 60% FEL3
The PRS main Server shall distribute the updated hot list inputs concerning
flagged vehicles within (60) seconds to the new local PRS Processing
Equipment automatically.
The PRS Main Server shall have sufficient storage capacity to store
information for the following periods of time:
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
Format- 3months
09/08/16
08/04/16
06/01/16
The PRS Main Server shall have an option to automatically archive records,
NO.
REV
DATE:
PROJECT
ALL LEADS
ENGINEER
The PRS Main Server shall maintain an accurate clock set to local time
09/08/16 using Coordinated Universal Time (UTC) information derived from the
DATE: SAUDI ARAMCO Master Clock. The local time will be synchronized to all
CERTIFIED
A M ALMATROOK Local Processor from the Main Server, by the use of a Network Time
09/08/16
DATE:
Protocol (NTP). All system transactions will be appended with a tamper-
CONSTRUCTION
AMR EL SHARKAWY proof time-stamp.
AGENCY
09/08/16
DATE:
The Local PRS Processing Equipment shall distribute its database
OPERATIONS
SHAHZAD YAZDANI
transactions events to the PRS Main Server automatically within not more
09/08/16 than thirty (30) minutes and upon request from local machine at gatehouse.
DATE: The local PRS Processing Equipment shall automatically distribute its
CONTROL NUMBER
ALI H GHAMDI
database Alarm within no more than one (1) second to the PRS Main
VERIFICATION
09/08/16
Server.
EDSD
DATE:
capacity to store information for the following periods of time (based upon
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG – PRS monochrome and color images linked to above database
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH entries – 30 days.
ASH
ASH
System Users shall be able to query the PRS System which shall be
LEADS
capable of generating, saving and printing Local and Site Global reports
LEADS
LEADS
ALL
ALL
ALL
listing:
(Recorded Alarms)
ISSUED FOR 60% FEL3
The PRS system shall ensure that there is a clear view of each vehicle’s
license plate and shall propose measures to ensure vehicle license plates
JO/EWO
are captured and processed in all traffic conditions, which may require
traffic calming measures.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT Outside Plant System (OSP)
ALL LEADS
ENGINEER
09/08/16
The Outside Plant Cable and Conduit System shall support the Security Cabling
DATE:
CERTIFIED connectivity from Security Support Building to various locations of Field
A M ALMATROOK
09/08/16
Equipment Cabinets (FECs) through Shelter #1 and Shelter #2 along the
DATE: perimeter fence.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 The works includes excavation, installation of buried and underground (in
DATE: conduit) fiber optic cables, construction of conduit facilities, installation of
OPERATIONS
SHAHZAD YAZDANI pedestal with guard post, cable splicing, installation of fiber optic patch panels,
09/08/16
cutting and replacing of paved and asphalt areas to original condition,
DATE:
installation of marker post, installation of electronic marker, termination of fiber
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
cables, cable testing and tagging.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The security systems provided by this project shall provide inter-connection
to the C2I platform to integrate with the different Security systems installed
ASH
ASH
ASH
under BI-10-00555.
LEADS
LEADS
LEADS
ALL
ALL
ALL
The C2I application software installed in the Dhahran RSCC under BI-10-
00555 shall have the capability to view each site and when required, a
10-02399-
10-02399-
10-02399-
0001
password protection scheme to take over the application of this site. The
0001
0001
DATE
allocated space for the sites that normally report to other RSCCs.
NO.
REV
DISCIPLINE
ENGINEER
C
A
09/08/16
DATE:
CONTROL NUMBER
ALI H GHAMDI
ENVIRONMENTAL IMPACT
VERIFICATION
09/08/16
EDSD
All work under the Scope of this project shall conform to all SAUDI
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
4.25STRUCTURAL
REVISION
GENERAL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR SHALL NOTE that all construction works shall be done in
accordance with latest international and Saudi Aramco Engineering standards
ASH
ASH
ASH
and procedures.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall ensure achieving high safety and security standards and
levels of control throughout all phases of the project. CONTRACTOR shall
JO/EWO
perform any other activity, not specifically mentioned above, but necessary to
achieve Completion of the Work.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
DATE:
Criteria Parameter
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Short Period Acceleration (Ss) in %g
EDSD
20.4
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Importance factor for seismic design 1.5
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
design, for any change in location of equipment, building or facility away from
the given test location contractor shall utilize the nearest test location and
prepare standalone report for utilization of nearest test location and submit it to
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall check and verify all Sub-Contractor and Vendor design
JO/EWO
and drawings provided comply with the Scope of Work, and documents
provided with this Scope, relevant SAUDI ARAMCO and International
10-02399-
10-02399-
10-02399-
0001
DATE: CONTRACTOR shall refer project proposal drawing ST-A00100.001 for general
PROJECT
ALL LEADS
ENGINEER notes on structural steel work. CONTRACTOR shall execute all structural steel
09/08/16 work in accordance with SAUDI ARAMCO standards.
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall note that all structural drawings of project proposal are
09/08/16 indicative; CONTRACTOR shall perform detailed structural calculations during
DATE:
CONSTRUCTION
detailed design as per vendor data and in accordance with SAUDI ARAMCO
AMR EL SHARKAWY
AGENCY standards.
09/08/16
DATE:
CONTRACTOR shall finalize all building design incorporating
OPERATIONS
SHAHZAD YAZDANI recommendations given in BRA report for all buildings. Blast resistant design
09/08/16 shall be performed where deemed necessary by using the project Building Risk
DATE: Assessment (BRA) report.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Equipment Foundations
OF THIS DRAWING IS COVERED, FOR ALL
CONTRACTOR shall provide concrete foundations for dye injection skid, SDA
injection skid, conductivity enhancer skid, custody metering skid, meter prover
REVISION
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall design foundations as per vendor requirement of size and
loading in accordance with SAUDI ARAMCO standards.
ASH
ASH
ASH
CONTRACTOR shall provide slab on grade and toe wall as per vendor
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
ISSUED FOR 60% FEL3
10-02399-
10-02399-
approval.
0001
0001
0001
DATE
09/08/16 CONTRACTOR shall design foundations as per vendor requirement of size and
DATE:
loading in accordance with SAUDI ARAMCO standards.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 CONTRACTOR shall provide slab on grade and toe wall as per vendor
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Shelters
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide following Shelter in YDH facility
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall design shelter foundations as per PEB- vendor load data
and provide anchor bolts as per vendor requirement.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall provide slab on grade for foam skid shelter with isolation
joint between major foundations and miscellaneous pipe supports shall be
09/08/16
08/04/16
06/01/16
NO.
REV
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall design and detail reinforced cement concrete oily water
09/08/16 lift station as per sizing requirement with appropriate coating on inside and
DATE:
outside face as per SAUDI ARAMCO standards.
CERTIFIED
A M ALMATROOK
09/08/16
CONTRACTOR shall provide dewatering system based on the depth of lift
DATE: station and water table level and shall dispose the water to an approved
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
location by SAUDI ARAMCO.
09/08/16
DATE:
Sanitary lift stations
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall design and detail reinforced cement concrete sanitary lift
EDSD
station as per sizing requirement with appropriate coating on inside and outside
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
station and water table level and shall dispose the water to an approved
(DCC) NO. _____________________
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
If required CONTRACTOR shall provide steel structure and monorail to handle
sanitary pump.
ASH
ASH
ASH
Dike wall
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
DESCRIPTION
of SAES-B-005.
ISSUED FOR 60% FEL3
CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face.
CONTRACTOR shall weld 1.5 mm thick HDPE liner for dike area with HDPE
liner provided by other CONTRACTOR around the tank foundations.
below grade.
10-02399-
10-02399-
10-02399-
0001
0001
DATE
above grade.
09/08/16
08/04/16
06/01/16
NO.
REV
CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
DISCIPLINE
ENGINEER
provided inside dike area.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
Steel pipe support, pipe sleepers, structural platforms and crossovers
09/08/16
DATE:
CONTRACTOR shall provide structural pipe support, structural platforms and
CERTIFIED crossovers as per piping plans and design in accordance with SAUDI ARAMCO
A M ALMATROOK
09/08/16 standards. CONTRACTOR shall provide all structural calculations for SAUDI
DATE: ARAMCO approval.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
DATE: approval.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
DATE: crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
foundations as per stress analysis load data in accordance with SAUDI
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Culvert
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall design RCC culvert for all possible load cases and load
combinations as per SAUDI ARAMCO and AASHTO standards requirement.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Buildings
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
10-02399-
10-02399-
bolts shall be specified by vendor and selection of anchor bolt shall be as per
0001
0001
0001
DATE
Musallah
DISCIPLINE
ENGINEER
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
C
A
DATE:
as per architectural plans, sections and elevations.
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTACTOR shall perform structural design of Musallah building in
accordance with SAUDI ARAMCO standards and submit design calculations to
DATE:
CERTIFIED SAUDI ARAMCO for review and approval.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall refer to BRA report recommendation during detailed
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
design of building and shall prepare blast resistant design.
09/08/16
DATE:
Security Guard house (2 No’s)
OPERATIONS
SHAHZAD YAZDANI
09/08/16
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTACTOR shall perform structural design of security guard house building
in accordance with SAUDI ARAMCO standards and submit design calculations
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
design of building.
OF THIS DRAWING IS COVERED, FOR ALL
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTACTOR shall perform structural design of operator shelter building in
accordance with SAUDI ARAMCO standards and submit design calculations to
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Smoking shelter
DESCRIPTION
CONTRACTOR shall provide foundation for smoking shelter as per load data
for structural steel shelter and providing anchor bolts as per SAUDI ARAMCO
JO/EWO
standards.
10-02399-
10-02399-
10-02399-
0001
0001
DATE
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
09/08/16
08/04/16
06/01/16
NO.
REV
DATE: accordance with SAUDI ARAMCO standards and submit design calculations to
PROJECT
ALL LEADS
ENGINEER
SAUDI ARAMCO for review and approval.
09/08/16
DATE:
CONTRACTOR shall refer to BRA report recommendation during detailed
CERTIFIED design of building.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall pre-engineered space frame structural sunshade for FSF
CONSTRUCTION
AMR EL SHARKAWY
AGENCY sunshade.
09/08/16
DATE: CONTRACTOR shall provide PEB vendor space frame structural design
OPERATIONS
SHAHZAD YAZDANI calculation for SAUDI ARAMCO review and approval. Space frame design shall
09/08/16 be in accordance with SAUDI ARAMCO standards.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 CONTRACTOR shall provide foundation size as per vendor data. Design of
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Receiving substation
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________________
CONTRACTOR during detail design shall validate the use of SAUDI ARAMCO
library drawing for receiving substation and adopt appropriate structural
arrangement to support overhead crane for GIS room.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall perform structural design as per SAUDI ARAMCO
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
standards and provide design calculations to SAUDI ARAMCO for review and
approval.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
vendors for the design and fabrication of precast walls and double tee slabs.
Necessary loading on roof shall be considered for the design of double tee.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
on grade with required slopes towards oily water catch basins.
drawings.
10-02399-
10-02399-
10-02399-
0001
0001
DATE
vendors for the design and fabrication of precast walls and double tee slabs.
Necessary loading on roof shall be considered for the design of double tee.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER
CONTRACTOR shall provide transformer foundation as per Vendor data.
C
A
DATE: CONTRACTOR shall provide reinforced cement concrete fire walls for
PROJECT
ALL LEADS
ENGINEER transformers as per vendor data.
09/08/16
DATE: CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
A M ALMATROOK
CERTIFIED on grade with required slopes towards oily water catch basins.
09/08/16
DATE: Engineering & Maintenance (E & M) building
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE: as per architectural plans, sections and elevations.
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTACTOR shall perform structural design of security support building in
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
accordance with SAUDI ARAMCO standards and submit design calculations to
SAUDI ARAMCO for review and approval.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
design of building and shall prepare blast resistant design for main gate
security support building.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall provide structural pipe support and platforms for TCF
facility as required in accordance with SAUDI ARAMCO standards.
X-Ray Building
JO/EWO
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
10-02399-
0001
0001
DATE
DATE:
CONTRACTOR shall provide foundation for covered car parking as per SAUDI
OPERATIONS ARAMCO library drawings DA-950184.001, DA-950185.001.
SHAHZAD YAZDANI
09/08/16
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Chemical shelter
EDSD
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Remote I/O Buildings (2 No’s)
ASH
ASH
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
LEADS
LEADS
LEADS
ALL
ALL
ALL
design of building.
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
Operation building
C
A
DATE:
PROJECT CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ALL LEADS
ENGINEER
09/08/16
as per architectural plans, sections and elevations.
DATE:
CERTIFIED CONTACTOR shall perform structural design of Operation building in
A M ALMATROOK
accordance with SAUDI ARAMCO standards and submit design calculations to
09/08/16
DATE:
SAUDI ARAMCO for review and approval.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall refer to BRA report recommendation during detailed
DATE:
design of building.
OPERATIONS
SHAHZAD YAZDANI
Security Support foundations
09/08/16
DATE:
CONTRACTOR shall provide continuous concrete anchor constructed
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
DATE:
CONTRACTOR shall provide foundations for fixed camera, PTZ camera, field
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG and shall be in compliance with SAUDI ARAMCO standards. Anchor bolts shall
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH be specified by vendor in accordance with SAUDI ARAMCO standards.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
standards.
DESCRIPTION
ISSUED FOR 60% FEL3
CONTRACTOR shall construct concrete duct banks for cable routing as shown
JO/EWO
in electrical drawings.
10-02399-
10-02399-
10-02399-
CONTRACTOR shall construct crash rated barriers, crash rated beams and
0001
0001
0001
DATE
valve boxes.
09/08/16
08/04/16
06/01/16
NO.
REV
DATE:
CONTRACTOR shall conduct site survey to finalize the locations of
OPERATIONS equipment’s and routing of piping, location of pipe supports, platforms and
SHAHZAD YAZDANI
09/08/16
crossovers inside SAMREF refinery.
DATE:
Equipment Foundations
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall provide concrete foundations for surge relief pumps,
EDSD
custody metering skid, meter prover and custody metering shelter (vendor
DATE:
package).
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall provide anchor bolts as per vendor requirement in
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH accordance with SAUDI ARAMCO standards.
ASH
ASH
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
of foundation, materials, quantities etc. the drawings those are being provided
10-02399-
10-02399-
10-02399-
to CONTRACTOR are for their reference and for cost estimate purpose. It is
0001
0001
0001
DATE
DATE: anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
PROJECT
ALL LEADS
ENGINEER of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
09/08/16 fluoropolymer/ceramic; galvanized bolts shall not be used.
DATE: Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107.
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall work in close coordination with cathodic protection and
DATE: leak detection sub-contractor regarding the scheduling and sequence of
CONSTRUCTION
AMR EL SHARKAWY
AGENCY construction.
09/08/16
DATE: CONTRACTOR shall submit allowable settlement limits for tanks foundations
OPERATIONS
SHAHZAD YAZDANI as per tank vendor specifications for SAUDI ARAMCO review and approval. In
09/08/16 case actual settlements are more than recommended and not acceptable to
DATE: Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
differential settlements are within the limits concurred by SAUDI ARAMCO.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall develop procedure and monitor tank settlement as per
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
API 650 standard and shall submit method statement to Saudi Aramco for
approval.
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Standard.
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
ISSUED FOR 60% FEL3
of SAES-B-005.
CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face and outer face of
tank ring beam.
10-02399-
10-02399-
above grade.
0001
0001
0001
DATE
CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
09/08/16
08/04/16
06/01/16
NO.
REV
DATE: Steel pipe support, pipe sleepers, structural platforms and crossovers
PROJECT
ALL LEADS
ENGINEER
09/08/16 CONTRACTOR shall provide structural pipe support, structural platforms and
DATE:
crossovers as per piping plans and design in accordance with SAUDI ARAMCO
CERTIFIED standards. CONTRACTOR shall provide all structural calculations for SAUDI
A M ALMATROOK
09/08/16
ARAMCO approval.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
09/08/16 approval.
DATE:
OPERATIONS
SHAHZAD YAZDANI
CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
09/08/16 crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
DATE:
foundations as per stress analysis load data in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all foundation design
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
General
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall conduct site survey to finalize the locations of
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
equipment’s and routing of piping, location of pipe supports, platforms and
crossovers inside Yanbu refinery.
ASH
ASH
ASH
CONTRACTOR shall conduct site visits to finalize the piping road crossing
LEADS
LEADS
LEADS
ALL
ALL
ALL
inside Yanbu refinery plant as per piping plans. CONTRACTOR shall check
available space inside existing culverts to cross pipes for proposed lines and if
space is not adequate to cross the proposed lines CONTRACTOR shall
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Equipment Foundations
CONTRACTOR shall provide slab on grade and toe wall as per vendor
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
DISCIPLINE
ENGINEER
IFC drawing for all equipment foundations.
C
A
ALI H GHAMDI
VERIFICATION
09/08/16 of foundation, materials, quantities etc. the drawings those are being provided
EDSD
to CONTRACTOR are for their reference and for cost estimate purpose. It is
CONTRACTOR’s responsibility to ensure that adequate tank foundations are
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
In case anchor bolts are required for tank anchorage to the foundations, then
(DCC) NO. _____________________
anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
fluoropolymer/ceramic; galvanized bolts shall not be used.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107. All
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH anchor bolts shall be torqued to specified requirements.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
construction.
as per tank vendor specifications for SAUDI ARAMCO review and approval. In
case actual settlements are more than recommended and not acceptable to
DESCRIPTION
Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
DATE
API 650 standard and shall submit method statement to Saudi Aramco for
DISCIPLINE
ENGINEER approval.
C
A
DATE:
CONTRACTOR shall design dike wall in accordance with Saudi Aramco
A M ALMATROOK
CERTIFIED Standard.
09/08/16
DATE: CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
CONSTRUCTION
AMR EL SHARKAWY
AGENCY of SAES-B-005.
09/08/16
DATE: CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
OPERATIONS
SHAHZAD YAZDANI appropriate HDPE insert on concrete dike wall inside face and outer face of
09/08/16 tank ring beam.
DATE:
CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
above grade.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
BY DRAWING COMPLETION CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall provide structural pipe support, structural platforms and
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
crossovers as per piping plans and design in accordance with SAUDI ARAMCO
standards. CONTRACTOR shall provide all structural calculations for SAUDI
ASH
ASH
ASH
ARAMCO approval.
LEADS
LEADS
LEADS
ALL
ALL
ALL
General
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
road crossings as proposed in pipeline drawings and this shall include but not
DISCIPLINE
ENGINEER
limited to soil excavation, backfilling, concrete lining, dewatering if required and
detour for open cut road crossings.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall conduct detailed geotechnical investigation at road
09/08/16 crossing location to assess soil condition to determine methodology to be used
DATE:
for thrust boring option.
CERTIFIED
A M ALMATROOK
09/08/16 If CONTRACTOR intends to use existing geotechnical report for sleeper
DATE: foundation designs along the route of pipelines, CONTRACTOR shall take prior
CONSTRUCTION
AMR EL SHARKAWY
AGENCY approval from SAUDI ARAMCO and prepare standalone report indicating use
09/08/16 of existing borehole for deriving bearing capacity for foundation design.
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall utilize project proposal geotechnical report 2015/104 for
09/08/16 assessing soil conditions for Yanbu –Jiddah Highway crossing and Yanbu
DATE: refinery exit crossing.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 Steel pipe support, pipe sleepers, structural platforms and crossovers
EDSD
crossovers as per piping plans and design in accordance with SAUDI ARAMCO
standards. CONTRACTOR shall provide all structural calculations for SAUDI
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
ARAMCO approval.
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
foundations as per stress analysis load data in accordance with SAUDI
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
GENERAL DESCRIPTION
DESCRIPTION
ISSUED FOR 60% FEL3
All exterior walls will be CMU and insulated and cladded with drywalls from
inside the buildings (Except Substation Building which will have precast panels
JO/EWO
10-02399-
10-02399-
All interior walls will be CMU and drywalls as per the standards and codes
0001
0001
0001
DATE
requirements.
09/08/16
08/04/16
06/01/16
NO.
REV
All exterior walls (Except Substation Building) will have plaster with paint
DISCIPLINE
ENGINEER finish.
C
A
All interior wall surfaces and exposed structures shall be painted and finished
DATE:
PROJECT
in accordance with SAES-H-101V.
ALL LEADS
ENGINEER
09/08/16
Buildings will have acoustical ceiling tiles where allowed by standards and
DATE: codes.
CERTIFIED
A M ALMATROOK
09/08/16
All roofs shall have waterproofing membrane system including complete
DATE:
CONSTRUCTION
AMR EL SHARKAWY
insulation and roof accessories in compliance with SAES-M-100.
AGENCY
09/08/16
All buildings will have finishing materials as per Building Design and Finishing
DATE:
OPERATIONS Guidelines (SAES-R-004) and as per the applicable standards.
SHAHZAD YAZDANI
09/08/16
Smoking Shelter is open (No walls) covered by steel structure shelter and
DATE:
including 4 wooden bench.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
Fire barriers shall be provided to separate different use area. Fire walls shall
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Telecom, HVAC, Electrical /UPS and Battery rooms. All fire barriers shall be
(DCC) NO. _____________________
Interior framing, members, finishes, partition, cabinets, doors, and trim, shall
REVISION
be non-combustible.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Provide gypsum board (fire rated and moisture resistant) drywall partitions
with insulation on metal studs with painted finish and ceramic tiles at wet
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
All ceramic wall tiles finished shall be full height extended to under face of
ceiling. Ceramic wall base shall be cove and rounded edges at exposed
corner angles.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
All separating wall shall be constructed to achieve a giving fire rating where
ISSUED FOR 60% FEL3
Provide 19 mm thick plywood and finished with 2 coats of fire retardant paint
to Telecommunication Room. Plywood shall be installed on a fire resistive wall
assembly such as type ‘X’ fire rated gypsum board or concrete wall.
Raised Access Floor shall be heavy grade access floor system with coated
steel and durable anti-static pressure laminate floor. Where required this shall
be chemical resistant and anti-static floor compound.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
and paint finished.
PROJECT
ALL LEADS
ENGINEER
09/08/16 Battery Room shall be exposed smooth surface concrete structure with acid
DATE:
resistant paint finished.
CERTIFIED
A M ALMATROOK
09/08/16
All fire rated doors assemblies shall be labeled by an approved international
DATE: testing agency. The labels shall comply with NFPA-80 and shall be permanently
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
affixed to the door frame. The label shall be applied at the factory and shall
09/08/16 show the following:
DATE:
OPERATIONS
SHAHZAD YAZDANI
Name of manufacturer.
09/08/16 Trademark of the third-party inspection agency.
DATE: Fire-protection rating.
Maximum transmitted temperature end point for fire door exit enclosure and
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
Smoke and draft control door shall show the letter “S” on the label.
DATE:
BY:
All fire rated doors shall be provided with required fire rating including smoke
and draft seals in accordance with IBC Chapter 7, and UL listed, with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Double door shall be provided with dust proof and astragal, weather strip and
door bottom sweep.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Provide all exit doors with panic devices as per IBC 2009, Section 1008.1.10
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH and SAES-B-014, Section 5.13 and SAES-P-103 , Section 6.2.4
ASH
ASH
All fire rated doors shall be provided with door closers and with smoke/in
tumescent seals to heads and both sides. Closer shall be specified to operate
LEADS
LEADS
LEADS
ALL
ALL
ALL
for individual door size/weight and for particular internal and external.
Provide all internal door sets paint finished galvanized steel and providing fire
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
and sound resistance where necessary. Doors with vision glass panel shall be
DESCRIPTION
Provide all external door paint finished, thermally insulated and fire-resistant
galvanized steel door with gas, dust and weather seals. Entrance door to air
lock shall be safety tempered clear glass on powder coated aluminum
finished.
10-02399-
10-02399-
0001
0001
0001
DATE
All buildings windows must have, LOW-E (on 2nd. Face) double glazed (6mm,
09/08/16
08/04/16
06/01/16
16mm, 6mm), reflective heat strengthen exterior & clear tempered interior
NO.
REV
DATE:
5.1. MAIN GATEHOUSE
PROJECT
ALL LEADS
ENGINEER
09/08/16
CIVIL
DATE:
CERTIFIED For civil scope refer to section 4.22.
A M ALMATROOK
09/08/16
DATE:
STRUCTURAL
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 For structural scope refer to section 4.25.
DATE:
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
6.
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
be mounted so that the extinguisher top is not more than 1.5 m above the
floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
ASH
ASH
ASH
extinguisher top is not more than 1.0 m above the floor level.
LEADS
LEADS
LEADS
ALL
ALL
ALL
TELECOMMUNICATION
ISSUED FOR 60% FEL3
CONTRACTOR shall provide this building 4 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
RJ45 modules in each faceplate outlets.
CONTRACTOR shall procure, install, test and commission one (1) Radio
Frequency Dispatch Terminal (RFDT) at the Guardhouse. The transceiver
shall be located at the Security Support Building and the control head at the
Guardhouse.
JO/EWO
Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support
Facility building for the connectivity required in the gatehouse. Cat 6
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
ELECTRICAL
NO.
REV
DATE:
PROJECT CIVIL
ALL LEADS
ENGINEER
09/08/16
Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste water from the
DATE:
CERTIFIED support buildings toilet sanitary pipe and shall be connected to sanitary
A M ALMATROOK
sewer network then heading to the sanitary lift station area. These will
09/08/16
DATE: include the provision of sanitary manholes, cleanouts and other fixtures.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop
DATE: to support building facilities toilet.
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
ARCHITECTURAL
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
main Musallah near the E & M building. The proposed Musallah capacity
shall be for approximately 45 persons with an ablution area and toilets.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
The proposed building shall be CMU external wall, concrete frame structure
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
and concrete roof slab with all utilities to be provided. For the proposed
ASH
LEADS
LEADS
ALL
STRUCTURAL
ALL
ALL
HVAC
DESCRIPTION
ISSUED FOR 60% FEL3
10-02399-
10-02399-
0001
0001
DATE
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER The condensate drain line from each HVAC Equipment shall be routed
C
A
DATE:
CERTIFIED CONTRACTOR shall provide and install supply and return GI ductwork
A M ALMATROOK
along with fiberglass insulation (50mm thick – Indoor, Density: 48 kg/m3
09/08/16
DATE:
& 100mm thick – Outdoor, Density: 48kg/m3) along with supports and
CONSTRUCTION
AMR EL SHARKAWY all accessories such as motorized volume dampers, volume control
AGENCY
09/08/16 dampers and Air terminal devices such as diffuser’s and grilles.
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
ALI H GHAMDI
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
CONTRACTOR shall ensure that all HVAC Equipment selected for the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
SAES-K-001.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide cladding for all externally exposed
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH ductwork with 0.9mm thick Aluminum sheet.
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide and install Exhaust Fans for the different
areas listed in the building as per HVAC Layouts along with all
accessories such as back draft dampers and disconnect switch.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
ISSUED FOR 60% FEL3
Fire & Smoke Dampers shall be installed on all fire rated walls and
these fire & smoke dampers shall be manufactured according to UL555
and UL 555S standard and shall bear a seal from UL.
10-02399-
10-02399-
0001
0001
DATE
DISCIPLINE
ENGINEER
C
A
DATE:
PROJECT
The DDC Panel shall provide following alarms (Audio & visual) as a
ALL LEADS
ENGINEER minimum:
09/08/16
DATE:
CERTIFIED
- Unit Trip Alarm
A M ALMATROOK - Dirty Filter Alarm
09/08/16
DATE:
- Low Airflow Alarm
CONSTRUCTION
AMR EL SHARKAWY
- High Temperature Alarm
AGENCY
09/08/16
DATE:
OPERATIONS
SHAHZAD YAZDANI
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
DATE:
BY:
CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
Panel & DCS.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
ASH
ASH
ASH
Intake duct as per layout drawing and shall be connected to DDC and
DCS System.
LEADS
LEADS
LEADS
ALL
ALL
ALL
The Testing and Air - Balancing requirements shall be provided for the
DESCRIPTION
PLUMBING
JO/EWO
10-02399-
10-02399-
0001
building. The water supply system shall provide both Cold and Hot
NO.
REV
DISCIPLINE water requirements to the building utility areas. For water supply layout,
ENGINEER
refer to drawing PL-A00002.001.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
CONTRACTOR shall provide and install hose bib with vacuum breaker
09/08/16 within close proximity of PACU unit for periodic washing.
DATE:
A M ALMATROOK
CERTIFIED CONTRACTOR shall ensure that the installation of water supply system
09/08/16 shall be in accordance with SAUDI ARAMCO Engineering Standards
DATE:
CONSTRUCTION
(SAES-S-060) and Uniform Plumbing Code (UPC).
AMR EL SHARKAWY
AGENCY
09/08/16
CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot
DATE:
OPERATIONS
water above ground pipes and CPVC Schedule 80 Pipe for the below
SHAHZAD YAZDANI
09/08/16
ground water supply pipes. The hot water pipes shall be provided with
DATE:
closed cell fiberglass insulation of density 64 kg/m3.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 Domestic hot water will be generated by point of use water heaters.
EDSD
being served.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall provide tie –in to the building water supply lines
(DCC) NO. _____________________
along with standard accessories such as Isolation valves and back flow
preventer. For details regarding the building tie-ins relevant civil
drawings shall be referred.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG DRAIN & VENT SYSTEM
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide and install complete drainage system
ASH
ASH
ASH
ALL
ALL
CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage &
DESCRIPTION
vent lines inside the building. The outside building underground drain
ISSUED FOR 60% FEL3
FIRE PROTECTION
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
will attract attention, and otherwise meet the requirements of NFPA 10,
Chapter 6.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER CONTRACTOR shall provide and Install Portable type Fire Extinguisher
09/08/16 inside the Buildings as per Table -1, SAES-B-019.
DATE:
A M ALMATROOK
CERTIFIED
CONTRACTOR shall install all fire Extinguisher units less than 18 kg
09/08/16 shall be mounted so that the extinguisher top is not more than 1.5 m
DATE:
CONSTRUCTION
AMR EL SHARKAWY
above the floor level. Extinguisher units weighing over 18 Kg shall be
AGENCY
09/08/16 mounted so that extinguisher top is not more than 1.0 m above the floor
DATE:
level.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 For the proposed Fire Protection layout refer to drawing # FI-A00026-
DATE: 001
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 ELECTRICAL
EDSD
FIRE PROTECTION
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
906, SAES-M-100.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Hand-type portable extinguisher shall be mounted in easily accessible
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
locations at grade. Their location shall be marked in RED in a way that
ASH
will attract attention, and otherwise meet the requirements of NFPA 10,
ASH
Chapter 6.
LEADS
LEADS
LEADS
ALL
ALL
ALL
shall be mounted so that the extinguisher top is not more than 1.5 m
ISSUED FOR 60% FEL3
ARCHITECTURAL
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
with 360 degree vision to control the access to the facility and to house
SAUDI ARAMCO security personnel. This guard-house will be provided
09/08/16
08/04/16
06/01/16
NO.
REV
one at the main entrance gate and one in tank farm area gate, between
DISCIPLINE
ENGINEER two lanes at each entrance and exit access. Main entrance gate will
C
A
09/08/16
DATE:
HVAC
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
CONTRACTOR shall provide and Install Wall Mounted Split A/c Units
(FCU-01 & FCU-02 both Duty) along with their corresponding Condensing
DATE:
BY:
Units (ACCU-1 & ACCU-2). For HVAC layout, refer to drawing HV-A00007-
REVISIONCERTIFICATION
001 for Security Guard House at Main Gate and HV-A000016-001 for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide & install vibration isolators etc. for the HVAC
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
equipment so that the installation is as per manufacturer’s
ASH
recommendation.
ASH
LEADS
CONTRACTOR shall provide & install the condensate drain line from
LEADS
LEADS
ALL
ALL
ALL
HVAC Equipment up to the nearest drain pit with proper slope and P trap.
TELECOMMUNICATION
CONTRACTOR shall provide this building 4 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
JO/EWO
CONTRACTOR shall procure, install, test and commission one (1) Radio
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
Guardhouse.
DISCIPLINE
ENGINEER
Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support
C
A
DATE:
PROJECT
Facility building for the connectivity required in the gatehouse. Cat 6
ALL LEADS
ENGINEER
protector modules shall be provided by the Contactor
09/08/16
DATE:
CERTIFIED
ELECTRICAL
A M ALMATROOK For Building electrical scope refer to section 4.15.
09/08/16
DATE:
5.4. OPERATOR SHELTER (2 Nos.)
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 ARCHITECTURE
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
Provide Two (2) 54 m2 air conditioned shelter within the operating area.
The shelter shall include lunch area, lockers, storage room, toilet and two
DATE:
offices: one for the field operators and the other for the area Supervising
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
Operator. The building shall be designed to accommodate a total of eight
users (building occupancy group B).
EDSD
DATE:
The proposed building shall be CMU external wall, concrete frame structure
BY:
and concrete roof slab with all utilities and communication systems to be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
provided.
OF THIS DRAWING IS COVERED, FOR ALL
CIVIL
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Provide 8” diameter RTR pipe, 80FEOD, for sanitary wastes from the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
support buildings toilet sanitary pipe and shall be connected to the sanitary
lift station which will pump the sanitary water to the lift station #1 in the
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop to
the plumbing pipes to supply building facilities toilet.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
FIRE PROTECTION
10-02399-
10-02399-
0001
0001
0001
DATE
locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
09/08/16
08/04/16
06/01/16
6.
NO.
REV
DISCIPLINE
ENGINEER
Dry chemical extinguisher shall be located on the building exterior of the
C
A
DATE:
STRUCTURAL
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
HVAC
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide & install vibration isolators, flexible
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
connections etc. for the HVAC equipment so that the installation is as per
manufacturer’s recommendation.
ASH
ASH
ASH
CONTRACTOR shall provide & install the condensate drain line from HVAC
LEADS
LEADS
LEADS
ALL
ALL
ALL
Equipment up to the nearest drain pit with proper slope and P trap.
ductwork with their fiber glass insulation along with supports and all
DESCRIPTION
CONTRACTOR shall provide and install Exhaust Fans for Toilet as per the
HVAC drawings.
sequence the HVAC Equipment and Exhaust Fans along with necessary
field devices such as temperature sensors, transmitters, pressure
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE The DDC Panel shall provide following alarms (Audio & visual) as a
ENGINEER
minimum:
C
A
DATE:
Unit Trip Alarm
PROJECT
ALL LEADS
ENGINEER
Dirty Filter Alarm
09/08/16 Low Airflow Alarm
DATE:
High Temperature Alarm
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall provide necessary termination details, interfacing and
DATE: wiring details and programming of DDC Panels to initiate alarms and to
CONSTRUCTION
AMR EL SHARKAWY
AGENCY sequence or shutdown HVAC Equipment.
09/08/16
DATE: CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
OPERATIONS
SHAHZAD YAZDANI Panel & DCS.
09/08/16
ALI H GHAMDI
VERIFICATION
09/08/16 CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
EDSD
Intake duct as per layout drawing and shall be connected to DDC and DCS
System.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The Testing and Air - Balancing requirements shall be provided for the
building as per the SAES-K-001 through an independent 3rd Party
CONTRACTOR approved by SAUDI ARAMCO.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
ASH
ASH
ASH
SAES-K-001.
LEADS
LEADS
LEADS
ALL
ALL
ALL
PLUMBING
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
system to serve toilet fixtures, Lavatories, Janitor sinks of the building. The
water supply system shall provide both Cold and Hot water requirements to
the building utility areas. For water supply layout, refer to drawing PL-
A00005.001.
CONTRACTOR shall provide and install hose bib with vacuum breaker
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
09/08/16
08/04/16
06/01/16
NO.
REV
DATE:
A M ALMATROOK
CERTIFIED CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot water
09/08/16 above ground pipes and CPVC Schedule 80 Pipe for the below ground
DATE:
CONSTRUCTION
AMR EL SHARKAWY
water supply pipes. The hot water pipes shall be provided with closed cell
AGENCY
09/08/16 fiberglass insulation of density 64 kg/m3.
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
DATE: Domestic hot water will be generated by point of use water heaters. Point of
CONTROL NUMBER
ALI H GHAMDI
use or “instantaneous” types will be provided for remote, single fixture
VERIFICATION
09/08/16
applications and will be mounted on the wall below the fixture being served.
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
CONTRACTOR shall provide tie –in to the building water supply lines along
with standard accessories such as Isolation valves and back flow preventer.
(DCC) NO. _____________________
For details regarding the building tie-ins relevant civil drawings shall be
referred.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG DRAIN & VENT SYSTEM
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide and install complete drainage system
including their piping, fittings, vents and fixtures. The design of drainage
ASH
ASH
ASH
LEADS
LEADS
ALL
CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage & vent
lines inside the building. The outside building underground drain and vent
lines shall be with RTR pipes.
CONTRACTOR shall provide Venting for all fixtures, including Floor Drains.
Venting systems will terminate through the roof with minimal roof
JO/EWO
penetrations.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
TELECOMMUNICATION
CONTRACTOR shall procure, install, test and commission the two (2)
09/08/16
08/04/16
06/01/16
NO.
REV
12VDC 250W 100-240VAC Power Supply and one (1) Ethernet Access
DISCIPLINE
ENGINEER Switch 24G POE+ 1-slot switch equipped with SFP pluggable 1000Base-LX
C
A
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall provide the required UTP Cat. 6 Patch Cords for the
EDSD
CONTRACTOR shall supply and install one (1) Distribution patch panel and
BY:
5 outlets for voice and data communication. UTP Cat 6 4-pr x 23 ga. Cable
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
ELECTRICAL
For Building electrical scope refer to section 4.15.
5.5. SMOKING SHELTER
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ARCHITECTURE
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The proposed shelter shall be steel framed structure and single skin steel roof.
DESCRIPTION
FIRE PROTECTION
will attract attention, and otherwise meet the requirements of NFPA 10,
Chapter 6.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
C
A
be mounted so that the extinguisher top is not more than 1.5 m above the
DATE:
PROJECT
floor level. Extinguisher units weighing over 18 Kg shall be mounted so
ALL LEADS
ENGINEER that extinguisher top is not more than 1.0 m above the floor level
09/08/16
DATE:
CERTIFIED
For the proposed Fire Protection layout refer to drawing # FI-A00034-001.
A M ALMATROOK
09/08/16
STRUCTURAL
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 For structural scope refer to section 4.25.
DATE:
OPERATIONS 5.6. FSF SUPPORT BUILDING
SHAHZAD YAZDANI
09/08/16
ARCHITECTURE
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall provide FSF Support Building of an approximate
area of 50 SM shall be located in-front of the new security gate house.
EDSD
and shall consist of one break room, office, kitchenette, weapon store
BY:
and a toilet.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
systems to be provided.
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG The current FSF Support building area is 50 SM as indicated in FSF Layout
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
drawing ARA00008-001. LSTK Contractor shall revise and submit all
affected deliverables based on 50 SM during detail design.
ASH
ASH
ASH
STRUCTURAL
LEADS
LEADS
LEADS
ALL
ALL
ALL
CIVIL
DESCRIPTION
and be provided with in 300 meter front of the bulk plant main gatehouse to
allow preliminary inspection by Facility Security Forces (FSF) government
agency.
Provide five (5) car parking lots for the FSF people working at the FSF.
Parking stall layout and wheel stop detail and pavement arrows and
cross walk markings shall be in reference as per standard drawing nos.
DD-950107 sheet 001 rev.00 and AD-036512 sheet 001 rev. 00
JO/EWO
10-02399-
10-02399-
0001
09/08/16
08/04/16
06/01/16
DISCIPLINE
concrete pavement.
ENGINEER
C
A
09/08/16
FIRE PROTECTION
DATE:
Placement of portable extinguisher in building shall comply with section
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
906, SAES-M-100.
EDSD
will attract attention, and otherwise meet the requirements of NFPA 10,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Chapter 6.
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide and Install Portable type Fire Extinguisher
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH inside the Buildings as per Table -1, SAES-B-019.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
001
HVAC
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall provide & install the condensate drain line from
09/08/16
08/04/16
06/01/16
HVAC Equipment up to the nearest drain pit with proper slope and P
NO.
REV
DISCIPLINE trap.
ENGINEER
C
A
DATE:
CONTRACTOR in general shall provide and install supply and Return
PROJECT GI ductwork with their fiber glass insulation along with supports and all
ALL LEADS
ENGINEER
09/08/16
accessories such as motorized volume damper, volume control
dampers and Air terminal devices as shown on the drawings.
DATE:
CERTIFIED
A M ALMATROOK
CONTRACTOR shall provide cladding for all externally exposed
09/08/16
DATE: ductwork with 0.9 mm thick Aluminum sheet.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16 CONTRACTOR shall provide and install Exhaust Fans as per the HVAC
DATE: drawings.
OPERATIONS
SHAHZAD YAZDANI
09/08/16 CONTRACTOR shall provide and install a Direct Digital Control Panel
DATE: to sequence the HVAC Equipment and Exhaust Fans along with
necessary field devices such as temperature sensors, transmitters,
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
The DDC Panel shall provide following alarms (Audio & visual) as a
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
minimum:
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
High Temperature Alarm
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide necessary termination details, interfacing
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
Panel & DCS.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
Intake duct as per layout drawing and shall be connected to DDC and
DCS System.
JO/EWO
The Testing and Air - Balancing requirements shall be provided for the
building as per the SAES-K-001 through an independent 3rd Party
CONTRACTOR approved by SAUDI ARAMCO.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall ensure that all HVAC Equipment selected for the
09/08/16
08/04/16
06/01/16
DISCIPLINE SAES-K-001.
ENGINEER
C
A
DATE:
PLUMBING
PROJECT
ALL LEADS
ENGINEER
09/08/16 WATER SUPPLY SYSTEM
DATE:
CERTIFIED CONTRACTOR shall provide and install complete water distribution
A M ALMATROOK
09/08/16
piping system to serve toilet fixtures, Lavatories, Janitor sinks of the
DATE: building. The water supply system shall provide both Cold and Hot
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
water requirements to the building utility areas. For water supply layout,
09/08/16 refer to drawing PL-A00007.001.
DATE:
OPERATIONS
SHAHZAD YAZDANI
CONTRACTOR shall provide and install hose bib with vacuum breaker
09/08/16 within close proximity of PACU unit for periodic washing.
DATE:
CONTRACTOR shall ensure that the installation of water supply system
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot
water above ground pipes and CPVC Schedule 80 Pipe for the below
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
ground water supply pipes. The hot water pipes shall be provided with
closed cell fiberglass insulation of density 64 kg/m3.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG fixture applications and will be mounted on the wall below the fixture
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH being served.
ASH
ASH
CONTRACTOR shall provide tie –in to the building water supply lines
along with standard accessories such as Isolation valves and back flow
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage &
vent lines inside the building. The outside building underground drain
and vent lines shall be with RTR pipes.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
Drains. Venting systems will terminate through the roof with minimal
roof penetrations.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE TELECOMMUNICATION
ENGINEER
CONTRACTOR shall procure, install, test and commission 1 analog
C
A
DATE:
phone.
PROJECT
ALL LEADS
ENGINEER
09/08/16
DATE:
CERTIFIED
A M ALMATROOK CONTRACTOR shall provide this building 1 outlet for voice
09/08/16
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to
DATE:
CONSTRUCTION
AMR EL SHARKAWY each RJ45 modules in each faceplate outlets.
AGENCY
09/08/16
DATE: ELECTRICAL
OPERATIONS
SHAHZAD YAZDANI For Building electrical scope refer to section 4.15.
09/08/16 5.7. RECEIVING SUBSTATION
DATE:
ARCHITECTURE
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
For the proposed building floor plan refer to drawing # ARA00003-001
ASH
ASH
LEADS
CIVIL
LEADS
LEADS
ALL
ALL
ALL
room.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
1.20m wide walk gate and one 4.0m wide drive gate.
NO.
REV
DISCIPLINE
ENGINEER
STRUCTURAL
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER
For structural scope refer to section 4.25.
09/08/16
DATE:
HVAC
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall provide & install Air Handling Units (AHU-01 Duty &
DATE: AHU-02 Standby) inside Mechanical Room. These Air Handling Units
CONSTRUCTION
AMR EL SHARKAWY
AGENCY (AHU-01 & AHU-02) are connected to their corresponding outdoor
09/08/16 Condensing units – ACCU-01 & ACCU-02 through refrigerant pipes
DATE: between these units as indicated on the HVAC Layout and route these
OPERATIONS
SHAHZAD YAZDANI pipes inside the trench from Condensing unit to the Mechanical Room. For
09/08/16 HVAC layout, refer to drawing HV-A00003.001 & 002.
DATE:
CONTRACTOR shall provide & install vibration isolators, flexible
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 connections etc. for the HVAC equipment so that the installation is as per
EDSD
manufacturer’s recommendation.
DATE:
BY:
CONTRACTOR shall provide and install bleed air fan and inertial filter and
fresh air intake stack at the fresh air system.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
connections etc. for the HVAC equipment so that the installation is as per
manufacturer’s recommendation.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide & install the condensate drain line from
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH HVAC Equipment up to the nearest drain pit with proper slope and P trap.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide and install Exhaust Fans for battery room as
per the HVAC drawings.
CONTRACTOR shall provide Explosion Proof motor for the Battery Room
Exhaust fans. Stainless steel ductwork & accessories shall be provided
inside Battery Room.
JO/EWO
Fire & Smoke Dampers shall be installed on all fire rated walls and these
fire dampers shall be manufactured according to UL 555 & UL555S
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE sequence the HVAC Equipment and Exhaust Fans along with necessary
ENGINEER
field devices such as temperature sensors, transmitters, pressure
C
A
DATE:
differential switches, damper actuators, duct smoke detectors and air-flow
PROJECT switches as per the requirements of SAUDI ARAMCO standards.
ALL LEADS
ENGINEER
09/08/16
The DDC Panel shall provide following alarms (Audio & visual) as a
DATE:
CERTIFIED minimum:
Unit Trip Alarm
A M ALMATROOK
09/08/16
DATE: Dirty Filter Alarm
CONSTRUCTION
AMR EL SHARKAWY
AGENCY Low Airflow Alarm
09/08/16
High Temperature Alarm
DATE:
OPERATIONS
SHAHZAD YAZDANI CONTRACTOR shall provide necessary termination details, interfacing
09/08/16 and wiring details and programming of DDC Panels to initiate alarms and
DATE: to sequence or shutdown HVAC Equipment.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
EDSD
emanating from Battery Room to DCS for alarm and to provide interfacing
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
between battery charger and battery room exhaust fans to trip the high
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
Intake duct as per layout drawing and shall be connected to DDC and DCS
ASH
ASH
ASH
System.
LEADS
LEADS
LEADS
ALL
ALL
ALL
The Testing and Air - Balancing requirements shall be provided for the
DESCRIPTION
CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
SAES-K-001.
PLUMBING
10-02399-
0001
0001
DATE
system to serve eye wash and shower station. For water supply layout,
refer to drawing PL-A00003-001.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER
CONTRACTOR shall provide and install hose bib with vacuum breaker
within close proximity of ACCU and AHU unit for periodic washing.
C
A
DATE:
PROJECT
ALL LEADS
ENGINEER CONTRACTOR shall ensure that the installation of water supply system
09/08/16 shall be in accordance with SAUDI ARAMCO Engineering Standards
DATE: (SAES-S-060) and Uniform Plumbing Code (UPC).
CERTIFIED
A M ALMATROOK
09/08/16 CONTRACTOR shall use PVC Schedule 80 Pipe for water supply of
DATE: above ground pipes and CPVC Schedule 80 Pipe for the below ground
CONSTRUCTION
AMR EL SHARKAWY
AGENCY water supply pipes..
09/08/16
DATE: CONTRACTOR shall provide tie –in to the building water supply lines
OPERATIONS
SHAHZAD YAZDANI along with standard accessories such as Isolation valves and back flow
09/08/16 preventer. For details regarding the building tie- in relevant civil drawings
DATE: shall be referred.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
DRAIN & VENT SYSTEM
EDSD
DATE:
including their piping, fittings, vents and fixtures. The design of drainage
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage & vent
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lines inside the building. The outside building underground drain and vent
lines shall be with RTR pipes.
ASH
ASH
ASH
CONTRACTOR shall provide and install Floor Drains with vented deep
LEADS
LEADS
LEADS
ALL
ALL
ALL
seal traps for battery rooms and mechanical rooms. All Mechanical Room
shall be provided with Floor Drains complete in place with Funnel and
Strainer assembly.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
Drains. Venting systems will terminate through the roof with minimal roof
penetrations.
tank in a readily accessible location just outside the facility. Venting serving
the acid waste system shall be extended to roof terminations through acid
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
resistant piping and shall be dedicated to the acid waste system according
to SAUDI ARAMCO Standards.
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
ENGINEER FIRE PROTECTION
C
A
DATE:
PROJECT Placement of portable extinguisher in building shall comply with section
ALL LEADS
ENGINEER
09/08/16
906, SAES-M-100.
DATE:
CERTIFIED Hand-type portable extinguisher shall be mounted in easily accessible
A M ALMATROOK
locations at grade. Their location shall be marked in RED in a way that will
09/08/16
DATE:
attract attention, and otherwise meet the requirements of NFPA 10,
CONSTRUCTION
AMR EL SHARKAWY Chapter 6.
AGENCY
09/08/16
DATE:
Dry chemical extinguisher shall be located on the building exterior of the
OPERATIONS
SHAHZAD YAZDANI
control building and electrical substations, near entrance.
09/08/16
DATE:
Carbon dioxide (CO2) extinguisher shall be located inside control room
building and electrical substation.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
EDSD
as required by SAES-B-014.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide and Install Portable type Fire Extinguisher
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH inside the Buildings as per Table -1, SAES-B-019.
ASH
ASH
CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
LEADS
LEADS
LEADS
ALL
ALL
ALL
TELECOMMUNICATION
CONTRACTOR shall procure, install, test and commission the two (2)
12VDC 250W 100-240VAC Power Supply and one (1) Ethernet Access
Switch 24G POE+ 1-slot switch equipped with SFP pluggable 1000Base-
LX Mini-GBIC Transceivers that support single mode fiber over 1310nm
wavelength with LC connector. The 1000Base-LX Mini-GBIC Transceiver
supports 9 micron single mode fiber up to a maximum distance of 10km.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
The Ethernet Access Switch 24G POE+ 1-slot switch shall be powered
NO.
REV
DATE:
CONTRACTOR shall procure, install, test and commission 3 IP phones.
PROJECT
ALL LEADS
ENGINEER
09/08/16
CONTRACTOR shall provide this building 3 outlets for voice
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
DATE:
CERTIFIED RJ45 modules in each faceplate outlets.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall provide outlet at the PSA cabinet to terminate one
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
VOIP telephone. One wall outlet shall also be provided for PSA
09/08/16 requirement.
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16 Redundant fiber cable to rack room of new operation building shall be
DATE: provided by the CONTRACTOR. In the Substation, separate entrance
facility for the fiber cable and separate cube IT cabinet shall be provided
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
DATE:
BY:
ELECTRICAL
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
ARCHITECTURE
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall provide Utility Power Substation Building of an
approximate area of 473 SM which shall be provided to accommodate
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CIVIL
yard.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DATE:
CONTRACTOR shall provide SAUDI ARAMCO General Purpose Fence
A M ALMATROOK
CERTIFIED type IV around transformer yard. CONTRACTOR shall provide 2 nos.
09/08/16 1.20m wide walk gate and one 4.0m wide drive gate.
DATE:
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
STRUCTURAL
DATE:
OPERATIONS
For structural scope refer to section 4.25.
SHAHZAD YAZDANI
09/08/16
DATE:
HVAC
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall provide & install Air Handling Units (AHU-01 Duty &
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
between these units as indicated on the HVAC Layout and route these
(DCC) NO. _____________________
pipes inside the trench from Condensing unit to the Mechanical Room. For
HVAC layout, refer to drawing HV-A00004.001 & 002.
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide & install vibration isolators, flexible
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
connections etc. for the HVAC equipment so that the installation is as per
ASH
manufacturer’s recommendation.
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide and install bleed air fan and inertial filter and
fresh air intake stack at the fresh air system.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
connections etc. for the HVAC equipment so that the installation is as per
ISSUED FOR 60% FEL3
manufacturer’s recommendation.
CONTRACTOR shall provide & install the condensate drain line from HVAC
Equipment up to the nearest drain pit with proper slope and P trap.
10-02399-
10-02399-
0001
0001
DATE
09/08/16
08/04/16
06/01/16
DATE: CONTRACTOR shall provide and install Exhaust Fans for battery room as
PROJECT
ALL LEADS
ENGINEER per the HVAC drawings.
09/08/16
DATE:
CERTIFIED
CONTRACTOR shall provide Explosion Proof motor for the Battery Room
A M ALMATROOK
Exhaust fans. Stainless steel ductwork & accessories shall be provided
09/08/16
DATE: inside Battery Room.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
09/08/16
Fire & Smoke Dampers shall be installed on all fire rated walls and these
DATE:
fire dampers shall be manufactured according to UL 555 & UL555S
OPERATIONS
SHAHZAD YAZDANI
standard and shall bear a seal from UL.
09/08/16
DATE:
CONTRACTOR shall provide and install a Direct Digital Control Panel to
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 sequence the HVAC Equipment and Exhaust Fans along with necessary
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The DDC Panel shall provide following alarms (Audio & visual) as a
(DCC) NO. _____________________
minimum:
Unit Trip Alarm
Dirty Filter Alarm
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
Low Airflow Alarm
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
High Temperature Alarm
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
DESCRIPTION
alarm to DCS.
10-02399-
10-02399-
10-02399-
CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
0001
0001
0001
DATE
Intake duct as per layout drawing and shall be connected to DDC and DCS
09/08/16
08/04/16
06/01/16
System.
NO.
REV
DISCIPLINE
ENGINEER
All necessary installation, pre-commissioning and termination works shall
C
A
09/08/16
PLUMBING
DATE:
CONTROL NUMBER
ALI H GHAMDI
WATER SUPPLY SYSTEM
VERIFICATION
09/08/16
EDSD
system to serve eye wash and shower station. For water supply layout,
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
CONTRACTOR shall provide and install hose bib with vacuum breaker
OF THIS DRAWING IS COVERED, FOR ALL
within close proximity of ACCU and AHU unit for periodic washing.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall use PVC Schedule 80 Pipe for water supply of above
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
ground pipes and CPVC Schedule 80 Pipe for the below ground water
ASH
supply pipes.
ASH
CONTRACTOR shall provide tie –in to the building water supply lines along
LEADS
LEADS
LEADS
ALL
ALL
ALL
with standard accessories such as Isolation valves and back flow preventer.
For details regarding the building tie- in relevant civil drawings shall be
referred.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
lines inside the building. The outside building underground drain and vent
lines shall be with RTR pipes.
10-02399-
10-02399-
10-02399-
CONTRACTOR shall provide and install Floor Drains with vented deep seal
0001
0001
0001
DATE
traps for battery rooms and mechanical rooms. All Mechanical Room shall
09/08/16
08/04/16
06/01/16
be provided with Floor Drains complete in place with Funnel and Strainer
NO.
REV
DISCIPLINE assembly.
ENGINEER
CONTRACTOR shall provide Venting for all fixtures, including Floor Drains.
C
A
DATE: Venting systems will terminate through the roof with minimal roof
PROJECT
ALL LEADS
ENGINEER penetrations.
09/08/16 CONTRACTOR shall provide seal trapped and vented floor drains in
DATE: Battery rooms to serve emergency shower and eye wash fixtures Drain,
CERTIFIED
A M ALMATROOK waste and vent piping shall be acid resistant type and shall be independent
09/08/16
DATE: of other drainage systems.
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
CONTRACTOR shall provide piping for waste to an acid neutralization tank
09/08/16
in a readily accessible location just outside the facility. Venting serving the
DATE: acid waste system shall be extended to roof terminations through acid
OPERATIONS
SHAHZAD YAZDANI
resistant piping and shall be dedicated to the acid waste system according
09/08/16
to SAUDI ARAMCO Standards.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
FIRE PROTECTION
09/08/16
EDSD
906, SAES-M-100.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
locations at grade. Their location shall be marked in RED in a way that will
(DCC) NO. _____________________
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
6.
Dry chemical extinguisher shall be located on the building exterior of the
REVISION
AHG
AHG
AHG
Carbon dioxide (CO2) extinguisher shall be located inside control room
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH
building and electrical substation.
ASH
control rooms, and PIBs, install two fire blankets and one basket type litter
LEADS
LEADS
LEADS
ALL
ALL
ALL
as required by SAES-B-014.
Provide water spray system in accordance with NFPA 15 since this
substation is considered critical.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
TELECOMMUNICATION
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall procure, install, test and commission the two (2)
12VDC 250W 100-240VAC Power Supply and one (1) Ethernet Access
09/08/16
08/04/16
06/01/16
NO.
REV
DISCIPLINE
Switch 24G POE+ 1-slot switch equipped with SFP pluggable 1000Base-LX
ENGINEER Mini-GBIC Transceivers that support single mode fiber over 1310nm
C
A
DATE:
wavelength with LC connector. The 1000Base-LX Mini-GBIC Transceiver
PROJECT
ALL LEADS
ENGINEER
supports 9 micron single mode fiber up to a maximum distance of 10km.
09/08/16 CONTRACTOR shall install Cube IT Rack to mount the Ethernet Access
DATE: Switch 24G POE+ 1-slot switch, 12VDC 250W 100-240VAC Power Supply,
CERTIFIED
A M ALMATROOK fiber optic/UTP copper patch panel and ancillaries.
DATE:
09/08/16
The Ethernet Access Switch 24G POE+ 1-slot switch shall be powered from
CONSTRUCTION
AMR EL SHARKAWY utility power source and UPS.
AGENCY
09/08/16 CONTRACTOR shall procure, install, test and commission 4 IP phones.
DATE: CONTRACTOR shall provide this building 2 outlets for voice
OPERATIONS
SHAHZAD YAZDANI communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
09/08/16
RJ45 modules in each faceplate outlets.
DATE:
CONTRACTOR shall provide outlet at the PSA cabinet to terminate one
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 VOIP telephone. One wall outlet shall also be provided for PSA
EDSD
requirement.
Redundant fiber cable to rack room of new operation building shall be
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
facility for the fiber cable and separate cube IT cabinet shall be provided for
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
the PSA.
(DCC) NO. _____________________
Redundant and separate 12 core fiber cable (separate for Control System
and Communication) from Utility Substation in YDH to Relay Room of
MARAFIQ Substation 91 shall be provided by the CONTRACTOR. In
REVISION
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Substation 91, wall mounted fiber patch panel shall be provided by the
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH CONTRACTOR
ASH
ASH
ELECTRICAL
LEADS
LEADS
LEADS
ALL
ALL
ALL
CIVIL
ISSUED FOR 60% FEL3
Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste from this
building toilet sanitary pipe and shall be connected to sanitary sewer
network then heading to the sanitary lift station area. These will include
the provision of sanitary manholes, cleanouts and other fixtures.
Provide 2” diameter RTR pipe, 1FE0U water supply to all toilet and wash
area.
JO/EWO
10-02399-
10-02399-
0001
0001
DATE
DATE: from battery room. The discharge water from neutralization pit shall be
PROJECT
ALL LEADS
ENGINEER connected to OWS system.
09/08/16
DATE: CONTRACTOR shall provide 8” RTR pipe, IFE0U oily water sewer
CERTIFIED
A M ALMATROOK connection from Workshop room to OWS system.
09/08/16
DATE:
CONSTRUCTION
FIRE PROTECTION
AMR EL SHARKAWY
AGENCY
09/08/16
Placement of portable extinguisher in building shall comply with section
DATE:
906, SAES-M-100.
OPERATIONS
SHAHZAD YAZDANI
09/08/16
Hand-type portable extinguisher shall be mounted in easily accessible
DATE:
locations at grade. Their location shall be marked in RED in a way that will
CONTROL NUMBER
ALI H GHAMDI
attract attention, and otherwise meet the requirements of NFPA 10,
VERIFICATION
09/08/16
Chapter 6.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide Fire Hose Cabinets System with all Piping,
Fittings, Cabinets, Gate Vales, Y-Strainers as per NFPA and as shown on
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
ISSUED FOR 60% FEL3
ARCHITECTURE
battery room, E-learning room, library, meeting room, break room, store,
locker room, tea room and toilets. The building will accommodate a total of
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE structure and concrete roof slab, with all utilities and communication
ENGINEER systems to be provided. For the proposed building floor plans refer to
C
A
09/08/16
AHU-02 Standby) inside Mechanical Room on Ground Floor to serve the
offices and essential service rooms provided on the ground floor and first
DATE:
floor. These Air Handling Units (AHU-01 & AHU-02) are connected to their
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
corresponding outdoor Condensing units ACCU-01 & ACCU-02 through
EDSD
004.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
supply duct of Air Handling Units (AHU-01 & AHU-02) in order to meet
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG design comfort humidity requirements and humidity control requirements of
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH Telecom rooms (GF & FF).
ASH
ASH
CONTRACTOR shall provide and install Fresh Air Stack complete with all
accessories at locations shown on the HVAC layout drawings.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide and install inertial filter and Bleed fan to
remove sand particles in Fresh Air before the duct work is connected to the
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
ISSUED FOR 60% FEL3
CONTRACTOR shall provide and install sand trap louver for the fresh air
intake of PACU unit.
CONTRACTOR shall provide & install ceiling mounted split type HVAC unit
as standby serving the Telecom Rooms (FCU-01/ACCU-01 and FCU-
02/ACCU-02 for Telecom Room GF and FCU-03/ACCU-03 for Telecom
Room FF) respectively along with interconnecting refrigerant pipes and
ductwork to serve these rooms.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
DATE
manufacturer’s recommendation.
09/08/16
08/04/16
06/01/16
CONTRACTOR shall provide & install the condensate drain line from
NO.
REV
DISCIPLINE HVAC Equipment up to the nearest drain pit with proper slope and P trap.
ENGINEER
C
A
DATE:
CONTRACTOR in general shall provide and install supply and Return GI
PROJECT ductwork with their fiber glass insulation along with supports and all
ALL LEADS
ENGINEER
09/08/16
accessories such as motorized volume dampers, fire/smoke dampers,
backdraft dampers, volume control dampers and air terminal devices as
DATE:
CERTIFIED shown on the drawings.
A M ALMATROOK
09/08/16
DATE: CONTRACTOR shall provide and Install VAV terminal units with Heaters
CONSTRUCTION
AMR EL SHARKAWY
AGENCY
for the office areas as mentioned in the HVAC Layouts to maintain the
09/08/16 comfort conditions.
DATE:
OPERATIONS
SHAHZAD YAZDANI
CONTRACTOR shall provide and install Exhaust fans for the Battery
09/08/16 Room with explosion proof motor. Stainless steel ductwork & accessories
DATE:
shall be provided inside Battery Room.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 CONTRACTOR shall provide cladding for all externally exposed ductwork
EDSD
CONTRACTOR shall provide and install Exhaust Fans for the Toilet, Tea
room and Lunch room as per the HVAC drawings.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Fire & Smoke Dampers shall be installed on all fire rated walls and these
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide and install a Direct Digital Control Panel to
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
sequence the HVAC Equipment and Exhaust Fans along with necessary
field devices such as temperature sensors, transmitters, pressure
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The DDC Panel shall provide following alarms (Audio & visual) as a
minimum:
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
JO/EWO
10-02399-
0001
0001
DATE
emanating from Battery Room to DCS for alarm and to provide interfacing
between battery charger and battery room exhaust fans to trip the high
09/08/16
08/04/16
06/01/16
DISCIPLINE
ENGINEER
CONTRACTOR shall provide high temperature alarm, common trouble
C
A
DATE: The Testing and Air - Balancing requirements shall be provided for the
OPERATIONS
SHAHZAD YAZDANI building as per the SAES-K-001 through an independent 3rd Party
09/08/16 CONTRACTOR approved by SAUDI ARAMCO.
DATE:
CONTRACTOR shall ensure that all HVAC Equipment selected for the
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 project are as per the EER requirements tabulated under Chapter 7 of
EDSD
SAES-K-001.
DATE:
BY:
PLUMBING
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Shower of the building. The water supply system shall provide both Cold
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and Hot water requirements to the building utility areas. For water supply
layout, refer to drawing PL-A00001-001.
ASH
ASH
ASH
CONTRACTOR shall provide and install hose bib with vacuum breaker
LEADS
LEADS
LEADS
ALL
ALL
ALL
within close proximity of ACCU & AHU and PACU units for periodic
washing.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot water
above ground pipes and CPVC Schedule 80 Pipe for the below ground
water supply pipes. The hot water pipes shall be provided with closed cell
fiberglass insulation of density 64 kg/m3.
Domestic hot water will be generated by point of use water heaters. Point
of use or “instantaneous” types will be provided for remote, single fixture
JO/EWO
applications and will be mounted on the wall below the fixture being
served.
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
CONTRACTOR shall provide tie –in to the building water supply lines
09/08/16
08/04/16
06/01/16
along with standard accessories such as Isolation valves and back flow
NO.
REV
DISCIPLINE preventer. For details regarding the building tie-ins relevant civil drawings
ENGINEER shall be referred.
C
A
DATE:
PROJECT DRAIN & VENT SYSTEM
ALL LEADS
ENGINEER
09/08/16
CONTRACTOR shall provide and install complete drainage system
DATE:
CERTIFIED including their piping, fittings, vents and fixtures. The design of drainage
A M ALMATROOK
system shall be in accordance with SAUDI ARAMCO Engineering
09/08/16
DATE:
Standards (SAES-S-060) and Uniform Plumbing Code (UPC). For drain
CONSTRUCTION
AMR EL SHARKAWY and vent layout, refer to drawing PL-A00001-002.
AGENCY
09/08/16
DATE:
CONTRACTOR shall use Schedule 40 PVC DWV Pipe for drainage & vent
OPERATIONS
SHAHZAD YAZDANI
lines inside the building. The outside building underground drain and vent
09/08/16
lines shall be with RTR pipes.
DATE:
CONTRACTOR shall provide Floor Drains with vented deep seal traps in
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16 all toilet rooms, kitchen and mechanical rooms. All Mechanical Room shall
EDSD
be provided with Floor Drains complete in place with Funnel and Strainer
assembly.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
Drains. Venting systems will terminate through the roof with minimal roof
OF THIS DRAWING IS COVERED, FOR ALL
penetrations.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG Waste and vent piping shall be acid resistant type and shall be
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH independent of other drainage systems.
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
the acid waste system shall be extended to roof terminations through acid
resistant piping and shall be dedicated to the acid waste system according
to SAUDI ARAMCO Standards.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
TELECOMMUNICATION
ISSUED FOR 60% FEL3
CONTRACTOR shall procure, install, test and commission the two (2)
JO/EWO
12VDC 250W 100-240VAC Power Supply and one (1) 24G POE+ 1-slot
switch equipped with SFP pluggable 1000Base-LX Mini-GBIC
10-02399-
10-02399-
10-02399-
0001
0001
Transceivers that support single mode fiber over 1310nm wavelength with
0001
DATE
DISCIPLINE
ENGINEER CONTRACTOR shall procure, install, test and commission the Redundant
C
A
Power Supply and one (1) Modular access switch equipped of 24-port
DATE:
PROJECT
10/100/1000Base-T and 20-Port 10/100/1000Base-T/4-SFP combo ports
ALL LEADS
ENGINEER
with SFP pluggable 1000Base-LX Mini-GBIC Transceivers that support
09/08/16
single mode fiber over 1310nm wavelength with LC connector. The
DATE:
CERTIFIED
1000Base-LX Mini-GBIC Transceiver supports 9 micron single mode fiber
A M ALMATROOK up to a maximum distance of 10km.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY
CONTRACTOR shall install Universal 19” Standard Rack to mount the
AGENCY
09/08/16 Access Switch, redundant Power Supply, fiber optic/UTP copper patch
panel and ancillaries.
DATE:
OPERATIONS
SHAHZAD YAZDANI
09/08/16
The Modular Access switch and Access Switch 24G POE+ 1-slot switch
shall be powered from utility power source and UPS.
DATE:
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
09/08/16
CONTRACTOR shall procure, install, test and commission 6 Basic IP
EDSD
CONTRACTOR shall provide the required UTP Cat. 6 Patch Cords for the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
The TR on the ground floor of this building shall be provided with two (2)
Distribution UTP patch panels and 13 outlets for voice and data
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
REVISION
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The TR on the first floor of this building shall be provided with two (2)
Distribution UTP patch panel and 28 outlets for voice and data
ASH
ASH
ASH
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
RJ45 modules in each faceplate outlets.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall procure, install, test and commission One (1) Radio
Frequency Dispatch Terminal (RFDT) at the Foreman Room of E & M
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Building. The transceiver shall be located at the TR room and the control
DESCRIPTION
ELECTRICAL
CIVIL
Provide 8” diameter RTR pipe, 80FEOD, for sanitary wastes from this
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
DISCIPLINE
ENGINEER
Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop to
C
A
09/08/16 Placement of portable extinguisher in building shall comply with section 906,
DATE: SAES-M-100.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
DATE:
BY:
6.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
be mounted so that the extinguisher top is not more than 1.5 m above the
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
For the proposed Fire Protection layout refer to drawing # FI-A00031-001 &
FIA00031-002.
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
DESCRIPTION
ARCHITECTURE
ISSUED FOR 60% FEL3
The proposed building shall be CMU external wall, concrete frame structure
and concrete roof slab with all utilities and communication systems to be
10-02399-
10-02399-
10-02399-
0001
0001
0001
DATE
provided.
09/08/16
08/04/16
06/01/16
For the proposed building floor plan refer to drawing # ARA00007-001 and
NO.
REV
DISCIPLINE ARA00007-004
ENGINEER
C
A
STRUCTURAL
DATE:
PROJECT
ALL LEADS
ENGINEER
09/08/16
For structural scope refer to section 4.25.
DATE:
CERTIFIED HVAC
A M ALMATROOK
09/08/16
DATE:
CONTRACTOR shall provide & install Package Air conditioning Units
CONSTRUCTION
AMR EL SHARKAWY (PACU-01 Duty & PACU-02 Standby) outside the building as per the location
AGENCY
09/08/16 shown on the HVAC layout drawings HV-A00008-001 & 002 for Security
DATE:
Support Building at Main Gate and HV-A00017-001 & 002 for Security
OPERATIONS
SHAHZAD YAZDANI
Support Building at Tank Farm.
09/08/16
DATE:
CONTRACTOR shall provide & install vibration isolators, flexible
connections etc. for the HVAC equipment so that the installation is as per
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
CONTRACTOR shall provide & install the condensate drain line from HVAC
DATE:
Equipment up to the nearest drain pit with proper slope and P trap.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
ductwork with their fiber glass insulation along with supports and all
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
CONTRACTOR shall provide cladding for all externally exposed ductwork
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASH with 0.9 mm thick Aluminum sheet.
ASH
ASH
CONTRACTOR shall provide and install Exhaust Fans for the Toilet as per
the HVAC drawings.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide and install Exhaust fans for the Battery Room
with explosion proof motor and shall be UL listed. Stainless steel ductwork &
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
Fire & Smoke Dampers shall be installed on all fire rated walls and these fire
& smoked dampers shall be manufactured according to UL555S standard
and shall bear a seal from UL.
10-02399-
10-02399-
0001
0001
0001
DATE
The DDC Panel shall provide following alarms (Audio & visual) as a
minimum:
09/08/16
08/04/16
06/01/16
DATE: CONTRACTOR shall provide wiring for the high Temperature alarms
OPERATIONS
SHAHZAD YAZDANI emanating from Battery Room to DCS for alarm and to provide interfacing
09/08/16 between battery charger and battery room exhaust fans to trip the high rate
DATE: battery charge in case of failure of HVAC Equipment.
CONTROL NUMBER
ALI H GHAMDI
VERIFICATION
alarm to DCS.
DATE:
BY:
CONTRACTOR shall provide & install Gas Detectors on the Fresh Air Intake
REVISIONCERTIFICATION
duct as per layout drawing and shall be connected to DDC and DCS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV.CNO.__________
CERTIFICATE
System.
(DCC) NO. _____________________
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AHG
AHG
AHG
For CONTRACTOR shall provide wiring for the high Temperature alarms
ENGG CERT
SAY
SAY
SAY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
emanating from Battery Room to DCS for alarm and to provide interfacing
between battery charger and battery room exhaust fans to trip the high rate
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The Testing and Air - Balancing requirements shall be provided for the
building as per the SAES-K-001 through an independent 3rd Party
ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 90% PROJECT PROPOSAL
ISSUED FOR 60% FEL3
CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
SAES-K-001.
PLUMBING
10-02399-
10-02399-
0001
0001
0001
DATE
shower of the building. The water supply system shall provide both Cold
and Hot water requirements to the building utility areas. For water supply
09/08/16
08/04/16
06/01/16
DISCIPLINE
Main Gate and PL-A00013-001 for Security Support Building at Tank Farm.
ENGINEER
C
A
DATE:
CERTIFIED
CONTRACTOR shall provide and install hose bib with vacuum breaker
A M ALMATROOK
within close proximity of and PACU units for periodic washing.
09/08/16
DATE:
CONSTRUCTION
AMR EL SHARKAWY CONTRACTOR shall use PVC Schedule 80 Pipe for Cold and Hot water
AGENCY