EXECUTIVE SUMMARY 1
1. INTRODUCTION
1.1 General Project Description and Facilities 15
1.2 Purpose and Scope of Work 15
2. SITE CONDITIONS
2.1 Site Local Geology and General Description 17
2.2 Potential Geologic Hazards 18
2.3 Site Class & Liquefaction analysis 18
2.4 Site Topography and Surface Features 19
3. SUBSURFACE CONDITIONS
3.1 Stratigraphy 24
3.2 Subsurface Material Properties and General Description 25
3.3 Groundwater Table Depths 25
4. FIELD INVESTIGATIONS
4.1 Summary of Operations 27
4.2 Description of Sampling Procedures 27
4.2.1.a Standard Penetration Tests 27
4.2.1.b Undisturbed Samples 28
4.3 Logs of Borings 30
4.4 Other in-situ tests 30
4.4.1 Seismic cross-hole Tests 30
4.4.2 Piezo cone Penetration Tests 32
4.4.3 Electrical Resistivity tests 33
4.4.4 Seismic Refraction tests 34
4.4.5 Thermal Resistivity tests 35
4.4.6 Excavation of test pits and Collection of bulk samples 36
4.4.7 Photographs of field operations 36
5. LABORATORY TESTS
5.1 Description of Tests 37
5.2 Presentation and Discussion of Test Results 38
5.3 Chemical Analysis of Soils & Water 40
6. FOUNDATION RECOMMENDATIONS
6.1 General 41
6.2 Geotechnical Evaluation 41
6.3 Shallow foundations 43
6.3.1 Criteria 43
6.3.2 Net Allowable Bearing Capacities 43
6.3.4 Spread footings 44
6.3.5 Increase in bearing capacity for short term loading & 51
Blasting
i
Geotechnical File No. 2015/104, Rev.2
9. SELECTED REFERENCES 89
ii
Geotechnical File No. 2015/104, Rev.2
ILLUSTRATIONS
Figure.
Vicinity Map 1
Facility Plot plan 2
Boreholes & other tests Location Plan 2a thru 2e
Generalized Subsoil profiles 3
Field SPT-N Tables 4 (a) thru 4(e)
SPT-N60 Tables 5 (a) thru 5(e)
iii
Geotechnical File No. 2015/104, Rev.2
APPENDIX-A
(Borehole Data)
Figure
Symbols A-85
APPENDIX- B
(Laboratory Test Data of Borehole Samples)
Figure
Summary of Laboratory Test Results on BH Samples B-1 thru B-31
Summary of Chemical Tests on Water Samples B-31(a)
Gradation Charts B-32 thru B-116
Plasticity Charts B-117 thru B-142
Direct Shear Test Plots B-143 thru B-149
Unconfined Compression Test Plots of cohesive soils B-150 thru B-159
Consolidation test plots B-160 thru B-167
APPENDIX-C
(Settlement Analysis Computations)
Burland & Burbidge’s Analysis for Elastic settlement computation C-1 & C-1a
Equation for NABC of Mat foundations C-2
Typical Settlement Computations for Spread foundations C-3 thru C-7
Typical calculations based on Shear Criteria for Spread C-8 thru C-11
Foundations
Typical NABC Computations for Mat foundations C-12 thru C-14
Input & Out files of Settle 3D Software for All Tank C-15 thru C-36(b)
iv
Geotechnical File No. 2015/104, Rev.2
APPENDIX – D
(Seismic Cross-hole Test Data)
APPENDIX-E
(Piezo-cone Penetration Test Data)
APPENDIX-F
(Seismic Refraction Test Data)
APPENDIX-G
(Electrical Resistivity Test Data)
v
Geotechnical File No. 2015/104, Rev.2
APPENDIX-H
(Laboratory Test Data of Bulk Samples)
APPENDIX-I
(Field Thermal Resistivity Test Data)
APPENDIX-J
(Site classification & Liquefaction Analysis)
vi
Geotechnical File No. 2015/104, Rev.2
APPENDIX-K
(Typical Charts and Equations)
APPENDIX-L
(Calibration Certificates)
APPENDIX-M
(Compliance statement)
vii
Geotechnical File No. 2015/104, Rev.2
GEOTECHNICAL INVESTIGATION
FOR
YANBU DISTRIBUTION HUB (YDH) PROJECT, YANBU
(Sub Contract No.: SC-5723-2118K, Rev.1)
EXECUTIVE SUMMARY
A. General
As stated in OEO’s Endorsement Letter, the dimensions, locations and loads of all
proposed structures were not available when the Endorsement Letter was prepared.
As a result, OEO stated in the Endorsement letter that the SOW “may be” sufficient.
MHDP made the missing information available to OEO only a few days before
starting of the field work. Furthermore, MHDP informed OEO the IFC
st
drawings/documents will be issued to the LSTK contractors on May 31 , 2016.
Accordingly, it was not possible to drill additional boreholes due to time limitations.
However OEO has added extra five PCPTs at locations where suspected weak
zones were anticipated and the soil replacement was deepened in one tank in light of
the results of the extra PCPT. OEO suggests that LSTK Contractor undertakes four
confirmatory boreholes during the LSTK Contractor detailed geotechnical study. This
statement is added to the report.
The geotechnical investigation comprised a total of eighty four (84) boreholes, {50
boreholes 20m & 34 boreholes 30m}, five (5) Piezocone Penetration Tests (PCPTs),
twenty (20) soil resistivity tests, five (5) In-situ thermal resistivity tests, seven (7)
Cross-hole seismic tests, five (5) shallow seismic refraction soundings and
Excavation of Test Pits at fourteen (14) locations including field density tests at 0.30
1
Geotechnical File No. 2015/104, Rev.2
m interval right from surface, Collection of Bulk samples for laboratory Testing from
each test pit locations. Plans showing boreholes and all other tests locations are
included in Figure 2a thru 2e. Facility Plot Plan for tank farm area & other units is
presented in Figure 2.
The stratigraphy from 84 boreholes consists of primarily granular (sands & gravels)
soils within the depths of investigation. Fine grained soils (clays & silts) were
encountered in few boreholes mainly at deeper depths and in very few boreholes fine
grained soils were noticed at shallow depths. Presence of fine grained within in the
shallow depths of boreholes is presented in Table 2.
Based on the corrected Standard Penetration Test (SPT) N60-values and correlations
as presented in Table 3, the compactness of the granular soils has been observed to
vary from medium dense to very dense except for loose layers in borehole BH-82
and the consistency of fine-grained soils has been observed to be very stiff & hard in
general. Loose granular soils were encountered within top 4.5m depth in borehole
BH-82. Stiff fine grained soils were encountered at a depth of 1.5m-3m in BH-5,
1.5m-2.25m in BH-17 & 18. Layer of medium stiff fine grained soils were noticed at a
depth of 3m to 3.75m in BH-29.
Granular soils included well graded to poorly graded gravels with varied amounts of
silt, well graded to poorly graded gravels, silty clayey gravels, silty gravels, well
graded to poorly graded sands, well graded to poorly graded sands with varied
amounts of silt, silty sand, silty clayey sands, clayey sands, which are classified into
GW-GM, GP-GM, GW, GP, GC-GM, GM, SW, SP, SW-SM, SP-SM, SM, SC-SM and
SC groups as per ASTM D- 2487. Fine-grained soils included sandy silt, sandy silty
clay, sandy lean clay and sandy fat clay, which are classified into ML, CL-ML & CL
groups as per ASTM D-2487.
2
Geotechnical File No. 2015/104, Rev.2
Topography: Existing ground elevations within the boreholes (as presented in Table
1) varied between +2.48m & +5.84m indicating a difference in elevation of about
3.36m except for boreholes BH-82 & 83. These 2 boreholes are located in higher
elevation of +10.36m & +11.27m for BH-82 & BH-83, respectively. The elevations of
test locations are with relative to Saudi Aramco Vertical Datum (SAVD-78).
The GWT readings were recorded during the period of the field work in April-May
2016. The groundwater table was encountered at depths of 1.5m to 5m below
existing ground levels at the borehole locations BH-1 thru BH-81 & BH-84. Ground
water table was encountered at deeper depths of 9.5m & 10.4m in BH-82 & BH-83,
respectively, due to higher ground level at these boreholes. The variation in GWT
was consistent with the ground surface undulations in general. A possible fluctuation
of about 1.0m can be anticipated due to seasonal and tidal variations. Nine (9) stand
pipe piezometers {in boreholes P01, P07, P13, P19, P25, P28, P34, P37 & P45}
were installed and ground water levels were monitored during our field work in April-
May, 2016.
C. Recommendations
According to SOW, proposed Yanbu Distribution Hub project includes the mainly
construction of 20 tanks, in which six (6) Gasoline tanks, three (3) Diesel tanks, one
(1) DPK tank, three (3) DPK/KEROSINE tanks, one (1) T&I Diesel/DPK tank, two (2)
Slop tanks, two (2) Fire water tanks, one (1) Utility water tank and one (1) Surge
relief tank and other structural units with design details & sizes as provided by client
is presented in Tables 9, 9(a), 9(b), 9(c) & 10.
According to the SOW, the proposed structures/facilities other than tanks will be
founded on shallow foundations of spread & mat foundations. Tanks are founded on
ground supported ring wall foundation. Accordingly, the Report presents analysis and
discussion on the Spread foundations (Section 6.3), Mat foundations (Section 6.4)
and Tank foundations (Section 6.5).
The analysis has been carried out for given tank diameters with design applied stress
of 150 kPa and foundation depth of 0.6m, 1.0m & 1.5m below FGL using the Settle
3D computer software, considering idealized soil profile of under each tank.
Immediate and consolidation settlements evaluated using Settle 3D software
3
Geotechnical File No. 2015/104, Rev.2
considering idealized soil profile under each tank. Accordingly, estimated settlements
at center and at edge of tanks are presented in Table 14.
Settle 3D software considers very nominal time of 1 year for long term (creep)
settlements. Therefore, estimated settlements by settle 3D are increased 25% to
account for long term (creep) settlements over the period of 25 years in accordance
with SAES-A-113 using Schmertmann’s equation for time-dependent creep
settlements. Total estimated settlements at center and edge of tanks are summarized
in below Table.
4
Geotechnical File No. 2015/104, Rev.2
5
Geotechnical File No. 2015/104, Rev.2
S.NO. Type of structure BH Dia. of Design Depth of Total Estimated Immediate Long term Immediate Long term
covered Tank, m or Load, Foundation settlements (mm) Settlement settlement Settlement settlement
Foundation (kPa) from Final including long term (mm) (mm) (mm) (mm)
size Grade (m) settlement
@center @edge @center @edge
4 DPK tank D-0401 37,38,39 67 150 0.6 81 40 65 16 32 8
1.0 79 39 63.5 15.5 31.5 7.5
1.5 78 39 62.5 15.5 31 8
5 DPK/KER D-0402 34,35,36 55 150 27 7
OSINE 0.6 69 34 55 14
1.0 68 33 54 14 26 7
1.5 65 31 52 13 25 6
D-0403 31,32,33 55 150 0.6 70 34 56 14 27 6
1.0 69 33 55 14 26 7
1.5 66 32 53 13 25.5 6.5
D-0404 28,29,30 55 150 0.6 139.5 73.5 93.5 46 36.5 37
1.0 138.5 72.5 92 46.5 35.5 37
1.5 137 72 90 47 35 37
6 T&I D-0502 40,41,42 77 150 0.6 80 40 64 16 32 8
Diesel/DP 1.0 79 39 63.5 15.5 31 8
K 1.5 79 38 63 16 30.5 7.5
6
Geotechnical File No. 2015/104, Rev.2
S.NO. Type of structure BH Dia. of Design Depth of Total Estimated Immediate Long term Immediate Long term
covered Tank, m or Load, Foundation settlements (mm) Settlement settlement Settlement settlement
Foundation (kPa) from Final including long term (mm) (mm) (mm) (mm)
size Grade (m) settlement
@center @edge @center @edge
9 Utility X40-D- 50 5.5 70 2 1
water tank 0703 0.6 5 3 4 1
1.0 4 3 3 1 2 1
1.5 4 3 3 1 2 1
10 Surge X40-D- 51,52 20.5 100 7 2
0.6 18 9 14 4
relief tank 0801
6.5 1.5
1.0 16 8 12.5 3.5
6 2
1.5 15 8 12 3
Si: Immediate Settlement, SL: Long term Settlement.
From above Table it is noted that, higher settlements at center about 140-260mm & edge settlements about 72-150 mm are concern for
the tanks D-0102, D-0203 & D-0404 and these settlements are higher than permissible uniform settlement of 50 mm at edge as per API
650 procedure. For all other tank settlements are within the range of permissible uniform settlement of 50 mm at edge as per API 650
procedure. Therefore, soil improvement by excavation and replacement is recommended to a depth of 3m for Tanks D-0102 & D-0203,
and to a depth of 6m for Tank D-0404 to keep the anticipated settlements within the permissible limits. The soil improvement measures
are detailed in Section 6.5.4. In addition to these measures, any other measures required by Saudi Aramco shall be followed in the
ground improvement. Excavation considerations and Dewatering measures shall be recommended in case of deep excavation for Tank
D-0404. Excavation considerations and Dewatering measures are detailed in Section 7.2 & 7.7.
Note 1: In case that the facilities layout is modified, a new geotechnical campaign should be carried out by the LSTK contractor at the
new footprint of the facilities
Note 2: There may be possibilities that edge settlements during the hydro test are proved to be higher than the API tolerances of
50mm; any increase on the edge settlements / differential API limits should be provided by the awarded LSTK Contractor & relevant
Tank Vendor/Manufacturer in writing through a letter; amended tolerances shall be reviewed by CSD/Tank Specialists for their
concurrence.
7
Geotechnical File No. 2015/104, Rev.2
8
Geotechnical File No. 2015/104, Rev.2
Specific spread foundation sizes (square, rectangular & strip) and depths of
foundation below FGL is provided by the Client are considered in the analysis. The
design details of the spread foundation are presented in Tables 9, 9a, 9b & 9C.
For spread foundations, analysis has been carried out considering both shear criteria
using equations presented in Figure 5 & settlement criteria based on Burland &
Burbridge method, as per SAES-A-113. The Net Allowable Bearing Capacity (NABC)
values are selected based on the least values estimated by the shear and the
settlement criteria, and are presented in the following tables.
Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.
9
Geotechnical File No. 2015/104, Rev.2
The recommended net allowable bearing capacities are low in specific borehole
location BH-82 due to presence of loose granular soils up to 4.5m. These bearing
capacities shall be verified by designer against design requirements. In the event,
above bearing capacities at BH-82 do not meet the design requirements; we
recommend soil improvement (as per Section 6.5.4). Since borehole location is
shifted from original, designer shall ensure the presence of any structure at drilled
location.
Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.
10
Geotechnical File No. 2015/104, Rev.2
Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.
11
Geotechnical File No. 2015/104, Rev.2
The analysis has been carried out for mat sizes given by client for different structures
as presented in Table 10 using the Equation 7 (Figure C-2), considering lower
subsoil profiles of applicable boreholes under each structure. Accordingly, Net
Allowable Bearing Capacities (NABC) are presented in Table 10. Time factor of 1.5
for time period of 25 years is considered in recommending the Net allowable baring
capacity.
Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.
12
Geotechnical File No. 2015/104, Rev.2
The recommended maximum NABC should not exceed 400 kPa to avoid possible
non-linear load-settlement response underneath the mat foundations leading to
higher settlements than those calculated by Equation 7. However, NABC with values
of higher than 400 kPa may be used for mat foundations, if required, provided that
the load-displacement response of soil is further assessed by pressure meter testing
to determine the modulus of subgrade reaction of the soil.
Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.
The site is located within a zone of very light seismic activity. According to SAES-A-
112, the Peak Ground Acceleration at the site is 0.04g, where g is the gravity
acceleration. The Seismic Site Class varies from C to D across the site. However,
an amplification factor of 1.6 (Site Seismic Class D) and Earthquake Magnitude of
5.5 were conservatively adopted in the liquefaction analysis. The analysis indicated
that liquefaction is unlikely for the loosest granular soil encountered at the site.
OEO has undertaken five extra PCPTs (PCPTs 6 thru 10), which were not included
in the original Scope of Work, to verify the vertical extent of the shallow clay layer at
some tank locations. The results of these extra PCPTs indicated tip cone resistance,
qc, of less than 5 MPa in the top 3.0m for the soundings of PCPT-6, 7 & 8 and 3m-6m
13
Geotechnical File No. 2015/104, Rev.2
for the sounding of PCPT-9 and gradually increases with depth up to the refusal
stress (35 MPa). The values of qc were greater than 5 MPa for soundings of PCPT-1
thru 5 in general.
The apparent soil resistivity values varied from 1.3-93.0 Ohm-meters. A correlation
between soil resistivity and corrosivity is presented in Figure G-22 for general
information. Following this figure, the corrosivity could vary from very severe to mild.
CBR tests conducted on bulk samples that indicated CBR value between 12 to 56 at
95% compaction and 21 to 71 at 100% compaction. The soil rating system for sub
grade, sub base or base for use in the design of light traffic pavements in terms of
CBR values is reproduced in Figure H-69. Following this figure, the existing A-3, A-1-
b/A-2-4 soils could be categorized in general as ‘good to excellent’ sub-grade
materials to support pavements.
The chemical tests results are examined and compared with the exposure types as
per SAES Q-001 dated January 2016, reproduced in Figure K-8. As per the chemical
test results and following Figures K-8 thru K-8(b), consider S2 Sulfate Exposure & C2
Chloride Exposure and Cement type shall be Type V, Uncoated and Type I +
Pozzolan or Slag with Epoxy Coated Rebars (ECR), respectively. Overall, Type I +
Pozzolan or Slag with Epoxy Coated Rebars (ECR) is recommended. However,
concrete mix should be verified against exposure to sulfates attack.
D. Other Aspects
The report also includes soil design parameters and discussions regarding some of
the construction aspects including but not limited to site preparation, foundation
protection, dewatering, erosion protection etc. The Report concludes with the general
comments and limitations of the study and selected references. All field & laboratory
test data and typical analyses are presented in the Illustrations & Appendices as
stated in the report.
14
Geotechnical File No. 2015/104, Rev.2
1. INTRODUCTION
The objective of the YANBU DISTRIBUTION HUB PROJECT (YDH) (Saudi Aramco
BI-10-02399) project is to efficiently meet the kingdom’s refined product demands in
Makkah province. The Yanbu Distribution Hub (YDH) will aggregate refined product
from the three (3) local refineries (SAMREF, YASREF, and Yanbu) and act as the
origin pump station for at least two (2) connecting pipelines, the Yanbu to Jeddah
pipeline and the Yanbu to Central Region pipeline. A detailed geotechnical
investigation was undertaken at the current project for the design of the proposed
facilities. Mustang Al Heijailan Dar PI (MUSTANG) has been appointed as design
consultant for this project.
15
Geotechnical File No. 2015/104, Rev.2
• Performing seven (7) cross-hole seismic tests at given locations as per Table
1a.
• Conducting five (5) shallow refraction seismic soundings at the locations
given in Table 1a.
• Excavation of fourteen (14) tests pits at specified locations as given in Table
1a to 1.0 m depth, conducting Field Density tests at 0.30 m interval right from
surface and also collection of bulk sample from top 1.0 m for laboratory
testing of CBR.
• Physical & Chemical laboratory testing & analysis of borehole soil and water
samples.
• Preparation of this Interpretive Report on all field work and laboratory tests
data; and provide geotechnical and foundation recommendations.
Plans showing boreholes and all other tests locations are included in Figure 2a thru
2e. Test locations for geotechnical investigation are included in Figure 2b. Facility
Plot Plan for tank farm area & other units is presented in Figure 2.
The scope of work also includes but is not limited to executing an exploration
program, conducting field & laboratory testing and preparation of a geotechnical
engineering report summarizing our findings & field / laboratory test data and
incorporating recommendations regarding site preparation, bearing capacity values
for the given foundation sizes, depths and settlements for design pressures under the
tank foundations etc.
Borehole logs are presented in Appendix-A and laboratory tests data on borehole soil
& water samples are presented in Appendix-B. Other field tests data are included in
Appendix-D thru Appendix-I.
16
Geotechnical File No. 2015/104, Rev.2
2. SITE CONDITIONS
The project site is located about 30 to 40 km from Yanbu towards Jeddah, in Western
province of the Kingdom of Saudi Arabia. The western coast plain of Kingdom of
Saudi Arabia along the Red Sea is low in elevation, and is covered, in many areas,
by salt bearing deposits. While rainfall is low, occasional high intensity rainstorms
create flash floods resulting in flooding and development of water courses (wadis). In
some locations, salt bearing soils are absent and instead there exists terraces of
coralline limestone overlooking the Red Sea. Further inland, localized deposits of
argillaceous silts and gypsum outcrops can be found. West of the coastal plains,
offshore coral banks and reefal limestone can be found either outcropping or covered
with mostly carbonate sands. The coastal plains of Red Sea (Tihama) rise gently into
eastern plain, consisting of granular soils (sands, gravel, boulders and cobbles,
overlaying tertiary limestone, shale, siltstone and sandstone) or crystalline rocks.
The Red Sea coastal zone can be divided into broadly defined zones each of which
is topographically distinct. Running parallel to the coast and few (about 10km) inland
from the site is range of mountains that comprise the scarp of Arabian shield. The
rocks are pre-Cambrian and consist of a complex set of igneous and metamorphic
rocks. Material has eroded from these mountains to form the coastal plain, which
consists of gravel, sand and silt as a network of interlinked alluvial fans and gravel
mounds. At many locations along the coastaline, these deposits extend from the
shoreline out to the coral reef, intermixing with the reef deposits. The formation of the
coralline deposits can be related to changes in the sea level in geologically recent
times. Initially the sea level was considerably lower relative the land surface than at
present. Reefs were formed at this level and the thickness increased initially with the
reef growth and other processes associated with the changes in sea level.
Generalized geologic map of the Arabian Peninsula is shown in Figure 3.
17
Geotechnical File No. 2015/104, Rev.2
The site is located within a zone of very light seismic activity. According to SAES-A-
112, the Peak Ground Acceleration at the site is 0.04g, where g is the gravity
acceleration. The earthquake-induced liquefaction triggering analysis published by
Youd et al. (2001) was implemented to assess the liquefaction potential based on the
SPT blow counts (N). The N values were corrected for hammer energy, as automatic
hammers were used in the investigation and the adopted method is based on N60.
The N values were also corrected for overburden stress effect and rod length
variation.
As per ASCE 07-05, the SPT-N values directly measured from field shall be used in
seismic site class assessment. However, SPT-N60 values (without overburden
correction) were adopted in seismic site class evaluation as automatic hammers
were used in the investigation. The Site Seismic Class assessment was carried out
for typical boreholes (presented in Figure J-2, J-3 & J-4, Appendix-J) and it varies
from Class C to Class D across the site. Class D, with a corresponding amplification
factor of 1.6 corresponding to Ss <= 0.25 (Table 3.4.2.3-1, AASHTO guide
specifications for LRFD Seismic Bridge Design) was assumed in the liquefaction. In
18
Geotechnical File No. 2015/104, Rev.2
The UTM co-ordinates of the boreholes under the current investigation, MSL
elevations, depths of Groundwater below existing ground levels and MSL elevations
of Ground water table are given in Table 1. These coordinates are referenced to the
International 1924 Ellipsoid, Ain (Ayn) Al Abd 1970 Datum. MSL Elevations are
referenced to SAVD 1978 Datum. These coordinates & elevations are also presented
in borehole logs Appendix A. Co-ordinates & elevations of bench marks used for
survey are presented in below Table 1.
Existing ground elevations within the boreholes (as presented in Table 1) varied
between +2.48m & +5.84m indicating a difference in elevation of about 3.36m except
for boreholes BH-82 & 83. Theses 2 boreholes are located in higher elevation of
+10.36m & 11.27m for BH-82 & BH-83, respectively. The elevations of test locations
are with relative to Saudi Aramco Vertical Datum (SAVD-78).
19
Geotechnical File No. 2015/104, Rev.2
Table 1
UTM Coordinates, Elevations of Boreholes & Ground Water Table
Depth Ain (Ayn) Al Abd 1970 Depth (m) MSL
MSL
(m) Datum of GWT Elevation
Elevation of
below below EGL of GWT
Northing EGL
Point EGL Easting
BH-01 30 2650110.93 430252.64 3.08 2.35 0.73
BH-02 20 2650128.80 430231.29 3.02 2.30 0.72
BH-03 20 2650093.10 430273.92 3.15 2.70 0.45
BH-04 30 2650027.90 430183.11 3.35 2.55 0.80
BH-05 20 2650045.76 430161.77 3.44 2.70 0.74
BH-06 20 2650010.07 430204.40 3.45 2.70 0.75
BH-07 30 2650234.10 430090.74 3.21 2.50 0.71
BH-08 20 2650251.96 430069.39 3.29 2.55 0.74
BH-09 20 2650216.27 430112.02 3.29 2.60 0.69
BH-10 30 2649917.10 430090.35 4.19 3.45 0.74
BH-11 20 2649934.97 430069.00 4.24 3.50 0.74
BH-12 20 2649899.27 430111.63 4.46 3.65 0.81
BH-13 30 2649834.07 430020.83 4.13 3.50 0.63
BH-14 20 2649851.93 429999.48 3.93 3.15 0.78
BH-15 20 2649816.23 430042.11 4.12 3.45 0.67
BH-16 30 2650137.99 430010.27 3.15 2.45 0.70
BH-17 20 2650155.85 429988.92 3.21 2.60 0.61
BH-18 20 2650120.16 430031.55 3.27 2.55 0.72
BH-19 30 2650591.85 429640.08 4.94 4.20 0.74
BH-20 20 2650612.73 429615.13 5.00 4.35 0.65
BH-21 20 2650571.00 429664.97 4.83 4.05 0.78
BH-22 30 2650472.74 429540.35 5.27 4.50 0.77
BH-23 20 2650493.62 429515.40 5.25 4.55 0.70
BH-24 20 2650451.86 429565.27 5.34 4.60 0.74
BH-25 30 2650353.63 429440.62 5.52 4.80 0.72
BH-26 20 2650374.51 429415.67 5.54 4.85 0.69
BH-27 20 2650332.78 429465.51 5.48 4.70 0.78
BH-28 30 2650425.79 429873.47 4.56 3.85 0.71
BH-29 20 2650443.65 429852.12 4.83 4.10 0.73
BH-30 20 2650407.96 429894.75 4.46 3.70 0.76
BH-31 30 2650341.18 429802.63 4.50 3.80 0.70
BH-32 20 2650359.04 429781.28 4.57 3.85 0.72
BH-33 20 2650323.35 429823.91 4.50 3.80 0.70
BH-34 30 2650256.57 429731.79 4.62 3.90 0.72
BH-35 20 2650274.43 429710.44 4.41 3.80 0.61
BH-36 20 2650238.74 429753.07 4.31 3.65 0.66
BH-37 30 2650162.00 429652.60 4.38 3.70 0.68
BH-38 20 2650183.56 429626.78 4.44 3.70 0.74
BH-39 20 2650140.36 429678.38 4.09 3.35 0.74
BH-40 30 2650935.09 429618.55 4.71 3.95 0.76
20
Geotechnical File No. 2015/104, Rev.2
21
Geotechnical File No. 2015/104, Rev.2
Table 1a
Coordinates & elevations of other tests locations
22
Geotechnical File No. 2015/104, Rev.2
23
Geotechnical File No. 2015/104, Rev.2
3. SUBSURFACE CONDITIONS
3.1 Stratigraphy
The stratigraphy from 84 boreholes consists of primarily granular (sands & gravels)
soils within the depths of investigation. Fine grained soils (clays & silts) were
encountered in few boreholes mainly at deeper depths and in very few boreholes fine
grained soils were noticed at shallow depths. Presence of fine grained within in the
shallow depths of boreholes is presented in Table 2.
Table 2
Presence of fine grained soils at shallow depths of Boreholes
Depth of occurrence of Boreholes
fine grained soils in Description
shallow boreholes
From (m) To (m)
1.5 3.0 BH-1 very stiff to hard, sandy lean clay (CL)
1.5 3.75 BH-2 very stiff to hard, lean clay (CL)
1.5 3.0 BH-5 stiff, sandy lean clay (CL)
1.5 3.0 BH-6 very stiff, sandy lean clay (CL)
3.0 4.5 BH-7 thru 9 very stiff to hard, sandy lean clay (CL)
0.0 3.0 BH-16 thru 17 stiff to very stiff, sandy lean clay (CL)
1.5 2.25 BH-18 stiff, sandy lean clay (CL)
Based on the corrected Standard Penetration Test (SPT) N60-values and correlations
as presented in Table 3, the compactness of the granular soils has been observed to
vary from medium dense to very dense except for loose layers in borehole BH-82
and the consistency of fine-grained soils has been observed to be very stiff & hard in
general. Loose granular soils were encountered within top 4.5m depth in borehole
BH-82. Stiff fine grained soils were encountered at a depth of 1.5m-3m in BH-5,
1.5m-2.25m in BH-17 & 18. Layer of medium stiff fine grained soils were noticed at a
depth of 3m to 3.75m in BH-29.
24
Geotechnical File No. 2015/104, Rev.2
Table 3
Correlation of SPT Values with Relative Density/Consistency
Soil state of Undrained Angle of Internal
“N” Values
Soil Types compactness/co Cohesion (cu Friction (Deg.)
(Blows/300mm)
nsistency - kPa)
Very Soft Less than 2 <10 -
Soft 2–4 10-20 -
Cohesive
Medium Stiff 5–8 20-35 -
Materials
Stiff 9 – 16 35-75 -
(Clays & Silts)
Very Stiff 17 – 32 75-125 -
Hard Greater than 32 125-150 -
Very Loose 0–4 - 28
Granular
Loose 5 – 10 - 28-30
Materials
Medium Dense 11 – 30 - 30-36
(Sands &
Dense 31 – 50 - 33-38
Gravels)
Very Dense Greater than 50 - 36-41
Granular soils included well graded to poorly graded gravels with varied amounts of
silt, well graded to poorly graded gravels, silty clayey gravels, silty gravels, well
graded to poorly graded sands, well graded to poorly graded sands with varied
amounts of silt, silty sand, silty clayey sands, clayey sands, which are classified into
GW-GM, GP-GM, GW, GP, GC-GM, GM, SW, SP, SW-SM, SP-SM, SM, SC-SM and
SC groups as per ASTM D- 2487. Fine-grained soils included sandy silt, sandy silty
clay, sandy lean clay and sandy fat clay, which are classified into ML, CL-ML & CL
groups as per ASTM D-2487.
25
Geotechnical File No. 2015/104, Rev.2
depths of 1.5m to 5m below existing ground levels at the borehole locations BH-1
thru BH-81 & BH-84. Ground water table was encountered at deeper depths of 9.5m
& 10.4m in BH-82 & BH-83, respectively, due to higher ground level at these
boreholes. The variation in GWT was consistent with the ground surface undulations
in general. A possible fluctuation of about 1.0m can be anticipated due to seasonal
and tidal variations. Nine (9) stand pipe piezometers {in boreholes P01, P07, P13,
P19, P25, P28, P34, P37 & P45} were installed and ground water levels were
monitored during our field work in April-May, 2016.
26
Geotechnical File No. 2015/104, Rev.2
4. FIELD INVESTIGATIONS
Subsurface conditions at the YANBU DISTRIBUTION HUB project site were explored
through (i) drilling boreholes, (ii) conducting standard penetration tests and sampling
for laboratory testing and analysis, (iii) observing ground water levels, (iv) conducting
piezocone penetration tests, (v) performing seismic cross-hole tests, (vi) conducting
seismic refraction tests, (vii) conducting soil electrical resistivity tests, (viii)
Excavation of test pits, conducting field density test and collection of bulk samples for
laboratory CBR tests.
Table 4
Summary of All Field Tests Performed
S.No. Field Test Performed in the Site
1 Boreholes/SPT
2 Seismic cross-hole tests
3 Piezo-cone Penetration tests
4 Seismic refraction tests
5 Soil electrical resistivity tests
6 Excavation of Test pits and Collection of Bulk Samples
along with Field density tests at each 0.30m interval
7 Groundwater Measurement
For drilling and sampling, four-wheel drive (4WD) truck mounted straight rotary
drilling rigs, Acker SIMCO type, Soil Max type, AD-II type and MP8 type owned and
operated by Osaimi Engineering Office (OEO) were used. Boreholes were advanced
using wash boring techniques whereby the borings were stabilized using a
continuous flow of drilling mud. The boreholes were drilled to specified depths of
20/30 m below the existing ground levels (EGL) across the study locations.
Hand excavations were carried out in few borehole locations up to 1.5m depth to
verify the presence of any underground utilities or cables prior to start drilling.
Standard penetration tests (SPTs) were conducted and representative soil samples
were retrieved at 0.15 m, every 0.75 m depth interval up to 4.5m and subsequently at
27
Geotechnical File No. 2015/104, Rev.2
1.5 m interval up to the final depth using test techniques in accordance with ASTM D-
1586. In this test, a split spoon sampler of 50.8 mm (2”) outside diameter & 38.1mm
(1.5”) inside diameter is driven into the soil with blows from a 63.5 kg. (140 lbs)
sliding weight (hammer) dropped freely through a distance of 760mm (30”).
Both Plastic (PVC) sampling tubes with U100 Sampler & Shelby tube sampler were
used in collection of undisturbed samples from cohesive soil layers. Samples
recovered during the investigation were examined for field classification by our site
supervisor, properly labeled, packed and transported to OEO laboratory at Al-
Khobar, for further testing and analysis.
The list of undisturbed samples collected from different depths of boreholes, which
are tested for consolidation/ UCS Tests are given below in Table 5.
Table 5
List of undisturbed samples collected & Tested for Consolidation
BH DEPTH(m) Classification Soil Type
Detailed descriptions of the soils encountered at each borehole and the depths at
which samples were taken are presented on the borehole logs in Figures A-1 thru A-
84 of Appendix-A. The penetration resistance of cohesive samples was also
measured (N-value) for each sample, as shown on the boring logs. Blows required
28
Geotechnical File No. 2015/104, Rev.2
for the penetration of each 15cms (6”) are recorded in the field. N-value is the
number of blows required for the penetration of the last 30 cms (12”) out of 45 cms
(18”) of the sampler and is shown accordingly on the logs. When the sampler
penetration is less than 15 cms (6”) for 50 blows of the hammer, further blows are
stopped after recording the penetration.
SPT-N values measured are summarized in Figures 4 (a) thru 4 (e), Illustrations.
Further, above SPT-N values are to be corrected for energy ratio, borehole diameter,
rod length, sampling method etc. and N60 values are usually used in the analysis.
A total of seven (7) drilling rings with Automatic hammers were used for this project.
Drilling rig and respective hammer efficiency are summarized in the following Table 6
(Calibration Certificate attached in Appendix-I).
29
Geotechnical File No. 2015/104, Rev.2
Table 6
Corrected SPT values (SPT-N60) are estimated using the equation 1 & are
summarized in Figures 5 (a) thru 5 (e), Illustrations.
Symbols used on the borehole logs are presented in Figure A-85. All borehole soil
samples are classified as per ASTM D-2487 as shown in Figure A-86. The Clark &
Walker carbonate sediment classification system is shown in Figure A-87.
Seven (7) cross-hole tests were conducted in the study area at locations as shown in
Figure 2(a) and indicated in Table # 1(a). Typical schematic layout of the test is
shown in Figure D-1, Appendix-D. In the cross-hole test, the travel times of the
seismic waves are determined in the field. From the field data, Poisson’s ratio (µ),
dynamic shear modulus (G) and Young’s modulus (E) are computed. In cross-hole
test method, the time for compression waves (P) and shear waves (S) propagating
between adjacent boreholes is measured.
A suite of three (3) boreholes arranged in a co-linear array was employed. The two
(2) end holes drilled prior to the actual test were used to house three component
30
Geotechnical File No. 2015/104, Rev.2
down-hole geophones and thus served as receiver holes. The third boring, located
adjacent to the receiver holes, was used to generate seismic energy and is referred
to herein as the shot hole. Shot hole was drilled as the survey progressed and the
measurements were observed stopping at every 0.75m interval till the final depth of
10m. Tests were conducted up to 10m depth below existing grades at these
locations.
At each measurement depth, we impacted the drill string with a 63.5 Kg (140 lbs)
hammer. SPT Sampling was done at each measurement depth in Shot hole. Energy
transmitted down the drill rods to the bottom of the hole propagates through strata in
the form of P-waves and vertically polarized S-waves. The resulting ground motion
was detected by the geophones situated at the same depth in the receiver holes. The
geophones were fixed in place against the PVC casing. The signals received by the
geophones were recorded using a multi-channel signal enhancement seismograph.
Borehole diameter was kept to a minimum consistent with source and receiver
characteristics. PVC casing of 2 ½” diameter was employed and coupled to the soil
with low density cement-Bentonite grout thus providing better coupling and
transmission at the source and receivers. In performing the seismic cross-hole test,
we had adopted a co-linear array of three boreholes allowing interval timings to be
measured as well as first arrivals. The detectors used for the cross-hole survey
consisted of two borehole picks of Geostuff, USA. The borehole pick unit comprised
of submersible probe containing three (3) mutually perpendicular geophones. The
seismic information detected by these geophones is converted into electrical
impulses and transmitted to the seismograph via a long multi-conductor water-proof
cable.
The P-wave and S-wave travel times for each cross-hole measurement were
determined from the display/print out. From this data, the difference in travel time (∆t)
from the shot hole to receiver holes was determined. The difference in travel path
(∆x) was divided by (∆t) to determine the interval velocity. Thus P-wave velocities
(Vp) and S-wave velocities (Vs) were determined for each test depth.
From these velocities, other dynamic soil parameters were computed using the
following relations:
31
Geotechnical File No. 2015/104, Rev.2
0.5(Vp / Vs )2 − 1
Poisson’s Ratio, µ = ……….……………………….(2)
(Vp / Vs )2 − 1
γ 2
Dynamic Shear Modulus, G= .Vs ……………………………… ..(3)
g
Young’s modulus, E = 2(1 + µ ).G ………………..……………………..(4)
Wave velocity and elastic modulii values for varying depths for the tests are
presented graphically in Figures D-12(a) thru D-18(a), Appendix-D. These figures
also include the stratigraphy details from shot borehole log.
A total of ten (10) Static Piezo cone penetrometer soundings were carried out, in
which 5 locations as specified in Figure 2a given by client and additional 5 locations
within 1.0m radius of boreholes BH-16, BH-17, BH-5, BH-29 & BH-64 as mentioned
in Table 1a as interest of OEO to understand better strength & stratigraphy. The tests
were performed in accordance with ASTM D5778-95. The soundings were made by
hydraulically pushing 1000sq. mm end area, 60-degree apex angle cones into the
ground. The cone was advanced at a constant rate. The cone contains electrical load
transducers for measuring the cone tip resistance and sleeve friction. Readings of
the cone tip resistance and sleeve friction resistance are obtained at constant
intervals. The data is transmitted continuously via an electric cable in the cone rods,
to a computer on the site. During the test, the data is displayed on the computer
screen. All the data is stored in the computer and later on sent to office for
processing and are plotted using processing software Coneplot.
The test results of cone penetration tests (cone tip resistance, local friction, pore-
water pressure and friction ratio versus depth) are presented as graphical plots in
Figures E-1 thru E-10, Appendix – E. The plots PCPT-01 thru 04 indicated refusal
32
Geotechnical File No. 2015/104, Rev.2
within the 3m depth & other plots at depths varying between 3.5 m & 7.0 m in
general. Accordingly, the tests were terminated at refusal depths. Friction ratio is
defined as the ratio of sleeve friction to cone tip resistance, expressed as
percentage. Cone tip resistance & friction ratio data is utilized to facilitate
interpretation of soil classification.
OEO has undertaken five extra PCPTs (PCPTs 6 thru 10), which were not included
in the original Scope of Work, to verify the vertical extent of the shallow clay layer at
some tank locations. The results of these extra PCPTs indicated tip cone resistance,
qc, of less than 5 MPa in the top 3.0m for the soundings of PCPT-6, 7 & 8 and 3m-6m
for the sounding of PCPT-9 and gradually increases with depth up to the refusal
stress (35 MPa). The values of qc were greater than 5 MPa for soundings of PCPT-1
thru 5 in general.
A total of Twenty (20) Soil Electrical resistivity tests were conducted at locations (SR
# 1 thru 20) as specified in Figure 2a and indicated in Table # 1 (a). The tests were
conducted using Wenner array method and in general in accordance with ASTM G
57. The array consisted of four equally spaced electrodes set out in a collinear
arrangement. Electrical current is introduced into the ground through the outer
electrodes (designated C1 and C2) and the potentials arising from the resulting
electrical field are measured across the inner electrodes (designated P1 and P2). A
schematic diagram is shown in Figure G-1, Appendix-G. Variation in resistivity with
depth is obtained by increasing the separation distance i.e. distances between the
electrodes. This forces the current to flow deeper into the earth in order to complete
the circuit, thereby increasing the depth of penetration. The depth of penetration
approximately equals the electrode spacing.
At all test locations, the electrical resistivity measurements were taken along two
mutually perpendicular directions. The proposed electrode spacing was 0.5, 1.0, 1.5,
3, 5.0 and 7.0 m. When the readings obtained were negligibly small, the test was
terminated at that spacing. Otherwise the test was continued up to the maximum
electrode spacing. Results of the tests are presented in graphical form as a relation
between computed electrical resistivity and electrode spacing in Figures G-2 thru G-
21, Appendix- G. The field test data is also presented in tabular form in these figures.
33
Geotechnical File No. 2015/104, Rev.2
A total of five (5) seismic refraction tests {SRS-01 thru 05} were carried out at the
specified location as given in Table 1a.
Concept of Sounding
Hammer impacts on steel plate are used as source of seismic energy. The seismic
waves generated by hammer impact were detected by collinear array of geophones
placed at predetermined distances along a line from the shot point or impact point.
The geophone array was of 24 m spread with 12 geophones spaced at 2 m intervals.
With the time (T) of arrival and distance (X) between the receiver (geophone) and
energy source (shot point) known, seismic velocity through the medium is calculated.
The soundings were made in forward direction and reverse directions at each test
34
Geotechnical File No. 2015/104, Rev.2
location and Time vs Distance (T-X) plots for the tests have been established using
software Easy Refract of Geostru. seismic wave velocity contour maps are presented
in Figures F-2 thru F-6.
As per to SAES –A-114, Table 1, the excavation is rock type if the seismic velocity is
more than 1530 m/s. Accordingly, based on the seismic velocity contour maps
provided in Figures F-2 thru F-6, excavation can be considered as rock type where
the velocity is more than 1530 m/s. Further, below tables summarizes the layers,
seismic velocity of the each layer and excavation type.
Seismic
Excavation
SRT # Test depth Layers velocity Vp,
type
(m/s)
0-5 700 Normal
1 @ surface
5-30 1925 Rock
A total of Five (5) In-situ thermal resistivity tests were conducted using field thermal
needle method and in accordance with IEEE standard 442-1981. The tests were
performed in the locations (SRT # 1 thru 5) indicated in Table # 1(a) according to
SOW. Thermal resistivity tests results along with the temperature details are
presented in Figure I-1, Appendix-I. Thermal resistivity values ranged between 8.779
m. K/watt to 10.978 m. K/watt, which are generally in the range of values expected
for dry sands to stiff cohesive soils. However, we believe it may be necessary to re-
conduct and re-evaluate the results after site preparation works are complete.
35
Geotechnical File No. 2015/104, Rev.2
A total of fourteen (14) out of fifteen (15), test pits were excavated by using
mechanical excavator and performing field density tests at 0.30m interval right from
surface and bulk samples two at each location were collected from within the depths
of top 1.0 m at the respective existing grades. The samples were transported to OEO
laboratory, Al-Khobar for testing of compaction characteristics and CBR. Test pit logs
are shown in Figure H-1 thru H-14, Appendix-H.
Photographs taken during the field operations, samples (soil, bulk samples) & tests
pits are presented in enclosed CD.
36
Geotechnical File No. 2015/104, Rev.2
5. LABORATORY TESTS
The physical and chemical characteristics of selected and representative soil & water
samples from the boreholes presented in this report were tested adopting the latest
revisions of ASTM procedures. Some of the tests conducted are detailed below.
Particle size analysis of soils was done in accordance with ASTM D-422. Liquid and
plastic limits of finer soil samples were obtained as per ASTM D-4318. These tests
help in the classification of soil following ASTM D-2487. Natural moisture content of
soils was determined adopting ASTM D-2216 procedures. Specific gravity tests were
conducted in accordance with ASTM D-854. Consolidation tests were performed on
selected samples in accordance with ASTM D-2435. Unconfined compression tests
on fine-grained clay soils were performed in accordance with ASTM D-2166. Direct
shear test on granular soils was conducted as per ASTM D-3080.
On bulk samples from Test pits, Compaction tests were conducted in accordance
with ASTM D-1557. Laboratory CBR tests were carried out in accordance with ASTM
D-1883.
Chemical tests were conducted on selected soil samples to determine pH, sulfates,
and chlorides using AASHTO test procedures. The tests were performed for
carbonate content using ASTM D 4373 – 96. The ground water samples from the
selected boreholes were tested for pH, sulfates, chlorides and TDS using the
respective standards / test procedures.
37
Geotechnical File No. 2015/104, Rev.2
Summary of all laboratory test results on borehole soils & water samples are
presented in Figures B-1 thru B-31(a), Appendix-B. All borehole samples are
classified as per ASTM D-2487.
Laboratory tests have indicated that the granular soils are classified into GW-GM,
GP-GM, GW, GP, GC-GM, GM, SW, SP, SW-SM, SP-SM, SM, SC-SM and SC
groups as per ASTM D-2487. Gradation charts are presented in Figures B-32 thru B-
116. The percent fines in coarse grained soil varied between 1% & 49%.
Plasticity charts are included in Figures B-117 thru B-142. Fine-grained soils are
classified into ML, CL-ML & CL groups as per ASTM D-2487. The liquid limits varied
between 23 & 45 and the plasticity indexes between 4 and 19. The natural moisture
contents varied from 0.7 & 34.9. Specific gravity test results of selected soil samples
indicated values of between 2.66 and 2.7. Direct shear test plots as presented in
Figures B-143 thru B-149 indicated the angle of internal friction to vary between 33 &
380. The stress-strain plots as illustrated in Figures B-150 thru B-159 revealed the
unconfined compressive strength of fine-grained soils in the range of 184 – 315
kN/m2.
38
Geotechnical File No. 2015/104, Rev.2
The consolidation tests results (Figures B-160 thru B-167) conducted on selected
samples from different depths & from the boreholes presented in this report revealed
that the fine-grained samples are primarily over-consolidated with medium to low
compressibility.
The initial void ratio varied between 0.46 and 0.88; the pre-consolidation pressures
ranged between 180-330 kPa. The compression index values varied from 0.10 - 0.28
& Re-compression index varied between 0.02 & 0.06.
The Summary of laboratory test results on bulk samples are presented in Figure H-
15 thru H-17, Appendix-H. The bulk samples are classified as per ASTM D-2487,
Figure H-18. The soil classification chart for highway purposes as per ASTM D-3282
is given in Figure H-19. Gradation charts for bulk samples are given in Figures H-20
thru H-33. Plasticity charts for bulk samples are given Figures H-34 thru H-36.
Laboratory tests have indicated that the bulk samples collected represented silty
sand, poorly graded sands with varied amounts of silt, silty clayey sand & silty clayey
gravel, which are classified into SM, SP-SM, SC-SM & GC-GM groups as per ASTM
D-2487 and as A-2-4, A-1-B & A-3 types as per ASTM D-3282.
39
Geotechnical File No. 2015/104, Rev.2
Soil samples from selected boreholes presented in this report were tested for pH,
Sulfates, Chlorides & carbonates. Ground water samples from selected boreholes
were tested for pH, Sulfates, Chlorides & TDS. The Chemical analysis results of soil
samples are presented in summary sheets, Figures B-1 thru B-31 and water samples
are presented in Figure B-31(a). Based on the summary, the range of parameters is
included in Table 8.
Table 8
Chemical analysis of soil & water
Soil Water
Based on the above chemical tests results and following the table given in SAES Q-
001 dated January 2016 as reproduced in Figures K-8 thru K-8(b) , the exposure
type and cement type shall be assessed.
40
Geotechnical File No. 2015/104, Rev.2
6. FOUNDATION RECOMMENDATIONS
6.1 General
As stated in OEO’s Endorsement Letter, the dimensions, locations and loads of all
proposed structures were not available when the Endorsement Letter was prepared.
As a result, OEO stated in the Endorsement letter that the SOW “may be” sufficient.
MHDP made the missing information available to OEO only a few days before
starting of the field work. Furthermore, MHDP informed OEO the IFC
drawings/documents will be issued to the LSTK contractors on May 31st, 2016.
Accordingly, it was not possible to drill additional boreholes due to time limitations.
However OEO has added extra five PCPTs at locations where suspected weak
zones were anticipated and the soil replacement was deepened in one tank in light of
the results of the extra PCPT. OEO suggests that LSTK Contractor undertakes four
confirmatory boreholes during the LSTK Contractor detailed geotechnical study. This
statement is added to the report.
The project includes the mainly construction of 20 tanks, in which six (6) Gasoline
tanks, three (3) Diesel tanks, one (1) DPK tank, three (3) DPK/KEROSINE tanks, one
(1) T&I Diesel/DPK tank, two (2) Slop tanks, two (2) Fire water tanks, one (1) Utility
water tank and one (1) Surge relief tank and other structural units with design details
& sizes as provided by client is presented in Tables 9, 9(a), 9(b), 9(c) & 10.
41
Geotechnical File No. 2015/104, Rev.2
The stratigraphy from 84 boreholes consists of primarily granular (sands & gravels)
soils within the depths of investigation. Fine grained soils (clays & silts) were
encountered in few boreholes mainly at deeper depths and in very few boreholes fine
grained soils were noticed at shallow depths. Presence of fine grained within in the
shallow depths of boreholes is presented in Table 2.
Based on the corrected Standard Penetration Test (SPT) N60-values and correlations
as presented in Table 3, the compactness of the granular soils has been observed to
vary from medium dense to very dense except for loose layers in borehole BH-82
and the consistency of fine-grained soils has been observed to be very stiff & hard in
general. Loose granular soils were encountered within top 4.5m depth in borehole
BH-82. Stiff fine grained soils were encountered at a depth of 1.5m-3m in BH-5,
1.5m-2.25m in BH-17 & 18. Layer of medium stiff fine grained soils were noticed at a
depth of 3m to 3.75m in BH-29.
Existing ground elevations within the boreholes (as presented in Table 1) varied
between +2.48m & +5.84m indicating a difference in elevation of about 3.36m except
for boreholes BH-82 & 83. Theses 2 boreholes are located in higher elevation of
+10.36m & 11.27m for BH-82 & BH-83, respectively. The elevations of test locations
are with relative to Saudi Aramco Vertical Datum (SAVD-78).
The GWT readings were recorded during the period of the field work in April-May
2016. The groundwater table was encountered at depths of 1.5m to 5m below
existing ground levels at the borehole locations BH-1 thru BH-81. Ground water table
was encountered at deeper depths of 9.5m & 10.4m in BH-82 & BH-83, respectively,
due to higher ground level at these boreholes. A possible fluctuation of about 1.0m
can be anticipated due to seasonal and tidal variations for design.
Based on the field and laboratory testing results (Atterberg limits, natural moisture
content and UCS), the fine-grained soils can be considered as inactive, non-swelling,
non-collapsible and primarily over-consolidated.
42
Geotechnical File No. 2015/104, Rev.2
6.3.1 Criteria
A suitable foundation for any structure must satisfy the following two basic and
independent criteria with respect to the underlying foundation soils, as follows:
a) The foundation must have an adequate factor of safety against shear failure or
bearing capacity failure of sub soil.
b) Vertical movements of foundation due to compression of the soils beneath the
foundation must be within tolerable limits.
Generally, the bearing pressures are computed for both shear failure and maximum
permissible settlement criteria and the smaller value is considered as the Net
Allowable Bearing Capacity (NABC) and adopted in the design of foundations.
The equations used to estimate the safe bearing capacity against shear failure are
given in equation 6. The values of c and φ in the above-mentioned equations are
estimated based on N60 within the influence zones underneath the foundations.
43
Geotechnical File No. 2015/104, Rev.2
S = Si + Sc + Ss (5)
The elastic settlements in granular soil layers are estimated using Burland &
Burbidge’s method. This equation considers the average SPT-N60 values and net
effective stress in soil layers. This method is detailed in Figures C-1 and C-1a,
Appendix-C. The settlement analysis using this method considers average SPT-N60
values within a depth of influence (related to footing size).Therefore, applicable
primarily for homogeneous granular soils only.
In the analysis, it is reasonable to assume that very stiff to hard fine-grained soils are
negligible consolidation settlements and only soft to stiff fine grained soils would
contribute to consolidation. Consistency of fine grained soils met in the applicable
shallow foundations area in general observed to be hard. Therefore, the analysis
considers that hard fine grained soils primarily undergo elastic settlements.
Since the fine-grained soils met are observed to be inorganic, we have ignored the
effect of secondary consolidation due to inorganic nature of fine grained soils.
However, the settlement analysis based on Burland & Burbidge’s method considers a
factor (ft) for long-term (secondary) settlements in sands. In this analysis, we have
considered an elapsed time of 25 years to account for creep in granular soils.
Specific spread foundation sizes (square, rectangular & strip) and depths of
foundation below FGL is provided by the Client are considered in the analysis. The
design details of the spread foundation are presented in Tables 9, 9a, 9b & 9C.
Generally, the allowable bearing pressures are computed for both shear failure and
maximum permissible settlement criteria and usually the smaller of the two is used in
the design of foundations and is considered as the Net Allowable Bearing Capacity
(NABC) of the soil.
44
Geotechnical File No. 2015/104, Rev.2
Shear Considerations:
ଵ ఊᇲ
ݍ(௧) = ி ቂݏ ݍ ܰ + ଶ
ݏ ܤఊ ܰఊ ቃ − ߛ ᇱ ܦ (6)
Where
B = Width of foundation
D = Foundation embedment
ߛ ′ = Effective unit weight
F = Factor of safety to be 3
φ B
N q = tan 2 45 + .eπ . tan φ , N γ = 2.[ N q + 1]. tan φ , S q = 1 + . tan φ ,
2 L
B
Sγ = 1 − 0.4 , ∅_Based on Correlation ∅ (deg)= 27.1+0.3N60-0.00054[N60]2
L
γ' = Effective unit weight_Based on Correlation
Spread sheets showing the settlement estimations for typical sizes & depth are
shown in Figures C-3 thru C-8 based on Burland & Burbidge method. Also, spread
45
Geotechnical File No. 2015/104, Rev.2
sheets showing shear estimation for typical spread footing dimensions and depths
are shown in Figures C-9 thru C-11 (Appendix C).
Accordingly, the NABC for spread footings based on applicable borehole profile each
structure are presented in Tables 9, 9(a), 9(b) & 9c.
46
Geotechnical File No. 2015/104, Rev.2
Table 9
Net Allowable Bearing Capacities (kN/m2)-Square Footings
Structure Boreholes Footing Footing NABC (kPa) for Allowable Recommended
Covered Depth Size Permissible bearing capacity Net Allowable
(m) (m x m) Settlement of 25 based on shear Bearing Capacity
below mm Criteria
FGL Square Footing Square Footing Square Footing
(m x m) (m x m) (m x m)
OME building 1.0 2.5 x 2.5 300 340 325
BH-55
1.5 2.5 x 2.5 300 800 300
Operation shelter 1.0 1.5 x 1.5 300 300 300
BH-58
1.5 1.5 x 1.5 300 500 300
1.5 x 1.5 300 600 300
1.0
Security support 2.0 x 2.0 300 700 300
BH-59
building 1.5 x 1.5 300 1000 300
1.5
2.0 x 2.0 300 1000 300
Chemical 1.5 x 1.5 300 300 300
1.0
shelter/x-ray 2.0 x 2.0 300 325 300
building & BH-60 1.5 x 1.5 300 700 300
Security support 1.5 2.0 x 2.0 300 800 300
building
1.5 x 1.5 300 300 300
1.0
2.0 x 2.0 300 325 300
Mosque BH-55
1.5 x 1.5 300 750 300
1.5
2.0 x 2.0 300 750 300
Sunshade for BH-59 3.5 x 3.5 300 1000 300
2.0
gatehouse BH-60 3.5 x 3.5 300 1000 300
Pump sheds *BH-62 thru 65 1.5 3.0 x 3.0 250 450 250
**1.0 3.0 x 3.0 250 180 180
Scraper trap BH-74, 75
**1.5 3.0 x 3.0 300 250 250
**Depth of foundation below EGL, *BH-62 & 64 critical boreholes for analysis.
47
Geotechnical File No. 2015/104, Rev.2
Table 9a
Net Allowable Bearing Capacity (kN/m2)-Square Footings
Structure Borehol Footing Footing NABC (kPa) for Allowable bearing Recommended Net
es Depth (m) Size Permissible Settlement capacity based on Allowable Bearing
Covered below FGL (m x m) of 25 mm shear Criteria Capacity
Square Footing (m x m) Square Footing (m x m) Square Footing (m x m)
1.0 3.0 x 3.0 300 350 300
Pipe rack BH-68
1.5 3.0 x 3.0 300 1000 300
PS-006-fire, utility, 1.0 3.5 x 3.5 300 350 300
drinking water BH-53 1.5 3.5 x 3.5 300 550 300
pump house
FSF building 1.0 1.5 x 1.5 300 400 300
BH-61
1.5 1.5 x 1.5 300 1000 300
**1.0 2.0 x 2.0 300 300 300
Metering room 2.5 x 2.5 300 325 300
BH-76
marafiq **1.5 2.0 x 2.0 300 500 300
2.5 x 2.5 300 550 300
Platform BH-77 & **1.0 1.5 x 1.5 300 300 300
foundation 78 **1.5 1.5 x 1.5 300 1000 300
Platform BH-79 & **1.0 1.5 x 1.5 300 300 300
foundation 80 **1.5 1.5 x 1.5 300 450 300
BH-81, 1.0 1.5 x 1.5 300 225 225
Platform 83 & 84 1.5 1.5 x 1.5 300 325 300
foundation 1.0 1.5 x 1.5 150 225 150
BH-82
1.5 1.5 x 1.5 150 300 150
BH-81, 1.0 3.0 x 3.0 250 300 250
83 & 84 1.5 3.0 x 3.0 300 400 300
Pipe supports
1.0 3.0 x 3.0 90 300 90
*BH-82
1.5 3.0 x 3.0 80 300 80
**Depth of foundation below EGL, *Borehole shifted about 14m from original location.
48
Geotechnical File No. 2015/104, Rev.2
Table 9b
Net Allowable Bearing Capacity (kN/m2)-Rectangular Footings
Structure Boreholes Footing Footing NABC (kPa) for Allowable bearing Recommended Net
Covered Depth (m) Size Permissible capacity based on Allowable Bearing
below (m x m) Settlement of 25 mm shear Criteria Capacity
FGL Rectangular footing Rectangular footing Rectangular footing
(m x m) (m x m) (m x m)
Pumps 1.0 3x5 300 325 300
3x6 300 300 300
*BH-62 to
4x8 250 300 250
65
1.5 3x5 300 400 300
3x6 300 400 300
4x8 250 450 250
Skids 1.0 2.5 x 5 300 1000 300
3x5 300 1000 300
BH-67
1.5 2.5 x 5 350 1000 300
3x5 350 1000 300
1.0 3.5 x 4 300 350 300
Pipe sleepers BH-77 & 78
1.5 3.5 x 4 350 1000 300
BH-81, 83 & 1.0 3.5 x 4 250 250 250
Pipe sleepers
84 1.5 3.5 x 4 300 350 300
1.0 3.5 x 4 80 300 80
Pipe sleepers BH-82
1.5 3.5 x 4 70 300 70
1.0 3.5 x 4 350 350 300
Pipe sleepers BH-79, 80
1.5 3.5 x 4 300 700 300
Drinking water 1.0 4x4 300 350 300
tank (vessel 1.5 4x4 300 600 300
BH-50
type)
X40-D-0704
*BH-62 & 64 critical boreholes for analysis.
49
Geotechnical File No. 2015/104, Rev.2
Table 9c
Net Allowable Bearing Capacity (kN/m2)-Strip Footings
Structure Boreholes Footing Width of NABC (kPa) for Allowable bearing Recommended Net
Covered Depth (m) footing Permissible capacity based on Allowable Bearing
below (m) Settlement of 25 mm shear Criteria Capacity
FGL Strip footing (m) Strip footing (m) Strip footing (m)
Substation 0.6 2.0 350 200 200
Buildings 2.5 350 200 200
3.0 300 250 250
4.0 300 300 300
BH-56
1.0 2.0 350 250 250
2.5 350 250 250
3.0 300 300 300
4.0 300 350 300
0.6 2.0 350 200 200
2.5 350 200 200
3.0 300 250 250
4.0 250 300 300
BH-57
1.0 2.0 350 250 250
2.5 350 250 250
3.0 300 300 300
4.0 250 350 300
Pipe sleepers BH-69 thru 1.0 2.5 300 250 250
main pipe way 71 1.5 2.5 350 350 350
Note: In case that actual design loads exceeding the allowable soil bearing capacities, all geotechnical analyses should be revisited to
ascertain that the settlement criteria are satisfied due the new loads. In case that the facilities layout is modified, a new geotechnical
campaign should be carried out by the LSTK contractor at the new footprint of the facilities.
50
Geotechnical File No. 2015/104, Rev.2
The recommended net allowable bearing capacities are low in specific borehole
location BH-82 due to presence of loose granular soils up to 4.5m. These bearing
capacities shall be verified by designer against design requirements. In the event,
above bearing capacities at BH-82 do not meet the design requirements; we
recommend soil improvement (as per Section 6.5.4). Since borehole location is
shifted from original, designer shall ensure the presence of any structure at drilled
location.
6.3.5 Increase in Bearing Capacity for Short-Term Loading & Blast Loading
The use of a one-third stress increase for load combinations including earthquake
loads may be used for foundation soil bearing capacities, if specially permitted by
registered geotechnical engineer. Also, as per NAVFAC DM_7.02, when part of the
live loads are temporary (earthquake, wind, snow etc.), use a factor of safety of 2.
The maximum increase over the safe loads to account for transient (wind,
earthquake & hydrostatic) loading shall be 33 to the order of even 50 percent. An
increase in allowable bearing capacities may be expected due to blast load
conditions, if any. Appropriate factors for dynamic effects shall be considered as per
SAES M-009.
The bearing capacities in Tables 9, 9a, 9b and 9c, and their associated settlements,
are considered total settlements for static conditions and for a single isolated footing
subjected to vertical concentric loads having no interference from adjacent
foundations. However, in practice, footings might be constructed close enough that
may result in overlap of stress zones below the footings. When the center-to-center
spacing of footings is such that an overlap of the foundation stress zone takes place,
there will be increased foundation settlements due to interference. Settlements due
to the presence of footings within the close proximity of adjacent footings can be
estimated using Figure K-1 (Appendix K). It is observed from this figure, the
influence increases as the relative distance (dA/B) decreases.
It is often the differential settlement rather than the total settlement that is critical to a
structure. The differential settlements are expected to be about two-thirds of the total
settlements. Differential settlement is the relative movement of two parts of the
51
Geotechnical File No. 2015/104, Rev.2
structure. This results in angular distortion or relative rotations, which become critical
beyond certain limiting values. The limiting values differ, however, depending on the
function of the structure. Generally, an angular distortion of 1/500 is considered a
safe limit for buildings unless specified otherwise. Bjerrum (1963) presented the
limiting angular distortions and are shown in Figure K-2 (Appendix K).
Foundation stability shall be checked using service load combinations from Saudi
Aramco specifications and /or International Standards like SAES-M-001, SAES-M-
100, ASCE/SE17 and / or SEI/ASCE37 for any other probable and realistic
combinations of loads. For higher resistance against sliding, other options such as
‘shear key’, anchoring could be considered. Foundation stability factors for blast
resistant buildings shall be in accordance with SAES-M-009.
For mat foundations on sand or gravel, Terzaghi & Peck suggest an increase in
allowable pressure than those for footings. Thus, settlements of the order of 50mm
can be usually considered acceptable in case of mats. The recommendations are
made accordingly in this report.
The analysis has been carried out for mat sizes given by client for different structures
as presented in Table 10 using the Equation 7 (Figure C-2), considering lower
subsoil profiles of applicable boreholes under each structure. Accordingly, Net
Allowable Bearing Capacities (NABC) are presented in Table 9. Time factor of 1.5 for
time period of 25 years is considered in recommending the Net allowable baring
capacity.
52
Geotechnical File No. 2015/104, Rev.2
Settlement consideration:
For Mat foundation in granular soils, Net Allowable Bearing Capacity can be obtained
from the following equation with settlement (Se) limited to 50 mm.
ேలబ ା.ଷ ଶ ௌ
ݍ(௧) = .଼
ቂ
ቃ ܨௗ ቂଶହ ቃ (7)
Spread sheets showing NABC estimation of mat footing dimension and depths for
given sizes are shown in Figures C-12 thru C-14 (Appendix C), respectively.
Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.
The recommended maximum NABC should not exceed 400 kPa to avoid possible
non-linear load-settlement response underneath the mat foundations leading to
higher settlements than those calculated by Equation 7. However, NABC with values
of higher than 400 kPa may be used for mat foundations, if required, provided that
53
Geotechnical File No. 2015/104, Rev.2
6.5.1 General
The project includes the construction of six (6) Gasoline tanks, three (3) Diesel tanks,
one (1) DPK tank, three (3) DPK/KEROSINE tanks, one (1) T&I Diesel/DPK tank, two
(2) Slop tanks, two (2) Fire water tanks, one (1) Utility water tank and one (1) Surge
relief tank. The stratigraphy at these tanks are coming are explored boreholes by BH
# 1 thru 52. The site of each large-diameter Tank is explored by 3 boreholes, out of
which the center borehole was drilled to 30 m depths and the peripheral boreholes
were drilled to 20 m depths. The layout of tanks and corresponding boreholes is
shown in Figure 2 & 2(a). All tanks are circular with diameters of 55m, 65m, 67m, 77,
38.5m, 22.5m, 20.5m & 5.5m and anticipated applied pressure at the formation levels
of 150 kPa. Type of tanks and locations of the corresponding boreholes, as well as
the design details are provided by M/s. Mustang and presented in Table 11.
54
Geotechnical File No. 2015/104, Rev.2
Table 11
Type of Tanks, Corresponding Boreholes & Design Details
55
Geotechnical File No. 2015/104, Rev.2
Tank foundations shall also be designed and constructed as per provisions of the
latest version of API standards 650. As per this, the minimum reinforcement in any
ring-wall should be 0.002 times the cross-sectional area of the wall above grade. For
hot tanks, greater amount of steel may be required to withstand the thermal stresses.
It is emphasized that the soil fill between the concrete ring walls be properly tested
and compacted. The material specifications shall be that of a select fill. The material
specifications and compaction requirements shall be in accordance with SAES A-
114.
As per the data provided by Client (presented in Table 12), average existing grade
levels (NGL) under different tanks vary from +3.0m to +5.5m and Finished Grade
Levels (FGL) vary from +4.15m to +5.6m. Therefore, it is interpreted that existing
levels would be raised to the respective finished grade levels with well compacted
structural fill material. Filling & cutting requirements based on NGL & FLG of each
tank is provided in Table 12.
56
Geotechnical File No. 2015/104, Rev.2
Table 12
Average Natural ground levels (NGL) Finished graded levels (FGL) under each Tank
TAG
Number as Permanent Dia. Height NGL FGL Fill/Cut
TANK TYPE
per Plot TAG Number (m) (m) (m) (m) (m)
plan
Diesel DPK T & I
X40-D-0502 X40-D-0009 77 15 5 5.5 0.5 fill
Tank
Diesel Tank X40-D-0301 X40-D-0006A 65 15 5.25 5.5 0.25 fill
Diesel Tank X40-D-0302 X40-D-0006B 65 15 5.25 5.5 0.25 fill
Diesel Tank X40-D-0303 X40-D-0006C 65 15 5 5.5 0.5 fill
DPK X40-D-0401 X40-D-0017 67 15 4.5 5.5 1.0 fill
DPK X40-D-0402 X40-D-0018A 55 15 4.5 5.5 1.0 fill
DPK X40-D-0403 X40-D-0018B 55 15 4.5 5.5 1.0 fill
DPK X40-D-0404 X40-D-0018C 55 15 4.5 5.5 1.0 fill
GASOLINE 95 X40-D-0101 X40-D-0016A 55 15 3 4.9 1.9 fill
GASOLINE 95 X40-D-0102 X40-D-0016B 55 15 3.5 4.9 1.4 fill
GASOLINE 95 X40-D-0103 X40-D-0016C 55 15 3.25 4.9 1.65 fill
GASOLINE 91 X40-D-0201 X40-D-0002A 55 15 4 4.9 0.9 fill
GASOLINE 91 X40-D-0202 X40-D-0002B 55 15 4 4.9 0.9 fill
GASOLINE 91 X40-D-0203 X40-D-0002C 55 15 3.25 4.9 1.65 fill
SLOP TANKS X40-D-0601 X40-D-0010A 38.5 15 3.25 4.9 1.65 fill
SLOP TANKS X40-D-0602 X40-D-0010B 38.5 15 3.5 4.9 1.4 fill
SURGE RELIEF X40-D-0801 X40-D-0011 20.5 7.5 4.5 4.15 0.35 cut
FIRE WATER
X40-D-0701 X40-D-0028A 22.5 16 5 5.6 0.6 fill
TANK
FIRE WATER
X40-D-0702 X40-D-0028B 22.5 16 5 5.6 0.6 fill
TANK
UTILITY WATER
X40-D-0703 X40-D-0014 5.5 6 5 5.6 0.6 fill
TANK
57
Geotechnical File No. 2015/104, Rev.2
Table 13
Idealized Soil Profile & Soil Design Parameters
3 Es (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m ) Ф (Deg) Cu (kPa) µ
parameters
Gasoline – 95 Tank –BH-1, 2 & 3 (D-0101)
FGL-NGL Structural fill-2m 20 18 33 -- 0.325 20
NGL-1.5 Medium dense SAND 20 18 33 -- 0.325 20
1.5-3.75 Very stiff to hard sandy lean CLAY 32 19 -- 110 0.45 12.5
3.75 – 6.0 Dense SAND with gravels 49 20 40 -- 0.375 49
6.0 - 30 Very dense SAND with gravels 85 20 40 -- 0.375 85
Gasoline – 95 Tank –BH-4, 5 & 6 (D-0102)
FGL-NGL Structural fill-1.5m 20 18 33 -- 0.325 20
NGL – 1.5 Medium dense SAND 23 18 33 -- 0.325 23
Cc=0.2, Cr=0.05,
1.5 -3.0 Very stiff sandy lean CLAY 20 19 -- -- 0.45 8.4
e0=1.05 & OCR=1
3.0-9.0 Dense SAND with gravels 48 19 40 -- 0.375 48
9.0 – 22.5 Very dense SAND with gravels 61 20 40 -- 0.375 61
22.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
Gasoline – 95 Tank –BH-7, 8 & 9 (D-0103)
FGL-NGL Structural fill-1.65m 20 18 33 -- 0.325 20
NGL – 3.75 Medium dense SAND 28 18 35 -- 0.325 28
3.75 -7.5 Hard sandy lean CLAY 43 19 -- 145 0.45 16
7.5 – 30.0 Very dense SAND 85 20 40 -- 0.375 85
Gasoline – 91 Tank –BH-10, 11 & 12 (D-0201)
FGL-NGL Structural fill-0.9m 20 18 33 -- 0.325 20
NGL-4.5 Dense SAND 32 19 36 -- 0.375 32
4.5 – 22.5 Very dense SAND with gravels 76 20 40 -- 0.375 76
22.5 – 30.0 Very dense SAND with gravels 86 20 40 -- 0.375 86
Gasoline – 91 Tank –BH-13, 14 & 15 (D-0202)
FGL-NGL Structural fill-0.9m 20 18 33 -- 0.325 20
NGL – 1.5 Medium dense SAND 21 18 33 -- 0.325 21
1.5 –9.0 Very dense SAND with gravels 74 20 40 -- 0.375 74
9.0 -16.5 Hard sandy lean CLAY 84 19 40 145 0.45 67
16.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
58
Geotechnical File No. 2015/104, Rev.2
Table 13 (a)
Idealized Soil Profile & Soil Design Parameters
3 Es (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m ) Ф (Deg) Cu (kPa) µ
parameters
Gasoline – 91 Tank –BH-16, 17 & 18 (D-0203)
FGL-NGL Structural fill-1.65m 20 18 33 0.325 20
Cc=0.18, Cr=0.05,
NGL -3.0 Very stiff sandy lean CLAY 17 19 -- 0.45 7.4
e0=0.95 & OCR=1
3.0 -4.5 Hard sandy lean CLAY 34 19 -- 125 0.45 13
4.5 – 18.0 Very dense SAND with gravels 76 20 40 -- 0.375 76
18.0-22.5 Hard sandy lean CLAY 100 20 145 0.45 76
22.5 - 30 Very dense SAND with gravels 86 20 40 -- 0.375 86
Diesel Tank –BH-19, 20 & 21 (D-0301)
NGL – 3.0 Medium dense SAND 23 18 33 -- 0.325 23
3.0 – 4.5 Dense SAND with gravels 45 19 40 -- 0.375 45
4.5 -10.5 Very dense SAND with gravels 71 20 40 -- 0.375 70
10.5 – 15.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
22.5 – 30.0 Very dense SAND with gravels 68 20 40 -- 0.375 68
Diesel Tank –BH-22, 23 & 24 (D-0302)
NGL – 1.0 Medium dense SAND 24 18 33 -- 0.325 24
1.0 – 7.5 Dense SAND with gravels 49 19 40 -- 0.375 49
7.5 – 15.0 Very dense SAND with gravels 63 20 40 -- 0.375 63
15.0 – 30.0 Very dense SAND 87 20 40 -- 0.375 87
Diesel Tank –BH-25, 26 & 27 (D-0303)
FGL-NGL Structural fill-0.5m 20 18 33 -- 0.325 20
NGL-0.75 Dense SAND 28 19 35 -- 0.375 28
0.75 – 2.25 Dense SAND 40 19 40 -- 0.375 40
2.25 – 19.5 Very dense SAND with gravels 73 20 40 -- 0.375 73
19.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
59
Geotechnical File No. 2015/104, Rev.2
Table 13 (b)
Idealized Soil Profile & Soil Design Parameters
Es (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m3) Ф (Deg) Cu (kPa) µ
parameters
DPK/KEROSINE Tank –BH-28, 29 & 30 (D-0404)
FGL-NGL Structural fill-1m 20 18 33 0.325 20
NGL – 3.0 Medium dense SAND 24 18 33 -- 0.325 24
Cc=0.2, Cr=0.06,
3.0 -3.75 Stiff sandy lean CLAY 9 19 -- -- 0.45 7.8
e0=1 & OCR=1
3.75 – 6.0 Very stiff sandy lean CLAY 26 20 100 0.45 10
6.0-9.0 Medium dense SAND 23 18 33 -- 0.325 23
6.0-9.0 Dense SAND with gravels 49 19 40 -- 0.375 49
9.0 - 30 Very dense SAND with gravels 70 20 40 -- 0.375 70
DPK/KEROSINE Tank –BH-31, 32 & 33 (D-0403)
FGL-NGL Structural fill-1m 20 18 33 -- 0.325 20
NGL – 3.75 Medium dense SAND 20 18 33 -- 0.325 20
3.0-7.5 Dense SAND with gravels 44 19 40 -- 0.375 44
7.5 – 13.5 Very dense SAND with gravels 62 20 40 -- 0.375 62
13.5 – 16.5 Hard sandy silt 63 20 -- -- 0.45 50
16.5 – 25.5 Very dense SAND with gravels 84 20 40 -- 0.375 84
25.5 – 27.0 Hard lean clay 75 20 -- -- 0.45 60
27.0 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
DPK/KEROSINE Tank –BH-34, 35 & 36 (D-0402)
FGL-NGL Structural fill-1m 20 18 33 0.325 20
NGL – 2.25 Medium dense SAND 19 18 32 -- 0.325 19
2.25-6.0 Dense SAND with gravels 36 19 37 -- 0.375 36
6.0 – 9.0 Very dense SAND with gravels 58 20 40 -- 0.375 58
9.0 -15.0 Hard sandy lean CLAY 51 19 -- 145 0.45 41
15.0 – 21.0 Very dense SAND 76 20 40 -- 0.375 76
21.0 -28.5 Hard sandy lean CLAY 77 19 -- 145 0.45 61.5
28.5 – 30.0 Very dense SAND 90 20 40 -- 0.375 90
60
Geotechnical File No. 2015/104, Rev.2
Table 13 (c)
Idealized Soil Profile & Soil Design Parameters
3 Es (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m ) Ф (Deg) Cu (kPa) µ
parameters
DPK Tank –BH-37, 38 & 39 (D-0401)
FGL-NGL Structural fill-1m 20 18 33 -- 0.325 20
NGL-3.0 Dense SAND with gravels 40 19 38 -- 0.375 40
3.0 – 12.0 Very dense SAND with gravels 68 20 40 -- 0.375 68
12.0- 23 Dense SAND with gravels 41 20 38 -- 0.375 41
23.0 - 30 Very dense SAND with gravels 85 20 40 -- 0.375 85
T & I Diesel/DPK Tank –BH-40, 41 & 42 (D-0502)
FGL-NGL Structural fill-0.5m 20 18 33 -- 0.325 20
NGL – 1.5 Dense SAND with gravels 40 19 38 -- 0.375 40
1.5 -6.0 Medium dense SAND 25 18 34 -- 0.325 25
6.0-10.5 Very dense SAND with gravels 57 19 40 -- 0.375 57
10.5 – 16.5 Very dense SAND with gravels 82 20 40 -- 0.375 82
16.5-22.5 Very dense SAND with gravels 63 20 40 -- 0.375 63
22.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
Slop Tank –BH-43 & 44 (D-0601)
FGL-NGL Structural fill-1.65m 20 18 33 -- 0.325 20
NGL – 7.5 Dense SAND with gravels 36 19 37 -- 0.375 36
7.5 – 18.0 Very dense SAND with gravels 53 20 40 -- 0.375 53
18.0 -27.0 Hard sandy lean CLAY 47 19 -- 145 0.45 38
27 – 30.0 dense SAND 34 19 36 -- 0.375 34
Slop Tank –BH-45 & 46 (D-0602)
FGL-NGL Structural fill-1.5m 20 18 33 -- 0.325 20
NGL-2.25 Dense SAND 37 19 37 -- 0.375 37
2.25 – 7.5 Dense SAND 42 19 38 -- 0.375 42
7.5 – 21.0 Very dense SAND with gravels 84 20 40 -- 0.375 84
21.0 – 30.0 dense SAND with gravels 42 20 38 -- 0.375 42
61
Geotechnical File No. 2015/104, Rev.2
Table 13 (d)
Idealized Soil Profile & Soil Design Parameters
Es (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m3) Ф (Deg) Cu (kPa) µ
parameters
Fire water Tanks –BH-47 48 & 49 (D-0701/0702)
FGL-NGL Structural fill-0.6m 20 18 33 -- 0.325 20
NGL – 1.5 Medium dense SAND 21 18 33 -- 0.325 21
1.5 –4.5 Dense SAND 46 19 39 -- 0.375 46
4.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
Utility water Tank –BH-50 (D-0703)
FGL-NGL Structural fill-0.6m 20 18 33 -- 0.325 20
NGL – 3.75 Dense SAND with gravels 45 19 39 -- 0.375 45
3.75 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
Surge relief Tank –BH-51 & 52 (D-0801)
FGL – 1.5 Medium dense SAND 27 18 33 -- 0.325 27
1.5 – 7.5 Very dense SAND with gravels 58 20 40 -- 0.375 58
7.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
62
Geotechnical File No. 2015/104, Rev.2
Settle 3D computer software was used to model the given tanks foundation system. The
analysis was progressed as follows:
(vi) A fill/Cut requirement as presented in Table 11 is considered for each
Tank. The fill material specification shall be that of a select fill. The
material specification and compaction requirements shall be in
accordance with SAES-A-114.
(vii) A minimum SPT-N value of 20 has been considered throughout the
thickness of structural fill.
(viii) An idealized soil profile was developed based on stratigraphy
encountered in boreholes within the tanks. The idealized stratigraphy
and geotechnical parameters presented in Tables 13 thru 13 (d) were
considered in the analysis for respective tank.
(ix) Tank diameters & depths below FGL are considered in the analysis as
per SOW provided by client.
(x) It is reasonable to assume that consolidation settlements of very stiff
to hard fine grained soils are negligible and therefore, the analysis
considers that very stiff to hard fine grained soils primarily undergo
elastic settlements.
(xi) In the settlement analysis, stress influence zone is considered 1.25
times diameter of tank base under axi-symmetric conditions below the
depth of tank foundation in accordance with SAES-A-114.
(xii) Depth beyond 30m, stratigraphy encountered at bottom of idealized
soil profile for applicable tank would continue up to influence depth for
settlement analysis.
(xiii) Immediate and consolidation settlements evaluated using Settle 3D
software considering idealized soil profile under each tank
The analysis has been carried out for given tank diameters with design applied stress
of 150 kPa and foundation depth of 0.6m, 1.0m & 1.5m below FGL using the Settle
3D computer software, considering idealized soil profile of under each tank.
Accordingly, estimated settlements at center and at edge of tanks are presented in
Table 14.
Settle 3D software considers very nominal time of 1 year for long term (creep)
settlements. Therefore, estimated settlements by settle 3D are increased 25% to
63
Geotechnical File No. 2015/104, Rev.2
account for long term (creep) settlements over the period of 25 years in accordance
with SAES-A-113 using Schmertmann’s equation for time-dependent creep
settlements.
Total estimated settlements at center and edge of tanks are summarized in Table 14.
Input & output files of settle 3D software analysis for all Tanks are presented in
Figures C-15 thru 36 (b)
64
Geotechnical File No. 2015/104, Rev.2
Table 14
Estimated Settlements of Tanks for Applied pressure of 150 kPa
S.N Type of structure BH Dia. of Desig Depth of Estimated Total Estimated Si SL Si SL
O. covered Tank, m n Foundati settlements, mm settlements (mm) (mm) (mm) (mm) (mm)
or Load, on from including long term
Founda (kPa) Final settlement
tion Grade (m) @center @edge @center @edge @center @edge
size
1 Gasoline D-0101 1,2,3 55 150 0.6 59 29 74 36 59 15 29 7
– 95 1.0 58 28 73 35 58 15 28 7
tank 1.5 56 27 70 34 56 14 27 7
D-0102 4,5,6 55 150 0.6 122 68 153 85 64.5 88.5 *14.5 *70.5
1.0 121 67 151 84 62.5 89 *13 *71
1.5 120 66 150 83 61 89 *11.5 *71.5
D-0103 7,8,9 55 150 0.6 61 30 76 38 61 15 30 8
1.0 60 29 75 36 60 15 29 7
1.5 59 28 74 35 59 15 28 7
2 Gasoline D-0201 10,11,12 55 150 0.6 48 24 60 30 48 12 24 6
– 91 1.0 47 23 59 29 47 12 23 6
tank 1.5 46 22 58 28 46 12 22 6
D-0202 13,14,15 55 150 0.6 45 23 56 29 45 11 23 6
1.0 44 22 55 28 44 11 22 6
1.5 42 21 53 26 42 11 21 5
D-0203 16,17,18 55 150 0.6 207 120 259 150 48.5 210.5 *30 *120
1.0 206 119.5 257 149.5 46 211 *30 *119.5
1.5 205.5 116 256.5 145 44 212.5 *29 *116
3 Diesel D-0301 19,20,21 65 150 0.6 62 31 78 39 62 16 31 8
tank 1.0 61 30 76 38 61 15 30 8
1.5 59 29 74 36 59 15 29 7
D-0302 22,23,24 65 150 0.6 51 26 64 33 51 13 26 7
1.0 50 25 63 31 50 13 25 6
1.5 49.5 24.5 62 31 49.5 12.5 24.5 6.5
65
Geotechnical File No. 2015/104, Rev.2
66
Geotechnical File No. 2015/104, Rev.2
Note 1: In case that the facilities layout is modified, a new geotechnical campaign should be carried out by the LSTK contractor at the
new footprint of the facilities.
Note 2: There may be possibilities that edge settlements during the hydro test are proved to be higher than the API tolerances of
50mm; any increase on the edge settlements / differential API limits should be provided by the awarded LSTK Contractor & relevant
Tank Vendor/Manufacturer in writing through a letter; amended tolerances shall be reviewed by CSD/Tank Specialists for their
concurrence
67
Geotechnical File No. 2015/104, Rev.2
From the above table, it is noted that the estimated settlements for applied bearing
pressure of 150 kPa are in the range of 4-81mm for all the tanks except for tanks D-
0102, D-0203 & D-0404, which indicated higher settlements about 140-260mm at
center of tanks. These high settlements are due to the presence of fine-grained soils
with relatively low stiffness in comparison with that of the encountered cohesionless
soil. According to the boreholes findings, the depth of the fine-grained extends up to
3m at Tanks D-0102, D-0203 and 3m to 6m at Tank D-0404. Further investigation by
PCPT also indicted that fine-grade soil extends to a depth of about 6m with low tip
resistance of less than 5 MPa. The sounding of PCPT at Tank D-0404 is presented in
Figure E-9, Appendix-E (PCPT No. 9).
Edge settlements are estimated about 3-40mm for applied bearing pressure of 150
kPa for all the tanks except for Tanks D-0102, D-0203 & D-0404, which indicated
higher edge settlements about 72-150mm. Besides, about one-third of the edge
settlements are expected to occur differentially along the perimeter of the tank due to
normal soil variations. Additional settlements also do take place due to the proximity
of other adjacent tanks. The magnitude of these additional settlements (both at
center and edge) is a function of relative distance between the tanks. For current
settlement assessment long term/creep settlement for period of 25 years has been
considered. However effect of adjacent foundation on settlement shall be considered
during detailed design by LSTK contractor and final settlement values shall be
reported including this consideration before proceeding with foundation design.
Higher settlements at center about 140-260mm & edge settlements 72-150mm are
concern for the tanks D-0102, D-0203 & D-0404 and these settlements are higher
than permissible uniform settlement of 50 mm at edge as per as per API 650
procedure. For all other tank settlements are within the range of permissible uniform
settlement of 50 mm at edge as per as per API 650 procedure. Therefore, soil
improvement by excavation and replacement is recommended to a depth of 3m for
Tanks D-0102 & D-0203, and to a depth of 6m for Tank D-0404 to keep the
anticipated settlements within the permissible limits. The soil improvement measures
are detailed in Section 6.5.4. Excavation considerations and Dewatering measures
shall be recommended in case of deep excavation for Tank D-0404. Excavation
considerations and Dewatering measures are detailed in Section 7.2 & 7.7. In
addition to these measures, are other measures required by Saudi Aramco shall be
followed in the ground improvement.
68
Geotechnical File No. 2015/104, Rev.2
Design limits of differential settlement are currently not available. When those
tolerance data are provided by Tank Vendor/Manufacturer, mitigation measures may
be required if the provided tolerance data are not satisfied. In this case, additional
soil improvement measures may be required, in post-award stage, to satisfy the
tolerance data.
Significant settlements underneath the tanks D-0102, D-0203 and D-0404 due to the
presence of stiff fine-grained soils, as discussed above in Section 6.5.2. Therefore, it
is recommended to excavate the top 3m fine grained soils at Tanks D-0102 & D-0203
and the top 6m at Tank D-0404, and replace them with well compacted select fill
material to keep the settlement within the permissible limits.
The material specifications shall be that of a select fill. The material specifications
and compaction requirements shall be in accordance with SAES A-114. The fill
should be verified by SPT boreholes to prove that the blow counts equal to or
exceeding 20. Alternately, it can be verified with CPT soundings to prove a cone tip
resistance not less than 10 MPa. One borehole or CPT should be conducted every
600 square meters
Soil improvement contractor shall ensure that the post improvement, settlements will
be within the permissible settlements. Post–improvement, assuming an equivalent
SPT-N value of 20 in the improved soil layers, the settlements are expected to be
similar to those estimated for the other unit areas. Post improvement settlements are
presented in below Table.
69
Geotechnical File No. 2015/104, Rev.2
Table 15
Post Improvement Settlements
Variations in the subsurface conditions may do generally exist, which leads to differential settlements. Fig.# 20 presents typical tolerable
differential settlement values for storage tanks and ring wall foundations in accordance with NAVFAC Design Manual.
Further, it is recommended to undertake Hydro-testing of tanks prior to piping connections are made. With hydro-testing (as detailed in
Section 6.5.4), the majority of the settlements are expected to be induced immediately, prior to the actual operations.
70
Geotechnical File No. 2015/104, Rev.2
Hydro-testing of tanks is most important and highly beneficial. The main purpose of
hydro-testing of tanks is to induce the settlements in the substrata prior to the actual
loading and thus reduce the post-construction settlements under actual operational
loads. Based on our experience and literature, a few guidelines for hydro-testing are
outlined.
Prior to hydro-test, a level survey of points marked on shell base plate at 10m
spacing around the tank perimeter and at selected other points shall be conducted
for settlement observations. It is advisable that the Tank should be initially test
loaded in several stages over a period of several days to weeks and the settlements
of the ring-walls and possibly of selected internal points should be carefully planned
and monitored over a longer period. However, the maximum duration/time for testing
may be restricted as per the project requirements and time constraints. The stages
may be typically chosen as 0.25H, 0.5H, 0.75H & H, where H is the final/design
height of water. These are known as ‘hold points’. The rate of filling of ground tanks
in general shall not exceed 2m per day. Each hold point load shall be for 48 hrs of
‘hold period’. Immediately after each hold point is reached, shell levelness surveys
shall be conducted at 4, 12, 24, 36 & 48 hrs intervals. If two successive surveys at 12
hrs intervals indicate that settlement has essentially ceased, filling to the next ‘hold
point’ can start. In general, it is suggested that the new loading should not be started
until the average increase in settlement is limited to 2 mm/12 hrs, with no individual
marker settlement greater than 5 mm/12 hrs. In addition to the above settlement
criteria, we suggest that the hydro-test should immediately cease and tank emptied if:
The level survey data should also be obtained during the tank unloading process.
One set of data should be obtained when the test load is at 0.5H. One additional set
of data should also be obtained when the test load is completely removed and the
71
Geotechnical File No. 2015/104, Rev.2
final data set should be obtained after about 24 hrs after the test load is completely
removed. It is once again emphasized that the above stages of test loading and
unloading, rate of filling, time/duration of testing etc. shall be done in accordance with
project requirements/ specifications, duly approved by standard procedures of Saudi
ARAMCO.
The above information should be taken as guidelines only and the actual stages of
test loading, unloading, holding period etc. shall be done in accordance with
approved standard procedures of Owner.
The LSTK contractor shall submit an official letter to SAUDI ARAMCO indicating
possible higher limits for edge settlements and stating that such an increase may
result in additional stresses to be accommodated/compensated during tank piping
design.
Generally, machine foundations when acted upon by dynamic loads, may vibrate in
any one or combination of the six modes of vibrations (degrees of freedom) as
illustrated in Figure K-4. These modes of vibrations include translational modes along
vertical and horizontal directions, rotational modes in the form of rocking (about
longitudinal axis) or pitching (about lateral axis) or yawning (about vertical axis).
The recommended NABCs for shallow footings are applicable for vertical, concentric
‘static’ loads only. For machine foundations, the bearing capacity values should be
reduced appropriately as per generally accepted industry practices (generally one-
half of the static values). Applicable specifications should be followed for the design
and construction of foundations supporting heavy machinery.
72
Geotechnical File No. 2015/104, Rev.2
1. For high tuned foundations, the soil bearing pressure shall not exceed fifty
percent (50%) of the allowable bearing pressure permitted for static loads.
2. For low tuned foundations, the soil bearing capacities shall not exceed
seventy five percent (75%) of the allowable bearing pressure permitted for
static loads.
The long-term cyclic loadings imposed by the machines could, however, cause minor
or some densification of the granular material beneath the foundations. Due to this
densification, differential settlements will be minimized. The design of the foundations
should restrain the dynamic response of the soil-structure system to within tolerable
and acceptable limits of displacements as per applicable project Specifications.
Richart, Hall and Woods (1970) provide guidance for tolerable displacement
amplitudes for machine vibrations, as shown in FigureK-5. Same information is
reproduced in “Design of structures & foundations for vibrating machines” by Arya,
O’Neill & Pincus (1984).
The maximum permissible increase over the safe loads on the foundations to
account for the transient dynamic loads also shall be 25 percent.
For the design of foundations subjected to dynamic loads, seven (7) seismic cross-
hole tests (CHS # 01 thru CHS # 07) have been performed at locations as indicated
in Table # 1(a). The borehole logs for cross-holes tests at shot hole locations are
presented in Figures D-2 thru D-8. Summary of the laboratory test results of cross-
hole tests are presented in Figures D-9 thru D-11. Details of parameters computed
from the data of seismic tests are tabulated in Figures D-12 thru D-18, Appendix- D.
The data is also presented graphically in Figures D-12(a) thru D-18(a).
Based on the cross-hole test results, the following range of parameters are
recommended for preliminary design of machine foundations (extreme values are
ignored).
73
Geotechnical File No. 2015/104, Rev.2
Table 16
Dynamic Soil Parameters from Cross-hole Tests
Parameter/ µ G (MPa) E (MPa)
Reference
CHS-1 0.28 – 0.39 110 - 300 300 – 850
CHS-2 0.30 – 0.38 40 - 350 100 – 950
CHS-3 0.29 – 0.41 150 - 450 350 – 1300
CHS-4 0.25 – 0.41 80 - 450 200 – 1300
CHS-5 0.31 – 0.39 100 - 500 200 – 1400
CHS-6 0.28 – 0.38 60 - 500 175 - 1450
CHS-7 0.24 - 0.39 60-450 150-850
µ: Poisson’s ratio; G: Dynamic shear modulus; E: Young’s modulus
These design parameters can also be used to calculate other dynamic parameters
such as spring constants.
For a rigid block foundation resting on an elastic half-space, the spring constants and
damping aspects are related to mass ratio and mass moment of inertia. For design
purposes, the values of Equivalent spring constants and geometric damping ratios
with embedment effect as reproduced by Arya et al. (1984) are given in Tables 16 (a)
thru 16 (e).
74
Geotechnical File No. 2015/104, Rev.2
Table 16(a)
Equivalent Spring Constants for Rigid Footings
Motion Spring Constant
Circular Footing
Vertical kz = 4Gro. η z /1-µ
Horizontal kx = 32 (1-µ) Gro3 η x /(7-8µ)
Rocking k ψ = 8Gro³ ηψ /[3(1-µ)]
Torsional k θ = 16 (G ro³) /3
Rectangular Footing
Vertical Kz = [G/ (1- µ)] βz (bL)1/2η z
Horizontal Kx= 2(1+µ) G βx (bL)1/2 η x
Rocking k ψ = [G/ (1-µ)] β ψ bL2 ηψ
Table 16(b)
Embedment Coefficients for Spring Constants
Motion Coefficient (η
η)
Vertical η z = 1 + 0.6(1 − µ )(h / r0 )
Horizontal η x = 1 + 0.55(2 − µ )(h / r0 )
Rocking ηψ = 1 + 1.2( 2 − µ )(h / r0 ) + 0.22(2 − µ )( h / r0 ) 3
Torsional Not available
Where h = depth of embedment below grade
Table 16(c)
Geometrical Damping Ratios
75
Geotechnical File No. 2015/104, Rev.2
Table 16(d)
Embedment Coefficients on Damping Ratios
Motion Coefficient (η
η)
Vertical α z = 1 + 1.9(1 − µ )( h / r0 ) / η z
Horizontal α x = 1 + 1.9(2 − µ )(h / r0 ) / η x
Rocking αψ = [1 + 0.7(1 − µ )(h / r0 ) + 0.6(2 − µ )(h / r0 ) 3 ] / ηψ
Torsional Not available
Where h = depth of embedment below grade
Table 16(e)
Values of ηψ for various values of Bψ
The internal damping ratio value needs to be combined with the various damping
ratios for geometrical damping as shown in this reference. The soils parameters
provided in above tables can be used for design purposes.
76
Geotechnical File No. 2015/104, Rev.2
7. CONSTRUCTION CONSIDERATIONS
A. General
It is noted that the existing ground elevations within the boreholes (as presented in
Table 1) varied between +2.48m & +5.84m indicating a difference in elevation of
about 3.36m except for boreholes BH-82 & BH-83. Theses 2 boreholes are located in
higher elevation of +10.36m & +11.27m for BH-82 & BH-83, respectively. According
to SOW, the final grade expected to vary about 0.5m to 2m within the tanks.
Therefore, based on final grade levels, the site needs to be cut/raised, as a part of
site grading and development work. Based on the groundwater table elevation and
proposed footing depths, appropriate dewatering system may be adopted if
applicable to maintain the groundwater table well below the foundation depths.
Therefore, the site preparation would involve cutting, backfilling and raising
operations in order to bring the various construction areas to the desired grades, and
dewatering as applicable. The construction aspects and work of site preparation shall
be done in accordance with applicable SAES A-114 Standards.
77
Geotechnical File No. 2015/104, Rev.2
and minor sloughing may be anticipated. Similar slope can also be adopted for the fill
embankments up-to a height of 1.5 to 2.0 meters. When any excavation or trench
reaches a depth of 1.2m (4 ft), shoring shall be installed or the sides shall be sloped
or benched. For every 1.2m depth of excavation, benches may be required to ensure
safe means of entry and exit for all trenches. For excavations below GWT,
appropriate dewatering system shall be adopted for proper drainage and disposal of
all water throughout excavation and construction. For further deeper excavations,
sheet piling, ground anchoring or a combination of the two or any other method
acceptable and approved by Saudi Aramco shall be adopted. Therefore, proper
excavation protection should be required in the form of sheet piling, ground
anchoring or any other method acceptable and approved by Saudi Aramco should be
adopted. In all cases, applicable earthwork specifications and construction safety
procedures shall be adhered to Saudi Aramco’s Construction Safety Manual and
Safety Management Guide 06-002-2008.
A. Fill Material
SAES A-114 specifies that Fill materials are broadly of two types, ‘General Fill
material’ or ‘Select fill material’. ‘Select fill material’ shall be required within 0.6m of
the bottom elevation of foundations, tanks, spread footings, slab on grade and
pavements when fill is required to achieve final grade. As per Commentary Note
6.3.1.1 “Foundations may be constructed directly on undisturbed soil. Excavation of
undisturbed soil and replacement with Select Fill Material shall not be performed
except as noted in 6.2.3.2 or 7.2.2 of SAES-A-114”. Requirements for ‘fill material’ as
per SAES A-114 are as follows.
1. General Fill Material – Fill material shall consist of gravel, sand and/or marl.
The maximum size of fill material shall be one-half the lift thickness or 75 mm
(3 inches), whichever is less. Fill material shall be free of frozen lumps,
organic matter, trash, chunks of high plastic clay of other unsatisfactory
material.
78
Geotechnical File No. 2015/104, Rev.2
the No. 40 sieve shall have a maximum liquid limit of 35 and maximum
plasticity index of 12 as per ASTM D-4318.
The top soils (to depths of about 2 SPTs ~ 1.5 m) from majority of the boreholes
revealed predominantly poorly graded to well graded sands with silt/silty sand/clayey
sand/silty clayey gravel/silty gravel/poorly graded gravel with silt/ fine-grained
materials with percent material passing through No. 200 Sieve more than 20. In
addition, majority of the test pit samples also indicated fines percent more than 20.
However, some locations indicated poorly graded sands with silt/silty sand/silty gravel/
well graded to poorly graded gravels with silt/well graded to poorly graded sands with
silt/ silty gravel with percent material passing through No. 200 Sieve less than 20.
Therefore, the suitability of the on-site soils to meet the specifications of fill material
criteria as per SAES A-114 may not be clearly commented. However, the on-site soils
are observed to be free from organic material & carbonates and comprise of granular
soils intermixed with fines and/or fine-grained soils of low plasticity. Therefore, the
material from the excavations may be utilized as general fill material. To utilize as
Select fill material, the on-site/ borrowed material shall be tested/ re-tested and
approved by Saudi Aramco/ Owner Engineer. Besides, compaction requirements and
adequate quality control shall be ensured.
Soil mixture free from organic matter, containing no rocks or lumps over 75 mm (3
inches) or half-the lift thickness, whichever is less, may be considered as satisfactory
material for general fill. This is however subject to the approval of Aramco / M/S
MUSTANG/ Owner Engineer at site In addition, while utilizing this material as backfill,
proper compaction requirements and adequate quality control shall be ensured.
Fill or backfill material shall be as per the suitability criteria mentioned above in
Section. Fill material shall be placed in lifts of about 200 mm - 300 mm in loose
depth for vibratory roller compaction; and not exceeding 100mm for hand-operated
compaction. If the fill material is predominantly fine-grained, shall be placed in lifts of
about 150 mm -200 mm in loose thickness.
79
Geotechnical File No. 2015/104, Rev.2
Other lift thicknesses may be approved by the Aramco Engineers based on field test
section using the intended compaction equipment. It is advisable to prepare a ‘trial
section’ in the field using the anticipated procedure/ equipment and check if the
assumptions made for the fill are achieved by performing appropriate testing.
Compaction shall begin only after the fill or backfill has been properly placed and the
material to be compacted is at the proper moisture content. Compaction shall be
performed with equipment compatible with soil type. Preferably, vibratory roller
compaction is recommended for granular fill materials and static sheep foot rollers /
pneumatic - tired rollers are preferred in compacting fine-grained fills.
Fill or backfill placed beneath mat foundations shall be compacted to at least 90% of
the Maximum Modified Proctor Density as determined by ASTM D-1557. For
cohesionless free draining soils, 70% relative density as determined by ASTM D-
4253 and ASTM D-4254 shall be used. In general, it is recommended that the
moisture contents of the fill material shall be ± 2% of the optimum moisture at the
time of compaction, to achieve desired degree of compaction. Where mechanical
mixing of soil and water is done, it shall be carried out in field sections as outlined in
Section 7.3 C and the degree of compaction be verified in field sections.
In no case should compaction be allowed on slopes steeper than 1(V) to 5 (H) i.e.
20% slopes. A series of horizontal benches, steps or terraces, at least 1 compactor
width, should be cut into existing and natural slopes prior to adding new
fill. Construction of new slopes shall be accomplished by compacting horizontal fill
layers at least 1 (one) roller width beyond the design edge of the slope and when
trimming back to achieve the final slope dimensions.
D. Field Control
Prior to compaction of any fill material, a field section using the intended compaction
equipment shall be performed to determine the proper lift thickness to achieve the
necessary density requirements.
80
Geotechnical File No. 2015/104, Rev.2
To verify that the specified degree of compaction has been achieved, in-place density
and moisture content of soils shall be determined as per ASTM D-1556 or D-2922 or
other acceptable methods. As per applicable SAES A-114 standards, the acceptance
testing of in-place density and moisture content (field density testing) on compacted
fill can be performed.
The number of tests shall be increased if a visual inspection determines that the
moisture content is not uniform or if the compacting effort is variable and not
considered sufficient to attain specified density. The Site Engineer may approve a
decrease in the number of tests once a compaction procedure has proven to meet
compaction requirements.
A well-planned drainage network should be designed for the site to take care of (i)
rainfall; (ii) runoff water; (iii) sewage, etc.
The drainage system should be capable of disposing, safely, waters from all sources
without causing any adverse effect to structures and/or foundation soils. While
preparing the site for the proposed construction, a suitable drainage network should
be planned so as to remove the rainwater and other sources of water effectively
away from the main structures. This should be continuously and effectively taken to a
pre-planned zone so as to discharge into the designated outlets in the area.
81
Geotechnical File No. 2015/104, Rev.2
For a positive protection, in our opinion, the splash zone should be covered with
asphalt cap. This will minimize the ingress of water into foundation soils. Any
gardening activity in the form of lawns, flowerbeds etc. should be accordingly
undertaken somewhat away (about 2m) from the proposed structures.
On-site near-surface soils are generally susceptible to wind and water erosion. These
could be stabilized with Cement. The soil and cement should be well mixed,
moisture-conditioned to within 1 per cent of optimum moisture and compacted to at
least 95% of the maximum dry density. The optimum moisture content and maximum
dry density of the soil-cement mixture should be determined by the ASTM D-558 test
method. Subject to the availability, marl might also be used in lieu of soil-cement
mixture. Mixing, moisture conditioning, and compaction should be completed in not
more than two hours. Traffic, except as required to maintain the surface of the soil-
cement in a damp condition, should not be permitted for at least 24 hours after final
compaction.
The exposed sands could also be stabilized using a mixture of marl and on-site or
imported sands or base aggregate. The aggregate base (10cm-15cm thick) should
be compacted to at least 95 percent of the maximum dry density based on the ASTM
D-1557 test procedures.
For slope protection against erosion from wind, stabilization of surface soil with Type
V Portland Cement as per ASTM C 150 may be adopted. For slope protection
against erosion from water, slowing down of surface water is needed. To accomplish
this, erosion control blankets, fiber rolls may be used. Erosion control blankets are
usually woven type from a chosen material, with lots of ridges and obstructions.
These materials are either synthetic or natural. Fiber rolls are also made of similar
material as used in erosion control blankets, but are rolled into large diameter logs.
Coir type logs/ Logs made of rice/wheat straw also may be used. These logs are
nailed into the slope to slow down the surface water. Tensar type geo-grids also may
be effective. The source/ availability of the appropriate material is essential in
selection of the technique, and it shall be duly approved by Saudi Aramco Engineer.
82
Geotechnical File No. 2015/104, Rev.2
Once the aggregate proportions have been determined, the total chloride and sulfate
contents of the concrete materials should be checked to ensure that the limits as
recommended by ACI/ASTM or other applicable Specifications are not exceeded.
In temperate climates, a concrete mix is typically designed to meet three criteria and
their importance is usually identified thus:
Strength, Workability and Durability
It was rightly said that in the Gulf environment, the order of their significance should
be reversed to:
Durability, Workability and Strength
83
Geotechnical File No. 2015/104, Rev.2
Extreme care is, therefore, advised in the design and construction of foundations to
eliminate the possibility of concrete deterioration and/or corrosion of steel. All
concrete construction below ground level shall be appropriately “protected” in order
to safeguard from aggressive chemical attack from soil and/or groundwater. Details
for “protection of buildings against water from the ground” are given in CP 102 of BSI.
Appropriate coating shall be considered for reinforcement of steel. Consideration
should be given to the provision of an impervious membrane or to the use of special
cements/ additives to provide a concrete of adequate resistance to chemical attack.
Summary of the results of laboratory chemical analysis for sulfates and chlorides of
selected soil and water samples tested is presented in Table 8. The chemical tests
results are examined and compared with the exposure types as per SAES Q-001
dated January 2016, reproduced in Figure K-8. As per the chemical test results and
following Figures K-8 thru K-8(b), consider S2 Sulfate Exposure & C2 Chloride
Exposure and Cement type shall be Type V, Uncoated and Type I + Pozzolan or
Slag with Epoxy Coated Rebars (ECR), respectively. Overall, Type I + Pozzolan or
Slag with Epoxy Coated Rebars (ECR) is recommended. However, concrete mix
should be verified against exposure to sulfates attack.
The GWT readings were recorded during the period of the field work in April-May
2016. The groundwater table was encountered at depths of 1.5m to 5m below
existing ground levels at the borehole locations of boreholes BH-1 thru BH-81 & BH-
84. Ground water table was encountered at deeper depths of 9.5m & 10.4m in BH-82
& BH-83, respectively, due to higher ground level at these boreholes. Based on final
grade levels, excavation levels, dewatering as required shall be carried out before
84
Geotechnical File No. 2015/104, Rev.2
the excavation. Besides, in order to maintain the ground water table at depths well
below the bottom of foundations, and during the site grading activities, to obtain a
stable bottom of the excavation, dewatering is required. Dewatering may be carried
out in advance of any excavation. It is suggested that dewatering, shall be performed
by carefully installed well point system or by any other measures applicable within
project technical specifications. The dewatering system should be designed by
experienced dewatering contractors having sufficient knowledge with local
experience.
A total of fourteen (14) test pits were excavated by using mechanical excavator as
specified in Figure 2a. Bulk samples were collected from each layer of test pits within
the depths of top 1.0 m at the respective existing grades. Index tests, Proctor and
CBR tests were conducted on all the bulk samples. The summary of laboratory test
results on test pit samples are given in Figures in Appendix-H.
As observed from the summary of laboratory tests (Figures H-15 thru H-17), the
samples are classified as SM, SP-SM, SC-SM & GC-GM as per ASTM-2487 and A-
2-4, A-1-b & A-3 as per ASTM D-3282.
85
Geotechnical File No. 2015/104, Rev.2
From the summary, it is noted that out of 16 samples collected, about 3 samples (TP
# 2, 7 & 9) only indicated the fines passing through sieve No. # 200 less than 20. The
remaining samples indicated fines passing through sieve No. # 200 more than 20
percent. Therefore, the suitability of the on-site soils to meet the specifications of fill
material criteria as per SAES A-114 can not be clearly commented. In view of this,
verification tests are required after the site grading is complete. In general, it is
recommended that the moisture contents of the sub-grade soils be ± 2% of the
optimum moisture at the time of compaction. Accordingly, the existing sub-grade
soils if needed to be utilized should, therefore, be wetted to increase their moisture
contents in order to provide adequate and proper compaction. It is essential that the
sub-grade and sub-base be hard and non-yielding at the time of pavement
construction.
It is known that CBR value for the material is an important parameter in the material
selection and design of flexible pavements. CBR tests conducted on bulk samples
that indicated CBR value between 12 to 56 at 95% compaction and 24 to 71 at 100%
compaction. The soil rating system for sub grade, sub base or base for use in the
design of light traffic pavements in terms of CBR values is reproduced in Figure H-
65. Following this figure, the existing A-3, A-2-4 / A-1-b soils could be categorized in
general as ‘good to excellent’ sub-grade materials to support pavements.
A base course may be generally defined as a layer of granular material, which lies
immediately below the wearing surface of a flexible pavement. As this course lies
close to the pavement surface, it must possess high resistance to deformation in
order to withstand high pressures imposed upon it.
All Asphalt concrete paving aspects shall be in accordance with SAES Q-006.
For “Asphalt Concrete Paving”, the entire sub grade shall be compacted to not less
than 95 percent of the maximum dry density per (ASTM D-1557, Method-D, or
AASHTO T-180 Method-D) or to not less than 70 percent of relative density
determined by ASTM D-4253 and D-4254, unless specified otherwise in the
Earthwork documents. The granular sub base material should be compacted to 95%
of the maximum modified dry density (ASTM D-1557). All compaction operations at
86
Geotechnical File No. 2015/104, Rev.2
the site shall preferably be done at moisture content close to optimum, and shall be
done in accordance with project specifications. Sub grade below paved areas and
roadways should be prepared as recommended in the site preparation section as per
SAES A-114 or Project specifications. Fill necessary to raise each site and bring the
pavement areas to the desired grades should also be as specified in SAES A-114.
On-site granular soil can be used as backfill if properly compacted and prepared as
discussed above and also meet the project specifications. It is recommended that all
pavement areas and drives be properly graded to promote effective drainage of
water and prevent ponding of surface water onto the pavement areas.
87
Geotechnical File No. 2015/104, Rev.2
This Detailed Engineering Report is for exclusive use of Mustang HDP for specific
application to the proposed YANBU DISTRIBUTION HUB Project.
The soil data, test results and foundation recommendations submitted in this report
are based on subsurface conditions revealed through a total of eighty four (84)
Boreholes, Standard penetration tests & Collection of Samples for laboratory testing
on borehole samples, ten (10) PCPTs, seven (7) seismic cross-hole tests, five (5)
seismic refraction tests, twenty (20) soil electrical resistivity tests, Excavation of
fourteen (14) Test pits including field density tests and Collection of Bulk Samples as
per the locations provided in SOW. No other warranty, expressed or implied, is
made.
In the event that the design or location of the proposed structures/locations with
reference to current boreholes is changed, the recommendations contained in this
report should be thoroughly reviewed and the conclusions of this report shall be re-
evaluated with specific application.
It is a standard and good practice to probe for and remove all loose/soft
zones/pockets at foundation level or immediately below and replace the same with
compacted fill (as per project specifications), prior to placement of foundations. It is
recommended that all construction operations dealing with excavations, earthwork
and foundations be supervised by experienced personnel.
Extreme care is advised in the design & construction to eliminate the possibility of
concrete deterioration and/or corrosion of steel.
Due care shall be exercised to ensure proper erosion protection measures are
implemented.
88
Geotechnical File No. 2015/104, Rev.2
9. SELECTED REFERENCES
89
Drawing Title : Client / Owner: Project Title :
Geotechnical Investigation for
FACILITY PLOT PLAN YANBU DISTRIBUTION HUB Project, Yanbu
TESTS LOCATION PLAN Geotechnical File No. 2015/104 Figure No. 2(a)
Drawing Title : Client / Owner: Project Title :
Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
TESTS LOCATION SCHEDULE
Geotechnical File No. 2015/104 Figure No. 2(b)
Drawing Title : Client / Owner: Project Title :
Geotechnical Investigation for
BOREHOLES AND OTHER YANBU DISTRIBUTION HUB Project, Yanbu
TESTS LOCATION PLAN Geotechnical File No. 2015/104 Figure No. 2(c)
Drawing Title : Client / Owner: Project Title :
Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
BOREHOLES LOCATION PLAN
Geotechnical File No. 2015/104 Figure No. 2(d)
Drawing Title : Client / Owner: Project Title :
Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
BOREHOLES LOCATION PLAN
Geotechnical File No. 2015/104 Figure No. 2(e)
Depth 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0.15 21 20 17 27 30 16 33 35 25 24 24 28 28 18 18 18 20 9 31 19
0.75 24 13 19 17 20 23 32 35 28 32 33 26 19 20 22 11 17 11 17 15
1.5 27 21 33 22 10 20 30 36 24 38 42 29 53 49 58 13 12 12 40 21
2.25 43 33 30 41 14 21 18 36 29 43 52 19 57 61 58 13 15 13 48 18
3 50 26 34 50/11 45 46 33 18 20 44 47 28 91/24 66 50 U 28 24 37 56
3.75 49 50 42 76 32 36 34 32 17 44 49 20 50/10 75 46 31 26 22 43 41
4.5 56 46 36 38 29 53 31 37 43 53 54 49 50/10 81 59 50/12 48 88/25 56 51
6 64 56 73 43 33 62 52 U-1 42 50 58 51 50/13 95/27 65 48 39 71 45 58
7.5 61 53 60 42 32 58 44 50/10 65 46 44 55 83 50/13 69 62 53 63 56 52
9 65 63 62 76 43 64 50/13 50/9 63 46 40 53 93/26 50/10 56 59 50 66 55 58
10.5 36 63 60 71 40 80 50/11 50/10 74 43 37 55 50/12 40 70 69 62 76 59 51
12 49 69 57 73 35 70 50/10 50/8 93/25 43 34 58 50/14 37 66 46 68 68 59 53
13.5 45 68 45 69 41 70 50/11 50/11 84 40 48 59 50/12 80 63 47 71 54 59 59
15 56 60 42 59 37 63 50/14 50/13 94/25 47 51 56 90/24 94/25 61 41 45 59 53 63
16.5 48 65 50 63 29 43 50/12 50/14 95/26 47 55 53 50/12 94/25 72 46 47 71 49 57
18 56 54 79 78 28 64 50/8 50/11 85 46 50 70 50/10 50/9 50/7 77/27 92/25 76 32 61
19.5 56 67 79 71 34 69 50/11 50/10 50/13 53 42 68 50/14 50/12 50/5 50/13 88/28 50/13 40 45
21 53 67 83 59 37 74 87/24 50/12 50/12 50 48 56 50/12 50/8 50/11 82 50/4 50/12 48 44
22.5 57 60 82 54 50/13 70 53
24 47 60 90/24 46 50/11 73 40
25.5 46 62 91 52 50/12 50/12 36
27 59 63 99/25 53 50/10 50/14 41
28.5 58 58 50/13 48 50/13 50/11 48
30 61 65 50/10 52 50/14 50/13 49
CL-ML/CL/ML U: Undistrubed sample
GWT 2.35 2.3 2.7 2.55 2.7 2.7 2.5 2.55 2.6 3.45 3.5 3.65 3.5 3.15 3.45 2.45 2.6 2.55 4.2 4.35
RIG # 808 808 814 808 812 814 690 690 690 812 812 812 690 690 814 790 790 790 690 790
Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO
Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO
Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO
Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,110.93 meter TYPE OF BORING: ROTARY WASH
EAST: 430,252.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-01
GROUND ELEVATION: 3.08 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.35 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 24-4-16
MEASURED AT: 0700 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 36 11.4 05 Dense, dark brown, poorly graded sand with silt & gravel.
36 11.0
37 11.3
SP-SM
38 11.6
39 11.9
40
SPT - 11 49 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 12 45 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 13 >50 9.1 06 Very dense, dark brown, poorly graded gravel with silt & 15.2
51 sand. 15.5
52 GP-GM 15.8
53 16.2
54 16.5
55 SPT - 14 48 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 15 >50 Ditto but very dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 16 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 17 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,110.93 meter TYPE OF BORING: ROTARY WASH
EAST: 430,252.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-01
GROUND ELEVATION: 3.08 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.35 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 24-4-16
MEASURED AT: 0700 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, dark brown, poorly graded gravel with silt & 21.6
sand.
72 21.9
73 22.3
74 22.6
SPT - 18 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 19 47 8.7 04 Dense, brown, poorly graded gravel with sand.
80 24.4
81 24.7
GP
82 25.0
83 25.3
84 25.6
SPT - 20 46 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 21 >50 Ditto but very dense.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 22 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 23 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,128.80 meter TYPE OF BORING: ROTARY WASH
EAST: 430,231.29 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-02
GROUND ELEVATION: 3.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.30 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 21-4-16
MEASURED AT: 0710 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,128.80 meter TYPE OF BORING: ROTARY WASH
EAST: 430,231.29 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-02
GROUND ELEVATION: 3.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.30 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 21-4-16
MEASURED AT: 0710 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 6.5 11 Very dense, brown, poorly graded gravel with silt & sand. 12.2
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto but with traces of clay.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,093.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,273.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-03
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 23-4-16
MEASURED AT: 0725 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,093.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,273.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-03
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 23-4-16
MEASURED AT: 0725 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded sand with silt & gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 12.4 14 Very dense, brown, silty gravel with sand. 12.2
41 12.5
42 GM 12.8
43 13.1
44 13.4
45
SPT - 13 45 Dense, brown, silty sand with gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 42 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto but very dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,027.90 meter TYPE OF BORING: ROTARY WASH
EAST: 430,183.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-04
GROUND ELEVATION: 3.35 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 25-4-16
MEASURED AT: 0740 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,027.90 meter TYPE OF BORING: ROTARY WASH
EAST: 430,183.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-04
GROUND ELEVATION: 3.35 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 25-4-16
MEASURED AT: 0740 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 12.7 16 Very dense, brown, silty gravel with sand.
36 11.0
37 11.3
GM
38 11.6
39 11.9
40
SPT - 12 >50 30.6 32 Very dense, yellowish, silty sand with traces of clay. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 23.3 26 Very dense, brown, silty sand. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 30.2 25 SM Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,027.90 meter TYPE OF BORING: ROTARY WASH
EAST: 430,183.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-04
GROUND ELEVATION: 3.35 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 25-4-16
MEASURED AT: 0740 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.76 meter TYPE OF BORING: ROTARY WASH
EAST: 430,161.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-05
GROUND ELEVATION: 3.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 24-4-16
MEASURED AT: 0800 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.76 meter TYPE OF BORING: ROTARY WASH
EAST: 430,161.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-05
GROUND ELEVATION: 3.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 24-4-16
MEASURED AT: 0800 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 40 Dense, brown, gravel with silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 35 Dense, brownish grey, clayey sand with gravel. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 41 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 37 14.3 20 Ditto. 15.2
51 15.5
52 SC 15.8
53 16.2
54 16.5
55 SPT - 15 29 Ditto but medium dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 28 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 34 Ditto but dense. 19.8
66 20.1
SPT - 18 37 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,010.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,204.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-06
GROUND ELEVATION: 3.45 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 25-4-16
MEASURED AT: 0810 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,010.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,204.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-06
GROUND ELEVATION: 3.45 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 25-4-16
MEASURED AT: 0810 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, clayey silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 27.8 26 Very dense, brown, silty sand with gravel & traces of clay. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 33.3 36 Very dense, brown, silty sand with traces of clay. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but yellowish grey. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 43 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto but very dense, greyish brown. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,234.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.74 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-07
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 23-4-16
MEASURED AT: 0825 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,234.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.74 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-07
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 23-4-16
MEASURED AT: 0825 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 9.9 15 Very dense, light grey, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40 SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 13.3 13 Very dense, brown, silty gravel with sand. 18.3
61 18.6
62 GM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 14.6 31 SC Very dense, dark brown,clayey sand with occasional gravel. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,234.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.74 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-07
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 23-4-16
MEASURED AT: 0825 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,251.96 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-08
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 0835 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,251.96 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-08
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 0835 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 >50 Very dense, light grey, silty clayey sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40 SPT - 11 >50 Very dense, dark brown, silty sand with gravel. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 12 >50 Ditto but light grey. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 13 >50 14.6 11 Very dense, light grey, poorly graded sand with silt. 15.2
51 15.5
52 SP-SM 15.8
53 16.2
54 16.5
55 SPT - 14 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
SPT - 15 >50 Ditto.
60 18.3
61 18.6
62 18.9
63 19.2
64 19.5
SPT - 16 >50 Ditto.
65 19.8
66 >50 20.1
SPT - 17 Ditto.
67 END OF BORING @ 20.12 m. 20.4
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,216.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,112.02 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-09
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 24-4-16
MEASURED AT: 0850 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,216.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,112.02 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-09
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 24-4-16
MEASURED AT: 0850 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Very dense, brown, gravel with silty sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 17.2 17 Very dense, brown, silty sand. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but with gravel. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
SPT - 17 >50 Ditto.
65 19.8
66 >50 20.1
SPT - 18 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,917.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-10
GROUND ELEVATION: 4.19 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 1048 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,917.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-10
GROUND ELEVATION: 4.19 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 1048 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 43 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 43 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 40 11.0 25 Dense, brown, silty clayey sand with gravel. 13.7
46 14.0
47 SC-SM 14.3
48 14.6
49 14.9
50 SPT - 14 47 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 47 11.3 17 Ditto but dark brown. 16.8
56 17.1
57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 46 Dense, dark brown, silty sand with occasional gravel. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 50 Ditto but dense. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,917.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-10
GROUND ELEVATION: 4.19 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 1048 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.97 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.00 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-11
GROUND ELEVATION: 4.24 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 25-4-16
MEASURED AT: 0915 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.97 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.00 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-11
GROUND ELEVATION: 4.24 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 25-4-16
MEASURED AT: 0915 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 37 Dense, yellowish brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 34 20.7 27 Dense, brown, silty clayey sand with gravel. 12.2
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
SPT - 13 48 Dense, brown, silty sand with gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but very dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 50 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 42 Ditto. 19.8
66 20.1
SPT - 18 48 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,899.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,111.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-12
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0925 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-12
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,899.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,111.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-12
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0925 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 10.1 16 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 13.7 11 Very dense, brown, well graded gravel with silt & sand. 15.2
51 15.5
52 GW-GM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-12
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,834.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,020.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-13
GROUND ELEVATION: 4.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 27-4-16
MEASURED AT: 0935 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,834.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,020.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-13
GROUND ELEVATION: 4.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 27-4-16
MEASURED AT: 0935 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 Very dense, brown, silty clayey sand with occasional gravel.
36 11.0
37 11.3
SC-SM
38 11.6
39 11.9
40 SPT - 12 >50 Very dense, brown, well graded sand with silt & gravel. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 20.2 08 Ditto. 15.2
51 15.5
52 SW-SM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,834.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,020.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-13
GROUND ELEVATION: 4.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 27-4-16
MEASURED AT: 0935 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, well graded sand with silt & gravel. 21.6
72 21.9
73 22.3
74 22.6
SPT - 19 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 19.0 41 Very dense, brownish grey, silty clayey sand.
80 24.4
81 24.7
SC-SM
82 25.0
83 25.3
84 25.6
SPT - 21 >50 20.0 41 Ditto but brown with occasional gravel.
85 25.9
86 26.2
SC-SM
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 SPT - 24 >50 Ditto but brownish grey. 30.2
100 END OF BORING @ 30.14 m. 30.5
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,851.93 meter TYPE OF BORING: ROTARY WASH
EAST: 429,999.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-14
GROUND ELEVATION: 3.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.15 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 25-4-16
MEASURED AT: 0950 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-14
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,851.93 meter TYPE OF BORING: ROTARY WASH
EAST: 429,999.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-14
GROUND ELEVATION: 3.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.15 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 25-4-16
MEASURED AT: 0950 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 40 Dense, brown, well graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 37 17.5 41 Dense, brown, clayey gravel with sand. 12.2
41 12.5
42 GC 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Very dense, greyish brown, clayey silty sand with gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Very dense, brown, gravel with silty sand. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 9.5 18 Very dense, brown, silty sand with gravel. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 END OF BORING @ 20.23 m. 20.4
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-14
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,816.23 meter TYPE OF BORING: ROTARY WASH
EAST: 430,042.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-15
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.45 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 27-4-16
MEASURED AT: 1000 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-15
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,816.23 meter TYPE OF BORING: ROTARY WASH
EAST: 430,042.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-15
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.45 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 27-4-16
MEASURED AT: 1000 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 21.0 53 Hard, brown, sandy silty clay.
36 11.0
37 11.3
CL-ML
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 17.3 50 Hard, brown, sandy silt. 13.7
46 14.0
47 ML 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but yellowish. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 11.1 11 Very dense, brown, well graded gravel with silt & sand. 16.8
56 17.1
57 GW-GM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Very dense, brown, silty sand with gravel. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65
SPT - 17 >50 Very dense, brown, gravel with silty sand. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 END OF BORING @ 20.26 m. 20.4
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-15
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,137.99 meter TYPE OF BORING: ROTARY WASH
EAST: 430,010.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-16
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.45 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 24-4-16
MEASURED AT: 1010 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,137.99 meter TYPE OF BORING: ROTARY WASH
EAST: 430,010.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-16
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.45 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 24-4-16
MEASURED AT: 1010 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 >50 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 11 46 15.0 19 Dense, brown, silty sand with occasional gravel. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 12 47 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 13 41 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 14 46 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 15 >50 Very dense, brown, poorly graded sand with silt & gravel. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 16 >50 37.7 12 Ditto but brownish grey. 19.8
66 20.1
67 SP-SM 20.4
68 20.7
69 21.0
70 SPT - 17 >50 20.5 31 SM Very dense, brownish grey, silty sand with traces of clay. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,137.99 meter TYPE OF BORING: ROTARY WASH
EAST: 430,010.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-16
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.45 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 24-4-16
MEASURED AT: 1010 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brownish grey, silty sand with traces of clay. 21.6
72 SM 21.9
73 22.3
74 22.6
SPT - 18 >50 Very dense, brown, silty sand with gravel.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 19 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 20 >50 Ditto but greyish brown.
85 25.9
86 26.2
87 26.5
88 26.8
89 >50 27.1
SPT - 21 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 SPT - 22 >50 Ditto. 28.7
95 29.0
96 29.3
97 29.6
98 29.9
99 SPT - 23 >50 Ditto. 30.2
100 END OF BORING @ 30.28 m. 30.5
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,155.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,988.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-17
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 23-4-16
MEASURED AT: 1025 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-17
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,155.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,988.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-17
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 23-4-16
MEASURED AT: 1025 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto but brownish grey. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 45 15.4 17 Dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 47 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 27.7 53 Hard, light grey, sandy silt. 18.3
61 18.6
62 ML 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but light brown. 19.8
66 >50 20.1
SPT - 18 Ditto.
67 END OF BORING @ 20.19 m. 20.4
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-17
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,120.16 meter TYPE OF BORING: ROTARY WASH
EAST: 430,031.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-18
GROUND ELEVATION: 3.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 25-4-16
MEASURED AT: 1035 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,120.16 meter TYPE OF BORING: ROTARY WASH
EAST: 430,031.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-18
GROUND ELEVATION: 3.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 25-4-16
MEASURED AT: 1035 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, gravel with clayey silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Very dense, brown, poorly graded sand with silt & gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 26.6 51 Hard, brown, sandy silt. 16.8
56 17.1
57 ML 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 13.1 37 Very dense, greyish brown, silty sand with occasional gravel 19.8
SM
& traces of clay.
66 20.1
SPT - 18 >50 Ditto.
67 20.4
END OF BORING @ 20.27 m.
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,591.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,640.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-19
GROUND ELEVATION: 4.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 18-4-16
MEASURED AT: 1045 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,591.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,640.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-19
GROUND ELEVATION: 4.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 18-4-16
MEASURED AT: 1045 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 16.9 18 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 12 >50 15.6 13 Very dense, brown, silty sand with gravel. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 16.3 19 Very dense, brown, silty clayey sand with gravel. 15.2
51 15.5
52 SC-SM 15.8
53 16.2
54 16.5
55 SPT - 15 49 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 32 22.8 76 Very stiff, brown, lean clay with sand. 18.3
61 18.6
62 CL 18.9
63 19.2
64 19.5
65 SPT - 17 40 Dense, brown, clayey sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 48 18.7 48 SC Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,591.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,640.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-19
GROUND ELEVATION: 4.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 18-4-16
MEASURED AT: 1045 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,612.73 meter TYPE OF BORING: ROTARY WASH
EAST: 429,615.13 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-20
GROUND ELEVATION: 5.00 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.35 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 18-4-16
MEASURED AT: 1055 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,612.73 meter TYPE OF BORING: ROTARY WASH
EAST: 429,615.13 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-20
GROUND ELEVATION: 5.00 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.35 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 18-4-16
MEASURED AT: 1055 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 11.7 09 Very dense, brownish grey, poorly graded gravel with silt &
36 11.0
sand.
37 11.3
GP-GM
38 11.6
39 11.9
40
SPT - 12 >50 12.8 15 Very dense, brown, clayey sand with gravel. 12.2
41 12.5
42 SC 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Very dense, brown, silty sand with gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 17.4 20 Very dense, brown, silty clayey gravel with sand. 15.2
51 15.5
52 GC-GM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Very dense, brownish grey, silty sand with occasional gravel. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Very dense, brownish grey, silty sand with gravel. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 45 Ditto but dense. 19.8
66 20.1
SPT - 18 44 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,571.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,664.97 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-21
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.05 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 16-4-16
MEASURED AT: 1105 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,571.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,664.97 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-21
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.05 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 16-4-16
MEASURED AT: 1105 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 8.8 02 Very dense, brown, poorly graded gravel with sand.
36 11.0
37 11.3
GP
38 11.6
39 11.9
40
SPT - 12 >50 Ditto but grey. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 18.7 11 Very dense, brown, poorly graded sand with silt & gravel. 13.7
46 14.0
47 SP-SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Very dense, greyish brown, fine to coarse gravel with silty 15.2
51 sand. 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
SPT - 17 >50 Ditto.
65 19.8
66 >50 20.1
SPT - 18 Ditto.
67 END OF BORING @ 20.13 m. 20.4
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,472.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,540.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-22
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 17-4-16
MEASURED AT: 1120 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,472.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,540.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-22
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 17-4-16
MEASURED AT: 1120 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 43 Dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 9.3 09 Ditto but very dense. 12.2
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 13.4 20 Very dense, brown, silty sand with gravel. 18.3
61 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,472.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,540.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-22
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 17-4-16
MEASURED AT: 1120 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,493.62 meter TYPE OF BORING: ROTARY WASH
EAST: 429,515.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-23
GROUND ELEVATION: 5.25 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 13-4-16
DEPTH OF GROUNDWATER TABLE: 4.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 14-4-16
MEASURED AT: 1130 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,493.62 meter TYPE OF BORING: ROTARY WASH
EAST: 429,515.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-23
GROUND ELEVATION: 5.25 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 13-4-16
DEPTH OF GROUNDWATER TABLE: 4.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 14-4-16
MEASURED AT: 1130 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 37 20.3 27 Dense, greyish brown, silty clayey sand with gravel. 12.2
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
SPT - 13 37 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but very dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 15.1 15 Ditto but brown. 16.8
56 17.1
57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Very dense, brown, silty sand with gravel. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,451.86 meter TYPE OF BORING: ROTARY WASH
EAST: 429,565.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-24
GROUND ELEVATION: 5.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 17-4-16
MEASURED AT: 1145 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,451.86 meter TYPE OF BORING: ROTARY WASH
EAST: 429,565.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-24
GROUND ELEVATION: 5.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 17-4-16
MEASURED AT: 1145 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, gravel with silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto but greyish brown. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 18.5 10 Very dense, grey, well graded sand with silt & gravel. 16.8
56 17.1
57 SW-SM 17.4
58 17.7
59 18.0
60 SPT - 16 50 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,353.63 meter TYPE OF BORING: ROTARY WASH
EAST: 429,440.62 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-25
GROUND ELEVATION: 5.52 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 11-4-16
MEASURED AT: 1200 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,353.63 meter TYPE OF BORING: ROTARY WASH
EAST: 429,440.62 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-25
GROUND ELEVATION: 5.52 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 11-4-16
MEASURED AT: 1200 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 39 19.6 33 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 45 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 42 Dense, brown, silty gravel with sand. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but very dense with clay. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 47 22.5 30 Dense, brown, silty sand with gravel & traces of clay. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, brown, silty gravel with sand. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,353.63 meter TYPE OF BORING: ROTARY WASH
EAST: 429,440.62 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-25
GROUND ELEVATION: 5.52 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 11-4-16
MEASURED AT: 1200 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,374.51 meter TYPE OF BORING: ROTARY WASH
EAST: 429,415.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-26
GROUND ELEVATION: 5.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 10-4-16
MEASURED AT: 1210 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,374.51 meter TYPE OF BORING: ROTARY WASH
EAST: 429,415.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-26
GROUND ELEVATION: 5.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 10-4-16
MEASURED AT: 1210 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 14.5 11 Very dense, brown, well graded sand with silt. 13.7
46 14.0
47 SW-SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65
SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 END OF BORING @ 20.24 m. 20.4
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,332.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,465.51 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-27
GROUND ELEVATION: 5.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 14-4-16
MEASURED AT: 1225 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,332.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,465.51 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-27
GROUND ELEVATION: 5.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 14-4-16
MEASURED AT: 1225 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 11.8 13 Very dense, brown, silty gravel with sand. 12.2
41 12.5
42 GM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Very dense, brown, silty sand with gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 14.7 16 Ditto. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.40 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,425.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,873.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-28
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 22-4-16
MEASURED AT: 1235 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,425.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,873.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-28
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 22-4-16
MEASURED AT: 1235 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 29 Medium dense, grey, gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 27 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 29 Medium dense, brownish grey, gravel with silty sand. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 32 Ditto but dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 42 Dense, brown, silty sand with gravel. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 43 Dense, greyish brown, gravel with silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 42 Dense, brown, silty sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 43 17.4 29 GC Dense, brown, clayey gravel with sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,425.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,873.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-28
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 22-4-16
MEASURED AT: 1235 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,443.65 meter TYPE OF BORING: ROTARY WASH
EAST: 429,852.12 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-29
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 18-4-16
MEASURED AT: 1245 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,443.65 meter TYPE OF BORING: ROTARY WASH
EAST: 429,852.12 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-29
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 18-4-16
MEASURED AT: 1245 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, dark brown, clayey gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto but with sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 47 Dense, dark brown, clayey sand with gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but very dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Very dense, dark brown, sandy clayey gravel. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 48 Ditto but dense. 19.8
66 20.1
SPT - 18 45 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,407.96 meter TYPE OF BORING: ROTARY WASH
EAST: 429,894.75 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-30
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 23-4-16
MEASURED AT: 1255 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-30
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,407.96 meter TYPE OF BORING: ROTARY WASH
EAST: 429,894.75 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-30
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 23-4-16
MEASURED AT: 1255 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 36 9.5 10 Dense, brown, well graded gravel with silt & sand.
36 11.0
37 11.3
GW-GM
38 11.6
39 11.9
40
SPT - 12 41 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 35 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 39 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 39 12.4 26 Dense, greyish brown, clayey sand with gravel. 16.8
56 17.1
57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 46 Ditto but light grey. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 35 Ditto but greyish brown. 19.8
66 20.1
SPT - 18 41 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-30
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,341.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,802.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-31
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 19-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 20-4-16
MEASURED AT: 1305 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,341.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,802.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-31
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 19-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 20-4-16
MEASURED AT: 1305 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, dark brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 26.8 74 Hard, light grey, lean clay with sand. 12.2
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Very dense, dark brown, silty sand with gravel. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 29 Medium dense, dark brown, poorly graded sand with gravel. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,341.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,802.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-31
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 19-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 20-4-16
MEASURED AT: 1305 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Medium dense, dark brown, poorly graded sand with gravel. 21.6
72 21.9
73 22.3
74 22.6
SPT - 19 >50 Ditto but very dense.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Very dense, dark brown, silty sand.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 47 29.1 86 Hard, brown, lean clay with sand.
85 25.9
86 26.2
CL
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, brown, silty clayey sand with gravel.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50 16.9 29
95 29.0
96 29.3
SC-SM
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,359.04 meter TYPE OF BORING: ROTARY WASH
EAST: 429,781.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-32
GROUND ELEVATION: 4.57 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1315 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-32
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,359.04 meter TYPE OF BORING: ROTARY WASH
EAST: 429,781.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-32
GROUND ELEVATION: 4.57 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1315 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 29 19.2 44 Medium dense, light grey, clayey sand.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 12 44 Ditto but dense. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 35 27.8 66 Hard, light grey, sandy lean clay. 13.7
46 14.0
47 CL 14.3
48 14.6
49 14.9
50 SPT - 14 44 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Very dense, dark brown, silty sand with gravel. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-32
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,323.35 meter TYPE OF BORING: ROTARY WASH
EAST: 429,823.91 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-33
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 22-4-16
MEASURED AT: 1325 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-33
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,323.35 meter TYPE OF BORING: ROTARY WASH
EAST: 429,823.91 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-33
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 22-4-16
MEASURED AT: 1325 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 45 11.2 12 Ditto but dense. 12.2
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto but very dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 11.1 07 Very dense, brown, poorly graded sand with silt & gravel. 15.2
51 15.5
52 SP-SM 15.8
53 16.2
54 16.5
55 SPT - 15 46 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 45 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 45 Ditto. 19.8
66 20.1
SPT - 18 42 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-33
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,256.57 meter TYPE OF BORING: ROTARY WASH
EAST: 429,731.79 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-34
GROUND ELEVATION: 4.62 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 20-4-16
MEASURED AT: 1335 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-34
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,256.57 meter TYPE OF BORING: ROTARY WASH
EAST: 429,731.79 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-34
GROUND ELEVATION: 4.62 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 20-4-16
MEASURED AT: 1335 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 33 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 32 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 9.0 07 Very dense, brownish grey, poorly graded gravel with silt & 13.7
46 sand. 14.0
47 GP-GM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 10.5 10 Ditto but greyish brown. 16.8
56 17.1
57 GP-GM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 16.4 19 Very dense, brown, silty clayey sand with gravel. 19.8
66 20.1
67 SC-SM 20.4
68 20.7
69 21.0
70 SPT - 18 39 13.5 57 CL Hard, brown, sandy lean clay. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-34
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,256.57 meter TYPE OF BORING: ROTARY WASH
EAST: 429,731.79 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-34
GROUND ELEVATION: 4.62 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 20-4-16
MEASURED AT: 1335 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-34
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,274.43 meter TYPE OF BORING: ROTARY WASH
EAST: 429,710.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-35
GROUND ELEVATION: 4.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 17-4-16
MEASURED AT: 1345 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-35
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,274.43 meter TYPE OF BORING: ROTARY WASH
EAST: 429,710.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-35
GROUND ELEVATION: 4.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 17-4-16
MEASURED AT: 1345 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 45 15.8 26 Dense, light grey, clayey sand with occasional gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 12 >50 Ditto but very dense. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 48 Ditto but dense, greyish brown. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 42 17.4 28 Ditto. 15.2
51 15.5
52 SC 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto but very dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 50 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
END OF BORING @ 20.35 m.
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-35
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,238.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,753.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-36
GROUND ELEVATION: 4.31 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 24-4-16
MEASURED AT: 1355 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-36
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,238.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,753.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-36
GROUND ELEVATION: 4.31 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 24-4-16
MEASURED AT: 1355 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 30 Very stiff, brownish grey, sandy lean clay.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 37 20.9 65 Ditto but hard. 12.2
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
SPT - 13 38 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Very dense, brownish grey, silty sand with gravel. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto but brown. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 45 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-36
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,162.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,652.60 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-37
GROUND ELEVATION: 4.38 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 14-4-16
MEASURED AT: 1405 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-37
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,162.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,652.60 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-37
GROUND ELEVATION: 4.38 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 14-4-16
MEASURED AT: 1405 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 14.1 13 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 30 Ditto but medium dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 8.8 09 Very dense, brown, well graded gravel with silt & sand. 15.2
51 15.5
52 GW-GM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 11.0 12 Very dense, brown, well graded sand with silt & gravel. 18.3
61 18.6
62 SW-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Dense, brown, silty gravel with sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-37
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,162.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,652.60 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-37
GROUND ELEVATION: 4.38 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 14-4-16
MEASURED AT: 1405 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-37
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,183.56 meter TYPE OF BORING: ROTARY WASH
EAST: 429,626.78 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-38
GROUND ELEVATION: 4.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 12-4-16
MEASURED AT: 1410 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-38
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,183.56 meter TYPE OF BORING: ROTARY WASH
EAST: 429,626.78 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-38
GROUND ELEVATION: 4.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 12-4-16
MEASURED AT: 1410 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 9.5 07 Very dense, greyish brown, well graded gravel with silt &
36 11.0
sand.
37 11.3
GW-GM
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 24 23.9 10 Medium dense, brown, well graded sand with silt. 16.8
56 17.1
57 SW-SM 17.4
58 17.7
59 18.0
60 SPT - 16 26 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, greyish brown, silty gravel with sand. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-38
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,140.36 meter TYPE OF BORING: ROTARY WASH
EAST: 429,678.38 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-39
GROUND ELEVATION: 4.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.35 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 16-4-16
MEASURED AT: 1415 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-39
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,140.36 meter TYPE OF BORING: ROTARY WASH
EAST: 429,678.38 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-39
GROUND ELEVATION: 4.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.35 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 16-4-16
MEASURED AT: 1415 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, light grey, silty clayey sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 24 Medium dense, brown, silty sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 25 21.7 17 Ditto. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 26 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 24 Ditto but with occasional gravel. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 27 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 30 Ditto. 19.8
66 20.1
SPT - 18 32 Ditto but dense.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-39
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,935.09 meter TYPE OF BORING: ROTARY WASH
EAST: 429,618.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-40
GROUND ELEVATION: 4.71 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 1425 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-40
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,935.09 meter TYPE OF BORING: ROTARY WASH
EAST: 429,618.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-40
GROUND ELEVATION: 4.71 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 1425 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 11.3 29 Very dense, brownish grey, silty sand with gravel. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto but brown. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 32.8 66 Hard, greyish brown, sandy silt. 19.8
66 20.1
67 ML 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-40
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,935.09 meter TYPE OF BORING: ROTARY WASH
EAST: 429,618.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-40
GROUND ELEVATION: 4.71 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 1425 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-40
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,960.01 meter TYPE OF BORING: ROTARY WASH
EAST: 429,588.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-41
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1435 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-41
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,960.01 meter TYPE OF BORING: ROTARY WASH
EAST: 429,588.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-41
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1435 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, silty clayey gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Very dense, greyish brown, silty sand with gravel. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 11.1 20 Very dense, brown, silty clayey sand with gravel. 15.2
51 15.5
52 SC-SM 15.8
53 16.2
54 16.5
55 SPT - 15 43 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 44 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 36 Dense, brown, silty sand with occasional gravel. 19.8
66 20.1
SPT - 18 43 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-41
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,910.14 meter TYPE OF BORING: ROTARY WASH
EAST: 429,648.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-42
GROUND ELEVATION: 4.47 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1450 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-42
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,910.14 meter TYPE OF BORING: ROTARY WASH
EAST: 429,648.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-42
GROUND ELEVATION: 4.47 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1450 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 48 Very dense, brownish grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 50 15.7 08 Dense, brown, poorly graded sand with silt & gravel. 12.2
41 12.5
42 SP-SM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto but very dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 12.1 08 Ditto. 15.2
51 15.5
52 SP-SM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-42
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,060.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,945.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-43
GROUND ELEVATION: 3.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 26-4-16
MEASURED AT: 1455 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-43
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,060.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,945.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-43
GROUND ELEVATION: 3.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 26-4-16
MEASURED AT: 1455 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 46 11.1 19 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 19.4 35 Very dense, brown, silty clayey sand with gravel. 15.2
51 15.5
52 SC-SM 15.8
53 16.2
54 16.5
55 SPT - 15 39 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 22 Ditto but medium dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 21 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 25 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-43
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,060.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,945.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-43
GROUND ELEVATION: 3.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 26-4-16
MEASURED AT: 1455 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-43
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,933.01 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-44
GROUND ELEVATION: 3.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.65 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 23-4-16
MEASURED AT: 1510 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-44
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,933.01 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-44
GROUND ELEVATION: 3.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.65 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 23-4-16
MEASURED AT: 1510 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 33 19.7 38 Dense, light grey, clayey sand.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 12 31 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 31 26.2 46 Ditto. 13.7
46 14.0
47 SC 14.3
48 14.6
49 14.9
50 SPT - 14 38 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 36 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 37 Hard, light grey, sandy lean clay. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 40 29.2 58 Ditto. 19.8
CL
66 20.1
SPT - 18 37 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-44
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,003.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,897.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-45
GROUND ELEVATION: 3.63 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 21-4-16
MEASURED AT: 1520 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-45
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,003.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,897.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-45
GROUND ELEVATION: 3.63 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 21-4-16
MEASURED AT: 1520 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 8.2 10 Very dense, dark brown, poorly graded sand with silt &
36 11.0
gravel.
37 11.3
SP-SM
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Very dense, light grey, clayey sand with gravel. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 50 16.0 23 Ditto but dense. 15.2
51 15.5
52 SC 15.8
53 16.2
54 16.5
55 SPT - 15 50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 46 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 13.1 18 Very dense, dark brown, silty sand with gravel. 19.8
66 20.1
67 SM 20.4
68 20.7
69 21.0
70 SPT - 18 25 Ditto but medium dense. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-45
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,003.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,897.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-45
GROUND ELEVATION: 3.63 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 21-4-16
MEASURED AT: 1520 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-45
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,988.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,884.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-46
GROUND ELEVATION: 3.79 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 2.95 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1530 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-46
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,988.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,884.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-46
GROUND ELEVATION: 3.79 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 2.95 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1530 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 12.6 21 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 13.2 28 Very dense, brown, clayey gravel with sand. 15.2
51 15.5
52 GC 15.8
53 16.2
54 16.5
55 SPT - 15 >50 14.6 38 Very dense, brown, clayey sand with gravel. 16.8
56 17.1
57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 34 Dense, dark brown, silty sand with occasional gravel. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
SPT - 18 37 Ditto but dense.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-46
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,820.89 meter TYPE OF BORING: ROTARY WASH
EAST: 429,427.18 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-47
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1545 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-47
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,820.89 meter TYPE OF BORING: ROTARY WASH
EAST: 429,427.18 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-47
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1545 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 13.8 21 Ditto. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 47 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 38 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 19.0 37 SC-SM Very dense, brown, silty clayey sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-47
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,820.89 meter TYPE OF BORING: ROTARY WASH
EAST: 429,427.18 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-47
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1545 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-47
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,811.76 meter TYPE OF BORING: ROTARY WASH
EAST: 429,438.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-48
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 27-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 28-4-16
MEASURED AT: 1555 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-48
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,811.76 meter TYPE OF BORING: ROTARY WASH
EAST: 429,438.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-48
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 27-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 28-4-16
MEASURED AT: 1555 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 19.1 20 Very dense, yellowish brown, silty sand. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 49 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto but very dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but yellowish brown. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-48
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,802.60 meter TYPE OF BORING: ROTARY WASH
EAST: 429,449.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-49
GROUND ELEVATION: 4.91 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 25-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1610 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-49
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,802.60 meter TYPE OF BORING: ROTARY WASH
EAST: 429,449.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-49
GROUND ELEVATION: 4.91 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 25-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1610 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Very dense, brown, silty sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 29.7 17 Ditto. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but yellowish grey. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto but yellowish. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 23.2 72 Hard, brown, lean clay with sand. 19.8
66 20.1
67 CL 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Very dense, grey, silty sand with occasional gravel. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-49
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,802.60 meter TYPE OF BORING: ROTARY WASH
EAST: 429,449.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-49
GROUND ELEVATION: 4.91 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 25-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1610 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-49
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,837.67 meter TYPE OF BORING: ROTARY WASH
EAST: 429,407.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-50
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 27-4-16
MEASURED AT: 1625 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-50
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,837.67 meter TYPE OF BORING: ROTARY WASH
EAST: 429,407.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-50
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 27-4-16
MEASURED AT: 1625 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, well graded gravel with silt.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 24.0 32 Very dense, brown, silty clayey sand with gravel. 13.7
46 14.0
47 SC-SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 25.1 60 Hard, brown, sandy silty clay. 15.2
51 15.5
52 CL-ML 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Very dense, brown, silty gravel with sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 14.3 25 GM Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-50
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,837.67 meter TYPE OF BORING: ROTARY WASH
EAST: 429,407.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-50
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 27-4-16
MEASURED AT: 1625 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-50
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,710.02 meter TYPE OF BORING: ROTARY WASH
EAST: 430,746.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-51
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 30-4-16
MEASURED AT: 0630 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-51
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,710.02 meter TYPE OF BORING: ROTARY WASH
EAST: 430,746.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-51
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 30-4-16
MEASURED AT: 0630 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 32.7 31 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40 SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 Hard, greyish brown, lean clay. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 30 Ditto but very stiff. 15.2
51 15.5
52 U-1 26.2 97 Ditto. 15.8
53 CL 16.2
54 16.5
55 SPT - 15 >50 Very dense, greyish brown, silty sand. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-51
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,710.02 meter TYPE OF BORING: ROTARY WASH
EAST: 430,746.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-51
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 30-4-16
MEASURED AT: 0630 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-51
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,700.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,738.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-52
GROUND ELEVATION: 4.60 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0645 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-52
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,700.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,738.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-52
GROUND ELEVATION: 4.60 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0645 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty clayey gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40 SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 17.1 15 Very dense, brown, silty sand with gravel. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 17.6 38 Very dense, brown, clayey sand with occasional gravel. 16.8
56 17.1
57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 16.7 33 Very dense, brown, silty sand with occasional gravel. 19.8
SM
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-52
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,806.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,378.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-53
GROUND ELEVATION: 5.18 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 4.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 9-5-16
MEASURED AT: 0655 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-53
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,806.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,378.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-53
GROUND ELEVATION: 5.18 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 4.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 9-5-16
MEASURED AT: 0655 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 13.9 04 Very dense, brown, well graded gravel with sand.
36 11.0
37 11.3
GW
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 23.7 21 Very dense, brown, silty sand. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 18.8 43 Very dense, brown, silty clayey sand with occasional gravel. 18.3
61 18.6
62 SC-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-53
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,640.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,686.65 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-54
GROUND ELEVATION: 4.33 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0710 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-54
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,640.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,686.65 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-54
GROUND ELEVATION: 4.33 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0710 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 50 14.0 21 Dense, brown, silty sand with gravel. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 20.2 18 Ditto but very dense without gravel. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 47 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-54
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,703.10 meter TYPE OF BORING: ROTARY WASH
EAST: 429,434.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-55
GROUND ELEVATION: 5.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 2-5-16
MEASURED AT: 0725 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-55
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,703.10 meter TYPE OF BORING: ROTARY WASH
EAST: 429,434.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-55
GROUND ELEVATION: 5.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 2-5-16
MEASURED AT: 0725 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 48 Dense, brown, well graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 46 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 49 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 11.9 16 Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 11.1 11 Very dense, brown, well graded sand with silt & gravel. 19.8
66 20.1
67 SW-SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-55
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,703.10 meter TYPE OF BORING: ROTARY WASH
EAST: 429,434.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-55
GROUND ELEVATION: 5.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 2-5-16
MEASURED AT: 0725 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, well graded sand with silt & gravel. 21.6
72 21.9
73 22.3
74 22.6
SPT - 19 >50 11.7 08 Ditto.
75 22.9
76 23.2
SW-SM
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 >50 12.5 09 Very dense, brown, well graded sand with silt & gravel.
85 25.9
86 26.2
SW-SM
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-55
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,869.95 meter TYPE OF BORING: ROTARY WASH
EAST: 430,845.99 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-56
GROUND ELEVATION: 3.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 2.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 1-5-16
MEASURED AT: 0735 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-56
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,869.95 meter TYPE OF BORING: ROTARY WASH
EAST: 430,845.99 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-56
GROUND ELEVATION: 3.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 2.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 1-5-16
MEASURED AT: 0735 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, poorly graded gravel with silt &
36 11.0
sand.
37 11.3
38 11.6
39 11.9
40 SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 13.3 09 Ditto but brown. 15.2
51 15.5
52 GP-GM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
SPT - 16 >50 Ditto.
60 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 21.0 48 Very dense, brown, silty sand with traces of clay. 19.8
66 20.1
67 SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-56
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,869.95 meter TYPE OF BORING: ROTARY WASH
EAST: 430,845.99 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-56
GROUND ELEVATION: 3.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 2.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 1-5-16
MEASURED AT: 0735 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-56
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,390.05 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-57
GROUND ELEVATION: 3.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0750 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-57
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,390.05 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-57
GROUND ELEVATION: 3.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0750 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 >50 14.1 34 Very dense, brown, silty clayey sand with occasional gravel.
36 11.0
37 11.3
SC-SM
38 11.6
39 11.9
40
SPT - 11 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 12 46 Ditto but dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 13 >50 11.8 20 Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 14 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 15 42 Dense, greyish brown, gravel with silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 16 46 Ditto. 19.8
66 20.1
SPT - 17 >50 Ditto but very dense.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-57
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,203.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,508.89 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-58
GROUND ELEVATION: 4.96 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 0800 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-58
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,203.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,508.89 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-58
GROUND ELEVATION: 4.96 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 0800 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 13.2 11 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
GP-GM
38 11.6
39 11.9
40
SPT - 12 >50 8.7 06 Ditto. 12.2
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 11.2 08 Ditto. 16.8
56 17.1
57 GP-GM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 16.3 39 Very dense, greyish brown, silty clayey sand with occasional 18.3
61
gravel. 18.6
62 SC-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-58
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,687.23 meter TYPE OF BORING: ROTARY WASH
EAST: 429,325.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-59
GROUND ELEVATION: 5.59 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0815 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 Dense, brown, silty sand with gravel & traces of clay. 0.3
SPT - 1 35
2 0.6
3 Ditto. 0.9
SPT - 2 39
4 1.2
5 1.5
6 SPT - 3 41 6.9 15 Dense, brown, silty gravel with sand. 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 4 41
9 2.7
10 3.0
11 SPT - 5 48 Ditto. 3.4
12 3.7
13
SPT - 6 >50 5.1 16 Ditto but very dense. 4.0
14 GM 4.3
15 4.6
SPT - 7 >50 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 47 Dense, dark brown, silty gravel with sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 50 8.5 18 Ditto.
26 7.9
27 8.2
GM
28 8.5
29 8.8
30 Ditto. 9.1
SPT - 10 50
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-59
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,687.23 meter TYPE OF BORING: ROTARY WASH
EAST: 429,325.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-59
GROUND ELEVATION: 5.59 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0815 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, dark brown, silty gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 43 Ditto but dense. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 36 15.0 31 Ditto. 13.7
46 14.0
47 GM 14.3
48 14.6
49 14.9
50 SPT - 14 34 Dense, brown, clayey sand with gravel. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 32 22.5 49 Ditto. 16.8
56 17.1
57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 32 21.6 41 Dense, brown, silty sand. 18.3
61 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 31 Ditto. 19.8
66 20.1
SPT - 18 32 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-59
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,755.27 meter TYPE OF BORING: ROTARY WASH
EAST: 429,523.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-60
GROUND ELEVATION: 4.70 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0830 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-60
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,755.27 meter TYPE OF BORING: ROTARY WASH
EAST: 429,523.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-60
GROUND ELEVATION: 4.70 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0830 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 42 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 39 11.7 26 Dense, brown, silty clayey sand with occasional gravel. 12.2
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
SPT - 13 39 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 40 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 42 15.2 33 Dense, brown, silty clayey sand. 16.8
56 17.1
57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 34 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 32 Ditto. 19.8
66 20.1
SPT - 18 29 Ditto but medium dense.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-60
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,730.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,243.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-61
GROUND ELEVATION: 5.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 5.00 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 30-4-16
MEASURED AT: 0845 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-61
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,730.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,243.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-61
GROUND ELEVATION: 5.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 5.00 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 30-4-16
MEASURED AT: 0845 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, well graded sand with silt & gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 15.2 20 Very dense, brown, silty sand with gravel. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 8.5 08 Very dense, brown, well graded sand with silt & gravel. 18.3
61 18.6
62 SW-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-61
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,220.79 meter TYPE OF BORING: ROTARY WASH
EAST: 430,305.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-62
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 1-5-16
MEASURED AT: 0900 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-62
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,220.79 meter TYPE OF BORING: ROTARY WASH
EAST: 430,305.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-62
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 1-5-16
MEASURED AT: 0900 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 45 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 47 7.3 15 Ditto. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 13 48 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 45 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 6.4 21 Very dense, brown, silty sand with gravel. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 47 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 47 Ditto. 19.8
66 20.1
SPT - 18 46 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-62
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,879.91 meter TYPE OF BORING: ROTARY WASH
EAST: 430,700.66 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-63
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 2-5-16
MEASURED AT: 0915 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-63
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,879.91 meter TYPE OF BORING: ROTARY WASH
EAST: 430,700.66 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-63
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 2-5-16
MEASURED AT: 0915 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 10.5 13 Very dense, greyish brown, silty sand with occasional gravel.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 >50 15.5 19 Very dense, brown, silty sand with gravel. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 11.8 18 Very dense, brown, silty sand with occasional gravel. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-63
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,503.40 meter TYPE OF BORING: ROTARY WASH
EAST: 429,966.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-64
GROUND ELEVATION: 5.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 1-5-16
MEASURED AT: 0925 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-64
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,503.40 meter TYPE OF BORING: ROTARY WASH
EAST: 429,966.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-64
GROUND ELEVATION: 5.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 1-5-16
MEASURED AT: 0925 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
U-3 14.3 48 Brown, clayey sand.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 9 40 Dense, brown, silty sand with gravel. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 10 >50 11.2 17 Ditto but very dense. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 11 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 12 >50 Very dense, brown, well graded gravel with silt & sand. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 13 >50 8.6 12 Ditto. 18.3
61 18.6
62 GW-GM 18.9
63 19.2
64 19.5
65 SPT - 14 >50 Ditto. 19.8
66 20.1
SPT - 15 >50 Ditto.
67 20.4
END OF BORING @ 20.29 m.
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-64
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.52 meter TYPE OF BORING: ROTARY WASH
EAST: 430,635.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-65
GROUND ELEVATION: 5.49 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 0940 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-65
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.52 meter TYPE OF BORING: ROTARY WASH
EAST: 430,635.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-65
GROUND ELEVATION: 5.49 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 0940 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 24.7 34 Very dense, brown, silty clayey sand with gravel.
36 11.0
37 11.3
SC-SM
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 19.0 91 Hard, dark brown, silty clay. 13.7
46 14.0
47 CL-ML 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 23.0 90 Hard, dark brown, silty clay. 16.8
56 17.1
57 CL-ML 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-65
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,937.30 meter TYPE OF BORING: ROTARY WASH
EAST: 429,836.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-66
GROUND ELEVATION: 4.17 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 1000 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-66
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,937.30 meter TYPE OF BORING: ROTARY WASH
EAST: 429,836.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-66
GROUND ELEVATION: 4.17 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 1000 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 48 Dense, dark grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 Ditto but very dense. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 4.5 08 Very dense, grey, poorly graded gravel with silt & sand. 13.7
46 14.0
47 GP-GM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-66
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,025.88 meter TYPE OF BORING: ROTARY WASH
EAST: 430,546.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-67
GROUND ELEVATION: 4.77 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 3-5-16
MEASURED AT: 1010 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-67
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,025.88 meter TYPE OF BORING: ROTARY WASH
EAST: 430,546.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-67
GROUND ELEVATION: 4.77 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 3-5-16
MEASURED AT: 1010 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 9.5 22 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 11.7 27 Very dense, brown, silty sand with gravel. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 11.2 35 Very dense, dark brown, silty sand. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-67
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,998.94 meter TYPE OF BORING: ROTARY WASH
EAST: 429,744.05 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-68
GROUND ELEVATION: 3.61 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 1025 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-68
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,998.94 meter TYPE OF BORING: ROTARY WASH
EAST: 429,744.05 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-68
GROUND ELEVATION: 3.61 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 1025 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 29 Hard, greyish brown, lean clay.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 11 43 Dense, brown, silty sand with gravel. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 12 >50 11.4 09 Very dense, brown, well graded gravel with silt & sand. 13.7
46 14.0
47 GW-GM 14.3
48 14.6
49 14.9
50 SPT - 13 45 Ditto but dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 14 >50 10.9 09 Ditto but very dense. 16.8
56 17.1
57 GW-GM 17.4
58 17.7
59 18.0
60 SPT - 15 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 16 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 17 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-68
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,998.94 meter TYPE OF BORING: ROTARY WASH
EAST: 429,744.05 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-68
GROUND ELEVATION: 3.61 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 1025 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, well graded gravel with silt & sand. 21.6
72 21.9
73 22.3
74 22.6
SPT - 18 >50 11.9 17 Very dense, brown, silty sand with gravel.
75 22.9
76 23.2
SM
77 23.5
78 23.8
79 24.1
SPT - 19 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 20 >50 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 21 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Hard, light brown, sandy silty clay. 28.7
SPT - 22 48 21.2 60
95 29.0
96 29.3
CL-ML
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 23 44
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-68
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,889.71 meter TYPE OF BORING: ROTARY WASH
EAST: 429,650.70 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-69
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 6-5-16
MEASURED AT: 1035 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-69
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,889.71 meter TYPE OF BORING: ROTARY WASH
EAST: 429,650.70 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-69
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 6-5-16
MEASURED AT: 1035 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 22 Medium dense, brown, silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 22 Very stiff, brown, lean clay. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
U-1 30.5 97 Ditto. 13.7
46 14.0
47 CL 14.3
48 14.6
49 14.9
50 SPT - 13 21 Very stiff, brown, lean clay with sand. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 14 22 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 U-2 22.7 76 Ditto. 18.3
61 18.6
62 CL 18.9
63 19.2
64 19.5
65 SPT - 15 >50 Very dense, brown, silty sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 Very dense, brown, gravel with silty sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-69
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,889.71 meter TYPE OF BORING: ROTARY WASH
EAST: 429,650.70 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-69
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 6-5-16
MEASURED AT: 1035 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-69
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,784.52 meter TYPE OF BORING: ROTARY WASH
EAST: 429,562.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-70
GROUND ELEVATION: 3.28 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1045 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-70
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,784.52 meter TYPE OF BORING: ROTARY WASH
EAST: 429,562.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-70
GROUND ELEVATION: 3.28 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1045 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 36 12.8 18 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 34 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 30 Ditto but medium dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 40 Ditto but dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 46 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 9.3 11 Very dense, grey, well graded sand with silt & gravel. 18.3
61 18.6
62 SW-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 9.5 09 SW-SM Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-70
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,784.52 meter TYPE OF BORING: ROTARY WASH
EAST: 429,562.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-70
GROUND ELEVATION: 3.28 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1045 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, grey, well graded sand with silt & gravel. 21.6
72 SW-SM 21.9
73 22.3
74 22.6
SPT - 19 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 >50 13.0 15 Very dense, brown, silty sand with gravel.
85 25.9
86 26.2
SM
87 26.5
88 26.8
89 27.1
SPT - 22 40 Ditto but dense.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 40
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 35
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-70
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,703.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,495.20 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-71
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 5-5-16
MEASURED AT: 1100 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, well graded sand with silt & occasional gravel.
2 0.6
(Hand excavation)
3 H-1 4.6 11 0.9
4 1.2
5 1.5
6 SPT - 1 43 8.8 16 Dense, brown, silty clayey gravel with sand. 1.8
GC-GM
7 2.1
8 Ditto. 2.4
SPT - 2 44
9 2.7
10 3.0
11 SPT - 3 43 Ditto. 3.4
12 3.7
13
SPT - 4 45 Ditto. 4.0
14 4.3
15 4.6
SPT - 5 >50 12.4 19 Ditto but very dense.
16 4.9
17 5.2
GC-GM
18 5.5
19 5.8
20 6.1
SPT - 6 >50 12.9 22 Ditto but brown to grey.
21 6.4
22 6.7
GC-GM
23 7.0
24 7.3
25 7.6
SPT - 7 >50 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 Very dense, brown, clayey sand with gravel. 9.1
SPT - 8 >50
31 9.4
32 9.8
33 10.1
34 10.4
35 GC-GM 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-71
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,703.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,495.20 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-71
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 5-5-16
MEASURED AT: 1100 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 19.2 26 Very dense, light brown, silty clayey gravel with sand.
36 11.0
37 11.3
GC-GM
38 11.6
39 11.9
40
SPT - 10 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 11 >50 15.0 25 Very dense, greyish brown, clayey sand with gravel. 13.7
46 14.0
47 SC 14.3
48 14.6
49 14.9
50 SPT - 12 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 13 >50 10.8 16 Very dense, greyish brown, silty clayey gravel with sand. 16.8
56 17.1
57 GC-GM 17.4
58 17.7
59 18.0
60 SPT - 14 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 15 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 15.2 27 SC-SM Very dense, brown, silty clayey sand with gravel. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-71
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,703.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,495.20 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-71
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 5-5-16
MEASURED AT: 1100 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-71
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,442.51 meter TYPE OF BORING: ROTARY WASH
EAST: 430,033.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-72
GROUND ELEVATION: 4.22 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1110 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-72
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,442.51 meter TYPE OF BORING: ROTARY WASH
EAST: 430,033.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-72
GROUND ELEVATION: 4.22 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1110 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty clayey sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 >50 15.8 46 Very dense, brown, clayey sand with occasional gravel. 12.2
41 12.5
42 SC 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 12.5 34 Very dense, brown, clayey gravel with sand. 15.2
51 15.5
52 GC 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 12.9 39 Very dense, brown, silty clayey sand with occasional gravel. 18.3
61 18.6
62 SC-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-72
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,116.03 meter TYPE OF BORING: ROTARY WASH
EAST: 430,423.61 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-73
GROUND ELEVATION: 4.11 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 3.30 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 3-5-16
MEASURED AT: 1125 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-73
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,116.03 meter TYPE OF BORING: ROTARY WASH
EAST: 430,423.61 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-73
GROUND ELEVATION: 4.11 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 3.30 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 3-5-16
MEASURED AT: 1125 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 41 5.3 22 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 42 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 43 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 41 7.0 22 Ditto. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 47 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 30 14.2 26 Medium dense, yellowish brown, silty sand with gravel & 18.3
61
traces of clay. 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 33 Ditto but dense. 19.8
66 20.1
SPT - 18 30 Ditto but medium dense.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-73
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,932.26 meter TYPE OF BORING: ROTARY WASH
EAST: 430,938.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-74
GROUND ELEVATION: 2.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 1.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 3-5-16
MEASURED AT: 1145 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-74
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,932.26 meter TYPE OF BORING: ROTARY WASH
EAST: 430,938.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-74
GROUND ELEVATION: 2.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 1.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 3-5-16
MEASURED AT: 1145 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 11.8 29 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 >50 12.7 20 Very dense, brown, silty sand with gravel. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 14.6 28 Very dense, light brown, silty clayey sand with occasional 16.8
56 gravel. 17.1
57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
END OF BORING @ 20.36 m.
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-74
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,922.17 meter TYPE OF BORING: ROTARY WASH
EAST: 430,930.43 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-75
GROUND ELEVATION: 2.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 1.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 2-5-16
MEASURED AT: 1200 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-75
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,922.17 meter TYPE OF BORING: ROTARY WASH
EAST: 430,930.43 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-75
GROUND ELEVATION: 2.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 1.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 2-5-16
MEASURED AT: 1200 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 50 5.6 10 Dense, brown, well graded gravel with silt & sand. 12.2
41 12.5
42 GW-GM 12.8
43 13.1
44 13.4
45
SPT - 13 >50 Ditto but very dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
END OF BORING @ 20.33 m.
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-75
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,713.52 meter TYPE OF BORING: ROTARY WASH
EAST: 431,029.53 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-76
GROUND ELEVATION: 2.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.00 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 4-5-16
MEASURED AT: 1210 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-76
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,713.52 meter TYPE OF BORING: ROTARY WASH
EAST: 431,029.53 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-76
GROUND ELEVATION: 2.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.00 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 4-5-16
MEASURED AT: 1210 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 12.7 08 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
GP-GM
38 11.6
39 11.9
40
SPT - 12 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45 SPT - 13 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 >50 17.3 14 Very dense, brown, silty sand with occasional gravel. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, greyish brown, gravel with silty sand. 19.8
66 20.1
SPT - 18 >50 Ditto but grey.
67 END OF BORING @ 20.24 m. 20.4
68 20.7
69 21.0
70 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-76
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,497.33 meter TYPE OF BORING: ROTARY WASH
EAST: 429,367.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-77
GROUND ELEVATION: 4.23 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 19-5-16
MEASURED AT: 1118 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, silty gravel with sand. (Hand excavation,
2 0.6
0.00-2.00 m. depth)
3 0.9
H-1 6.5 17 GM
4 1.2
5 1.5
6 1.8
7 2.1
8 Very dense, light brown, silty clayey sand with gravel. 2.4
SPT - 1 >50 12.5 35
9 SC-SM 2.7
10 3.0
11 SPT - 2 >50 Very dense, brown, poorly graded gravel with silt & sand. 3.4
12 3.7
13
SPT - 3 >50 Ditto. 4.0
14 4.3
15 4.6
SPT - 4 >50 6.3 09 Ditto.
16 4.9
17 5.2
GP-GM
18 5.5
19 5.8
20 6.1
SPT - 5 40 9.7 20 Dense, brown, silty clayey gravel with sand.
21 6.4
22 6.7
GC-GM
23 7.0
24 7.3
25 7.6
SPT - 6 36 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 Dense, yellowish brown, silty gravel with sand. 9.1
SPT - 7 48 13.3 27
31 9.4
32 9.8
GM
33 10.1
34 10.4
35 >50 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-77
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,497.33 meter TYPE OF BORING: ROTARY WASH
EAST: 429,367.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-77
GROUND ELEVATION: 4.23 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 19-5-16
MEASURED AT: 1118 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 8 Very dense, dark grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40 SPT - 9 >50 Very dense, brown, silty sand with gravel & traces of clay. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 10 >50 13.5 22 Ditto but brown to dark grey. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 11 >50 10.0 31 Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 12 >50 Very dense, brown, silty gravel with sand. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 13 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 14 >50 12.1 13 Ditto. 19.8
66 20.1
67 GM 20.4
68 20.7
69 21.0
70 SPT - 15 >50 Very dense, brown, silty sand with gravel & traces of clay. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-77
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,497.33 meter TYPE OF BORING: ROTARY WASH
EAST: 429,367.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-77
GROUND ELEVATION: 4.23 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 19-5-16
MEASURED AT: 1118 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, silty sand with gravel & traces of clay. 21.6
72 21.9
73 22.3
74 22.6
SPT - 16 >50 14.5 20 Ditto.
75 22.9
76 23.2
SM
77 23.5
78 23.8
79 24.1
SPT - 17 >50 Very dense, light brown to brown, silty clayey gravel with
80 sand. 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 18 >50 15.9 22 Ditto.
85 25.9
86 26.2
GC-GM
87 26.5
88 26.8
89 27.1
SPT - 19 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 20 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 21 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-77
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,628.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,474.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-78
GROUND ELEVATION: 4.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1220 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, silty sand with occasional gravel. (Hand excavation,
2 0.6
0.00-1.50 m. depth)
3 H-1 4.0 14 SM 0.9
4 1.2
5 1.5
6 SPT - 1 39 10.7 18 Dense, brown, silty gravel with sand. 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 2 45
9 2.7
10 3.0
11 SPT - 3 40 10.4 17 Dense, light brown, silty clayey gravel with sand. 3.4
GC-GM
12 3.7
13
SPT - 4 >50 13.2 22 Very dense, light brown, silty gravel with sand. 4.0
14 GM 4.3
15 4.6
SPT - 5 38 21.3 45 Dense, yellowish brown, silty clayey sand with gravel.
16 4.9
17 5.2
SC-SM
18 5.5
19 5.8
20 6.1
SPT - 6 44 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 7 49 21.4 39 Ditto but brown.
26 7.9
27 8.2
SC-SM
28 8.5
29 8.8
30 Ditto. 9.1
SPT - 8 47
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-78
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,628.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,474.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-78
GROUND ELEVATION: 4.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1220 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, yellowish brown, silty clayey sand with gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 10 >50 11.6 19 Very dense, brown, silty gravel with sand. 12.2
41 12.5
42 GM 12.8
43 13.1
44 13.4
45
SPT - 11 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 12 >50 10.2 16 Very dense, brown, silty clayey gravel with sand. 15.2
51 15.5
52 GC-GM 15.8
53 16.2
54 16.5
55 SPT - 13 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 14 >50 8.1 13 Very dense, brown, silty gravel with sand. 18.3
61 18.6
62 GM 18.9
63 19.2
64 19.5
65 SPT - 15 >50 Very dense, brown, silty sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-78
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,628.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,474.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-78
GROUND ELEVATION: 4.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1220 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, silty sand with clay & gravel. 21.6
72 21.9
73 22.3
74 22.6
U-1 22.3 79 Brown, silty clay with sand.
75 22.9
76 23.2
CL-ML
77 23.5
78 23.8
79 24.1
SPT - 17 >50 Ditto but hard.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 18 >50 26.2 80 Hard, brown, lean clay with sand.
85 25.9
86 26.2
CL
87 26.5
88 26.8
89 27.1
SPT - 19 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 20 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 21 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-78
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,553.32 meter TYPE OF BORING: ROTARY WASH
EAST: 422,282.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-79
GROUND ELEVATION: 3.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 17-5-16
MEASURED AT: 1510 HOURS ON: 21-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, silty gravel with sand. (Hand excavation,
2 0.6
0.00-1.50 m. depth)
3 H-1 7.7 14 GM 0.9
4 1.2
5 1.5
6 SPT - 1 23 13.4 10 Medium dense, greyish brown, well graded sand with silt & 1.8
SW-SM gravel.
7 2.1
8 Ditto but dense. 2.4
SPT - 2 31
9 2.7
10 3.0
11 SPT - 3 17 23.0 26 Medium dense, off white, silty gravel size coral fragments 3.4
GM with sand.
12 3.7
13
SPT - 4 18 Ditto. 4.0
14 4.3
15 4.6
SPT - 5 20 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 6 25 11.9 13 Medium dense, brown, silty gravel with sand.
21 6.4
22 6.7
GM
23 7.0
24 7.3
25 7.6
SPT - 7 >50 13.5 07 Very dense, brown to dark grey, poorly graded gravel with
26 silt & sand. 7.9
27 8.2
GP-GM
28 8.5
29 8.8
30 Ditto but dense. 9.1
SPT - 8 47
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-79
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,553.32 meter TYPE OF BORING: ROTARY WASH
EAST: 422,282.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-79
GROUND ELEVATION: 3.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 17-5-16
MEASURED AT: 1510 HOURS ON: 21-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brown to dark grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 10 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 11 >50 11.1 13 Ditto. 13.7
46 14.0
47 GM 14.3
48 14.6
49 14.9
50 SPT - 12 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 13 >50 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 14 >50 8.9 14 Very dense, brown to dark grey, silty clayey gravel with 18.3
61
sand. 18.6
62 GC-GM 18.9
63 19.2
64 19.5
65 SPT - 15 >50 11.8 20 Ditto but brown. 19.8
66 20.1
67 GC-GM 20.4
68 20.7
69 21.0
70 SPT - 16 >50 Very dense, brown, silty gravel with sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-79
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,553.32 meter TYPE OF BORING: ROTARY WASH
EAST: 422,282.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-79
GROUND ELEVATION: 3.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 17-5-16
MEASURED AT: 1510 HOURS ON: 21-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-79
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,523.06 meter TYPE OF BORING: ROTARY WASH
EAST: 422,271.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-80
GROUND ELEVATION: 4.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1255 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, silty gravel with sand. (Hand excavation,
2 0.6
0.00-1.50 m. depth)
3 H-1 1.3 16 GM 0.9
4 1.2
5 1.5
6 SPT - 1 34 13.0 19 Dense, brown, silty sand with gravel. 1.8
SM
7 2.1
8 Ditto but medium dense. 2.4
SPT - 2 29
9 2.7
10 3.0
11 SPT - 3 28 Ditto. 3.4
12 3.7
13
SPT - 4 31 Ditto but dense, whitish brown. 4.0
14 4.3
15 4.6
SPT - 5 36 17.6 29 Dense, whitish, silty clayey gravel with sand.
16 4.9
17 5.2
GC-GM
18 5.5
19 5.8
20 6.1
SPT - 6 36 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 7 39 Ditto but brown.
26 7.9
27 8.2
28 8.5
29 8.8
30 Dense, brown, poorly graded gravel with silt & sand. 9.1
SPT - 8 47 5.3 06
31 9.4
32 9.8
GP-GM
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-80
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,523.06 meter TYPE OF BORING: ROTARY WASH
EAST: 422,271.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-80
GROUND ELEVATION: 4.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1255 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 10 >50 11.7 15 Very dense, brown, silty sand with gravel. 12.2
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
SPT - 11 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 12 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 13 >50 11.9 11 Very dense, brown, well graded sand with silt & gravel. 16.8
56 17.1
57 SW-SM 17.4
58 17.7
59 18.0
60 SPT - 14 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 15 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 7.7 05 GP-GM Very dense, brown, poorly graded gravel with silt & sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-80
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,523.06 meter TYPE OF BORING: ROTARY WASH
EAST: 422,271.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-80
GROUND ELEVATION: 4.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1255 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, poorly graded gravel with silt & sand. 21.6
72 GP-GM 21.9
73 22.3
74 22.6
SPT - 17 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 19 >50 11.9 08 Ditto.
85 25.9
86 26.2
GP-GM
87 26.5
88 26.8
89 27.1
SPT - 20 >50 14.0 21 Very dense, brown to grey, silty clayey gravel with sand.
90 27.4
91 27.7
GC-GM
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 21 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 22 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-80
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,886.53 meter TYPE OF BORING: ROTARY WASH
EAST: 422,834.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-81
GROUND ELEVATION: 3.58 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 2.90 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 5-5-16
MEASURED AT: 1235 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, silty sand with gravel. (Hand excavation,
2 0.6
0.00-1.50 m. depth)
3 H-1 8.3 21 SM 0.9
4 1.2
5 1.5
6 SPT - 1 39 Dense, greyish white, silty sand with gravel. 1.8
7 2.1
8 Dense, greyish brown, poorly graded gravel with sand. 2.4
SPT - 2 38 8.6 02
9 GP 2.7
10 3.0
11 SPT - 3 42 Ditto. 3.4
12 3.7
13
SPT - 4 45 Ditto. 4.0
14 4.3
15 4.6
SPT - 5 >50 Ditto but very dense.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 6 >50 21.7 13 Very dense, light brown, silty gravel with sand.
21 6.4
22 6.7
GM
23 7.0
24 7.3
25 7.6
SPT - 7 >50 Ditto but off white.
26 7.9
27 8.2
28 8.5
29 8.8
30 Very dense, brownish grey, well graded gravel with silt & 9.1
SPT - 8 >50 13.7 07
31 sand. 9.4
32 9.8
GW-GM
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-81
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,886.53 meter TYPE OF BORING: ROTARY WASH
EAST: 422,834.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-81
GROUND ELEVATION: 3.58 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 2.90 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 5-5-16
MEASURED AT: 1235 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brownish grey, well graded gravel with silt &
36 11.0
sand.
37 11.3
38 11.6
39 11.9
40
SPT - 10 >50 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 11 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 12 >50 25.8 64 Hard, brown, sandy silt. 15.2
51 15.5
52 ML 15.8
53 16.2
54 16.5
55 SPT - 13 >50 22.6 37 Very dense, brown, silty sand with occasional gravel & 16.8
56 traces of clay. 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 14 >50 Very dense, brown, gravel with silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 15 >50 Ditto but brownish grey. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 17.2 06 SW-SM 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-81
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,886.53 meter TYPE OF BORING: ROTARY WASH
EAST: 422,834.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-81
GROUND ELEVATION: 3.58 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 2.90 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 5-5-16
MEASURED AT: 1235 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brownish grey, well graded sand with silt & 21.6
gravel.
72 SW-SM 21.9
73 22.3
74 22.6
SPT - 17 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 >50 9.9 06 Ditto but greyish brown.
80 24.4
81 24.7
SW-SM
82 25.0
83 25.3
84 25.6
SPT - 19 >50 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 20 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 SPT - 21 >50 Ditto. 28.7
95 29.0
96 29.3
97 29.6
98 29.9
99 SPT - 22 >50 Ditto. 30.2
100 END OF BORING @ 30.09 m. 30.5
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-81
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,441.80 meter TYPE OF BORING: ROTARY WASH
EAST: 425,898.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-82
GROUND ELEVATION: 10.36 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-5-16
DEPTH OF GROUNDWATER TABLE: 9.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 8-5-16
MEASURED AT: 1315 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, silty sand with gravel. (Hand excavation,
2 0.6
0.00-1.50 m. depth)
3 H-1 1.8 14 SM 0.9
4 1.2
5 1.5
6 SPT - 1 08 Loose, brown, poorly graded gravel with silt & sand. 1.8
7 2.1
8 Ditto but medium dense. 2.4
SPT - 2 11 1.8 08
9 GP-GM 2.7
10 3.0
11 SPT - 3 04 Ditto but very loose. 3.4
12 3.7
13
SPT - 4 05 9.3 15 Loose, brown, silty sand with gravel. 4.0
14 SM 4.3
15 4.6
SPT - 5 12 2.8 05 Medium dense, brown, poorly graded gravel with silt &
16 4.9
sand.
17 5.2
GP-GM
18 5.5
19 5.8
20 6.1
SPT - 6 23 10.1 05 Medium dense, brown, well graded gravel with silt & sand.
21 6.4
22 6.7
GW-GM
23 7.0
24 7.3
25 7.6
SPT - 7 33 Ditto but dense.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto but very dense, grey. 9.1
SPT - 8 >50
31 9.4
32 9.8
33 10.1
34 10.4
35 SW 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-82
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,441.80 meter TYPE OF BORING: ROTARY WASH
EAST: 425,898.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-82
GROUND ELEVATION: 10.36 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-5-16
DEPTH OF GROUNDWATER TABLE: 9.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 8-5-16
MEASURED AT: 1315 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 36 5.4 03 Dense, brown to grey, well graded sand with gravel.
36 11.0
37 11.3
SW
38 11.6
39 11.9
40
SPT - 10 39 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 11 50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 12 >50 Ditto but very dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 13 >50 4.8 19 Very dense, brown, silty sand with occasional gravel. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 14 >50 Very dense, brown, silty gravel with sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 15 >50 14.2 33 Ditto. 19.8
66 20.1
67 GM 20.4
68 20.7
69 21.0
70 SPT - 16 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-82
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,441.80 meter TYPE OF BORING: ROTARY WASH
EAST: 425,898.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-82
GROUND ELEVATION: 10.36 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-5-16
DEPTH OF GROUNDWATER TABLE: 9.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 8-5-16
MEASURED AT: 1315 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-82
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,473.53 meter TYPE OF BORING: ROTARY WASH
EAST: 425,920.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-83
GROUND ELEVATION: 11.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 10.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 5-5-16
MEASURED AT: 1325 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, poorly graded sand with silt & occasional gravel.
2 0.6
(Hand excavation, 0.00-1.50 m. depth)
3 H-1 5.3 11 SP-SM 0.9
4 1.2
5 1.5
6 SPT - 1 >50 9.0 15 Very dense, brown, silty sand with occasional gravel. 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 2 >50
9 2.7
10 3.0
11 SPT - 3 >50 Ditto. 3.4
12 3.7
13
SPT - 4 >50 Ditto. 4.0
14 4.3
15 4.6
SPT - 5 >50 4.7 06 Very dense, brown, well graded gravel with silt & sand.
16 4.9
17 5.2
GW-GM
18 5.5
19 5.8
20 6.1
SPT - 6 >50 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 7 >50 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 Very dense, brown, poorly graded sand with silt & gravel. 9.1
SPT - 8 >50 6.0 12
31 9.4
32 9.8
SP-SM
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-83
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,473.53 meter TYPE OF BORING: ROTARY WASH
EAST: 425,920.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-83
GROUND ELEVATION: 11.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 10.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 5-5-16
MEASURED AT: 1325 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brown, poorly graded sand with silt & gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 10 >50 9.8 11 Ditto. 12.2
41 12.5
42 SP-SM 12.8
43 13.1
44 13.4
45
SPT - 11 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 12 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 13 >50 7.3 06 Very dense, brown, poorly graded gravel with silt & sand. 16.8
56 17.1
57 GP-GM 17.4
58 17.7
59 18.0
60 SPT - 14 >50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 15 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 9.7 12 SP-SM Very dense, brown, poorly graded sand with silt & gravel. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-83
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,473.53 meter TYPE OF BORING: ROTARY WASH
EAST: 425,920.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-83
GROUND ELEVATION: 11.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 10.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 5-5-16
MEASURED AT: 1325 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, poorly graded sand with silt & gravel. 21.6
72 SP-SM 21.9
73 22.3
74 22.6
SPT - 17 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 19 >50 11.0 13 Very dense, brown, silty sand with gravel.
85 25.9
86 26.2
SM
87 26.5
88 26.8
89 27.1
SPT - 20 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 21 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 22 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-83
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,651,355.36 meter TYPE OF BORING: ROTARY WASH
EAST: 427,444.45 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-84
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.15 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 12-5-16
MEASURED AT: 1015 HOURS ON: 13-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 0.3
Brown, poorly graded sand with silt & occasional gravel.
2 0.6
(Hand excavation, 0.00-2.00 m. depth)
3 0.9
H-1 3.6 11 SP-SM
4 1.2
5 1.5
6 1.8
7 2.1
8 Medium dense, brownish grey, silty sand with gravel. 2.4
SPT - 1 12 11.7 20
9 SM 2.7
10 3.0
11 SPT - 2 39 Ditto but dense. 3.4
12 3.7
13
SPT - 3 36 Ditto. 4.0
14 4.3
15 4.6
SPT - 4 42 15.1 12 Dense, grey, well graded sand with silt & gravel.
16 4.9
17 5.2
SW-SM
18 5.5
19 5.8
20 6.1
SPT - 5 47 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 6 50 12.0 07 Dense, grey, poorly graded gravel with silt & sand.
26 7.9
27 8.2
GP-GM
28 8.5
29 8.8
30 Ditto but very dense. 9.1
SPT - 7 >50
31 9.4
32 9.8
33 10.1
34 10.4
35 GP-GM 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-84
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,651,355.36 meter TYPE OF BORING: ROTARY WASH
EAST: 427,444.45 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-84
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.15 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 12-5-16
MEASURED AT: 1015 HOURS ON: 13-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 8 >50 7.2 05 Very dense, grey, poorly graded gravel with silt & sand.
36 11.0
37 11.3
GP-GM
38 11.6
39 11.9
40
SPT - 9 >50 11.6 06 Ditto. 12.2
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
SPT - 10 >50 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 11 >50 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 12 >50 15.8 07 Very dense, grey, poorly graded sand with silt & gravel. 16.8
56 17.1
57 SP-SM 17.4
58 17.7
59 18.0
60 SPT - 13 50 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 14 >50 Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 15 >50 9.7 06 GP-GM Very dense, grey, poorly graded gravel with silt & sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-84
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,651,355.36 meter TYPE OF BORING: ROTARY WASH
EAST: 427,444.45 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-84
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.15 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 12-5-16
MEASURED AT: 1015 HOURS ON: 13-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, grey, poorly graded gravel with silt & sand. 21.6
72 GP-GM 21.9
73 22.3
74 22.6
SPT - 16 47 Hard, light brown, lean clay with gravel.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 17 47 32.3 72 Ditto.
80 24.4
81 24.7
CL
82 25.0
83 25.3
84 25.6
SPT - 18 >50 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 19 >50 Hard, light brown, lean clay with gravel.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 20 >50 27.9 64
95 29.0
96 29.3
CL
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 21 >50
100 30.5
101
END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-84
Boulder & Cobbles Well Graded Gravel with Silt
Poorly Graded Sand with Silt Well Graded Sand with Silt
COMPRESSIVE
APPROXIMATE
UNCONFINED
INDURATION
DEGREE OF
STRENGTH
BIOCLASTIC OOLITE SHELL CORAL ALGAL PISOLITES
NOT DISCERNIBLE
(Organic) (Inorganic) (Organic) (Organic) (Organic) (Inorganic) Algal : Composed of the remains of calcareous
INCREASING GRAIN SIZE OF PARTICULATE DEPOSITS secreting algae.
0.002 mm. 0.075 mm. 4.75 mm. 75 mm. Authigenic : Formed in place by chemical or
biochemical action.
Carbonate Carbonate Carbonate Bioclastic : Consisting of fragmental remains of organism.
( <30 to >300 kPa )
CLAY SILT ( 1 ) SAND (1) Coral : Calcareous skeleton of corator group of corals.
Non Indurated
Mixed Carbonate and Non Detrital : Derived of pre - existing rock fragments.
50 %
Carbonate GRAVEL ( 2 ) Oolitic : Made up of ooliths ( 0.25 to 2 mm. spherical
Calcareous Calcareous Calcareous particles, usually carbonate ).
CLAY ( 3 ) SILT (1) SAND (1) Pisolitic : Made up of pisolith ( 2 to 10 mm. round particles
usually carbonate ).
12 %
Shell : The generally hard rigid covering of an animal
CLAY SILT Silica SAND GRAVEL
commonly calcareous.
Siliceous : Containing abundant quartz or silica, generally
CALCILUTITE CALCISILTITE CALCARENITE CALCIRUDITE
( 0.3 to 12.5 Mpa )
moderately weak
cryptocrystalline.
50 %
Indutated
Hard to
slightly
LIMESTONE LIMESTONE & detail of both the particle minerals & matrix
strong to strong
LIMESTONE
Moderately
50 %
(3) Calcareous is suggested as a general term to indicate
Calcareous Calcareous Calcareous the presence of unidentified carbonates. When mineral
Calcareous CONGLOMERATE
CLAYSTONE SILTSTONE SANDSTONE identification is possible, calcareous referring to
calcite or alternative adjective such as dolomitic,
12 %
oragonitic, sideritic, etc. should be use.
CLAYSTONE SILTSTONE SANDSTONE CONGLOMERATE or BRECCIA
BH - 02 0.75 19.2 91 67 29 NP SM
1.50 29.3 2.68 89 86 72 38 15 CL
3.00 26.1 93 80 67 39 18 CL
7.50 17.3 89 30 15 NP SM
12.00 6.5 34 17 11 NP GP-GM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-1
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 06 0.75 6.9 97 77 36 NP SM
1.50 18.3 89 77 56 34 12 CL
3.00 19.1 80 46 33 28 08 SC
4.50 14.7 64 45 28 32 12 SC
6.00 12.3 76 50 32 26 05 SC-SM
12.00 27.8 2.67 85 82 26 30 03 SM
13.50 33.3 98 88 36 36 05 SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-2
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 08 1.50 15.7 90 68 15 NP SM
3.75 17.4 2.67 100 85 53 34 12 CL
6.00 16.5 2.7 89 76 65 40 17 CL 0.271 U-1
9.00 17.0 73 40 30 26 06 SC-SM
15.00 14.6 96 21 11 NP SP-SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-3
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 11 1.50 12.3 77 42 20 NP SM
3.00 8.0 75 47 20 NP SM
7.50 9.1 72 52 22 NP SM
12.00 20.7 71 47 27 26 06 SC-SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-4
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 14 0.15 3.3 84 53 22 NP SM
1.50 16.5 77 26 16 NP SM 7.5 0.606 0.374 6
3.75 11.6 86 53 35 24 05 SC-SM
9.00 9.7 41 15 08 NP GW-GM
12.00 17.5 62 49 41 29 09 GC
16.50 9.5 72 36 18 NP SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-5
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-6
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-7
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 21 0.15 6.5 81 51 31 NP SM
1.50 16.2 93 52 26 26 05 SC-SM
3.00 12.6 41 09 06 NP GW-GM
6.00 16.6 69 15 08 NP SP-SM
10.50 8.8 30 11 02 NP GP
13.50 18.7 76 20 11 NP SP-SM
BH - 22 0.15 7.8 88 54 36 NP SM
1.50 19.1 89 53 32 26 07 SC-SM
4.50 9.6 31 11 05 NP GW-GM
9.00 9.5 54 21 09 NP GP-GM
12.00 9.3 34 17 10 NP GP-GM
18.00 13.4 66 41 20 NP SM
27.00 12.9 59 32 16 NP SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-8
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 24 0.15 3.6 92 47 25 NP SM
2.25 16.0 65 40 26 26 03 SM
3.75 17.3 63 21 13 NP SM
6.00 17.0 71 35 15 NP SM
9.00 12.3 65 23 12 NP SW-SM
16.50 18.5 79 15 10 NP SW-SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-9
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 28 0.15 6.3 89 53 27 NP SM
1.50 20.8 93 58 30 28 08 SC
3.00 18.7 89 52 23 30 10 SC
4.50 19.6 90 52 23 29 09 SC
6.00 19.9 99 91 40 31 10 SC
9.00 22.3 85 51 26 26 07 SC-SM
21.00 17.4 61 44 29 28 09 GC
22.50 22.4 63 54 44 36 14 GC
27.00 26.3 2.67 65 58 42 39 08 GM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 10
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 30 0.15 3.8 96 66 34 NP SM
1.50 20.5 2.67 94 58 34 27 03 SM
3.00 16.1 100 93 40 28 09 SC
3.75 15.2 100 91 42 26 06 SC-SM
6.00 20.2 69 44 22 25 06 SC-SM
10.50 9.5 43 20 10 NP GW-GM
16.50 12.4 65 52 26 29 09 SC
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 11
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 33 0.15 1.7 78 41 22 NP SM
1.50 14.5 75 43 23 NP SM
3.75 7.6 36 22 12 NP GW-GM
6.00 8.7 36 20 12 NP GW-GM
12.00 11.2 48 21 12 NP GP-GM
15.00 11.1 59 20 07 NP SP-SM
BH - 34 0.15 8.5 93 61 32 NP SM
1.50 13.7 83 25 07 NP SP-SM 7.5 0.536 0.170 4
3.00 16.7 56 35 24 27 07 GC-GM
4.50 9.8 80 62 38 26 06 SC-SM
7.50 22.1 78 52 33 26 07 SC-SM
13.50 9.0 30 14 07 NP GP-GM
16.50 10.5 36 19 10 NP GP-GM
19.50 16.4 62 32 19 26 05 SC-SM
21.00 13.5 99 84 57 34 12 CL
28.50 25.5 2.67 99 86 48 34 07 SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 12
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 36 0.15 4.0 95 59 17 NP SM
1.50 13.9 84 34 09 NP SW-SM 7.5 0.317 0.214 4
3.75 9.0 47 32 10 NP GP-GM
9.00 21.7 100 88 59 36 14 CL
12.00 20.9 100 91 65 38 15 CL
BH - 37 1.50 8.3 56 34 15 NP GM
3.00 13.4 68 42 27 27 03 SM
7.50 9.1 35 16 08 NP GP-GM
10.50 14.1 62 31 13 NP SM
15.00 8.8 43 20 09 NP GW-GM
18.00 11.0 68 35 12 NP SW-SM
22.50 14.7 56 33 16 NP GM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 13
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 39 1.50 9.7 74 45 15 NP SM -- 34
3.00 12.6 52 30 19 NP GM
6.00 15.7 78 49 32 31 10 SC
9.00 21.2 76 50 35 27 07 SC-SM
13.50 21.7 100 82 17 NP SM
BH - 40 0.15 3.0 96 65 34 NP SM
1.50 17.3 2.67 94 62 35 29 09 SC
6.00 8.5 47 27 15 26 06 GC-GM
13.50 11.3 78 58 29 NP SM
19.50 32.8 2.67 100 92 66 42 10 ML
28.50 34.0 2.68 100 100 97 45 12 ML
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 14
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 42 0.15 3.8 97 61 28 NP SM
1.50 14.4 95 49 13 NP SM 7.4 <0.002 0.372 2
4.50 17.8 93 29 15 NP SM
7.50 12.9 55 28 18 NP GM
12.00 15.7 59 32 08 NP SP-SM
15.00 12.1 58 30 08 NP SP-SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 15
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 46 0.15 6.0 80 42 18 NP SM
1.50 8.5 58 33 15 NP SM
3.00 10.7 54 28 17 28 08 GC
4.50 7.8 25 13 09 NP GP-GM
6.00 12.9 73 39 22 29 10 SC
10.50 12.6 61 33 21 28 09 SC
15.00 13.2 46 41 28 30 09 GC
16.50 14.6 70 56 38 32 12 SC
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 16
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 48 0.15 2.7 90 56 37 NP SM
1.50 16.7 2.68 76 42 26 NP SM
4.50 11.3 54 27 15 NP GM
7.50 7.2 39 21 10 NP GP-GM
15.00 19.1 100 77 20 NP SM
BH - 49 0.15 6.9 79 53 33 NP SM
1.50 11.9 63 35 22 NP SM
3.75 10.3 57 31 20 NP GM
6.00 9.0 31 11 07 NP GP-GM
13.50 29.7 94 86 17 NP SM
19.50 23.2 100 97 72 36 14 CL
25.50 22.0 99 90 21 NP SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 17
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 51 0.75 11.0 98 68 29 NP SM
2.25 11.3 65 39 26 NP SM
3.00 15.2 73 46 30 28 08 SC
7.50 8.5 57 30 14 NP SM
10.50 32.7 76 55 31 38 15 SC
15.50 26.2 2.68 100 100 97 42 19 CL 0.185 U-1
22.50 24.8 100 98 22 NP SM
27.00 18.4 100 87 34 NP SM
BH - 52 1.50 12.8 73 46 27 29 09 SC
3.00 13.9 98 62 38 30 09 SC
6.00 10.2 42 29 16 27 07 GC-GM
13.50 17.1 72 60 15 NP SM
16.50 17.6 93 71 38 32 12 SC
19.50 16.7 91 67 33 NP SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 18
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 54 1.50 9.4 84 51 30 NP SM
3.00 10.3 50 26 15 26 05 GC-GM
6.00 11.6 58 30 17 26 06 GC-GM
9.00 23.1 2.67 79 63 37 30 09 SC
13.50 14.0 73 68 21 NP SM
15.00 20.2 100 100 18 NP SM
BH - 55 0.15 4.6 97 51 24 NP SM
1.50 16.9 90 51 28 NP SM
3.00 8.3 54 28 16 NP GM
6.00 10.3 40 20 11 NP GP-GM
9.00 14.7 36 10 05 NP GW-GM
15.00 11.9 64 28 16 NP SM
19.50 11.1 62 21 11 NP SW-SM
22.50 11.7 55 17 08 NP SW-SM
25.50 12.5 58 17 09 NP SW-SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 19
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 58 0.15 2.3 93 52 23 NP SM
0.75 13.4 59 23 13 NP SM
1.50 10.6 64 36 20 NP SM
3.00 12.5 65 30 16 NP SM
7.50 11.5 42 18 08 NP GP-GM
10.50 13.2 47 22 11 NP GP-GM
12.00 8.7 24 12 06 NP GP-GM
16.50 11.2 35 17 08 NP GP-GM
18.00 16.3 2.67 90 74 39 26 06 SC-SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 20
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 60 0.15 3.6 97 70 26 NP SM
3.00 16.2 91 44 27 27 05 SC-SM
6.00 14.2 93 47 25 NP SM
7.50 10.2 90 45 20 NP SM
12.00 11.7 90 49 26 26 05 SC-SM
16.50 15.2 96 61 33 26 06 SC-SM
BH - 61 0.75 11.4 55 30 15 NP GM
3.00 4.2 35 19 10 NP GP-GM
7.50 11.5 59 15 07 NP SW-SM
12.00 15.2 79 43 20 NP SM
18.00 8.5 54 23 08 NP SW-SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 21
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 22
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 66 0.75 15.6 66 43 25 NP SM
2.25 5.4 48 24 13 NP GM
7.50 8.1 50 23 13 NP GM
13.50 4.5 37 12 08 NP GP-GM
BH - 67 0.75 8.1 41 24 17 NP GM
1.50 10.6 73 43 29 NP SM 7.6 0.581 0.851 4
3.75 9.1 60 36 19 NP SM
6.00 13.2 68 36 19 26 06 SC-SM
9.00 7.0 67 41 18 NP SM
10.50 9.5 81 48 22 28 08 SC
13.50 11.7 83 49 27 NP SM
16.50 11.2 94 59 35 NP SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 23
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 24
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 25
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 73 0.75 7.3 89 60 27 NP SM
3.75 8.4 73 33 13 NP SM
7.50 6.3 62 43 21 NP SM
10.50 5.3 61 46 22 NP SM
15.00 7.0 68 45 22 NP SM
18.00 14.2 2.67 84 53 26 28 03 SM
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 26
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 27
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 79 0.00-1.50 7.7 46 27 14 NP GM
1.50 13.4 80 38 10 NP SW-SM
3.00 23.0 58 36 26 27 03 GM
6.00 11.9 41 22 13 NP GM
7.50 13.5 31 14 07 NP GP-GM
13.50 11.1 47 21 13 NP GM
18.00 8.9 41 23 14 21 04 GC-GM
19.50 11.8 59 33 20 22 04 GC-GM
24.00 13.2 55 30 18 NP GM
27.00 11.5 43 24 11 NP GP-GM
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 28
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
BH - 81 0.00-1.50 8.3 62 37 21 NP SM
2.25 8.6 41 19 02 NP GP
6.00 21.7 52 28 13 NP GM
9.00 13.7 48 15 07 NP GW-GM
15.00 25.8 2.68 100 83 64 37 07 ML
16.50 22.6 2.68 87 52 37 29 04 SM
21.00 17.2 59 10 06 NP SW-SM
24.00 9.9 54 11 06 NP SW-SM
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 29
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 30
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 31
OEO - GF - 02, Rev. 00
NP - Non Plastic
TESTED PARAMETERS
Borehole # Cl- REMARKS
SO4 TDS
pH
(ppm) (ppm) (ppm)
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 01 1.50 42 19 62 CL
2.25 40 17 67 CL
3.75 29 9 42 SC
BH - 02 1.50 38 15 72 CL
3.00 39 18 67 CL
BH - 03 1.50 29 9 32 SC
3.75 26 6 24 SC-SM
BH - 04 0.75 26 5 42 GC-GM
12.00 + 32 4 32 SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 05 1.50 32 12 57 CL
2.25 34 12 69 CL
3.75 26 6 13 GC-GM
6.00 28 8 28 SC
15.00 30 9 20 SC
BH - 06 1.50 34 12 56 CL
3.00 28 8 33 SC
4.50 32 12 28 SC
6.00 + 26 5 32 SC-SM
12.00 x 30 3 26 SM
13.50 -- 36 5 36 SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 07 3.00 36 14 52 CL
6.50 32 12 46 SC
7.50 30 10 43 SC
10.50 28 8 15 SC
21.00 29 9 31 SC
BH - 08 3.75 34 12 53 CL
6.00 40 17 65 CL
9.00 26 6 30 SC-SM
BH - 09 4.50 + 34 14 55 CL
5.00 x 38 15 65 CL
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 10 13.50 26 6 25 SC-SM
16.50 26 5 17 SC-SM
BH - 11 12.00 26 6 27 SC-SM
BH - 13 7.50 27 7 39 SC-SM
10.50 26 5 44 SC-SM
24.00 26 6 41 SC-SM
25.50 26 7 41 SC-SM
BH - 14 3.75 24 5 35 SC-SM
12.00 + 29 9 41 GC
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 15 10.50 26 6 53 CL-ML
13.50 28 4 50 ML
BH - 16 0.75 34 13 55 CL
1.50 30 9 52 CL
2.25 29 9 55 CL
3.00 27 7 48 SC-SM
3.75 27 7 48 SC-SM
21.00 28 3 31 SM
BH - 17 1.50 + 29 10 79 CL
2.25 x 29 9 65 CL
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 17 3.00 30 9 44 SC
3.75 27 7 42 SC-SM
4.50 27 7 23 GC-GM
18.00 39 8 53 ML
BH - 18 1.50 34 12 50 CL
2.25 29 8 43 SC
3.00 26 5 20 GC-GM
7.50 26 7 24 SC-SM
16.50 + 35 5 51 ML
19.50 x 29 4 37 SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 19 1.50 31 10 31 SC
3.00 25 6 32 SC-SM
4.50 27 7 24 SC-SM
10.50 29 9 18 SC
15.00 25 6 19 SC-SM
18.00 34 12 76 CL
21.00 34 12 48 SC
BH - 20 1.50 36 14 47 SC
3.00 + 32 12 47 SC
4.50 x 28 8 17 SC
12.00 -- 30 10 15 SC
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 20 15.00 26 6 20 GC-GM
BH - 21 1.50 26 5 26 SC-SM
BH - 22 1.50 26 7 32 SC-SM
BH - 23 12.00 25 4 27 SC-SM
16.50 26 5 15 SC-SM
BH - 24 2.25 26 3 26 SM
BH - 25 16.50 26 3 30 SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 28 1.50 28 8 30 SC
3.00 30 10 23 SC
4.50 29 9 23 SC
6.00 31 10 40 SC
9.00 26 7 26 SC-SM
21.00 28 9 29 GC
22.50 36 14 44 GC
27.00 39 8 42 GM
BH - 29 2.25 + 26 7 35 SC-SCM
3.00 x 34 12 57 CL
3.75 -- 36 14 59 CL
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 29 4.50 38 15 60 CL
6.00 29 9 35 SC
7.50 26 7 41 SC-SM
BH - 30 1.50 27 3 34 SM
3.00 28 9 40 SC
3.75 26 6 42 SC-SM
6.00 25 6 22 SC-SM
16.50 29 9 26 SC
BH - 31 4.50 + 29 9 29 SC
12.00 x 32 12 74 CL
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 31 25.50 38 15 86 CL
28.50 25 4 29 SC-SM
BH - 32 3.75 28 9 31 SC
6.00 31 10 31 SC
10.50 32 12 44 SC
13.50 38 15 66 CL
BH - 34 3.00 27 7 24 GC-GM
4.50 26 6 38 SC-SM
7.50 + 26 7 33 SC-SM
19.50 x 26 5 19 SC-SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 34 21.00 34 12 57 CL
28.50 34 7 48 SM
BH - 35 2.25 26 7 19 SC-SM
3.00 26 4 20 SC-SM
7.50 28 8 31 SC
10.50 32 12 26 SC
15.00 29 9 28 SC
BH - 36 9.00 36 14 59 CL
12.00 + 38 15 65 CL
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 37 3.00 27 3 27 SM
BH - 38 2.25 26 4 29 SC-SM
BH - 39 6.00 31 10 32 SC
9.00 27 7 35 SC-SM
BH - 40 1.50 29 9 35 SC
6.00 26 6 15 GC-GM
19.50 42 10 66 ML
28.50 45 12 97 ML
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 41 0.75 27 7 33 SC-SM
6.00 27 7 17 GC-GM
9.00 26 6 20 GC-GM
15.00 25 4 20 SC-SM
BH - 43 1.50 25 6 40 SC-SM
15.00 26 5 35 SC-SM
22.50 32 5 63 ML
BH - 44 0.75 29 9 42 SC
1.50 + 32 12 49 SC
10.50 x 31 10 38 SC
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 44 13.50 34 12 46 SC
19.50 36 15 58 CL
BH - 45 15.00 29 9 23 SC
BH - 46 3.00 28 8 17 GC
6.00 29 10 22 SC
10.50 28 9 21 SC
15.00 30 9 28 GC
16.50 32 12 38 SC
BH - 47 21.00 x 25 4 37 SC-SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 49 19.50 36 14 72 CL
BH - 50 13.50 26 5 32 SC-SM
15.00 27 7 60 CL-ML
BH - 51 3.00 28 8 30 SC
10.50 38 15 31 SC
15.50 42 19 97 CL
BH - 52 1.50 29 9 27 SC
3.00 30 9 38 SC
6.00 x 27 7 16 GC-GM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 52 16.50 32 12 38 SC
BH - 53 18.00 26 6 42 SC-SM
BH - 54 3.00 26 5 15 GC-GM
6.00 26 6 17 GC-GM
9.00 30 9 37 SC
BH - 56 3.00 26 3 27 GM
19.50 34 7 48 SM
22.50 27 5 44 SC-SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 57 3.75 41 18 83 CL
6.50 39 17 75 CL
10.50 26 6 34 SC-SM
BH - 58 18.00 26 6 39 SC-SM
BH - 59 16.50 36 14 49 SC
BH - 60 3.00 27 5 27 SC-SM
12.00 26 5 26 SC-SM
16.50 26 6 33 SC-SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 62 3.75 24 4 15 GC-GM
BH - 63 6.00 25 4 21 SC-SM
BH - 64 0.75 29 9 33 SC
3.75 34 12 52 CL
4.50 27 7 47 SC-SM
7.50 26 6 77 CL-ML
10.50 28 8 48 SC
BH - 65 9.00 30 9 40 SC
10.50 + 26 4 34 SC-SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 65 13.50 23 7 91 CL-ML
16.50 26 5 90 CL-ML
BH - 67 6.00 26 6 19 SC-SM
10.50 28 8 22 SC
BH - 68 1.50 27 3 29 SM
2.25 27 6 24 SC-SM
7.50 38 15 97 CL
28.50 27 7 60 CL-ML
BH - 69 0.75 + 27 3 21 GM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 69 3.75 28 3 27 SM
6.00 26 5 24 SC-SM
13.50 39 17 97 CL
18.00 34 12 76 CL
BH - 70 2.25 27 7 35 SC-SM
7.50 28 8 32 SC
BH - 71 1.50 26 6 16 GC-GM
4.50 25 5 19 GC-GM
6.00 + 26 6 22 GC-GM
10.50 x 27 7 26 GC-GM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 71 13.50 28 8 25 SC
16.50 26 7 16 GC-GM
21.00 26 6 27 SC-SM
24.00 34 12 49 SC
27.00 27 7 62 CL-ML
BH - 72 1.50 24 6 33 SC-SM
3.00 27 7 58 CL-ML
6.50 26 6 50 CL-ML
9.00 + 26 4 48 SC-SM
12.00 x 29 9 46 SC
15.00 -- 30 10 34 GC
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 72 18.00 26 7 39 SC-SM
BH - 73 18.00 28 3 26 SM
BH - 74 1.50 25 6 38 SC-SM
3.75 26 7 47 SC-SM
10.50 28 9 29 SC
16.50 26 6 28 SC-SM
BH - 75 1.50 26 5 47 SC-SM
3.00 27 5 26 SC-SM
6.00 + 24 6 20 GC-GM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 76 0.75 27 7 15 SC-SM
1.50 29 4 25 SM
3.00 28 4 25 SM
BH - 77 2.25 24 4 35 SC-SM
6.00 24 4 20 GC-GM
13.50 26 3 22 SM
15.00 20 3 31 SM
22.50 27 3 20 SM
25.50 + 26 4 22 GC-GM
BH - 78 3.00 x 24 4 17 GC-GM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 78 3.75 26 3 22 GM
4.50 26 7 45 SC-SM
7.50 26 5 39 SC-SM
12.00 27 3 19 GM
15.00 23 4 16 GC-GM
22.50 27 7 79 CL-ML
25.50 34 12 80 CL
BH - 79 3.00 27 3 26 GM
18.00 + 21 4 14 GC-GM
19.50 x 22 4 20 GC-GM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
BH - 80 4.50 26 6 29 GC-GM
27.00 25 6 21 GC-GM
BH - 81 15.00 37 7 64 ML
16.50 29 4 67 SM
BH - 82 27.00 38 15 84 CL
BH - 84 24.00 38 15 72 CL
28.50 36 14 64 CL
2.0
1.5
SHEAR STRESS, Kg/cm2
1.0
φ = 35o
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080
2.0
1.5
SHEAR STRESS, Kg/cm2
1.0
φ = 33o
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
2
NORMAL STRESS, Kg/cm
Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080
2.0
1.5
SHEAR STRESS, Kg/cm2
1.0
φ = 34o
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080
2.0
1.5
SHEAR STRESS, Kg/cm2
1.0
φ = 34o
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080
2.0
1.5
SHEAR STRESS, Kg/cm2
1.0
φ = 33o
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
2
NORMAL STRESS, Kg/cm
Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080
2.0
1.5
SHEAR STRESS, Kg/cm 2
1.0
φ = 38o
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
2
NORMAL STRESS, Kg/cm
Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080
2.0
1.5
SHEAR STRESS, Kg/cm2
1.0
φ = 38o
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080
240
234.74
220
200
180
160
S T R E S S, kN/m2
140
120
100
80
60
40
20
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
STRAIN, %
320
309.59
300
280
260
240
220
200
S T R E S S, kN/m2
180
160
140
120
100
80
60
40
20
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
STRAIN, %
280
271.34
260
240
220
200
180
S T R E S S, kN/m2
160
140
120
100
80
60
40
20
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
STRAIN, %
320
300 298.47
280
260
240
220
200
S T R E S S, kN/m2
180
160
140
120
100
80
60
40
20
0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
STRAIN, %
200
184.83
180
160
140
2
120
S T R E S S, kN/m
100
80
60
40
20
0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
STRAIN, %
280
272.13
260
240
220
200
180
S T R E S S, kN/m2
160
140
120
100
80
60
40
20
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
STRAIN, %
260
246.00
240
220
200
180
160
2
S T R E S S, kN/m
140
120
100
80
60
40
20
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00
STRAIN, %
280
260 259.13
240
220
200
180
S T R E S S, kN/m2
160
140
120
100
80
60
40
20
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
STRAIN, %
260
249.86
240
220
200
180
160
S T R E S S, kN/m2
140
120
100
80
60
40
20
0
0.00 2.00 4.00 6.00 8.00 10.00
STRAIN, %
340
320
314.88
300
280
260
240
220
2
S T R E S S, kN/m
200
180
160
140
120
100
80
60
40
20
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
STRAIN, %
200
186.53
180
160
140
S T R E S S, kN/m2
120
100
80
60
40
20
0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
STRAIN, %
300
287.80
280
260
240
220
200
2
180
S T R E S S, kN/m
160
140
120
100
80
60
40
20
0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50
STRAIN, %
0.65 0.0808
8 Kg.
0.0789
0.0772
0.60
0.0752
0.0739
0.55
VOID RATIO - e
0.50
0.45
0.40
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.85 0.0808
8 Kg.
0.0789
0.80
0.0772
0.0752
0.75
0.0739
VOID RATIO - e
0.70
0 0 0.0482 0 0 0.0718 0.0825
0.65
0.60
0.55
0.50
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.90 0.0808
8 Kg.
0.0789
0.88
0.0772
0.86
0.0752
0.84 0.0739
VOID RATIO - e
0.80
0.78
0.76
0.74
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.65 0.0808
8 Kg.
0.0789
0.0772
0.60
0.0752
0.0739
0.55
VOID RATIO - e
0.50
0.45
0.40
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.60 0.0808
8 Kg.
0.0789
0.55
0.0772
0.50
0.0752
0.45
0.0739
VOID RATIO - e
0.35
0.30
0.25
0.20
0.15
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.55
0.50
0.45
VOID RATIO - e
0.40
0.35
0.30
0.25
0.10 1.00 10.00
APPLIED STRESS [P], Kg/cm2
0.50
0.46
0.42
VOID RATIO - e
0.38
0.34
0.30
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.80 0.0808
8 Kg.
0.0789
0.75
0.0772
0.70
0.0752
0.65
0.0739
0.60
VOID RATIO - e
0.50
0.45
0.40
0.35
0.30
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.80 0.0808
8 Kg.
0.0789
0.75
0.0772
0.70
0.0752
0.65
0.0739
0.60
VOID RATIO - e
0.50
0.45
0.40
0.35
0.30
0.1 1 10
APPLIED STRESS [P], Kg/cm2
0.35 0.0808
8 Kg.
0.0789
0.30
0.0772
0.0752
0.25
0.0739
VOID RATIO - e
0.15
0.10
0.05
0.1 1 10
APPLIED STRESS [P], Kg/cm2
LOWER SPT-N60-BH-55
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Ƴ' (Kn/m3) qA(net) - kPa
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17
Net Allowable
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
Method Method
Spread 2 2 1 20 20000 210 320
FIGURE C-8
Mat 10 10 1 20 26000 120 210
SHEAR CONSIDERATION_USING EQUATION 6 PRESENTED IN REPORT-BH58
LOWER SPT-N60-BH 58
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Ƴ' (Kn/m3) qA(net) - kPa
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17
Net Allowable
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
Method Method
Spread 2 2 1 20 20000 210 320
FIGURE C-9
Mat 10 10 1 20 26000 120 210
SHEAR CONSIDERATION_USING EQUATION 6 PRESENTED IN REPORT-BH56
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17
Net Allowable
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
Method Method
Spread 2 2 1 20 20000 210 320
FIGURE C-10
Mat 10 10 1 20 26000 120 210
SHEAR CONSIDERATION_USING EQUATIONS PRESENTED IN FIGURE 5 OF ILUSTRATIONS-BH77 & 78
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17
Net Allowable
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
Method Method
Spread 2 2 1 20 49000 210 320
FIGURE C-11
Mat 10 10 1 20 26000 120 210
NET ALLOWABLE BEARING CAPACITY OF MAT FOUNDATION FOR SETTLMENT OF 50 MM_USING EQUATION PRESENTED IN FIGURE C-2 OF APPENDIX-C
STRUCTURE : SKIDS (BH-67)
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Fd qA(net) - kPa qA(net) - kPa
Reco.
Figure C-12
NET ALLOWABLE BEARING CAPACITY OF MAT FOUNDATION FOR SETTLMENT OF 50 MM_USING EQUATION PRESENTED IN FIGURE C-2 OF APPENDIX-C
STRUCTURE : OWS WATER PACKAGE (BH-54)
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Fd qA(net) - kPa qA(net) - kPa
Reco.
EGL: 4.3
Figure C-13
NET ALLOWABLE BEARING CAPACITY OF MAT FOUNDATION FOR SETTLMENT OF 50 MM_USING EQUATION PRESENTED IN FIGURE C-2 OF APPENDIX-C
STRUCTURE : OILY WATER LIFT STATION (BH-72)
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Fd qA(net) - kPa qA(net) - kPa
Reco.
Figure C-14
SETTLE3D 3.017
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0367619 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 56.027
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 56.027
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 893.848
Mean Stress [kPa] 0 108.73
Total Stress [kPa] 0 1565.83
Total Strain 0 0.00550863
Pore Water Pressure [kPa] 0 671.985
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 1.35 893.49
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 172.819
Loads
1. Circular Load
Radius 27.5 m
Center (10, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 1.5 m
Installation Stage Stage 1
Figure No: 15
: Page 2 of 2
Soil Layers
Soil Properties
Property Enginering Fill Medium dense SAND Hard CLAY Dense SAND Very dense SAND
Color ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 18 19.12 19 20
Saturated Unit Weight [kN/m3 ] 19.61 19.61 21.57 20.59 22.06
Poisson's Ratio 0.325 0.325 0.45 0.375 0.375
Immediate Settlement Enabled Enabled Enabled Enabled Enabled
E [kPa] 20000 20000 12360 49000 85000
Eur [kPa] 20000 20000 12360 49000 85000
Undrained Su A [kN/m2] 0 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 2 2 2 2 2
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
11.4
17.1
22.8
28.5
34.2
39.9
50
45.6
51.3
57.0
max (stage): 56.0 mm
max (all): 56.0 mm
56.03
26.91
25
Schmertmann: 46.75 mm
0
-25
-50
-75
-50 -25 0 25 50 75
Project
Figure No : 15 (b)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.183173 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 121.821
Consolidation Settlement [mm] 0 70.4404
Immediate Settlement [mm] 0 51.3802
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 1425.44
Mean Stress [kPa] 0 108.94
Total Stress [kPa] 0 1425.44
Total Strain 0 0.0521551
Pore Water Pressure [kPa] 0 13.2435
Degree of Consolidation [%] 0 100
Pre-consolidation Stress [kPa] 0.54 1424.99
Over-consolidation Ratio 1 1
Void Ratio 0 0.999697
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 279.229
Loads
1. Circular Load
Radius 27.5 m
Center (10, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 16
: Page 2 of 3
Empirical Results
Load 1
Modified Schmertmann Yes
Consider Time Dependent Settlement No
Schmertmann Method Thickness [m] Es [kPa] Unit Weight [kN/m 3] Sat. Unit Weight [kN/m3 ]
Layer 1 3 23000 18 19.61
Layer 2 1.5 45000 19 20.59
Layer 3 6 70000 20.59 22.06
Layer 4 4.5 85000 20.59 22.06
Layer 5 15 65000 20.59 22.06
Layer 6 52 70000 20.59 Figure No:22.06
15 (a)
Settlement Results
Schmertmann [mm]
Stage 1 57.136
Soil Layers
Soil Properties
: Page 3 of 3
Enginering Medimu dense Stiff tto very stiff Dense Very dense Very dense
Property
Fill SAND CLAY SAND SAND SAND 1
Color ___ ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 18 19 19 20 20
Saturated Unit Weight
18 19.61 21.57 20.59 22.06 22.06
[kN/m3 ]
Poisson's Ratio 0.325 0.325 0.45 0.375 0.375 0.375
Immediate Settlement Enabled Enabled Disabled Enabled Enabled Enabled
E [kPa] 20000 23000 48000 61000 85000
Eur [kPa] 20000 23000 48000 61000 85000
Primary Consolidation Disabled Disabled Enabled Disabled Disabled Disabled
Material Type Non-Linear
Cc 0.2
Cr 0.05 Figure No: 15 (a)
e0 1.05
OCR 1 1 1 1 1 1
Undrained Su A [kN/
0 0 0 0 0 0
m2]
Undrained Su S 0.2 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 0 1 0 0 0 0
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
Line # Start Location End Location Horizontal Divisions Vertical Divisions
1 10, 20 37.5, 20 20 Auto: 71
13
26
39
52
65
78
91
104
117
130
max (stage): 121.8 mm
max (all): 121.8 mm
50
121.82
67.2
Schmertmann: 57.14 mm
0
-50
-50 -25 0 25 50 75
Project
Figure No : 16 (c)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.177714 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 60.2567
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 60.2567
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 1421.16
Mean Stress [kPa] 0 103.846
Total Stress [kPa] 0 1421.16
Total Strain 0 0.00486725
Pore Water Pressure [kPa] 0 13.2435
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 1420.71
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 278.82
Loads
1. Circular Load
Radius 27.5 m
Center (10, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 17
: Page 2 of 3
Empirical Results
Load 1
Figure No: 17 (a)
Modified Schmertmann Yes
Consider Time Dependent Settlement No
Schmertmann Method Thickness [m] Es [kPa] Unit Weight [kN/m 3] Sat. Unit Weight [kN/m3 ]
Layer 1 3 23000 18 19.61
Layer 2 1.5 45000 19 20.59
Layer 3 6 70000 20.59 22.06
Layer 4 4.5 85000 20.59 22.06
Layer 5 15 65000 20.59 22.06
Layer 6 52 70000 20.59 22.06
Settlement Results
Schmertmann [mm]
Stage 1 57.136
Soil Layers
Soil Properties
Enginering Medimu dense Select Dense Very dense Very dense
Property
Fill SAND Fill SAND SAND SAND 1
Color ___ ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 18 18 19 20 20
Saturated Unit Weight
18 19.61 19.61 20.59 22.06 22.06
[kN/m3 ]
Poisson's Ratio 0.325 0.325 0.325 0.375 0.375 0.375
Immediate Settlement Enabled Enabled Enabled Enabled Enabled Enabled
E [kPa] 20000 23000 20000 48000 61000 85000
Eur [kPa] 20000 23000 20000 48000 61000 85000
Undrained Su A [kN/m2] 0 0 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 0 1 0 0 0 0
: Page 3 of 3
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
Line # Start Location End Location Horizontal Divisions Vertical Divisions
1 10, 20 37.5, 20 20 Auto: 71
6.1
12.2
18.3
24.4
30.5
36.6
42.7
48.8
54.9
61.0
max (stage): 60.3 mm
max (all): 60.3 mm
50
60.26
29.25
Schmertmann: 57.14 mm
0
-50
-50 -25 0 25 50 75
Project
Figure No : 17(c)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.16738 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 61.039
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 61.039
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 892.68
Mean Stress [kPa] 0 108.416
Total Stress [kPa] 0 1566.14
Total Strain 0 0.0046452
Pore Water Pressure [kPa] 0 673.457
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 892.327
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 172.735
Loads
1. Circular Load
Radius 27.5 m
Center (10, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 18
: Page 2 of 3
Empirical Results
Load 1
Modified Schmertmann Yes
Consider Time Dependent Settlement No
Schmertmann Method Thickness [m] Es [kPa] Unit Weight [kN/m 3] Sat. Unit Weight [kN/m3 ]
Layer 1 3 23000 18 19.61
Layer 2 1.5 45000 19 20.59
Layer 3 6 70000 20.59 22.06
Layer 4 4.5 85000 20.59 22.06
Layer 5 15 65000 20.59 22.06
Layer 6 52 70000 20.59 22.06
Settlement Results
Schmertmann [mm]
Stage 1 58.4869
Soil Layers
Soil Properties
Property Engineering Fill Medium dense SAND Hard Clay Very Dense SAND
Color ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 18 19 20
Saturated Unit Weight [kN/m3 ] 19.61 19.61 21.57 22.06
Poisson's Ratio 0.325 0.325 0.45 0.375
Immediate Settlement Enabled Enabled Enabled Enabled
E [kPa] 20000 28000 15990 85000
Eur [kPa] 20000 28000 15990 85000
Undrained Su A [kN/m2] 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1
: Page 3 of 3
Query Lines
Line # Start Location End Location Horizontal Divisions Vertical Divisions
1 10, 20 37.5, 20 20 Auto: 61
6.2
12.4
18.6
24.8
31.0
37.2
43.4
49.6
55.8
62.0
max (stage): 61.0 mm
max (all): 61.0 mm
50
29.43
60.9
Schmertmann: 58.49 mm
0
-50
-50 -25 0 25 50 75
Project
Figure No: 18 (c)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.15046 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 46.4508
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 46.4508
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 904.575
Mean Stress [kPa] 0 106.863
Total Stress [kPa] 0 1566.75
Total Strain 0 0.00268153
Pore Water Pressure [kPa] 0 662.175
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.9 904.307
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 175.195
Loads
1. Circular Load
Radius 27.5 m
Center (10, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 1m
Installation Stage Stage 1
Figure No: 19
: Page 2 of 3
Empirical Results
Load 1
Modified Schmertmann Yes
Consider Time Dependent Settlement No
Schmertmann Method Thickness [m] Es [kPa] Unit Weight [kN/m 3] Sat. Unit Weight [kN/m3 ]
Layer 1 3 23000 18 19.61
Layer 2 1.5 45000 19 20.59
Layer 3 6 70000 20.59 22.06
Layer 4 4.5 85000 20.59 22.06
Layer 5 15 65000 20.59 22.06
Layer 6 52 70000 20.59 22.06
Settlement Results
Schmertmann [mm]
Stage 1 53.1387
Soil Layers
Soil Properties
Property Engineering Fill Dense SAND Very dense SAND Very dense SAND 1
Color ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 19 20 20
Saturated Unit Weight [kN/m3 ] 19.61 20.59 22.06 22.06
Poisson's Ratio 0.325 0.375 0.375 0.375
Immediate Settlement Enabled Enabled Enabled Enabled
E [kPa] 20000 32000 76000 86000
Eur [kPa] 20000 32000 76000 86000
Undrained Su A [kN/m2] 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1
: Page 3 of 3
Query Lines
Line # Start Location End Location Horizontal Divisions Vertical Divisions
1 10, 20 37.5, 20 20 Auto: 67
4.7
9.4
14.1
18.8
23.5
28.2
32.9
37.6
42.3
47.0
max (stage): 46.5 mm
max (all): 46.5 mm
50
46.45
22.84
Schmertmann: 53.14 mm
0
-50
-50 -25 0 25 50 75
Project
Figure No : 19 (c)
Analysis Description
Drawn By Company
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0360327 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 45.153
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 45.153
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 905.402
Mean Stress [kPa] 0 108.73
Total Stress [kPa] 0 1571.01
Total Strain 0 0.00463381
Pore Water Pressure [kPa] 0 665.608
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 905.099
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 175.233
Loads
1. Circular Load
Radius 27.5 m
Center (10, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 20
: Page 2 of 2
Soil Layers
Soil Properties
Engineering Medium dense Very dense Hard Very dense SAND
Property
Fill SAND SAND CLAY 1
Color ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 18 20 19.12 20
Saturated Unit Weight [kN/
19.61 19.61 22.06 22.06 22.06
m3 ]
Poisson's Ratio 0.325 0.325 0.375 0.45 0.375
Immediate Settlement Enabled Enabled Enabled Enabled Enabled
E [kPa] 20000 21000 74000 67200 85000
Eur [kPa] 20000 21000 74000 67200 85000
Undrained Su A [kN/m2] 0 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
13.8
18.4
23.0
27.6
32.2
36.8
50
41.4
46.0
max (stage): 45.2 mm
max (all): 45.2 mm
45.01
22.01
25
0
-25
-50
-75
-50 -25 0 25 50 75
Project
Figure No : 20 (b)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0360112 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 207
Consolidation Settlement [mm] 0 168.593
Immediate Settlement [mm] 0 38.4071
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 907.653
Mean Stress [kPa] 0 114.384
Total Stress [kPa] 0 1578.17
Total Strain 0 0.0712903
Pore Water Pressure [kPa] 0 670.514
Degree of Consolidation [%] 0 100
Pre-consolidation Stress [kPa] 0.54 907.388
Over-consolidation Ratio 1 1
Void Ratio 0 0.895036
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 175.11
Loads
1. Circular Load
Radius 27.5 m
Center (10, 10)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 21
: Page 2 of 3
Soil Layers
Layer # Type Thickness [m] Depth [m]
1 Engineering Fill 1.65 0
2 Sttiff tto very stiff CLAY 3 1.65
3 Hard CLAY 1.5 4.65
4 Very dense SAND 13.5 6.15
5 Hard Clay 4.5 19.65
6 Very dense SAND1 46 24.15
Soil Properties
Engineering Sttiff tto very stiff Hard Very dense Hard Very dense
Property
Fill CLAY CLAY SAND Clay SAND1
Color ___ ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 19 20 20 19 20
Saturated Unit Weight
19.61 21.57 21.57 22.06 22.06 22.06
[kN/m3 ]
Poisson's Ratio 0.325 0.45 0.45 0.375 0.375 0.375
Immediate Settlement Enabled Disabled Enabled Enabled Enabled Enabled
E [kPa] 20000 13020 76000 76000 80000
Eur [kPa] 20000 13020 76000 76000 80000
Primary Consolidation Disabled Enabled Disabled Disabled Disabled Disabled
Material Type Non-Linear
Cc 0.18
Cr 0.05
e0 0.95
OCR 1 1 1 1 1 1
Undrained Su A [kN/m2] 0 0 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
: Page 3 of 3
Query Lines
Line # Start Location End Location Horizontal Divisions Vertical Divisions
1 10, 10 37.5, 10 20 Auto: 77
105
126
147
168
189
210
25
120.01
207
0
-25
-50
-75
-40 -20 0 20 40 60
Project
Figure No : C-21 (c)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0362498 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 53.8665
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 53.8665
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 898.387
Mean Stress [kPa] 0 108.94
Total Stress [kPa] 0 1568.9
Total Strain 0 0.00503161
Pore Water Pressure [kPa] 0 670.514
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 898.121
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 173.827
Loads
1. Circular Load
Radius 27.5 m
Center (10, 10)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 22
: Page 2 of 3
Soil Layers
Layer # Type Thickness [m] Depth [m]
1 Engineering Fill 1.65 0
2 Select Fill 3 1.65
3 Hard CLAY 1.5 4.65
4 Very dense SAND 13.5 6.15
5 Hard Clay 4.5 19.65
6 Very dense SAND1 46 24.15
Soil Properties
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
10.8
16.2
21.6
27.0
32.4
37.8
43.2
50
48.6
54.0
max (stage): 53.9 mm
max (all): 53.9 mm
25
53.87
21.26
0
-25
-50
-40 -20 0 20 40 60
Project
Figure No : C-22 (b)
Analysis Description
Drawn By Company
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.158311 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 61.4142
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 61.4142
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 1055.82
Mean Stress [kPa] 0 107.895
Total Stress [kPa] 0 1830.81
Total Strain 0 0.00405356
Pore Water Pressure [kPa] 0 774.99
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 1055.52
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 205.34
Loads
1. Circular Load
Radius 32.5 m
Center (10, 20)
Load Type Flexible
Area of Load 3301.49 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 23
: Page 2 of 2
Soil Layers
Soil Properties
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
6.2
12.4
18.6
24.8
31.0
37.2
43.4
49.6
55.8
62.0
max (stage): 61.4 mm
max (all): 61.4 mm
50
61.41
30.24
0
-50
-50 -25 0 25 50 75
Project
Figure No: C-23 (b)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.16452 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 49.2789
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 49.2789
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 1056.26
Mean Stress [kPa] 0 108.416
Total Stress [kPa] 0 1831.25
Total Strain 0 0.00178153
Pore Water Pressure [kPa] 0 774.99
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.9 1055.95
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 205.291
Loads
1. Circular Load
Radius 32.5 m
Center (-70, 10)
Load Type Flexible
Area of Load 3301.49 m2
Load 150 kPa
Depth 1.5 m
Installation Stage Stage 1
Figure No: 24
: Page 2 of 3
Soil Layers
Soil Properties
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
: Page 3 of 3
50
max (stage): 49.3 mm
max (all): 49.3 mm
49.24
24.54
0
-50
-100 -50 0
Project
Figure No: C-24(c)
Analysis Description
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.181246 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 50.6329
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 50.6329
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 739.867
Mean Stress [kPa] 0 107.303
Total Stress [kPa] 0 1519.76
Total Strain 0 0.0021345
Pore Water Pressure [kPa] 0 779.895
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 1.01125 739.624
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 142.156
Loads
1. Circular Load
Radius 32.5 m
Center (-10, 20)
Load Type Flexible
Area of Load 3301.49 m2
Load 150 kPa
Depth 1.5 m
Installation Stage Stage 1
Figure No: 25
: Page 2 of 3
Soil Layers
Soil Properties
Soil Soil Soil Soil Soil Soil Soil
Property
Property 1 Property 2 Property 3 Property 4 Property 5 Property 6 Property 7
Color ___ ___ ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 16.18 18.14 20.59 20.59 20.59 20.59 20.59
Saturated Unit Weight
18 18 18 18 18 18 18
[kN/m3 ]
Poisson's Ratio 0.325 0.375 0.35 0.375 0.375 0.375 0.375
Immediate Settlement Enabled Enabled Enabled Enabled Enabled Enabled Enabled
E [kPa] 24000 40000 68000 75000 80000 80000 85000
Eur [kPa] 24000 40000 68000 75000 80000 80000 85000
Undrained Su A [kN/
0 0 0 0 0 0 0
m2]
Undrained Su S 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
5.1
10.2
15.3
20.4
25.5
30.6
35.7
40.8
45.9
51.0
max (stage): 50.6 mm
max (all): 50.6 mm
50
50.63
25.24
0
-50
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.202662 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 64.5336
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 64.5336
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 1079.26
Mean Stress [kPa] 0 108.59
Total Stress [kPa] 0 1883.68
Total Strain 0 0.00464117
Pore Water Pressure [kPa] 0 804.42
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 1078.94
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 210.008
Loads
1. Circular Load
Radius 33.5 m
Center (-15, 30)
Load Type Flexible
Area of Load 3507.78 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 26
: Page 2 of 3
Soil Layers
Soil Properties
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
: Page 3 of 3
Query Lines
26.0
32.5
39.0
45.5
52.0
58.5
65.0
max (stage): 64.5 mm
max (all): 64.5 mm
50
64.53
31.71
0
-50
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0372555 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 54.7318
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 54.7318
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 907.304
Mean Stress [kPa] 0 113.636
Total Stress [kPa] 0 1569.48
Total Strain 0 0.00458562
Pore Water Pressure [kPa] 0 662.175
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 906.831
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 175.166
Loads
1. Circular Load
Radius 27.5 m
Center (-20, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 27
: Page 2 of 3
Soil Layers
Soil Properties
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
: Page 3 of 3
Query Lines
27.5
33.0
38.5
44.0
49.5
55.0
max (stage): 54.7 mm
50
54.73
26.23
25
0
-25
-50
Drawn By Company
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0625037 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 52.6745
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 52.6745
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 902.426
Mean Stress [kPa] 0 112.896
Total Stress [kPa] 0 1559.7
Total Strain 0 0.00442328
Pore Water Pressure [kPa] 0 657.27
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 1.35 901.977
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 174.108
Loads
1. Circular Load
Radius 27.5 m
Center (-20, 25)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 1.5 m
Installation Stage Stage 1
Figure No: 28
: Page 2 of 3
Soil Layers
Soil Properties
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
: Page 3 of 3
Query Lines
31.8
37.1
42.4
47.7
53.0
max (stage): 52.7 mm
max (all): 52.7 mm
50
52.34
25.12
25
0
-25
-50
Drawn By Company
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.22345 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 111.238
Consolidation Settlement [mm] 0 36.7109
Immediate Settlement [mm] 0 74.5269
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 801.796
Mean Stress [kPa] 0 110
Total Stress [kPa] 0 1459.07
Total Strain 0 0.0504021
Pore Water Pressure [kPa] 0 657.27
Degree of Consolidation [%] 0 100
Pre-consolidation Stress [kPa] 0.54 801.524
Over-consolidation Ratio 1 1
Void Ratio 0 0.943252
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 154.386
Loads
1. Circular Load
Figure No: 29
D-0404.s3z Osaimi Engineering Office 5/4/2016, 10:13:53 AM
SETTLE3D 3.020
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu: Page 2 of 3
Radius 27.5 m
Center (10, 10)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Soil Layers
Soil Properties
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu: Page 3 of 3
Very
Engineering Medium Stiff lean very stiff sandy medium Dense
Property dense
Fill dense SAND CLAY lean clay dense SAND SAND
SAND
Color ___ ___ ___ ___ ___ ___ ___
Unit Weight [kN/
18 18 19 19 18 19 20
m3 ]
Saturated Unit
19.61 19.61 19.61 19.64 18 20.59 20.59
Weight [kN/m3 ]
Poisson's Ratio 0.325 0.325 0.45 0.45 0.325 0.375 0.375
Immediate
Enabled Enabled Disabled Enabled Enabled Enabled Enabled
Settlement
E [kPa] 20000 24000 10000 23000 49000 70000
Eur [kPa] 20000 24000 10000 23000 49000 70000
Primary
Disabled Disabled Enabled Disabled Disabled Disabled Disabled
Consolidation
Non-
Material Type
Linear
Cc 0.2
Cr 0.06
e0 1
OCR 1 1 1 1 1 1 1
Undrained Su A
0 0 0 0 0 0 0
[kN/m2]
Undrained Su S 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
24
36
48
60
72
84
96
50
108
120
max (stage): 111.2 mm
max (all): 111.2 mm
25
111.24
58.16
0
-25
-50
-40 -20 0 20 40 60
Project
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu Figure No : C-29(C)
Analysis Description
Drawn By Company
Osaimi Engineering Office
Date File Name
SETTLE3D 3.020
5/4/2016, 10:13:53 AM D-0404.s3z
SETTLE3D 3.020
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 72.247
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 72.247
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 883.994
Mean Stress [kPa] 0 106.522
Total Stress [kPa] 0 1541.26
Total Strain 0 0.00474131
Pore Water Pressure [kPa] 0 657.27
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 883.543
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 171.153
Loads
1. Circular Load
Figure No: 30
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu: Page 2 of 3
Radius 27.5 m
Center (10, 10)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Soil Layers
Soil Properties
Groundwater
Figure No: 30 (a)
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu: Page 3 of 3
Query Lines
14.6
21.9
29.2
36.5
43.8
51.1
58.4
50
65.7
73.0
max (stage): 72.2 mm
max (all): 72.2 mm
25
72.25
35.01
0
-25
-50
-40 -20 0 20 40 60
Project
Geotechnical Investigation for YANBU DISTRIBUTION HUB (YDH) Project, Yanbu Figure No : C-30 (c)
Analysis Description
Drawn By Company
Osaimi Engineering Office
Date File Name
SETTLE3D 3.020
5/4/2016, 10:13:53 AM D-0404 - Post Improvement (Recovered)
SETTLE3D 3.020
: Page 1 of 3
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0508661 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 63.7566
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 63.7566
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 1207.71
Mean Stress [kPa] 0 111.435
Total Stress [kPa] 0 2134.75
Total Strain 0 0.00354166
Pore Water Pressure [kPa] 0 927.045
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.45 1207.32
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 235.411
Loads
1. Circular Load
Radius 38.5 m
Center (-5, 15)
Load Type Flexible
Area of Load 4633.02 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 31
: Page 2 of 3
Soil Layers
Soil Properties
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
: Page 3 of 3
Query Lines
19.2
25.6
32.0
38.4
44.8
51.2
57.6
64.0
max (stage): 63.8 mm
max (all): 63.8 mm
50
63.76
31.15
0
-50
-50 0 50
Project
Figure No: C-31(c)
Analysis Description
Drawn By Company
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0394133 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 57.2749
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 57.2749
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 617.45
Mean Stress [kPa] 0 111.29
Total Stress [kPa] 0 1099.61
Total Strain 0 0.00450271
Pore Water Pressure [kPa] 0 482.161
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 617.234
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 117.614
Loads
1. Circular Load
Radius 19.25 m
Center (10, 20)
Load Type Flexible
Area of Load 1158.26 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 32
: Page 2 of 2
Soil Layers
Soil Properties
Property Engineering Fill Dense SAND Very dense SAND Hard CLAY Dense SAND1
Color ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 19 20 20 19
Saturated Unit Weight [kN/m3 ] 19.61 20.59 22.06 21.57 20.59
Poisson's Ratio 0.325 0.375 0.375 0.45 0.375
Immediate Settlement Enabled Enabled Enabled Enabled Enabled
E [kPa] 20000 36000 53000 37000 34000
Eur [kPa] 20000 36000 53000 37000 34000
Undrained Su A [kN/m2] 0 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
23.2
29.0
34.8
40.6
46.4
52.2
58.0
max (stage): 57.3 mm
40
57.27
28.8
20
0
-20
-20 0 20 40
Project
Figure No: C-32(b)
Analysis Description
Drawn By Company
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.199068 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 47.4329
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 47.4329
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 604.439
Mean Stress [kPa] 0 107.48
Total Stress [kPa] 0 1081.21
Total Strain 0 0.00468873
Pore Water Pressure [kPa] 0 476.766
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 604.164
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 115.335
Loads
1. Circular Load
Radius 19.25 m
Center (10, 20)
Load Type Flexible
Area of Load 1158.26 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 33
: Page 2 of 2
Soil Layers
Soil Properties
Property Engineering Fill Dense SAND Dense SAND1 Very dense SAND Dense SAND2
Color ___ ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 19 19 20 19
Saturated Unit Weight [kN/m3 ] 19.61 20.59 20.59 21.57 20.59
Poisson's Ratio 0.325 0.375 0.375 0.375 0.375
Immediate Settlement Enabled Enabled Enabled Enabled Enabled
E [kPa] 20000 37000 42000 84000 42000
Eur [kPa] 20000 37000 42000 84000 42000
Undrained Su A [kN/m2] 0 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
19.2
24.0
28.8
33.6
38.4
43.2
48.0
max (stage): 47.4 mm
40
47.43
23.91
20
0
-20
-20 0 20 40
Project
Figure No: C-33 (b)
Analysis Description
Drawn By Company
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.161743 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 23.7443
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 23.7443
Loading Stress [kPa] 0 150
Effective Stress [kPa] 0 408.661
Mean Stress [kPa] 0 103.846
Total Stress [kPa] 0 679.417
Total Strain 0 0.00461277
Pore Water Pressure [kPa] 0 270.756
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 408.53
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 76.6939
Loads
1. Circular Load
Radius 11.25 m
Center (10, 20)
Load Type Flexible
Area of Load 395.592 m2
Load 150 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 34
: Page 2 of 2
Soil Layers
Soil Properties
Property Engineering Fill Medium dense SAND Dense SAND Very dense SAND
Color ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 18 19 20
Saturated Unit Weight [kN/m3 ] 19.61 19.61 20.59 21.57
Poisson's Ratio 0.325 0.325 0.375 0.375
Immediate Settlement Enabled Enabled Enabled Enabled
E [kPa] 20000 21000 46000 85000
Eur [kPa] 20000 21000 46000 85000
Undrained Su A [kN/m2] 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
0.0
2.4
4.8
7.2
9.6
12.0
40
14.4
16.8
19.2
21.6
24.0
max (stage): 23.7 mm
max (all): 23.7 mm
30
23.74
11.52
20
10
0
-10
-10 0 10 20 30
Project
Drawn By Company
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.0802485 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 2.86353
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 2.86353
Loading Stress [kPa] 0 70
Effective Stress [kPa] 0 240.694
Mean Stress [kPa] 0 49.3939
Total Stress [kPa] 0 376.562
Total Strain 0 0.000893299
Pore Water Pressure [kPa] 0 135.869
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 240.617
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 47.6965
Loads
1. Circular Load
Radius 2.25 m
Center (10, 20)
Load Type Flexible
Area of Load 15.8237 m2
Load 70 kPa
Depth 1.5 m
Installation Stage Stage 1
Figure No: 35
: Page 2 of 2
Soil Layers
Soil Properties
Property Engineering Fill Dense SAND Very dense SAND
Color ___ ___ ___
Unit Weight [kN/m3 ] 18 19 20
Saturated Unit Weight [kN/m3 ] 19.61 20.59 21.57
Poisson's Ratio 0.325 0.375 0.375
Immediate Settlement Enabled Enabled Enabled
E [kPa] 20000 45000 85000
Eur [kPa] 20000 45000 85000
Undrained Su A [kN/m2] 0 0 0
Undrained Su S 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8
Piezo Line ID 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
0.00
0.29
0.58
0.87
1.16
1.45
24
1.74
2.03
2.32
2.61
2.90
max (stage): 2.9 mm
max (all): 2.9 mm
22
2.86
1.53
20
18
16
14
6 8 10 12 14
Project
Figure No: C-35(b)
Analysis Description
Drawn By Company
: Page 1 of 2
Stage Settings
Stage # Name
1 Stage 1
Results
Time taken to compute: 0.173543 seconds
Stage: Stage 1
Data Type Minimum Maximum
Total Settlement [mm] 0 13.0385
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 13.0385
Loading Stress [kPa] 0 100
Effective Stress [kPa] 0 396.088
Mean Stress [kPa] 0 70.5628
Total Stress [kPa] 0 660.958
Total Strain 0 0.00234946
Pore Water Pressure [kPa] 0 264.87
Degree of Consolidation [%] 0 0
Pre-consolidation Stress [kPa] 0.54 395.966
Over-consolidation Ratio 1 1
Void Ratio 0 0
Hydroconsolidation Settlement [mm] 0 0
Undrained Shear Strength 0 76.1041
Loads
1. Circular Load
Radius 10.25 m
Center (10, 20)
Load Type Flexible
Area of Load 328.39 m2
Load 100 kPa
Depth 0.6 m
Installation Stage Stage 1
Figure No: 36
D-0801.s3z 5/3/2016, 11:48:56 AM
SETTLE3D 3.020
: Page 2 of 2
Soil Layers
Soil Properties
Property medium Dense SAND Very dense SAND Very dense SAND1
Color ___ ___ ___
Unit Weight [kN/m3 ] 18 20 20
Saturated Unit Weight [kN/m3 ] 19.61 22.06 21.57
Poisson's Ratio 0.325 0.375 0.375
Immediate Settlement Enabled Enabled Enabled
E [kPa] 27000 58000 85000
Eur [kPa] 27000 58000 85000
Undrained Su A [kN/m2] 0 0 0
Undrained Su S 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8
Piezo Line ID 1 1 1
Groundwater
Groundwater method Piezometric Lines
Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table
Query Lines
7.0
8.4
9.8
11.2
12.6
14.0
max (stage): 13.0 mm
30
13.04
6.46
20
10
0
-10 0 10 20 30
Project
Figure No: C-36 (b)
Analysis Description
Drawn By Company
HYDRAULIC
PUMP
BOREHOLE BOREHOLE
DETECTOR UNIT
( Geophones )
ENERGY SOURCE
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,868.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,716.00 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-02
GROUND ELEVATION: 4.00 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 8-5-16
MEASURED AT: 1015 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 Medium dense, brown, silty sand with gravel & traces of 0.3
SPT - 1 29 clay.
2 0.6
3 Ditto but dense. 0.9
SPT - 2 48 8.9 27
4 SM 1.2
5 1.5
6 SPT - 3 >50 9.6 23 Ditto but very dense. 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10 3.0
11 SPT - 5 >50 Ditto. 3.4
12 3.7
13
SPT - 6 >50 8.2 22 Ditto. 4.0
14 SM 4.3
15 4.6
SPT - 7 >50 Ditto.
16 4.9
17 5.2
18
SPT - 8 >50 9.3 17 Very dense, brownish grey, silty sand with gravel. 5.5
19 SM 5.8
20 6.1
SPT - 9 >50 Ditto.
21 6.4
22 6.7
23 SPT - 10 >50 Ditto. 7.0
24 7.3
25 7.6
SPT - 11 41 1.7 26 Dense, brown, silty clayey sand.
26 SC-SM 7.9
27 8.2
28 SPT - 12 50 Ditto. 8.5
29 8.8
30 Very dense, brown, silty sand with gravel. 9.1
SPT - 13 >50 7.2 17
31 SM 9.4
32 9.8
33 SPT - 14 >50 Ditto. 10.1
34 END OF BORING @ 10.20 m. 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,510.53 meter TYPE OF BORING: ROTARY WASH
EAST: 429,958.13 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-03
GROUND ELEVATION: 5.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-5-16
DEPTH OF GROUNDWATER TABLE: 4.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 9-5-16
MEASURED AT: 1030 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,947.61 meter TYPE OF BORING: ROTARY WASH
EAST: 430,621.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-04
GROUND ELEVATION: 5.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 4.84 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 8-5-16
MEASURED AT: 1040 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,737.92 meter TYPE OF BORING: ROTARY WASH
EAST: 430,722.72 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-05
GROUND ELEVATION: 4.57 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 10-5-16
DEPTH OF GROUNDWATER TABLE: 3.97 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 10-5-16
MEASURED AT: 1055 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,796.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,371.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-06
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.67 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 12-5-16
MEASURED AT: 1110 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 Medium dense, brown, silty sand with gravel & traces of 0.3
SPT - 1 13 clay.
2 0.6
3 Ditto. 0.9
SPT - 2 28 15.6 24
4 SM 1.2
5 1.5
6 SPT - 3 30 Ditto. 1.8
7 2.1
8 Dense, brown, silty clayey sand with gravel. 2.4
SPT - 4 38 13.4 17
9 SC-SM 2.7
10 3.0
11 SPT - 5 38 Ditto. 3.4
12 3.7
13
SPT - 6 47 5.1 11 Dense, brown, poorly graded gravel with silt & sand. 4.0
14 GP-GM 4.3
15 4.6
SPT - 7 46 11.9 31 Dense, brown, silty gravel with sand.
16 4.9
GM
17 5.2
18
SPT - 8 46 Dense, brown, poorly graded gravel with sand. 5.5
19 5.8
20 6.1
SPT - 9 >50 8.1 04 Ditto but very dense.
21 GP 6.4
22 6.7
23 SPT - 10 >50 Ditto. 7.0
24 7.3
25 7.6
SPT - 11 >50 17.1 34 Very dense, brown, silty clayey sand with gravel.
26 SC-SM 7.9
27 8.2
28 SPT - 12 >50 Ditto. 8.5
29 8.8
30 Very dense, brown, silty clayey gravel with sand. 9.1
SPT - 13 >50 13.0 29
31 GC-GM 9.4
32 9.8
33 SPT - 14 >50 Ditto. 10.1
34 END OF BORING @ 10.20 m. 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,930.50 meter TYPE OF BORING: ROTARY WASH
EAST: 429,824.54 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-07
GROUND ELEVATION: 4.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-5-16
DEPTH OF GROUNDWATER TABLE: 3.47 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 11-5-16
MEASURED AT: 1130 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-8
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. D-9
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. D - 10
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. D - 11
OEO - GF - 02, Rev. 00
NP - Non Plastic
CROSS HOLE TEST RESULTS (CHS-01) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)
0.75 5.8 0.0058 11.8 0.0118 3 517.24 254.24 4.14 0.34 18 119 318
1.50 4.3 0.0043 7.95 0.00795 3 697.67 377.36 3.42 0.29 18 261 676
2.25 4.1 0.0041 9.4 0.0094 3 731.71 319.15 5.26 0.38 19 197 545
3.00 4.8 0.0048 10.8 0.0108 3 625.00 277.78 5.06 0.38 19 149 412
3.75 6.1 0.0061 11.8 0.0118 6 983.61 508.47 3.74 0.32 19 501 1320
4.50 4.2 0.0042 9.6 0.0096 3 714.29 312.50 5.22 0.38 19 189 523
5.25 3.4 0.0034 7.5 0.0075 3 882.35 400.00 4.87 0.37 20 326 894
6.00 5.1 0.0051 9.2 0.0092 3 588.24 326.09 3.25 0.28 19 206 526
6.75 4.8 0.0048 10.6 0.0106 3 625.00 283.02 4.88 0.37 19 155 425
7.50 4.3 0.0043 9.6 0.0096 3 697.67 312.50 4.98 0.37 19 189 520
9.00 3.5 0.0035 8.2 0.0082 3 857.14 365.85 5.49 0.39 20 273 758
9.75 3.6 0.0036 8.2 0.0082 3 833.33 365.85 5.19 0.38 19 259 716
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 12
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL
Blows/ 300mm
Classification
Unit Weight,
SPT Values
Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters
Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC
S - Wave Velocity, Vs
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa
GM 21 18 0.34 1.00
25 18 0.29
2.00
2
SC-SM 39 19 0.38
3.00
SM 45 19 0.38
46 19 0.32 4.00
4
50 19 0.38
5.00
SM >50 20 0.37
SM 48 19 0.28 6.00
6
49 19 0.37 7.00
47 19 0.37
8 8.00
SM >50 20 0.33
45 19 0.38
10 10.00
Legend : vp vs
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 12(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-02) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)
2.25 5 0.005 9.4 0.0094 3 600.00 319.15 3.53 0.30 20 208 541
3.00 4 0.004 7.6 0.0076 3 750.00 394.74 3.61 0.31 20 318 831
3.75 7 0.007 15.5 0.0155 6 857.14 387.10 4.90 0.37 20 305 838
4.50 3.4 0.0034 7.23 0.00723 3 882.35 414.94 4.52 0.36 20 351 953
5.25 4.3 0.0043 9.6 0.0096 3 697.67 312.50 4.98 0.37 20 199 547
6.00 6.9 0.0069 14.5 0.0145 6 869.57 413.79 4.42 0.35 20 349 945
6.75 3.8 0.0038 8.2 0.0082 3 789.47 365.85 4.66 0.36 20 273 744
7.50 4.3 0.0043 8.7 0.0087 3 697.67 344.83 4.09 0.34 19 230 616
8.25 3.6 0.0036 8.2 0.0082 3 833.33 365.85 5.19 0.38 19 259 716
9.00 4 0.004 8.25 0.00825 3 750.00 363.64 4.25 0.35 20 270 726
9.75 5.8 0.0058 13 0.013 6 1034.48 461.54 5.02 0.38 20 434 1195
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 13
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL
Blows/ 300mm
Classification
Unit Weight,
SPT Values
Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters
Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC
S - Wave Velocity, Vs
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa
SM 48 19 0.31 1.00
SM >50 20 0.33
2.00
2
>50 20 0.30
3.00
>50 20 0.31
SM >50 20 0.37
4 4.00
>50 20 0.36
5.00
>50 20 0.37 `
SM
6 >50 20 0.35 6.00
>50 20 0.36
7.00
SC-SM 41 19 0.34
8 8.00
50 19 0.38
>50 20 0.38
10 10.00
Legend : vp vs
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 13(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-03) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)
0.75 5.5 0.0055 10.4 0.0104 3 545.45 288.46 3.58 0.31 18 153 399
1.50 4.8 0.0048 8.9 0.0089 3 625.00 337.08 3.44 0.29 18 208 540
2.25 4.7 0.0047 10 0.01 3 638.30 300.00 4.53 0.36 18 165 449
3.00 5.1 0.0051 9.6 0.0096 3 588.24 312.50 3.54 0.30 18 179 467
3.75 4.8 0.0048 10.4 0.0104 3 625.00 288.46 4.69 0.36 18 153 417
4.50 4.3 0.0043 10.1 0.0101 3 697.67 297.03 5.52 0.39 18 162 450
5.25 4.1 0.0041 9.6 0.0096 3 731.71 312.50 5.48 0.39 18 179 498
6.00 3.8 0.0038 8.9 0.0089 3 789.47 337.08 5.49 0.39 18 208 579
6.75 4.8 0.0048 12 0.012 6 1250.00 500.00 6.25 0.40 19 484 1360
8.25 4.8 0.0048 12.25 0.01225 6 1250.00 489.80 6.51 0.41 19 465 1310
9.00 6 0.006 12.8 0.0128 6 1000.00 468.75 4.55 0.36 19 426 1157
9.75 2.9 0.0029 7 0.007 3 1034.48 428.57 5.83 0.40 18 337 941
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 14
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL
Blows/ 300mm
Classification
Unit Weight,
SPT Values
Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters
Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC
S - Wave Velocity, Vs
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa
GM 18 18 0.31 1.00
SP-SM 16 18 0.29
2.00
2
16 18 0.36
3.00
SW-SM 18 18 0.30
25 18 0.36 4.00
4
28 18 0.39
5.00
SC-SM 17 18 0.39
6 31 18 0.39 6.00
CL 25 19 0.40
7.00
41 19 0.33
8 8.00
CL-ML U-2 19 0.41
30 18 0.40
10 10.00
Legend : vp vs
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 14(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-04) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)
0.75 4.34 0.00434 8.68 0.00868 3 691.24 345.62 4.00 0.33 20 244 649
1.50 5.8 0.0058 10.1 0.0101 3 517.24 297.03 3.03 0.25 19 171 429
2.25 6.5 0.0065 14.5 0.0145 3 461.54 206.90 4.98 0.37 20 87 240
3.00 10.8 0.0108 20.5 0.0205 6 555.56 292.68 3.60 0.31 20 175 457
3.75 7.5 0.0075 16.1 0.0161 6 800.00 372.67 4.61 0.36 20 283 771
4.50 5.8 0.0058 10.8 0.0108 3 517.24 277.78 3.47 0.30 20 157 408
5.25 7 0.007 12.8 0.0128 3 428.57 234.38 3.34 0.29 20 112 288
6.00 6.5 0.0065 12.1 0.0121 3 461.54 247.93 3.47 0.30 20 125 325
6.75 6.3 0.0063 12.3 0.0123 6 952.38 487.80 3.81 0.32 20 485 1283
7.50 5.5 0.0055 12.3 0.0123 6 1090.91 487.80 5.00 0.38 20 485 1334
8.25 4.8 0.0048 12.25 0.01225 6 1250.00 489.80 6.51 0.41 20 489 1379
9.00 3.4 0.0034 7.5 0.0075 3 882.35 400.00 4.87 0.37 20 326 894
9.75 4.1 0.0041 8.9 0.0089 3 731.71 337.08 4.71 0.37 20 232 633
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 15
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL
Blows/ 300mm
Classification
Unit Weight,
SPT Values
Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters
Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC
S - Wave Velocity, Vs
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa
SM 40 19 0.25
2.00
2
SM >50 20 0.37
3.00
GM >50 20 0.31
>50 20 0.32
7.00
>50 20 0.38
8 8.00
>50 20 0.41
>50 20 0.37
10 10.00
Legend : vp vs
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 15(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-05) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)
0.75 7.1 0.0071 13.5 0.0135 3 422.54 222.22 3.62 0.31 20 101 264
1.50 3.6 0.0036 7.5 0.0075 3 833.33 400.00 4.34 0.35 20 326 881
2.25 5.3 0.0053 10.6 0.0106 3 566.04 283.02 4.00 0.33 20 163 435
3.00 7 0.007 13.7 0.0137 6 857.14 437.96 3.83 0.32 20 391 1035
3.75 5.6 0.0056 12.3 0.0123 6 1071.43 487.80 4.82 0.37 20 485 1329
4.50 4.1 0.0041 9.2 0.0092 3 731.71 326.09 5.04 0.38 20 217 597
5.25 3.9 0.0039 8.6 0.0086 3 769.23 348.84 4.86 0.37 20 248 680
6.00 4 0.004 8.8 0.0088 3 750.00 340.91 4.84 0.37 20 237 649
6.75 4.7 0.0047 9.4 0.0094 3 638.30 319.15 4.00 0.33 20 208 554
7.50 3.9 0.0039 9 0.009 3 769.23 333.33 5.33 0.38 20 227 627
8.25 2.5 0.0025 6 0.006 3 1200.00 500.00 5.76 0.39 20 510 1422
9.00 3.6 0.0036 8.5 0.0085 3 833.33 352.94 5.57 0.39 20 254 706
9.75 2.5 0.0025 5.9 0.0059 3 1200.00 508.47 5.57 0.39 20 527 1466
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 16
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL
Blows/ 300mm
Classification
Unit Weight,
SPT Values
Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters
Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC
S - Wave Velocity, Vs
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa
SM >50 20 0.35
2.00
2
>50 20 0.33
3.00
>50 20 0.32
>50 20 0.38
8 8.00
>50 20 0.39
Legend : vp vs
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 16(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-06) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)
0.75 7.9 0.0079 16.4 0.0164 3 379.75 182.93 4.31 0.35 19 65 175
2.25 9.6 0.0096 17.4 0.0174 6 625.00 344.83 3.29 0.28 19 230 590
3.00 9.8 0.0098 21 0.021 6 612.24 285.71 4.59 0.36 19 158 430
3.75 8 0.008 16.4 0.0164 6 750.00 365.85 4.20 0.34 19 259 697
4.50 5.1 0.0051 11.5 0.0115 6 1176.47 521.74 5.08 0.38 19 527 1453
5.25 8.9 0.0089 17.6 0.0176 6 674.16 340.91 3.91 0.33 19 225 598
6.00 3.1 0.0031 7 0.007 3 967.74 428.57 5.10 0.38 20 374 1032
6.75 2.6 0.0026 5.8 0.0058 3 1153.85 517.24 4.98 0.37 20 545 1499
7.50 4.6 0.0046 9 0.009 3 652.17 333.33 3.83 0.32 20 227 599
8.25 2.9 0.0029 5.7 0.0057 3 1034.48 526.32 3.86 0.33 20 565 1497
9.00 3.1 0.0031 6.1 0.0061 3 967.74 491.80 3.87 0.33 20 493 1308
9.75 3.1 0.0031 6 0.006 3 967.74 500.00 3.75 0.32 20 510 1343
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 17
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL
Blows/ 300mm
Classification
Unit Weight,
SPT Values
Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters
Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC
S - Wave Velocity, Vs
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa
SM 28 19 0.35 1.00
30 19 0.35
2.00
2
SC-SM 38 19 0.28
3.00
38 19 0.36
>50 20 0.37
7.00
>50 20 0.32
10 10.00
Legend : vp vs
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 17(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-07) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)
0.75 9.6 0.0096 16.4 0.0164 3 312.50 182.93 2.92 0.24 20 68 169
1.50 11.5 0.0115 17.4 0.0174 6 521.74 344.83 2.29 0.11 20 242 539
3.00 10.6 0.0106 20.5 0.0205 6 566.04 292.68 3.74 0.32 20 175 460
3.75 9.2 0.0092 17.4 0.0174 6 652.17 344.83 3.58 0.31 19 230 602
4.50 10 0.01 18.1 0.0181 6 600.00 331.49 3.28 0.28 17 190 488
5.25 9.4 0.0094 17.1 0.0171 6 638.30 350.88 3.31 0.28 17 213 548
6.00 5.3 0.0053 10.85 0.01085 3 566.04 276.50 4.19 0.34 19 148 398
6.75 3.6 0.0036 7.5 0.0075 3 833.33 400.00 4.34 0.35 20 326 881
7.50 8.2 0.0082 17.6 0.0176 6 731.71 340.91 4.61 0.36 20 237 645
8.25 5.3 0.0053 12.5 0.0125 6 1132.08 480.00 5.56 0.39 20 470 1306
9.00 4.6 0.0046 8.7 0.0087 3 652.17 344.83 3.58 0.31 20 242 633
9.75 4.1 0.0041 9.3 0.0093 3 731.71 322.58 5.15 0.38 20 212 585
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 18
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL
Blows/ 300mm
Classification
Unit Weight,
SPT Values
Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters
Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC
S - Wave Velocity, Vs
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa
SM 29 20 0.24 1.00
SP-SM 40 20 0.11
2.00
2
47 20 0.24
3.00
GW-GM 49 20 0.32
GW >50 20 0.35
7.00
>50 20 0.36
8 8.00
GP-GM >50 20 0.39
>50 20 0.38
10 10.00
Legend : vp vs
Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 18(a)
OEO - GF - 12, Rev. 00
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: mMustang-PCPT-01 CLIENT REP: START TIME: 08:42:40
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-1
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: mMustang-PCPT-02 CLIENT REP: START TIME: 09:33:49
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-2
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
TEST ID: mMustang-PCPT-03 CLIENT REP: START TIME: 10:07:55
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-3
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: Mustang-PCPT-04 CLIENT REP: START TIME: 15:05:31
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
1
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-4
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: Mustang-PCPT-05 CLIENT REP: START TIME: 14:29:57
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
3
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-5
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
Test ID: PCPT-06 Near BH-16 CLIENT REP: START TIME: 14:53:57
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
2
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-6
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Mon 23-May-2016
TEST ID: PCPT-07 Near BH-17 CLIENT REP: START TIME: 09:21:01
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-7
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
TEST ID: PCPT-08 Near BH-5 CLIENT REP: START TIME: 15:17:03
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-8
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
TEST ID: PCPT-09 Near BH-29 CLIENT REP: START TIME: 09:04:07
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
Depth
(m)
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-9
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: PCPT-10 Near BH-64 CLIENT REP: START TIME: 16:02:22
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR
4
Depth
(m)
5
1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983
Figure E-10
Test No: SRT-01
Figure F-2
Test No: SRT-02
Figure F-3
Test No: SRT-03
Figure F-4
Test No: SRT-04
Figure F-5
Test No: SRT-05
Figure F-6
RHOMETER
C1 V1 V2 C2
C1 P1 P2 C2
ELECTRODES
b EARTH EARTH
a a a
4π . a . R.
ρa = 2a a
1 +
a 2 + 4b 2 a2 + b2
Where :
R = Resistance ( V / I )
a = Electrode Separation
b = Depth of Electrode into the Earth
Data obtained at each location is given in the form of plots of apparent resistivity
ρ a values for various electrode spacing.
Source: IEEE81
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
30.0
APPARENT RESISTIVITY in Ohm-metres
27.0
24.0
21.0
18.0
15.0
12.0
9.0
6.0
3.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
50.0
APPARENT RESISTIVITY in Ohm-metres
45.0
40.0
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
13.5
12.0
10.5
9.0
7.5
6.0
4.5
3.0
1.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
36.0
32.0
28.0
24.0
20.0
16.0
12.0
8.0
4.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
5.0 -- --
9.0
APPARENT RESISTIVITY in Ohm-metres
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
45.0
40.0
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
60.0
APPARENT RESISTIVITY in Ohm-metres
54.0
48.0
42.0
36.0
30.0
24.0
18.0
12.0
6.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
25.0
APPARENT RESISTIVITY in Ohm-metres
22.5
20.0
17.5
15.0
12.5
10.0
7.5
5.0
2.5
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
72.0
64.0
56.0
48.0
40.0
32.0
24.0
16.0
8.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
40.0
APPARENT RESISTIVITY in Ohm-metres
36.0
32.0
28.0
24.0
20.0
16.0
12.0
8.0
4.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
22.5
20.0
17.5
15.0
12.5
10.0
7.5
5.0
2.5
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
90.0
80.0
70.0
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
18.0
16.0
14.0
12.0
10.0
8.0
6.0
4.0
2.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
72.0
64.0
56.0
48.0
40.0
32.0
24.0
16.0
8.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
45.0
40.0
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
100.0
APPARENT RESISTIVITY in Ohm-metres
90.0
80.0
70.0
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
40.0
APPARENT RESISTIVITY in Ohm-metres
36.0
32.0
28.0
24.0
20.0
16.0
12.0
8.0
4.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
18.0
16.0
14.0
12.0
10.0
8.0
6.0
4.0
2.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
36.0
32.0
28.0
24.0
20.0
16.0
12.0
8.0
4.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Terrain Condition :
Plain area, surface covered with silty sand with gravels & cobbles.
OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters
54.0
48.0
42.0
36.0
30.0
24.0
18.0
12.0
6.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
DRS 1 0.00 0.50 Brown, silty sand with occasional gravel & traces of clay.
SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
DRS 1 0.00 0.50 Brown, poorly graded sand with silt & gravel.
SP-SM A-1-b
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
SC-SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
DRS 2 0.50 1.00 SC-SM A-2-4 Brown, silty sand with crystals of anhydrite.
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
SC-SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
DRS 1 0.00 0.50 Brown, silty sand with occasional gravel & traces of clay.
SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
DRS 1 0.00 0.50 SC-SM A-2-4 Brown, silty clayey sand with gravel.
DRS 2 0.50 1.00 SC-SM A-2-4 Brown, silty clayey sand with gravel.
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
SC-SM A-2-4
DRS 2 0.50 1.00 Ditto but light grey with crystals of anhydrite.
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
GC-GM A-2-4
DRS 2 0.50 0.75 Ditto but brownish white with crystals of anhydrite.
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
DRS 1 0.00 0.50 Brown, silty sand with occasional gravel & traces of clay.
SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
GC-GM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
DRS 1 0.00 0.50 Brown, silty sand with gravel & taces of clay.
SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
SC-SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
SC-SM A-2-4
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:
ATTERBERG
Natural SIEVE ANALYSIS ( ASTM D - 422 ) CLASSIFICATION MOISTURE DENSITY CBR VALUE
TEST SAMPLE LIMITS
Moisture RELATIONSHIP
PIT/BULK DEPTH
DESCRIPTION Content PERCENT PASSING ASTM D-4318 ASTM ASTM (ASTM D- 1557) (ASTM D-1883) REMARKS
SAMPLE
No. OMC,
m % #4 # 10 # 20 # 40 # 140 # 200 LL, % PI, % D - 2487 D - 3282 MDD, g/cc 95% 100%
%
Brown, silty sand with occasional gravel &
TP - 01 0.00-1.00 traces of clay 1.0 88 76 61 50 26 20 20 02 SM A-2-4 2.147 8.4 23 50
TP - 04 0.00-0.50 Brown, silty clayey sand 1.8 96 89 83 74 44 33 26 06 SC-SM A-2-4 2.063 10.1 12 32
TP - 05 0.00-1.00 Brown, silty clayey sand with gravel 1.8 69 60 53 47 30 25 24 04 SC-SM A-2-4 2.182 6.0 22 35
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. H - 15
OEO - GF - 07, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
ATTERBERG
Natural SIEVE ANALYSIS ( ASTM D - 422 ) CLASSIFICATION MOISTURE DENSITY CBR VALUE
TEST SAMPLE LIMITS
Moisture RELATIONSHIP
PIT/BULK DEPTH
DESCRIPTION Content PERCENT PASSING ASTM D-4318 ASTM ASTM (ASTM D- 1557) (ASTM D-1883) REMARKS
SAMPLE
No. OMC,
m % #4 # 10 # 20 # 40 # 140 # 200 LL, % PI, % D - 2487 D - 3282 MDD, g/cc 95% 100%
%
Brown to greyish brown, silty sand
TP - 06 0.00-1.00 with occasional gravel & traces of clay 2.9 90 80 66 52 23 22 22 03 SM A-2-4 2.231 6.7 44 66
TP - 07 0.00-0.50 Brown, silty clayey sand with gravel 1.5 81 65 50 41 22 17 25 05 SC-SM A-2-4 2.172 7.8 24 40
0.50-1.00 Brown, silty clayey sand with gravel 5.6 64 51 41 29 17 16 26 06 SC-SM A-2-4 -- -- -- --
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. H - 16
OEO - GF - 07, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
ATTERBERG
Natural SIEVE ANALYSIS ( ASTM D - 422 ) CLASSIFICATION MOISTURE DENSITY CBR VALUE
TEST SAMPLE LIMITS
Moisture RELATIONSHIP
PIT/BULK DEPTH
DESCRIPTION Content PERCENT PASSING ASTM D-4318 ASTM ASTM (ASTM D- 1557) (ASTM D-1883) REMARKS
SAMPLE
No. OMC,
m % #4 # 10 # 20 # 40 # 140 # 200 LL, % PI, % D - 2487 D - 3282 MDD, g/cc 95% 100%
%
Brown to light grey, silty clayey
TP - 11 0.00-1.00 gravel with sand 4.4 52 47 43 38 26 23 24 04 GC-GM A-2-4 2.287 4.2 51 71
Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. H - 17
OEO - GF - 07, Rev. 00
NP - Non Plastic
Soil Classification
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Group
Group NameB
Symbol
COARSE - GRAINED SOILS Gravels Clean Gravels Cu ≥ 4 and 1 ≤ Cc ≤ 3E GW Well - graded gravelF
More than 50 % retained More than 50 % of coarse Less than 5 % fines C
Cu < 4 and/or 1 > Cc > 3 E
GP Poorly graded gravelF
on No. 200 sieve fraction retained on No. 4 sieve Gravels with fines Fines classify as ML or MH GM Silty gravelF, G, H
More than 12 % fines C
Fines classify as CL or CH GC Clayey gravelF, G, H
E
Sands Clean Sands Cu ≥ 6 and 1 ≤ Cc ≤ 3 SW Well - graded sandI
50 % or more of coarse Less than 5 % fines D
Cu < 6 and/or 1 > Cc > 3 E
SP Poorly graded sandI
fraction passes No. 4 sieve Sands with fines Fines classify as ML or MH SM Silty sandG, H, I
More than 12 % fines D
Fines classify as CL or CH SC Clayey sandG, H, I
FINE - GRAINED SOILS Silts and Clays Inorganic PI > 7 and plots on or above "A" line J CL Lean clayK, L, M
50 % or more passes Liquid limit less than 50 PI < 4 or plots below "A" lineJ ML SiltK, L, M
the No. 200 sieve Organic Liquid limit - oven dried Organic clayK, L, M, N
< 0.75 OL
Liquid limit - not dried Organic siltK, L, M, O
Silts and Clays Inorganic PI plots on or above "A" line CH Fat clayK, L, M
Liquid limit 50 or more PI plots below "A" line MH Elastic siltK, L, M
Organic Liquid limit - oven dried Organic clayK, L, M, P
< 0.75 OH
Liquid limit - not dried Organic siltK, L, M, Q
HIGHLY ORGANIC SOILS Primarily organic matter, dark in color, and organic odor PT Peat
A
Based on the material passing the 3-in. (75-mm) sieve E ( D30 )2 M
If soil contains ≥ 30 % plus No. 200,
B
Cu = D60/D10 Cc =
If field sample contained cobbles or boulders, or both D10 X D60 predominantly gravel, add "gravelly" to group name.
F N
add "with cobbles or boulders, or both" to group name If soil contains ≥ 15 % sand, add "with sand" to group name PI ≥ 4 and plots on or above "A" line.
C G O
Gravels with 5 to 12 % fines require dual symbols: If fines classify as CL-ML, use dual symbol PI < 4 or plots below "A" line.
P
GW - GM well - graded gravel with silt GC - GM or SC - SM PI plots on or above "A" line.
H Q
GW - GC well - graded gravel with clay If fines are organic, add "with organic fines" to group name PI plots below "A" line.
I
GP - GM poorly graded gravel with silt If soil contains ≥ 15 % gravel, add "with gravel" to group name
J
GP - GC poorly graded gravel with clay If Atterberg limits plot in hatched area, soil is a
D
Sands with 5 to 12 % fines require dual symbols: CL - ML, silty clay.
K
SW - SM well - graded sand with silt If soil contains 15 to 29 % plus No. 200, add "with sand"
SW - SC well - graded sand with clay or "with gravel," whichever is predominant.
L
SP - SM poorly graded sand with silt If soil contains ≥ 30 % plus No. 200, predominantly sand,
SP - SC poorly graded sand with clay add "sandy" to group name.
A
Plasticity Index of A - 7 - 5 subgroup is equal to or less than L L minus 30. Plasticity Index of A - 7 - 6 subgroup is greater than L L minus 30.
Reprinted with permission of American Association of State Highway and Transportation Officials.
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
TP - 01 0.00-1.00 20 2 20 SM
TP - 03 0.00-1.00 26 6 24 SC-SM
TP - 04 0.00-0.50 26 6 33 SC-SM
0.50-1.00 25 5 15 SC-SM
TP - 05 0.00-1.00 24 4 25 SC-SM
TP - 06 0.00-1.00 22 3 22 SM
TP - 07 0.00-0.50 25 5 17 SC-SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
TP - 07 0.50-1.00 26 6 16 SC-SM
TP - 08 0.00-1.00 24 4 22 SC-SM
TP - 09 0.00-1.00 25 5 18 GC-GM
TP - 10 0.00-1.00 20 2 24 SM
TP - 11 0.00-1.00 24 4 23 GC-GM
TP - 12 0.00-1.00 20 3 30 SM
60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %
Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30
20
10
7
4
4
0
0 10 20 30 40 50 60 70 80 90 100 110
16 LIQUID LIMIT ( LL ), %
TP - 13 0.00-1.00 24 4 26 SC-SM
TP - 14 0.00-1.00 25 5 29 SC-SM
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6344 6427 6489 6498 6465
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2006 2089 2151 2160 2127
Wet Density g / cc 2.137 2.225 2.291 2.300 2.265
Dry Density g / cc 2.012 2.070 2.092 2.065 2.015
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 10344 10461 10600 10612 10604
Weight of Mold g 5764 5764 5764 5764 5764
Weight of Soil g 4580 4697 4836 4848 4840
Wet Density g / cc 2.168 2.223 2.289 2.294 2.291
Dry Density g / cc 2.079 2.101 2.125 2.099 2.073
2.06
3.5 4.5 5.5 6.5 7.5 8.5 9.5 10.5 11.5
Corrected Optimum Moisture
Moisture Content, % Content (%) : 6.1
Corrected Maximum Dry Density
(g/cc) : 2.210
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6320 6377 6438 6448 6450
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1982 2039 2100 2110 2112
Wet Density g / cc 2.111 2.171 2.236 2.247 2.249
Dry Density g / cc 1.954 1.979 2.004 1.981 1.956
1.97
Fine Fraction (%) : 78
Oversize Fraction (%) : 22
1.96
Specific Gravity of Oversize : 2.67
1.94
Corrected Optimum Moisture
7.5 9.5 11.5 13.5 15.5 Content (%) : 9.3
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : 2.120
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6353 6409 6471 6482 6486
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2015 2071 2133 2144 2148
Wet Density g / cc 2.146 2.206 2.272 2.283 2.288
Dry Density g / cc 2.013 2.038 2.063 2.040 2.016
2.00
Corrected Optimum Moisture
6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0
Content (%) : --
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : --
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6301 6365 6426 6439 6431
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1963 2027 2088 2101 2093
Wet Density g / cc 2.091 2.159 2.224 2.237 2.229
Dry Density g / cc 2.001 2.038 2.063 2.040 2.004
2.02
Fine Fraction (%) : 76
2.01 Oversize Fraction (%) : 24
2.00 Specific Gravity of Oversize : 2.67
1.98
3.0 5.0 7.0 9.0 11.0 13.0 Corrected Optimum Moisture
Moisture Content, % Content (%) : 6.0
Corrected Maximum Dry Density
(g/cc) : 2.182
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6380 6438 6505 6514 6517
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2042 2100 2167 2176 2179
Wet Density g / cc 2.175 2.236 2.308 2.317 2.321
Dry Density g / cc 2.071 2.096 2.121 2.095 2.068
2.04
Corrected Optimum Moisture
3.5 5.5 7.5 9.5 11.5 13.5
Content (%) : 6.7
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : 2.231
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6356 6415 6478 6491 6496
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2018 2077 2140 2153 2158
Wet Density g / cc 2.149 2.212 2.279 2.293 2.298
Dry Density g / cc 2.031 2.056 2.081 2.053 2.028
2.04
Fine Fraction (%) : 81
2.03
Oversize Fraction (%) : 19
2.02 Specific Gravity of Oversize : 2.67
2.01 Water Content Oversize (%) : 0.2
9.6
2.00
4.5 6.5 8.5 10.5 12.5 14.5 Corrected Optimum Moisture
Moisture Content, % Content (%) : 7.8
Corrected Maximum Dry Density
(g/cc) : 2.172
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6305 6356 6395 6417 6420
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1967 2018 2057 2079 2082
Wet Density g / cc 2.095 2.149 2.191 2.214 2.218
Dry Density g / cc 2.018 2.041 2.051 2.039 2.016
1.99
Corrected Optimum Moisture
3.0 5.0 7.0 9.0 11.0
Content (%) : 5.7
Moisture Content, %
Corrected Maximum Dry
Density (g/cc) : 2.140
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 10132 10223 10304 10345 10343
Weight of Mold g 5764 5764 5764 5764 5764
Weight of Soil g 4368 4459 4540 4581 4579
Wet Density g / cc 2.067 2.110 2.149 2.168 2.167
Dry Density g / cc 2.001 2.021 2.031 2.019 1.999
1.97
1.5 3.5 5.5 7.5 9.5
Corrected Optimum Moisture
Moisture Content, % Content (%) : 4.2
Corrected Maximum Dry Density
(g/cc) : 2.186
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6318 6361 6398 6416 6417
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1980 2023 2060 2078 2079
Wet Density g / cc 2.108 2.154 2.193 2.213 2.214
Dry Density g / cc 2.051 2.071 2.081 2.068 2.048
2.02
Corrected Optimum Moisture
1.5 3.5 5.5 7.5 9.5
Content (%) : 5.0
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : 2.123
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 10396 10490 10573 10621 10622
Weight of Mold g 5764 5764 5764 5764 5764
Weight of Soil g 4632 4726 4809 4857 4858
Wet Density g / cc 2.192 2.237 2.276 2.299 2.299
Dry Density g / cc 2.124 2.144 2.154 2.142 2.122
2.09
1.5 3.5 5.5 7.5 9.5 Corrected Optimum Moisture
Moisture Content, % Content (%) : 4.2
Corrected Maximum Dry Density
(g/cc) : 2.287
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6364 6407 6448 6469 6470
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2026 2069 2110 2131 2132
Wet Density g / cc 2.158 2.204 2.247 2.269 2.270
Dry Density g / cc 2.105 2.125 2.136 2.123 2.102
2.08
1.0 3.0 5.0 7.0 9.0 Corrected Optimum Moisture
Moisture Content, % Content (%) : 4.3
Corrected Maximum Dry Density
(g/cc) : 2.225
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6355 6398 6435 6452 6455
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2017 2060 2097 2114 2117
Wet Density g / cc 2.148 2.194 2.234 2.251 2.254
Dry Density g / cc 2.040 2.060 2.070 2.058 2.038
2.04
Fine Fraction (%) : 83
DESCRIPTION 1 2 3 4 5
Weight of Mold & Wet Soil g 6319 6361 6397 6414 6415
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1981 2023 2059 2076 2077
Wet Density g / cc 2.110 2.154 2.193 2.211 2.212
Dry Density g / cc 2.002 2.021 2.031 2.019 2.000
2.00
Fine Fraction (%) : 77
1.97
4.0 6.0 8.0 10.0 12.0
Corrected Optimum Moisture
Moisture Content, % Content (%) : 6.2
Corrected Maximum Dry Density
(g/cc) : 2.148
1000
900
800
700
S T R E S S ( PSI )
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
50 50
40
VALUE
30
CBR
23
20
10
2.040
2.147
0
2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
CBR Value 52 32 23
Dry Density, g/cc 2.151 2.092 2.035
CBR Value @ 95 % of MDD = 23
CBR Value @ 100 % of MDD = 50
1400
1300
1200
1100
1000
S T R E S S ( PSI )
900
800
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
70
68
60
50 50
VALUE
40
CBR
30
20
10
2.100
2.210
0
2.040 2.080 2.120 2.160 2.200 2.240
DRY DENSITY ( g/cc )
CBR Value 69 61 47
Dry Density, g/cc 2.217 2.172 2.070
CBR Value @ 95 % of MDD = 50
CBR Value @ 100 % of MDD = 68
550
500
450
400
350
S T R E S S ( PSI )
300
250
200
150
100
50
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
28
26
24 24
22
20
18
VALUE
16
15
14
CBR
12
10
4
2.014
2.120
2
0
1.940 1.990 2.040 2.090 2.140
DRY DENSITY ( g/cc )
CBR Value 25 17 13
Dry Density, g/cc 2.129 2.050 1.957
CBR Value @ 95 % of MDD = 15
CBR Value @ 100 % of MDD = 24
550
500
450
400
S T R E S S ( PSI )
350
300
250
200
150
100
50
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
35
32
30
25
VALUE
20
CBR
15
12
10
5
1.960
2.063
0
1.930 1.970 2.010 2.050 2.090
DRY DENSITY ( g/cc )
CBR Value 33 23 11
Dry Density, g/cc 2.069 2.007 1.955
CBR Value @ 95 % of MDD = 12
CBR Value @ 100 % of MDD = 32
800
700
600
500
S T R E S S ( PSI )
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
35
35
30
25
VALUE
22
20
CBR
15
10
5
2.073
2.182
0
2.040 2.080 2.120 2.160 2.200
DRY DENSITY ( g/cc )
CBR Value 36 32 21
Dry Density, g/cc 2.191 2.165 2.060
CBR Value @ 95 % of MDD = 22
CBR Value @ 100 % of MDD = 35
1300
1200
1100
1000
900
S T R E S S ( PSI )
800
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
70
66
60
50
VALUE
44
40
CBR
30
20
10
2.119
2.231
0
2.020 2.060 2.100 2.140 2.180 2.220 2.260
DRY DENSITY ( g/cc )
CBR Value 69 52 38
Dry Density, g/cc 2.240 2.170 2.050
CBR Value @ 95 % of MDD = 44
CBR Value @ 100 % of MDD = 66
900
800
700
600
S T R E S S ( PSI )
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
40 40
30
VALUE
24
CBR
20
10
2.063
2.172
0
2.030 2.070 2.110 2.150 2.190
DRY DENSITY ( g/cc )
CBR Value 40 34 21
Dry Density, g/cc 2.180 2.119 2.050
CBR Value @ 95 % of MDD = 24
CBR Value @ 100 % of MDD = 40
1400
1300
1200
1100
1000
S T R E S S ( PSI )
900
800
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
70 70
60
56
50
VALUE
40
CBR
30
20
10
2.033
2.140
0
1.970 2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
CBR Value 70 64 48
Dry Density, g/cc 2.144 2.082 1.998
CBR Value @ 95 % of MDD = 56
CBR Value @ 100 % of MDD = 70
1400
1300
1200
1100
1000
900
S T R E S S ( PSI )
800
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
70 69
60
50 51
VALUE
40
CBR
30
20
10
2.077
2.186
0
2.040 2.080 2.120 2.160 2.200
DRY DENSITY ( g/cc )
CBR Value 70 62 46
Dry Density, g/cc 2.192 2.127 2.060
CBR Value @ 95 % of MDD = 51
CBR Value @ 100 % of MDD = 69
1300
1200
1100
1000
900
S T R E S S ( PSI )
800
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
70
69
60
50 49
VALUE
40
CBR
30
20
10
2.017
2.123
0
1.980 2.020 2.060 2.100 2.140
DRY DENSITY ( g/cc )
CBR Value 69 62 47
Dry Density, g/cc 2.127 2.072 2.008
CBR Value @ 95 % of MDD = 49
CBR Value @ 100 % of MDD = 69
1500
1400
1300
1200
1100
1000
S T R E S S ( PSI )
900
800
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
80
71
70
60
VALUE
50 51
CBR
40
30
20
10
2.173
2.287
0
2.140 2.180 2.220 2.260 2.300
DRY DENSITY ( g/cc )
CBR Value 72 61 48
Dry Density, g/cc 2.291 2.221 2.160
CBR Value @ 95 % of MDD = 51
CBR Value @ 100 % of MDD = 71
1400
1300
1200
1100
1000
S T R E S S ( PSI )
900
800
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
80
70 70
60
VALUE
52
50
CBR
40
30
20
10
2.114
2.225
0
2.080 2.120 2.160 2.200 2.240
DRY DENSITY ( g/cc )
CBR Value 70 64 47
Dry Density, g/cc 2.231 2.177 2.095
CBR Value @ 95 % of MDD = 52
CBR Value @ 100 % of MDD = 70
1200
1100
1000
900
800
S T R E S S ( PSI )
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
70
62
60
50
VALUE
40 40
CBR
30
20
10
2.044
2.152
0
2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
CBR Value 63 50 37
Dry Density, g/cc 2.158 2.098 2.030
CBR Value @ 95 % of MDD = 40
CBR Value @ 100 % of MDD = 62
1100
1000
900
800
S T R E S S ( PSI )
700
600
500
400
300
200
100
0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
PENETRATION IN INCHES
60
58
50
VALUE
40
38
CBR
30
20
10
2.041
2.148
0
2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
CBR Value 59 50 36
Dry Density, g/cc 2.155 2.098 2.030
CBR Value @ 95 % of MDD = 38
CBR Value @ 100 % of MDD = 58
2. Wt. of Bag g 29 29 29 29
12. Wt. of can & wet soil g 515.2 523.4 469.8 569.6
13. Wt. of can & dry soil g 498.3 514.6 463.8 563
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 66
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 26 29
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 67
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 27 27
CAN No. 31 15
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 68
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 26 26 26 26
12. Wt. of can & wet soil g 501.0 464.6 392.4 447.4
13. Wt. of can & dry soil g 498.6 444.2 374.2 434.1
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 69
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 26 26 26 26
12. Wt. of can & wet soil g 529.8 435.0 378.2 497.8
13. Wt. of can & dry soil g 524.4 426.8 371.4 492.3
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 70
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 27 27 27 27
12. Wt. of can & wet soil g 603.8 468.8 488.4 552.0
13. Wt. of can & dry soil g 598.3 454.7 466.8 544.4
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 71
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 26 26 26 26
12. Wt. of can & wet soil g 473.2 467.0 433.4 426.2
13. Wt. of can & dry soil g 461.7 452.2 407.0 402.0
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 72
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 25 25 25 25
12. Wt. of can & wet soil g 526.2 501.2 437.6 488.0
13. Wt. of can & dry soil g 515.4 492.6 424.3 474.3
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 73
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g
3. Wt. of Soil g
CAN No.
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 74
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 22 23 23 23
12. Wt. of can & wet soil g 512.0 459.6 441.8 444.6
13. Wt. of can & dry soil g 509.3 454.7 423.0 432.6
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 75
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 23 23 23 24
12. Wt. of can & wet soil g 476.0 521.2 424.6 513.7
13. Wt. of can & dry soil g 470.8 516.4 416.5 505.4
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 76
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 24 24 25 24
12. Wt. of can & wet soil g 547.0 563.2 554.2 494.2
13. Wt. of can & dry soil g 543.3 560.0 550.8 489.6
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 77
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 27 27 27 27
12. Wt. of can & wet soil g 452.0 408.8 449.0 467.2
13. Wt. of can & dry soil g 447.0 384.6 409.6 428.7
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 78
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4
2. Wt. of Bag g 27 27 27 27
12. Wt. of can & wet soil g 561.6 458.4 482.8 477.4
13. Wt. of can & dry soil g 560.4 454.2 480.6 474.6
Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 79
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
COORDINATES
TR Value
TR # Depth (m.) Temperature, (oC)
(m.k/watt)
Northing Easting
BOREHOLE_BH # 28 & 29
From-To BEGL di (m) Aver. Ni (di / Ni )
Ń =Σ(di ) / Σ(di/Ni ) 50
Śu =Σ(di ) / Σ(di/Sui ) 90
Figure J-2
TYPICAL CALCULATION FOR SITE CLASSIFICATION
BOREHOLE_BH # 4 & 5
From-To BEGL di (m) Aver. Ni (di / Ni )
Ń =Σ(di ) / Σ(di/Ni ) 57
Śu =Σ(di ) / Σ(di/Sui ) 90
Figure J-3
TYPICAL CALCULATION FOR SITE CLASSIFICATION
BOREHOLE_BH # 16 & 17
From-To BEGL di (m) Aver. Ni (di / Ni )
Ń =Σ(di ) / Σ(di/Ni ) 53
Figure J-4
OEO YANBU DISTRIBUTION HUB PROJECT, YANBU
Geotechnical File No. 2015/104
Input Parameters
Rod Lengths assumed equal to depth plus 0.5m (for above ground extension)
Boring Sample Depth Measure Flag Fines Energy CE CB CR CS N60 σvc σvc' CN (N1)60 α β (N1)60-cs Stress CSR MSF for Kσ for CRR for CRR Factor of
No (m) dN "Clay" or Content Ration, Reductio Sand sand M=7.5, Safety
"Unsatur (%) ER (%) n coeff, rd svc'=1at
BH-82 SPT-2 0.75 8 unsaturated 14 100.9 1.68167 1 0.75 1 10.1 14.3 14.3 1.70 17.2 2.2 1.04 20.1 1.00 0.026 1.80 1.00 0.216 n.a. n.a.
BH-82 SPT-3 1.50 8 14 100.9 1.68167 1 0.75 1 10.1 29.0 24.1 1.70 17.2 2.2 1.04 20.1 0.98 0.031 1.80 1.00 0.216 0.390 12.7
BH-82 SPT-4 2.25 11 8 100.9 1.68167 1 0.75 1 13.9 44.0 31.7 1.62 22.5 0.3 1.01 23.1 0.97 0.035 1.80 1.00 0.259 0.466 13.4
BH-82 SPT-5 3.00 4 8 100.9 1.68167 1 0.8 1 5.4 59.0 39.4 1.68 9.1 0.3 1.01 9.5 0.95 0.037 1.80 1.00 0.108 0.195 5.3
BH-82 SPT-6 3.75 5 15 100.9 1.68167 1 0.85 1 7.1 74.0 47.0 1.50 10.7 2.5 1.05 13.8 0.93 0.038 1.80 1.00 0.148 0.266 7.0
BH-82 SPT-7 4.50 12 5 100.9 1.68167 1 0.85 1 17.2 89.0 54.7 1.30 22.2 0.0 1.00 22.2 0.92 0.039 1.80 1.00 0.245 0.441 11.4
BH-82 SPT-8 6.00 23 5 100.9 1.68167 1 0.95 1 36.7 119.0 70.0 1.11 40.9 0.0 1.00 40.9 0.88 0.039 1.80 1.00 2.000 3.600 92.6
BH-82 SPT-9 7.50 33 5 100.9 1.68167 1 0.95 1 52.7 149.0 85.2 1.05 55.1 0.0 1.00 55.1 0.84 0.038 1.80 1.00 2.000 3.600 94.5
BH-82 SPT-10 9.00 36 5 100.9 1.68167 1 0.95 1 57.5 179.0 100.5 1.00 57.6 0.0 1.00 57.6 0.80 0.037 1.80 1.00 2.000 3.594 97.4
BH-82 SPT-11 10.50 36 3 100.9 1.68167 1 1 1 60.5 209.0 115.8 0.96 58.4 0.0 1.00 58.4 0.76 0.035 1.80 0.96 2.000 3.444 97.2
Figure J-4
1000
AS PER SAES-A-114