General Earthworks

Structural Excavation
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
Excavation 209.36 Cu. M 329 Cu. M
Backfilling and Compaction 128.61 Cu. M 180 Cu. M
Embankment / imported fill 240.52 Cu. M Cu. M
Gravel Fill 68.84 Cu. M 39 Cu. M

Termite and Control Work


Soil poisoning
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
Soil poisoning 1086.88 sq. m 661.5 sq. m

Concrete Works
Resting on Ground Concrete,
28 MPA @ 28 days

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit
Concrete 28 MPA @ 28 days 128.42 Cu. M Cu. M
Deformed Reinforcing Bars 275 Mpa
11137.47 kg kg

Concrete Works - Suspended


Concrete, 28 MPA @ 28 days

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit
Concrete 28 MPA @ 28 days 148.54 Cu. M Cu. M
Deformed Reinforcing Bars 275 Mpa
37746.45 kg kg

Masonry Works
Concrete Hollow Blocks, 150 mm thk.

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit
CHB walls 150 mm thk. 680.59 sq. m 585 sq. m
CHB walls 100 mm thk. 267.73 kg 130 kg

Carpentry Works Ceiling


with Ventilation

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit
Ceiling with Ventilation 498.9 sq. m 427.5 sq. m

Roof and Framing Works


Pre painted metal sheet (.50 mm)

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit
Pre painted Metal sheets 612.02 sq. m 614 sq. m
Steel Trusses and Accessories 6077.1 kg 4299 kg
Purlins and Channel Beam 6419.68 kg 4030 kg
Angular Base Plate 277.47 kg kg
Cross - Bracing 502.44 kg kg
Turn Buckle 40 each kg
Sag Rod 227.43 kg kg

Fabricated Materials and Hardwares


Doors and Windows
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
D-1 16 sets 16 sets
D-2 2 sets 2 sets
D-3 4 sets 2 sets
D-4 8 sets 3 sets
D-5 3 sets 2 sets
Door Accessories 33 sets sets
W-1 16 kg 18 kg
W-2 16 sets 16 sets
W-3 4 sets 2 sets
W-4 3 sets sets
Black board 8 sets 16 sets
Rail Guard 1 lot lot

Finishing Works
Finishes

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit

Vitrified Glazed Tiles Wall finish 115.51 sq. m 79 sq. m


Vitrified Unglazed Tiles Tile Floor finish 44.49 sq. m 37 sq. m
Plain Cement Finish wih Floor
Hardener Non-skid 745.95 sq. m sq. m
Non-skid Cement Floor Finish with
6mm Groove Lines 14.45 sq. m sq. m
Plain Cement Plaster Finish 3245.96 sq. m sq. m

Painting Works
Finishes
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit

Masonry / Concrete Painting 3681.01 sq. m 2251 sq. m


Wooden Painting 212.61 sq. m sq. m
Metal Painting 62 sq. m sq. m

Electrical Works
Cicruit Breakers and Panel
Boards
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
Enclosed Air Circuit Breaker(50 A,
2P, 220V, 20 AT 1 set 1 set

Electrical Works

Cicruit Breakers and Panel


Boards

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit
Fire Alarm Control Panel (FACP) (3
Zones) 1 set 1 set

Electrical Works
Electrical Fixtures, Outlets, Switches &
Accessories

A. Materials Katuparan Village Kakarong Resettlement


Description Quantity Unit Quantity Unit

Fire Alarm Bell, 150 mm dia. 4 set 4 set


Duplex Convenience Outlet 20 set 16 set
Weather Proof Duplex
Convenience Ourlet set 6 set
Ceiling Fan Outlet 16 set 8 set

Push Button Fire Alarm Switch 2 set 2 set


Tumbler Switch, 1-gang. Flush
mounting 17 set 4 set
Tumbler Switch, 2 gang, flush
mounting 12 set 10 set
Tumbler Switch, 3 gang, flush
mounting 4 set 2 set
Flourescent Light(NHL), 2-40
watts, 220 V 32 set 44 set
Incandescent Bulb 50W 5 set 11 set

Plumbing Works
Drainage System
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
PVC Downspout, 75mm dia. 84 lin.m 137 lin.m

Cement Drain Pipe, 150 mm dia. 68 lin.m 105 lin.m


Basket Strainer set 12 set
Concrete Catch basin, 700 mm x
700 mm set 12 set
PVC Clean-out, 75 mm dia. set 12 set

Plumbing Works
Sewer system
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit

PVC Sewer Pipe, 100 mm dia. 49 lin.m 63 lin.m


PVC Sewer Pipe, 50 mm dia. 42 lin.m 30 lin.m
PVC Clean out, 100 mm dia. 10 lin. m 5 set
Floor Drain with P-trap, 50 mm
dia. 12 set 14 set
Water Closet, Flush Type 9 set 5 set

Lavatory with P-trap, Ordinary 3 set 2 set


General Earthworks
Structural Excavation

Difference
-119.64
-51.39

29.84

Termite and Control Work


Soil poisoning

Difference
425.38

Concrete Works
Resting on Ground Concrete,
28 MPA @ 28 days

Difference

Concrete Works - Suspended


Concrete, 28 MPA @ 28 days

Difference

Masonry Works
Concrete Hollow Blocks, 150 mm thk.

Difference
95.59
137.73

Carpentry Works Ceiling


with Ventilation

Difference
71.4

Roof and Framing Works


Pre painted metal sheet (.50 mm)

Difference
-1.98
1778.1
2389.68

Fabricated Materials and Hardwares


Doors and Windows

Difference
0
0
2
5
1

-2
0
2
3
-8

Difference

36.51
7.49

Difference

1430.01
212.61

Electrical Works
Cicruit Breakers and Panel
Boards

Difference

Electrical Works

Cicruit Breakers and Panel


Boards

Difference

Electrical Works
Electrical Fixtures, Outlets, Switches &
Accessories
Difference

0
4

-6
8

13

-12
-6

Plumbing Works
Drainage System

Difference
-53

-37
-12

-12
-12

Plumbing Works
Sewer system

Difference

-14
12
5

-2
4