Vous êtes sur la page 1sur 3

FORM 4.1-5.

TRAINING PLAN

Qualification: COMPUTER SYSTEM SERVICING NC II


Facilities
Trainee’s Date
/Tools
Training Training Mode of Assessment and
Staff and Venue
Requirem Activity/Task Training Arrangement Tim
Equipme
ents e
nt
Set – up a. Prepare Dualized Blair Brian Equipme Direct observation
Computer a Training A. Torres nt and Kapatagan while the tasks are 06/1
Straight Program(DT (Trainer) materials National being performed
4/18
Networks P/OJT -
Through relevant High School 06-
LO1. Cable to the ( Senior 18-18
Questions/Intervie
Install b. Install proposed High School w related to the
the activities Laboratory) 10
Network underpinning AM to
network
Cables knowledge/skills 12:00
cable - PPE Noon
from the EMCOR -
router to Desktop / DIGOS Assessment of 15
desktop Laptop underpinning and hours
compute practical skills may
r Wireless be combined.
Access
LO2. Set c. Configur Point Actual on how to
network ing perform the related 06/2
Comput Router 0/18
configurati tasks -
er name
on UTP Cable 16/2
and 4/18
Workgro
15
up RJ45 AM to
d. Changin 12:00
Crimping Noon
g IP
Address, Tool
10
Subnet hours
Mask,
Default
Gateway
,
Preferre
d and
Alternat
e DNS
Server
e. Sharing
Network
Resourc
es
f. Setting
Network
Configur
ation
and
Sharing
of
Network
Resourc
es

LO3. Set g. Set the 06/2


router/Wi- router 6/18

Fi/wireless and Wap
access 06/2
point/repe 8/18
ater 10:00
configurati AM
on to
12:00
Noon

5
hours

07/0
4/18
-
07/0
LO4. h. Ping 6/18
Inspect your
and test compute 10:00
AM
configured r and to
network the 12:00
services router Noon

5
hours

Prepared by:

BLAIR BRIAN A. TORRES


COMPUTER SYSTEM SERVICING NC II TRAINER

Vous aimerez peut-être aussi