Vous êtes sur la page 1sur 1

A-1

Edition
Date
Approved
20/05/2019
Date

NORTH
Drawing Chek
LZ

CANTEEN CLJV
OFF
ICE

ET
20/05/2019

ET
TOILET

TOIL
ENG

TOIL
R
OFF 'S
ICE
Date

T E
TOIL
OFF
30 x ICE I.C
11
GS
Drawn

6.00 WIDE TEMPORARY ACCESS ROAD


CONCRETE PUMP
BOILER DT GENSET E.P COM. A.T CON. VAN
WP WT 5x8 5x5 5x8 5x4 5x4 5x4
2x3 8x3

J4

UTILITY TRENCH
M4 M2
J3

UTILITY TRENCH
CONCRETE PUMP
J2
M3 M1 J1

DRAINAGE TRENCH

5.00 5.00
CONCRETE PUMP CONCRETE PUMP
M3 M3
5.50 5.00

UTILITY TRENCH
M2 M2 5.50 5.00

M1 M1 5.50

DRAINAGE TRENCH

6.0
0W
IDE
50.00 35.00 30.00 25.00

AC
CE
SS
TEM
PO
40.00 35.00 35.00 35.00

RA
RY
RO
AD
40.00 35.00 35.00 35.00
6.00
WID
E TE
MPO
RAR 40.00 35.00 35.00 35.00
Y AC
CES
S RO
AD
40.00 35.00 35.00 35.00

40.00 35.00 35.00 25.00

40.00 35.00 35.00 20.00


11+
00 9

40.00 35.00 35.00

REINFORCED SLAB
35.00
REINFORCED SOIL
TOTAL AREA = 18854 m2
12 +000

NOTES:
1. MAXIMUM NUMBER OF LATTICE PLANKS IN ONE COLUMN IS THIRTEEN(13).
2. SOLUTION OF PROPOSED REINFORCEMENT OF THE SOIL WITH GEOGRIDS COULD BE PREPARED BY PORTLAND CEMENT STABILIZING ROAD MIX
ACCORDING TO THE ITEM 204 OF BLUE BOOK. VALUE OF THE CAPACITY TO BE ACHIEVE WITH THIS SOLUTION WOULD BE THE SAME DEFINED BY
GEOGRID PROPOSAL.
3. FINAL DESIGN OF GEOGRID WILL BE PROVIDED BY SUPPLIER OF GEOGRIDS. LOAD FOR DESIGN CAN BE FOUND IN TW-CLJV-REP-456396. PRECAST YARD
4. REQUIREMENTS FOR WOOD SUPPORTS UNDER GIRDERS AND LATTICE PLANKS MAY BE FOUND IN TW-CLJV-REP-456396. REINFORCEMENT OF SOIL
SCALE 1:500

MATERIALS

1 2 +
WOOD SUPPORTS

10
· COMPRESSION STRENGTH PERPENDICULAR TO GRAIN Fcpo min = 4.2 MPa

MAIN CONTRACTOR CONSULTANT SUBCONTRACTOR PROJECT:


0 REVISIONS SHEET CONTENTS: SHEET NO.

PRECAST YARD AT CORDOVA CAUSEWAY 1 1 OF 1


REINFORCEMENT OF SOIL
CEBU-CORDOVA LINK SCALE
AS SHOWN
EXPRESSWAY PROJECT A GS LZ 20/05/2019 RELEASE FOR CONSTRUCTION DRAWING NO. TW-CLJV-DRA-456397 REV. NO.
20/05/2019
REV. BY CHK DATE DESCRIPTION ISSUE FOR: CONSTRUCTION ORIGINAL IN : A1 A