Académique Documents
Professionnel Documents
Culture Documents
Edition
Date
Approved
20/05/2019
Date
NORTH
Drawing Chek
LZ
CANTEEN CLJV
OFF
ICE
ET
20/05/2019
ET
TOILET
TOIL
ENG
TOIL
R
OFF 'S
ICE
Date
T E
TOIL
OFF
30 x ICE I.C
11
GS
Drawn
J4
UTILITY TRENCH
M4 M2
J3
UTILITY TRENCH
CONCRETE PUMP
J2
M3 M1 J1
DRAINAGE TRENCH
5.00 5.00
CONCRETE PUMP CONCRETE PUMP
M3 M3
5.50 5.00
UTILITY TRENCH
M2 M2 5.50 5.00
M1 M1 5.50
DRAINAGE TRENCH
6.0
0W
IDE
50.00 35.00 30.00 25.00
AC
CE
SS
TEM
PO
40.00 35.00 35.00 35.00
RA
RY
RO
AD
40.00 35.00 35.00 35.00
6.00
WID
E TE
MPO
RAR 40.00 35.00 35.00 35.00
Y AC
CES
S RO
AD
40.00 35.00 35.00 35.00
REINFORCED SLAB
35.00
REINFORCED SOIL
TOTAL AREA = 18854 m2
12 +000
NOTES:
1. MAXIMUM NUMBER OF LATTICE PLANKS IN ONE COLUMN IS THIRTEEN(13).
2. SOLUTION OF PROPOSED REINFORCEMENT OF THE SOIL WITH GEOGRIDS COULD BE PREPARED BY PORTLAND CEMENT STABILIZING ROAD MIX
ACCORDING TO THE ITEM 204 OF BLUE BOOK. VALUE OF THE CAPACITY TO BE ACHIEVE WITH THIS SOLUTION WOULD BE THE SAME DEFINED BY
GEOGRID PROPOSAL.
3. FINAL DESIGN OF GEOGRID WILL BE PROVIDED BY SUPPLIER OF GEOGRIDS. LOAD FOR DESIGN CAN BE FOUND IN TW-CLJV-REP-456396. PRECAST YARD
4. REQUIREMENTS FOR WOOD SUPPORTS UNDER GIRDERS AND LATTICE PLANKS MAY BE FOUND IN TW-CLJV-REP-456396. REINFORCEMENT OF SOIL
SCALE 1:500
MATERIALS
1 2 +
WOOD SUPPORTS
10
· COMPRESSION STRENGTH PERPENDICULAR TO GRAIN Fcpo min = 4.2 MPa