CE/AKLZ/AKL/2018-19/T-19R
Is Manufacturer Applicable NO
Is Trader Applicable NO
Page 2 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
To be submitted online not later than the date mentioned in the tender details. For
participating in tender opening, the tenderer can login at the specified time and date of opening of
the tender, if he desires so.
The tenderer is requested to quote his lowest rates F.O.R. destination for the supply
of materials. The material is required at various places in the State of Maharashtra. The
tender documents duly filled-in and digitally signed, are to be submitted online before due time &
date of the submission of tender in prescribed form.
I. SCOPE OF WORK:
The scope of work under this tender is for design, engineering (wherever applicable),
manufacture, inspection & testing before despatch, packing and supply of material /
equipments as specified in Annexure-D/Technical Specifications, at various destination sites /
stores Centers of the Purchaser in Maharashtra.
II. PRICES:
Prices are acceptable only on F.O.R. destination basis inclusive of Goods and Service Tax
(GST for brevity) i.e. Integrated GST (IGST) for outside State / Central GST+ State GST
(CGST+SGST) for with in State, risk in transit, freight showing the break-up as desired in the
Annexure ‘B’. It shall be noted that quotations not conforming to F.O.R. Destination basis
inclusive of IGST /(CGST+SGST) etc. and to the unit as specified in Annexure ‘B’, shall be
rejected even though the tenderer’s offer may be lowest. Therefore, the prices shall be quoted
only in the form of Annexure ‘B’ of the tender documents. The tenderer shall quote Ex-Works
Price and element of freight and insurance alongwith applicable rate of IGST/(CGST+SGST). The
F.O.R. destination price i.e. upto site or the Store Centre of the purchaser as the case may be inclusive of
IGST/(CGST+SGST), risk in transit and freight prepaid will be programmatically calculated. While raising
the invoices, however, IGST/(CGST+SGST) should be shown separately in the invoice raised.
The prices to be quoted by the tenderer should take into account the credit available on input under
the ‘Input Tax Credit’ scheme available under GST Law including such credit allowed on the stock
available as on the appointed day of GST as per Transitional Provisions.
The tenderer should give a declaration that any input tax credit in respect of duties on inputs as
admissible under GST Law is being totally and unconditionally passed on the purchaser in the
price quoted by him.
The tenderer should declare that in quoting the above price, tenderer has taken into account
the entire credit on inputs available under under the ‘Input Tax Credit’ scheme available under GST
Law.
Page 3 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
The tenderer should further agree to pass on such additional duties/taxes as input tax credit
as may become available in future in respect of all the inputs used in the manufacture of the final
product on the date of the supply under under the ‘Input Tax Credit’ scheme available under GST
Law by way of reduction of prices and advise the purchaser accordingly.
III. TAXES :
(i) The F.O.R. destination rate shall be quoted inclusive of IGST/(CGST+SGST). While raising the
invoices, however, IGST/(CGST+SGST) should be shown separately in the invoice raised. The
same shall be indicated against respective clauses of Annexure ‘B’ without any ambiguity.
(ii)It is imperative for the tenderer to indicate the amount of IGST/(CGST+SGST) included in their
price while giving the break-up of F.O.R. destination price in Annexure ‘B’, failing which, the
offer will be treated as ambiguous and will be rejected as per the provisions of clause IX of tender
form. In case the IGST/(CGST+SGST) is not Payable partially / fully, the tenderer shall indicate
the reasons thereof duly supported by documentary evidence.
(iii) The Purchaser is registered under Goods and Service Tax Act and should comply with all the
statutory compliance requirements of GST Law diligently.
The tenderer shall quote the prices on firm price basis or on variable price basis only, as has
been specifically brought out in the Tender Details. For any deviation in this regard, the offer shall be
summarily rejected.
V. PRICE VARIATION:
In case of offer which is called on price variation basis, the price variation shall be
admissible as per the price variation formula specified in Annexure ‘G’ of this tender. No
deviation shall be acceptable in the price variation formula. For any deviation, the offer shall be
summarily rejected.
VI. DELIVERY:
(i) Tenderer is requested to quote delivery F.O.R. DESTINATION only. Tenderer should quote clear
delivery schedule in the format specified in Techno-Commercial Bid. Offers, with qualified
delivery schedule which directly or indirectly affects the Conditions of Tender & Supply given
in Annexure ‘A’ shall be rejected.
(ii) It is mandatory on the part of the tenderer to quote the delivery on monthly basis. If the
offered delivery is indicated on quarterly basis, then the delivery would be counted
proportionately in three equal installments per month for liabilities of the contract including
payment of price variation and levy of liquidated damages.
(iii) Size mix for the purpose of delivery, when delivery is quoted in assorted items, shall be
determined by the Purchaser while issuing the A/T or despatch instructions and will be
binding on the tenderer The Purchaser will also have the liberty of modifying the size mix for
the purpose of delivery rates, even after the A/T is issued.
(iv) Offer shall be rejected if the commencement period and rate of delivery per month is
not indicated.
Page 4 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
The person/entity should not have controlling stake in more than one entity applied for the tender/
bid. Necessary certificate duly certified by chartered engineer/accountant to this effect
shall be submitted along with the tender documents.
Factory address, from which the bidder intends to supply the material against the tender, shall be as
indicated in the latest approved on line vendor registration form on e-tendering through which the vendor
is submitting the offer.
The tenderer shall offer the rates, taxes as applicable for the factory location indicated in his latest
approved on line vendor registration form on e-Tendering through which he is submitting his offer.
Tenderers shall quote the delivery only in the unit of the item specified in Annexure ‘B’ i.e. if
the quantity is in sets or in tones or in numbers or in kilometers or in coils, the rate of delivery shall
only be in the same unit. Similarly, if the tenderer quotes combined delivery in assorted sizes for all
the items, he would be required to supply all the items ordered on him in fair proportion or
particular item / items as may be required by the Purchaser at his option.
Further, if bidder s found to be conflict of interest shall be disqualified A bidder may be considered
to have a conflict of interest with one or more parties in a bidding process if they:
(b)Receive or have received any direct or indirect subsidy from any of them; or
(d)Have a relationship with each other, directly or through common third parties, that puts them in a
position to have access to information about or influence on a bid of another bidder, or influence
the decisions of the Employer regarding the bidding process.
VIII. QUOTATION:
(i) Tenderers shall quote his rate per unit specified in Annexure ‘B’ / Price Bid in figures.
(ii) Tenderer’s printed terms and conditions will not be considered as forming part of
the tender.
(iii) For each of the items quoted, tenderer shall offer minimum 20% (Twenty percent) of the
advertised qty. (advertised qty. means the qty. required as indicated in Annexure ‘B’ / Price Bid)
and the tenderer shall be able to deliver the said minimum offered qty. within the delivery
requirement of the Purchaser as indicated in the tender documents, failing which,
the offer shall not be acceptable. However the offered quantity for Distribution transformers
and conductors shall be minimum 10%.
The tenderer is requested to please make a note that in case of ambiguous terms in respect of
F.O.R. condition, GST, basis of price (i.e. firm / variable) or if the blanks are not filled
in/answered, the offer/tender shall be rejected.
Page 5 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
X. FILLING IN OF ANNEXURE :
The tenderer is requested to ensure that the comments against each and every item / clause
of Annexure shall be clearly filled in and answered. Any item/clause shall not be left blank or
unanswered. If any item/clause is not applicable, the “Not Applicable (N.A.)” checkbox shall be
selected.
The tenderer shall not make any additions, alterations or changes in the Tender Form and
the Conditions of Tender & Supply (Annexure ‘A’) including the description of material
mentioned in Annexure ‘B’. They should quote rate for the material described or click the
checkbox ‘Not quoted’ against each of the item in Annexure ‘B’ / Price Bid.
XIII. I.S.I. LICENCE: (Applicable for requirement of ISI marked material only).
A scanned copy of valid ISI License (full Copy) duly sealed & signed must be uploaded in
the registration form, failing which, the offer shall be rejected. In case the validity of the ISI license is
expiring before date of submission of tender, necessary documentary proof of having applied for
renewal of validity of the ISI license must be uploaded in vendor registration form.
The tenderer shall submit the drawings and bill of material conforming to the tender
specification wherever applicable. In such cases, the offer without the drawings and bill of material
shall not be evaluated and considered. The drawings and bill of material submitted along with the
tender shall not be considered for evaluation of the offer but the drawings and bill of material of the
successful tenderer shall be scrutinized when the Purchaser decides to accept such tender. It may,
however, be noted that Purchaser’s action of evaluation of the tender bid would not mean approval
of the drawings and bill of material submitted along with the tender bid.
The tenderer shall depute his representative for discussion on the drawings, either immediately
on hearing from the Purchaser or after receipt of Letter of Award. The formalities like
submission of drawings, bill of material etc. and getting the same approved by the Purchaser shall
be completed by the successful tenderer within TEN WORKING DAYS from the date of Letter of
Award of the contract. Any delay in this regard shall lead to cancellation of the Letter of Award at the
risk and cost of the tenderer. Finalised drawings and bill of material will be attached to the A/T. The
supplies against the contract shall conform to the approved detailed drawings/bill of material and
the detailed technical specifications.
Page 6 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
Wherever mentioned, the sample of each item offered shall be submitted free of cost to
the Executive Engineer (Respective Purchase Group) of this office before the due time and date
of submission of the tender. The samples submitted shall be strictly conforming to the
specification and drawings of the material offered. If the sample is found to be not as per the
specifications and drawings, the offer will not be considered and no correspondence from the
tenderer for accepting actual supplies conforming to Purchaser’s requirement will be
entertained. The sample of successful tenderer shall be retained with the Purchaser. Unsuccessful
tenderer, on notification, shall collect the sample within 30 days from the date of notification
at own Cost of the tenderer, failing which the sample shall be treated as Purchaser’s property
without any payment and any further notice.
The tenderer who sends the offer/sample by post should ensure superscribing the details of
despatches of samples on the envelope containing their offer..
The digital certificate shall be in the name of person authorized by the firm during vendor
registration process. In case, the digital certificate is compromised or the person holding the digital
certificate is no longer authorized to digitally sign the tender, it is the responsibility of the tenderer to
revoke this certificate and obtain the fresh certificate. While submitting the bids online only valid digital
certificate shall be used. The registered vendors are requested to check the validity of digital signature and
prior to the expiry date & they are requested to get their Digital signature key validated before expiry of
the same. MSEDCL shall not be responsible for Non-submission of any of the Bids (Techno Commercial
Bid, Deviation Bid, Price Bid, Annexure-C-1) by vendors due to expired/Invalid Digital signature. All
vendors are requested to opt for class-III digital certificate from any of the certifying authority licensed
from controller of certifying authorities (CCA) mentioned in certificate link(for registered vendor) & get
digital certificate link (for new vendor) . You may please visit their center nearest to you or website or
call on any of their phone numbers for new class-III digital signing certificate.
The registered vendors are requested to update their vendor registration details & documents from
time to time and get the approval of the MSEDCL authority accordingly after verification of original
documents.
The tenderer is responsible for all the contractual liabilities and responsibilities thereof.
In case the tenderer authorizes the agent or the representative to deal on behalf of the tenderer, the name
and address of such person should be informed to the purchaser. The tenderer shall submit the power of
Attorney in favour of agents / representative duly executed before the Notary. In the absence of the Power
of Attorney, the purchaser shall not deal with the agent / representative.
Page 7 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
registration form and get the same approved from the purchaser before submission of tender. The
details of pending orders and quantities outstanding against the orders of this Purchaser and others
should be submitted separately in electronic document form.
XIX (A) OFFER OF MICRO & SMALL ENTERPRISES AND OTHER UNITS:
The tenderer registered with Directorate of Industries of Government of Maharashtra for
manufacturing the items tendered / offered and those who have attached valid certificate at the time of
vendor registration shall be considered for concessions applicable and procurement of reserved items
as per GoM G.R. dtd. 30-10-2015 amended upto date . These benefits shall be available only to those
items approved during the registration process and subsequent updates in registration upto the
submission of this tender.
Based on concession of Central Government’s Micro & Small Enterprises office order
dtd. 23-03-2012, 241 items are being kept reserved. As per above reservation of items 100 % reserved
items to be purchased from Micro & Small Enterprises out of which 20 % reserved items to be
purchased from S.C./S.T. enterprises. Reservation is applicable for a limited period unless & until re-
examined. If Micro & Small Enterprises participated in the tender and the tendered item is not reserved
then 20 % order with L-1 rate to be given to Micro & Small Enterprises and out of this 20 % , 4 % to
be given to S.C./S.T. enterprises.
If there are any specific Government Directives such as reservation of items for units in
Maharashtra, non-eligibility of preference to SSI units etc. for particular items, price and purchase
preference etc. the same would be applicable irrespective of the fact that it has not been specifically
incorporated in the tender notice and/or tender documents.
The lowest acceptable rate will be the unit rate worked out without considering
IGST/(CGST+SGST) as applicable and the same rate will be considered as applicable to the
respective tenderer who has agreed to accept order at lowest acceptable rate.
1) If the lowest acceptable rate received against the tender is from a tenderer outside Maharashtra,
then they shall be considered for order upto 50% of Purchaser’s requirement and if industrial
units located in Maharashtra are agreeable to accept order at such lowest acceptable rate, such
industrial unit in Maharashtra shall be considered for order upto 50% of Purchaser’s
requirement by matching their rates with lowest acceptable unit rates exclusive of
IGST/(CGST+SGST).
However, if industrial units located in Maharashtra are not agree to accept order at such lowest
acceptable rate, then full supply order shall be placed on tenderers outside Maharashtra.The
Purchaser reserves the right to distribute the quantity among Tenderers after matching their
rates with the rate of lowest acceptable tenderer.
Further, it is to note if the bidder registered outside Maharashtra submitted offer and given
address of Maharashtra will be considered as bidder from Maharashtra only if offered the rate
with (CGST+SGST).
2) The tenderers who are not eligible under the above clauses can also give their
confirmation to accept order at the lowest acceptable rate received against the tender. They
could be considered for this entitlement only after allocating quantities of Maharashtra State
Industrial units as per the provisions stated at (1) above, in the order of merit as per price
Page 8 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
ranking for the balance quantity remained to be procured. The Maharashtra State
Industrial units who are not eligible for the purchase preference as above could also be
considered for this preference under this clause in the order of merit of their prices. Other
tenderers shall be considered for the order by matching their rates with the rate of lowest
acceptable tenderer after allocating reasonable quantities first to the industrial units of
Maharashtra eligible under Clause 5(a) and 5(b) of Annexure ‘C-1’.
The lowest acceptable rate is known only on the date of decision by the Competent
Authority, hence the lowest acceptable rates of the tender cannot be declared in advance,
however lowest acceptable rate of the tender would be equal to or more than the lowest rate received in
the tender.
The confirmation for acceptance of the order at the lowest acceptable rate indicated as above
shall be given in the format as per Annexure ‘C-l’ of the tender documents. The same should be
submitted online on or before the due time and date of submission of Annexure ‘C-1’. The
confirmation shall be opened online on due time and date of opening of Annexure ‘C-1’. Schedule for
submission and opening of Annexure ‘C-1’ shall be communicated separately by e-mail and on the
website. Though confirmation in Annexure `C-1’ as above is called from all the qualified
tenderers, the tenderers, who quoted rates within the range of 5 % in comparison with the lowest
acceptable rates, shall only be considered and their Annexure `C-1’ will be opened on the date and
time intimated subsequently in the presence of tenderers who chose to be present. Provided,
however, that the Annexure `C-1’ of the tenderers, who have quoted above the range of 5 % in
comparison with the lowest acceptable rates, shall also be considered in case the aforesaid tenderers
within the range of 5 % are unable to fulfill the quantity requirement. In that case also, the date of
opening of Annexure `C-1’ will be intimated to the tenderers
In the above confirmation, if the tenderer indicates any rate, then the confirmation given by
the tenderer will not be considered as valid.
Above confirmation for the quantity less than as indicated in Clause VIII (iii) of Instructions to
the Tenderer shall not be acceptable.
The prices indicated in the original offer shall not be considered as valid once offer for
acceptance of order by matching rates is given. In the event of withdrawal of offer by matching
rates within the validity period, the entire offer against the tender shall become invalid and shall be
summarily rejected and the earnest money paid by the tenderer shall be forfeited.
The lowest acceptable tenderer would be considered for awarding order upto 75% of
requirement or any reasonable quantity subject to his capacity and capability with following
restrictions:
Trial Order: - New firms, who have not supplied tendered item to any Government / Semi
Government Utility or SEB, may be considered for trial orders limited up to
20 % of total requirement.
Restricted Order:-Firms which are new to Purchaser but have supplied tendered item
to any Government / Semi Government Utility / SEB or the firms which
have executed MSEDCL’s one order, may be considered for restricted order
up to 25% of the requirement.
Page 9 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
Regular Order:-Firms who have satisfactorily executed MSEDCL’s two orders for
tendered items, may be considered for regular order.
If any balance quantity remained after allocation as mentioned above will be allocated
amongst the bidders whose quoted price(s) are within 5% and have matched with Lowest
Acceptable Tenderer, subject to their capacities.
If matching rate offer is not available, 100% quantity will be allotted to L-1 bidder provided
he is regular supplier and have capacity to supply total quantity. If L-1 bidder is new or semi regular
then after allocation of quantity as per quantity allocation criteria, balance quantity will be allotted
to offers available with matching rate who have quoted above the range of 5% in comparison with
the lowest acceptable rates.
In case L-1 offer is either from new/semi regular supplier and only 1 matching rate offer
from regular supplier is available then quantities will be allocated as per quantity allocation to
new/semi regular supplier. The remaining quantities will be allotted to regular supplier.
In case L-1 offer is either from new/semi regular supplier and only 1 matching rate offer
from new/semi regular supplier is available then quantities will be allocated as per quantity
allocation to new/ semi regular supplier. The balance quantity will be allotted to offers available
with matching rate who have quoted above the range of 5% in comparison with the lowest
acceptable rates.
The tenderer should pay the Earnest Money @1% (One Percent) of the Estimated Value of
Tender.
The earnest money shall be paid online or by demand draft drawn on the scheduled bank in
Mumbai in favor of MSEDCL, Mumbai. Reference to the tender no. should be given in case the EMD
is paid by demand draft before the due date of the tender and the relevant deposit amount should be
mentioned in the tender. Interest shall not be allowed on EMD. Earnest money deposit shall be
forfeited (i) in case the tenderer withdraws the tender/offer during the validity period (ii) in case the
tenderer fails to pay the security deposit if the contract is awarded.
However, tenderers from the following categories are exempted from payment of earnest money
deposit.
1) All Government and semi Government institutions under Govt. of Maharashtra and Zilla
Parishad in Maharashtra and fully owned undertaking of any State Govt. and Govt. of India only
for the items manufactured by such institutions.
2) Micro and Small Enterprises registered under Micro, Small and Medium Enterprises
Development Act-2006 only for the items mentioned in their permanent registration certificate at
the time of vendor registration.
Page 10 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
3) The tenderer registered with N.S.I.C. and those who have attached valid N.S.I.C.
Registration Certificate at the time of vendor registration.
The benefits mentioned in (1) to (3) above shall be available only to those items approved during
the registration process and subsequent updates in registration upto the date of submission of this tender.
Exempted bidders should upload a latest valid certificate issued by any approved body of
‘Ministry of Small & Medium Enterprises’ (MSME) such as ‘National Small Industries Corporation’
(NSIC) or ‘District Industries Centre’ (DIC) for EMD exemption.
Envelope for this part shall contain documents like Type Test Reports, Drawings, Bill of
Material, Catalogues etc. wherever applicable as per technical specification and they shall be
scanned and these scanned documents to be taken into PDF format on CD media (2 sets) and are
to be submitted to EE (SM) in sealed envelope on or before due date & time of submission.
METHOD OF SUBMISSION OF PART III AND THEIR OPENING:
[d] This envelope shall be individually sealed and shall be superscribed with the name
and address of tenderers and the following information before posting or delivering the same:
(i) Tender No.
(ii) Due date and time of submission.
(iii) Due date and time of opening.
Envelope as above shall be submitted on or before the prescribed due date and time of
submission and shall be opened on due date and time of opening prescribed.
In case of tenderers whose techno-commercial bid is acceptable, their Price Bids will
be opened at a later date. This date shall be intimated to such tenderers separately.
Page 11 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
XXIV. The Purchaser reserves the right to reject any offer without assigning any reason
whatsoever.
The Purchaser reserves the right to order out / procure any quantity in excess to the extent of
50% or any less quantity, of the quantities offered by the tenderer. The quantity specified may be for
despatch to one destination or several places.
Earnest money deposited shall be returned to the unsuccessful tenderer as soon as possible after
the tender has been decided and on submission of receipt of E.M.D. payment to the G.M. (F&A-SB),
MSEDCL, Prakashgad, Station Road, Bandra (East), Mumbai -400051.
Page 12 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
The tenderer shall keep the offer valid for acceptance upto and including last date of
calender month, covering the date of completion of 120 days (one hundred and Twenty days)
from the date of opening of the tender and shall also agree to extend the period of validity required
by the Purchaser. The tenderer shall not be allowed to modify or change the conditions of the tender
while extending the period of validity.
XXXII. The Policy & Procedure for Debarring of Agency from Business Dealings with MSEDCL is
as per Section-IV in order to ensure participation of reliable and honest bidders /
contractors / vendors, etc. and forms the parts of tender document.
The bidder shall submit the declaration along with the bid as below:
a) The business dealings with the agency have not been debarred by any Ministry of GoI / GoM /
State owned electricity distribution utility and still in force.
b) The Directors, Proprietors, Partners, Employee(s) or owner of the agency have not been either
jointly or severally guilty of malpractices in relation to its business dealings with the
Government or MSEDCL during the last five years.
(b) will reject a proposal for award if it determines that the bidder recommended for award has
engaged in corrupt or fraudulent practices in competing for the contract in question;
(c) will declare a firm ineligible, either indefinitely or for a stated period of time, to be
awarded an MSEDCL contract if at any time it determines that the firm has engaged in
corrupt or fraudulent practices in competing for, or in executing, an MSEDCL contract.
XXXIV. INFLUENCE:
Any efforts by the bidders to influence the owner during evaluation process before order
placement will be rejected. Similarly deviation in the term of payments, penalty, security
deposit, delivery period will be treated as non-responsive quotation / offer and will not be
considered for evaluation /order placement.
Page 13 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
Bidder shall submit the undertaking certifying that they have not approached any one for
undue influence.
The benefits mentioned in (1) to (3) above shall be available only to those items
approved during the registration process and subsequent updates in registration upto the date
of submission of this tender.
The tender fee paid against the particular tender shall not be refunded /transferred
/adjusted at all.
1) The bidder or its official representative is invited to attend pre-bid meeting(s) which
will take place at the place, date and time designated in the Bidding Data.
2) The purpose of the pre-bid meeting(s) will be to present the salient features of the
bidding documents to the bidders, including the bid submittal requirements, the
Conditions of Contract (including payment terms and conditions), the technical features
of the project, and to clarify issues and to answer questions on any matter that may be
raised by the bidders.
3) The bidder is advised to visit the Site and study the bid document thoroughly, and is
requested to submit any questions in writing or by fax, to reach the Employer not later
than one week before the pre-bid meeting.
4) Minutes of the meetings, including the text of the questions raised and the responses
given, will be transmitted without delay to all the prospective bidders through the
website cpa1.mahadiscom.in / www.mahadiscom.com. Any modification of the bidding
documents listed which may become necessary as a result of the pre-bid meetings shall
be made by the Employer exclusively through the issue of an Addendum pursuant to
Clause and not through the minutes of the pre-bid meetings.
5) Non attendance at the pre-bid meeting will not be a cause for disqualification of a
bidder. Nevertheless, senior representatives of the bidders are strongly encouraged to
participate in the pre-bid meeting to help ensure that they fully understand the key
concerns of the Employer and the Employer’s requirements.
Page 14 of 212
FF-1129(e) Dist-Two Bid(R-III/06/18)
The purchaser, if necessary, shall obtain clarifications on deviations by requesting for such
information from any or all the tenderers in writing, as may be necessary.
The same should be submitted online on or before the due time and date of submission of
Deviation Bid. The clarification shall be opened online on due time and date of opening of Deviation
Bid.
The Schedule for submission and opening of Deviation Bid shall be communicated by auto
generated e-mail of the e-tender website cpa1.mahadiscom.in.
E-Reverse Auction shall be conducted for finalization of contract, order shall be placed
on overall lowest tender basis. For the reverse auction, technically and commercially
acceptable tenderers and whose price bids have been opened only shall be eligible to
participate.
CERTIFICATE:
I/We agree to supply the materials at the rates herein tendered by me/us subject to the
conditions of tender and supply in Annexure ‘A’ of this tender which I/We have carefully read and which
I/we have thoroughly understood and to which I/we agree. I/we hereby agree to keep this offer
open upto the date mentioned in tender details and shall be bound by communication of acceptance
despatched within the validity period.
Page 15 of 212
FF-1115(e) Dist (R-3/06/18)
ANNEXURE ‘A’
CONDITIONS OF TENDER AND SUPPLY (SECTION II)
1) EFFECT OF CONTRACT:
The contract shall be considered as having come in to force from the date of Notification of Award.
The tenderer whose offer is accepted is hereinafter called “the supplier”.
2) SECURITY DEPOSIT:
(a)The supplier shall pay within 15 days, security deposit @ 3 % of the value of the order.Supplier
will have to pay additional security deposit for the extension of order if issued.If the contract is awarded to
authorized dealer,the manufacturer has to submit security deposit otherwise it shall be furnished by that
authorized dealer.
(b)Security deposit applicable will be 2% (Two percent) of the order value for the following
categories of suppliers :
i) Units in Maharashtra registered with DGS & D, New Delhi and Controller, Printing and
Stationary Kolkata,
ii) All Government and semi Government institutions under Govt. of Maharashtra and Zilla Parishad
in Maharashtra and fully owned undertaking of any State Govt. and Govt. of India only for the
items manufactured by such institutions.
(c ) Units registered with Directorate of Industries, District Industries Center and Central Stores
Purchase Organization,Mumbai and Mirco and Small Enterprieses registered with N.S.I.C. and Micro,
Small and Medium Enterprises Development Institute (MSMEDI) shall be exempted from payment of
security deposit for value of order upto Rs. 25,000/- and If the value of order is above Rs. 25,000 /- then
security deposit @ 3% or Rs. 10,000/- whichever is lower will be payable against the contract excluding
first amount of Rs. 25,000/-.
The benefits mentioned in (b) to (c) above shall be available only to those items approved during the
registration process and subsequent updates in registration upto the date of submission of this tender.
The failure to make payment of security deposit within 15 days as above will be viewed seriously and
the contract awarded shall be liable to be terminated at the risk and cost of the supplier and the supplier
shall be solely responsible for the consequences arising out of such termination.
This security deposit in cash/DD or in the form of bank guarantee or otherwise is for the due
performance of the material/contract and the same shall be liable to apportion towards amount due or
becoming due by the supplier on :
i. his failure to execute this order or
ii. any other contract and
iii. in the event of non fulfillment of the terms and conditions of the contract.
iv. Non completion of guarantee period of the supplied equipments /material.
Page 16 of 212
FF-1115(e) Dist (R-3/06/18)
The security deposit shall be refunded within 90(Ninety) days from the date of expiry of the
guarantee period of last consignment of equipments /material supplied, specified in condition of guarantee
stated herein below Sr. No.25 OR within 30 (thirty) days on furnishing of contract performance deposit in
the form of cash or DD from any Nationalized /Scheduled bank or from acceptance of bank guarantee
furnished by the supplier which is valid for completion of last consignment guarantee period. The
PURCHASER shall not be liable to pay any interest or compensation to the contractor for retaining the
deposit after the end of said period.
3) QUALITY OF SUPPLIES:
All materials supplied shall be strictly as per specification laid down and in accordance with the
approved standard samples. In case of any materials for which there are no standard / approved samples,
the supplies shall be of the best workmanship and good quality and this office shall be informed of the
progress of manufacture of the material.
6) ACCEPTANCE OF SUPPLIES/INSPECTION:
(a) The supplier shall normally offer at a time, the entire quantity required to be delivered every
month as per the delivery schedule indicated at Annexure ‘B’ of A/T for the purpose of
inspection by the Purchaser. However, in exceptional circumstances, the supplier may be allowed
to offer quantity at a time not less than 50% of the quantity required to be delivered every month.
(b) Materials shall be inspected by the Purchaser’s Executive Engineer/or the representative
authorized by the Purchaser before despatch. An intimation in the prescribed proforma about the
date on which materials shall be ready for inspection, indicating approximate quantity, shall have
to be given to the Executive Engineer (Inspection Wing), Maharashtra State Electricity
Distribution Co. Ltd., ‘Prakashgad’. 1st floor, Station Road, Bandra (East), Mumbai - 400 051,
so as to reach him sufficiently in advance, failing which, the supplier shall be responsible for
Page 17 of 212
FF-1115(e) Dist (R-3/06/18)
delay in delivery on account of inspection. On receipt of such intimation, the materials shall be
inspected within 20 days. The materials shall be despatched only after inspection and approval of
same by the Inspector. The inspection approval letter shall be valid for a period of 30 days from
the date of issue of letter to enable the supplier pack the material and arrange transportation
thereof so that material should be reached at the respective consignee within 30 days from
the date of inspection approval letter. After this period of 30 days, the validity of this
inspection approval letter will lapse. If the supplier fails to dispatch or the material is not reached
within 30 days to respective consignees, the approval of purchaser is to be sought by the supplier
for revalidation of inspection approval letter.
Further the price variation shall be payable limited to the period of original call letter or the
actual date of despatch whichever is lower and the liquidated damages for late delivery shall be
levied on such delays.
The positive price variation and statutory variations for supplies beyond contractual
delivery period will not be allowed.
In case of delay in delivery beyond contractual delivery period, the prices of items
supplied will remain firm, where delay is not attributable to MSEDCL, however
MSEDCL will recover the negative price variation amount applicable as on contractual
due date or actual date of supply whichever is beneficial to MSEDCL.
(c) The supplier shall notify the names of the consignees to whom the inspected lot would be
despatched. The Inspector shall intimate change in destination, if any, at the time of inspection
approval and accordingly the material shall be despatched. The supplier shall get the copies of
inspection approval letter together with witness certificate duly signed by the concerned
Inspecting Officer IN BLUE INK only and also mention reference or inspection approval letter
on the challan / invoice, failing which any delay occurred in getting the S.R. Notes from the
consignees would be solely to supplier’s account.
(d) Factory address, from which the bidder has to supply the material, shall be as indicated in the
latest approved on line vendor registration form on e-tendering through which the bidder has
submitted the offer.
(e) In the event, during the inspection by the Purchaser’s Inspecting Officer, if it is observed that the
quantity actually offered for inspection is less than the quantity indicated for inspection in the
inspection call, the Purchaser shall be entitled to recover from the supplier, the actual expenses
incurred for arranging the inspection, and the supplier shall not dispute the amount to be
recovered.
(f) The supplier shall submit the test certificates/reports from any approved laboratory or the
laboratory of his own for the respective quantity of material, before despatch. The material shall
not be despatched unless and until the test certificates are approved by the Purchaser.
(g) All the necessary help shall be extended by the supplier to the authorized representative of the
Purchaser to carry out testing of equipment/materials.
Page 18 of 212
FF-1115(e) Dist (R-3/06/18)
shall despatch the material as per the despatch instruction in accordance with A/T indicated by him in
the inspection call letter.
ii) The Purchaser reserves its right to change the delivery schedule of the contract either by reducing the
monthly lot upto 60% of the agreed lot or by increasing the same upto 120% of the agreed lot with
prior two months notice and the Purchaser shall not be liable to pay any compensation/damages on
account of such change in delivery schedule.
iii) The Purchaser reserves its right to defer the balance supply to be received against the order by giving
two months notice for a maximum period of 6 months. In such an event, the delivery period for the
deferred material shall be deemed to be extended proportionate to the period of deferment and the
Purchaser shall not be liable to pay any compensation/ damages on account of such deferment of
deliveries.
Page 19 of 212
FF-1115(e) Dist (R-3/06/18)
Page 20 of 212
FF-1115(e) Dist (R-3/06/18)
rights and remedies available to it in law and reserving always to itself the right to forfeit the security
deposit placed by the supplier for the due fulfillment of the contract.
In case the stores/materials are found not in accordance with the prescribed specifications and/or
the approved sample, the same will be rejected and the supplier shall replace the rejected stores/materials
free of cost within one month from the date of intimation. The replacement of goods shall also have to be
got inspected as per inspection clause. Further if the stores/ equipment supplied becomes incomplete on
account of either rejection or short supply of its components, the complete cost of the stores/equipment
shall be recovered from supplier’s bills without notice.
Page 21 of 212
FF-1115(e) Dist (R-3/06/18)
Page 22 of 212
FF-1115(e) Dist (R-3/06/18)
23) TAXES :
(i) In the event of any structural change occurred in the Input Tax Credit Scheme after the date of
submission of the tender till the currency of the contract, the benefit out of such change shall be
passed on to the purchaser.
(ii) In the event of ‘Input Tax Credit’ being extended by the GST Law which were otherwise
ineligible for claiming Input tax credit therof, the seller should advise the purchaser about the
additional benefits accrued or any variation thereof, through a letter containing such details and
comptation within such time as may be agreed between both the parties i.e. Supplier & MSEDCL.
24) DEDUCTION:
Any amount or amounts which become payable by the supplier to the purchaser under a particular
contract, shall be deducted by the purchaser from any amount/amounts due or becoming due to the
supplier under the same or any other contract and shall be adjusted against dues to the Purchaser.
25) GUARANTEE:
Goods offered shall be guaranteed for a period of 24 months from the date of commissioning or
30 months from the date of dispatch whichever is earlier. The stores/ materials found defective within the
above guarantee period shall be replaced/repaired by the supplier free of cost, within one month of receipt
of intimation. If the defective store/materials are not replaced/repaired within the specified period as
above, the Purchaser shall recover an equivalent amount plus 15 % supervision charges(Plus GST as may
be applicable) from any of the bills of the supplier. Further, in case of repeated failures of equipments /
material, the Purchaser reserves the right to debar / disqualify the supplier for future tenders / orders
irrespective of grounds for debarring in MSEDCL debar policy as per Section-IV.
Page 23 of 212
FF-1115(e) Dist (R-3/06/18)
d) Not withstanding what is contended in the foregoing clauses, the supplier shall be liable to pay the
Purchaser the cost and expenses incurred by the Purchaser, if any, including ground rent and the
same shall be appropriated and recovered from the sale proceeds.
If, at any time, during the continuance of this contract the performance in whole or in part by
either party of any obligation under this contract shall be prevented of delayed by reason of any war,
hostility, acts of the public enemy, civil commotion, sabotage, fires, floods, explosions, epidemics,
quarantine restriction, strikes, lock-outs or acts of God (hereinafter referred to as “events”), provided
notice of happening of any such eventuality is given by either party to the other within 21 days from the
date of occurrence thereof, neither party shall by reason of such event, be entitled to terminate this contract
nor shall either party have any claim for damages against the other in respect of such non-performance or
delay in performance; and deliveries under the contract shall be resumed as soon as practicable after such
event has come to an end or ceased to exist, and the decision of the purchasing officer as to whether the
deliveries have been so resumed or not, shall be final and conclusive, provided further that if the
performance in whole or part of any obligation under this contract is prevented or delayed by reason of any
such event for a period exceeding 60 days, either party may at its option terminate the contract
PROVIDED ALSO that it the contract is terminated under this clause, the purchaser shall be at liberty take
over from the contract at a price to be fixed by the purchasing Officer which shall be final all unused,
undamaged and acceptable materials, bought out components and stores in course of manufacture in the
possession of the contractor at the time of such termination or such portion thereof as the purchaser may
deem fit accepting such material, bought out components and stores as the contractor may with the
concurrence of the purchaser elect to retain.
Page 24 of 212
FF-1115(e) Dist (R-3/06/18)
32) JURISDICTION:
Any disputes or difference arising under, out of or in connection with this tender or contract if
concluded, shall be subject to the exclusive jurisdiction of the “Courts” in Mumbai.
1) The decision of the Purchaser shall be final as regards the acceptability of the stores supplied by
the supplier and the Purchaser shall not be required to give any reason in writing or otherwise at
any time for the rejection of the stores/materials.
Page 25 of 212
FF-1115(e) Dist (R-3/06/18)
2) In case the contractor/supplier fails to deliver the stores/material or any consignment thereof
within the contracted period of delivery or in case the stores/materials are found not in
accordance with the prescribed specification , approved samples and the performance of the
supplied material is not found satisfactory, the Purchaser shall exercise in discretionary power
either,
(a) to purchase from elsewhere, after giving due notice to the contractor, at the risk of
contractor, such stores/material not so delivered or other of similar description, without
canceling the contract in respect of consignment not yet due for delivery,
OR
(b) to cancel the contract reserving Purchaser’s right to recover damages Plus GST as may be
applicable.
(c) notwithstanding that the powers under (a) and (b) referred above are in addition to the
rights and remedy available to the Purchaser under the General Law of India relating to
contract.
(d) Purchaser reserves right to recover damages against risk purchase or 10 % value of
non-supplied material plus applicable taxes, if any whichever is higher.
In the event of risk purchase of stores of similar description, the option of the Purchaser shall be
final. In the event of action taken under (a) or (b) above, the supplier shall be liable for any loss
which the Purchaser may sustain on that account but the supplier shall not be entitled to any saving
on such purchases made against default.
During the execution of the supply if the events as under happens then the supplier shall be
suspended:-
a) If the enquiry conducted by CBI or any other investigating Agency and recommended for
suspension.
b) If the Purchaser finds the offense of moral turpitude committed by the supplier.
c) If it is found that supplier has attempted some irregular/illegal activities to gain the order.
In the event of disqualification, as the case may be, the bidder will be de-listed for that
particular item/s from the list of registered vendors of MSEDCL’s e-tendering system for the
disqualified period. On expiry of disqualified period the bidder, if he desires, shall have to register
again after following the prevailing registration process.
Page 26 of 212
FF-1115(e) Dist (R-3/06/18)
The purchaser shall deduct tax at source in accordance with the provisions of the GST laws as and
when the same is notified
NOTES:
(i) In respect of Micro, Small and Medium Enterprises, best efforts will be made for payment
within 45 days from date of submission of invoice along with requisite documents after the
delivery of entire lot. However, no claim for interest will be entertained in case of delay in
payment beyond 45 days. The Micro, Small and Medium Enterprises who are ready to
accept this payment term may only quote. No dispute in this regard will be entertained.
(ii) After completion of order, the claims of whatsoever nature lodged after 30 days from the
last date of payment will not be entertained.
Page 27 of 212
FF-1117e Dist. (R-I/12/16)
ANNEXURE ‘C-l’
[To be submitted later on as per as per Clause XIX(B) of Instructions]
CONFIRMATION FOR ACCEPTING ORDER BY MATCHING RATES WITH LOWEST
ACCEPTABLE TENDERER
APPLICABLE FOR INDUSTRIAL UNITS FROM MAHARASHTRA ONLY
Marketing Assistance and Purchase Preference to the units from Maharashtra (refer Clause XIX of
Instructions to Tenderers):-
Note:-
1. If the tenderer gives the above confirmation for the quantity less than as indicated in Clause
VIII (iii) of the Instructions to the Tenderers, then the above confirmation shall not be
acceptable.
2. Tenderers may confirm matching for one or more items originally tendered.
3. Any withdrawal of confirmation for order by matching rate within validity of offer will
render the entire offer invalid and shall be summarily rejected and Earnest Money Deposit
shall stand forfeited.
4. A tenderer will not be entitled to the benefit of offers by matching rates and will not be
considered for orders if his original offer is rejected on the ground of ambiguity or because
of not accepting/non compliance of the terms & conditions of the tender.
5. In the above confirmation, if the tenderer indicates any rate, then the above confirmation
given by the tenderer will not be considered as valid.
Page 28 of 212
Rev. III/09
ADDITIONAL INSTRUCTIONS
(Applicable for tenders called on Rate Contract basis)
RATE CONTRACT:
The terms and conditions for the rate contract shall be same as those specified in Annexure ‘A’
Conditions of Tender & Supply, with the following additions/modifications. These clauses are
applicable wherever they are deviating from the relevant clauses of the tender form and shall
supersede the terms & conditions mentioned therein and shall be applicable to the rate contract tender.
2.0 QUANTITY:
2.1 Quantity ordered in Annexure ‘B’ of the tender documents or quantity, which shall be ordered on
successful bidder, is only the estimated requirement for the contract period of one year. The
actual supply against the contract shall be limited to the quantity demanded during the contract
period which shall not be less than 40% of the ordered quantity.
2.2 It will not be binding on the part of the purchaser to draw the entire quantity during the contract
period.
2.3 On expiry of the contract period, any undemanded portion of the contract shall stand
automatically cancelled without any financial liability on either side.
3.3 In the last demand/s made, if the deliveries cannot be effected within the contract period after
counting the delivery period in the above manner, the contract period shall stand automatically
extended till the expiry of the delivery period counted in the above manner, unless instructed by
the concerned Demanding Officer not to dispatch the material after expiry of the contract period.
3.4 The commencement of the delivery period shall include the period for submission of prototype/
sample (wherever applicable) and approval of the same and also the time required for routine
inspection and approval of test certificates, wherever required.
Page 29 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
Page 30 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
BID DOCUMENT
( Document Version –I)
Section 4: Schedule of Prices & Schedule Section 8: Criteria for approval of Vendors
of Payments
Page 31 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
Volume I , PART – A
Page 32 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
Page 33 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
Note:- These are estimated Costs and payments will be made as per actual works
executed by the contractor.
3. Bidding is open to individual bidders who satisfy the qualification criteria set forth in
the bidding documents with respect to their experience and financial capabilities.
The details are as follows.
Pre-Qualification criteria:
(a) The bidder should have at least 3 years’ Experience, as a prime contractor in the
construction of works of a similar nature and complexity to that required under this
contract. Such works should include construction, erection, testing and
commissioning of transmission and/or distribution lines and allied works;
(b) The bidder should have an average annual financial turnover during 3 years out
of FY 2014-15, 2015-16, 2016-17 or 2017-18 equivalent to at least 30% of the
estimated cost of the total tenders quoted for;
(c) The Bidder should have General Experience executed in any sector (with
authentication of MSEDCL/Equivalent Govt. Utility authority i.e. not below the rank of
Executive Engineer) during the any Five last financial years out of FY 2013-14, 2014-
15, 2015-16, 2016-17, 2017-18 either-
i) One work order / contract (denotes executed only) equivalent to at least 20% of the
estimated cost of the total tenders quoted for or
ii) Two work orders / contracts (denote executed only) together equivalent to at least
25% of the estimated cost of the total tenders quoted for or
iii) Three work orders / contracts (denote executed only) together equivalent to at
least 30% of the estimated cost of the total tenders quoted for;
(d) Specific Experience: The Bidder should have specific experience of 15% of the total
physical parameters involved/covered under the tender [i.e. S,E,T,C of LT line(AB
Page 34 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
cable/OH line); as under during the period of last 5 financial year’s i.e. FY 2013-14,
2014-15, 2015-16, 2016-17 and 2017-18;
This specific experience shall be considered from all work orders executed by
contractors in last five years. Not necessary from single order or two orders or three
orders as mentioned clause no. 5.1 (c)
(e) The bidder should have a Net Worth
(which is defined as “Net value of the assets – net value of liabilities”) as below.
10% (ten percent) of the Estimated Cost of the total tender quoted for; and
Pre-Qualification criteria for Joint Venture – Not Allowed
A. The Pre-qualification process will be carried out and offers (Price Bids) of only
technically qualified Bidders will be considered.
4. Bidder may bid for either one or more than one of the tenders floated subject to
satisfy pre-Qualifying criteria.
5. Interested bidders may obtain further information from the office of the Employer at
the address given below :
The Chief Engineer (Akola Zone)
Maharashtra State Electricity Distribution Co. Ltd.
1st Floor, Vidyut Bhavan, Ratanlal Plot,
Akola-444001
Telephone: (0724- 2434740)
Email: ceakola@gmail.com
Contact person:- Executive Engineer (Adm), Mobile No. 7875763003
6. The entire bidding document in the form of Volume-I to Volume-II shall be available
only in electronic format (soft copy) and is to be downloaded from Employer’s
website www.mahadiscom.in from 28.05.2019 onwards. It shall be the bidder’s
responsibility to ensure that the entire bid document is downloaded from the
requisite website. No hardcopy of tender document (Volume-I to Volume-II) will be
provided. All the subsequent instructions / corrigendum to the bidding document
etc. shall also be available on the website only mentioned above as per procedure led
by the MSEDCL and it will not published in newspapers separately.
Non Refundable Tender Fees shall be as below
i) Tender value above Rs. 50 lakhs & less than Rs. 500 lakhs- Rs. 5000/-
(+ %GST applicable (presently 18%) per tender may be paid through online
payment only, prior to the dead line for submission of bids as per the
procedure led by the Employer.
The purpose of the pre-bid meeting, will be to present the salient features of the
bidding documents to the bidders, including the bid submittal requirements, the
Conditions of Contract (including payment terms and conditions) and the Employer’s
Requirements, as well as to assist in scheduling site visits to clarify issues and answer
questions on any matter that may be raised by the bidders. Non-attendance at the
pre-bid meeting will not be a cause for disqualification of a bidder, but senior
representatives of the bidders are strongly encouraged to participate in the pre-bid
meeting to ensure that they fully understand the key concerns and requirements of
the Employer.
7. The Employer shall accept and process the bids by following e-tendering process
described in the bidding document. The entire bid submission shall be carried out by
Page 35 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
the bidder by following the specified procedure. The Bidders shall submit separate
price bid for each tender for which they wish to bid, one common technical bid with
one tender and a declaration for technical bid with other tenders as specified in sub-
clause no. 23.1.2 of section 1, volume I of the bidding document. Bidder shall submit a
bid security in the amount specified in the Table in Clause 2 of this Invitation for Bids,
separately for each Tender for which price bid is submitted by the bidder in separate
envelop as per specified procedure and prior to the dead line for submission of bids.
Bids in PDF format must be uploaded on MSEDCL’s e-tendering web site, on or before
15:00 Hours on 03.06.2019 (date). Bid securities shall be in the form of online
payment or an Unconditional, irrevocable Bank Guarantee from any
Nationalized/Scheduled Bank in India in favor of the Maharashtra State Electricity
Distribution Co. Ltd. payable at Akola. No Cash or DD will be accepted at any
conditions.
No additional documents will be accepted after due date of submission of bids.
8. The Technical Proposals will be opened at 17:00 hours on 03.06.2019, the deadline
for submission of bids in the event of the specified date of bid opening being declared
a holiday for the Employer, the bids shall be opened at the same time on the next
working day.
9. The Price Proposals will remain unopened until the time of opening of the Price
Proposals. Technical Proposals which are submitted by non qualified bidders or
which are evaluated to be not substantially responsive will be rejected and not further
considered.
10. Price Proposals of only the qualified and substantially responsive bidders will be
subsequently opened. The time and date of the opening of the Price Proposals will be
informed later on by the Employer following completion of the evaluation of the
Technical Proposals.
11. The Employer will not be responsible for any costs or expenses incurred by bidders in
connection with preparation of Bids, or loss of any documents.
If any Corrigendum/Circular/Guidelines regarding The work involved under this tender
i.e. supply of i) Replacement of LT O/H Line by LT Aerial Bunched cable ii) Providing of Mid
Pole in existing Long span LT Lines from MSEDCL is issued by the Corporate office,
M.S.E.D.C.L., Mumbai or Higher Authority, during the course of tender process or
contract period, the same will be applicable to this tender & will be binding on the
bidders.
The Employer reserves the right to accept any bid, or reject any or all bids, without
assigning any reason thereof and without thereby incurring any liability to the Bidder or
Bidders.
Sr. No Particulars Date
1 Availability of bid documents on web site in 28.05.2019 Onwards
electronics format
2 Date and time of Pre-Bid Meeting 31.05.2019 at 12.00 Hrs.
3 Date and time of sale of bid documents 02.06.2019 Onwards
4 Date and time of submission of bid documents 03.06.2019 upto 15.00 Hrs.
5 Date and time of opening of Technical bids 03.06.2019 at 17.00 Hrs.
6 Date and time of opening of Price bids Will be informed later
Chief Engineer,
MSEDCL, Akola Zone, Akola.
Page 36 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 1
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 INSTRUCTIONS TO BIDDERS
Section 1
Instructions to Bidders (ITB)
Page 37 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
SECTION 1
INSTRUCTIONS TO BIDDERS
TABLE OF CLAUSES
Sr. No. Particulars Page No.
A. General
1 Scope of Bid 5
2 Source of Funds 6
3 Eligible Bidders 6
4 Eligible for Import of Materials and Equipment’s 6
5 Qualification of the Bidder – Individual Bidder 6
6 Qualification of the Bidder – Joint Venture (Deleted) 9
7 Conflict of Interest 9
8 Cost of Bidding 10
9 Site Visit 10
B. Bidding Documents
10 Content of Bidding Documents 1
11 Clarification of Bidding Documents 11
12 Amendment of Bidding Documents 12
C. Preparation of Bids
13 Language of Bid 12
14 Documents Comprising the Bid 12
15 Bid Form and Price Schedules 14
16 Bid Prices 15
17 Currencies of Bid and Payment 16
18 Bid Validity 17
19 Bid Security 17
20 Alternative Proposals by Bidders 18
21 Pre-Bid Meeting 18
22 Format and Signing of Bid 18
D. Submission of Bids
23 Sealing and Marking of Bids 19
24 Deadline for Submission of Bids 20
25 Late Bids 20
E. Opening and Evaluation of Technical Proposals
26 Opening of Technical Bids(Proposals) 20
27 Process to be Confidential 20
28 Examination of Technical Proposals and Determination of 20
Responsiveness
29 Evaluation and Comparison of Technical Proposals 21
30 Clarification of Technical Proposals and Contacting the Employer 21
31 Invitation to Attend Opening of Price Proposals 21
F. Opening of Price Proposals
32 Bid Opening of Price Proposals 22
33 Process to be Confidential 22
Page 38 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 39 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
SECTION 1
INSTRUCTIONS TO BIDDERS
GENERAL
1 Scope of Bid
1.1 The Maharashtra State Electricity Distribution Company Ltd. (MSEDCL),
represented by the Chief Engineer (O&M)Akola Zone(hereinafter referred to as
"the Employer"), wishes to receive bids for Full Turnkey Contract for System
Improvement work; i) Replacement of LT O/H Line by LT Aerial Bunched cable ii)
Providing of Mid Pole in existing Long span LT Lines, while conversion as above, on
High Loss feeders (11 KV Cotton Market & 11 KV Tajnapeth Feeder) under Akola
Urban-I Sub-division Areas of Akola Urban Division, of Akola Circle on single point
responsibility, indivisible” Full Turnkey” contract basis, as defined in these bidding
documents (hereinafter referred to as "the Works”), and as described in the Bidding
Documents.
1.2 The Works are to be carried out at various sites in the Akola Urban-I Div., of Akola
Circle in the State of Maharashtra, as described in the Bidding Data. For
convenience and efficiency, works are grouped into Tenders on a Sub-Division wise
basis. Bidders may bid for one or more than one of the contracts (Tenders), as
further defined in the bidding documents, and shall submit separate price bids for
each contract. As regards Technical Bid, the bidder shall submit one common bid
with one tender and a declaration as specified elsewhere, with the other tenders.
Bidders wishing to offer discounts in case they are awarded more than one contract
will be allowed to do so, provided that those discounts are included in the Form of
Price Bid or submitted in writing before the deadline for submission. All bids and
offers of discounts shall be opened and evaluated simultaneously so as to determine
the bid or combination of bids, including discounts, which offers the lowest
evaluated cost to the Employer.
1.3 The successful Bidder(s) will be required to start works simultaneously in all
areas within the Sub-Division as per the requirements of the bidding
document and to coordinate his activities so that various Works are
completed and commissioned in their entirety so as to provide early benefits
to the Employer and its customers. The successful bidder will be expected to
complete the Works, including testing and commissioning, within the Time
for Completion, Bidding Data, from the date of Notice to Proceed with the
Works. In addition, the successful bidder will be required to guarantee the
Works for a period of 24 (Twenty Four) months after completion of the Works
and acceptance by the Employer.
1.4 Time is the essence in completing the Works. The successful Bidder will be
required to complete the works within the stipulated time as specified in the
clause 8.2 of section 2.
1.5 Bids shall be complete and cover all Works described in the Schedule of
Prices. Any item of works required for completion of useful section shall be
deemed to be included in bidder’s scope irrespective of whether it is
specifically mentioned in the price schedules. Bidder should note that
obtaining permissions from statutory bodies such as Railways, Forest
Departments, Local bodies etc., wherever required for execution of works,
shall be entirely in bidder’s scope. Partial bids, or bids which do not cover the
entire scope of the project will be treated as incomplete and not responsive to
the terms and conditions of bidding and are liable to be rejected.
Page 40 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
2. Source of Funds
System improvement works for to reduce losses on High Loss Feeders has been
approved by Competent Authority vide resolution 1324 Dtd. 11.06.2018 and the said
work has to be executed under system improvement works in statutory towns under
IPDS Scheme.
3. Eligible Bidders
3.1This Notice Inviting Tender (NIT) is open to individual bidders, however if more than
1 Tenders will be awarded in one Subdivision/Circle, provided the tenderer meets
the qualifying requirements as specified in Clause 5 of invitation of Bids. The
bidders should be EPC contractor with adequate technical knowledge and experience of
similar works specified in the Tender document and meet the applicable qualification
criteria specified in Clauses 5.
3.2 Bidders shall provide such evidence of their eligibility satisfactory to the
Employer, as the Employer shall request.
3.3 Bidders shall not be under a declaration of ineligibility for corrupt and fraudulent
practices issued by the MSEDCL, World Bank, Asian Development Bank or any State
within India in accordance with Sub-clause 42.1(c). The Bidder should not be
debarred / black listed in any of the power utilities across the India for such type of
works in last five years.
3.4 A Bidder shall not have any conflict of interest as provided in Clause 7.
Page 41 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
(a) The bidder should have at least 3years’ Experience, as a prime contractor in the
construction of works of a similar nature and complexity to that required under this
contract. Such works should include construction, erection, testing and
commissioning of transmission and/or distribution lines and allied works;
(b) The bidder should have an average annual financial turnover during 3 years out of
FY 2014-15, 2015-16, 2016-17 or 2017-18 equivalent to at least 30% of the
estimated cost of the total tenders quoted for;
(c) The Bidder should have General Experience executed in any sector (with
authentication of MSEDCL/Equivalent Govt. Utility authority i.e. not below the rank
of Executive Engineer) during the any Five last financial years out of FY 2013-14,
2014-15, 2015-16, 2016-17, 2017-18 either-
i) One work order / contract (denotes executed only) equivalent to at least 20%
of the estimated cost of the total tenders quoted for or
ii) Two work orders / contracts (denote executed only) together equivalent to at
least 25% of the estimated cost of the total tenders quoted for or
iii)Three work orders / contracts ( denote executed only) together equivalent to
at least 30% of the estimated cost of the total tenders quoted for;
(d) Specific Experience: The Bidder should have specific experience of 15% of the total
physical parameters involved/covered under the tender [i.e. S,E,T,C of LT line(AB
cable/OH line); as under during the period of last 5 financial year’s i.e. FY 2013-14,
2014-15, 2015-16, 2016-17 and 2017-18;
This specific experience shall be considered from all work orders executed by
contractors in last five years. Not necessary from single order or two orders or three
orders as mentioned clause no. 5.1 (c)
(e) The bidder should have a Net Worth (which is defined as “Net value of the assets –
net value of liabilities”) as below.
10% (ten percent) of the Estimated Cost of the total tender quoted for; and
For the purpose of evaluation of the Bidder’s compliance with the provisions of sub-
paras (b) and (g) above, (Turnover, Net Worth) the Estimated Cost of the Works
refers to the Employer’s Estimated Cost as set forth in the Notice Inviting Tender.
Note 1:Adivisible turnkey contract implies that entire material required for
completion of works are to be Supplied, erected and commissioned by the bidder.
The Employer has reserved the right to decide regarding to acceptability of a
particular contract executed by the Bidder in support of the ‘specific experience’
shall be final.
5.2 To be qualified for award of Contract, bidder shall also submit:
(a) Copies of original documents defining the constitution or legal status, place
of registration and principal place of business for the bidder, also the
documents in support such as Memorandum /Article of Association, List of
Directors along with DIN numbers and percentage of shareholding, list of
Companies –Holding subsidiaries duly certified from Practicing Chartered
Accountant/cost and Management Accountant.
(b) written power of attorney authorizing the signatory of the bid to commit the
bidder; and
Page 42 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
(c) audited annual accounts including balance sheets and other financial
statements for any three (3) financial years out ofFY 2014-15, 2015-16,
2016-17, 2017-18; and
(d) Upto date information for current contract commitments/works in progress
and financial resources in sufficient detail so as to enable assessment of the
financial capacity of the bidder. and
(e) Proposals regarding work methods, scheduling and resourcing which shall
be provided in sufficient detail to confirm the bidder’s capability to complete
the works in accordance with the specifications and the time for completion,
including:
i. qualifications and experience of key site management and technical
personnel proposed for the contract;
ii. source (own, lease, hire, etc.) and deployment schedule for major
items of construction equipment and materials handling facilities
proposed for carrying out the work;
iii. procurement plan for supply and delivery of major materials and
equipment to the Site; and
(f) Registration certificates for Goods and Service Tax; and
(g) Registration certificates under PF and labor laws as may be applicable as per
the relevant acts.
(h) Bidder should note that in support of documentation required as per sub
clause no (e) iii above, only a list of proposed vendors and procurement plan
are required. Bidder should not submit qualification documents of the
vendors, technical details of equipment offered, guaranteed technical
particulars etc.
(i) The Bidder must satisfactorily demonstrate that he has adequate financial
capacity to undertake the Works, including access to, or availability of,
financial resources such as liquid assets, unencumbered real assets, lines of
credit and other financial means - other than contractual payments - to meet
(i) a cash flow requirement of at least 20% (twenty percent) of the
Estimated Cost of the Works and (ii) the overall cash flow requirements for
this contract and its other current works commitments.
a. In order to be eligible for award of more than one Contract, bidder
who submits bids for two or more contracts will be required to
demonstrate that
his Average Annual Turnover, Networth for the last three
financial years, adequate financial resources& Specific
Experience, as set forth under Sub-Clause 5.1 (b), 5.1(g), 5.2(i)
&5.1 (d)respectively are satisfied the Estimated Costs of the
Works for all Contracts taken together.
Page 43 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
have the right to award only that contract (or those contracts, if more
than one) for which the bidder qualifies and which promises to confer
the greatest benefit to the Employer.
5.3 The bidder must also satisfactorily demonstrate that
(i) it has the personnel for the key positions required to carry out the Works,
and
(ii) that it has access to the minimum levels of key plant, equipment and
machinery that are required to complete the Works within the stipulated time
for completion, and
(iii) that its proposals regarding work methods, scheduling and mobilization
of resources are adequate to demonstrate the bidder’s capability to complete
the Works in accordance with the specifications and time for completion
referred to in Sub-Clause 1.3 above, and
(iv) that its understanding of the requirements of the contract as per Sub-
Clause 14.4 is clear and unambiguous. Any unsatisfactory assessment of these
requirements may lead to the bidder being evaluated as technically non
responsive.
5.4 Information submitted by the bidder with respect to its experience and
qualifications shall be supported by mandate letters, completion certificates,
WIP certificates, etc., from the respective clients, failing which their
experience claims will not be considered for evaluation. Only those details of
experience which are given in corresponding schedules as per stipulated
formats will be considered as valid. No other documents, irrespective of having
been included by the bidder in his offer elsewhere, will be considered for technical
evaluation purpose. The experience details must be supported by the following.
i) Experience certificates issued by the respective employers (Not below the sign
of Executive Engineer or Equivalent) on their letter heads with their seals and
signature and must include order No, date, scope of work, date of completion
of work, total cost of work completed and overall performance. Sample formats
of the certificates which would be acceptable to the Employer are provided in
Section 5, Sample schedules.
ii) Attach copies of only the corresponding work orders issued by the employers
giving details of scope and cost data only.
5.5 Information provided on the bidder’s financial capacity shall be duly certified
by a chartered accountant. Further, only those details covered in the
respective schedules, especially related to turn over and net worth, shall be
considered and that too only if authenticated by a chartered accountant.
5.6 Bidder shall note that the qualification requirements described in the above
clauses shall strictly apply to the bidder and not its associated companies or
group companies or companies taken over by him.
7. Conflict of Interest
7.1 Each bidder shall submit only one bid for each contract (Tender). A bidder
who submits or participates in more than one bid for the same tender will be
disqualified.
Page 44 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 45 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
BIDDING DOCUMENTS
Page 46 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
(The Employer has reserved the right to alter, change the date specified above)
PREPARATION OF BIDS
13. Language of Bid
The bid, and all correspondence and documents, related to the bid, exchanged
between the bidder and the Employer shall be written in the English language.
Supporting documents and printed literature furnished by the bidder may be in
another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of
interpretation of the bid the English translation shall prevail.
Page 47 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Bid or through a separate letter which is submitted before the deadline for
submission of bids.
14.3 The Technical Proposal submission shall comprise of: (i) the Bid Security separate
for each tender quoted for; and (ii) a declaration by the Bidder (in the Form of Bid)
that he accepts the terms and conditions set forth in Volume I and Volume II of
tender documents.
Volumes I and II will form part of the Contract with the successful Bidder.
While giving confirmation of acceptance of all the stipulations of Volumes I and IIof
the bidding document, the bidder is not required to submit signed copy of any of the
volumes of bidding document.
14.4 In case a Bidder anticipates any deviations in the technical specifications
required for the Works, such deviations should be brought to the notice of the
Employer on or before the time of pre-bid meeting. Specific written approval
of the Employer should be sought for any proposed deviations to the
Technical specifications. No deviation shall be permitted in the bid or after
submission of the Bid”.
Without limiting the generality of the foregoing, the Technical Proposal shall
contain the following:
(i) Separate Bid Security for each tender for which price proposal is submitted
by the bidder;
(ii) Bid Form for Technical Proposal, signed by the authorized signatory;
(iii) Appendix to Technical Proposal, signed by the authorized signatory;
(iv) Declaration of Acceptance of Volumes I and II;
(v) Power of Attorney;
(vi) Declaration by contractor in Schedules (Section 5), including:
(a) Part 1, Experience and Financial Qualifications, comprised of
(i) Schedule I : Application for Qualification
(ii) Schedule II : Summary of Bidder’s Qualifications Information
(iii) Schedule III : Bidder Information Sheet
(iv) Schedule VI (A) : Experience as Prime Contractor and
(v) Schedule VI (B) :General Experience (Formats for Certificate to
be obtained from the respective Employer are also given in
Section 5.)
(vi) Schedule VII :Specific Experience (Formats for Certificate to
be obtained from the respective Employer are also given in
Section 5.)
(vii) Schedule VIII : Bidder’s Certification
(viii) Schedule IX : Annual Turnover
(ix) Schedule X : Financial Situation
(x) Schedule XI : Financial Resources
(xi) Schedule XII : Current Contract Commitments/ Works in
Progress
Page 48 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 49 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
The Bidders should note while bidding that, the Employer will
discharge its GST liability by availing the most beneficial cost advantage
under the appropriate general Exemption and Notifications of GST.
The bidder should also note that the Employer will discharge its tax
liability under the most beneficial scheme for availing the maximum cost
advantage. Bidder should therefore take any GST refund / rebate to which
they may be legally entitled into consideration while offering their quoted
rates/prices.
16.3 Bidders shall give a breakup of the prices in the manner and detail called for
in the Schedules of Prices. The Price Schedules shall be as follows, or as may
otherwise be provided in the bid document.
Grand Summary (Schedule of Prices, showing Goods and Service Tax as
separate line items), to be quoted on a percentage basis against the total cost of
the Employer’s Estimate. Bidder should not quote separate rates for Cost of
Material and Services. The rate should be quoted on the total estimated cost
only. The rate must be exclusive of Goods and Service Tax. Any deviation in this
will make the offer submitted by the bidder liable for rejection.
(b) Supply and Installation of Plant and Equipment manufactured or
fabricated either within or outside the Employer's country (Schedule of Prices
3., The cost of doing this work is sub-divided into two components:
Under “Part 1: Cost of Material ”, the Employer’s Estimate includes
the costs of procurement of the plant and equipment on an ex-
factory, ex-works, ex-warehouse or off-the-shelf basis, as applicable,
including all duties and taxes paid or payable by the Contractor.
Page 50 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 51 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
accordance with the sample form of bid security included in Section 3; other
formats may be permitted, subject to the prior approval of the Employer.
19.3 Any bid not accompanied by an acceptable bid security shall be rejected by
the Employer as non-responsive.
19.4 The bid security of the unsuccessful bidders will be returned as promptly as
possible, after award and signing of the Contract Agreement or expiration of
the period of bid validity, whichever is earlier.
19.5 The bid security of the successful bidder will be returned when the bidder has
signed the Contract Agreement and furnished the required security deposit.
19.6 The bid security may be forfeited:
(a) If the bidder withdraws its bid, except that written notice of the withdrawal of bid is
received by the employer prior to the deadline for submission of bids; or
(b) If the bidder does not accept the correction of its bid price, pursuant to Sub-Clause
36.1; or
(c) If the bidder is determined, at any time prior to award of contract, to have engaged
in corrupt or fraudulent practices as defined under Sub-clause 42.1 in competing
for the contract; or
(d) In the case of a successful bidder, if it fails within the specified time limit to:
(i) Sign the Contract Agreement, or
(ii) Furnish the required security deposit.
21 Pre-Bid Meeting
21.1 The bidder or its official representative is invited to attend pre-bid meeting(s)
which will take place at the place, date and time designated in the Bidding
Data.
21.2 The purpose of the pre-bid meeting(s) will be to present the salient features
of the bidding documents to the bidders, including the bid submittal
requirements, the Conditions of Contract (including payment terms and
conditions), the technical features of the project, and to clarify issues and to
answer questions on any matter that may be raised by the bidders.
21.3 The bidder is advised to visit the Site and study the bid document thoroughly,
and is requested to submit any questions in writing to reach the Employer not
later than one week before the pre-bid meeting.
21.4 Minutes of the meetings, including the text of the questions raised and the
responses given, will be transmitted without delay to all the prospective
bidders through the website www.mahadiscom.in. Any modification of the
Page 52 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 53 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
a) Receipt of On-Line Payment made by the bidder against the Tender Fees as
applicable (+GST) per tender quoted for.
b) Bid security separate for each tender quoted for.
c) Power of attorney in the name of the person authorized to sign tender
documents.
d)Copy of technical proposal in electronic (soft copy) format.
The envelope shall provide the name and address of the bidder, and shall:
be addressed to the Employer at the address designated in the Bidding Data: &
bear the following identification:
Full Turnkey Contract for System Improvement on High Loss Feeder
Bid Reference NO:CE/AKLZ/AKL/T/T-19(R)/2018-19
Tender for Works in Akola Urban-I Sub-Division
DO NOT OPEN BEFORE 15:00hrs on 03.06.2019
23.2 Price Proposal:The bidder shall scan all the documents forming part of price
proposals and convert the same into PDF format. The size of the PDF
document for price proposal for each tender shall not 5 MB. If the size of the
PDF document exceeds 5 MB, it shall be split up into files of size less than or
equal to 5 MB each.There after each file shall be numbered as
“CE/AKLZ/AKL/T/T-19(R)/2018-19/Price Bid)_Part_(Number).pdf”. The files
shall be digitally signed by the bidder’s authorized signatory using the
software provided by the Employer during registration of the bidder. The
digitally signed documents shall be uploaded on the e-tendering web site of
MSEDCL.
Page 54 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
27.1 Unless requested by the Employer, from the time the bids are opened to the time
the contract is awarded, the bidders or their representatives should not contact the
Employer or any other persons involved in the evaluation process on any matter
related to their Technical or Price Proposals. Any effort by a bidder to influence the
Employer’s processing of bids or award decisions may result in rejection of the
bidder’s bid and forfeiture of the bid security in accordance with the provisions of
Sub-clause 19.6 (c).
27.2 Information relating to the examination, clarification, evaluation and comparison of
bids and recommendations for the award of a contract shall not be disclosed to
bidders or any other persons not officially concerned with such process until after
the Letter of Award is issued.
Page 55 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
acceptable vendor or subcontractor without any change to the bid price and
confirm acceptance of this requirement.
29.2 No subcontractor(s) shall be appointed on the Project without prior written
approval of the Employer. Notwithstanding the approval of any such
subcontractor the contractor, shall be liable for the satisfactory performance
of such subcontractor(s) including the coordination of their activities for the
said project.
Page 56 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
AWARD OF CONTRACT
Page 57 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
38. Employer’s right to accept any Bid and to reject any or all Bids
The Employer reserves the right to accept or reject any bid, and to annul the
bidding process and reject all bids, at any time prior to award of Contract, without
thereby incurring any liability to the affected bidder or bidders or any obligation to
inform the affected bidder or bidders of the grounds for the Employer's action.
41.1 Within 14(Fourteen)days of receipt of the Letter of Award from the Employer,
the successful bidder shall furnish Compulsory to the Employer a performance
security deposit equivalent to an amount of ten percent (10%) of the Contract
Price in accordance with the Conditions of Contract specified in clause no: 4.2
of section 2
42. Corrupt or Fraudulent Practices
42.1 The Maharashtra State Electricity Distribution Company Ltd. and the State
require that bidders/ suppliers/ contractors observe the highest standard of
ethics during the procurement and execution of such contracts. In pursuance
of this policy, MSEDCL:
(a) defines for the purposes of this provision, the terms set forth below as
follows:
(i) “corrupt practice” means behavior on the part of officials in the public or
private sectors by which they improperly and unlawfully enrich themselves
and/or those close to them, or induce others to do so, by misusing the position
in which they are placed, and it includes the offering, giving, receiving or
soliciting of anything of value to influence the action of any such official in the
procurement process or in contract execution; and
Page 58 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 59 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Section 2
General Conditions of Contract
For
Design-Build and Divisible Turnkey Contracts
Page 60 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Section 2
General Conditions of Contract
Table of Contents
Section 2 ........................................................................................................................................................................... 6
PART 1: GENERAL CONDITIONS OF CONTRACT ............................................................................................ 6
1 THE CONTRACT .......................................................................................................................................... 6
1.1 Definitions ...................................................................................................................................................... 6
1.2 Headings and Marginal Notes .............................................................................................................. 11
1.3 Interpretation ............................................................................................................................................. 11
1.4 Law and Language .................................................................................................................................... 12
1.5 Contract Agreement ................................................................................................................................. 12
1.6 Priority of Documents ............................................................................................................................. 12
1.7 Documents on Site .................................................................................................................................... 12
1.8 Communications ........................................................................................................................................ 12
1.9 Provision of Construction Documents .............................................................................................. 13
1.10 Employer’s Use of Contractor’s Documents ................................................................................... 13
1.11 Contractor’s Use of Employer’s Documents ................................................................................... 13
1.12 Confidential Details .................................................................................................................................. 13
1.13 Compliance with Statutes, Regulations and Laws ....................................................................... 13
1.14 Joint and Several Liability ...................................................................................................................... 14
1.15 Confidentiality ............................................................................................................................................ 14
1.16 Inspections and Audit by the Financing Agency and/or Employer ...................................... 14
2 THE EMPLOYER ........................................................................................................................................ 14
2.1 General Obligations .................................................................................................................................. 14
2.2 Access to and Possession of the Site .................................................................................................. 14
2.3 Permits, Licenses or Approvals ........................................................................................................... 14
2.4 Employer’s Entitlement to Terminate .............................................................................................. 14
3 THE EMPLOYER'S REPRESENTATIVE ............................................................................................. 15
4 THE CONTRACTOR .................................................................................................................................. 15
4.1 General Obligations .................................................................................................................................. 15
4.2 Performance Guarantee in lieu of Security deposit .................................................................... 16
4.3 Forfeiture of performance Bank Guarantee…………….…….………………………………….…..12
4.4 Contractor’s Representative .................................................... Error! Bookmark not defined.
4.5 Co-ordination of the Works................................................................................................................... 18
4.6 Subcontractors ........................................................................................................................................... 18
4.7 Assignment of Subcontractors ............................................................................................................. 18
4.8 Setting Out .................................................................................................................................................... 19
4.9 Quality Assurance ..................................................................................................................................... 19
4.10 Site Data ........................................................................................................................................................ 20
4.11 Matters Affecting the Execution of the Works............................................................................... 21
4.12 Unforeseeable Sub-Surface Conditions ............................................................................................ 21
Page 61 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 62 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 63 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
Page 64 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 2
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 GENERAL CONDITIONS OF CONTRACT
18 INSURANCE ................................................................................................................................................. 68
18.1 Insurance for Design ................................................................................................................................ 68
18.2 Insurance for Works and Contractor's Equipment ..................................................................... 69
18.3 Insurance against Injury to Persons and Damage to Property............................................... 69
18.4 Insurance for Workers ............................................................................................................................ 69
18.5 General Requirements for Insurances .............................................................................................. 69
19 FORCE MAJEURE....................................................................................................................................... 71
19.1 Definition of Force Majeure .................................................................................................................. 71
19.2 Effect of Force Majeure Event .............................................................................................................. 71
19.3 Contractor's Responsibility ................................................................................................................... 71
19.4 Employer's Responsibility ..................................................................................................................... 71
19.5 Payment to Contractor ............................................................................................................................ 72
19.6 Optional Termination, Payment and Release ................................................................................ 72
19.7 Release from Performance under the Law ..................................................................................... 72
20 CLAIMS, DISPUTES AND ITS SETTLEMENT .................................................................................. 72
20.1 Procedure for Claims ............................................................................................................................... 72
20.2 Payment of Claims..................................................................................................................................... 73
20.3 Dispute Resolution Committe ................................................................................................................ 73
20.4 Arbitration ..................................................................................................................................................... 73
20.5 Disputes ………………………………………………………………………………..……………………………...80
21 Payment of Commission, Gratuities, Rebates, Gifts .........................................................................
22 Facilities to be provided for the employer and his representatives .......................................
23 Pre-dispatch Inspection Outside the Employer’s Country ...........................................................
24 Name plates......................................................................................................................................................
25 crop/ tree compensation ............................................................................................................................
26 SALVAGED MATERIALS ..............................................................................................................................
Page 65 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Section 2
GENERAL CONDITIONS OF CONTRACT
THE CONTRACT
Definitions
In the Contract (as defined below) the words and expressions defined below
shall have the meanings assigned to them, except where the context requires
otherwise:
Documents
"Contract" means the agreement if any to be entered into by the owner with
the contractor and shall includes these Conditions of Contract (Parts I
and II), the Employer's Requirements, the Tender, the Contractor's
Proposal, the Schedules, the Letter of Award and such further
documents as may be expressly incorporated in the Letter of Award or
Contract Agreement (if completed) and any further conditions which
may be specifically agreed to between the parties as forming the part
of contract.
"Employer's Requirements" means the description of the scope, standards,
design criteria (if any) and program of work, as included in the
Contract, and any alterations and modifications thereto in accordance
with the Contract. The Conditions of Contract, Technical Specifications,
Drawings, Appendix to Tender and all other information contained in
the bidding documents form an integral part of the Employer’s
Requirements.
"Tender" means the Contractor's priced offer to the Employer for the Works, as
accepted by the Letter of Award. The word 'tender’ is synonymous
with 'bid'.
“Appendix to Tender" means the completed appendix comprised in the
Tender. The words ‘Appendix to Tender’ are synonymous with the
words ‘Appendix to Bid’, ‘Appendix to Technical Proposal’, and
‘Appendix to Price Proposal’.
"Contractor's Proposal" means the completed Sections, Schedules, and
supporting documentation submitted with the Tender, as included in
the Contract.
"Schedules" means the information and data submitted with the Tender, as
included in the Contract.
"Schedule of Payments" means the Schedule designated as such (if any),
referred to in Sub-Clause 13.3.
"Letter of award" means the formal acceptance by the Employer of the Tender.
The term “Letter of award” is synonymous with the term “Notice of
Award”.
"Contract Agreement" means the contract agreement (if any) referred to in
Sub-Clause 1.5.
“Activity Schedule” is the schedule of activities which define the Scope of the
Works, comprised of the design, shop test, supply, transport, insurance,
Page 66 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 67 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 68 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 69 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
"Provisional Sum" means a sum (if any) specified in the Contract and
designated as such, for the execution of any part of the Works or for
the supply of Plant, Materials or services.
"Cost" means all expenditure properly incurred (or to be incurred} by the
Contractor, whether on or off the Site, including overhead and similar
charges, but does not include profit.
"Interim Payment Certificate" means any payment certificate issued by the
Employer's Representative under Clause 13, other than the Final
Payment Certificate.
"Final Payment Certificate" means the payment certificate issued by the
Employer's Representative under Sub-Clause 13.13.
"Final Statement" means the agreed statement defined in Sub-Clause 13.11.
Other Definitions
"Construction Documents" means all drawings, calculations, computer
software (programs), samples, patterns, models, operation and
maintenance manuals, and other manuals and information of a similar
nature, to be submitted by the Contractor.
“Specifications” mean and include collectively all the terms and stipulations
contained in the bid document including the Conditions of Contract,
technical provisions and annexure thereto, addenda and lists of
corrections, amendments and clarifications, as well as any variations
issued by the Employer’s Representative during the course of the
Contract.
"Variation" means any alteration and/or modification to the Contract which is
instructed by the Employer's Representative or approved as a
variation by the Employer's Representative, in accordance with Clause
14.
"Works" means the Permanent Works and the Temporary Works or either of
them as appropriate, including design, supply, transportation,
construction, erection, testing, pre-commissioning of the constructed
facilities and remedying of any defects, but excluding guarantee of the
facilities after completion of the Works (as defined in Sub-Para
1.1.6.12).
“Defect” means any part of the Works not completed in accordance with the
Specifications and terms and conditions of Contract, including any
Works or part thereof which becomes faulty during the Guarantee
(Defects Liability) Period.
“Facilities” means the Plant and Equipment to be supplied and installed, as
well as all the Installation Services to be carried out by the Contractor
under the Contract.
"Permanent Works" means the permanent works to be designed and executed
in accordance with the Contract.
"Temporary Works" means all temporary works of every kind (other than
Contractor's Equipment) required for the execution and completion of
the Works and the remedying of any defects.
Page 70 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 71 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 72 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 73 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
THE EMPLOYER
General Obligations
The Employer shall provide the Site, and shall pay the Contractor in
accordance with Clause 13.
Access to and Possession of the Site
The Employer shall grant the Contractor right of access to, and possession of,
the Site within the time stated in the Appendix to Tender. Such right and
possession may not be exclusive to the Contractor.
If the Contractor suffers delay and/or incurs Cost from failure on the part of
the Employer to grant right of access to or possession of the Site, the
Contractor shall give notice to the Employer's Representative. After receipt of
such notice the Employer's Representative shall proceed in accordance with
Clause 3 to agree or determine:
(a) any extension of time to which the Contractor is entitled under Sub-
Clause 8.3,
Permits, Licenses or Approvals
The Employer will, at the request and cost of the Contractor, assist him in
applying for permits, licenses or approvals, which are required for any part of
the Works, for delivery (including clearance through customs) of Plant,
Materials and Contractor's Equipment, and for the completion of the Works.
Such requests may also include requests for the Employer's assistance in
applying for any necessary government consent to the export of Contractor's
Equipment when it is removed from the Site.
Employer’s Entitlement to Terminate
Page 74 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
4. THE CONTRACTOR
General Obligations
Page 75 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 76 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
g. The performance guarantee shall be valid for the full value and for the full
period of contract including 60 days for a claim period after the end of
guarantee period and shall be extendable for the further period if so
required.
h. The Performance Bank Guarantee will be generally released to the
Contractor within 30 days after completion of all works, successful
commissioning of all section/facilities, end of Guarantee period (defect
liability period) or the issue of the Final Contract Completion Certificate
whichever is later.
i. The Performance Bank Guarantee of the five major equipments will be
generally released within 30 days after satisfactory completion of the
guarantee period for these equipments.
j. Prior to making a claim under the security deposit, the Employer shall, in
every case, notify the Contractor stating the nature of the default for which
the claim is to be made.
Forfeiture of performance Bank Guarantee
The performance Bank Guarantee submitted in lieu of security deposit
specified in the clause 4.2 will be liable to be forfeited if
a) The contractor fails to initiate the works after award of contract or
b) The progress of works were perpetually lagging behind the intended
progress of works as per agreed milestone or
c) The contract is terminated due to the reasons attributed to the
contractor or
d) The quality of material is not as per standard or if the works is not
carried out as per standard method of construction, or not observing
the rules and regulations as specified or
e) Any other reasons thereof
The performance bank Guarantee shall not be forfeited unless the opportunity
of being heard has been reasonably given to the party and no sign of
improvement has been observed.
Contractor’s Representative
Unless the Contractor's Representative is named in the Contract, the
Contractor shall, within 14 days of the Effective Date, submit to the
Employer's Representative for consent the name and particulars of the person
the Contractor proposes to appoint. The Contractor shall not revoke the
appointment of the Contractor's representative without the prior consent of
the Employer's Representative.
The Contractor's Representative shall give his whole time to directing the
preparation of the Construction Documents and the execution of the Works.
Except as otherwise stated in the Contract, the Contractor's Representative
shall receive (on behalf of the Contractor) all notices, instructions, consents,
approvals, certificates, determinations and other communications under the
Contract. Whenever the Contractor's Representative is to be absent from the
Site, a suitable replacement person shall be appointed, and the Employer's
Representative shall be notified accordingly.
Page 77 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 78 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
d) The employer shall have the right to obtain from the contractor any
agreement in writing entered into by the contractor with any of his sub
contractor or any purchase orders placed for suppliers and services in
respect of the works.
Setting Out
The Contractor shall set out the Works in relation to original points, lines and
levels of reference specified in the Contract Documents or, if not specified,
given by the Employer's Representative in writing. The Contractor shall
rectify, at his cost, any error in the positions, levels, dimensions or alignment
of the Works.
Quality Assurance
a) The Contractor shall institute a Quality Assurance and Quality Control
(QA/QC) system in accordance with accepted industry standards and
practices, as well as the requirements described in the Contract
Documents, to demonstrate compliance with the requirements of the
Contract. Compliance with the quality assurance system shall not
relieve the Contractor of his duties, obligations or responsibilities.
b) The Contractor shall submit, within 14 days of signing of Agreement,
the proposed Quality Assurance and Quality Control (QA/QC) Program
for approval by the Employer’s Representative. Such QA/QC Program
shall be developed to describe the type, frequency and procedure of
tests to be done on the Site(s); type, frequency and procedure of tests
to be done at manufacturers’ locations outside the Site; all parameters
to be measured in these tests; permissible limits of such parameters;
details of laboratories to be established at the Site(s); details of testing
equipment and machines and their calibration schedules; details of the
contractor’s internal control systems for assuring quality control at
locations of manufacturers’ outside the Site; details of qualifications
and experience of the Quality Control professionals to be deployed by
the contractor for the entire project; and the systems of Quality Audit
to be instituted by the contractor, etc., essential for systematic and
professional management as well as adherence to the highest
standards of quality of all construction works.
c) The Employer’s Representative shall scrutinize, modify if required and
approve such proposed QA/QC Program, in consultation with the
Contractor, within 14 days of submission by the Contractor. If the
Employer’s Representative does not give its approval or objection
within the stated period, the QA/QC Program shall be deemed to be
accepted. Nevertheless, any approval by the Employer’s
Representative, or failure to object to the proposed QA/QC Program,
will not relieve the Contractor of any of its obligations or responsibility
under the contract.
d) The Contractor, prior to commencement of permanent works at the
Site, shall set up his own quality control/ testing laboratory, with prior
notification to the Employer’s Representative. The calibration of the
laboratory equipment and instruments shall at the initial stages be
certified by agencies approved by the Employer’s Representative.
Laboratory equipment shall be properly maintained and calibrated
Page 79 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 80 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
the Employer shall not in any way relieve the contractor of his
responsibility to fulfill his obligation under the contract.
Matters Affecting the Execution of the Works
The Contractor shall be deemed to have satisfied himself as to the correctness
and sufficiency of the Contract Price. Unless otherwise stated in the Contract,
the Contract Price shall cover all his obligations under the Contract and all
things necessary for the proper design, execution and completion of the
Works and the remedying of any defects.
Unforeseeable Sub-Surface Conditions
If sub-surface conditions are encountered by the Contractor which in his
opinion was not foreseeable by an experienced contractor, the Contractor
shall give notice to the Employer's Representative so that the Employer's
Representative can inspect such conditions. After receipt of such notice and
after his inspection and investigation, the Employer's Representative shall, if
such conditions were not (by the Base Date) foreseeable by an experienced
contractor, proceed in accordance with Clause 3 to agree or determine:
(a) any extension of time to which the Contractor is entitled under Sub-
Clause 8.3,
Access Route
The Contractor shall be deemed to have satisfied himself as to the suitability
and availability of the access routes he chooses to use. The Contractor shall
(as between the parties) be responsible for the maintenance of access routes.
The Contractor shall provide any signs or directions which he may consider
necessary for the guidance of his staff, labor and others. The Contractor shall
obtain any permission that may be required from the relevant authorities for
the use of such routes, signs and directions.
The Employer will not be responsible for any claims which may arise from the
use or otherwise of any access route. The Employer does not guarantee the
suitability or availability of any particular access route, and will not entertain
any claim for any non-suitability or non-availability for continuous use during
construction of any such route.
Rights of Way and Facilities
The Contractor shall bear all costs and charges for special or temporary
rights-of-way required by him for access to the Site and shall make his own
arrangements for construction of the field offices, workshops, stores,
assembling yards, testing laboratories, etc. The Contractor shall also provide,
at his own cost, any additional facilities outside the Site required by him for
the purposes of the Works.
Programme
a) The Contractor shall submit his proposed construction program to the
Employer's Representative for approval within the time stated in the
Appendix to Tender. The program shall include the following:
I. the order in which the Contractor proposes to carry out the Works
(including each stage of design, procurement, manufacture, delivery to
Site, construction, erection, testing and commissioning);
Page 81 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 82 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 83 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 84 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 85 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
the proceeds shall be paid to the Contractor. If the proceeds of the sale are
insufficient to meet the Employer's costs, the outstanding balance shall be
recoverable from the Contractor by the Employer.
Security of the Site
Unless otherwise stated in Part II;
(a) the Contractor shall be responsible for keeping unauthorized persons
off the Site, and
(b) Authorized persons shall be limited to the employees of the Contractor,
employees of his subcontractors and persons authorized by the
Employer or the Employer's Representative.
The Contractor shall have total responsibility for the safety and security of all
Plant, Equipment and Materials delivered to the Site, including goods which
are stored, loose, semi-assembled and/ or erected, from the time of delivery
to the Site until the date of taking over by the Employer, as certified by the
Taking-Over Certificate issued by the Employer’s Representative. The
Contractor shall make suitable security arrangements to ensure the
protection of all Plant, Equipment and Materials from theft, fire, pilferage and
any other damages or loss. All Plant, Equipment and Materials provided by the
Contractor shall enter and leave the Site only with the written authorization
of the Employer’s Representative in the prescribed manner.
Contractor’s Operations on Site
The Contractor shall confine his operations to the Site, and to any additional
areas which may be provided by the Contractor and agreed by the Employer's
Representative as working areas. The Contractor shall take all necessary
precautions to keep his personnel and equipment within the Site and such
additional areas, and to keep and prohibit them from encroaching on adjacent
land.
Fossils
All fossils, coins, articles of value or antiquity, and structures and other
remains or things of geological or archaeological interest discovered on the
Site shall (as between the parties) be the property of the Employer. The
Contractor shall take reasonable precautions to prevent his staff, labor or
other persons from removing or damaging any such article or thing. The
Contractor shall, immediately upon discovery of such article or thing, advise
the Employer's Representative, who may issue instructions for dealing with it.
If the Contractor suffers delay and/or incurs Cost in following these
instructions of the Employer's Representative, and if such delay and/or Cost
was not (by the Base Date) foreseeable by an experienced contractor, the
Contractor shall give notice to the Employer's Representative, with a copy to
the Employer. After receipt of such notice, the Employer's Representative
shall proceed in accordance with Clause 3 to agree or determine:
(a) any extension of time to which the Contractor is entitled under Sub-
Clause 8.3, and
(b) the amount of such Cost, which shall be added to the Contract Price,
and shall notify the Contractor accordingly.
Emergency Work
Page 86 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
DESIGN
General Obligations
The Contractor shall carry out, and be responsible for, final design of the
Works, including any site surveys, subsoil investigations, materials testing,
and all other things necessary for proper planning and design. Design shall be
prepared by qualified designers who are engineers or other professionals
who are knowledgeable about the requirements of the IE Rules 1956 and
Electricity Rules 2005 and experienced in design of transmission and
distribution systems. For each part of the Works, the prior consent of the
Employer's Representative shall be obtained to the designer and design
Subcontractor, if they are not named as such in the Contract. Nothing
contained in the Contract shall create any contractual relationship or
professional obligations between any designer, or a design Subcontractor, and
the Employer.
The Contractor’s responsibility for design will normally be limited to those
activities which are necessary to comply with the requirements of Sub-Clause
5.2, Construction Documents. Final designs and construction documents will
be based on preliminary designs provided by the Employer, and will usually
include conducting the necessary surveys, site investigations, subsoil
investigations and detailed designs for the following works:
(i) Finalization of alignments for new and/ or relocated sub-
transmission lines;
(ii) Finalization of locations and layouts for DTCs;
(iii) Finalization of foundation designs and drawings for all
structures;
(iv) Finalization of construction drawings for road crossings,
railway crossings, river crossings, utility crossings, etc., as
applicable;
(v) Any other designs that may be reasonably required for
satisfactory completion of the Works;
(vi) Finalization of layout plans for new and/ or rehabilitated
substations;
Page 87 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 88 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 89 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 90 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 91 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 92 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 93 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
The Contractor shall at all times take all reasonable precautions to prevent
any unlawful, riotous or disorderly conduct by or amongst his staff and labor,
and to preserve peace and protection of persons and property in the
neighborhood of the Works against such conduct.
Foreign Staff and Labor
The Contractor may import such staff and laborers as are required in order to
execute the Works. The Contractor must ensure that all such staff and labor
are provided with the required visas and work permits. The Contractor shall
be responsible for the return to the place where they were recruited or to
their domicile of all persons whom the Contractor recruited and employed for
the purpose of or in connection with the Contract. The Contractor shall be
responsible for such persons as are to be returned until they shall have left
the Site or, in the case of foreign nationals who have been recruited outside
India, shall have left it.
Page 94 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Page 95 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
Contractor's Equipment and all other things required for the completion of
the Works.
For those items of plant and Equipments that requires inspection at the
manufactures plant before delivery (pre-dispatch inspection), the contractor
shall be responsible to ensure that the goods are delivered to the site within
14 days of approval by the Engineer, as the case may be. In case the contractor
fails the deliver the goods to the site within this time, the said approval will
automatically lapse and the goods will require re-inspection and re-approval
before delivery is made. In such case, the contractor will bear all cost
associated with such re-inspection, and the employer will be entitled to
recover such costs from any amounts due or to become due to the contractor.
Inspection
7.3.1: General: The Employer, and Third Party Inspectors shall be entitled, during
manufacture, fabrication and preparation at any places where work is being
carried out, to inspect, examine and test the materials and workmanship, and
to check the progress of manufacture, of all Plant and Materials to be supplied
under the Contract. The Contractor shall give them full opportunity to inspect,
examine, measure and test any work at the factory, on Site, or wherever else
carried out.
The Contractor shall give due notice to the Employer whenever such work is
ready, before packaging, covering up or putting out of view. The Employer
and/or Third Party Inspector shall then either carry out the inspection,
examination, measurement or testing without unreasonable delay, or notify
the Contractor that it is considered unnecessary. If the Contractor fails to give
such notice, he shall, when required by the Employer, uncover such work and
thereafter reinstate and make good at his own cost.
The Contractor shall submit, within 14 days of signing the Agreement, the
proposed Procurement Program of all necessary Plant and Materials to be
incorporated in the Permanent Works, as well as the Contractor’s Equipment
necessary for construction, erection and installation, for approval by the
Employer. Such Procurement Program shall be developed on a normally
available commercial project management software showing detailed
planning for placing of orders, inspection by the representatives of the
Contractor, Employer or Third Party Agencies, as applicable, transportation
plans and delivery schedules for all Plant and Materials to be incorporated in
the Permanent Works essential for systematic and professional management
of all construction works. The Employer shall scrutinize, modify if required
and approve such proposed Procurement Program, in consultation with the
Contractor, within 14 days of submission by the Contractor. If the Employer
does not give its approval or objection within the stated period, the
Procurement Program shall be deemed to be accepted. Nevertheless, any
approval by the Employer, or failure to object to the proposed Procurement
Program, will not relieve the Contractor of any of its obligations or
responsibility under the contract.
7.3.2 Third Party Inspection: Without limiting the generality of the foregoing, the
Employer will engage, at his own cost, Third Party Inspectors or Third Party
Inspection Agencies to act as the Employer’s Representative for the purposes
Page 96 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
of quality assurance and quality control testing of the Plant, Equipment and
Materials to be supplied by the Contractor, and shall notify the Contractor
accordingly. The third party inspector or agency, as appropriate, will be
authorized to carry out inspections and acceptance tests on behalf of the
Employer at all important stages of the Works, including:
(i) Inspection at the Site and during execution of the project Works;
(ii) Inspection after erection and commissioning of the Plant, Equipment
and Materials.
Testing
If the Contract provides for tests, other than the Tests after Completion, the
Contractor shall provide all documents and other information necessary for
testing and such assistance, labor, materials, electricity, fuel, stores, apparatus
and instruments as are necessary to carry out such tests efficiently.
The Contractor shall agree, with the Employer's Representative, the time and
place for the testing of any Plant and other parts of the Works as specified in
the Contract. The Employer's Representative shall give the Contractor not less
than 24 hours' notice of his intention to attend the tests. The Contractor shall
provide sufficient suitably qualified and experienced staff to carry out the
tests specified in the Contract.
If the Employer's Representative does not attend at the time and place agreed,
or if the Contractor and the Employer's Representative agree that the
Employer's Representative shall not attend, the Contractor may proceed with
the tests, unless the Employer's Representative instructs the Contractor
otherwise. Such tests shall be deemed to have been made in the Employer's
Representative's presence.
The Contractor shall promptly forward to the Employer's Representative duly
certified reports of all test reports, including type test reports, third party
inspection reports, routine/ acceptance test reports, etc. If the Employer's
Representative has not attended the tests, he shall accept the readings as
accurate. When the specified tests have been passed, the Employer's
Representative shall endorse the Contractor's test certificate, or issue a
certificate to him, to that effect.
The above notwithstanding, neither the execution of a test and/ or inspection
of Plant and Equipment or any part of the Works and Facilities, or the
attendance by the Employer or Employer’s Representative for any tests, nor
the issue and acceptance of any test certificates and/ or inspection reports
shall not in any way relieve the Contractor of any of his responsibilities for
quality standards, performance guarantees, and other obligations under the
Contract.
Testing for Distribution Transformers:
i) 10% quantity of the Distribution Transformers will be tested at Contractor’s
site for Short Circuit Test. If this test fails, 100% quntity of Distribution
Transformers will be tested.
ii) 100% quantity of Distribution Transformers will be tested for losses test.
All these tests should be carried out by EE (Testing) of that Circle in presence
of Contractor’s representatives and O&M engineer,
Testing for Conductor:
Page 97 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
i) Sample from each conductor drum lot will be taken and tested for
resistance test and inspected for size of conductor by EE (Testing) of that
Circle in presence of Contractor’s representatives and O&M engineer
Rejection
If, as a result of inspection, examination or testing, the Employer's
Representative and/ or Third Party Inspector decides that any Plant,
Materials, design or workmanship is defective or otherwise not in accordance
with the Contract, the Employer's Representative or Third Party Inspector
may reject such Plant, Materials, design or workmanship and shall notify the
Contractor promptly, stating his reasons. The Contractor shall then promptly
make good the defect and ensure that the rejected item complies with the
Contract.
If the Employer's Representative or Third Party Inspector requires such Plant,
Materials, design or workmanship to be retested, the tests shall be repeated
under the same terms and conditions. If such rejection and retesting cause the
Employer to incur additional costs, such costs shall be recoverable from the
Contractor by the Employer, and may be deducted by the Employer from any
monies due, or to become due, to the Contractor.
The additional costs will be calculated based on the direct cost of any labor,
equipment, materials, superintendence and other services provided by the
Employer for carrying out such retesting, as certified by the Employer’s
Representative, plus an administration fee of 10% (ten percent) of the direct
costs to cover overheads and other indirect costs.
Ownership of Plant and Materials
Each item of Plant and Materials shall become the property of the Employer at
whichever is the earlier of the following times:
(a) when it is delivered to Site and accepted by the Employer’s
Representative;
(b) when by virtue of Sub-Clause 8.11, the Contractor becomes entitled to
payment of the value of the Plant and Materials.
(c) When the material leaves the manufacturer’s works, in case of divisible
contract.
The above notwithstanding, the Contractor shall remain liable for the safety
and security of all Plant, Equipment and Materials delivered to the Site from
the time of delivery until the date of taking over by the Employer, in
accordance with the conditions stated in Sub-Clause 4.23.
Failure to Remedy Defects or to Complete Part of Works
If the Contractor fails to remedy any defect in the Plant, Materials, design or
workmanship or if the Contractor fails to complete any Works or part of the
Works as deemed necessary by the Employer within a reasonable time after
being notified by the Employer’s Representative, the Employer or the
Employer's Representative may fix a date on or by which to remedy the defect
or damage or to execute part of the works to the satisfaction of the Employer’s
Representative, and give the Contractor reasonable notice of such date.
If the Contractor fails to remedy the defect or damage or to complete the
required Works by such date the Employer may (at his sole discretion):
Page 98 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
(a) carry out the work himself or by others, in a reasonable manner and at
the Contractor's risk and cost; the costs properly incurred by the
Employer in remedying the defect or damage or in executing part of
the works shall be recoverable from the Contractor by the Employer
and will be calculated based on the direct cost of any labor, equipment,
materials, superintendence and other services provided by the
Employer for carrying out such work, as certified by the Employer’s
Representative, plus an administration fee of 10% (ten percent) of the
direct costs to cover overheads and other indirect costs; or
(b) require the Employer's Representative to determine and certify a
reasonable reduction in the Contract Price; or
if the defect or damage is such that the Employer has been deprived of
substantially the whole of the benefit of the Works or parts of the Works,
terminate the Contract in respect of such parts of the Works as cannot be put
to the intended use; the Employer shall then be entitled to recover all sums
paid for such parts of the Works together with the cost of dismantling the
same, clearing the Site and returning Plant and Materials to the Contractor,
and the provisions of Clause 15 will apply.
Page 99 of 212
CE/AKLZ/AKL/2018-19/T-19R
MSEDCL, AKOLA ZONE SECTION 5
BID NO: CE/AKLZ/AKL/T/T-19(R)/2018-19 DECLARATION BY CONTRACTOR
(a) the Contractor has marked the Plant and/or Materials as the
Employer's property in accordance with the Employer's
Representative's instructions, and
(b) the suspension is not due to a cause attributable to the Contractor.
The Employer shall then, if requested by the Contractor, take over the
responsibility for protection, storage, security and insurance of such
suspended Plant and/or Materials; the risk of loss or damage to the
suspended works shall then pass to the Employer.
Prolonged Suspension
If suspension under Sub-Clause 8.9 has continued for more than 84 days, and
the suspension is not due to a cause attributable to the Contractor, the
Contractor may by notice to the Employer's Representative require
permission to proceed within 28 days. If permission is not granted within that
time, the Contractor may treat the suspension as an omission under Clause 14
of the affected part of the Works. If such suspension affects the whole of the
Works, the Contractor may terminate his employment,
Resumption of Work
After receipt of permission or of an instruction to proceed, the Contractor
shall, after notice to the Employer's Representative, and together with the
Employer's Representative, examine the Works and the Plant and Materials
affected by the suspension. The Contractor shall make good any deterioration
or defect in or loss of the Works or Plant or Materials, which has occurred
during the suspension.
If the Employer has taken over risk and responsibility for the suspended
Works under Sub-Clause 8.11, risk and responsibility shall revert to the
Contractor 14 days after receipt of the permission or instruction to proceed.
TESTS ON COMPLETION
Contractor’s Obligations
9.1.1 General: The Contractor shall carry out the Tests on Completion in
accordance with this Clause and Sub-Clause 7.4, after providing the
documents in accordance with Sub-Clauses 5.6 and 5.7 and supply of any
necessary labor, material, electricity, fuel, water, tools and plant (TandP) as
may be required. The Contractor shall give, to the Employer's Representative,
21 days' notice of the date after which the Contractor will be ready to carry
out the Tests on Completion. Unless otherwise agreed, such Tests shall be
carried out within 14 days after this date, on such day or days as the
Employer's Representative shall instruct.
In considering the results of the Tests on Completion, the Employer's
Representative shall make allowances for the effect of any use of the Works by
the Employer on the performance or other characteristics of the Works. As
soon as the Works, or a Section, have passed the Tests on Completion, the
Contractor shall provide the Employer's Representative and the Employer
with a certified report of the results of all such Tests.
9.1.2 Tests on Completion: As soon as the Facilities or any Section thereof has, in
the opinion of the Contractor, been completed operationally and structurally
and put in a tight and clean condition as specified in the Contract, excluding
minor item not materially affecting the operation or safety of the Facilities, the
Contractor shall notify the Employer’s Representative in writing of the date
after which the Contractor will be ready to carry out the Tests on Completion.
As soon as reasonably practicable after issue of the notification, and in
accordance with the schedule agreed by the Employer’s Representative, the
Contractor shall commence Pre-commissioning of the facilities in the presence
of the Employer’s Representative and, if required by the Employer, Third
Party Inspectors, comprised of test charging and switch off of the allied
Facilities. As soon as possible after Pre-commissioning, the Contractor shall
complete all outstanding minor items so that the Facilities are fully in
accordance with the Contract, failing which the Employer will undertake such
completion and deduct any costs thereof from any monies owing to the
Contractor.
Upon rectification of any observed defects and successful completion of the
Pre-commissioning Tests, the Employer’s Representative will issue a Taking-
Over Certificate certifying successful completion of the Facilities or such
Section. Upon completion, the Employer shall take over responsibility for the
care and custody of the Facilities or any relevant part thereof, together with
the risk of loss or damage thereto.
Delayed Tests
If the Tests on Completion are being unduly delayed by the Contractor, the
Employer's Representative may by notice require the Contractor to carry out
such Tests within 21 days after the receipt of such notice. The Contractor shall
carry out such Tests on such day or days within that period as the Contractor
may fix and of which he shall give notice to the Employer's Representative.
If the Contractor fails to carry out the Tests on Completion within 21 days, the
Employer's Representative may himself proceed with such Tests. All such
Tests so carried out by the Employer's Representative shall be at the risk and
cost of the Contractor. These Tests on Completion shall then be deemed to
have been carried out in the presence of the Contractor and the results of such
Tests shall be accepted as accurate.
Retesting
If the Works, or a Section, fail to pass the Tests on Completion, Sub-Clause 7.5
shall
apply, and the Employer's Representative or the Contractor may require such
failed
Tests, and the Tests on Completion on any related work, to be repeated under
the same terms and conditions.
Failure to Pass Tests on Completion
If the Works, or a Section, fail to pass the Tests on Completion repeated under
Sub-Clause 9.3, the Employer's Representative shall be entitled to:
(a) order further repetition of Tests on Completion under Sub-Clause 9.3;
(b) reject the Works or Section (as the case may be), in which event the
Employer shall have the same remedies against the Contractor as are
provided under Clause 15; or
(c) issue a Taking-Over Certificate, if the Employer so requires: the
Contract Price shall then be reduced by such amount as may be agreed
by the Employer and the Contractor (in full satisfaction of such failure
only), and the Contractor shall then proceed in accordance with his
other obligations under the Contract.
Completion, and the Contractor shall carry out such Tests on Completion as
soon as practicable, before the expiry of the Contact Period.
If, for reasons not attributable to the Contractor, a Test after Completion on
the Works or any Section cannot be completed within 60 days after receipt of
notification from the Contractor under Sub-clause 11.1.2 that the Works are
ready for Commissioning (or any other period agreed upon by the Employer
and the Contractor), then the Works or such Section shall be deemed to have
passed such Test after Completion.
Retesting
If the Works, or a Section, fail to pass the Tests after Completion, the
Employer or the Contractor may require such failed Tests and the Tests after
Completion on any related work, to be repeated under the same terms and
conditions. If such failure and retesting result from a default of the Contractor
and cause the Employer to incur additional cost, such cost shall be
recoverable from the Contractor by the Employer, and may be deducted by
the Employer from any monies due, or to become due, to the Contractor.
Failure to Pass Tests after Completion
If the following conditions apply, namely:
(a) the Works, or a Section, fail to pass any or all of the Tests after Completion,
(b) the relevant sum payable as liquidated damages for such failure is stated
(or its method of calculation is defined) in the Appendix to Tender, and
(c) the Contractor pays such relevant sum to the Employer during the
Contract Period,
then the Works or such Section shall be deemed to have passed such Tests
after Completion.
If the Works, or a Section, fail to pass a Test after Completion and the
Contractor in consequence proposes to make any adjustment or modification
thereto, the Employer's Representative may instruct the Contractor that the
Employer does not wish such adjustment or modification to be made until a
time that is convenient to the Employer. In such event, the Contractor shall
remain liable to carry out the adjustment or modification, and to satisfy such
Test within a reasonable time of being notified to do so by the Employer's
Representative. If, however, the Employer's Representative fails to give any
such notice during the Contract Period, the Contractor shall be relieved of any
such obligation and the Works or Section (as the case may be) shall be
deemed to have passed such Test after Completion.
If the Contractor incurs additional Cost as a result of any unreasonable delay
by the Employer in permitting access to the Works or Plant by the Contractor,
either to investigate the causes of failure to pass a Test after Completion, or to
carry out any adjustments or modifications, then the Contractor shall be paid
the additional Cost, plus reasonable profit, caused by such delay.
Performance Certificate
Upon successful completion of the Contractor’s obligations under the
Contract, including successfully passing of the required Tests After
Completion in accordance with the provisions of Sub-Clause 11.1 and
correction of all defects in accordance with Sub-Clause 12.9, the Employer will
issue a Performance Certificate which certifies that the Works, or a Section
which is defined as such in the approved Construction Program, have been
DEFECTS LIABILITY
Completion of Outstanding Work and Remedying Defects
For the purposes of this Clause 12, reference to any Works required to be
undertaken by the Contractor during the Defects Liability Period shall be
deemed to be synonymous with the Works required to be undertaken during
the Guarantee Period as stated in the Appendix to Tender and as defined in
Sub-Clause 12.11. The Contractor shall guarantee that the Plant, Equipment
and Materials supplied under the Contract will be free from defects in
materials, workmanship and manufacturer’s defects. The Contractor shall
ensure satisfactory performance during the entire Guarantee Period, and shall
repair or replace any Plant or Equipment which is determined to be defective
for the reasons and in accordance with the terms set out in Sub-Clause 12.2.
For the purposes of this Sub-Clause, the Contractor’s liability shall be limited
to the repair or replacement of any defective part in the Plant, Equipment or
Materials provided under the Contract arising from faulty design, materials,
workmanship and/ or manufacturer’s defects. All costs for the repair/
replacement of defective parts such as dismantling, re-erection, supply,
transportation, etc., shall be to the account of the Contractor.
In order that the Construction Documents and the Works shall be in the
condition required by the Contract (fair wear and tear expected) at, or as soon
as practicable after, the expiry of the Contract Period, the Contractor shall :
(a) complete any work which is outstanding on the date stated in a Taking-
Over Certificate, as soon as practicable after such date, and
(b) Execute all work of amendment, reconstruction, and remedying defects
or damage, as may be instructed by the Employer or the Employer's
Representative during the Contract Period.
If any such defect appears or damage occurs, the Employer or the Employer's
Representative shall promptly notify the Contractor in writing. Every time a
notice of Defect is given, and Defects Correction Period for the notified Defect
begins, the Contractor will be required to correct the notified Defect within
the time prescribed under Sub-Para 1.1.3.10 (14 days). The Contractor shall
promptly correct any Defects that he notices himself.
Cost of Remedying Defects
All work referred to in Sub-Clause 12.1 (b) shall be executed by the Contractor
at his own cost, if the necessity for such work is due to:
(a) the design of the Works,
(b) Plant, Materials or workmanship not being in accordance with the
Contract, or
(c) Failure by the Contractor to comply with any of his other obligations.
If such necessity is due to any other cause, the Employer's Representative
shall notify the Contractor accordingly and seek agreement to an adjustment
to the Contract Price. In this event, Sub-Clause 14.3 shall apply to such work.
Extension of Contract Period (Not applicable)
Unless the defect is one for which the Contractor is liable, the Cost of such
search, shall be added to the Contract Price.
12.9 Final Contract Completion Certificate
On completion of the guarantee services of the Contractor, as certified by the
Employer’s Representative, the Contractor ensure that all Facilities
constructed under the Contract are in good operating condition (fair wear and
tear excepted), that any necessary repairs to the civil, mechanical or electrical
installations have been properly carried out, and that any and all defects or
damages arising from the design, workmanship, materials or manufacturer’s
defects have been remedied, as per Sub-Clause 12.11. Upon successful
completion of the Contractor’s obligations, the Employer shall issue a Final
Contract Completion Certificate accordingly.
The Contract shall not be considered to be completed until the Contract
Completion Certificate has been signed by the Employer's Representative and
delivered to the Contractor, stating the date on which the Contractor
completed his obligations to the Employer's Representative's satisfaction.
The Contract Completion Certificate shall be given by the Employer's
Representative by the date 28 days after the expiry of the Contract Period, or
as soon after such date as the Contractor has provided all the Construction
documents and completed and tested all the Works, including remedying any
defects.
Only the Contract Completion Certificate shall be deemed to constitute
approval of the Works.
12.10 Unfulfilled Obligations
After the Contract Completion Certificate has been issued, the Contractor and
the Employer shall remain liable for the fulfillment of any obligation which
remains unperformed at that time. For the purposes of determining the
nature and extent of any such obligation, the Contract shall be deemed to
remain in force.
12.11 Guarantee Services
Following completion of the Works and issue of the Taking-Over Certificate in
accordance with the provisions of Sub-Clause 10.1, the Contractor will be
responsible for providing the Guarantee Services as defined in Sub-Para
1.1.6.12 for the period of time as specified in the Appendix to Tender (the
Guarantee Period). During this period, the Contractor will be responsible to
guarantee the completed Works against any defects in design, materials,
workmanship and manufacturer’s defects of the Plant and facilities under
normal operating conditions, and to remedy any defects therein at his own
cost so as to ensure that the facilities are kept in good and proper operating
condition.
Also each of the following major equipments shall be guaranteed by the
Contractor against design, manufacturing and workmanship for an additional
period of time as specified in the Appendix to tender (the guarantee period)
from the date of commissioning of an individual equipment:
that the Contractor has satisfactorily fulfilled all of his obligations under the
Contract.
a) After receipt of material, contractor shall raise the separate invoice for material
purchase within Maharashtra and separate invoice for interstate material
(Format of invoice enclosed in section 6,”Sample forms” of Volume-I part-B)
b) No payment shall be released against supply of material till erection and
commission of the materials.
Activity % Description
Payments
Supply, after delivery, storage, a) Progressive payments against cost of material
erection/ installation and 90% commensurate with the progress achieved for
successful completion and supply, after delivery, storage, erection/ installation
commisssioning of the and successful completion & commisssioning of the
complete works against complete works and feeding of online NSC through
material utilized for works ERP as per actual utilized quantity at site and
(RA bill wise) submission of the completion certificate for that
Works duly signed by the Contractor’s
representative, SDO & EE concerned or a person
authorized by the SE (O&M); Subject to condition
specified in clause 16.4 of Section-I.
Supply, after delivery, storage, 10% b) Balance payment upon successful commissioning
erection/ installation and of the entire works and completion of all the
successful completion and Contractor’s obligations under the Contract, as duly
commissioning of the complete certified by the Employer’s Representative and after
works against material issue of the last completion certificate and
utilized for works submission of a “No Claim Certificate” by the
Contractor specified in clause 13.6.
2) Delivery of material:
Contractor shall supply the materials in due time so that work shall be completed as
given schedule as given in the erection and commissioning order/agreement.
3) Inspection of material as mentioned in tender condition.
4) All other terms in the tender, related to supply of material shall be applicable
For the purpose of effective execution of the Contract, the Contractor shall open a
dedicated Contract Bank Account in a bank located in Maharashtra, and the
Employer will transfer or deposit all payments directly into the Contractor’s Contract
Bank Account. It is expected that the Contractor will use these payment solely for
expenditures under the Contract so that an adequate cash flow is maintained at all
times during execution. All payments due to the Contractor shall be paid only by
“Account Payee” cheque or by direct transfer of funds to the Contractor’s dedicated
Contract Bank Account.
The Employer shall make progressive payments for the work completed by the
Contractor in accordance with the provisions of Sub-Clause 13.3 as and when they
are due. The Contractor shall submit his invoices along with the documents listed in
the relevant clauses of these terms of payment to the Employer’s Representative for
review and approval, with an information copy to the Employer. The Employer’s
Representative shall submit the approved Contractor’s invoice to the Employer along
with an Interim Payment Certificate certifying the amount of invoice which is
approved for payment. The Employer will sanction the certified payment, and the
Employer and/ or Financing Agency will make payment to the Contractor,
the claim having a value equivalent to at least the value of a Section. All
relevant deductions or adjustments, as set out in Sub-Clause 13.2, shall be
applied to such Interim Payments.
The Employer's Representative may in any payment certificate make any
correction or modification that should properly be made to any previous
certificate.
Procedure for payment and material movement and billing thereof
A. Unless otherwise stated,
(a) the Employer shall pay, or cause to be paid, the amount payable to the
Contractor against each of his invoices for interim payment, within 45
days from the date of submission of invoice to the Employer's
Representative along with necessary documents stipulated elsewhere;
and
(b) the Employer shall pay, or cause to be paid, the amount certified in the
Final Payment Certificate within 45 days from the date of issue of the
Final Payment Certificate by the Employer’s Representative.
Payments shall be made into the project bank account, located in
Maharashtra, nominated by the Contractor.
B.
(b) Material Procured from Outside of Maharashtra (Interstate
Materials)
1. The material shall be consigned by the manufacture in the name of the
contractor. On arrival of the consignment at site the dispatch documents
delivery challans, lorry receipt etc shall be endorsed by the contractors
in the name of MSEDCL.
2. After unloading the material a representative of MSEDCL or any other
personal as nominated by S.E (O&M) of the concerned zone, shall inspect
the material and hand it over back to contractor by issuing a Material
Receipt and Handing over (MRHO) Note against the indemnity bond.
3. The Contractor shall submit “Interstate Material Invoice” in enclosed
format-5 in Section 6 Sample forms with the copy of the corresponding
MRHO note to the Superintending Engineer of the concerned O & M
circle.
4. After end of each quarter the contractor shall submit a statement in
format 7 in Section 6 Sample forms submitted to the Superintending
Engineer of the concerned O & M circle
5. As a part of the Invoice for 100% payment against useful section
completed the contractor shall enclosed an interstate material utilization
statement in Format 6 in Section 6 Sample forms
(c) Intra-State Material (Material Procured within Maharashtra
State)
1. The material shall be consigned by the manufacture in the name of
MSEDCL.
2. After unloading the material a representative of MSEDCL or any other
personal as nominated by S.E (O&M) of the Circle, shall inspect the
a : Interim Payments
O1. Intimation to be given by Contractor to SE _______ with copies to concerned SDO &
EE about readiness of useful section after completion of works in all respects and
after recording Joint Measurement by representative of Employer and the
contractor.
A. The representative of SE ________ to carryout inspection of the useful section
within 3 days and give quality check list to the Contractor.
B. Contractor to carryout rectifications, wherever required, and submit
compliance report to SE________.
EE of Division shall check the invoices and if any discrepancies are observed the
same shall be get rectified from the Contractor after receipt of invoices. The
receipt of final invoices to be entered in intranet (MSEDCL). The invoices to be
submitted by the Contractor shall be accompanied with
a. Quality Check Certificate
05.
b. Joint measurement sheet signed by Contractor’s representative, EE of
Division and countersigned by SDO.
c. Copies of checklist prepared and signed by EE (O&M).
06. Certification and submission by EE (O&M) of 3 copies of invoices duly stamped for
90% payment along with payment certificate, above said documents and physical
progress certificate to SE (O&M).
07. SDO/EE (O&M) shall submit the invoices along with physical progress certificate
to SE (O&M) after verification and recording for payment processing purpose.
08. Circle Office shall exercise quick check whether all the documents listed above are
attached, calculate and deposit TDS in Income Tax Office and arrange to send the
invoices to REC / PFC showing TDS deduction. At the same time an advice shall be
sent to Loan Section.
11. Circle office shall send TDS certificate to the Contractor of receipt of advice.
1. The contractor shall submit invoice claiming payment against the contractual
price of commissioned useful section along with Quantity Variation, Interim
Penalty/ Liquidated Damages, in four copies to the S.D.O. (O&M). The invoice
shall be accompanied with following documents:
a. Copy of Handing over and taking over certificate issued by the concerned
SDO in charge
b. Copy of charging permission issued by the Electrical Inspector
c. Detailed Joint measurement sheet signed by contractor’s representative,
JE/AE (Section) and SDO and countersigned by EE (O&M).
d. Copies of check lists issued SDO & EE (if issued) complied by the
contractor. The compliance of the check lists by the contractor shall be
signed by EE (O&M)
f. Copies of the factory test reports and site test reports of major
equipments
g. Copies of (O and M) manuals
2. Check and scrutinize the invoice and forward the invoice with their payment
certificates in one original and two copies by the EE (O&M) of the Division.
3. The EE (O&M) shall note the completed and commissioned works viz a viz
LOA quantities, exercise sample checks of the works and forward all the
copies of invoice with his certificate to the concerned (O and M) circle office.
4. The concerned EE (O&M) shall arrange auditing of the invoice, capitalization
of the works and after capitalization shall retain the original copy and forward
two copies of the audited invoice, duly signed by him to the Superintending
Engineer (O&M), _____________ Circle.
5. The EE office shall check the invoices and put up office note to the SE (O&M).
6. The concerned Circle Office shall release payment to the Contractor.
7. Deleted.
8. Section Incharge and Contractor to arrange test charging of useful section after receipt
of compliance report from Contractor about rectification of defects, if any.
9. Carrying out and recording of joint measurement by representatives of EE (O&M) with
Contractor’s representative of test charging.
10. JE/AE shall countersign the Joint Measurement Certificate (JMC) of recording by the
Contractor.
(a) the value of all work done in accordance with the Contract, and
(b) any further sums which the Contractor considers to be due to him
under the Contract or otherwise.
If the Employer's Representative disagrees with or cannot verify any part of
the draft final statement, the Contractor shall submit such further information
as the Employer's Representative may reasonably require and shall make
such changes in the draft as may be agreed between them. The Contractor
shall then prepare and submit to the Employer's Representative the Final
Statement as agreed.
If, following discussions between the Employer's Representative and the
Contractor and any changes to the draft final statement which may be agreed
between them, it becomes evident that a dispute exists, the Employer's
representative shall deliver to the Employer (with a copy to the Contractor)
an Interim Payment Certificate for those parts of the draft final statement
which are not in dispute. The dispute may then be resolved under Clause 20,
in which case the Contractor shall then prepare and submit to the Employer
(with a copy to the Employer's Representative) a Final Statement in
accordance with the outcome of the dispute.
Discharge
When submitting the Final Statement, the Contractor shall submit a written
discharge which confirms that the total of the Final Statement represents full
and final settlement of all monies due to the Contractor under the Contract.
Such discharge may state that it shall become effective only after payment due
under the Final Payment Certificate has been made and the security deposit
referred to in Sub-Clause 4.2 has been returned to the Contractor.
Issue of Final Payment Certificate
The Employer's Representative shall issue to the Employer, with a copy to the
Contractor, the Final Payment Certificate within 28 days after receiving the
Final Statement and written discharge in accordance with Sub-Clauses13.10
and 13.11, stating:
(a) the amount which is finally due,
(b) the schedule for making final payments with respect to (i) completion
of all Works under the Contract, and (ii) successful completion of
warranty services during the Guarantee Period, and
(c) after giving credit to the Employer for all amounts previously paid by
the Employer and for all sums to which the Employer is entitled, other
than under Sub-Clause 8.6, the balance, if any, due from the Employer
to the Contractor or from the Contractor to the Employer as the case
may be.
If the Contractor has not applied for a Final Payment Certificate in accordance
with Sub-Clauses 13.10 and 13.11, the Employer's Representative shall
request the Contractor to do so. If the Contractor fails to make such an
application within a period of 28 days, the Employer's Representative shall
issue the Final Payment Certificate for such amount as he considers being due.
The above notwithstanding, the Employer will not issue the Final Payment
Certificate for the Works until the Contractor has submitted the As-built
The Employer will issue the “C” Form for materials, Plant and Equipment
supplied under the Contract and sold to MSEDCL on an Interstate Basis. To
avail of this facility, the successful Bidder will be required to submit a sales
invoice to the Employer charging no tax stating clearly in the invoice “Sales
under section 6(2) (b) of the Central Sales Tax Act 1956-against “C” form. The
successful bidder will give Form ‘C’ to the supplier, who would issue Form E -
1 to the successful bidder. Irrespective of whether the Employer can issue “C”
Forms and whether the Sales Tax Department accepts it or not the Employer
shall not be liable to reimburse any amount to the Contractor towards CST.
The Bidders should note while bidding that, the Employer will discharge its
Service Tax liability by availing the most beneficial cost advantage under the
appropriate General Exemption and Notifications of Service Tax.
The bidder should also note that the Employer will discharge its tax liability
under the most beneficial scheme for availing the maximum cost advantage.
Bidder should therefore take any VAT and/or Service Tax refund / rebate to
which they may be legally entitled into consideration while offering their
quoted rates / prices.
VARIATIONS
Right to Vary
a) Deleted.
b) In case it is determined that any extra item, which is not appearing in
any of the cost data sheets forming part of the bidding document, is
necessary and required for the satisfactory operation of the completed
work as determined by the Employer’s Representative, then in such
case the Contractor shall submit a proposal to the Employer’s
Representative for approval of suitable rate for such item. Such a
proposal shall be accompanied by all supporting documents. Provision
for such extra item shall not be made by the Contractor unless it is
approved by the Employer’s Representative.
c) Quantities as provided in the Contract are the best estimates for the
purpose of submitting the lump-sum percentage bid. The Contractor
shall be required to execute the works at the quoted rates set out in
the Schedules of Prices.
d) The Sub Activities are mentioned in the cost data sheets for individual
activity will be paid on actually executed quantities.
e) In case additional civil work is required, the cost of Tender Rate is
considered. On the contrary if tender rate is not available DSR rate of
Tender Floating Year shall be consider for the estimate along with
quoted offer.
Value Engineering
The Contractor may, at any time, submit to the Employer's Representative a
written proposal which in the Contractor's opinion will reduce the cost of
constructing, maintaining or operating the Works, or improve the efficiency or
value to the Employer of the completed Works, or otherwise be of benefit to
the Employer. Any such proposal shall be prepared at the cost of the
Contractor and shall include the items listed in Sub-Clause 14.3.
Deleted
Provisional Sums
Provisional Sums (if any) provided under the Contract shall only be used, in
whole or in part, in accordance with the instructions of the Employer’s
Representative for lawful expenditures incurred on behalf of the Employer for
statutory fees/ charges/ levies imposed by Governmental or Semi-
Governmental Agencies for the following works or services which are
required for successful completion of the Works:
(i) Charges levied by the Department of Environment and Forests related
to obtaining necessary approvals for any required tree cutting;
(ii) Charges levied by Railway authorities related to approval of
construction drawings and inspection fees for railway crossings;
(iii) Charges levied by utility authorities related to approval of construction
drawings and inspection fees for utility crossings;
(iv) Road cutting and/ or road crossing charges levied by the responsible
agency;
(v) Electrical inspection fees and charges.
(vi) The actual expense of Octroi / LBT / LPT charges, all above charges
shall be reimbursed on submission of valid receipt
Any other statutory charges or incidental expenses which may be incurred,
including any crop/ tree compensation as stated in Clause 25, are not eligible
for reimbursement out of the Provisional Sum allowance, and the Contractor
will be responsible to include any such costs in his quoted rates/ prices.
The total sum paid to the Contractor shal include only such amounts for the
work, supplies or services to which such Provisional Sums relate as the
Employer's Representative shall have instructed. The Contractor will be
reimbursed the actual price paid (or due to be paid) for each Provisional Sum
expenditure ordered by the Employer's Representative upon submission of
the original quotations, invoices, vouchers and accounts or receipts in
substantiation.
Amendments to the Contract Conditions/Specifications
If the Employer’s Representative determines that if, in exceptional
circumstances, it would be in best interests of the Project to modify or amend
some of the Contract Conditions/ Specifications, then such modifications or
amendments may be made if mutually agreed by the Employer and the
Contractor.
DEFAULT OF CONTRACTOR
Notice to Correct
If the Contractor fails to carry out any of his obligations, or if the Contractor is
not executing the Works in accordance with the Contract, the Employer's
Representative may give notice to the Contractor requiring him to make good
such failure and remedy the same within a specified reasonable time.
Termination
If the Contractor:
(a) fails to comply with a notice under Sub-Clause 15.1, or
(b) abandons or repudiates the Contract, or
(c) without reasonable excuse fails:
(i) to commence the Works in accordance with Sub-Clause 8.1,
(ii) to proceed with the Works in accordance with Clause 8, or
(iii) to demonstrate that sufficient design capability is employed in the
design of the Works to achieve completion within the Time for
Completion, or
(d) becomes bankrupt or insolvent, goes into liquidation, has a receiving or
administration order made against him, compounds with his creditors,
or carries on business under a receiver, trustee or manager for the
benefit of his creditors, or if any act is done or event occurs which (under
any applicable law) has a similar effect to any of these acts or events, or
(e) fails to comply with a notice issued under Sub-Clause 7.5 within 28 days
after having received it, or
(f) assigns the Contract or subcontracts the Works without the required
consent, or
(g) in the judgment of the Employer has engaged in corrupt and fraudulent
practices in competing for or in executing the Contract, or
(h) fails to achieve the agreed monthly milestones for a period of 3
consecutive months,
then the Employer may, after having given 14 days' notice to the Contractor,
terminate the Contractor's employment under the Contract and expel him
from the Site. The Contractor shall then deliver all Construction Documents,
and other design documents made by or for him, to the Employer's
Representative. The Contractor shall also remove from the Site, without delay
and at his own cost, all materials, plant and equipment which have not been
incorporated into the Permanent Works and commissioned and accepted by
the Employer. The Contractor shall not be released from any of his obligations
or liabilities under the Contract. The rights and authorities conferred on the
Employer and the Employer's Representative by the Contract shall not be
affected.
The Employer may upon such termination complete the Works himself
and/or by any other contractor at the risk and cost of terminated contractor.
The Employer or such other contractor may use for such completion so much
of the Construction documents, other design documents made by or on behalf
of the Contractor, Contractor's Equipment, Temporary Works, Plant and
Contract. The total liability of the Contractor to the Employer under the
Contract shall not exceed the Contract Price. Except that this Sub-Clause shall
not limit the liability of the Contractor:
(a) under Sub-Clauses 4.20, 4.21, 5.9, 8.6 and 11.4,
(b) under any other provisions of the Contract which expressly impose a
greater liability,
(c) in cases of fraud, willful misconduct or illegal or unlawful acts, or
(d) in cases of acts or omissions of the Contractor which are contrary to
the most elementary rules of diligence which a conscientious
contractor would have followed in similar circumstances.
If the total liability exceeds Rs.10/- lakhs prior to completion of the work then the
Contractor shall arrange to renew the policy for the same amount to cover the
balance completion period. However, irrespective of the value of the policy, the
Contractor shall indemnify the Owner for all liabilities.
The Contractor shall use his best endeavors to maintain such professional
indemnity insurance in full force and effect throughout the periods of his
liability, under the Contract and under the law of Country. The Contractor
Each insurance policy shall be consistent with the general terms agreed in
writing prior to the Effective Date, and such agreement shall take precedence
over the provisions of this Clause.
The Contractor shall, within the respective periods stated in the Appendix to
Tender (calculated from the Commencement Date), submit to the Employer:
(a) evidence that the insurances described in this Clause have been effected,
and
(b) copies of the policies for the insurances described in Sub-Clauses 18.2 and
18.3.
When each premium has been paid, the Contractor shall submit copy receipts
to the Employer. The Contractor shall also, when providing such evidence,
policies and receipts to the Employer, notify the Employer's Representative of
so doing.
The Contractor shall effect all insurances for which he is responsible with
insurers and in terms approved by the Employer. Each policy insuring against
loss or damage shall provide for payments to be made in the currencies
required to rectify such loss or damage. Payments received from the insurers
shall be used for the rectification of such loss or damage.
The Contractor (and, if appropriate, the Employer) shall comply with the
conditions stipulated in each of the insurance policies. The Contractor shall
make no material alteration to the term of any insurance without the prior
approval of the Employer. If an insurer makes (or purports to make) any such
alteration, the Contractor shall notify the Employer immediately.
If the Contractor fails to effect and keep in force any of the insurances
required under the Contract, or fails to provide satisfactory evidence, policies
and receipts in accordance with this Sub-Clause, the Employer may, without
prejudice to any other right or remedy, effect insurance for the coverage
relevant to such default, and pay the premiums due. Such payments shall be
recoverable from the Contractor by the Employer, and may be deducted by
the Employer from any monies due, or to become due, to the Contractor.
Nothing in this Clause limits the obligations, liabilities or responsibilities of
the Contractor or the Employer, under the other terms of the Contract or
otherwise. Any amounts not insured or not recovered from the insurers shall
be borne by the Contractor and/or the Employer accordingly.
1. In order to comply the clause 18 and the directives of the Government of
Maharashtra resolution
a. AIF/2183/CR-174/83ADM-5 Date 16/01/1984
b. Vimasa-1098/Pr.Kra28/98/Shashan Hami Dt. 19/08/1998
c. Vimassa-1011/Prakra 15/Vima Prashasan Date 29/04/2011 and
d. L.No: AIF/2311/Co-Ins/MST Co/Ltd/F da.04.02.2012
and the directives issued by the Executive Director (H.R) MSEDC vide
letter No: IR/Insurance/9623 Date 13.04.2012, the Contractor All Risk
Policy (CAR) or Transit cum Erection (TCE) or Erection All Risk Insurance
Policy (EAR) in respect of contract works awarded by MSEDCL as principle
to the contract and workman’s compensation insurance in respect of the
workmen engaged and deployed by the contractor’s to complete the
contract work is required to be obtained from M/s National Insurance Co.
Ltd on co-insurance cum servicing basis under indirect method in the ratio
of 40:60 (i.e. Govt. Insurance fund @ 40% and national Insurance co.@
60%) and their offices as specified in the circulars or following divisional /
Branch office only.
i. National Insurance Co. Ltd. Red Cross House, 11 M.G. Road, Pune 411
001 Ph 020 26134267/ /9890011793
ii. National Insurance Co. Ltd. 104, Bharat House 3rd Floor , Mumbai
Samachar Marg, Fort Mumbai 400023 Phone 022-22610110
/22673692/ 9820308755
2. As per the Directive of Govt. Of Maharashtra letter No: NMP1009/Sankra
39/NV 26 date: 16th March 2009, in case the directives are not followed
by the contractor , the concerned authority of MSEDCL shall recover (1%)
one percent amount of the contract value and deposit the same with
Director of Insurance Govt. Maharashtra through Cheque/demand draft
with complete particulars of contract works along with copy of work
order.
19 FORCE MAJEURE
19.1 Definition of Force Majeure
In this Clause, "Force Majeure" means an event beyond the control of the
Employer and the Contractor, which makes it impossible or illegal for a party
to perform, including but not limited to:
(a) act of God;
(b) war, hostilities (whether war be declared or not), invasion, act of
foreign enemies, mobilization, requisition, or embargo;
(c) rebellion, revolution, insurrection, or military or usurped power, or
civil war;
(d) contamination by radio-activity from any nuclear fuel, or from any
nuclear waste from the combustion of nuclear fuel, radio-active toxic
explosive, or other hazardous properties of any explosive nuclear
assembly or nuclear component of such assembly;
(e) riot, commotion or disorder, unless solely restricted to employees of
the Contractor or of his Subcontractors.
20.4 Arbitration
20.4.1 The matters to be determined by the Chief Engineer (C.E.):-
All disputes and differences of any kind whatsoever arising out of or in
connection with the contract, whether during the progress of the work or
after its completion and whether before or after the determination of the
contract, shall be referred by the contractor to the C.E. and the C.E. shall
(within l20 days) after receipt of the contractor’s representation make and
notify decisions of all matters referred to by the contractor in writing.
(i) Demand for Arbitration: In the event of any dispute or difference
between the parties hereto as to the construction or operation of this
contract, or the respective rights and liabilities of the parties on any
matter in question, the dispute or difference on any account or as to
the withholding by MSEDCL of any certificate to which the contractor
may claim to be entitled to, or if the C.E. fails to make a decision (within
l20 days) then and in any such case the contractor (after 120 days) but
within (180 days) of his presenting his final claim on disputed matters,
shall demand in writing that the dispute or difference to be referred to
arbitration.
(ii) The demand for arbitration shall specify the matters which are in
question, or subject of the dispute or difference as also the amount of
claim item-wise. Only such dispute(s) or difference(s) in respect of
which the demand has been made, together with counter claims or set
off shall be referred to arbitration and other matters shall not be
included in the reference.
(a) The arbitration proceedings shall be assumed to have
commenced from the day, a written and valid demand for
arbitration is received by the MSEDCL.
(b) The claimant shall submit his claim stating the facts supporting
the claims along with all relevant documents and the relief or
remedy sought against each claim within a period of 30 days
from the date of appointment of the Arbitral Tribunal.
(c) The MSEDCL shall submit its defence statement and counter
claim(s), if any, within a period of 60 days of receipt of copy of
claims from the Tribunal thereafter unless otherwise extension
has been granted by the Tribunal.
(iii) No new claim shall be added during the proceedings by either party.
However a party may amend or supplement the original claim or
defence thereof during the course of arbitration proceedings subject to
acceptance by Tribunal having due regard to the delay in making it.
(iv) If the contractor(s) does/do not prefer his/their specific and final
claims in writing, within a period of 90 days of receiving the intimation
from the MSEDCL, that the final bill is ready for payment, he/they will
be deemed to have waived his/their claim(s) and the MSEDCL shall be
discharged and released of all liabilities under the contract in respect
of these claims.
20.4.2 Obligation during pendency of Arbitration:
Work under the contract shall, unless otherwise directed by the Engineer,
continue during the arbitration proceedings, and no payment due or payable
by the MSEDCL shall be withheld on account of such proceedings, provided,
however, it shall be open for Arbitral Tribunal to consider and decide whether
or not such work should be continued during arbitration proceedings.
(i) In cases where the total value of all claims in question added together
does not exceed Rs.1,00,00,000/- (Rupees One Crore) the Arbitral
Tribunal shall consist of a Sole Arbitrator who shall be either the C.E. of
the MSEDCL or serving or retired officer of the MSEDCL/Government
not below the grade of C.E. or equivalent nominated by the MD of the
MSEDCL in that behalf. The Sole Arbitrator shall be appointed within
60 days from the day when a written and valid demand for arbitration
is received by the MSEDCL.
(ii) In cases the value of the claim exceeds Rs.1,00,00,000/- (Rupees One
Crore) as above, the Arbitral Tribunal shall consist of panel of 3 serving
or retired officers of MSEDCL/Govt. not below the grade of C.E./C.A.O.
as the Arbitrators. For this purpose, the MSEDCL will send a panel of
more than 3 names of arbitrators of one or more department of the
(x) Where the arbitral award is for payment of money, no interest shall be
payable on whole or any part of the money for any period till the date
on which the award is made.
(xi) The cost of the arbitration shall be borne equally by the respective
parties. The cost shall inter-alia include fees of the arbitrators as per
the rates fixed by the MSEDCL from time to time. Provided that the fees
payable per arbitrator for claims up to Rs. One Crore shall not exceed
Rs. 2000/- per sitting subject to a maximum of Rs. 25,000/- and the
fees payable per arbitrator for claims over Rs. One Crore, shall not
exceed Rs.2000/- per sitting subject to a maximum of Rs. 50,000/-.
Provided further that the arbitrators who are in service of
Govt./MSEDCL shall draw fees at half of the rates mentioned above.
(xii) MSEDCL shall maintain a list of arbitrators. The MD shall have full
powers to delete or add the name of the arbitrators in the list or to
make amendments to the said list as per his discretion.
(xiii) The arbitral proceedings should be completed and the award be
finalized within one year from the date of appointment of arbitrators.
(xiv) Subject to the provisions as aforesaid, Arbitration and Conciliation Act,
1996 and the rules there under, and any statutory notification thereof
shall apply to the arbitration proceedings under this clause.
20.5 Disputes
Any disputes or differences arising under, out of or in connection with this
tender or contract if not concluded shall be subject to exclusive jurisdiction of
courts in Mumbai city of Maharashtra. The Indian Law shall govern the
contract. .
24 name plates
All distribution transformers shall have nameplates affixed at a suitable
position with full particulars marked thereon, in accordance with the relevant
standards. A rating plate of non-corrodible material shall be attached to the
transformer and other equipment wherever necessary. The plate shall be
permanently engraved with the designed full load ratings, model number,
serial number, date of manufacture and other salient features. In addition, the
name of the project and place of installation shall also be engraved onto the
bodies of the transformers and related equipment.
26 SALVAGED MATERIALS
All materials salvaged by the Contractor during his work on rehabilitation,
replacement, reconstruction and/or upgrading of existing facilities and/or re-
conductoring of existing power lines shall remain the absolute property of the
Employer. The contractor shall be the trustee of the
materials/plant/equipment so recovered in accordance with the provisions of
Sub-Clause 4.23, and these shall not on any account be removed from the site
of work and shall, at all times, be open to inspection by the Employer’s
Representative.
All salvaged materials/ plant/ equipment shall be delivered to the nearest
Departmental Store as and when directed by the Employer’s Representative,
and the cost of such services shall be included in the quoted prices. If the
Contractor fails to deliver the materials/ plant/ equipment as required, or if
any items are lost through theft or negligence, he shall be liable to pay the
prevailing market price for such items. The decision of the Engineer-in-charge
as to the price of the salvaged materials/ plant/ equipment, keeping in view
its condition, suitability for re-use, etc., shall be final and conclusive.
SECTION 3
SECTION 3
A. FORM OF TECHNICAL PROPOSAL AND
APPENDIX TO TECHNICAL PROPOSAL
Preamble
This Volume 1 Part A , Invitation and Instructions to Bidders, is comprised of 4 parts:
Section 1, Instructions to Bidders,
Section 2, General Conditions of Contract
Section 3, Forms of Technical proposal and Price Proposal,
Section 4, Schedules of Prices and Schedule of Payments.
All portions of this Volume should be carefully read and thoroughly understood
in the context of all the various conditions of Contract before the forms contained in
Section3, Schedules, are completed by the Bidder. Section 2, General Conditions of
Contract, and Volume II, Technical Specifications and Drawings, describe the
technical requirements for the Works, while the activities listed in the Schedule of
Prices Price Bid, set out the scope of the Works that are to be completed under this
Contract.
In Section 3, Schedules, of this Technical Proposal, the Employer has requested
information on the Bidder’s experience, current financial position and technical
aspects related to execution of the Works. The Bidder shall complete these Schedules
in their entirety so as to enable the Employer to evaluate whether the Bidder is
qualified, and whether the technical aspects of the Bid are substantially responsive to
the requirements set forth in the bidding documents.
Such information shall cover all work described in, or to be implied from, the
Works described in this bidding document, and shall take into account all conditions
of Contract as set out in the Appendix to Technical Proposal under this Section 3. The
Bidder will be responsible to provide any supplementary data and documents
wherever these may be required.
The rates and prices quoted by the Bidder shall cover all work described in, or to
be implied from, the description, conditions and specifications provided in the
bidding documents.
In the event that any part of the Schedule has not been filled out, the cost of
doing the work described in that part will be deemed to have been included in other
parts and that the total bid price covers all the Contractor’s obligations mentioned in
or to be reasonably inferred from the bidding documents in respect of the supply,
delivery, construction, installation, testing, commissioning and completion of the
facilities, including guarantee (defects liability) for the specified period and all other
things required as per the Contract.
The Bidder’s attention is directed to the fact that the Form of Technical
Proposal and Appendix to Technical Proposal contained in this Section 3 are
designed to be complementary to the Form of Price Proposal and Appendix to
Price PROPOSAL as well as with the Schedules contained in Section 4.
All of these referenced Forms, Appendices and Schedules will form a part of the
Contract with the successful Bidder.
In the event that the Bidder discovers any discrepancies or contradictions in
these Sections, the Bidder is requested to bring such discrepancies to the
notice of the Employer before the Bids are submitted so that any necessary
clarifications or addenda can be issued.
5.1&6.1 (a) to (d) Satisfactory Evidence of Experience to Meet the Minimum Qualifying
Criteria
5.1&6.1 (e) Copy of Valid Electrical Contractor’s License
5.5 & 6.5 Mandate lettres, complétion certificats, WIP certificats, etc.
5.2&6.2 (c) Audited Financial Statements & Balance Sheets for Last 3 Financial Years
14.4 & 22.1 Technical Proposal with confirmation of acceptance of Vol-I and II
that cannot be mutually agreed with the Employer, and confirm that we specifically
agree that Arbitration proceedings will be applicable for resolving any disputes.
Yours faithfully
Signature ______________________
in the capacity of _________________ duly authorized to sign bids for and on behalf of
____________________________________________________________
Address: __________________________________
The Bidder’s attention is directed to the fact that it is responsible to submit, as a part
of its Price Proposal, all information and supporting documentation that is required
to be submitted in accordance with the instructions given in Section 1, Instructions
to Bidders.
For the Bidder’s convenience, the following checklist provides a summary of the
information that is required to be provided as a part of the Price Proposal. However,
this checklist does not necessarily include all items that are required to be submitted,
and the Bidder will be fully responsible to ensure that its proposal complies in all
respects with the requirements of these bidding documents.
Checklist of Documents Comprising the Bid (Price Proposal)
Reference
Sub-Clause
Required Submittals
No.
(Original and One Copy)
(Section 1)
Note: With the exception of the items for which the Employer's requirements have been inserted, the
following information must be completed before the Bid is submitted
Sub-Clause
Description (Section 2) Contract Data
1.1.3.8 Deleted
Milestone (Deleted)
Time for Access to the Site 2.2 Commencement Date, grant right of access to and give
possession of the whole Site or such parts of the Site as are
sufficient to enable the Contractor to commence and
proceed with the execution of the Works in accordance
with the approved Construction Programme.
The Employer shall, from time to time as the work
proceeds, give the Contractor possession of such further
portions of the Site as may be required to enable the
Contractor to proceed with the execution of the Works
with due diligence in accordance with the agreed program
or proposals, as the case may be.
In the event that any part of the Site is not handed over to
the Contractor in accordance with the agreed program or
schedule the Contractor and Employer shall mutually agree
on modifications to the approved Work Plan so that the
Contractor does not incur delay or additional Cost, and can
VI. If the Contractor fails to comply with Sub-Clause 8.2, the Contractor shall
8.6 pay to the Employer Liquidated damages for delay to be
(First Para) calculated at a rate of 0.5% (Half percent) of the value of
Liquidated Damages for Delay the works (activity wise) delayed excluding Taxes (if any)
for every week or part of the week which shall elapsed
between the stipulated time for completion of the works
and date stated in taking over of the certificate of the
works.
f) 8.7 h) Deleted
Interim Penalty for Delay (Deleted)
g) (b)
Bidder’s Signature:
________________________________
(Seal)
[ The following is only for Bidders who are submitting price bids against more
than one Tender and who wish to offer a discount in the event that they are
awarded more than one contract ]
We hereby advise that we are concurrently submitting Price Bids for: (1) Tender No.
___ for Works in ________ Sub-Dn.; (2) Tender No. ___ for Works in ________ Sub-Dn.
(etc.). In the event that we are determined to be eligible for award of this contract
and one or more of the other contracts we are pleased to offer the following
discounts for concurrent award of this contract plus one or more of the other
contracts:
1. Award of this Contract plus one other Contract: ____ % reduction in our
quoted price for this Contract.
2. Award of this Contract plus two other Contracts: ____ % reduction in our
quoted price for this Contract.
If our Bid is accepted, we will provide the specified Security Deposit, commence the
Works as soon as reasonably possible after receiving the Notice to Commence, and
complete the Works in accordance with the above-named document within the time
stated in the Appendix to Technical Proposal.
Unless and until a formal Agreement is prepared and executed, this Bid, together
with your written acceptance thereof, shall constitute a binding contract between us.
We understand that you are not bound to accept the lowest or any bid you may
receive.
We are, Gentleman
Yours faithfully
Signature __________________________
Address:
___________________________________________________________
____________________________________________________________
Sub-
Clause
Description Contract Data
(Section
2)
Maharashtra State Electricity
Distribution Co. Ltd.
Represented by the:
1.1.2.1 The Chief Engineer
Employer's Name and Address
& 1.8 Maharashtra State Electricity Distribution
Co. Ltd. Akola Zone,
1st Floor, Vidyut Bhawan, Ratanlal Plot,
Akola
Pin-444001, India
Contractor's Name and Address 1.1.2.3 (To be completed by the Bidder before
& 1.8 the Bid is submitted)
Signature of Bidder:
_________________________________
SECTION 4
SCHEDULE OF PRICES AND PAYMENTS
Index to Schedules
Note: The Bidder shall sign all the Schedules of Prices and submit as a part of the
Price Proposal. All works, goods and services supplied from within India should
be denominated in Indian Rupees only.
1 2 3 4 5 6= (3+4+5)
1 2 3 4 5
Part-2 Cost of
Transportation, Erection,
B Installation,
Commissioning and
Guararntee
1 2 3
l. Hot deep galvanized (HDG); half threaded nut-bolts of required suitable size
should be used for erection works.
m. If the SMC distribution boxes and spring Load box as utilized during the execution
the rate specified in the tender documents shall be given.
n. Wedge connectors shall be used during construction for jumpers at cut points, T-
connections as well as vertical drops in Distribution Transformer Centers ( DTC’s
)
For conductors of size 0.2 sq. inch, crimping of all joints by compression method
shall be used in construction of lines as well as substations.
o. (Deleted.) L.T, C.T, and AMR DTC Meter Box should be without Modem however,
DTC Meter Boxes should have provision of MODEMs installation to access the
proper signaling. While bidding quote accordingly, but no change in cost shall be
paid during actual billing. Technical specifications are already uploaded along
with Tender Document in Volume II.
p. (Deleted.) The DTC meter should have LT AC three phase 4 wire CT/PT operated
fully static AMR compatible Tri-vector meter with RS-232 Port.
q. Betonite Powder may be used instead of Charcoal, salt etc. for earthing with
sufficient quantity so as to maintain proper earth resistance as per IE rule as
specified in activities. If not considered in activities, then it assumes to be
included in sundry charges but no extra payment made for it.
Bidder can use Aluminum Bus Bar or any other material instead of Copper Bus
Bar in Distribution Box, However it should have same current carrying capacity
as that of copper. The Bidder may procure from the vender who is approved for
supplying the DB with Aluminum Bus Bar in any other distribution utilities are
allowed with valid type test.
Section 5
Declaration by Contractor
SECTION 5
DECLARATION BY CONTRACTOR
Index
Schedule No Particulars
Preamble and Instructions to Bidders
Part 1: Experience and Financial Qualifications
I Application for Qualification
II Summary of Bidder’s Qualifications
III Bidder Information Sheet
IV JV Information Sheet (Deleted)
IV (a) Joint Venture Agreement (Sample Format) (Deleted)
V (A) Experience as Prime Contractor
V (B) General Construction Experience (With format for Employers’
Certificate)
VI Specific Construction Experience (With format for Employers’
Certificate)
VII Bidder’s Certification
VIII Annual Turnover
IX Financial Situation
X Financial Resources
XI Current Contract Commitments / Works in Progress
XII Pending Litigation
Part 2: Technical Qualifications
(1) Bidders are required to provide full and complete information in the requested
format in the following Schedules, signed and sealed on all pages. Incomplete
submissions may be subject to rejection as per the Instructions to Bidders (ITB)
Sub-Clause 28.1.
(2) All Schedules are required to be completed, but Bidders should not restrict
themselves to using the space that is provided. Photocopies of the following
Schedules will be acceptable, and Bidders will be responsible to provide
additional sheets/pages and supplementary information wherever required. In
the event that any particular Schedule or item in the Schedule is not applicable,
the same should be clearly indicated.
(3) The Bidder shall submit an “Application for Qualification” letter, on his
letterhead, in the format provided in Schedule I. In order to assist the Employer
in its evaluation, Bidders shall also complete and submit the “Summary of
Qualification Information” in the format provided in Schedule II.
(4) Bidders shall submit adequate proof in support of their experience claims in the
form of Work Orders, Completion Certificates, etc., failing which their experience
claims will not be considered for evaluation. All documents related to the
Bidder’s financial status (audited financial statements, annual turnover, net
worth, working capital, access to financial resources, etc.) shall be certified by an
independent Chartered Accountant. Documents submitted without the
required Certification will not be considered for evaluation.
(5) All pages of the Bidder’s submission shall be numbered for ease of reference, and
the Bidder shall provide an Index to his submission. All Annexure with pre-
printed information (i.e., documents defining the firms’ constitution; audited
financial statements/ balance sheets; manufacturers’ data; etc.) shall be clearly
numbered as Annexure 1, Annexure 2, etc., and listed in the Index.
(6) The information provided by the Bidder will be used for evaluation of the
Technical Proposals to assess the qualifications of the Bidder pursuant to the
requirements of Section 1, Instructions to Bidders (ITB) Clauses 3 and 5, the
overall responsiveness of the Bid to the terms and conditions of bidding, and the
suitability and conformity of the offer to the requirements of the Bidding
Documents.
(7) Whatever technical specifications are proposed or considered by the Bidder, all
equipment provided by the successful bidder shall conform in all respects to the
specifications of the tender documents, or better, and shall be subject to the
approval of the Employer’s Representative.
(8) The Bidder should only consider makes from reputed manufacturers of
equipment corresponding to the state-of-the-art technology and to the latest
international / Indian standards. Plant and Materials supplied from within India
shall be procured from the Vendors, as satisfying the criteria set forth in Sec 8 of
Vol I. Plant and Materials supplied from outside India shall be procured only
from reputed manufacturers, approved by MSEDCL, who have an established
presence in India, including representative offices and service centers in
Maharashtra, and whose manufacturing standards and finished goods conform
in all respects to the specifications of the tender documents, or better.
(9) Changes in the approved manufacturer/ vendor by the successful Bidder after
award of Contract will be permitted subject to the fulfillment of the criteria as
stipulated in Sec 8.
(10)The Bidder shall be wholly responsible to ensure that his offer is compete in all
respects, and that all Plant, Equipment and Works which are required to be
provided, and which are deemed to be necessary by the Employer, are
incorporated into his offer.
Schedule I
Application for Qualification
(To be Submitted on Bidder’s Letterhead)
Date:-________________ 2018
Name of Contract: System Improvement on High Loss Feeders (11 KV Cotton Market & 11
KV Tajnapeth Feeder) under Akola Urban-I Sub-division.
Tender No: CE/AKLZ/AKL/T/T-19(R)/2018-19
To:
The Chief Engineer,
Maharashtra State Electricity Distribution Co. Ltd.
1st Floor, Vidyut Bhavan,
Ratanlal Plot, Akola-444001
We, the undersigned, herewith submit our application for qualification for the referenced
contract for the System Improvement on High Loss Feeder (11 KV Cotton Market & 11 KV
Tajnapeth Feeder) under Akola Urban-I Division of Akola Circle under IPDS Scheme on
“Full Turnkey” basis.
We hereby declare the following:
(a) We have examined and have no reservations to the Bidding Document and the
Qualification Criteria set forth under Clauses 3, 5 and 6 of the Instructions to Bidders
(ITB), including Addenda No(s) ____ issued in accordance with ITB Clause 12.
(b) We confirm that our bid is fully complying with the bidding document without any
deviation. We are fully aware that conditional bid will not be accepted by the Employer.
(c) We have submitted price bids for Tender Nos_____. Our Technical Proposal includes all
the details of qualifying criteria.
(d) We, including any subcontractors or suppliers for any part of the contract resulting from
this qualification, do not have any conflict of interest in accordance with ITB Clause 7.
(e) We, including any subcontractors or suppliers for any part of the contract resulting from
this application, have not been declared ineligible by the MSEDCL, World Bank, Asian
Development Bank or any State utilities within India in accordance with ITB Sub-Clause 3.3
and 42.1(c).
(f) We are submitting only one Bid, against any individual Tender and we do not have any
Conflict of Interest as defined in ITB Clause 7.
(g) We have filled in and submitted Schedules I to XVIII and under take to submit Schedules
XIX, XX and XXI before signing of Contract Agreement. We certify that the information
provided in the accompanying Schedules and the Annexure thereto is complete and
accurate, and that we understand that any misrepresentation of facts will be grounds for
rejection of our Bid.
(h) We understand and accept that, in accordance with ITB Clause 38, you are not bound to
accept any bid that you may receive, and that you may reject any or all bids at any time prior
to award of Contract without thereby incurring any liability to the affected bidder or any
obligation to inform the bidder of the grounds for the Employer’s action.
In connection with our Bid, we hereby grant MSEDCL the authority to seek references from
our Bankers to the extent required to confirm the information that we have provided in
Schedule X, Financial Resources.
Name .......................................................................................................................................................................................
In the capacity of ................................................................................................................................................................
Signed .....................................................................................................................................................................................
Duly authorized to sign the Application for and on behalf of .........................................................................
Date .........................................................................................................................................................................................
Schedule II
Summary of Qualification Information
Table 1
Basic Data for Financial Evaluation
(Bidder Shall Use the Following Values in Table 2 to Determine Its Compliance with Qualification Criteria)
Estimated Cost of the
Tender Minimum Qualification Criteria
Circle Division Sub-Division Works
No. (in Rs. lacs)
(Rs. lacs)
Average annual Net Worth
Turnover during last
(10% of
3 yrs
(30% of Estd. Cost) Estimated cost)
1 2 3 4 5 6 7
T-
T-
T-
T-
T-
Table 2
Compliance with Qualification Criteria
Evaluati
Submit on by
ted/ Employ
ITB Schd Minimum
Sl. Propos er
Sub- Qualification Requirement . Requireme
No. ed [Pass
Clause No. nt
By (P)
Bidder or Fail
(F)]
General and Legal:
Application for Qualification (On Bidder’s
1 5.2(e) Letterhead), with authorization to seek I Submission
references from the Bidder’s Bankers
To Be
Summary of Qualification Information (this
2 -- II Completed
Form)
by Bidder
Constitution and Experience as Prime
5.1(a)
3 Contractor III 3 years
6.1 (a)
Not
Number of members in a JV, including the
4 6.4(a) III - appliaca
lead partner (Not applicable)
ble
5.2(b) III
5 Power of Attorney Submission
6.4(b) IV
Not
Copy of Constitution (Bidder and all Doc.
6 6.2(a) IV appliaca
partners in a JV) (Not applicable) Evidence
ble
In case of a JV, copy of Joint Venture Not
7 6.4(i) Agreement with Annexure A. (Not IV(a) Submission appliaca
applicable) ble
6.1(e)
6.1(f) Bidder shall possess a valid Electrical
Contractor’s License issued under the Act,
6.2(f) Doc.
8 registration certificates for Goods and VII
6.2(g) Evidence
Service Tax, and registration certificates
6.4(c) under the applicable PF and labor laws.
Work Experience:
Bidder to have executed work in any sector
during the last 3 financial years of:
a) One work order/contract of at least 20% of
the estimated cost of the tender quoted for, a) 1 for 20%,
5.1&6.1(
or or
9 c) V
b) Two work orders/contracts totaling at b) 2 for 25%,
6.4(e)
least 25% of the estimated cost of the or
tender quoted for or c) 3 for 30%
c) Three work orders/contracts totaling at
least 30% of the estimated cost of the total
Schedule III
Bidder Information Sheet
To be completed by the Bidder
Bidder Information
Bidder’s actual or
Intended year of
constitution
Bidder’s legal
address
Bidder’s authorized
representative
(name, address,
telephone numbers,
fax numbers, e-mail
address)
Attached are copies of the following original documents.
1. Articles of incorporation or constitution of the legal entity (Bidder) named above, in
accordance with ITB Sub-Clause 5.1&6.1.
2. Authorization to represent the firm named in above, in accordance with ITB Sub-Clause
5.2(b) & 6.4(b).and 6.2(b)
Schedule V (A)
Experience as Prime Contractor
(For Compliance to ITB Sub-Clause 5.1(a) & 6.1 (a))
Schedule V (B)
General Experience
(For Compliance to ITB Sub-Clause 5.1(c) & 6.1 (c ) ]
Bidder shall provide details of his experience in the past 3 years in sufficient detail so as to
demonstrate compliance with the requirements of ITB Sub-Clause 5.1&6.1(c), i.e., a single work
order/contract of at least 20% of the estimated cost of the largest tender quoted for or two work
orders/contracts totaling at least 25% of the estimated cost, or three work orders/contracts totaling
at least 30% of the estimated cost.
Bidder shall attach copies of Work Orders and Certificates of Satisfactory Completion or Substantial
Completion for the contracts for which the Bidder is claiming relevant experience.
Contract Name :-
Name of the Contractor : - M/s. [Name of the bidder]
Whether Individual :- Yes / No [Which ever is applicable]
Role in Contract : - [Contractor / Management Contractor /
Subcontractor]
Work Order No. :-
Work Order Date :-
Contract Agreement No. :-
Contract Agreement Date :-
Contract Value : - Rs. [in figures] Lakhs
Value of work executed : - Rs. [in figures] Lakhs
Brief Details of Work Done :-
Starting Date of Contract :- [ Date], [Month] , [Year]
Ending Date of Contract :- [ Date], [Month] , [Year]
Actual Date of Contract Completion :- [ Date], [Month] , [Year]
We hereby confirm that M/s. [Name of the bidder] have executed the works as per the
values given in the above table of, Details of the work executed (Year-wise).
Schedule VI
Specific Construction Experience
(To Demonstrate Compliance to ITB Sub-Clause 5.1& 6.1 (d) )
Contract Identification:
Management
Role in Contract Contractor Subcontractor
Contractor
Commissioning of :
Contract Details
15% of the total physical parameters involved/covered uner
the tender and such experience should have been within
preceding 3 years.
If partner in a JV or
Percent of
subcontractor, specify
Total Not Applicable
participation of total
contract amount
Employer’s Name
Address
Telephone/Fax Number
E-mail
Description of the similarity in accordance with ITB Sub-Clause 5.1(d), 5.3(a, iv) , 6.1(d) & 6.3
(a, iv)
General Requirement :- A) Description of Scope and Nature of the Work
Turn key 15% of the total
physical parameters B) Value of Contract (In Rs. Crores)
involved/covered uner
the tender and such C) Cost of Materials Incorporated into the Permanent Works ( If
experience should have supplied by others and not included under (B) above)
been within preceding 3
years.
Bidder shall attach copies of Work Orders and Certificates of Satisfactory Completion of the
contract for which the Bidder is claiming relevant experience.
Contract Name :-
Name of the Contractor : - M/s. [Name of the bidder]
Whether Individual : -Yes / No [Which ever is applicable]
Particulars
Numbers / Length
Date of Completion
Date of Commissioning
No. of years in
operation
We hereby confirm that M/s. [Name of the bidder] have supplied & erected the
installations as per the particulars given in the above table of, (Details of the work
executed)
For [Name of the Employer]
Schedule VII
Bidder’s Certification
(To Demonstrate Compliance to ITB Sub-Clauses 5.1 and 6.1(e), (f), (g) and (h); and 6.5 (c)
& (d) )
To:
The Chief Engineer,
Maharashtra State Electricity Distribution Co. Ltd.
1st Floor, Vidyut Bhavan,
Ratanlal Plot, Akola-444001
In compliance with the qualification requirements set forth under ITB Sub-Clauses 5.1(e), (f), (g),
(h) and (where applicable) we, the undersigned, hereby certify that:
1) We possess a valid Electrical Contractor’s license issued in the State of Maharashtra on
____________________ [day/month/year], vide license number ________________________, a copy of which is
herewith attached; and
2) We are registered for Goods and Service Tax under the applicable laws, and copies of the
registration certificates are herewith attached; and
3) We are registered with the appropriate authorities under the PF and labor laws, and
copies of our registration certificates are herewith attached; and
Name ........................................................................................................................................................................................
In the capacity of .................................................................................................................................................................
Signed ......................................................................................................................................................................................
.....................................................................................................................................................................................................
.....................................................................................................................................................................................................
Duly authorized to sign the Application for and on behalf of ..........................................................................
Date ..........................................................................................................................................................................................
.....................................................................................................................................................................................................
Schedule VIII
Annual Turnover
(To Demonstrate Compliance to ITB Sub-Clauses 5.1&6.1(b) and 6.5(e))
The information supplied should be the Annual Turnover of the Bidder in terms of the
amounts billed to clients for each year for work in progress or completed.
The Bidder shall submit audited financial statements/ balance sheets in support of its claims
Schedule IX
Financial Situation
(To Demonstrate Compliance to ITB Sub-Clauses 5.1&6.1(h),(i), 6.5(g) and (h))
2. Current Assets
3. Total Liabilities
4. Current Liabilities
5. Profits Before
Taxes
8. Net Worth #
9. Available Working
Capital ** Information Not Information Not
Required Required
[= 2 – 4] + [7] **
Attached are copies of the audited financial statements/ balance sheets, including all related notes,
and income statements for the last three years, as indicated above, complying with the following
conditions.
All such documents reflect the financial situation of the Bidder and not sister or parent
companies.
Historic financial statements must be audited by a certified Chartered Accountant.
Historic financial statements must be complete, including all notes to the financial statements.
Historic financial statements must correspond to accounting periods already completed and
audited (no statements for partial periods shall be requested or accepted).
Auditor shall provide full details which illustrate how the Current Liabilities have been
calculated, using the International Accounting Standards as a basis for such calculations.
** In order for the Employer to take the Bidder’s available lines of credit into consideration for
assessing the Available Working Capital, the Bidder is required to complete Schedule X and provide
satisfactorily documentation in support of its claim. If applicable, the Bidder may provide a letter of
guarantee from a recognized Bank which states that it is willing to provide a dedicated revolving line
of credit to the Bidder for exclusive use for the Project if the Bidder is successful in its bid and selected
for award of contract, on the understanding that the Employer is not obligated to take this into
consideration during evaluation.
# Net worth to be calculated as 5.1 / 6.1 (h).
This Schedule IX and all supporting documents shall be certified by an independent Auditor/
Chartered Accountant.
Schedule X
Financial Resources
(To Demonstrate Compliance to ITB Sub-Clauses 5.1 & 6.1(i) and 5.3 & 6.3)
Bidders shall specify proposed sources of financing such as liquid assets, unencumbered real
assets, lines of credit, and other financial means, net of current commitments, available to meet
the total construction cash flow demands of the subject contract as indicated in Sub-Clause 5.1(i),
5.3 of Section 1, Instructions to Bidders.
Bidder shall provide documentary evidence of the availability of such financing as may be
necessary to support its claims.
Bidder’s Legal Name: _________________________________________________________
This Schedule X and all supporting documents shall be certified by an independent Auditor/
Chartered Accountant.
Schedule XI
Bidders should provide information on their current commitments on all contracts that have
been awarded, or for which a letter of intent or acceptance has been received, or for contracts
approaching completion but for which an unqualified, full completion certificate has yet to be
issued.
Bidder’s Legal Name: _________________________________________________________
This Schedule XI and all supporting documents shall be certified by an independent Auditor/
Chartered Accountant.
Schedule XII
Pending Litigation
Bidder’s Legal Name: _________________________________________________________
Schedule XIII
We hereby declare that the goods to be supplied under this Contract, including but not limited to
the Plant and Equipment listed in the following table, are proposed to be supplied and
manufactured by the manufacturer/ company listed in the following table and that all items to be
supplied shall conform to the Technical Specifications of this Bid. We hereby certify that all
manufacturers/ companies that are proposed in the following list are included in conformity to
the section IX.
We also declare that all Plant and Equipment supplied under the Contract will be new and free
from defects in materials and workmanship and suited for its normal operating conditions. We
understand and accept that changes in the approved manufacturer/ vendor by the successful
Bidder after award of Contract will not be considered unless the successful bidder can
satisfactorily demonstrate, to the full satisfaction of the Employer’s Representative, that the
proposed Plant and Materials are equivalent to or better than the approved plant and Materials.
We certify that we will not claim for any additional payments during the course of the approval
process or thereafter on this account.
Sl.
Major Equipment / Item Proposed Manufacturer/ Supplier
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Schedule XIV
Personnel
Bidders shall provide the names of suitably qualified key personnel who are proposed by the
Contractor for this Contract, in the following Form PER-1.
Data on the experience of each candidate should be supplied using the Resume format (Form
PER-2) provided on the following page.
The proposed Mobilization/ Deployment Schedule for all such key personnel shall be provided in
the format provided in Form PER-3, indicating the proposed date of mobilization/ deployment
and the total duration of their respective services.
Form PER-1
1. Title of position
Name
2. Title of position
Name
3. Title of position
Name
4. Title of position
Name
5. Title of position
Name
6. Title of position
Name
7 Title of position
Name
8 Title of position
Name
Form PER-2
Position:
Responsibiliti
es:
Personnel Name Date of birth Nationality
information
Professional qualifications
Fax E-mail
Bidder shall provide the proposed mobilization schedule for each of the key personnel in a bar-
chart form, clearly showing the proposed date of mobilization, duration of services, and date of
demobilization.
Form PER-3
Deployment Schedule
(in Months from the Commencement
Sl. Date)
Position/Designation
No.
-- -- -- 2
1 2 3 4 5 6
- - - 4
(Note: Bidders should provide the above schedule on a separate sheet showing all months from
Month 1 to Month 24) inclusive for the Works Period.)
Schedule XV
Site Organization
Bidder shall describe the roles and responsibilities of each of the personnel proposed under the
preceding Schedule XVI, and shall describe the roles, relationships and division of responsibilities
between the site management and the representative head/ branch office that will be responsible
for the Project. In particular, the Bidder shall provide details of the technical and financial
responsibility and authority of the Project Manager who will be responsible for the day-to-day
operations at the Site.
The Bidder shall provide a preliminary organization chart which indicates the relationship
between the site management and the representative head/ branch office, the direct on-site
works operations, the sub-contractors and suppliers, and the Employer’s Representative and
supervising Engineers.
Schedule XVI
Form EQP-1
Item of Plant/Equipment
Address of owner
Bidder shall provide the proposed mobilization/deployment schedule for each major item of
constructional plant and equipment described in Form EQP-1 in a bar-chart form, clearly showing
the proposed date of mobilization to the Site, duration of deployment, and date of removal from
the Site.
Form EQP-2
Deployment Schedule
No. (in Months from the Commencement
Sl. Name of Plant/Equipment of Date)
No. (Type, Make, Model) Item
s -- -- -- 2
1 2 3 4 5 6
- - - 4
(Note: Bidders should provide the above schedule on a separate sheet showing all months from
Month 1 to Month 6 inclusive for the Works Period.)
Schedule XVII
Method Statement
The Bidder shall provide a comprehensive statement of the methods that it proposes to adopt for
completing the Works under this Project, including descriptions of its proposed work methods,
scheduling, mobilization of labor force and resources, quality assurance and quality control
programs, etc., in order to demonstrate its overall understanding of requirements for successful
completion of the Contract within the stipulated time period, and to demonstrate the Bidder’s
capability with respect to its construction methodology, proper planning of activities,
procurement and deployment of necessary resources.
The Bidder should provide full details on his proposed procurement methods for major items of
plant, equipment and materials proposed to be incorporated into the Permanent Works,
including design of the plant and equipment, sources of materials, placing of orders, times
required for manufacture, tests to be conducted at the supplier’s/manufacturer’s plant, pre-
delivery inspections and testing, delivery, storage, installation, etc.
The Bidder’s attention is drawn to the requirements set out in the Conditions of Contract, and the
Bidder is requested to describe how it proposes to achieve the broad Milestone Targets that have
been established to ensure that pro-rata progress is maintained on all sub-components of the
Works throughout the execution period.
Schedule XVIII
Construction Schedule
The Bidder shall submit his proposed construction program in sufficient detail so as to
demonstrate: the order in which he proposes to carry out the Works (including each stage
of design, procurement, manufacture, pre-delivery inspection and testing, delivery to Site,
construction, erection, testing and commissioning); all major events and activities in the
production of Construction Documents; the periods for the design reviews and approvals
and for any other submissions, approvals and consents specified in the Employer's
Requirements; the sequence of all tests specified in the Contract; etc.
The Bidder should pay particular attention to demonstrating how his proposed program
for supply of major items of plant and equipment to be incorporated into the Permanent
Works (Schedule XXI) is to be managed to satisfy the requirements of the Contract,
including the time required for design, placing of confirmed orders, manufacturing, pre-
delivery inspections and tests, delivery to the Site, storage, installation, etc.
Such construction program shall be developed on a commercially available project management
software (such as Primavera, MS Project or equivalent) showing level-3 activities, together with
bar charts and CPM diagrams which clearly illustrate the critical path, and the resources required
to be provided by the Contractor to achieve the desired results.
The Bidder’s attention is drawn to the requirements set out in the Conditions of Contract, and the
Bidder is required to clearly demonstrate how he proposes to meet the broad Milestone Targets
that have been established to ensure that pro-rata progress is maintained on all sub-components
of the Works throughout the execution period.
Schedule XIX
Schedule XX
Safety Plan
The Bidder shall describe his proposed Safety Plan which shall be developed to ensure zero fatal
accidents and zero hazardous incidents/occurrences in all construction works, including
descriptions of the company’s standard policies and procedures regarding its site organization
and procedures, methods and frequency of conducting safety audits at the Site(s), record keeping
and reporting, providing safety training for its personnel, issue and mandatory use of safety
equipment, details of the qualifications and experience of the Bidder’s safety officers to be
deployed at the Site(s), etc.
The Bidder shall provide separate descriptions of its proposed safety plan during the design and
construction phase.
The Bidder shall also provide copies of the company’s standard rules and regulations regarding
safety procedures.
Schedule XXI
The Bidder shall provide details of its proposed environmental management plan in sufficient
detail so as to demonstrate the procedures that will be used to ensure that the environmental
concerns and requirements as set forth in the Conditions of Contract are satisfactorily met.
The Bidder shall provide separate descriptions of its proposals for minimizing any adverse
environmental impacts/effects during the design and construction phase.
Volume I Part B
Section 6
Sample Forms
Section 6
sample forms
Index to Forms
Description Page
Form of Bid Security 3
Form of Letter of Award and Form of Contract Agreement 5
Form of Security deposit 6
Form of Tax Invoices 8
as it may be extended by the Employer, notice of which extension(s) to the Bank is hereby
waived. Any demand in respect of this Guarantee should reach the Bank not later than the
above date.
SAMPLE FORM
Letter of award and Form of contract agreemeNt
The contract is divisible contract; three separate orders for the letter of awards and Form
of Contract Agreement for following contracts shall be issued subsequently.
a. Materials purchase,
b. Erection Testing and Commissioning of activities
1
An amount to be inserted by the Guarantor, representing 10% of the Contract Price and denominated in Indian
Rupees as specified in the Contract..
This guarantee shall be valid until the date of completion of the defects liability period, with
a claim period of further one month.
The successful bidders shall submit the separate invoices in the format specified for
a) Materials purchase
SECTION 7
(NOT APPLICABLE)
PRICE VARIATION FORMULAE
(FOR MAJOR MATERIALS)
SECTION 8
CRITERIA FOR APPROVAL OF VENDORS
Criteria for acceptance of Vendors proposed by the Bidders for major equipments.
1.0 The vendor should be a manufacturer of the item and, should have adequate
manufacturing capacity to cover the quantity required by the bidder and orders in
his hand.
2.0 Annual Turn over of the vendors during any one of the last three years shall satisfy
the minimum criteria fixed as per condition 5.1(b), ITB Section-I for supply of
different types of material.
3.0 The material supplied by the vendor should be as per the specification provided by
the MSEDCL.
4.0 The vendor should not have been black listed by MSEDCL and should not have been
involved in any civil or criminal proceedings.
5.0 The bidder shall submit a copy of the latest audited annual report obtained from the
Vendor.
6.0 The other items for which specific turn over requirement has not been stipulated
above, shall be procured from venders to be approved by the Employer’s
Representative after examination of documents to be submitted by the Contractor to
establish the vendors’ financial and manufacturing capabilities in addition to the
criteria stipulated at para nos.1, 3 & 4 above.
Schedule 1: Summary
MSEDCL's
Schedule Description of Activity Estimated
Number Cost
(Rs. Lakhs)
1 Civil Works and Other Services 0.00
The Taxes chargable to Employer will be paid as per the rates given below
GST as actual on Supply of equipment produced in Maharashtra For supply of
1
equipment produced outside Maharashtra
2 RI Charges
3 Interest During Consruction on @3.5% on 157.08% on Material Cost
4 H.O. Supervision Charges 1.3% on Material Cost & erection Charges
Grand DPR Cost
I/ we hereby offer to complete the above described Works contained in the Schedules 2 and 3 together, for the Price of:
________ % ( _____________________ percent) above / below the total tendercost of the Employer's Estimate for a total amount of: Rs.
__________________ Lakhs
(Rupees ______________________________________________________________________________ only), excluding the cost of Taxes
Signature of Bidder:
Company:
Page 1 of 7
Page 204 of 212
MSEDCL IP Sch2 Civil Work
Page 2 of 7
Page 205 of 212
Price Schedule Format-III
E-Tender for System Improvement work on High Loss Feeders under Akola Urban-I subdivision under Akola Division/Circle on Full Turnkey Basis.
5908 Providing Mid Pole to reduce Long Span Nos 65.00 0.09 0.03 0.11 5.57 1.84 7.41
New2 Removal of conductor Nos 23.00 0.00 0.11 0.11 0.00 2.51 2.51
Cost of Material 88.77 31.92 120.68
E-Tender for System Improvement work on High Loss Feeders under Akola Urban-I subdivision under Akola Division/Circle on Full Turnkey Basis.
5908 Providing Mid Pole to reduce Long Span Nos 61.00 0.09 0.03 0.11 5.23 1.73 6.96
New2 Removal of conductor Nos 22.00 0.00 0.11 0.11 0.00 2.41 2.41
Cost of Material 84.81 30.49 115.3
Page 4 of 7
Page 207 of 212
Cost for of AB Cable for 1 km
SR.NO. DESCRIPTION OF MATERIALS. UNIT QTY RT/UNIT(RS)
AMT.(RS)
SR.NO. DESCRIPTION OF MATERIALS. UNIT QTY RT/UNIT(RS)
AMT.(RS)
1 L.T.Aerial bunched cable(3x120) Rmt 1000 227.82 227820.00
2 G.I.Wire 8 SWG/ 6 SWG Kg 130 56.27 7315.10
3 M.S.Flat 50 x 6 mm kg 36.5 47.55 1735.58
4 AB Suspension clamp assembly for AB cable pairs 10 396.00 3960.00
5 AB Dead End Clamp Assembly for AB cable pairs 10 550.00 5500.00
6 Piercing Connector for network No 60 187.00 11220.00
7 Piercing Connector for Service Box No 100 187.00 18700.00
8 Neutral Bare Conductor Connector No 20 66.00 1320.00
9 Service Connection Box 9 way No 25 2662.00 66550.00
10 L.T. XLPE cable 3 1/2 C 35 sq.mm. Rmt 20 110.78 2215.60
11 Sundries LS 20 770.00 15400.00
Cost Of material 361736.28
Total 11407
Tender/
Perticulars DPR Amount Estimate
Amount
64.07% 33.12%
Cost with overheads on Material 14060 11407
Total Cost of the Estimate 14060 11407
LIST OF SERVICES
SR. ACTIVITY MATERIAL
SERVICE NAME UOM SAC CODE REQ. QTY VERSION
NO. NUMBER TYPE
Laying of A.B.
1 Price Bid Price Section Price Bid & Activity Schedule
Cable of all
Technical Laying of A.B.
2 as per terms conditi Technical QR
Section Cable of all
Removing old
3 Price bid Price Section Price Bid & Activity schedule
RSJ
Technical Removing old
4 as per terms conditi Technical QR
Section RSJ
Commercial Annual turnover, net worth, ITR, GST Reg., PF
5 as per terms conditi
Section REg. Electrical licences
Commercial Annual turnover, net worth, ITR, GST Reg., PF
6 as per terms conditi