Académique Documents
Professionnel Documents
Culture Documents
Submitted to
The Management Board
Prepared by
Finance Division
Alvin Chan
Anthony Leung
Inez Ng
Libby Chow
Mabel Ngan
28 February, 2004
TABLE OF CONTENTS
SECTIONS
EXECUTIVE SUMMARY................................................................................................................2
1. INTRODUCTION .................................................................................................................4
1.1 BUSINESS OBJECTIVES.................................................................................................................................... 4
1.2 BUSINESS PLAN .................................................................................................................................................. 4
In a review of the existing system and IT infrastructure, we found that the system may not be able
to support the Company to achieve the business objectives and the future plan. Improvement on
information security is regarded as a priority area for the Company. Therefore, we proposed to
upgrade the existing system, restructure the I.T. infrastructure and reengineer the current
workflow.
We have identified several threats and vulnerabilities in the existing system, which are summarized
as follows:
Proposed IT infrastructure
Both the Company and the business partners will benefit from the new system in terms of
efficiency, effectiveness, information availabilities, integrity and confidentiality. Information
security is improved as whole.
Estimated set up costs for the new system is approximately HK$2.1 million, representing around
0.1% of 2003 turnover. That includes hardware, software and consultancy fees. Recurring
expenditure would be increased by HK$320,000 per annum.
The project will start from 1 April 2004 and complete in September 2004.