Part 5: JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the
original JSA? In case of any new hazard indentified by any of the working team member during the job, JSA review process
should be carried on.
JSA No: JOB TITLE: Performing Survey with Total Station
Step Describe Job Step Potential Hazards Hazard Controls
1 Mobilization of People, Equipment Work without obtaining Permit All of personnel performing job should
& Material Manual handling inducted/trained
Work in live area Ensure use of appropriate PPE’s
Slip, trip & fall Ensure close supervision of all work
Avoid scattered materials at site
Do not perform any of work without any
permit (as excavation for marking points)
Keep access clear from obstruction
Do the only described job as mentioned in
permit
2 Performing Survey with Total station Manual handling/property loss Careful handling with total
Sharp edges machine/survey apparatus
Inappropriate PPE’s Ensure Use of hand gloves (PPE’s)
Hand injury Avoid throwing of materials
Road traffic Use full body harness (as needed)
Work at height/personnel fall Do not left un attendant any of
equipment/tools in the area
Consult with HSE in case of any
confusion/query
Be careful while working at excavation
adjacent
Maintain good housekeeping at site
Be aware of road traffic while performing
survey beside the roads