Académique Documents
Professionnel Documents
Culture Documents
1013
M2 P4
22 50 13
47 903 58
157
A C
40
40 80 37
2 - 18 ø HOLES
22
P4
80
FOR INFORMATION
85
APPROVED
37
APPROVED WITH COMMENTS
M2
63
NOT APPROVED (RE-SUBMIT)
A REVIEWED
NOT BE RETURNED
60 85 RETURN DATE
1008
M2 63 22 PROJECT ORGINATOR
P4
15
40
2 - 14 ø HOLES 2 - 14 ø HOLES
45
1.50 M2
150
60
APP. DATE
REV DESCRIPTION DWN CHKD
BY dd/mm/yy
CLIENT NAME & LOGO:
45
15
MAAS FABRICATORS
Mumbai - Maharashtra
PROJECT TITLE:
PROPOSED PRE ENGINEERING BUILDING
4 0,4 7
5 0,5 7
6
7
9
0,6
0,1
0,1
7
7
9
INFORMATION IN THIS DOCUMENTS IS PROPERTY OF PRIME STEEL, BEING
PROHIBITED OUTSIDE OF THEIR PURPOSE FORM OWNED TO PRIME STEEL 6 CANOPY RAFTER REQUIRED AS DRAWN MARKED- CRF1() SHEET NO. 01 OF 01
- A
A3
430 mm x 307 mm
CRF1 QTY= 6 CC150-1.5-15-60