Vous êtes sur la page 1sur 7

Bus_Report

Bus ID Equipment Nom kV Equipment Gap X Factor Grounding Limited App


Bus2 13.2 Other 13.0 2 Grounded 10
Bus3 0.48 Other 13.0 2 Grounded 10

Page 1
Bus_Report

Limited AppRestricted Prohibited Available P Total Bus B Total Bus A Source PD BSource PD A
5 2.16 0.6 0 3.05 3.021 0.807 0.799
3.5 1 0.1 0 37.611 22.874 29.804 18.126

Page 2
Bus_Report

Source Trip Source Trip Source Trip Trip Time ( Open Time Total FCT ( FPB (ft) Incident En
Fusible T1 36.007 0 36.007 2.71 3.918
CBT2 1.8 0 1.8 2.217 2.622

Page 3
Bus_Report

Working DisHazard /RisPPE DescripInsulated GInsulated Glove Class


18 1 PPE Requir 17000 2
18 1 PPE Requir 500 00

Page 4
PD_Report

PD ID Equipment Connected PD Type Limited AppLimited AppRestricted Prohibited


FsusibleT2 Bus2 Fuse 10 5 2.16 0.6
CBT1 Bus2 HV CB 10 5 2.16 0.6
CBT2 Bus3 LV CB 10 3.5 1 0.1
fusible Motor Bus3 Fuse 10 3.5 1 0.1
CB Motor Bus3 LV CB 10 3.5 1 0.1

Page 5
PD_Report

PD Bolted ( PD Arcing ( PD FCT (Cy Arcing kA f Upstream SSource PD RSource PD Upstream S


0.246 0.244 3.021 Fusible T1 36.007
2.811 2.784 3.021 Fusible T1 36.007
29.804 18.126 1.800 19.443 FsusibleT2 704.767
1.311 0.797 22.874 CBT2 1.800
1.311 0.797 22.874 CBT2 1.800

Page 6
PD_Report

FPB (ft) Incident En Working DisHazard /RisPPE DescripInsulated GInsulated Glove Class
2.71 3.918 18 1 PPE Requir 17000 2
2.71 3.918 18 1 PPE Requir 17000 2
40.173 861.08 18 > Max 500 00
2.217 2.622 18 1 PPE Requir 500 00
2.217 2.622 18 1 PPE Requir 500 00

Page 7

Vous aimerez peut-être aussi