[9:22 AM, 6/15/2019] Co Ord Samasti: GM, DRM ON PHONE AFTER BLOCK BURSTING.

NEXT
BLOCK TO BE ATTENDED BY ME. DESPITE INSTRUCTIONS OTHERWISE, INCIDENCES OF BLOCK
BURSTING CONTINUES. NOT ACCEPTABLE. NEXT BLOCK SHALL ONLY BE TAKEN
WHEN ALL THE PREPARATORY ARRANGEMENT HAVE BEEN MADE AND PERSONALLY CERTIFIED BY YOU.
HENCEFORTH, ALL THE BLOCKS SHALL BE ATTENDED BY AEN, EVEN IN CASE OF ONLY BCM.

[9:23 AM, 6/15/2019] Co Ord Samasti: Henceforth,

1. AEN to attend every block , even BCM.

2. PWI/ IC/ SKI to attend every block , even BCM.

3. Arrangement as per @ 250 per block or say 1 km in 4 blocks.

4. All necessary precautions must be completed before demanding blocks

5. This time PWI should be given SF/11 for indesciplined and careless working.

6. Next time, AEN will be taken up for block bursting.

7. You will attend @ 1 block per week,

8. By now, initiative has been taken by AEN to ensure that oversize sleepers are detected beforehand, and
taken off to ensure recurrence of this. Since, it has already happened twice, TODAYS BLOCK BURSTING
WILL BE TREATED AS AVOIDABLE. and action should be taken against all erring officials, from top to
bottom.

9. A template should be made for sorting out…

[9:26 AM, 6/15/2019] Co Ord Samasti: Sir Block for TRT/BCM /DGS /DUO Allowed from 01.10-04.30 in
between KJI-JYG but block but block not removed as yet rep 15284/12562/14674/55527/& inaugural
empty chg detain

[9:26 AM, 6/15/2019] Co Ord Samasti: Good morning sir, last night TRT block allowed-(3 hr 20min)
between KJI-JYG

Today again One over-dimensioned new sleeper(having height 260 mm against 240 mm due to
manufacturing defect) got stuck in conveyor , insert had to be cut by gas and its edge was broken
manually with hammer, it took about 35 minutes. So extra time taken in clearing block. Despite my
request to clear block at JYG in forward direction, Block had to cleared in KJI in pushing direction,which is
7.5 Km from site & it takes more than 1 hr running time to travel 7.5 km in pushing direction as speed is
upto 8 kmph only in pushing. Either base has to shifted to JYG or block to be cancelled at JYG instead of
KJI and block of 4.5 hr to be allowed to avoid block bursting.

Regards
Northern
RailwayObjective Q
uestions Engineerin
g Department1 1 )
20Kmph12)
13 mm13)1.
5 mm14)525
GMT15)±20
mm1 6 ) 7 y e a
rs 17)a refu
ge over eac
h pier18)5
mm19)150m
m2 0 ) 2 0 K m . 2
1)2 mm
A] Fill in the
Blanks:
1.Dynamic gaug
e in BG is
1750 mm
.2.Maximum super
elevation for BG,
group ‘A’ route
under normal
conditions is
165 mm
.3.Maximum
degree of
a curve, permitted
on a plain BG trac

E.C.Railway

Office of the
Divl. Rly. Manager (Engg.)
Samastipur

No:-W/281/Misc Dated 15.06.19

Sr.DEN-I, II & III/SPJ


E. C. Railway, Samastipur.
Sub:- Incident of block bursting continues
--------------
On 15.06.19 during the TRT machine working, an incidence of block bursting has been
occurred even the sufficient block as 3.20 hrs from 1.10 am. to 4.30 am had been granted. Block has
been cleared at 6.00 am i.e. 1.30 hrs. more time have been taken to clear the block. It shows that, the
primary preparation before avail the block is not enough.
Also before this event, it has been observed that traffic block had been bursted several
times during the TRT working, during past.
As per GM’s instruction, no block bursting is allowed , therefore shall not be
tolerated . The above incidence has been viewed very seriously by GM.
Therefore you are advised that block shall only be taken when all preparatory
arrangement have been made and personally certified by you.
Henceforth, all the machine blocks shall be attended by respective AENs.
In addition, following to be strictly adhered during TRT machine working-
1. AEN to attend every block , even BCM.
2. PWI/ IC/ SKI to attend every block , even BCM.
3. Arrangement as per @ 250 per block or say 1 km in 4 blocks.
4. All necessary precautions must be completed before demanding blocks
5. This time PWI is being given SF/11.
6. Next time, AEN will be taken up for block bursting.
7. Sr. DEN-I will attend @ 1 block per week,
8. By now, initiative should has been taken by AEN to ensure that oversize sleepers are detected
beforehand, and taken off to ensure recurrence of this. Since, it has already happened twice, TODAYS
BLOCK BURSTING WILL BE TREATED AS AVOIDABLE. and action should be taken against all
erring officials, from top to bottom.
9. A template should be made for sorting out oversized sleepers.
10.. Probable date of handing over the TRT mc to Srden/2 should be communicated to him at the earliest so
THAT IT IS ENSURED BY HIM THAT THE TRT MC WORKS WITHOUT ANY BREAK.
11. SRDEN/2 - PLS MAKE ALL ARRANGEMENTS FOR UTILIZING TRT IN NKE PNY SECTION,
AS SOON AS YOU GET THE MACHINES.
All concerned to note above and ensure strict compliance No block bursting is allowed,
Hence for shall not be tolerated.

Sr. DEN(Co-ord)/SPJ
Copy to –(i) PS to DRM/SPJ for kind information please.
(ii)All ADENs / SPJ,SHC,DBG-I,DBG-II,BMKI,&NKE for strict adherence to
above instruction.
(iii) All PWI/Incharge SPJ,HPO, KGG at SHC, SHC, BNKI, DBG, SKI, JNR, RXL,
BMKI, SGL, NKE/E, & NKE/W for strict adherence to above instruction.
(iv) Divisional Engg. Control & PWI/Planning for necessary action.

1. OBJECTIVE QUESTIONS

1)Lubrication of ERC and inserts in corrosion prone areas and platform


l i n e i s done once in a ________.2 ) M i n i m u m r a i l s e c t i o n r e c o m m e n d e d f o r
s e c t i o n h a v i n g t r a f f i c m o r e t h a n 20GMTs is _____.3 ) T h e r a i l d o l l e y s h a l l b e
p r o t e c t e d b y a f l a g m a n a t a d i s t a n c e o f _ _ _ _ _ m e t r e o n BG from the rail dolley, on
a double line in the direction from which train mayapproach.4 ) P e r m a n e n t c l o s u r e i n r u n n i n g
l i n e s f o r l o c a t i o n s s u c h a s 5 0 0 m e t r e l e n g t h o n both side approaches of
tunnels, tunnel proper, major and important bridgesincluding bridge proper, deep cuttings and high
embankments should not be less than______ in length, between two adjoining fish plates.5 ) D i s t a n c e
block to platform line are fixed at centre to centre distance
o f _________.6 ) P o i n t s & C r o s s i n g i s l a i d a t a c a n t
of i ) 1 i n 2 0 i i ) 1 i n 1
0 i i i ) 1 i n 1 5 i v ) N I L 7)Minimum
permissible vertical wear on nose of a 52 kg CMS crossing
o n Rajdhani route
isi ) 6 m m i i ) 8 m m i i i )
1 0 m m i v ) 1 2 m m 8)Minimum radius of
c u r v e s f o r B G t r a c k i s _ _ _ _ _ _ . 9)Minimum height above rail level
for high passenger platform is _________.1 0 ) M a x i m u m g r a d e i n s t a t i o n
y a r d i s _ _ _ _ _ _ . 11 )M in im um sp eed rest ri ct io n to b e im po sed fo r Track
renewal
isi ) S t o p d e a d & 1 0 K m p h i i ) 1 0 K m p h
i i i ) 1 5 K m p h i v ) 2 0 K m p h 1 2 ) Ve r t i c a l w e a r
permissible for 60kg/90UTS. rails is ________.
Page 3 of 41

Northern
RailwayObjective Questions Engineering Department13)Permissible wear of web & foot of rail due to corrosion is __
______.14)Service life in terms of total GMT carried for 52 kg. 90 UTS rail is______ 15)Permissible variation of
sleepers to sleeper spacing is ______.16)Normal life of detonators
isi ) 5 y e a r s i i ) 1 0 y e a r s i i i
) 7 y e a r s i v ) 6 y e a r s . 17)Maximum distance apart of trolley
refuges on bridges with main spans of 100metreor more
isi ) 5 0 m t r i i ) 1 0 0 m t r
i i i ) 2 0 0 m t r i v ) a r e f u g e o v e r e a c h p a i r . 18
)Permissible vertical wear for tongue rail of 52kg. lefthand fanshape curved switch is _____.19)Permissible creep
in track
isi ) 5 0 m m i i ) 1 0 0 m m i
i i ) 1 2 5 m m i v ) 1 5 0 m m . 20)Maximum
distance covered in a day by a Patrolman should not normally
exceedi ) 2 k m . i i ) 5 k m .
i i i ) 1 0 k m . i v ) 2 0 k m . 21)In case of
5 2 k g C M S C r o s s i n g d i m e n s i o n t o b e d e d u c t e d ( t o a c c o u n t f o r s l o p e in casting of
wing rail to 1:20 cant) from the observed wear measurements to find out the actual wear is ______
Answers
1 ) Y e a r 2 ) 6 0 k g 3
) 1 2 0 0 m e t e r 4 ) 1
1 m e t e r 5 ) 3 0 meter 6 )
N I L 7 ) 8 m m 8 ) 1 7
5 m e t e r 9 ) 7 6 0
m m 1 0 ) 1 i n 400
Page 4 of 41

Northern
RailwayObjective Questions Engineering Department1 1 ) 2 0 K m p h 1
2 ) 1 3 m m 1 3 ) 1 . 5 m m 1 4 )
5 2 5 G M T 1 5 ) ± 2 0 mm1 6 ) 7
y e a r s 1 7 ) a r e f u g e o v e r
e a c h p i e r 1 8 ) 5 m m 1 9 ) 1 5 0
mm2 0 ) 2 0 K m . 2 1 ) 2 m m
A] Fill in the Blanks:
1 . D y n a m i c g a u g e i n B G i s
1750 mm
.2 . M a x i m u m s u p e r e l e v a t i o n f o r B G , g r o u p ‘ A’ r o u t e u n d e r n o r m a l c o n d i t i o n s
is
165 mm
.3 . M a x i m u m d e g r e e o f a c u r v e , p e r m i t t e d o n a p l a i n B G t r a c k i s
10
o
.
4.Maximum values of normal cant deficiency prescribed for BG, A & B groups
is
75 mm.
5 . T h e m a x i m u m s i z e o f t r a c k b a l l a s t i s
65 mm.
6.Minimum depth of ballast cushion below the bottom of sleeper at the
r a i l s e a t should be
300 mm on
BG group A route.7 . C e n t r e t o c e n t r e s p a c i n g ( m a x i m u m ) o f w o o d e n s l e e p e r s o n
f i s h p l a t e d B G t r a c k is
30 cm
.8 . C e n t r e t o c e n t r e s p a c i n g ( m a x i m u m ) o f w o o d e n s l e e p e r s o n f i s h
p l a t e d B G track, between joint sleepers and first shoulder sleeper is
61 cm.
9 . S l e e p e r d e n s i t y f o r g r o u p ‘ A’ r o u t e w i t h t r a f f i c d e n s i t y m o r e t h a n 2 0 G M T i s
1660 sleepers per kilometer.
1 0 . T h e p e r m i s s i b l e s p e e d , f o r 1 i n 8 ½ s y m m e t r i c a l s p l i t w i t h c u r v e d s w i t c h o n B G track,
is
30 kmph
.1 1 . S p e e d i n e x c e s s o f
15 kmph
should not be permitted on turn in curves laid withwooden sleepers.1 2 . S W R s h a l l n o t b e l a i d o n
curves sharper than
500 metres
radius in both BG andMG.1 3 . T h e l u b r i c a t i o n o f E R C s a n d i n s e r t s h o u l d b e d o n e
once in a year
in corrosion prone areas and platform lines and
once in two years
in other areas.1 4 . F o r a l l b r i d g e s , i n c a s e o f LW R t r a c k , f u l l b a l l a s t s e c t i o n , a s s p e c i f i e d
i n LW R Manual should be provided upto
100 metres
from the abutments.
Page 5 of 41
Northern RailwayObjective Questions Engineering Department1 5 . F l a n g e - w a y c l e a r a n c e o f B G t u r n o u t s
b e t w e e n r u n n i n g r a i l a n d c h e c k r a i l a t nose of crossing is
48 mm (maximum) and 44 mm (minimum).
1 6 . T h r o w o f t h e s w i t c h o f B G t u r n o u t s i s
11 5 m m ( m a x i m u m ) a n d 9 5 m m (minimum).
17.There are special chairs provided behind the heel of switch to give
a s u i t a b l e ramp to the tongue rail, which is raised by
6 mm
at the heel.
Page 6 of 41
Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

Northern RailwayObjective Questions Engineering Department


2.Objective Questions on Track Machines
( 1 ) W h a t i s t h e g a u g e o f A u x i l i a r y Tr a c k f o r w o r k i n g o f P Q R S s ?
( A ) 3 4 0 0 m m
( B ) 3 7 0 0 m m
( C ) 3 0 0 0 m m
( D ) 1 6 7 6 m m
( 2 ) H o w m a n y o n O n - Tr a c k t r a c k m a c h i n e s c a n w o r k i n a b l o c k s e c t i o n
a t a time as per subsidiary rule?
( A ) O n e (
B ) T h r e e
( C ) F i v e
( D ) F o u r
(3)Which machine is not a relaying machine:
( A ) T -
2 8 ( B ) T R
T ( C ) P Q R
S ( D ) U T V
(4)What shall be the minimum safe distance between track machines
w h e n moving in the block section in convey?
( A ) 5 0 m
( B ) 1 8 0
m ( C ) 1 2 0
m ( D ) 2 0 0
m (5)As per IRTMM, the auxiliary track for PQRS working
c a n b e h i g h e r t h a n the existing track by not more than:
( A ) 4 0 m m
( B ) 5 0 m m
( C ) 2 5 m m
( D ) 1 0 m m
(6)The size of wooden battens for loading PSC sleepers on special
B F R s f o r TRT working shall
be( A ) 5 0 m m X 5 0 m m (
B ) 7 5 m m X 7 5 m m ( C )
1 0 0 m m X 1 0 0 m m ( D ) N o n e
o f t h e a b o v e (7)Maintenance tamping of track
d u r i n g s u m m e r s e a s o n s h a l l n o t b e d o n e when the rail temperature is more than:
( A ) t d (
B ) t d + 5
( C ) t d +
1 0 ( D ) t d
– 5
Page 7 of 41

Northern RailwayObjective Questions Engineering Department


(8)What shall be the distance between two track machines during working ina
block section?
( A ) 5 0 m
( B ) 1 2 0
m ( C ) 9 0
m ( D ) 1 8 0
m (9)What is the minimum cushion of clean ballast is
r e c o m m e n d e d f o r p r o p e r functioning of tamping machines?
( A ) 5 0 m m
( B ) 7 5 m m
( C ) 1 0 0 m m
( D ) 1 5 0 m m
(10)Recommended tamping (squeezing) pressure for
PSC sleeper
t r a c k , is( A ) 9 0 – 1 0 0 K g / S q . c m .
( B ) 1 0 0 – 1 1 0 K g / S q . c m . ( C ) 1 1 0
– 1 2 0 K g / S q . c m . ( D ) 1 2 0 – 1 3 0
K g / S q . c m . (11 ) T h e ta m p i n g t o o l s s h a l l b e r e p l a c e d w h e n
t h e s e c t i o n a l a r e a o f t h e t o o l blade is reduced
by( A ) 1 5 %
( B ) 2 0 %
( C ) 2 5 %
( D ) 3 0 %
(12)What are the main functions of tamping machines?
( A ) C o r r e c t i o n o f A l i g n m e n t ( B ) C o r r e c t i o n o f
l o n g i t u d i n a l ( C ) P a c k i n g u n d e r s l e e p e r s
( D ) A l l o f a b o v e (13)Which small track machine is not
r e q u i r e d f o r d o i n g w e l d i n g o f r a i l s i n LWRs?
( A ) H y d r a u l i c R a i l B e n d e
r ( B ) D o u b l e A c t i o n W e l d Tri
mmer ( C ) R a i l P r o f i l e G r i n d e r ( D ) R a i
l C u t t i n g M a c h i n e (14)What is the capacity of non-
infringing track jacks normally used for
t r a c k maintenance( A ) 8
T ( B ) 9
T ( C ) 1 0
T ( D ) 1 2
T
Page 8 of 41

Northern RailwayObjective Questions Engineering Department


( 1 5 ) W h a t a r e a d v a n t a g e s o f u s i n g D y n a m i c Tr a c k S t a b i l i z e r
machine( A ) A c h i e v i n g S p a t i a l F o r c e t o ( B ) R e g a i n i n g
t h e r e s i s t a n c e free consolidation lateral displacement( C ) R e l a x i n g t h e
s p e e d R e s t r i c t i o n ( D ) A l l o f a b o v e . expeditiously( 1 6 ) W h a t i s
recommended squeezing time for maintenance
packing( A ) 0 . 2 s e c t o 0 . 4 s e c (
B ) 0 . 4 s e c t o 0 . 6 s e c ( C ) 0
. 6 s e c t o 0 . 8 s e c ( D ) 0 . 8 s
e c t o 1 . 0 s e c (17)What shall be the ramp
g r a d i e n t b e f o r e c l o s i n g t h e t a m p i n g w o r k a n d obligatory point?
( A ) 1 i n 6 0
0 ( B ) 1 i n 8
0 0 ( C ) 1 i n 1
0 0 0 ( D ) 1 i n 1
5 0 0 ( 1 8 ) Tw o i n s e r t i o n s d u r i n g t a m p i n g o f c o n c r e t e s l e e p e r s
a n d r e q u i r e d f o r l i f t more
than( A ) 1 0 m
m ( B ) 3 0 m
m ( C ) 5 0 m
m ( D ) 7 5 m
m (19)After one round of tamping along
w i t h D T S a f t e r d e e p s c r e e n i n g , t h e traffic can be resumed with speed restriction
of:( A ) 3 0
K M P H ( B ) 4 0
K M P H ( C ) 6 0
K M P H ( D ) 7 5
K M P H (20)Which machine is used for turnout
renewals:
( A ) T R T (
B ) P Q R S (
C ) T -
2 8 ( D ) R A I L
- V A C
Answers: - 1-B, 2-C, 3-D, 4-C, 5-B, 6-B, 7-C, 8-A, 9-D, 10-C, 11-B, 12-D, 13-A, 14-A,15-D, 16-B, 17-C, 18-
B, 19-B, 20-C.
Page 9 of 41

Northern RailwayObjective Questions Engineering Department


3.Objective Questions P & D,SOD
1 . I n w h i c h c a t e g o r y s u b u r b a n s t a t i o n s h a v e b e e n include
d a s p e r c a t e g o r i z a t i o n o f s t a t i o n f o r passenger
amenities?‘C’2 . W h a t i s t h e n o r m s f o r b o o k i n g f a c i l i t i e s ( n o o
f counters) for a ‘A’ category station as per minimumessential amenities?

153 . W h a t i s t h e m a x i m u m h e i g h t a b o v e r a i l l e v e l o f e n d loading platform for BG?


1295mm4. What is the full form of IVRS? Interactive voiceResponse
system.5 . W h a t i s t h e c r i t e r i a f o r a ‘ D ’ c a t e g o r y s t a t i o n ? P a s s e n g e r e a r n - ings
between Rs.1crore and Rs.3crores per annum.6 . W h a t i s t h e m i n i m u m d i s t a n c e o f
a 3 - m e t e r s h i g h b u i l d i n g o n p a s s e n g e r p l a t f o r m f r o m c e n t r e o f track?
5330mm7 . I n h o w m a n y c a t e g o r i e s s t a t i o n s h a v e b
e e n c a t e g o r i z e d f r o m p a s s e n g e r a m e n i t i e s p o i n t o f view?6 categories i.e. A,B, C, D,
E & F.8. What is minimum horizontal distance from centre of track to any structure from rail level to 305 mmabove
rail level for BG in station yard?1675mm9 . W h a t i s m a x i m u m a n d
m i n i m u m h o r i z o n t a l d i s t a n c e from center of track to face of passenger platformcoping for BG?
Max.1680mmMin.1670mm1 0 . W h a t i s m a x i m u m h e i g h t a b o v e r a i l l e v e l f o r l o w - level
passenger platform for BG?455mm1 1 W h a t i s m i n i m u m h o r i z o n t a l d i s t a n c e
o f a n y telegraph post measured from the center of track atright angles to the nearest track for BG?The height of
post+
2135mm1 2 W h a t i s t h e P l i n t h a r e a o f t y p e -
I I I Q u a r t e r ? 5 5 . 7 5 s q . m . 13.What is minimum no. of
u r i n a l s r e q u i r e d f o r 1 0 0 persons in a office building as per IRWM?4
Nos.1 4 . F o r w h a t t h e w o r d “ S R S F ” s
t a n d s f o r ? S p e c i a l R a i l w a y Safety
Fund.1 5 N a m e t h e p l a n h e a d u n d e r w h i c h c o n s t r u c t i o n o f a health unit can be sanctioned?
Plan head 52:Amenities for staff 1 6 . I n h o w m a n y v o l u m e s w o r k s p r o g r a m m e i s 5 N o s .
Page 10 of 41
Northern RailwayObjective Questions Engineering Department
prepared?1 7 . I n h o w m a n y d a y s s o f f i t f o r m w o r k t o b e a m s c a n b e removed?7 days1 8 . W h a t
i s m i n i m u m d i s t a n c e f r o m c e n t e r l i n e o f t r a c k to duty hut at L-Xing?6.0 m1 9 W h a t i s t h e
c h a r a c t e r i s t i c c o m p r e s s i v e s t r e n g t h o f 150mm cube at 28 days of M20 concrete?20
N/mm22 0 . W h a t i s r e c o m m e n d e d g r a d i e n t i n s
t a t i o n y a r d ? 1 : 1 0 0 0
Page 11 of 41

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

Northern RailwayObjective Questions Engineering Department


4. LEVEL CROSSINGS
Q.1. What is the normal position of level crossing gate:a. Branch line where Railway traffic is less and road traffic is
more?Ans.1a. Open to road traffic.a. On main line, where TVU is more than 25000.A n s . 1 b . O p e n
t o r o a d t r a f f i c . a. On B-class level crossing with TVU less than 25000A n s .
1 c . C l o s e t o r o a d t r a f f i c . Q.2. What is the new criteria of classification of manne
d level crossings?
A n s . 2 . C l a s s C r i t e r
i a Special- TVU>50,000A TVU> 30,000Or Line capacity utilization more than 80% (on single
line) and road vehicle more
than1,000)B TVU>20,000 & road vehicle more than 7.50C Under consideration of Railway Board.Q.3 What is the
minimum number of gatekeepers required in special class, A- class &B-class?Ans.3 3 numbers in special class.2
numbers in A & B classes.Q4. How the TVU is calculated?Ans. 4.The multiplication of total number of train
units from both side and number of road vehicle unit is cold TVU of level crossing.Q.5. What is the
distance of WIL Boards for unmanned level crossings on single line section and where visibility is clear?
Ans. 5. 350 meters.Q.6. What is the minimum distance of height gauge in case of level crossings?A n s . 6 .
H e i g h t g a u g e s h o u l d b e l o c a t e d a t a m i n i m u m d i s t a n c e o f 8 . 0 0 m f r o m g a t e posts.
Page 12 of 41

Northern RailwayObjective Questions Engineering DepartmentQ . 7 W h a t i s t h e m i n i m u m l e n g t h o f


f e n c i n g p a r a l l e l t o t r a c k w i t h e a c h g a t e p o s t o n special &A class?Ans.7. 15 metersQ.8. What is the
minimum length of fencing parallel to track with each gatepost on B &C class?Ans. 8. 15 metersQ.9.What is the
gradient of road on C-class level crossing gates?Ans.9 1:15 is the gradient provided on ‘C’ class level crossing
gates.Q.10. Describe the types of gates are in Railway?Ans. 10.There are two types of gates in Railway:

Traffic gates

Engineering gatesQ . 11 W h a t i s t h e d i s t a n c e o f s p e e d b r e a k e r s o n t h e a p p r o a c h e s o f
u n m a n n e d l e v e l crossing?Ans. 11.Speed breakers are provided at a distance of 20 M from gate.Q.12. What
legend is written on stop Boards at level crossings?
A n s . 1 2 . S t o p , l o o k o u t f o r t r a i n s b e f o r e c r o s s i n g i n E n g l i s h , H i n d i a n d R e g i o n a l language is
written on stop Boards.Q.13. What is the visibility requirements for unmanned level crossing for road users?Ans.
13For new unmanned level crossing the visibility requirements for road users along the track shall be
600 m with single or double line track.
Page 13 of 41

Northern RailwayObjective Questions Engineering Department


5. QUESTIONNAIRE FOR 70% QUOTA EXAMINATION
Q - 1 P e r i o d i c a l c e n s u s o f t r a f f i c a t a l l l e v e l c r o s s i n g s w h e t h e r u n m a n n e d o r Manned should
between at least1 . O n c e i n s i x y e a r s . 2 . O n c e i n o n e
y e a r . 3 . O n c e i n f i v e y e a r s . Q-2Level crossing beyond the outer must stop signals is
called1 . O p e r a t i n g g a t e . 2 . E n g i n e e r i n g G a t e . 3 . O p e r a t i n g & E n g g .
g a t e . 4 . N o n e o f t h e a b o v e . Q-3Maximum clearance of check rails at
level crossing should be1 . 4 4 m m 2 . 4 8 m m 3 . 5 1 m m 4 . 5 7 m
m Q-4Minimum clearance of check rails at level
crossing should be1 . 4 8 m m 2 . 5 7 m m 3 . 5 1 m m 4 . 4 4 m
m Q.5The gauge on BG route of Indian Railways maintained
to1 . 1 6 0 0 m m 2 . 1 6 7 6 m m 3 . 1 6 8 0 m m 4 . N o n e o f a b o v e . Q.6Curve
inspection shall be carried out by Sectional PWI1 . O n c e i n t h r e e
months2.Once in six months3.Once in four months4 . No n e o f
a b o v e . Q.7Curve inspection shall be carried out by PWI in
charge1 . O n c e i n t w o m o n t h s 2 . O n c e i n f o u r m o n t h s 3 . O n c e i n t h r e e
m o n t h s 4 . O n c e i n s i x m o n t h s . Q.8Foot plate Inspection shall be carried
out by PWI1 . O n c e i n t w o m o n t h s 2 . O n c e i n o n e m o n t h 3 . O n c e i n t h r e e
month4.None of the above.
Page 14 of 41

Northern RailwayObjective Questions Engineering DepartmentQ.9 PWI/In charge and his Assistant should
carry out the inspection of Points &crossings of passenger running line by rotation1 . O n c e i n t w o
months2.Once in three months3.Once in four months4.None of the
a b o v e . Q.10When check rails of level crossing cannot be refixed & train have to be
p a s s e d , speed restriction should be
imposed1 . 1 5 k m p h 2 . 3 0 k m p h 3 . 4 5 k m p h 4 . N o n e o f t h e
a b o v e . Q - 11 Av e r t e d c o l l i s i o n i s c a t e g o r i e s a s ( a ) ( b )
( c ) ( d ) Q-12An accident has taken place at out station
a n d m a i n l i n e i s b l o c k e d a n d r e l i e f train is to be turned out without medical car. The hooter shall
be:3 l o n g 4 l o n g 4 l o n g , 1
s h o r t 3 l o n g , a n d 1 s h o r
t Q-13Permissible limit for wheel tread diameter for the same axle
is0 . 5 m m 1 . 0 0 m
m 1 . 7 5 m m 1 . 2 5
m m Q-14Lateral and longitudinal clearance between axle box and axle
guard should
n o t exceed6 m m 8 m m 1 0
m m 1 2 m m Q-15In a semi
permanent (BG) diversion the gradient should not be
steeper than1 i n 7 5 1 i n 1 2 5
1 i n 1 0 0 1 i n 1 5 0
Page 15 of 41

Northern RailwayObjective Questions Engineering Department


7. Track Recording.
Q 1 . W h a t i s t h e l i m i t s o f r i d i n g i n d e x . Ans.
( i ) 4 . 5 I m p o s i t i o n o f s p e e d r e s t r i c t i o n . (ii) 3.5 For taking early maintenance.(iii) 300 For
satisfaction level of maintenance.Q 2 . W h a t a r e t h e p a r a m e t e r s w h i c h c o n t r i b u t e s t o h i g h e r v a l u e
o f r i d i n g i n d e x . A n s . Tw i s t , M i s a l i g n m e n t , U n e v e n n e s s a n d G a u g e . Q 3 . W h a t i s m e a n s
0.35 Horizontal peak in OMS recording.Ans.Alignment kinks and gauge
variation.Q 4 . G i v e t h e f o r m u l a o f
T G I V a l u e . A n s . 2 U I + G I + T I + G A I . -----------------------10Q 5 . W h a t i s t h e v a l u e o f
T G I f o r b a d , g o o d o r v e r y g o o d . A n s . B e l o w 3 6 - B a d . 36 to 49 -Good.50 to 79 -Very
Good.80 and above -Outstanding.Q 6 . W h a t a r e t h e d e f i c i e n c i e s i n t r a c k w h i c h l e a d s t o v e r t i c a l
acceleration peak?A n s .
( i ) L o w j o i n t ( i i ) T w i s t ( i i i ) S l a c k s ( i v ) Ve r t i c a l w e a r o f t h e r a i l s .
( v ) B a l l a s t cushion deficiency (vi)Loose packing (vii)Weak formation (viii)Wornout sleeper seat.Q 7 . W h a t a r e
t h e d e f i c i e n c i e s i n t r a c k w h i c h l e a d s t o h o r i z o n t a l ( l a t e r a l ) a c c e l e r a t i o n peak?A n s . ( i )
G a u g e v a r i a t i o n ( i i ) M i s - a l i g n m e n t ( i i i ) D e f i c i e n t b a l l a s t ( i v ) W e a k r a i l holding
seats of the sleeper (v) Side lateral wear of the rail etc.Q 8 . W h a t i s t h e 8 p e a k s r e c o r d e d b y T R C
and how do you make use of itA n s . 8 p e a k s r e c o r d e d
b y T R C m e a n s w o r s t l o c a t i o n w h i c h n e e d a t t e n t i o n f o r improving the TGI
Value.Q 9 . P r i o r t o T R C w h a t s h o u l d b e y o u r p r i o r i t y f o r a t t a i n i n g v a r i o u s
p a r a m e t e r s f o r effective improvement.A n s . ( i ) A t t e n d i n g g a u g i n g f r o m o n e s i d e t o t h e o t h e r.
(ii) Attend low joints with picking of slacks.Q 1 0 . W h a t i s t h e
f r e q u e n c y o f T R C . Ans.A b o v e 1 3 0 k m
p h . O n c e i n t w o m o
n t h s . A b o v e 1 1 0 k m
p h O n c e i n t h r e e m
o n t h s . A & B r o u t
e . O n c e i n f o u
r m o n t h s . E & D
r o u t e . O n c e i n
s i x m o n t h s . G r
o u p E s p e c i a l . O n
c e i n 1 2 m o n t h s .
Page 16 of 41

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

Northern RailwayObjective Questions Engineering DepartmentQ 11 . W h a t i s t h e f r e q u e n c y o f


Oscillograph high speed.A n s . R a j d h a n i r o u t e . -
O n c e i n f o u r m o n t h s . Above 100 kmph.-Once in six
m o n t h s . Q12.What is the frequency of OMS
recording.A n s . A b o v e 1 0 0 k m p h . - O n c e i n a
m o n t h . O t h e r r o u t e . - O n c e i n t w o
m o n t h s . Q13.What is the value for Good, Bad, Outstanding track during
OMS recording.A n s . A v . P P K M . C a t e
g o r y o f t r a c k . ( i ) M o r e
t h a n 2 . 0 0 b e l o w a v e r a g e .
( i i ) 1 . 0 0 t o 2 .
0 0 G o o d . ( i i i ) 0 . 2 5
t o 1 . 0 0 V e r y G o o d . ( i v ) U p t o
0 . 2 5 . O u t s t a n d i n g . Q14.What
is the peak value during OMS recording.A n s . G r o u p A , R a j d h a n i / S h a t a b a d i r o u t e s . -
0.15g.F o r o t h e r r o u t
e . - 0 . 2 0 g . Q15.What is the value of CTR for
category of track.A n s .
( i ) N e g a t i v e . B e l o w a v e r a g e .
( i i ) 0 - 3 0 A v e r a g e .
( i i i ) 3 0 - 5 5 G o o d .
( i v ) 5 6 - 7 5 V e r y G o o d .
( v ) A b o v e 7 5 . O u t s t a n d i n g . Q16.What is the
v a l u e o f d i f f e r e n t c h o r d s o n w h i c h S D v a l u e i s m e a s u r e d f o r t h e calculation of
TGI.A n s . U n e v e n e s s 9 . 6 M .
T w i s t 3 . 6 M .
A l i g n m e n t . 7 . 2 M . Q17.As
p e r C R S s t i p u l a t i o n , a f t e r h o w m o n t h o f r e c o r d i n g o n ‘ A’ r o u t e s p e e d o f Rajdhani
will be reduced.A n s . A f t e r e x p i r y o f 6 m o n t h s o f r e c o r d i n g s p e e d o f R a j d h a n i w i l l b e r e d u c e d
t o 11 0 kmph.Q18.Write down the values of short chord and long chord of different
parameter.A n s . P a r a m e t e r . S t a
n d a r d . L o n g C h o r d . U
n e v e n n e s s . 3 . 6
M . 9 . 6 M . T w i s
t . 3 . 6 M . 4 .
8 M . A l i g n m e n
t . 7 . 2 M . 9 . 6 M .
Q19.What do you understand by three stars (xxx) and two stars (xx) printed
i n printout of TRC.A n s . T h r e e s t a r s ( x x x ) m e a n s u r g e n t m a i n t e n a n c e a n d t w o s t a r s ( x x ) m e a n s
p l a n n e d maintenance is required.
Page 17 of 41

Northern RailwayObjective Questions Engineering DepartmentQ 2 0 . W h a t d o y o u m e a n s b y n o r m a l i s e d


SD value in track recording.Ans.Normalised SD value of a parameter is the measured SD
v a l u e d i v i d e d b y S D value prescribed for urgent maintenance.Q21.In TRC printout, if the index value of
any parameter is less than 36.What does itindicates.A n s . I t i n d i c a t e s t h a t t h e m e a s u r e d S D
v a l u e i s e q u a l t o o r g r e a t e r t h a n S D v a l u e specified for urgent maintenance.Q 2 2 . W h a t
parameters are recorded by OMS-2000.Ans.OMS records vertical , lateral
a c c e l e r a t i o n a n d r i d e i n d e x . Question on LWR.Q 1 . W h a t i s m i n . l e n g t h o f L W R ?
Ans.Greater than 250m on BG and 500 m on MG.Q 2 . W h a t i s m i n . c u s h i o n
r e q u i r e d f o r LW R ? A n s . 2 5 0 m m . Q 3 . W h a t i s s t e e p e s t g r a d e
p e r m i t t e d f o r LW R ? A n s . 1 : 1 0 0 . Q4.Up to what degree of reverse
c u r v e s LW R c a n b e c o n t i n u e d ? A n s . U p t o 8 7 5 m r a d i u s i . e . 2 ” . Q 5 . W h i c h r a i l s
s e c t i o n s a r e p e r m i t t e d f o r L W R ? A n s . B G - 9 0 R / 5 2 k g . / 6 0 k g . MG-
75R/90R.Q 6 . W h e n t h e H o t w e a t h e r p a t r o l l i n g i s i n t r o d u c e d ? A n s . W h e n t h e
rail temp. exceeds td+20
0
C.Q 7 . W h e n C o l d w e a t h e r p a t r o l l i n g i s i n t r o d u c e d ? A n s . W h e n r a i l t e m p . i s l e s s
than td-30
0
C.Q 8 . W h a t i s t h e b e a t o f p a t r o l m a n i n L W R / C W R s e c t i o n ? A n s . T w o k i l o m e t e r
f o r o n e p a t r o l m a n . Q 9 . W h a t i s t h e l o w e s t l e v e l o f s u p e r v i s o r f o r d e s t r e s s i n g o f LW R ?
A n s . P W I . Q 1 0 . W h a t i s m e a n r a i l t e m p e r a t u r e ( t m ) ? Ans.It is the
a v e r a g e o f m a x i m u m a n d m i n i m u m t e m p e r a t u r e s r e c o r d e d f o r a s e c t i o n . Q 11 . W h a t
i s p r e v a i l i n g r a i l t e m p e r a t u r e ( t d ) ? Ans.Prevailing rail temperature (tp)is the rail temperature
prevailing at the time whenany operation connected with destressing is carried out.
Page 18 of 41

Northern RailwayObjective Questions Engineering DepartmentQ 1 2 . W h a t i s S E J ?


Ans.It is switch Expansion Joint. It is expansion
j o i n t i n s t a l l e d a t e a c h a n d o f LWR/CWR to permit Expansion/Contraction of the adjoining
breathing lengths due totemperature variations.Q 1 3 . W h a t i s G l u e d J o i n t ? A n s . T h e G l u e d
j o i n t G 3 ( L ) t y p e i s p r o v i d e d i n a l l i n s u l a t i o n s f o r t r a c k c i r c u t i n g i n LWR/CWR.Q 1 4 . W h a t
i s b r e a t h i n g l e n g t h ? A n s . B r e a t h i n g l e n g t h i s t h a t l e n g t h a t e a c h e n d o f LW R / C W R
w h i c h i s s u b j e c t e d t o Expansion/Contraction on account of temperature variations.Q 1 5 . W h a t a r e
B u f f e r R a i l s ? Ans.Buffer rails are a set of rails provided in lieu of SEJ at the ends of
LWR/CWR
toa l l o w E x p a n s i o n / C o n t r a c t i o n o f a d j o i n i n g b r e a t h i n g l e n g t h s d u e t o t e m p e r a t u r e v a r i a t i o
n s . T h e s e w i l l b e l a i d w i t h p r i o r a p p r o v a l o f C h i e f Tr a c k E n g i n e e r a t t h e locations where
provision of SEJ is not permitted.Q 1 6 . U p t o w h a t d e g r e e o f c u r v e S E J c a n b e p r o v i d e d ?
A n s . U p t o 0 . 5
0
curve.Q 1 7 . W h a t i s t h e c o n d i t i o n r e g a r d i n g L - X i n g i n LW R / C W R ? A n s . L . X i n g s h o u l d n o t
f a l l i n b r e a t h i n g l e n g t h o f LW R / C W R . Q 1 8 . W h a t s h o u l d b e t h e g a p a t S E J ?
Ans.Gap at SEJ shall be adjusted at the time of laying/subsequent
d e s t r e s s i n g o f LWR/CWR as
under:R a i l s e c t i o n l a i d . G a p t o
b e p r o v i d e d a t t d . 5 2 k
g . / 6 0 k g . 4
0 m m . O t h
e r s . 6 0
m m . Q 1 9 . T h e r m a l f o r c e i n LW R i s
c a l c u l a t e d ? Ans.The thermal force ‘P’ is calculated by the following
f o r m u l a : P=EAxtWhere ‘P’-Thermal force in the rail(kg).‘E’-Modulus of Elasticity of rail steel,
(2.15x10kg/sq.cm).A-Area of cross section of the rail (sq. cm).d-Coefficient of linear expansion of steel (152x10/
0
C).t-Variation of rail temperature from td/t(C
0
).Q 2 0 . W h a t i s d e s t r e s s i n g t e m p e r a t u r e ( t d ) ? Ans.Destressing temperature (td) is the
average trail temperature during the period of fastening the rails to the sleepers after destressing LWR
without the use of rail tensor. If rail tensor is used, td for all practical purposes is equal to stress free
temperature toRange of td or t
o
shall be within the limits of rail temperature shown below:-
R a i l S e c t i o n
. R a n g e . ( i ) 5 2 k g .
a n d h e a v i e r . t m + 5
0
C to tm+10
0
C.
( i i ) O t h e r s . t
m t o t m + 5
0
C.
Page 19 of 41

Northern RailwayObjective Questions Engineering Department


8.General mixed questions.
A] FIND THE CORRECT STATEMENT
1. In case of heel and C.I blocks behind the heel, all holes are perpendicular to:<WA>Perpendicular to left hand
side<WA>Drilled at angle Q/2<CA>Right hand sideof block<WA>None of
these2. The two locations where wear of tongue rail is to measured are:<WA>150mm and 1m behind
ATS <WA>300mm behind ATS and at H.<CA>Wherehead width of tongue rail is 13mm and at
JOH3. No part of the tree shall be nearer than ... from the nearest live conductor <CA>4 m<WA>5 m<WA>6 m<WA>7
m4 . M a x . r a t e o f c h a n g e o f c a n t / c a n t d e f i c i e n c y o n t r a n s i t i o n
curve is< WA > 4 5 m m / S e c . < C A > 5 5 m m / S e c .
< W A > 3 5 m m / S e c . < W A > 2 5 m m / S e c . 5 Frequency of inspection of manned level Xing by P
WI is< C A > O n c e a m o n t h < W A > O n c e a w e e k < W A > O n c e
a f o r t n i g h t < W A > O n c e in 6 months. 6 . D u r i n g w e l d i n g o f a r a i l j o i n t
with tensor, tensor may be opened
after < W A > 5 m i n u t e s < W A > 1 0 m i n u t e s < W A > 1 5
m i n u t e s < C A > 2 0 m i n u t e s 7.Maximum speed of Lorry wh
en visibility is
clear < W A > 6 K m p h < C A > 1 0 K m p h < W A > 1 5 K m p
h < W A > 2 0 K m p h 8.For 52 Kg 75 mm Gap welding finished weld
tolerances are measure
b y < WA > 1 0 c m s t r a i g h t e d g e < C A > 1 5 c m s t r a i g h t e d g e < WA > 2 5 c m s t r a i g h t e d g e <WA>1 m
straight
edge9 . S p e e d r e s t i c t i o n o n r a i l c l u s t e r s s h a l l b e <
C A > 1 0 K m p h < W A > 1 5 Kmph<WA>20 Kmph<WA>30
Kmph1 0 . T h e s p e e d r e s t r i c t i o n o n l e v e l X i n g i f c h e c k r a i l i s n
o t f i x e d < W A > 2 0 Kmph<CA>30 Kmph<WA>40 Kmph<WA>50 Kmph1 1 . T h e
equilibrium super elevation
i s < WA > D i r e c t l y p r o p o r t i o n a l t o V < C A > D i r e c t l y p r o p o r t i o n a l t o s q u a r e o f V <
WA>Inversely proportional to V <WA>Not related to V1 2 . M i n i m u m c l e a n c u s h i o n r e q u i r e d
f o r T T M w o r k i n g i s <WA>100mm <CA>150mm <WA>200mm <WA>300mm
[
Page 20 of 41

Northern RailwayObjective Questions Engineering Department


B] FIND THE INCORRECT STATEMENT
1. Maximum Horizontal distance from centre of track to face of any platform wall in BG is 1905mm.2.
Maximum height above rail level for high level passenger platform is 840 mm.3. Maximum height above rail level
for low passenger platform is 405mm.4. Minimum horizontal distance from centre of track to face of any platform
wall in BGis 1675mmAnswer 3FIND THE INCORRECT STATEMENT1.The designed Toe-load of ERC MK III flat Toe
is 850-1100kg2.The Toe load deflection corresponding to the designed toe load for MK III flat toe clipis 13.5mm .
3.The approximate weight of ERC MK III flat toe is 0.91kg.4.The Bar dia of ERC MK III flat toe is 18.64.Answer
41.Minimum distance of height gauge at level crossing from gate post is 10 m.2.Minimum height of height gauge at
level crossing from road level is 4.67 m.3.Minimum distance of gate post at level crossing from centre line of track is
3 m .4.Minimum distance of gate lodge from centre line of track is 6 m.Answer 11.Ride index is a measure of
passenger comfort.2.Indian railway has adopted Dr. Sperling Ride index formula.3.He was a Franch Engineer .
4.Lower value of Ride Index are preferable.Answer 31.Minimum distance of stop board from centre line of track on
unmanned level crossingis 5 m .2.Minimum distance of whistle board at level crossing from end of road is 600
m.3.Minimum distance of speed breakers at level crossing from gate post is 30 m4.Minimum distance of fish plated
joints in SWR track from end of level crossing is 6m.Answer 3The reason for providing super elevation is1.To have a
better distribution of load on two rails. 2.To reduce the wear & tear of railsand rolling stocks.3.To neutralise the effect
of centrifugal force.4.To increase the haulage capacity of vehicle.ANSWER 3Fill in the Blanks
Page 21 of 41

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

Northern RailwayObjective Questions Engineering Department1 Laying tolerance for sleeper spacing is...
+/_ 20mm..."2 T h e m i n i m u m r a d i u s f o r v e r t i c a l c u r v e s o n ' A ' r o u t e
is...4000....m"3Modulus of elasticity of rail steel is ........2.15*10..Kg
/sqcm"4"Later al wea r pe rmitted fo r 60kg tongue r ail
i s " . . 8 m m 5Squeezing pressure in case of PRC sleeper is..110 to
1 2 0 k g / s q c m . . . . . " The normal life of detonators is seven years. The life of the detonators can be
extendedto ten years on an yearly basis subject to the condition that two detonators from eachlot of over 7 year
old ones are tested for the explosive content and the results being found satisfactory.For new unmanned
level X-ings the visibility requirements for road users along thetrack shall be 600 m with single or
double line track. Where this is not feasible, thedistance may be reduced suitably with the approval
of Chief Engineer provided themaximum permissible speed is less than 100 kmphIn case of LWR if rail
temperature after a maintenance operation exceeds td + 20 degreeC, then during the period of consolidation as
per para 1.18 of LWR manual a
speedrestriction of 50 kmph on BG shall be imposed when shoulder and crib compactionhas been done.
C] WHAT IS MY NAME
I can rebuild the lateral resistance of track 2. My maximum self propelled speedis 60
Kmph2 . M y w o r k i n g s p e e d i s 0 t o 2 . 5 K m p h 4 . I a m P r i m a r i l y u s e d b e h i n d t h e
t a m p i n g machine 5. My weight is 57 TonnesANSWER Dynamic track stablizer 3 . I a m e s s e n t i a l f o r
p r o t e c t i o n o f t h e t r a c k . 2 . I n e e d c a r e f u l c u s t o d y 3 . M y c o l o u r is red 4. My extended
life is 10 years 5. I sound caution to the driver ANSWER DETONATOR 4 . I a m a n a c t i v i t y t o
b e p e r f o r m e d o n c e i n e v e r y 1 0 y e a r s 2 . I a m u s e f u l i n improving
drainage5 . I a m u s e f u l i n i m p r o v i n g r u n n i n g o n t r a c k 4 . I a m a n a c t i v i t y
t o b e p e r f o r m e d under speed restriction6 . I a m a n a c t i v i t y f o r
w h i c h s u f f i c i e n t b a l l a s t h a s t o b e a r r a n g e d ANSWER DEEP SCREENING7 . I a m
an activity to be performed during moderate temperature 2. I
r e q u i r e looking mirror and convex lens8 . W h e n p e r f o r m e d o n l a r g e s c a l e s p e e d
r e s t r i c t i o n s h a l l b e r e q u i r e d 4 . I f I a m carefully performed the fracture
instances will be minimised 5. I facilitate expansionand contraction of fish plated jointsANSWER
Lubrication of fish plated joints
D] TRUE/ FALSE
Page 22 of 41

Northern RailwayObjective Questions Engineering Department1 S E J s a r e t o b e


i n s p e c t e d b y P W I o n c e a m o n t h i n e x t r e m e s u m m e r m o n t h s . <WA>True
<CA>False2 I f t h e t e m p e r a t u r e r i s e s a b o v e t d + 2 0 d e g r e e C , h o t
w e a t h e r p a t r o l l i n g w i l l b e started by Gang mate.<CA>True
<WA>False3 . O n b a l l a s t e d d e c k b r i d g e t h e t r o l l y r e
f u g e s h o u l d b e m i n . 1 0 0 m apart.<WA>True <CA>False. 4 A r a m p o f 1
i n 1 0 0 0 s h a l l b e g i v e n b e f o r e c l o s i n g t h e t a m p i n g w o r k . < C A > T r u e <WA>False5 .
Any deviation from the dimension of schedule I will require prior
s a n c t i o n o f CRS.<CA>True <WA>FalseQ 1 . W r i t e s h o r t n o t e o n . Gauge
variation.Ans.This is measured as deviation from nominal gauge which is 1676mm for
BG.Unevenness.A n s . T h i s i s m e a s u r e d i n t e r m s o f d i f f e r e n c e i n l o n g i t u d i n a l l e v e l s o v e r a
f i x e d b a s e . It is measured over a chord of 3.5M for left and right rails separately.Cross level difference.A n s . T h i s
i s m e a s u r e d i n t e r m s o f r e l a t i v e d i f f e r e n c e i n l e v e l o f 2 r a i l t o p s m e a s u r e d at the same
point.Twist.A n s . T h i s i s m e a s u r e d i n t e r m s o f c h a n g e i n c r o s s l e v e l s p e
r u n i t l e n g t h o f measurement. This is denoted as
mm/metre.Q 2 . W h a t a r e s e r v i c e t o l e r a n c e s ? A n s . T h e s e a r e t o l e r a n c e s t o
w h i c h t r a c k p a r a m e t e r s m a y v a r y a n y t i m e d u r i n g t h e service. These are based on
a c c e p t a b l e l i m i t s o f r i d i n g c o m f o r t i n r e l a t i o n t o t h e vehicles in use.Service Tolerances for 120kmph
on
BG.S . n o . P a r a m e t e r s
. T o l e r a n c e s . 0 1 . G a u
g e . ( a ) O n s t r a i g h t t r a c k .
+ 6 m m - 3 m m . ( b ) O n c u r v e s u p t o 4
0
+13mm-3mm.0 2 . T w i s t . ( a ) O n s t r a i g h t a n d c u r v e d
t r a c k 2 m m / m . other than transitions.
( b ) O n t r a n s i t i o n .
1 m m / m . Alignment.( a ) O n
s t r a i g h t . 5 m m .
( b ) O n c u r v e
s . 5 m m . Q3.What are new track tolerances
G i v e v a l u e s f o r G a u g e , A l i g n m e n t , C r o s s L e v e l and Sleeper Spacing.
Page 23 of 41

Northern RailwayObjective Questions Engineering DepartmentA n s . T h e s e a r e t h e t o l e r a n c e s p r e s c r i b e d


for laying the new track. The
measurementsshould be taken in floating conditions three months after normalisation of
s p e e d . Following are the tolerances prescribed for the track laid with new
material.S . n o . P a r a m e t
e r s . V a l u e . 0 1
. G a u g e . +
-
2 m m . 0 2 . E x p
a n s i o n G a p . + -
2 m m . 0 3 S q u a r e n e s s o f j o i n t s
o n + - 1 0 m m . straight.0 4 . S l e e p e r
S p a c i n g . + -
2 0 m m . 0 5 . C r o s s
L e v e l . + -
3 m m . *****
Page 24 of 41

Northern RailwayObjective Questions Engineering Department


QUESTIONAIRRE (OBJECTIVE TYPE)Gr.‘C’to‘B’
9.Works
S N Q u
e s t i
o n A n
s w e r
1 S t a n d i n g e a r n e s t m o n e y f o r c o n t r a c t h a v i n g t e n d e r v a l u e R s . 1 8 . 0 0 l a c s Rs.
18,000/-Rs. 20,000/-Rs. 22,000/-Rs. 10,000/-Rs. 20,0002 T h e t e n d e r c o s t o f w o r k i s R s .
4 , 2 0 , 0 0 0 / - . W h a t w i l l b e e a r n e s t m o n e y ? Rs. 10,500/-Rs. 10,000/-Rs. 9,500/-Rs. 11,000/-Rs.
10,000/-3 T h e t e n d e r c o s t o f w o r k i s R s . 5 , 6 0 , 0 0 0 / - . W h a t w i l l b e s e c u r i t y
D e p o s i t ? Rs. 35,500/-Rs. 37,000/-Rs. 33,000/-Rs. 30,000/-Rs. 35,500/-4 W h a t i s t h e
v a l i d i t y p e r i o d i n w h i c h t e n d e r o f f e r r e m a i n o p e n ? 60 days90 days75 days180 days90
days5 M a x i m u m l i m i t o f o n e q u o t a t i o n c a n b e c a l l e d b y J . A . g r a d e o f f i c e r Rs.
50,000/-Rs. 40,000/-Rs. 1,00,000/-Rs. 2,00,000/-Rs. 1,00,000/-6 T h e t e n d e r c o s t o f w o r k i s
R s . 1 5 l a c s . W h a t w i l l b e c o s t o f t e n d e r f o r m ? Rs. 500/-Rs. 1,000/-Rs. 1,500/-Rs. 2,000 /-Rs.
1,000/-7 H o w m a n y e s t i m a t e s a r e i n u s e ? 678578 T h e s t a g e a t w h i c h
a d d e n d u m c u m c o r r i g e n d u m i s r e q u i r e d - When the individual item varies 10% from the
agreementWhen the individual item varies 20% from the agreementWhen the individual item varies 25% from the
agreement None of the
aboveW h e n t h e i n d i v i d u a l i t e m varies 25% from
theagreement
Page 25 of 41
Northern RailwayObjective Questions Engineering Department9 T h e c o s t o f a d e p o s i t w o r k i s
R s . 1 0 , 0 0 , 0 0 0 / - . H o w m u c h a m o u n t t h e p a r t y has to deposit with Railway man for
preparation of plan and estimate-Rs. 10,000/-Rs. 20,000/-Rs. 15,000/-Rs.25,000/-Rs. 20,000/-1 0 T h e c o s t o f
o p e n t e n d e r i s R s . 4 . 5 0 l a c s . W h o w i l l b e t h e t e n d e r c o m m i t t e e members?Sr. Scale
Office of executive Department and Sr. Scale Officer of Account Department.Sr. Scale Office of
executive Department and Jr. Scale Officer of Account Department.Jr. Scale Office of executive
Department and Sr. Scale Officer of Account Department.Jr. Scale Office of executive Department and
Jr. Scale Officer of
AccountDepartmentJ r. S c a l e O f f i c e o f executiveDepartment and Jr.S c a l e O f f i c e r o f Acco
untDepartment11 T h e a p p r o v e d l i s t o f ‘ C ’ c l a s s C o n t r a c t o r i s m a i n t a i n e d a t Assistance Divisional
OfficeDivisional OfficeZonal Railway man office None of the above.Divisional Office1 2 H o w m a n y t y p e
o f a p p r o v e d l i s t o f c o n t r a c t o r i s b e i n g m a i n t a i n e d ? 456351 3 H o w m a n y
c l a s s o f t e n d e r i s b e i n g u s e d ? Open tender and limited tender Limited tender and single
tender Open tender, limited tender and single tender None of the
above.O p e n t e n d e r , l i m i t e d t e n d e r a n d single
tender 1 4 C o n t r a c t o r h a s d e m a n d e d a n
a r b i t r a t i o n o f R s . 9 . 5 0 l a c s . H o w m a n y Arbitrator will be appointed?Sole
Arbitrator Two Arbitrator Three Arbitrator None of the above.Sole
Arbitrator 1 5 W h o i s c o m p e t e n t t o a p p o i n t a n a r b i t r a t o r DRMTerritorial HODPrincipal
HODGeneral Manager General Manager 1 6 D e l a y e d T e n d e r i s - When tender is received before
the due date and time.When tender is received after the due date and time, but before opening
thetender.When tender is received after the due date and time and after opening the tender. None of the
above.W h e n t e n d e r i s r e c e i v e d a f t e r t h e d u e d a t e a n d t i m e a n d a f t e r
o p e n i n g the tender.
Page 26 of 41
Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

Northern RailwayObjective Questions Engineering Department1 7 A r b i t r a t i o n A c t


w a s r e v i s e d i n 199419961998199919961 8 U r g e n c y C e r t i f i c a t e i s i s s u e d f o r t h e w o r k - to
carry out the repair work affected by flood.To carry out the repair caused due to accident.Or other unforeseen
contingency caused due to accident or flood.All of the above.All of the above.
Page 27 of 41

Northern RailwayObjective Questions Engineering DepartmentQUESTIONAIRRE (OBJECTIVE TYPE)


10.Water Supply & Hydraulics
S N Q u
e s t i
o n A n
s w e r
1Device meant for measuring the discharge in a pipe is called
… … … … … . Ve n t u r i m e t e r 2 D e v i c e m e a n t f o r m e a s u r i n g v e l
o c i t y i n a p i p e i s c a l l e d … … … … … . P i t o t T u b e 3The su
m o f P o t e n t i a l e n e r g y , P r e s s u r e e n e r g y a n d . . . . . . . . . . . . . . . . . . . . . . e n e r g y consti
tutes Bernaullis theorem with empirical formula (Z+
p
/
w
+
v
2
/
2g
)Kinetic4 F o r a c i r c u l a r c h a n n e l o f d i a m e t e r ‘ D ’ , t h e d e p t h o f f l o w
f o r m a x i m u m velocity is ..……..D.0.815 F o r a c i r c u l a r c h a n n e l o f d i a m e t e r
‘ D ’ , t h e d e p t h o f f l o w f o r m a x i m u m discharge is …….D.0.956 B e s t t r a p e z o i d a l
c h a n n e l o f b e s t s e c t i o n g i v i n g m a x i m u m d i s c h a r g e s h o u l d have side angle………….to the
horizontal.60
O
7 T r i a n g u l a r c h a n n e l o f b e s t s e c t i o n g i v i n g m a x i m u m d i s c h a r g e s h o u l d h a v e side
angle …………...to the horizontal.45
O
8The water quality is said alkaline when pH value is………….and
a c i d i c when pH is …….8 to 14 & 1 to 69 T h e r e q u i r e d r e s i d u a l c h l o r i n e i n d r i n k i n g
w a t e r a t e v e r y t a p p i n g p o i n t should be……….ppm.0.51 0 … … … … … … i s t h e t e r m
u s e d i n w h i c h l i q u i d o f f e r s r e s i s t a n c e t o a n y deforming forces.Viscosity11 A t y p e
o f f l o w i n w h i c h f l u i d p a r t i c l e s m o v e i n l a y e r s i s c a l l e d … … … … … ……..
flow.Laminar 1 2 R a t e o f p u m p i n g s h o u l d b e … … … … … … t h a n t h e r a t e o f
r e c h a r g e i n a tubewell for longer life of a tubewell.lesser 1 3 T h e r a d i a l d i s t a n c e b e t w e e n t w o
t u b e w e l l s s h o u l d n o t b e l e s s t h a n … … … ….…
mtrs.1501 4 T h e v i s c o s i t y o f a f l u i d … … … … … … … … . . . w i t h t h
e i n c r e a s e o f temperature.decreases1 5 T h e d e n s i t y o f a f l u i d … … … … …
… … . . w i t h t e m p e r a t u r e a n d p r e s s u r e . V a r i e s 16The property of a fluid
b y v i r t u e o f w h i c h t h e m o l e c u l e s o f a l i q u i d r e m a i n attached to each other is
called……………………..adhesion1 7 T h e p r o p e r t y o f a f l u i d w h i c h o f f e r s a t e n s i l e
r e s i s t a n c e a t i t s s u r f a c e i s called…………….Surface Tension1 8 V i s c o s i t y o f
water is ……………… times higher than the viscosity of
a i r . 5 0 19A circular plate of diameter ‘d’ is held vertically in water so that the
u p p e r e n d o f t h e v e r t i c a l d i a m e t e r i s a t w a t e r s u r f a c e . T h e d e p t h o f c e n t r e o f pressure
is…………………..0.62 d2 0 W h e n a b o d y i s i m m e r s e d i n a l i q u i d , t h e l i q u i d w i l l e x e r t a n
u p w a r d f o r c e on the body equal to the weight of the liquid displaced. The upward forceis known as
……………….Buoyancy
Page 28 of 41
Northern RailwayObjective Questions Engineering Department
11.Soil Mechanics & Construction Materials
Q1 The desirable silt contents in an alluvial soil suitable for the production of structural bricks is
( a ) 2 0 - 3 0 % ( b ) 4 0 -
6 5 % ( c ) 6 5 - 7 5 % ( c ) l e s s
t h a n 1 0 % A . ( a ) 2 0 - 3 0 %
Q . 2 Wa t e r a b s o r p t i o n i n 1 s t c l a s s b r i c k s s h o u l d n o t b e m o re t h a n
(a) 10% (b) 15%(c) 20% (d) 25%A . [ c ] 2 0 %
Q.3 Th e d imen si on s of st an da rd bri ck a re
(a) 19x9x9 cm (b) 20x10x10 cm19x9x4 cmA n s . [ c ] 1 9 x 9 x 9 c m .
Q.4 Efflorescence of bricks is due to
(a)Soluble salts present in clay for making bricks.
( b ) H i g h p o r o s i t y o f b r i c k s (c) High silt content in brick earth.(d) Excessive burni
ng of bricks.A. [a]Soluble salts present in clay for making bricks.
5 . S e a s o n i n g o f t i m b e r i s n e c e s s a r y t o :
( a ) I n c r e a s e t h e f i r e r e s i s t a n ce ( b ) I n c r e a se t h e ve r m i n
r e s i s t a n c e (c )R e du c e t he mi c rob i a l s ub s t an c e s (d)Expel the mo
i s t u r e p r e s e n t i n t i m b e r . A. [d]Expel the moisture present in timber
Q.6How many days, a timber may require for natural seasoning
( a ) 2 0 m o n t h s ( b ) 4 -
6 m o n t h ( c ) 1 y
e a r ( d ) 2 y e a
r A . [ b ] 4 – 6 m o n t h s
Page 29 of 41

Northern RailwayObjective Questions Engineering DepartmentQ 7 S o u n d n e s s t e s t o f c e m e n t i s


done to determine its
a . D u r a b i l i t y i n s e a w a t e r. b . F r e e l i m e c o n t e n t . c . I r o n
oxide content.d.Alumina content.A. [b] free-lime content
Q .8.The volume (cu. m.) of a bag of cement is about
(a) 0.035 (b) 0.053 (c) 0.35 (d) 0.53A . [ a ] 0 . 0 3 5
Q . 9 . S e g re g a t i o n i n c e m e n t c o n c re t e i s d e f i n e d a s
(a) Separation of coarser particles from mix.(b) appearance of cement and water slurry over surface of fini
shed concrete.( c ) f o r m a t i o n o f c a p i l l a r y p o r e s i n f r e s h c e m e n t c o n c r e t e . A .
[a]Separation of coarser particles from mix.
Q.10.When cement content in cement mortar is reduced, the
a . s l u m p i n c r e a s e s b . c o n s i s t e n c y d e c r e a s e s c.compressive strength
decreasesA . [ a ] s l u m p i n c r e a s e s
Q . 11 . N o r m a l c u r i n g p e r i o d f o r l i m e m o r t a r i s
(a) 3 days (b) 7days(c) 10 days (d) 14 daysA . [ b ] 7 d a y s
Q.12.The compacting factor test of cement concrete determines its
(a) strength (b) porosity(c) workability (d) degree of compaction under loadsA . [ c ] W o r k a b i l i t y
Q.13.In anticorrosive paints, pigment used is
(a) aluminum powder (b) red lead(c) copper powder A . [ b ] . R e d l e a d .
Page 30 of 41

Northern RailwayObjective Questions Engineering Department


Q.14The function of a base in paint is
a.to provide a film on surfaceb.to hide imperfection of surfacec.to reduce
shrinkage cracks in paint film.d.to make paint of desired consistency A. [c]to
reduce shrinkage cracks in paint film.
Q.15. In railway tracks metal used is
(a) cast iron (b) wrought iron(c) mild steel (d) stainless steelA . [ c ] m i l d s t e e l
Q.16.A well graded sand has particles
a . m a i n l y o f j u s t o n e s i z e b.mainly of sand combined with
g r a v e l c . o f n u m b e r o f s i z e s d.with uniformity coefficient very near
to unityA . [ c ] o f n u m b e r o f s i z e s
Q.17The possibility of quick sand condition will be there when flow of water to soil is
(a) horizontal (b) upward(c) downward (d) radialA . [ b ] u p w a r d s .
Q.18Determination of coefficient of permeability by means of a field pumping
t e s t can be done for
(a) soft clay (b) sandy soil(c) stiff clay (d) marine clayA . [ b ] S a n d y s o i l
Q.19.Optimum moisture content is the moisture content at which
a.settlement is maximumb.permeability is morec.dry
d e n s i t y i s m a x i m u m d . s h e a r s t r e n g t h i s l e s s A. [c]. dry density is maximum
Q.20. Primary consolidation is due to
a.expulsion of water b.compression of air c . e x p u l s i o n o f
w a t e r d.structural adjustment of grainsA . [ a ] e x p u l s i o n o f w a t e r
Page 31 of 41
Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

Northern RailwayObjective Questions Engineering Department


12.Multiple Choice Questions on Land Management:
Q.1.
Height of boundary stone above ground
isa ) 5 0 0 m m b ) 6 0 0 m c )
4 0 0 m m d ) A n y o n e of
aboveA n s . a ) 5 0 0 m m
Q.2
Maximum distance between two boundary stones isa) 100m b) 150m c) 200m d)
None of theseA n s . c ) 2 0 0 m
Q.3
Hard type encroachment
is:a) Category’A’ b) Cat. ‘B’ c) Cat. ‘C&D’ d) Cat.“A&B”A n s . C a
t . ‘ A ’ Q . 4 W h i c h o f t h e
f o l l o w i n g r e q u i r e d P P E A c t p r o c e e d i n g s
t o r e m o v e : a) Category’A’ b) Cat. ‘B’ c) Cat. ‘C&D’ d) Cat.“A&B”A n s .
C a t . ‘ A ’
Q.5
Standing Committee of land rates consists of a) CE/G, FA&CAO, CSC b) CE/MRTS, CE/G,
FA&CAOc) CE/MRTS, FA&CAO, CCMd ) C C M , C E / G ,
FA & C A O A n s . c ) C E / M R T S , F A & C A O , C
C M
Q.6
. M a x i m u m l i c e n s i n g p e r i o d o f l a n d f o r
G o v e r n m e n t s c h o o l f o r children of Railway employee is :a) 30 yrs. b) 40 yrs.
c) 50 yrs d)
45 yrs.A n s . a ) 3 0 y r s
Q.7
Maximum licensing period of land for Kendriya Vidalaya is:a) 50 yrs. b) 60 yrs. c) 80-90 yrs. d) 99
yrs.A n s . d ) 9 9 y r s
Page 32 of 41

Northern RailwayObjective Questions Engineering Department


Q.8
C o n t i n g e n c y c h a r g e s i n c l u d e d b y R a i l w a y i n r e l i n q u i s h m e n t estimate is:a) 4% b) 3% c) 5% d) 3-
5%A n s . b ) 3
Q. 9
Outsider encroachment falls in category of encroachment
as:a) Cat.’ A&C’ b) Cat. ‘ C&D’ c) Cat. ‘B&C’ d) Cat. ‘A&B’A n s . d ) C a
t ‘ A & B ’
Q.10
Revision of license fee will be done at the increment per
annuma) 10% b) 12% c) 15% d) None of theseA n s . a )
1 0
Q.11
In case of GMF, AEN can extant the licensing period up to the total
of i . 3 y r s . b ) 5 y r s . c ) 7 y r s . d ) 4 y r s . A n s . b ) 5
y r s
Q.12
1 Kanal is equal to:a) 5400 sqft b) 5000 sqft c) 5445 sqft d)
4500 sqftA n s . c ) 5 4 0 0 s q f t
Q.13
I begah is equal to :a) 27220 sqft b) 2700 sqft c) 27225 sqft d)
30000sqftA n s c ) 2 7 2 2 5 s q f t
Q.14
. W i t h i n s t a t i o n p r e m i s e s w h o i s r e s p o n s i b l e f o r
e n c r o a c h m e n t ? a ) S M & R P F I n s p e c t o r b ) S S E / W o r k s c ) S S E / Wo r k s &
S S E / P. Wa y d ) A l l o f a b o v e A n s . a ) S M & R P F I n s p
e c t o r
Page 33 of 41

Northern RailwayObjective Questions Engineering Department


Q. 15
. R a i l w a y B o a r d ’ s l e t t e r N o . 9 0 / L M L / 1 4 / 3 4 i s r e l a t e d
t o : a) Encroachments b) Cat C&D encroachmentc) Trespassing d) PPE ActA n s . b )
C a t C & D e n c r o a c h m e n t
Q. 16
. G e n e r a l s i z e o f p l o t l i c e n s e d f o r G M P i s a) 1-5 acres b)
1-3 acres c) 1-4 acres d) None of theseA n s . b ) 1 - 3
a c r e s
Q.17
R & R Policy is applicable on:a) Circulating areas b)
Safety zonec) Officer Colony d) All of aboveA n s . b ) S a f e t y z
o n e
Q. 18
. R e c o r d s f o r o w n e r s h i p o f l a n d i n s t a t e s o t h e r t h a n U . P.
i s : a) Musabi b) Khasra c) Jamabandi d)
all of themA n s . c ) J a m a n d i
Q.19
. A u t h e n t i c a t e d l a n d p l a n s b e a r s t h e
n u m b e r a s : a) CE b) LCO c) HQ d)
None of theseA n s . b ) L C O
Q.20
Scale of authenticated land plan is:a ) e q u a l t o R e v e n u e s c a l e b ) H a l f t o
Revenue scalec)Double to Revenue
scaled ) 1 c m t o 4 0 m A n s . a ) E q u a l t o R e v e n u
e s c a l e
Page 34 of 41

Northern RailwayObjective Questions Engineering Department


13. ROB/RUB
Q.1. What is the carriageway width of two lanes Road Over Bridge:
( a ) 8 . 0 m ( b ) 7 . 5 m ( c ) 7 . 0
0 m ( d ) 8 . 5 m Ans. 1. (b)Q . 2 . W h a t i s t h e m i n i m u m c l e a r a n c e
b e t w e e n t o p o f h i g h e s t r a i l l e v e l t o b o t t o m o f girder of Road Over Bridge:
( a ) 6 5 0 0 ( b ) 6 2 5 0 ( c ) 6 3
0 0 ( d ) 5 8 7 0 Ans. 2. (d)Q.3. What is the minimum horizontal distance
between centerline of track to pier:
( a ) 3 5 5 0 ( b ) 3 5 0 0 ( c ) 3 5
2 5 ( d ) 3 5 7 5 Ans. 3. (a)Q.4. What is the minimum horizontal distance
between centerline of track to abutment:
( a ) 4 5 0 0 ( b ) 4 5 5 0 ( c ) 4 3
5 0 ( d ) 4 3 7 5 Ans. 4. (c)Q.5. How much TVUs are required for cost
sharing of two lane ROB in lieu of level crossing:( a ) 2 , 0 0 , 0 0 0 ( b ) 1 , 5 0 , 0 0 0 ( c )
3 , 0 0 , 0 0 0 ( d ) 1 , 0 0 , 0 0 0 Ans. 5. (d)Q.6. How much and which charges are levied for construction
of ROB/RUBs on depositterms in replacement of level crossings and work executed by Railway?Ans. 6. There are
following charges which are levied for construction of ROB/RUBson deposit terms in replacement of level crossing
and work executed by Railway:1 . D & G ( s u p e r v i s i o n ) @ 1 2 . 5 % 2 . P & E c h a r g e s @
2 % 3.Departmental charges @ 12.5%4.Capitalized Maintenance charges @ 30%
capitalized5 . C o n t i n g e n c i e s @ 1 %
Page 35 of 41

Northern RailwayObjective Questions Engineering DepartmentQ.7. How much and which charges are levied for
construction of ROB/RUBs on BOT basis involving closure of level crossings and work executed by Railway?Ans.
7. Following charges are levied for construction of ROB/RUBs on BOT basis involving closure of level
crossings and work executed by Railway:1 . D & G ( s u p e r v i s i o n ) @ 1 2 % 2 . P & E c h a r g e s @
2 % 3 . M a i n t e n a n c e @ 3 0 % c a p i t a l i z e d 4 . C o n t i n g e n c i e s @ 1 % Q.8. What is B.O.T
system?Ans. 8. Under BOT system, the entrepreneur provides the full funds and builds theROB/RUB
as per plans and drawings approved by the Railway administration/road a u t h o r i t y a n d t h e p r i v a t e
e n t r e p r e n e u r i s p e r m i t t e d t o l e v y t o l l o n r o a d t r a f f i c f o r specific period. At the end of the agreed
period, the structure would revert back to roadauthority.Q.9. What is the carriageway of two lane ROB on National
Highway:( a ) 1 0 . 0 0 m ( b ) 8 . 5 m ( c )
9 . 5 0 m ( d ) 9 . 0 0 m Ans. 9. (c)Q.10. Which para of Engineering code deals
with cost sharing of ROB/RUBs:
( a ) 1 7 1 6 ( b ) 1 8 1 4 ( c ) 1 8
1 6 ( d ) 1 8 1 9 Ans.10. (c)Q.11. How much P&E charges are levied on
deposit/BOT works of ROB/RUBs:( a ) 1 %
( b ) 3 % ( c ) 2 %
( d ) 4 % Ans. 11. (c)Q.12. How much D&G (Supervision) charges
are levied on deposit/BOT works of ROB/RUBs in case of the work is executed by Railway:
( a ) 1 2 % ( b ) 1 3 % ( c )
1 1 . 5 % ( d ) 1 2 . 5 % Ans. 12. (d)
Page 36 of 41

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

Northern RailwayObjective Questions Engineering DepartmentQ.13. How much charges are levied on
deposit/BOT works of ROB/RUBs in case the work is executed by party under Railway supervision:
( a ) 6 % ( b ) 6 . 2 5 % ( c ) 6 . 5 0 % ( d )
6 . 1 5 % Ans. 13. (b)Q . 1 4 . H o w m u c h c a p i t a l i z e d m a i n t e n a n c e c h a r g e s a r e l e v i e d o n d e
p o s i t / B O T c o s t sharing works of ROB/RUBs:
( a ) 3 0 % ( b ) 2 5 %
( c ) 3 % ( d ) 4 % Ans. 14. (a)Q.15. How much
department charges are levied on BOT work of ROB/RUBs:
( a ) 1 2 . 5 % ( b ) 1 2 % ( c )
N i l ( d ) 1 0 % Ans. 15. (c)Q.16.What and how much charges are levied
on cost sharing works of ROB/RUBs?
Ans. 16.There are following charges which are levied on cost sharing works of
ROB/RUBs:1 . D & G @ 8 . 2 2 % o n R a i l w a y s h a r e 2 . D & G @
1 2 . 5 % o n S t a t e s h a r e 3.Contingencies @ 1% on Railway and State share4.Departmental
@ 1 2 . 5 % o n S t a t e s h a r e 5 . C a p i t a l i z e d m a i n t e n a n c e @ 3 0 % o n S t a t e s h a r e 6.Supervision
charges @ 12.5% on capitalized maintenance.Q.17. Who has to construct the bridge portion and
approaches of ROB in case of cost sharing works?Ans. 17. The bridge portion will be constructed by
Railway and approaches will be constructed by State Government in case of cost sharing works.Q.18. Who will
bear the cost of extra length for future tracks?Ans. 18 The Railway will bear the cost of extra length of ROB for
future tracks.
Page 37 of 41

Northern RailwayObjective Questions Engineering DepartmentQ.19. Who will bear the cost of construction of extra
width of ROB as per provision in para 1816 of Engineering code?Ans. 19. State Government will bear the cost of
extra width of ROB as per provision in para 1816 of Engineering code.Q.20. What is the full name of BOT?Ans.
20 Build-Operate-Transfer.
Page 38 of 41

Northern RailwayObjective Questions Engineering Department


14. ESTABLISHMENT MATTERS AND LABOUR LAWS
Q.1. Mark correct answers:1.1 From which date the reservation of OBC become applicable:i . 8 - 9 -
1 9 9 3 , i i . 8 - 9 - 1 9 9 2 i i i . 8 - 9 - 1 9 9 5 i v. 8 - 9 -
1 9 9 0 A n s . 1 . 1 . ( i ) 1.2 What is the percentage of reservation in Northern
Railway for
SC/ST/OBC:i . 2 0 : 5 : 2 7 i i . 1 9 : 4 : 2 7 i i i . 1 5 : 7 : 2 7 i v . 1 5 : 1 0 : 2 7 A n s .
1 . 2 . ( i i ) 1.3 What is the provision of issuing Railway passes to OBC
candidate for writtentest/viva voce of direct recruitment:i . P a s s e s a r e g i v e n i i . P a s s e s a r e n o t
g i v e n iii.Passes are given only written testi v . N o n e . A n s . 1 . 3 .
( i i ) 1.4 How many Union representatives are allowed to attend P
N M m e e t i n g a t Headquarter level?i . 2 0 i i . N o
l i m i t i i i . 3 0 i v . N o n e A n s . 1 . 4 . ( i ) 1.5 How m
any PREM Meeting are held at division level?
i . S i x i i . F o u r i i i . E i g h t i v . N o n e A n s . 1 . 4
. ( i ) Q.2. Give the correct answer:2.1 What is the maximum advance admissible on account of
marriage of daughter?A n s . 2 . 1 . 1 0 m o n t h s
Page 39 of 41

Northern RailwayObjective Questions Engineering Department2.2 Which is the standard form used for
issuing the charge sheet to a retired Railway employee?A n s . 2 . 2 . S F -
1 4 2.3 When was the Central Administrative Tribunal (CAT) formed?
A n s . 2 . 3 . O n 2 7
th
Feb.19852.4 How many cases can be taken by a retired employee to act as defence helper?
A n s . 2 . 4 . N o t m o r e t h a n 5 c a s e s a t a t i m e . 2.5 What minimum and
maximum family pension admissible?
A n s . 2 . 5 . M i n i m u m - R s . 1 2 7 5 / - P . M Maximum- Rs.9000/-
P.M.Q.3. Filling up the blanks:3.1 Who is the Chairman of PREM meeting at Headquarters level?
A n s . 3 . 1 . G M 3.2 Reservation to SC/ST candidates in promotion
from Group ‘C’ to Group ‘B’ isapplicable w.e.f.
---------------------------.A n s . 3 . 2 . 2 0 . 7 . 7 4 3.3 The maximum limit for
accumulation of LHAP is -----------------------.A n s . 3 . 3 . N o l i m i t 3.4
Contract Labour Act 1970 was introduced on
-------------------------.A n s . 3 . 4 . 1 0 . 2 . 1 9 7 1 Q.4. Write true or false against the
following:4.1 There is a chance where some punishment cannot be imposed by the authority thatissues S.F
11.A n s . 4 . 1 . T r u e . 4.2 Three dependent can be included in the Ist class
privilege pass but total should notexceed five.A n s . 4 . 2 . F a l s e .
Page 40 of 41

Northern RailwayObjective Questions Engineering Department4 . 3


TA i s n o t a d m i s s i b l e t o u n i o n r e p r e s e n t a t i v e s w h e n t h e y h a v e a t t e n d e d P N M meeting out of
Headquarter.A n s . 4 . 3 . T r u e . 4.4 A casual labour can be granted
Te m p o r a r y s t a t u s a f t e r c o m p l e t i o n o f 1 2 0 d a y s continuous service in construction
organization.A n s . 4 . 4 . F a l s e . 4.5 Special family planning increment cannot be
granted on a certificate issued by non-Railway Hospital.A n s . 4 . 5 . F a l s e .
Page 41 of 41

Reward Your Curiosity

Everything you want to read.


Anytime. Anywhere. Any device.
Read Free For 30 Days
No Commitment. Cancel anytime.
Share this document

Share or Embed Document


Sharing Options

 Share On Facebook, Opens A New Window

 Share On Twitter, Opens A New Window

 Share On LinkedIn, Opens A New Window

 Share With Email, Opens Mail Client

 Copy Text

Related Interests

 Track (Rail Transport)

 Civil Engineering

 Rail Transport

 Nature

Documents Similar To Objective Type Queston Bank for Group "B" selection in Indian Railways

Carousel Next

Civil Engineering Objective Type Questions and Answers


UPLOADED BY

MRABSENI


Subjective questions For Group 'B' Selection Civil Engineering
UPLOADED BY

navtejpvs

Ldce Questions 2001


UPLOADED BY

mikegrace02


Railway Establishment Rule 3
UPLOADED BY

lucknowlab

1384340625516-LDCE (Traffic) Notes


UPLOADED BY

Hanuma Reddy

Pay and allowances - indian railways


UPLOADED BY

Rajendra Kumar


group-C-to-group-B
UPLOADED BY

Krishnendu Kumar

30% LDCE
UPLOADED BY

Jitu Kumar Sahoo

Civil Engineering (Objective.Type.) by Jaya Rami Reddy


UPLOADED BY

Pinakin Gore

Railway Accounts Process Manuals


UPLOADED BY

HiraBallabh

Railway Abbreviations
UPLOADED BY

Santosh Pradhan

Question and Answers Bank-1


UPLOADED BY

kalyanssengupta

UPSC,SSC,CPWD,MES Civil Engineering Objectives Questions PDF


UPLOADED BY

MRABSENI

reinforced cement concrete questions


UPLOADED BY

Armaan Gupta

Civil Engineering Objective Type Questions


UPLOADED BY
Jean Simon

Irpwm Hindi
UPLOADED BY

Dharmsen Soni

Civil Engineering Objective Type Questions


UPLOADED BY

Mopidevi Vijaya Kishore

Compendium of Railway Board Orders - An IRTSA Compilation


UPLOADED BY

navtejpvs

satti k civil
UPLOADED BY
kvsnarayana_lnt

Objective Type - Civil Engineering


UPLOADED BY

Samantha Hampton

New Pension Scheme in Comparison to Old Pension Scheme


UPLOADED BY

navtejpvs

00Complete civil Tech


UPLOADED BY

puppyviki

Multiple Choice Questions Civil Engineering


UPLOADED BY
gurumurthy38

Concrete Technology Questions


UPLOADED BY

SubhaGhosh

LWR MANUAL UPDATED UPTO CS 16.pdf


UPLOADED BY

Shuja Mehdi

RCC-Conc Objective Questions


UPLOADED BY

Alok Jha

P&C spacings.