SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
In-Situ Strength Test of Fin Fan Coolers (Preparation) SAIC-E-2010 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Preparation for Pressure testing:

32-SAMSS-011,
A1 Plugs are removed at all telltale holes.
Para. 9.3.14
StrengthTest Pressure shall be the test pressure (NEW) indicated in the
SAES-A-004,
A2 approved Safety Instruction Sheet.
Para. 6.4.5
(SAES-A-105, Attachment E-1)
Temperature of water during hydrostatic testing is maintained at not less 32-SAMSS-011,
A3
than 17°C throughout the testing cycle. Para. 9.3.12

Hydrostatic test pressure shall be held for a minimum of one hour per 25 32-SAMSS-011,
A4
mm of exchanger header thickness and in no case < than 1 hour. Para. 9.3.2

Fluids used for pressure testing are as follows:


1) Clean potable water, treated for control of bacteria and corrosion
2) For exchangers with stainless steel, monel or non-ferrous tubes, the 32-SAMSS-011,
A5
water does not contain more than 50 ppm chlorides. Para. 9.3.4
3) For lube-oil and seal-oil exchangers the fluid to be used for pressure
testing is the system fluid.

Note: Strength testing preparation, pressurizing and inspection shall be


A6 SATIP-E-007-01
performed per SATIP-A-004-04.

NOTE:
Strength testing preparation, pressurizing and inspection shall be performed per
SATIP-A-004-04.
REMARKS:

REFERENCE DOCUMENTS:
1. 32-SAMSS-011, Manufacture of Air-Cooled Heat Exchangers, (30 March 2005)
2. SAES-A-004, General Requirements for Pressure Testing, (30 June, 2003)
3. SAES-A-005, Safety Instruction Sheet, (31 December, 2001)
4. SATIP-E-007-02, Saudi Aramco Typical Inspection and test Plan for Air Cooled Heat Exchanger (Fin Fan Cooler), Rev. 01
5. SATIP-A-004-01, Saudi Aramco Typical Inspection and Test Plan for Pressure testing of Pressure Vessels, Rev. 01

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1