Vous êtes sur la page 1sur 62

FILE: STANDARD: DoFrontF.

rpt FLS DIOE 1 04/10/2016 06/10/2016

DG KHAN Hub

DG KHAN Hub Cement

Cable Tray\ Ladder Installation

Department 051

Main Cable Route

051 Cable Tray\ Ladder Installation

80044938
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Chapter

Tray Level Specification ............................................ ........................................( 1 04/10/2016)................... 01


Tray Area Specification ............................................. ........................................( 1 04/10/2016)................... 02
Tray Type Specification ............................................. ........................................( 1 04/10/2016)................... 03
Y Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 04
C Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 05
I Tray Segment Quantites & Fill Area ................................ ........................................( 1 04/10/2016)................... 06
M Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 07
W Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 08
H Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 09
Cable Tray & Ladder Installation .................................... ........................................( 1 04/10/2016)................... 10

Title: Document: Page:

Table of Contents 80044938 0.1


DOCONT.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


01 Tray Level Specification ..................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 01.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 01.1

Title: Document: Page:

Tray Level Specification - Table of Contents 80044938 01.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Level Level Definition Cable Group

0 Y Y - Special Cable
1 C C - Signal Cable
2 I I - Inst. Safe
3 M M - Control Cable
4 W W - Power Cable
5 H H - High Tens. Cable
6
7
8
9

Title: Document: Page:

Tray Level Specification - List 80044938 01.1


(PLTLAYSB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


02 Tray Area Specification ...................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 02.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 02.1

Title: Document: Page:

Tray Area Specification - Table of Contents 80044938 02.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Area ID Area Description X0 Y0 Z0 X1 Y1


(m) (m) (m) (m) (m)

051 Main Cable Route 0.00 0.00 0.00 100.00 0.00

111 Limestone crusher 0.00 0.00 0.00 100.00 0.00

112 Clay/Bauxite/Gypsum/Puz CR 0.00 0.00 0.00 100.00 0.00

121 Limestone transport 0.00 0.00 0.00 100.00 0.00

131 Lime stone additive storage 0.00 0.00 0.00 100.00 0.00

143 Additive transport from stora 0.00 0.00 0.00 100.00 0.00

191 Limestone Crushing SS 0.00 0.00 0.00 100.00 0.00

193 Limestone storage SS 0.00 0.00 0.00 100.00 0.00

194 Coal Intake SS 0.00 0.00 0.00 100.00 0.00

211 Coal intake and crusher 0.00 0.00 0.00 100.00 0.00

231 Coal storage 0.00 0.00 0.00 100.00 0.00

291 Gypsum Crusher SS 0.00 0.00 0.00 100.00 0.00

331 Exhaust gas conditioning 0.00 0.00 0.00 100.00 0.00

341 Raw meal silo/ Kiln feed 0.00 0.00 0.00 100.00 0.00

421 Cyclone preheater & Kiln 0.00 0.00 0.00 100.00 0.00

441 Clinker cooler 0.00 0.00 0.00 100.00 0.00

465 Blower Room 0.00 0.00 0.00 100.00 0.00

471 Clinker transport to storage 0.00 0.00 0.00 100.00 0.00

481 Clinker storage and transport 0.00 0.00 0.00 100.00 0.00

491 Sub-station for Kiln 0.00 0.00 0.00 100.00 0.00

492 Sub-station for Cooler 0.00 0.00 0.00 100.00 0.00

711 Oil intake/Unloading and stora 0.00 0.00 0.00 100.00 0.00

741 Compressor room 0.00 0.00 0.00 100.00 0.00

Title: Document: Page:

Tray Area Specification - List 80044938 02.1


(PLAREALB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Area ID Area Description X0 Y0 Z0 X1 Y1


(m) (m) (m) (m) (m)

762 Water Dist, Pump and Cool sys 0.00 0.00 0.00 100.00 0.00

791 Substation For Utilities 0.00 0.00 0.00 100.00 0.00

801 AUX & CCR Dept 0.00 0.00 0.00 100.00 0.00

891 Main Substation 0.00 0.00 0.00 100.00 0.00

Title: Document: Page:

Tray Area Specification - List 80044938 02.2


(PLAREALB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


03 Tray Type Specification ...................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 03.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 03.1

Title: Document: Page:

Tray Type Specification - Table of Contents 80044938 03.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0001 - 051-0-0002 TO 891 ENTRY 15.37 90 0 100 TRBY 100 TRBC 100 TRBM 600 LRBW 600 (x4) LRBH

051-0-0001 - 891-1-0001 TO 891 ENTRY 1.70 -140 60 100 THBY 100 THBC 100 THBM 600 LHBW 600 (x4) LHBH

051-0-0002 - 051-0-0004 TWDS 591 SUBSTATION 10.63 90 0 100 TRBY 100 TRBC 300 TRBM 600 LRBW 600 (x4) LRBH

051-0-0002 - 051-0-0120 TO 401LG200EX09/401LG200X 2.47 180 0 100 TRBY 100 TRBM 200 LRBW 300 LRBH

051-0-0002 - 051-0-0208 TO 891SJ992A01W01 3.80 0 -90 200 LRBW

051-0-0004 - 051-0-0005 TWDS 591 SUBSTATION 45.92 90 0 100 TRBY 100 TRBM 600 LRBW 600 LRBH

051-0-0004 - 051-0-0119 TO 401LG200X15 45.55 0 0 100 TRBY 100 TRBC 300 TRBM 600 LRBW 600 (x3) LRBH

051-0-0004 - 051-0-0207 TO 891SJ993A01W01 3.80 0 -90 200 LRBW

051-0-0005 - 051-0-0006 TO 591 SUBSTATION 25.78 180 0 200 LRBW 600 LRBH

051-0-0005 - 051-0-0118 TO 401LG200X18 2.85 90 0 100 TRBY 100 TRBM 300 LRBW 300 LRBH

051-0-0005 - 051-0-0206 TO 891SJ994A01W01 3.80 0 -90 200 LHAW

051-0-0007 - 051-0-0008 TO 531 DEPT (CUSTOMER 6.54 -90 0


SCOPE)

051-0-0009 - 051-0-0010 TO 742 DEPT (CUSTOMER 1.88 180 0


SCOPE)
051-0-0011 - 791-1-0001 TWDS 791 SS ENTRY 3.29 100 35 100 THBY 100 THBM 300 LHBW 300 LHBH

051-0-0012 - 051-0-0013 TO 762 DEPT 5.17 0 0 300 TRBC 100 TRBM 600 LRBW

051-0-0012 - 791-1-0003 TWDS 762 DEPT ENTRY 2.51 180 49 300 TRBC 100 TRBM 600 LRBW

051-0-0013 - 762-1-0001 TWDS 762DQ250D01 3.85 -82 79 300 TRBC 100 TRBM 600 LRBW

051-0-0016 - 051-0-0122 TO 101LG400EX08 2.00 -90 0 100 TRBY 100 TRBC 300 TRBM 200 LRBW 600 (x3) LRBH

051-0-0016 - 891-1-0019 TWDS 891 DEPT 1.81 140 62 100 TRBY 100 TRBC 300 TRBM 200 LRBW 600 (x3) LRBH

051-0-0017 - 143-1-0264 TWDS 143 DEPT 3.40 0 90 100 TRBY 100 TRBC 100 TRBM 300 LRBH

051-0-0018 - 051-0-0017 TO 511 DEPT CONVEYOR 25.58 -27 0 200 PRAY 200 PRAC 200 PRAM 200 PRAH

051-0-0018 - 051-0-0019 TWDS 194 SUBSTATION 3.16 -90 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH

051-0-0019 - 051-0-0020 TO 101LG400EX19 2.63 -180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH

051-0-0020 - 051-0-0021 TWDS 194 SUBSTATION 109.56 -90 0 200 PRAY 200 PRAM 200 PRAW

051-0-0020 - 051-0-0123 TO 101LG400X23 3.00 180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH

051-0-0021 - 051-0-0022 TWDS 194 SUBSTATION 29.97 -72 0 200 PRAY 200 PRAM 200 PRAW

Title: Document: Page:


Tray Type Specification - List 80044938 03.1
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0022 - 051-0-0023 TO 194 SUBSTATION 30.00 0 0 200 PRAY 200 PRAM 200 PRAW

051-0-0023 - 194-1-0023 TWDS 194 DEPT 1.91 -21 69 100 THBY 300 THBM 200 LHBW

051-0-0024 - 051-0-0025 TO 231 DEPT 4.19 -90 0 200 PRAY 200 PRAC 200 PRAM 200 (x3) PRAW

051-0-0024 - 194-1-0001 TWDS 194 DEPT 2.60 90 43 100 THBY 300 THBC 300 THBM 600 (x3) LHBW

051-0-0025 - 231-1-0001 TWDS 101LG400X15 3.70 0 90 100 TRBY 300 TRBC 300 TRBM 600 (x3) LRBW

051-0-0026 - 051-0-0027 TO THER POWER PL (CUST 98.73 -90 0


SCOPE)
051-0-0026 - 051-0-0126 TO 101LG400X25 67.70 180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH

051-0-0026 - 051-0-0209 TO 891SJ991A01W01 3.60 0 -90 200 LRBW

051-0-0029 - 051-0-0030 TO 481 DEPT CONVEYOR 14.90 90 0 200 PRAC 200 PRAM 200 (x2) PRAW

051-0-0029 - 051-0-0032 TO 401LG200X14 128.90 0 0 100 TRBY 300 TRBC 300 TRBM 600 (x3) LRBW 600 (x3) LRBH

051-0-0030 - 481-1-0028 TO 481 MAIN ENTRY 3.47 -1 78 300 TRBC 300 TRBM 500 (x3) LRBW

051-0-0031 - 711-1-0001 TO 711 DEPT 4.61 180 85 100 TRBY 100 TRBC 100 TRBM 300 LRBW

051-0-0032 - 051-0-0031 TO 731 DEPT 13.28 -88 0 200 PRAY 200 PRAC 200 PRAM 200 PRAW

051-0-0032 - 051-0-0033 TO 7.12 0 0 100 TRBY 300 TRBC 500 TRBM 600 (x3) LRBW 600 (x3) LRBH
401LG200EX08/401LG200EX15
051-0-0033 - 492-1-0098 TWDS 492 DEPT ENTRY 2.71 -18 44 100 TRBY 300 TRBC 500 TRBM 600 (x3) LRBW 600 (x3) LRBH

051-0-0034 - 051-0-0036 TO 441 DEPT 42.82 90 0 100 TRBY 500 TRBC 300 TRBM 300 LRBH

051-0-0034 - 492-1-0007 TWDS 492 DEPT ENTRY 4.94 -94 23 100 THBY 500 THBC 300 THBM 300 LHBH

051-0-0035 - 051-0-0037 TO 441 DEPT 42.82 90 0 600 (x6) LRBW

051-0-0035 - 492-1-0008 TWDS 492 DEPT ENTRY 4.94 -86 23 600 (x6) LHBW

051-0-0036 - 051-0-0037 TO 441 DEPT 1.55 0 0 600 (x6) LRBW

051-0-0036 - 441-1-0001 TWDS 401LG201EX07 3.64 19 77 100 THBY 500 THBC 300 THBM 600 (x6) LHBW 300 LHBH

051-0-0038 - 051-0-0043 TO 493 SUBSTATION 67.73 0 0 100 TRBY 100 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH

051-0-0038 - 492-1-0107 TWDS 492 DEPT ENTRY 2.01 -117 71 100 THBY 100 THBC 100 THBM 600 (x2) LHBW 600 (x2) LHBH

051-0-0039 - 051-0-0040 TWDS 841 DEPT 18.40 141 0 200 PRAY 200 PRAM

051-0-0039 - 421-1-0043 TWDS 841ES410A01 3.77 -23 70 100 TRBY 100 TRBM

Title: Document: Page:


Tray Type Specification - List 80044938 03.2
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0042 - 051-0-0041 TO 465 DEPT (CUSTOMER 16.30 94 0


SCOPE)

051-0-0043 - 051-0-0042 TO 401LG100EX16B 15.60 90 0 100 TRBY 100 TRBM 200 LRBW

051-0-0043 - 051-0-0088 TWDS 491 SUBSTATION 1.54 2 0 100 TRBY 100 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH

051-0-0044 - 051-0-0212 TO 14.26 0 0 100 TRBY 100 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH
401LG100X19/401LG100EX09

051-0-0045 - 491-1-0001 TWDS 491 DEPT ENTRY 2.58 -18 43 100 THBY 100 THBC 100 THBM 600 (x2) LHBW 600 (x2) LHBH

051-0-0046 - 051-0-0105 TWDS 421 DEPT 13.43 90 0 100 TRBY 500 (x2) TRBC 500 TRBM 600 LRBW

051-0-0046 - 491-1-0011 TWDS 491 DEPT ENTRY 4.88 -94 21 100 THBY 500 (x2) THBC 500 THBM 600 LHBW

051-0-0047 - 051-0-0051 TWDS 421 DEPT 35.89 90 0 600 (x9) LHBW

051-0-0047 - 491-1-0012 TWDS 491 DEPT ENTRY 4.88 -86 21 600 (x9) LHBW

051-0-0048 - 051-0-0049 TWDS 421 DEPT 2.80 180 0 100 TRBY 500 (x2) TRBC 500 TRBM

051-0-0049 - 051-0-0050 TO 421 DEPT 3.70 90 0 100 TRBY 500 (x2) TRBC 500 TRBM

051-0-0050 - 051-0-0053 TO 421 DEPT 1.55 0 0 600 (x9) LHBW

051-0-0050 - 421-1-0001 TWDS 421 DEPT ENTRY 3.39 0 77 100 TRBY 500 (x2) TRBC 300 TRBM 600 (x9) LHBW

051-0-0051 - 051-0-0052 TWDS 421 DEPT 2.78 180 0 600 (x9) LHBW

051-0-0052 - 051-0-0053 TO 421 DEPT 2.15 90 0 600 (x9) LHBW

051-0-0054 - 051-0-0213 TO 401LG100EX08 2.00 0 0 100 TRBY 300 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH

051-0-0054 - 491-1-0151 TWDS 491 DEPT ENTRY 1.87 -117 69 100 THBY 300 THBC 100 THBM 600 (x2) LHBW 600 (x2) LHBH

051-0-0055 - 051-0-0056 TWDS 741 DEPT 5.75 -90 0 300 TRBC 100 TRBM 600 (x2) LRBW

051-0-0055 - 051-0-0058 TO 391 SUBSTATION 21.22 0 0 100 TRBY 100 TRBM 300 LRBW 600 (x2) LRBH

051-0-0055 - 051-0-0210 TO 491SJ991A01W01 3.80 0 -90 200 LRBW

051-0-0056 - 051-0-0057 TO 741 DEPT 4.10 0 0 300 TRBC 100 TRBM 600 (x2) LRBW

051-0-0057 - 741-1-0001 TO 741 DEPT 7.48 180 85 300 TRBC 100 TRBM 600 (x2) LRBW

051-0-0058 - 051-0-0059 TWDS 321 DEPT 15.10 90 0 100 TRBY 100 TRBC 100 TRBM 300 LRBW 600 (x2) LRBH

051-0-0059 - 051-0-0060 TWDS 133 DEPT CONVEYOR 1.55 0 0 100 TRBY 100 TRBC 100 TRBM 300 LRBW 600 (x2) LRBH

051-0-0059 - 051-0-0061 TO 321 DEPT(CUSTOMER 56.57 90 0


SCOPE)

Title: Document: Page:


Tray Type Specification - List 80044938 03.3
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0060 - 051-0-0062 TWDS 133 DEPT CONVEYOR 41.84 90 0 100 TRBY 100 TRBC 100 TRBM 200 LRBW 300 LRBH

051-0-0062 - 051-0-0063 TWDS 133 DEPT CONVEYOR 23.23 0 0 100 TRBY 100 TRBC 100 TRBM 200 LRBW 300 LRBH

051-0-0062 - 051-0-0211 TO 491SJ992A01W01 3.80 0 -90 200 LRBW

051-0-0063 - 051-0-0064 TO 133 DEPT CONVEYOR 28.14 90 0 100 TRBY 100 TRBC 100 TRBM 200 LRBW 300 LRBH

051-0-0064 - 143-1-0283 TO 311 DEPT 6.94 158 89 100 TRBY 100 TRBC 100 TRBM 200 LRBW 300 LRBH

051-0-0065 - 051-0-0068 TWDS 801 CCR BUILDING 14.38 90 0 100 TRBY 100 TRBC 100 TRBM 300 LRBW 300 LRBH

051-0-0068 - 051-0-0069 TWDS 801 CCR BUILDING 28.51 60 0 100 TRBY 100 TRBC 100 TRBM 300 LRBW 300 LRBH

051-0-0069 - 051-0-0070 TWDS 801 CCR BUILDING 45.53 90 0 100 TRBY 100 TRBC 100 TRBM 300 LRBW 300 LRBH

051-0-0070 - 051-0-0071 TO WORKSHOP 91.16 0 0 200 PRAM 200 PRAH

051-0-0070 - 051-0-0130 TO 801LG300X04 33.31 90 0 100 TRBY 100 TRBC 100 TRBM 300 LRBW 300 LRBH

051-0-0070 - 051-0-0131 TO Main canteen 97.37 180 1 200 PRAC 200 PRAW 200 PRAH

051-0-0071 - 051-0-0172 TO Main Store 39.79 0 3 200 PRAC 200 PRAW 200 PRAH

051-0-0072 - 801-1-0001 TWDS 801 DEPT ENTRY 0.39 -179 15 100 THBY 100 THBC 100 THBM 300 LHBW 300 LHBH

051-0-0073 - 051-0-0074 TO 231 DEPT CENTRE PIT 52.90 -90 0 200 PRAY 200 PRAM 200 PRAW

051-0-0073 - 231-1-0017 TO 231 DEPT CENTRE PIT 8.90 90 89 100 TRBY 100 TRBM 300 LRBW

051-0-0074 - 231-1-0098 TO 101LG400X17 8.90 -90 89 100 TRBY 100 TRBM 300 LRBW

051-0-0075 - 051-0-0076 TO 112 DEPT 8.39 -90 0 200 PRAY 200 PRAC 200 PRAM 200 (x3) PRAW 200 PRAH

051-0-0075 - 291-1-0001 TWDS 291 SS ENTRY 6.82 90 11 100 THBY 500 THBC 300 THBM 600 (x3) LHBW 300 LHBH

051-0-0076 - 112-3-0001 TWDS 112BF430A01 4.08 0 90 100 TRBY 500 TRBC 300 TRBM 600 (x3) LRBW 300 LRBH

051-0-0077 - 051-0-0078 TWDS 133 DEPT CENTRE PIT 54.80 0 0 200 PRAY 200 PRAC 200 PRAM 200 (x2) PRAW

051-0-0079 - 051-0-0080 TWDS 133 DEPT 24.95 -90 0 200 PRAY 200 PRAC 200 PRAM 200 (x2) PRAW 200 PRAH

051-0-0079 - 193-1-0003 TWDS 193 DEPT 2.62 90 45 100 THBY 300 THBC 100 THBM 600 (x2) LHBW 300 LHBH

051-0-0080 - 051-0-0081 TO 133 DEPT 29.72 -58 0 200 PRAY 200 PRAC 200 PRAM 200 (x2) PRAW 200 PRAH

051-0-0081 - 131-1-0198 TO 131 DEPT ENTRY 3.12 0 90 100 TRBY 300 TRBC 100 TRBM 600 (x2) LRBW 300 LRBH

051-0-0082 - 051-0-0083 TO 133 DEPT 17.49 0 0 200 PRAY 200 PRAC 200 PRAM 200 (x3) PRAW 200 PRAH

051-0-0082 - 193-1-0001 TWDS 193 DEPT 4.91 180 22 100 THBY 300 THBC 100 THBM 600 (x3) LHBW 300 LHBH

Title: Document: Page:


Tray Type Specification - List 80044938 03.4
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0084 - 051-0-0085 TWDS 131 DEPT CENTRE PIT 55.79 0 0 200 PRAM 200 PRAW 200 PRAH

051-0-0084 - 131-1-0099 TWDS 891 DEPT 0.84 0 73 100 THBM 200 LHBW 300 LHBH

051-0-0086 - 051-0-0087 TO 111 DEPT 10.09 90 0 100 TRBY 500 TRBC 300 TRBM 600 (x4) LRBW 600 LRBH

051-0-0086 - 191-1-0001 TWDS 191 DEPT ENTRY 2.70 -73 45 100 THBY 500 THBC 300 THBM 600 (x4) LHBW 600 LHBH

051-0-0087 - 111-1-0144 TO 111DEPT ENTRY 3.09 0 69 100 THBY 500 THBC 300 THBM 600 (x4) LHBW 600 LHBH

051-0-0088 - 051-0-0044 TWDS 491 SUBSTATION 18.25 0 0 100 TRBY 100 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH

051-0-0088 - 051-0-0089 TO 231 CONV (CUSTOMER 21.43 -90 0


SCOPE)
051-0-0092 - 051-0-0011 TO 2.55 90 0 100 TRBY 100 TRBM 300 LRBW 300 LRBH
701LG100EX07/701LG100EX13

051-0-0092 - 051-0-0106 TWDS MT WORK SHOP 270.00 0 0 200 PRAC 200 PRAW 200 PRAH

051-0-0094 - 051-0-0095 TWDS 401LG200X17 18.00 -150 0 100 TRBY 100 TRBM 200 LRBW 300 LRBH

051-0-0095 - 051-0-0214 TWDS 401LG200X17 10.66 180 0 100 TRBY 100 TRBM 200 LRBW 300 LRBH

051-0-0096 - 051-0-0097 TO 511 CONVEYOR 6.71 -90 0 200 PRAC 200 PRAW 200 PRAH

051-0-0096 - 051-0-0098 TWDS 166.53 180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH
101LG400EX09/101LG400EX20

051-0-0098 - 051-0-0099 TWDS 41.51 -150 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH
101LG400EX09/101LG400EX20
051-0-0099 - 051-0-0124 TO 29.17 180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH
101LG400EX09/101LG400EX20

051-0-0100 - 051-0-0101 TWDS CANTEEN/PRAYER ROOM 99.25 180 0 100 TRBM 600 (x3) LRBH

051-0-0100 - 051-0-0141 TWDS 955 MAIN GATE 183.00 -90 0 200 PRAY 200 PRAM 200 PRAH

051-0-0101 - 051-0-0102 TWDS POWER GRID 22.56 180 0 100 TRBM 600 (x3) LRBH

051-0-0101 - 051-0-0134 TWDS 952 MAIN GATE 172.80 90 1 200 PRAM 200 PRAH

051-0-0102 - 051-0-0028 TO POWER GRID 41.49 180 0 100 TRBM 600 (x3) LRBH

051-0-0102 - 051-0-0128 TO REST ROOMS/OFFICE 29.30 -90 4 200 PRAC 200 PRAW 200 PRAH

051-0-0104 - 051-0-0048 TWDS 421 DEPT 10.70 90 0 100 TRBY 500 (x2) TRBC 500 TRBM

051-0-0104 - 051-0-0103 TO 465 DEPT 3.71 180 0 200 PRAY 200 PRAC 200 PRAI 200 PRAM 200 PRAW 200 PRAH

051-0-0105 - 051-0-0104 TWDS 421 DEPT 10.21 90 0 100 TRBY 500 (x2) TRBC 500 TRBM

051-0-0105 - 051-0-0215 TO 465 DEPT 15.08 -180 0 200 PRAY 200 PRAC 200 PRAM 200 (x2) PRAW

Title: Document: Page:


Tray Type Specification - List 80044938 03.5
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0106 - 051-0-0107 TWDS MT WORK SHOP 30.20 7 0 200 PRAC 200 PRAW 200 PRAH

051-0-0107 - 051-0-0108 TWDS MT WORK SHOP 60.00 0 0 200 PRAC 200 PRAW 200 PRAH

051-0-0108 - 051-0-0109 TWDS MT WORK SHOP 25.07 5 0 200 PRAC 200 PRAW 200 PRAH

051-0-0109 - 051-0-0110 TWDS MT WORK SHOP 22.05 0 0 200 PRAC 200 PRAW 200 PRAH

051-0-0110 - 051-0-0112 TWDS MT WORK SHOP 30.00 90 0 200 PRAC 200 PRAW 200 PRAH

051-0-0111 - 051-0-0113 TWDS MT WORK SHOP 81.49 90 0 200 PRAC 200 PRAW 200 PRAH

051-0-0112 - 051-0-0111 TWDS MT WORK SHOP 21.70 67 0 200 PRAC 200 PRAW 200 PRAH

051-0-0113 - 051-0-0114 TO MT WORK SHOP 189.51 0 0 200 PRAC 200 PRAW 200 PRAH

051-0-0115 - 051-0-0092 TO 701LG100X11 261.23 90 0 100 TRBY 100 TRBM 300 LRBW 300 LRBH

051-0-0116 - 051-0-0115 TO 701LG100EX14 3.57 90 0 100 TRBY 100 TRBM 300 LRBW 300 LRBH

051-0-0117 - 051-0-0116 TO 185.73 90 0 100 TRBY 100 TRBM 300 LRBW 300 LRBH
701LG100EX08/701LG100X12

051-0-0118 - 051-0-0117 TO 701LG100EX15 172.97 90 0 100 TRBY 100 TRBM 300 LRBW 300 LRBH

051-0-0119 - 051-0-0029 TWDS 401LG200X14 18.02 0 0 100 TRBY 100 TRBC 300 TRBM 600 LRBW 600 (x3) LRBH

051-0-0120 - 051-0-0121 TO 401LG200EX16 20.86 180 0 100 TRBY 100 TRBM 200 LRBW 300 LRBH

051-0-0121 - 051-0-0094 TWDS 401LG200X17 43.74 180 0 100 TRBY 100 TRBM 200 LRBW 300 LRBH

051-0-0122 - 051-0-0018 TWDS 511 DEPT. 20.71 -90 0 100 TRBY 100 TRBC 300 TRBM 200 LRBW 600 (x3) LRBH

051-0-0123 - 051-0-0096 TWDS 511 CONVEYOR 16.72 180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH

051-0-0124 - 051-0-0125 TO 101LG400X24 2.50 180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH

051-0-0125 - 051-0-0026 TWDS 101LG400X25 20.85 180 0 100 TRBY 100 TRBM 200 LRBW 600 (x3) LRBH

051-0-0126 - 051-0-0127 TO 101LG400EX21 20.98 180 0 100 TRBY 100 TRBM 600 (x3) LRBH

051-0-0127 - 051-0-0100 TWDS WEIGH BRIDGE 6.40 180 0 100 TRBY 100 TRBM 600 (x3) LRBH

051-0-0129 - 051-0-0055 TWDS 391 SUBSTATION 2.00 0 0 100 TRBY 300 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH

051-0-0130 - 051-0-0072 TO 5.00 90 0 100 TRBY 100 TRBC 100 TRBM 300 LRBW 300 LRBH
801LG300EX05/801LG300EX07
051-0-0131 - 051-0-0132 TWDS Fire Truck HSE 115.53 180 0 200 PRAC 200 PRAW 200 PRAH
OFFICE
051-0-0132 - 051-0-0133 TO Fire Truck HSE OFFICE 39.05 90 0 200 PRAC 200 PRAW 200 PRAH

Title: Document: Page:


Tray Type Specification - List 80044938 03.6
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0134 - 051-0-0135 TO 953 Canteen/PRAYER 48.15 0 0 200 PRAC 200 PRAW 200 PRAH
ROOM

051-0-0134 - 051-0-0136 TWDS 952 MAIN GATE 25.35 90 0 200 PRAM 200 PRAH

051-0-0136 - 051-0-0137 TWDS 952 MAIN GATE 22.40 94 0 200 PRAM 200 PRAH

051-0-0137 - 051-0-0138 TWDS 952 MAIN GATE 17.55 116 0 200 PRAM 200 PRAH

051-0-0138 - 051-0-0139 TWDS 952 MAIN GATE 18.81 147 0 200 PRAM 200 PRAH

051-0-0139 - 051-0-0140 TO 952 MAIN GATE 165.40 -180 0 200 PRAM 200 PRAH

051-0-0141 - 051-0-0142 TO 951 WEIGH BRIDGE 10.45 180 0 200 PRAC 200 PRAW 200 PRAH

051-0-0141 - 051-0-0143 TWDS 955 MAIN GATE 53.00 -90 0 200 PRAY 200 PRAM 200 PRAH

051-0-0143 - 051-0-0144 TO 955 MAIN GATE 46.20 180 1 200 PRAC 200 PRAW 200 PRAH

051-0-0143 - 051-0-0145 TWDS Truck Stand El. Room 111.25 -90 0 200 PRAY 200 PRAM 200 PRAH

051-0-0145 - 051-0-0146 TO Truck Stand El. Room 44.30 180 0 200 PRAC 200 PRAW 200 PRAH

051-0-0145 - 051-0-0147 TWDS Staff Hostel EL.ROOM 28.66 -67 0 200 PRAY 200 PRAM 200 PRAH

051-0-0147 - 051-0-0148 TO Staff Hostel EL.ROOM 119.99 -68 0 200 PRAY 200 PRAM 200 PRAH

051-0-0147 - 051-0-0149 TWDS ICPL Staff Residence 28.63 19 0 200 PRAM 200 PRAH
EL.R
051-0-0149 - 051-0-0150 TWDS ICPL Staff Residence 30.00 13 0 200 PRAM 200 PRAH
EL.R

051-0-0150 - 051-0-0151 TWDS ICPL Staff Residence 29.99 13 0 200 PRAM 200 PRAH
EL.R
051-0-0151 - 051-0-0152 TWDS ICPL Staff Residence 29.99 12 0 200 PRAM 200 PRAH
EL.R

051-0-0152 - 051-0-0153 TWDS ICPL Staff Residence 29.74 14 0 200 PRAM 200 PRAH
EL.R
051-0-0153 - 051-0-0154 TWDS ICPL Staff Residence 29.98 16 0 200 PRAM 200 PRAH
EL.R

051-0-0154 - 051-0-0155 TWDS ICPL Staff Residence 29.99 16 0 200 PRAM 200 PRAH
EL.R
051-0-0155 - 051-0-0156 TWDS ICPL Staff Residence 30.00 0 0 200 PRAM 200 PRAH
EL.R

051-0-0156 - 051-0-0157 TWDS ICPL Staff Residence 29.68 -14 0 200 PRAM 200 PRAH
EL.R
051-0-0157 - 051-0-0158 TWDS ICPL Staff Residence 30.02 -15 0 200 PRAM 200 PRAH
EL.R

Title: Document: Page:


Tray Type Specification - List 80044938 03.7
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0158 - 051-0-0159 TWDS ICPL Staff Residence 29.76 -7 0 200 PRAM 200 PRAH
EL.R

051-0-0159 - 051-0-0160 TWDS ICPL Staff Residence 30.35 -6 0 200 PRAM 200 PRAH
EL.R
051-0-0160 - 051-0-0161 TWDS ICPL Staff Residence 30.00 -7 0 200 PRAM 200 PRAH
EL.R

051-0-0161 - 051-0-0162 TWDS ICPL Staff Residence 30.00 -8 0 200 PRAM 200 PRAH
EL.R
051-0-0162 - 051-0-0163 TWDS ICPL Staff Residence 29.99 -8 0 200 PRAM 200 PRAH
EL.R

051-0-0163 - 051-0-0164 TWDS ICPL Staff Residence 29.99 -8 0 200 PRAM 200 PRAH
EL.R
051-0-0164 - 051-0-0165 TWDS ICPL Staff Residence 30.16 -10 0 200 PRAM 200 PRAH
EL.R

051-0-0165 - 051-0-0166 TWDS ICPL Staff Residence 29.77 -12 0 200 PRAM 200 PRAH
EL.R
051-0-0166 - 051-0-0167 TWDS ICPL Staff Residence 29.45 -12 0 200 PRAM 200 PRAH
EL.R

051-0-0167 - 051-0-0168 TWDS ICPL Staff Residence 29.45 -12 0 200 PRAM 200 PRAH
EL.R
051-0-0168 - 051-0-0169 TWDS ICPL Staff Residence 29.45 -12 0 200 PRAM 200 PRAH
EL.R

051-0-0169 - 051-0-0170 TWDS ICPL Staff Residence 29.46 -12 0 200 PRAM 200 PRAH
EL.R
051-0-0170 - 051-0-0171 TO ICPL Staff Residence 28.00 -59 0 200 PRAM 200 PRAH
EL.ROO

051-0-0172 - 051-0-0173 TO Raw Storage 53.00 0 0 200 PRAC 200 PRAW 200 PRAH

051-0-0174 - 051-0-0175 TWDS G.H/off.Hostels/El. 140.43 0 4 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0174 - 131-1-0292 TWDS G.H/off.Hostels/El. 7.43 180 58 100 TRBM 300 LRBH
Room

051-0-0175 - 051-0-0176 TWDS G.H/off.Hostels/El. 22.52 -3 0 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0176 - 051-0-0177 TWDS G.H/off.Hostels/El. 29.99 -8 0 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0177 - 051-0-0178 TWDS G.H/off.Hostels/El. 30.16 -8 7 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0178 - 051-0-0179 TWDS G.H/off.Hostels/El. 30.07 -10 0 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0179 - 051-0-0180 TWDS G.H/off.Hostels/El. 29.99 -12 0 200 PRAM 200 PRAW 200 PRAH
Room

Title: Document: Page:


Tray Type Specification - List 80044938 03.8
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0180 - 051-0-0181 TWDS G.H/off.Hostels/El. 30.07 -12 5 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0181 - 051-0-0182 TWDS G.H/off.Hostels/El. 29.99 -11 0 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0182 - 051-0-0183 TWDS G.H/off.Hostels/El. 29.99 -11 0 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0183 - 051-0-0184 TWDS G.H/off.Hostels/El. 21.63 -12 2 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0184 - 051-0-0185 TWDS G.H/off.Hostels/El. 29.82 -29 1 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0185 - 051-0-0186 TWDS G.H/off.Hostels/El. 29.68 -33 4 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0186 - 051-0-0187 TWDS G.H/off.Hostels/El. 29.50 -15 2 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0187 - 051-0-0188 TWDS G.H/off.Hostels/El. 24.98 -9 2 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0188 - 051-0-0189 TWDS G.H/off.Hostels/El. 20.65 -4 0 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0189 - 051-0-0190 TWDS G.H/off.Hostels/El. 15.28 20 -1 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0190 - 051-0-0191 TWDS G.H/off.Hostels/El. 29.18 64 -1 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0191 - 051-0-0192 TWDS G.H/off.Hostels/El. 29.87 56 1 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0192 - 051-0-0193 TWDS G.H/off.Hostels/El. 30.07 39 4 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0193 - 051-0-0194 TWDS G.H/off.Hostels/El. 19.88 30 -4 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0194 - 051-0-0195 TWDS G.H/off.Hostels/El. 19.99 3 -1 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0195 - 051-0-0196 TWDS G.H/off.Hostels/El. 29.99 -15 0 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0196 - 051-0-0197 TWDS G.H/off.Hostels/El. 29.99 -15 0 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0197 - 051-0-0198 TWDS G.H/off.Hostels/El. 30.04 -15 3 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0198 - 051-0-0199 TWDS G.H/off.Hostels/El. 22.81 -23 3 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0199 - 051-0-0200 TWDS G.H/off.Hostels/El. 30.00 0 1 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0200 - 051-0-0201 TWDS G.H/off.Hostels/El. 29.64 -18 0 200 PRAM 200 PRAW 200 PRAH
Room

Title: Document: Page:


Tray Type Specification - List 80044938 03.9
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

051-0-0201 - 051-0-0202 TWDS G.H/off.Hostels/El. 30.05 -25 0 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0202 - 051-0-0203 TWDS G.H/off.Hostels/El. 29.97 -27 0 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0203 - 051-0-0204 TWDS G.H/off.Hostels/El. 30.02 -26 0 200 PRAM 200 PRAW 200 PRAH
Room

051-0-0204 - 051-0-0205 T0 G.H/off.Hostels/El. 75.02 90 0 200 PRAM 200 PRAW 200 PRAH
Room
051-0-0212 - 051-0-0045 TO 401LG100EX17 1.60 0 0 100 TRBY 100 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH

051-0-0213 - 051-0-0129 TO 401LG100X18 7.01 0 0 100 TRBY 300 TRBC 100 TRBM 600 (x2) LRBW 600 (x2) LRBH

051-0-0214 - 051-0-0003 TO 691 DEPT. 84.09 180 0 100 TRBY 100 TRBM 200 LRBW 300 LRBH

051-0-0215 - 465-1-0001 TWDS 2.56 0 90 100 TRBY 100 TRBC 100 TRBM 600 LRBW
465BL580M01/465BV590Y01

Title: Document: Page:


Tray Type Specification - List 80044938 03.10
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


04 Y Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 04.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 04.1

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - Table of Contents 80044938 04.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0001 - 051-0-0002 TO 891 ENTRY 100 TRBY 15.37 0,0 1,665 28 9

051-0-0001 - 891-1-0001 TO 891 ENTRY 100 THBY 1.70 60,1 1,665 28 9

051-0-0002 - 051-0-0004 TWDS 591 SUBSTATION 100 TRBY 10.63 0,0 1,665 28 9

051-0-0002 - 051-0-0120 TO 401LG200EX09/401LG200X 100 TRBY 2.47 0,0 0,370 6 2

051-0-0004 - 051-0-0005 TWDS 591 SUBSTATION 100 TRBY 45.92 0,0 0,370 6 2

051-0-0004 - 051-0-0119 TO 401LG200X15 100 TRBY 45.55 0,0 2,035 34 11

051-0-0005 - 051-0-0118 TO 401LG200X18 100 TRBY 2.85 0,0 0,370 6 2

051-0-0011 - 791-1-0001 TWDS 791 SS ENTRY 100 THBY 3.29 35,3 0,370 6 2

051-0-0016 - 051-0-0122 TO 101LG400EX08 100 TRBY 2.00 0,0 1,850 31 10

051-0-0016 - 891-1-0019 TWDS 891 DEPT 100 TRBY 1.81 62,0 1,850 31 10

051-0-0017 - 143-1-0264 TWDS 143 DEPT 100 TRBY 3.40 90,0 0,740 12 4

051-0-0018 - 051-0-0017 TO 511 DEPT CONVEYOR 200 PRAY 25.58 0,0 0,740 3 4

051-0-0018 - 051-0-0019 TWDS 194 SUBSTATION 100 TRBY 3.16 0,0 1,110 19 6

051-0-0019 - 051-0-0020 TO 101LG400EX19 100 TRBY 2.63 0,0 1,110 19 6

051-0-0020 - 051-0-0021 TWDS 194 SUBSTATION 200 PRAY 109.56 -0,1 0,925 3 5

051-0-0020 - 051-0-0123 TO 101LG400X23 100 TRBY 3.00 0,0 0,185 3 1

051-0-0021 - 051-0-0022 TWDS 194 SUBSTATION 200 PRAY 29.97 0,0 0,925 3 5

051-0-0022 - 051-0-0023 TO 194 SUBSTATION 200 PRAY 30.00 0,0 0,925 3 5

051-0-0023 - 194-1-0023 TWDS 194 DEPT 100 THBY 1.91 68,6 0,925 15 5

051-0-0024 - 051-0-0025 TO 231 DEPT 200 PRAY 4.19 0,0 0,370 2 2

051-0-0024 - 194-1-0001 TWDS 194 DEPT 100 THBY 2.60 43,1 0,370 6 2

051-0-0025 - 231-1-0001 TWDS 101LG400X15 100 TRBY 3.70 90,0 0,370 6 2

051-0-0026 - 051-0-0126 TO 101LG400X25 100 TRBY 67.70 0,0 0,185 3 1

051-0-0029 - 051-0-0032 TO 401LG200X14 100 TRBY 128.90 0,0 2,035 34 11

051-0-0031 - 711-1-0001 TO 711 DEPT 100 TRBY 4.61 85,0 0,185 3 1

051-0-0032 - 051-0-0031 TO 731 DEPT 200 PRAY 13.28 0,0 0,185 1 1

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044938 04.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0032 - 051-0-0033 TO 401LG200EX08/401LG200EX15 100 TRBY 7.12 0,0 2,220 37 12

051-0-0033 - 492-1-0098 TWDS 492 DEPT ENTRY 100 TRBY 2.71 44,3 2,220 37 12

051-0-0034 - 051-0-0036 TO 441 DEPT 100 TRBY 42.82 0,0 1,480 25 8

051-0-0034 - 492-1-0007 TWDS 492 DEPT ENTRY 100 THBY 4.94 22,6 1,480 25 8

051-0-0036 - 441-1-0001 TWDS 401LG201EX07 100 THBY 3.64 77,0 1,480 25 8

051-0-0038 - 051-0-0043 TO 493 SUBSTATION 100 TRBY 67.73 0,0 1,295 22 7

051-0-0038 - 492-1-0107 TWDS 492 DEPT ENTRY 100 THBY 2.01 70,6 1,295 22 7

051-0-0039 - 051-0-0040 TWDS 841 DEPT 200 PRAY 18.40 0,0 0,185 1 1

051-0-0039 - 421-1-0043 TWDS 841ES410A01 100 TRBY 3.77 70,2 0,185 3 1

051-0-0043 - 051-0-0042 TO 401LG100EX16B 100 TRBY 15.60 0,0 0,740 12 4

051-0-0043 - 051-0-0088 TWDS 491 SUBSTATION 100 TRBY 1.54 0,0 0,555 9 3

051-0-0044 - 051-0-0212 TO 401LG100X19/401LG100EX09 100 TRBY 14.26 0,0 0,555 9 3

051-0-0045 - 491-1-0001 TWDS 491 DEPT ENTRY 100 THBY 2.58 42,7 0,555 9 3

051-0-0046 - 051-0-0105 TWDS 421 DEPT 100 TRBY 13.43 0,0 1,665 28 9

051-0-0046 - 491-1-0011 TWDS 491 DEPT ENTRY 100 THBY 4.88 21,0 1,665 28 9

051-0-0048 - 051-0-0049 TWDS 421 DEPT 100 TRBY 2.80 0,0 1,665 28 9

051-0-0049 - 051-0-0050 TO 421 DEPT 100 TRBY 3.70 0,0 1,665 28 9

051-0-0050 - 421-1-0001 TWDS 421 DEPT ENTRY 100 TRBY 3.39 76,6 1,665 28 9

051-0-0054 - 051-0-0213 TO 401LG100EX08 100 TRBY 2.00 0,0 0,555 9 3

051-0-0054 - 491-1-0151 TWDS 491 DEPT ENTRY 100 THBY 1.87 69,0 0,555 9 3

051-0-0055 - 051-0-0058 TO 391 SUBSTATION 100 TRBY 21.22 0,0 0,555 9 3

051-0-0058 - 051-0-0059 TWDS 321 DEPT 100 TRBY 15.10 0,0 0,740 12 4

051-0-0059 - 051-0-0060 TWDS 133 DEPT CONVEYOR 100 TRBY 1.55 0,0 0,740 12 4

051-0-0060 - 051-0-0062 TWDS 133 DEPT CONVEYOR 100 TRBY 41.84 0,0 0,740 12 4

051-0-0062 - 051-0-0063 TWDS 133 DEPT CONVEYOR 100 TRBY 23.23 0,0 0,925 15 5

051-0-0063 - 051-0-0064 TO 133 DEPT CONVEYOR 100 TRBY 28.14 0,0 0,925 15 5

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044938 04.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0064 - 143-1-0283 TO 311 DEPT 100 TRBY 6.94 89,1 0,740 12 4

051-0-0065 - 051-0-0068 TWDS 801 CCR BUILDING 100 TRBY 14.38 0,0 2,960 49 16

051-0-0068 - 051-0-0069 TWDS 801 CCR BUILDING 100 TRBY 28.51 0,0 2,960 49 16

051-0-0069 - 051-0-0070 TWDS 801 CCR BUILDING 100 TRBY 45.53 0,0 2,960 49 16

051-0-0070 - 051-0-0130 TO 801LG300X04 100 TRBY 33.31 0,0 2,960 49 16

051-0-0072 - 801-1-0001 TWDS 801 DEPT ENTRY 100 THBY 0.39 14,9 2,960 49 16

051-0-0073 - 051-0-0074 TO 231 DEPT CENTRE PIT 200 PRAY 52.90 0,0 0,370 2 2

051-0-0073 - 231-1-0017 TO 231 DEPT CENTRE PIT 100 TRBY 8.90 88,7 0,370 6 2

051-0-0074 - 231-1-0098 TO 101LG400X17 100 TRBY 8.90 88,7 0,370 6 2

051-0-0075 - 051-0-0076 TO 112 DEPT 200 PRAY 8.39 0,0 1,110 3 6

051-0-0075 - 291-1-0001 TWDS 291 SS ENTRY 100 THBY 6.82 11,0 1,110 19 6

051-0-0076 - 112-3-0001 TWDS 112BF430A01 100 TRBY 4.08 90,0 1,110 19 6

051-0-0077 - 051-0-0078 TWDS 133 DEPT CENTRE PIT 200 PRAY 54.80 0,0 0,370 2 2

051-0-0079 - 051-0-0080 TWDS 133 DEPT 200 PRAY 24.95 0,0 0,370 2 2

051-0-0079 - 193-1-0003 TWDS 193 DEPT 100 THBY 2.62 45,2 0,370 6 2

051-0-0080 - 051-0-0081 TO 133 DEPT 200 PRAY 29.72 0,0 0,370 2 2

051-0-0081 - 131-1-0198 TO 131 DEPT ENTRY 100 TRBY 3.12 90,0 0,370 6 2

051-0-0082 - 051-0-0083 TO 133 DEPT 200 PRAY 17.49 0,0 1,295 3 7

051-0-0082 - 193-1-0001 TWDS 193 DEPT 100 THBY 4.91 22,2 1,295 22 7

051-0-0086 - 051-0-0087 TO 111 DEPT 100 TRBY 10.09 0,0 1,190 20 7

051-0-0086 - 191-1-0001 TWDS 191 DEPT ENTRY 100 THBY 2.70 44,6 1,190 20 7

051-0-0087 - 111-1-0144 TO 111DEPT ENTRY 100 THBY 3.09 69,4 1,190 20 7

051-0-0088 - 051-0-0044 TWDS 491 SUBSTATION 100 TRBY 18.25 0,0 0,555 9 3

051-0-0092 - 051-0-0011 TO 701LG100EX07/701LG100EX13 100 TRBY 2.55 0,0 0,370 6 2

051-0-0094 - 051-0-0095 TWDS 401LG200X17 100 TRBY 18.00 0,0 0,370 6 2

051-0-0095 - 051-0-0214 TWDS 401LG200X17 100 TRBY 10.66 0,0 0,370 6 2

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044938 04.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0096 - 051-0-0098 TWDS 101LG400EX09/101LG400EX20 100 TRBY 166.53 0,0 0,185 3 1

051-0-0098 - 051-0-0099 TWDS 101LG400EX09/101LG400EX20 100 TRBY 41.51 0,0 0,185 3 1

051-0-0099 - 051-0-0124 TO 101LG400EX09/101LG400EX20 100 TRBY 29.17 0,0 0,185 3 1

051-0-0100 - 051-0-0141 TWDS 955 MAIN GATE 200 PRAY 183.00 0,3 0,185 1 1

051-0-0104 - 051-0-0048 TWDS 421 DEPT 100 TRBY 10.70 0,0 1,665 28 9

051-0-0104 - 051-0-0103 TO 465 DEPT 200 PRAY 3.71 0,0 0,000 0 0

051-0-0105 - 051-0-0104 TWDS 421 DEPT 100 TRBY 10.21 0,0 1,665 28 9

051-0-0105 - 051-0-0215 TO 465 DEPT 200 PRAY 15.08 0,0 0,370 2 2

051-0-0115 - 051-0-0092 TO 701LG100X11 100 TRBY 261.23 0,3 0,370 6 2

051-0-0116 - 051-0-0115 TO 701LG100EX14 100 TRBY 3.57 0,0 0,370 6 2

051-0-0117 - 051-0-0116 TO 701LG100EX08/701LG100X12 100 TRBY 185.73 0,0 0,370 6 2

051-0-0118 - 051-0-0117 TO 701LG100EX15 100 TRBY 172.97 0,0 0,370 6 2

051-0-0119 - 051-0-0029 TWDS 401LG200X14 100 TRBY 18.02 0,3 2,035 34 11

051-0-0120 - 051-0-0121 TO 401LG200EX16 100 TRBY 20.86 0,0 0,370 6 2

051-0-0121 - 051-0-0094 TWDS 401LG200X17 100 TRBY 43.74 0,0 0,370 6 2

051-0-0122 - 051-0-0018 TWDS 511 DEPT. 100 TRBY 20.71 0,0 1,850 31 10

051-0-0123 - 051-0-0096 TWDS 511 CONVEYOR 100 TRBY 16.72 0,0 0,185 3 1

051-0-0124 - 051-0-0125 TO 101LG400X24 100 TRBY 2.50 0,0 0,185 3 1

051-0-0125 - 051-0-0026 TWDS 101LG400X25 100 TRBY 20.85 0,0 0,185 3 1

051-0-0126 - 051-0-0127 TO 101LG400EX21 100 TRBY 20.98 0,0 0,185 3 1

051-0-0127 - 051-0-0100 TWDS WEIGH BRIDGE 100 TRBY 6.40 0,0 0,185 3 1

051-0-0129 - 051-0-0055 TWDS 391 SUBSTATION 100 TRBY 2.00 0,0 0,555 9 3

051-0-0130 - 051-0-0072 TO 801LG300EX05/801LG300EX07 100 TRBY 5.00 0,0 2,960 49 16

051-0-0141 - 051-0-0143 TWDS 955 MAIN GATE 200 PRAY 53.00 0,0 0,185 1 1

051-0-0143 - 051-0-0145 TWDS Truck Stand El. Room 200 PRAY 111.25 -0,3 0,185 1 1

051-0-0145 - 051-0-0147 TWDS Staff Hostel EL.ROOM 200 PRAY 28.66 0,0 0,185 1 1

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044938 04.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0147 - 051-0-0148 TO Staff Hostel EL.ROOM 200 PRAY 119.99 0,0 0,185 1 1

051-0-0212 - 051-0-0045 TO 401LG100EX17 100 TRBY 1.60 0,0 0,555 9 3

051-0-0213 - 051-0-0129 TO 401LG100X18 100 TRBY 7.01 0,0 0,555 9 3

051-0-0214 - 051-0-0003 TO 691 DEPT. 100 TRBY 84.09 0,0 0,370 6 2

051-0-0215 - 465-1-0001 TWDS 465BL580M01/465BV590Y01 100 TRBY 2.56 90,0 0,370 6 2

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044938 04.5


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


05 C Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 05.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 05.1

Title: Document: Page:

C Tray Segment Quantities & Fill Area - Table of Contents 80044938 05.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0001 - 051-0-0002 TO 891 ENTRY 100 TRBC 15.37 0,0 2,399 40 29

051-0-0001 - 891-1-0001 TO 891 ENTRY 100 THBC 1.70 60,1 2,399 40 29

051-0-0002 - 051-0-0004 TWDS 591 SUBSTATION 100 TRBC 10.63 0,0 2,399 40 29

051-0-0004 - 051-0-0119 TO 401LG200X15 100 TRBC 45.55 0,0 2,399 40 29

051-0-0012 - 051-0-0013 TO 762 DEPT 300 TRBC 5.17 0,0 4,971 28 53

051-0-0012 - 791-1-0003 TWDS 762 DEPT ENTRY 300 TRBC 2.51 49,0 4,971 28 53

051-0-0013 - 762-1-0001 TWDS 762DQ250D01 300 TRBC 3.85 78,7 4,971 28 53

051-0-0016 - 051-0-0122 TO 101LG400EX08 100 TRBC 2.00 0,0 2,697 47 29

051-0-0016 - 891-1-0019 TWDS 891 DEPT 100 TRBC 1.81 62,0 2,697 47 29

051-0-0017 - 143-1-0264 TWDS 143 DEPT 100 TRBC 3.40 90,0 2,697 47 29

051-0-0018 - 051-0-0017 TO 511 DEPT CONVEYOR 200 PRAC 25.58 0,0 2,697 10 29

051-0-0024 - 051-0-0025 TO 231 DEPT 200 PRAC 4.19 0,0 9,105 20 93

051-0-0024 - 194-1-0001 TWDS 194 DEPT 300 THBC 2.60 43,1 9,105 53 93

051-0-0025 - 231-1-0001 TWDS 101LG400X15 300 TRBC 3.70 90,0 9,105 53 93

051-0-0029 - 051-0-0030 TO 481 DEPT CONVEYOR 200 PRAC 14.90 0,0 7,672 17 70

051-0-0029 - 051-0-0032 TO 401LG200X14 300 TRBC 128.90 0,0 5,501 33 45

051-0-0030 - 481-1-0028 TO 481 MAIN ENTRY 300 TRBC 3.47 77,7 7,672 45 70

051-0-0031 - 711-1-0001 TO 711 DEPT 100 TRBC 4.61 85,0 1,723 31 17

051-0-0032 - 051-0-0031 TO 731 DEPT 200 PRAC 13.28 0,0 1,723 6 17

051-0-0032 - 051-0-0033 TO 401LG200EX08/401LG200EX15 300 TRBC 7.12 0,0 7,224 43 62

051-0-0033 - 492-1-0098 TWDS 492 DEPT ENTRY 300 TRBC 2.71 44,3 7,224 43 62

051-0-0034 - 051-0-0036 TO 441 DEPT 500 TRBC 42.82 0,0 16,208 53 181

051-0-0034 - 492-1-0007 TWDS 492 DEPT ENTRY 500 THBC 4.94 22,6 16,208 53 181

051-0-0036 - 441-1-0001 TWDS 401LG201EX07 500 THBC 3.64 77,0 16,208 53 181

051-0-0038 - 051-0-0043 TO 493 SUBSTATION 100 TRBC 67.73 0,0 1,945 35 19

051-0-0038 - 492-1-0107 TWDS 492 DEPT ENTRY 100 THBC 2.01 70,6 1,945 35 19

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044938 05.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0043 - 051-0-0088 TWDS 491 SUBSTATION 100 TRBC 1.54 0,0 1,945 35 19

051-0-0044 - 051-0-0212 TO 401LG100X19/401LG100EX09 100 TRBC 14.26 0,0 1,945 35 19

051-0-0045 - 491-1-0001 TWDS 491 DEPT ENTRY 100 THBC 2.58 42,7 1,945 35 19

051-0-0046 - 051-0-0105 TWDS 421 DEPT 500 (x2) TRBC 13.43 0,0 22,975 39 232

051-0-0046 - 491-1-0011 TWDS 491 DEPT ENTRY 500 (x2) THBC 4.88 21,0 22,975 39 232

051-0-0048 - 051-0-0049 TWDS 421 DEPT 500 (x2) TRBC 2.80 0,0 21,596 37 219

051-0-0049 - 051-0-0050 TO 421 DEPT 500 (x2) TRBC 3.70 0,0 21,596 37 219

051-0-0050 - 421-1-0001 TWDS 421 DEPT ENTRY 500 (x2) TRBC 3.39 76,6 21,596 37 219

051-0-0054 - 051-0-0213 TO 401LG100EX08 300 TRBC 2.00 0,0 4,521 27 39

051-0-0054 - 491-1-0151 TWDS 491 DEPT ENTRY 300 THBC 1.87 69,0 4,521 27 39

051-0-0055 - 051-0-0056 TWDS 741 DEPT 300 TRBC 5.75 0,0 4,521 27 39

051-0-0056 - 051-0-0057 TO 741 DEPT 300 TRBC 4.10 0,0 4,521 27 39

051-0-0057 - 741-1-0001 TO 741 DEPT 300 TRBC 7.48 84,6 4,521 27 39

051-0-0058 - 051-0-0059 TWDS 321 DEPT 100 TRBC 15.10 0,0 0,279 5 3

051-0-0059 - 051-0-0060 TWDS 133 DEPT CONVEYOR 100 TRBC 1.55 0,0 0,279 5 3

051-0-0060 - 051-0-0062 TWDS 133 DEPT CONVEYOR 100 TRBC 41.84 0,0 0,279 5 3

051-0-0062 - 051-0-0063 TWDS 133 DEPT CONVEYOR 100 TRBC 23.23 0,0 0,279 5 3

051-0-0063 - 051-0-0064 TO 133 DEPT CONVEYOR 100 TRBC 28.14 0,0 0,279 5 3

051-0-0064 - 143-1-0283 TO 311 DEPT 100 TRBC 6.94 89,1 0,279 5 3

051-0-0065 - 051-0-0068 TWDS 801 CCR BUILDING 100 TRBC 14.38 0,0 0,627 9 11

051-0-0068 - 051-0-0069 TWDS 801 CCR BUILDING 100 TRBC 28.51 0,0 0,627 9 11

051-0-0069 - 051-0-0070 TWDS 801 CCR BUILDING 100 TRBC 45.53 0,0 0,627 9 11

051-0-0070 - 051-0-0130 TO 801LG300X04 100 TRBC 33.31 0,0 0,627 9 11

051-0-0070 - 051-0-0131 TO Main canteen 200 PRAC 97.37 1,1 0,000 0 0

051-0-0071 - 051-0-0172 TO Main Store 200 PRAC 39.79 2,6 0,000 0 0

051-0-0072 - 801-1-0001 TWDS 801 DEPT ENTRY 100 THBC 0.39 14,9 0,627 9 11

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044938 05.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0075 - 051-0-0076 TO 112 DEPT 200 PRAC 8.39 0,0 13,446 29 136

051-0-0075 - 291-1-0001 TWDS 291 SS ENTRY 500 THBC 6.82 11,0 13,446 47 136

051-0-0076 - 112-3-0001 TWDS 112BF430A01 500 TRBC 4.08 90,0 13,446 47 136

051-0-0077 - 051-0-0078 TWDS 133 DEPT CENTRE PIT 200 PRAC 54.80 0,0 0,688 4 8

051-0-0079 - 051-0-0080 TWDS 133 DEPT 200 PRAC 24.95 0,0 5,664 15 54

051-0-0079 - 193-1-0003 TWDS 193 DEPT 300 THBC 2.62 45,2 5,664 33 54

051-0-0080 - 051-0-0081 TO 133 DEPT 200 PRAC 29.72 0,0 5,664 15 54

051-0-0081 - 131-1-0198 TO 131 DEPT ENTRY 300 TRBC 3.12 90,0 5,664 33 54

051-0-0082 - 051-0-0083 TO 133 DEPT 200 PRAC 17.49 0,0 4,592 14 49

051-0-0082 - 193-1-0001 TWDS 193 DEPT 300 THBC 4.91 22,2 4,592 26 49

051-0-0086 - 051-0-0087 TO 111 DEPT 500 TRBC 10.09 0,0 15,820 54 154

051-0-0086 - 191-1-0001 TWDS 191 DEPT ENTRY 500 THBC 2.70 44,6 15,820 54 154

051-0-0087 - 111-1-0144 TO 111DEPT ENTRY 500 THBC 3.09 69,4 15,820 54 154

051-0-0088 - 051-0-0044 TWDS 491 SUBSTATION 100 TRBC 18.25 0,0 1,945 35 19

051-0-0092 - 051-0-0106 TWDS MT WORK SHOP 200 PRAC 270.00 0,4 0,000 0 0

051-0-0096 - 051-0-0097 TO 511 CONVEYOR 200 PRAC 6.71 0,0 0,000 0 0

051-0-0102 - 051-0-0128 TO REST ROOMS/OFFICE 200 PRAC 29.30 3,5 0,000 0 0

051-0-0104 - 051-0-0048 TWDS 421 DEPT 500 (x2) TRBC 10.70 0,0 21,596 37 219

051-0-0104 - 051-0-0103 TO 465 DEPT 200 PRAC 3.71 0,0 0,000 0 0

051-0-0105 - 051-0-0104 TWDS 421 DEPT 500 (x2) TRBC 10.21 0,0 21,596 37 219

051-0-0105 - 051-0-0215 TO 465 DEPT 200 PRAC 15.08 0,0 2,405 11 31

051-0-0106 - 051-0-0107 TWDS MT WORK SHOP 200 PRAC 30.20 0,0 0,000 0 0

051-0-0107 - 051-0-0108 TWDS MT WORK SHOP 200 PRAC 60.00 0,0 0,000 0 0

051-0-0108 - 051-0-0109 TWDS MT WORK SHOP 200 PRAC 25.07 0,0 0,000 0 0

051-0-0109 - 051-0-0110 TWDS MT WORK SHOP 200 PRAC 22.05 0,0 0,000 0 0

051-0-0110 - 051-0-0112 TWDS MT WORK SHOP 200 PRAC 30.00 0,0 0,000 0 0

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044938 05.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0111 - 051-0-0113 TWDS MT WORK SHOP 200 PRAC 81.49 0,0 0,000 0 0

051-0-0112 - 051-0-0111 TWDS MT WORK SHOP 200 PRAC 21.70 0,0 0,000 0 0

051-0-0113 - 051-0-0114 TO MT WORK SHOP 200 PRAC 189.51 0,0 0,000 0 0

051-0-0119 - 051-0-0029 TWDS 401LG200X14 100 TRBC 18.02 0,3 2,399 40 29

051-0-0122 - 051-0-0018 TWDS 511 DEPT. 100 TRBC 20.71 0,0 2,697 47 29

051-0-0129 - 051-0-0055 TWDS 391 SUBSTATION 300 TRBC 2.00 0,0 4,521 27 39

051-0-0130 - 051-0-0072 TO 801LG300EX05/801LG300EX07 100 TRBC 5.00 0,0 0,627 9 11

051-0-0131 - 051-0-0132 TWDS Fire Truck HSE OFFICE 200 PRAC 115.53 0,0 0,000 0 0

051-0-0132 - 051-0-0133 TO Fire Truck HSE OFFICE 200 PRAC 39.05 0,0 0,000 0 0

051-0-0134 - 051-0-0135 TO 953 Canteen/PRAYER ROOM 200 PRAC 48.15 0,0 0,000 0 0

051-0-0141 - 051-0-0142 TO 951 WEIGH BRIDGE 200 PRAC 10.45 0,0 0,000 0 0

051-0-0143 - 051-0-0144 TO 955 MAIN GATE 200 PRAC 46.20 0,9 0,000 0 0

051-0-0145 - 051-0-0146 TO Truck Stand El. Room 200 PRAC 44.30 0,0 0,000 0 0

051-0-0172 - 051-0-0173 TO Raw Storage 200 PRAC 53.00 0,0 0,000 0 0

051-0-0212 - 051-0-0045 TO 401LG100EX17 100 TRBC 1.60 0,0 1,945 35 19

051-0-0213 - 051-0-0129 TO 401LG100X18 300 TRBC 7.01 0,0 4,521 27 39

051-0-0215 - 465-1-0001 TWDS 465BL580M01/465BV590Y01 100 TRBC 2.56 90,0 2,405 39 31

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044938 05.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


06 I Tray Segment Quantites & Fill Area ......................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 06.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 06.1

Title: Document: Page:

I Tray Segment Quantites & Fill Area - Table of Contents 80044938 06.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0104 - 051-0-0103 TO 465 DEPT 200 PRAI 3.71 0,0 0,000 0 0

Title: Document: Page:

I Tray Segment Quantites & Fill Area - List 80044938 06.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


07 M Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 07.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 07.1

Title: Document: Page:

M Tray Segment Quantities & Fill Area - Table of Contents 80044938 07.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0001 - 051-0-0002 TO 891 ENTRY 100 TRBM 15.37 0,0 3,010 40 12

051-0-0001 - 891-1-0001 TO 891 ENTRY 100 THBM 1.70 60,1 3,010 40 12

051-0-0002 - 051-0-0004 TWDS 591 SUBSTATION 300 TRBM 10.63 0,0 4,621 22 16

051-0-0002 - 051-0-0120 TO 401LG200EX09/401LG200X 100 TRBM 2.47 0,0 2,211 36 6

051-0-0004 - 051-0-0005 TWDS 591 SUBSTATION 100 TRBM 45.92 0,0 1,318 26 3

051-0-0004 - 051-0-0119 TO 401LG200X15 300 TRBM 45.55 0,0 5,339 28 17

051-0-0005 - 051-0-0118 TO 401LG200X18 100 TRBM 2.85 0,0 0,800 10 2

051-0-0011 - 791-1-0001 TWDS 791 SS ENTRY 100 THBM 3.29 35,3 2,290 59 6

051-0-0012 - 051-0-0013 TO 762 DEPT 100 TRBM 5.17 0,0 3,161 44 15

051-0-0012 - 791-1-0003 TWDS 762 DEPT ENTRY 100 TRBM 2.51 49,0 3,161 44 15

051-0-0013 - 762-1-0001 TWDS 762DQ250D01 100 TRBM 3.85 78,7 3,161 44 15

051-0-0016 - 051-0-0122 TO 101LG400EX08 300 TRBM 2.00 0,0 5,102 21 20

051-0-0016 - 891-1-0019 TWDS 891 DEPT 300 TRBM 1.81 62,0 5,102 21 20

051-0-0017 - 143-1-0264 TWDS 143 DEPT 100 TRBM 3.40 90,0 1,265 16 6

051-0-0018 - 051-0-0017 TO 511 DEPT CONVEYOR 200 PRAM 25.58 0,0 1,265 3 6

051-0-0018 - 051-0-0019 TWDS 194 SUBSTATION 100 TRBM 3.16 0,0 4,055 49 15

051-0-0019 - 051-0-0020 TO 101LG400EX19 100 TRBM 2.63 0,0 4,055 49 15

051-0-0020 - 051-0-0021 TWDS 194 SUBSTATION 200 PRAM 109.56 -0,1 4,762 13 14

051-0-0020 - 051-0-0123 TO 101LG400X23 100 TRBM 3.00 0,0 2,319 49 8

051-0-0021 - 051-0-0022 TWDS 194 SUBSTATION 200 PRAM 29.97 0,0 4,762 13 14

051-0-0022 - 051-0-0023 TO 194 SUBSTATION 200 PRAM 30.00 0,0 4,762 13 14

051-0-0023 - 194-1-0023 TWDS 194 DEPT 300 THBM 1.91 68,6 4,762 25 14

051-0-0024 - 051-0-0025 TO 231 DEPT 200 PRAM 4.19 0,0 7,685 27 39

051-0-0024 - 194-1-0001 TWDS 194 DEPT 300 THBM 2.60 43,1 7,685 34 39

051-0-0025 - 231-1-0001 TWDS 101LG400X15 300 TRBM 3.70 90,0 7,685 34 39

051-0-0026 - 051-0-0126 TO 101LG400X25 100 TRBM 67.70 0,0 1,583 30 6

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0029 - 051-0-0030 TO 481 DEPT CONVEYOR 200 PRAM 14.90 0,0 6,365 23 26

051-0-0029 - 051-0-0032 TO 401LG200X14 300 TRBM 128.90 0,0 10,624 51 36

051-0-0030 - 481-1-0028 TO 481 MAIN ENTRY 300 TRBM 3.47 77,7 6,365 28 26

051-0-0031 - 711-1-0001 TO 711 DEPT 100 TRBM 4.61 85,0 2,722 37 13

051-0-0032 - 051-0-0031 TO 731 DEPT 200 PRAM 13.28 0,0 2,722 8 13

051-0-0032 - 051-0-0033 TO 401LG200EX08/401LG200EX15 500 TRBM 7.12 0,0 13,846 39 50

051-0-0033 - 492-1-0098 TWDS 492 DEPT ENTRY 500 TRBM 2.71 44,3 14,582 42 52

051-0-0034 - 051-0-0036 TO 441 DEPT 300 TRBM 42.82 0,0 9,470 41 42

051-0-0034 - 492-1-0007 TWDS 492 DEPT ENTRY 300 THBM 4.94 22,6 9,470 41 42

051-0-0036 - 441-1-0001 TWDS 401LG201EX07 300 THBM 3.64 77,0 9,470 41 42

051-0-0038 - 051-0-0043 TO 493 SUBSTATION 100 TRBM 67.73 0,0 1,655 21 8

051-0-0038 - 492-1-0107 TWDS 492 DEPT ENTRY 100 THBM 2.01 70,6 1,655 21 8

051-0-0039 - 051-0-0040 TWDS 841 DEPT 200 PRAM 18.40 0,0 0,400 2 2

051-0-0039 - 421-1-0043 TWDS 841ES410A01 100 TRBM 3.77 70,2 0,400 6 2

051-0-0043 - 051-0-0042 TO 401LG100EX16B 100 TRBM 15.60 0,0 0,075 2 1

051-0-0043 - 051-0-0088 TWDS 491 SUBSTATION 100 TRBM 1.54 0,0 1,730 23 9

051-0-0044 - 051-0-0212 TO 401LG100X19/401LG100EX09 100 TRBM 14.26 0,0 1,730 23 9

051-0-0045 - 491-1-0001 TWDS 491 DEPT ENTRY 100 THBM 2.58 42,7 2,166 28 11

051-0-0046 - 051-0-0105 TWDS 421 DEPT 500 TRBM 13.43 0,0 15,398 37 88

051-0-0046 - 491-1-0011 TWDS 491 DEPT ENTRY 500 THBM 4.88 21,0 15,398 37 88

051-0-0048 - 051-0-0049 TWDS 421 DEPT 500 TRBM 2.80 0,0 13,185 32 73

051-0-0049 - 051-0-0050 TO 421 DEPT 500 TRBM 3.70 0,0 13,185 32 73

051-0-0050 - 421-1-0001 TWDS 421 DEPT ENTRY 300 TRBM 3.39 76,6 13,185 54 73

051-0-0054 - 051-0-0213 TO 401LG100EX08 100 TRBM 2.00 0,0 2,799 35 12

051-0-0054 - 491-1-0151 TWDS 491 DEPT ENTRY 100 THBM 1.87 69,0 3,017 37 13

051-0-0055 - 051-0-0056 TWDS 741 DEPT 100 TRBM 5.75 0,0 2,041 25 9

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0055 - 051-0-0058 TO 391 SUBSTATION 100 TRBM 21.22 0,0 0,540 7 2

051-0-0056 - 051-0-0057 TO 741 DEPT 100 TRBM 4.10 0,0 2,041 25 9

051-0-0057 - 741-1-0001 TO 741 DEPT 100 TRBM 7.48 84,6 2,041 25 9

051-0-0058 - 051-0-0059 TWDS 321 DEPT 100 TRBM 15.10 0,0 0,890 12 4

051-0-0059 - 051-0-0060 TWDS 133 DEPT CONVEYOR 100 TRBM 1.55 0,0 0,890 12 4

051-0-0060 - 051-0-0062 TWDS 133 DEPT CONVEYOR 100 TRBM 41.84 0,0 0,890 12 4

051-0-0062 - 051-0-0063 TWDS 133 DEPT CONVEYOR 100 TRBM 23.23 0,0 0,890 12 4

051-0-0063 - 051-0-0064 TO 133 DEPT CONVEYOR 100 TRBM 28.14 0,0 0,890 12 4

051-0-0064 - 143-1-0283 TO 311 DEPT 100 TRBM 6.94 89,1 0,715 9 3

051-0-0065 - 051-0-0068 TWDS 801 CCR BUILDING 100 TRBM 14.38 0,0 1,375 20 6

051-0-0068 - 051-0-0069 TWDS 801 CCR BUILDING 100 TRBM 28.51 0,0 1,375 20 6

051-0-0069 - 051-0-0070 TWDS 801 CCR BUILDING 100 TRBM 45.53 0,0 1,375 20 6

051-0-0070 - 051-0-0071 TO WORKSHOP 200 PRAM 91.16 0,0 0,300 1 1

051-0-0070 - 051-0-0130 TO 801LG300X04 100 TRBM 33.31 0,0 1,075 16 5

051-0-0072 - 801-1-0001 TWDS 801 DEPT ENTRY 100 THBM 0.39 14,9 1,075 16 5

051-0-0073 - 051-0-0074 TO 231 DEPT CENTRE PIT 200 PRAM 52.90 0,0 0,455 2 3

051-0-0073 - 231-1-0017 TO 231 DEPT CENTRE PIT 100 TRBM 8.90 88,7 0,455 8 3

051-0-0074 - 231-1-0098 TO 101LG400X17 100 TRBM 8.90 88,7 0,455 8 3

051-0-0075 - 051-0-0076 TO 112 DEPT 200 PRAM 8.39 0,0 12,792 27 59

051-0-0075 - 291-1-0001 TWDS 291 SS ENTRY 300 THBM 6.82 11,0 12,792 55 59

051-0-0076 - 112-3-0001 TWDS 112BF430A01 300 TRBM 4.08 90,0 12,792 55 59

051-0-0077 - 051-0-0078 TWDS 133 DEPT CENTRE PIT 200 PRAM 54.80 0,0 0,175 1 1

051-0-0079 - 051-0-0080 TWDS 133 DEPT 200 PRAM 24.95 0,0 4,571 10 23

051-0-0079 - 193-1-0003 TWDS 193 DEPT 100 THBM 2.62 45,2 4,571 61 23

051-0-0080 - 051-0-0081 TO 133 DEPT 200 PRAM 29.72 0,0 4,571 10 23

051-0-0081 - 131-1-0198 TO 131 DEPT ENTRY 100 TRBM 3.12 90,0 4,571 61 23

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0082 - 051-0-0083 TO 133 DEPT 200 PRAM 17.49 0,0 3,145 7 16

051-0-0082 - 193-1-0001 TWDS 193 DEPT 100 THBM 4.91 22,2 3,145 45 16

051-0-0084 - 051-0-0085 TWDS 131 DEPT CENTRE PIT 200 PRAM 55.79 0,0 0,580 2 3

051-0-0084 - 131-1-0099 TWDS 891 DEPT 100 THBM 0.84 72,8 0,580 10 3

051-0-0086 - 051-0-0087 TO 111 DEPT 300 TRBM 10.09 0,0 13,750 62 69

051-0-0086 - 191-1-0001 TWDS 191 DEPT ENTRY 300 THBM 2.70 44,6 13,825 63 70

051-0-0087 - 111-1-0144 TO 111DEPT ENTRY 300 THBM 3.09 69,4 13,750 62 69

051-0-0088 - 051-0-0044 TWDS 491 SUBSTATION 100 TRBM 18.25 0,0 1,730 23 9

051-0-0092 - 051-0-0011 TO 701LG100EX07/701LG100EX13 100 TRBM 2.55 0,0 1,554 40 4

051-0-0094 - 051-0-0095 TWDS 401LG200X17 100 TRBM 18.00 0,0 0,975 12 3

051-0-0095 - 051-0-0214 TWDS 401LG200X17 100 TRBM 10.66 0,0 0,975 12 3

051-0-0096 - 051-0-0098 TWDS 101LG400EX09/101LG400EX20 100 TRBM 166.53 0,0 2,319 49 8

051-0-0098 - 051-0-0099 TWDS 101LG400EX09/101LG400EX20 100 TRBM 41.51 0,0 2,319 49 8

051-0-0099 - 051-0-0124 TO 101LG400EX09/101LG400EX20 100 TRBM 29.17 0,0 2,319 49 8

051-0-0100 - 051-0-0101 TWDS CANTEEN/PRAYER ROOM 100 TRBM 99.25 0,0 0,650 9 3

051-0-0100 - 051-0-0141 TWDS 955 MAIN GATE 200 PRAM 183.00 0,3 0,415 1 2

051-0-0101 - 051-0-0102 TWDS POWER GRID 100 TRBM 22.56 0,0 0,350 4 2

051-0-0101 - 051-0-0134 TWDS 952 MAIN GATE 200 PRAM 172.80 0,6 0,300 1 1

051-0-0102 - 051-0-0028 TO POWER GRID 100 TRBM 41.49 0,0 0,350 4 2

051-0-0104 - 051-0-0048 TWDS 421 DEPT 500 TRBM 10.70 0,0 13,185 32 73

051-0-0104 - 051-0-0103 TO 465 DEPT 200 PRAM 3.71 0,0 0,000 0 0

051-0-0105 - 051-0-0104 TWDS 421 DEPT 500 TRBM 10.21 0,0 13,185 32 73

051-0-0105 - 051-0-0215 TO 465 DEPT 200 PRAM 15.08 0,0 3,963 10 25

051-0-0115 - 051-0-0092 TO 701LG100X11 100 TRBM 261.23 0,3 1,554 40 4

051-0-0116 - 051-0-0115 TO 701LG100EX14 100 TRBM 3.57 0,0 1,036 23 3

051-0-0117 - 051-0-0116 TO 701LG100EX08/701LG100X12 100 TRBM 185.73 0,0 0,818 21 2

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0118 - 051-0-0117 TO 701LG100EX15 100 TRBM 172.97 0,0 0,300 4 1

051-0-0119 - 051-0-0029 TWDS 401LG200X14 300 TRBM 18.02 0,3 5,839 30 18

051-0-0120 - 051-0-0121 TO 401LG200EX16 100 TRBM 20.86 0,0 1,493 28 4

051-0-0121 - 051-0-0094 TWDS 401LG200X17 100 TRBM 43.74 0,0 0,975 12 3

051-0-0122 - 051-0-0018 TWDS 511 DEPT. 300 TRBM 20.71 0,0 5,320 21 21

051-0-0123 - 051-0-0096 TWDS 511 CONVEYOR 100 TRBM 16.72 0,0 2,319 49 8

051-0-0124 - 051-0-0125 TO 101LG400X24 100 TRBM 2.50 0,0 1,583 30 6

051-0-0125 - 051-0-0026 TWDS 101LG400X25 100 TRBM 20.85 0,0 1,583 30 6

051-0-0126 - 051-0-0127 TO 101LG400EX21 100 TRBM 20.98 0,0 1,583 30 6

051-0-0127 - 051-0-0100 TWDS WEIGH BRIDGE 100 TRBM 6.40 0,0 1,065 14 5

051-0-0129 - 051-0-0055 TWDS 391 SUBSTATION 100 TRBM 2.00 0,0 2,581 32 11

051-0-0130 - 051-0-0072 TO 801LG300EX05/801LG300EX07 100 TRBM 5.00 0,0 1,075 16 5

051-0-0134 - 051-0-0136 TWDS 952 MAIN GATE 200 PRAM 25.35 0,0 0,300 1 1

051-0-0136 - 051-0-0137 TWDS 952 MAIN GATE 200 PRAM 22.40 0,0 0,300 1 1

051-0-0137 - 051-0-0138 TWDS 952 MAIN GATE 200 PRAM 17.55 0,0 0,300 1 1

051-0-0138 - 051-0-0139 TWDS 952 MAIN GATE 200 PRAM 18.81 0,0 0,300 1 1

051-0-0139 - 051-0-0140 TO 952 MAIN GATE 200 PRAM 165.40 0,0 0,300 1 1

051-0-0141 - 051-0-0143 TWDS 955 MAIN GATE 200 PRAM 53.00 0,0 0,415 1 2

051-0-0143 - 051-0-0145 TWDS Truck Stand El. Room 200 PRAM 111.25 -0,3 0,415 1 2

051-0-0145 - 051-0-0147 TWDS Staff Hostel EL.ROOM 200 PRAM 28.66 0,0 0,415 1 2

051-0-0147 - 051-0-0148 TO Staff Hostel EL.ROOM 200 PRAM 119.99 0,0 0,715 2 3

051-0-0147 - 051-0-0149 TWDS ICPL Staff Residence EL.R 200 PRAM 28.63 0,0 0,300 1 1

051-0-0149 - 051-0-0150 TWDS ICPL Staff Residence EL.R 200 PRAM 30.00 0,0 0,300 1 1

051-0-0150 - 051-0-0151 TWDS ICPL Staff Residence EL.R 200 PRAM 29.99 0,0 0,300 1 1

051-0-0151 - 051-0-0152 TWDS ICPL Staff Residence EL.R 200 PRAM 29.99 0,0 0,300 1 1

051-0-0152 - 051-0-0153 TWDS ICPL Staff Residence EL.R 200 PRAM 29.74 0,0 0,300 1 1

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.5


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0153 - 051-0-0154 TWDS ICPL Staff Residence EL.R 200 PRAM 29.98 0,0 0,300 1 1

051-0-0154 - 051-0-0155 TWDS ICPL Staff Residence EL.R 200 PRAM 29.99 0,0 0,300 1 1

051-0-0155 - 051-0-0156 TWDS ICPL Staff Residence EL.R 200 PRAM 30.00 0,0 0,300 1 1

051-0-0156 - 051-0-0157 TWDS ICPL Staff Residence EL.R 200 PRAM 29.68 0,0 0,300 1 1

051-0-0157 - 051-0-0158 TWDS ICPL Staff Residence EL.R 200 PRAM 30.02 0,0 0,300 1 1

051-0-0158 - 051-0-0159 TWDS ICPL Staff Residence EL.R 200 PRAM 29.76 0,0 0,300 1 1

051-0-0159 - 051-0-0160 TWDS ICPL Staff Residence EL.R 200 PRAM 30.35 0,0 0,300 1 1

051-0-0160 - 051-0-0161 TWDS ICPL Staff Residence EL.R 200 PRAM 30.00 0,0 0,300 1 1

051-0-0161 - 051-0-0162 TWDS ICPL Staff Residence EL.R 200 PRAM 30.00 0,0 0,300 1 1

051-0-0162 - 051-0-0163 TWDS ICPL Staff Residence EL.R 200 PRAM 29.99 0,0 0,300 1 1

051-0-0163 - 051-0-0164 TWDS ICPL Staff Residence EL.R 200 PRAM 29.99 0,0 0,300 1 1

051-0-0164 - 051-0-0165 TWDS ICPL Staff Residence EL.R 200 PRAM 30.16 0,0 0,300 1 1

051-0-0165 - 051-0-0166 TWDS ICPL Staff Residence EL.R 200 PRAM 29.77 0,0 0,300 1 1

051-0-0166 - 051-0-0167 TWDS ICPL Staff Residence EL.R 200 PRAM 29.45 0,0 0,300 1 1

051-0-0167 - 051-0-0168 TWDS ICPL Staff Residence EL.R 200 PRAM 29.45 0,0 0,300 1 1

051-0-0168 - 051-0-0169 TWDS ICPL Staff Residence EL.R 200 PRAM 29.45 0,0 0,300 1 1

051-0-0169 - 051-0-0170 TWDS ICPL Staff Residence EL.R 200 PRAM 29.46 0,0 0,300 1 1

051-0-0170 - 051-0-0171 TO ICPL Staff Residence EL.ROO 200 PRAM 28.00 0,0 0,300 1 1

051-0-0174 - 051-0-0175 TWDS G.H/off.Hostels/El. Room 200 PRAM 140.43 4,2 0,300 1 1

051-0-0174 - 131-1-0292 TWDS G.H/off.Hostels/El. Room 100 TRBM 7.43 57,9 0,300 4 1

051-0-0175 - 051-0-0176 TWDS G.H/off.Hostels/El. Room 200 PRAM 22.52 0,0 0,300 1 1

051-0-0176 - 051-0-0177 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.99 0,0 0,300 1 1

051-0-0177 - 051-0-0178 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.16 6,9 0,300 1 1

051-0-0178 - 051-0-0179 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.07 0,0 0,300 1 1

051-0-0179 - 051-0-0180 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.99 0,0 0,300 1 1

051-0-0180 - 051-0-0181 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.07 4,5 0,300 1 1

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.6


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0181 - 051-0-0182 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.99 0,0 0,300 1 1

051-0-0182 - 051-0-0183 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.99 0,0 0,300 1 1

051-0-0183 - 051-0-0184 TWDS G.H/off.Hostels/El. Room 200 PRAM 21.63 1,9 0,300 1 1

051-0-0184 - 051-0-0185 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.82 1,2 0,300 1 1

051-0-0185 - 051-0-0186 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.68 3,8 0,300 1 1

051-0-0186 - 051-0-0187 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.50 2,3 0,300 1 1

051-0-0187 - 051-0-0188 TWDS G.H/off.Hostels/El. Room 200 PRAM 24.98 2,4 0,300 1 1

051-0-0188 - 051-0-0189 TWDS G.H/off.Hostels/El. Room 200 PRAM 20.65 -0,3 0,300 1 1

051-0-0189 - 051-0-0190 TWDS G.H/off.Hostels/El. Room 200 PRAM 15.28 -0,5 0,300 1 1

051-0-0190 - 051-0-0191 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.18 -1,1 0,300 1 1

051-0-0191 - 051-0-0192 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.87 0,5 0,300 1 1

051-0-0192 - 051-0-0193 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.07 4,3 0,300 1 1

051-0-0193 - 051-0-0194 TWDS G.H/off.Hostels/El. Room 200 PRAM 19.88 -3,7 0,300 1 1

051-0-0194 - 051-0-0195 TWDS G.H/off.Hostels/El. Room 200 PRAM 19.99 -1,0 0,300 1 1

051-0-0195 - 051-0-0196 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.99 0,0 0,300 1 1

051-0-0196 - 051-0-0197 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.99 0,0 0,300 1 1

051-0-0197 - 051-0-0198 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.04 3,3 0,300 1 1

051-0-0198 - 051-0-0199 TWDS G.H/off.Hostels/El. Room 200 PRAM 22.81 2,7 0,300 1 1

051-0-0199 - 051-0-0200 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.00 0,9 0,300 1 1

051-0-0200 - 051-0-0201 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.64 0,0 0,300 1 1

051-0-0201 - 051-0-0202 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.05 0,0 0,300 1 1

051-0-0202 - 051-0-0203 TWDS G.H/off.Hostels/El. Room 200 PRAM 29.97 0,0 0,300 1 1

051-0-0203 - 051-0-0204 TWDS G.H/off.Hostels/El. Room 200 PRAM 30.02 0,0 0,300 1 1

051-0-0204 - 051-0-0205 T0 G.H/off.Hostels/El. Room 200 PRAM 75.02 0,0 0,300 1 1

051-0-0212 - 051-0-0045 TO 401LG100EX17 100 TRBM 1.60 0,0 1,948 26 10

051-0-0213 - 051-0-0129 TO 401LG100X18 100 TRBM 7.01 0,0 2,581 32 11

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.7


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0214 - 051-0-0003 TO 691 DEPT. 100 TRBM 84.09 0,0 0,475 6 2

051-0-0215 - 465-1-0001 TWDS 465BL580M01/465BV590Y01 100 TRBM 2.56 90,0 3,963 49 25

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044938 07.8


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


08 W Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 08.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 08.1

Title: Document: Page:

W Tray Segment Quantities & Fill Area - Table of Contents 80044938 08.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0001 - 051-0-0002 TO 891 ENTRY 600 LRBW 15.37 0,0 20,741 38 14

051-0-0001 - 891-1-0001 TO 891 ENTRY 600 LHBW 1.70 60,1 20,741 38 14

051-0-0002 - 051-0-0004 TWDS 591 SUBSTATION 600 LRBW 10.63 0,0 21,636 40 14

051-0-0002 - 051-0-0120 TO 401LG200EX09/401LG200X 200 LRBW 2.47 0,0 1,535 11 1

051-0-0002 - 051-0-0208 TO 891SJ992A01W01 200 LRBW 3.80 -90,0 0,640 6 1

051-0-0004 - 051-0-0005 TWDS 591 SUBSTATION 600 LRBW 45.92 0,0 23,367 36 7

051-0-0004 - 051-0-0119 TO 401LG200X15 600 LRBW 45.55 0,0 44,153 70 18

051-0-0004 - 051-0-0207 TO 891SJ993A01W01 200 LRBW 3.80 -90,0 0,640 6 1

051-0-0005 - 051-0-0006 TO 591 SUBSTATION 200 LRBW 25.78 0,0 4,651 28 2

051-0-0005 - 051-0-0118 TO 401LG200X18 300 LRBW 2.85 0,0 18,816 50 4

051-0-0005 - 051-0-0206 TO 891SJ994A01W01 200 LHAW 3.80 -90,0 0,720 7 1

051-0-0011 - 791-1-0001 TWDS 791 SS ENTRY 300 LHBW 3.29 35,3 19,746 60 6

051-0-0012 - 051-0-0013 TO 762 DEPT 600 LRBW 5.17 0,0 11,935 48 16

051-0-0012 - 791-1-0003 TWDS 762 DEPT ENTRY 600 LRBW 2.51 49,0 11,935 48 16

051-0-0013 - 762-1-0001 TWDS 762DQ250D01 600 LRBW 3.85 78,7 11,935 48 16

051-0-0016 - 051-0-0122 TO 101LG400EX08 200 LRBW 2.00 0,0 4,146 26 2

051-0-0016 - 891-1-0019 TWDS 891 DEPT 200 LRBW 1.81 62,0 4,146 26 2

051-0-0018 - 051-0-0019 TWDS 194 SUBSTATION 200 LRBW 3.16 0,0 4,146 26 2

051-0-0019 - 051-0-0020 TO 101LG400EX19 200 LRBW 2.63 0,0 4,146 26 2

051-0-0020 - 051-0-0021 TWDS 194 SUBSTATION 200 PRAW 109.56 -0,1 4,316 11 4

051-0-0020 - 051-0-0123 TO 101LG400X23 200 LRBW 3.00 0,0 2,230 30 4

051-0-0021 - 051-0-0022 TWDS 194 SUBSTATION 200 PRAW 29.97 0,0 4,316 11 4

051-0-0022 - 051-0-0023 TO 194 SUBSTATION 200 PRAW 30.00 0,0 4,316 11 4

051-0-0023 - 194-1-0023 TWDS 194 DEPT 200 LHBW 1.91 68,6 4,726 39 4

051-0-0024 - 051-0-0025 TO 231 DEPT 200 (x3) PRAW 4.19 0,0 61,485 21 44

051-0-0024 - 194-1-0001 TWDS 194 DEPT 600 (x3) LHBW 2.60 43,1 79,815 53 44

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044938 08.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0025 - 231-1-0001 TWDS 101LG400X15 600 (x3) LRBW 3.70 90,0 79,815 53 44

051-0-0026 - 051-0-0126 TO 101LG400X25 200 LRBW 67.70 0,0 0,810 7 1

051-0-0026 - 051-0-0209 TO 891SJ991A01W01 200 LRBW 3.60 -90,0 1,030 9 1

051-0-0029 - 051-0-0030 TO 481 DEPT CONVEYOR 200 (x2) PRAW 14.90 0,0 41,745 35 40

051-0-0029 - 051-0-0032 TO 401LG200X14 600 (x3) LRBW 128.90 0,0 104,228 66 58

051-0-0030 - 481-1-0028 TO 481 MAIN ENTRY 500 (x3) LRBW 3.47 77,7 41,745 52 40

051-0-0031 - 711-1-0001 TO 711 DEPT 300 LRBW 4.61 85,0 12,100 55 6

051-0-0032 - 051-0-0031 TO 731 DEPT 200 PRAW 13.28 0,0 12,100 22 6

051-0-0032 - 051-0-0033 TO 401LG200EX08/401LG200EX15 600 (x3) LRBW 7.12 0,0 116,328 75 64

051-0-0033 - 492-1-0098 TWDS 492 DEPT ENTRY 600 (x3) LRBW 2.71 44,3 116,328 75 64

051-0-0035 - 051-0-0037 TO 441 DEPT 600 (x6) LRBW 42.82 0,0 242,833 72 107

051-0-0035 - 492-1-0008 TWDS 492 DEPT ENTRY 600 (x6) LHBW 4.94 22,6 242,833 72 107

051-0-0036 - 051-0-0037 TO 441 DEPT 600 (x6) LRBW 1.55 0,0 242,833 72 107

051-0-0036 - 441-1-0001 TWDS 401LG201EX07 600 (x6) LHBW 3.64 77,0 242,833 72 107

051-0-0038 - 051-0-0043 TO 493 SUBSTATION 600 (x2) LRBW 67.73 0,0 61,833 48 21

051-0-0038 - 492-1-0107 TWDS 492 DEPT ENTRY 600 (x2) LHBW 2.01 70,6 61,833 48 21

051-0-0043 - 051-0-0042 TO 401LG100EX16B 200 LRBW 15.60 0,0 1,570 16 2

051-0-0043 - 051-0-0088 TWDS 491 SUBSTATION 600 (x2) LRBW 1.54 0,0 62,993 50 23

051-0-0044 - 051-0-0212 TO 401LG100X19/401LG100EX09 600 (x2) LRBW 14.26 0,0 62,993 50 23

051-0-0045 - 491-1-0001 TWDS 491 DEPT ENTRY 600 (x2) LHBW 2.58 42,7 62,993 50 23

051-0-0046 - 051-0-0105 TWDS 421 DEPT 600 LRBW 13.43 0,0 33,870 62 13

051-0-0046 - 491-1-0011 TWDS 491 DEPT ENTRY 600 LHBW 4.88 21,0 33,870 62 13

051-0-0047 - 051-0-0051 TWDS 421 DEPT 600 (x9) LHBW 35.89 0,0 299,006 74 173

051-0-0047 - 491-1-0012 TWDS 491 DEPT ENTRY 600 (x9) LHBW 4.88 21,0 299,006 74 173

051-0-0050 - 051-0-0053 TO 421 DEPT 600 (x9) LHBW 1.55 0,0 299,006 74 173

051-0-0050 - 421-1-0001 TWDS 421 DEPT ENTRY 600 (x9) LHBW 3.39 76,6 299,006 74 173

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044938 08.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0051 - 051-0-0052 TWDS 421 DEPT 600 (x9) LHBW 2.78 0,0 299,006 74 173

051-0-0052 - 051-0-0053 TO 421 DEPT 600 (x9) LHBW 2.15 0,0 299,006 74 173

051-0-0054 - 051-0-0213 TO 401LG100EX08 600 (x2) LRBW 2.00 0,0 75,855 62 25

051-0-0054 - 491-1-0151 TWDS 491 DEPT ENTRY 600 (x2) LHBW 1.87 69,0 75,855 62 25

051-0-0055 - 051-0-0056 TWDS 741 DEPT 600 (x2) LRBW 5.75 0,0 64,270 48 18

051-0-0055 - 051-0-0058 TO 391 SUBSTATION 300 LRBW 21.22 0,0 11,355 49 6

051-0-0055 - 051-0-0210 TO 491SJ991A01W01 200 LRBW 3.80 -90,0 0,640 6 1

051-0-0056 - 051-0-0057 TO 741 DEPT 600 (x2) LRBW 4.10 0,0 64,270 48 18

051-0-0057 - 741-1-0001 TO 741 DEPT 600 (x2) LRBW 7.48 84,6 64,270 48 18

051-0-0058 - 051-0-0059 TWDS 321 DEPT 300 LRBW 15.10 0,0 11,855 55 7

051-0-0059 - 051-0-0060 TWDS 133 DEPT CONVEYOR 300 LRBW 1.55 0,0 11,855 55 7

051-0-0060 - 051-0-0062 TWDS 133 DEPT CONVEYOR 200 LRBW 41.84 0,0 11,105 66 5

051-0-0062 - 051-0-0063 TWDS 133 DEPT CONVEYOR 200 LRBW 23.23 0,0 10,795 59 4

051-0-0062 - 051-0-0211 TO 491SJ992A01W01 200 LRBW 3.80 -90,0 0,720 7 1

051-0-0063 - 051-0-0064 TO 133 DEPT CONVEYOR 200 LRBW 28.14 0,0 10,795 59 4

051-0-0064 - 143-1-0283 TO 311 DEPT 200 LRBW 6.94 89,1 10,795 59 4

051-0-0065 - 051-0-0068 TWDS 801 CCR BUILDING 300 LRBW 14.38 0,0 21,100 56 9

051-0-0068 - 051-0-0069 TWDS 801 CCR BUILDING 300 LRBW 28.51 0,0 21,100 56 9

051-0-0069 - 051-0-0070 TWDS 801 CCR BUILDING 300 LRBW 45.53 0,0 21,100 56 9

051-0-0070 - 051-0-0130 TO 801LG300X04 300 LRBW 33.31 0,0 21,100 56 9

051-0-0070 - 051-0-0131 TO Main canteen 200 PRAW 97.37 1,1 0,000 0 0

051-0-0071 - 051-0-0172 TO Main Store 200 PRAW 39.79 2,6 0,000 0 0

051-0-0072 - 801-1-0001 TWDS 801 DEPT ENTRY 300 LHBW 0.39 14,9 21,100 56 9

051-0-0073 - 051-0-0074 TO 231 DEPT CENTRE PIT 200 PRAW 52.90 0,0 12,740 28 7

051-0-0073 - 231-1-0017 TO 231 DEPT CENTRE PIT 300 LRBW 8.90 88,7 12,740 57 7

051-0-0074 - 231-1-0098 TO 101LG400X17 300 LRBW 8.90 88,7 12,740 57 7

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044938 08.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0075 - 051-0-0076 TO 112 DEPT 200 (x3) PRAW 8.39 0,0 67,570 29 60

051-0-0075 - 291-1-0001 TWDS 291 SS ENTRY 600 (x3) LHBW 6.82 11,0 85,900 66 60

051-0-0076 - 112-3-0001 TWDS 112BF430A01 600 (x3) LRBW 4.08 90,0 85,900 66 60

051-0-0077 - 051-0-0078 TWDS 133 DEPT CENTRE PIT 200 (x2) PRAW 54.80 0,0 19,025 12 8

051-0-0079 - 051-0-0080 TWDS 133 DEPT 200 (x2) PRAW 24.95 0,0 39,960 26 24

051-0-0079 - 193-1-0003 TWDS 193 DEPT 600 (x2) LHBW 2.62 45,2 52,180 47 24

051-0-0080 - 051-0-0081 TO 133 DEPT 200 (x2) PRAW 29.72 0,0 39,960 26 24

051-0-0081 - 131-1-0198 TO 131 DEPT ENTRY 600 (x2) LRBW 3.12 90,0 52,180 47 24

051-0-0082 - 051-0-0083 TO 133 DEPT 200 (x3) PRAW 17.49 0,0 107,590 36 45

051-0-0082 - 193-1-0001 TWDS 193 DEPT 600 (x3) LHBW 4.91 22,2 125,920 67 45

051-0-0084 - 051-0-0085 TWDS 131 DEPT CENTRE PIT 200 PRAW 55.79 0,0 0,530 1 1

051-0-0084 - 131-1-0099 TWDS 891 DEPT 200 LHBW 0.84 72,8 0,940 8 1

051-0-0086 - 051-0-0087 TO 111 DEPT 600 (x4) LRBW 10.09 0,0 130,340 73 89

051-0-0086 - 191-1-0001 TWDS 191 DEPT ENTRY 600 (x4) LHBW 2.70 44,6 130,340 73 89

051-0-0087 - 111-1-0144 TO 111DEPT ENTRY 600 (x4) LHBW 3.09 69,4 130,340 73 89

051-0-0088 - 051-0-0044 TWDS 491 SUBSTATION 600 (x2) LRBW 18.25 0,0 62,993 50 23

051-0-0092 - 051-0-0011 TO 701LG100EX07/701LG100EX13 300 LRBW 2.55 0,0 19,746 60 6

051-0-0092 - 051-0-0106 TWDS MT WORK SHOP 200 PRAW 270.00 0,4 0,000 0 0

051-0-0094 - 051-0-0095 TWDS 401LG200X17 200 LRBW 18.00 0,0 1,535 11 1

051-0-0095 - 051-0-0214 TWDS 401LG200X17 200 LRBW 10.66 0,0 1,535 11 1

051-0-0096 - 051-0-0097 TO 511 CONVEYOR 200 PRAW 6.71 0,0 0,000 0 0

051-0-0096 - 051-0-0098 TWDS 101LG400EX09/101LG400EX20 200 LRBW 166.53 0,0 1,830 23 3

051-0-0098 - 051-0-0099 TWDS 101LG400EX09/101LG400EX20 200 LRBW 41.51 0,0 1,830 23 3

051-0-0099 - 051-0-0124 TO 101LG400EX09/101LG400EX20 200 LRBW 29.17 0,0 1,830 23 3

051-0-0102 - 051-0-0128 TO REST ROOMS/OFFICE 200 PRAW 29.30 3,5 0,000 0 0

051-0-0104 - 051-0-0103 TO 465 DEPT 200 PRAW 3.71 0,0 0,000 0 0

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044938 08.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0105 - 051-0-0215 TO 465 DEPT 200 (x2) PRAW 15.08 0,0 33,870 18 13

051-0-0106 - 051-0-0107 TWDS MT WORK SHOP 200 PRAW 30.20 0,0 0,000 0 0

051-0-0107 - 051-0-0108 TWDS MT WORK SHOP 200 PRAW 60.00 0,0 0,000 0 0

051-0-0108 - 051-0-0109 TWDS MT WORK SHOP 200 PRAW 25.07 0,0 0,000 0 0

051-0-0109 - 051-0-0110 TWDS MT WORK SHOP 200 PRAW 22.05 0,0 0,000 0 0

051-0-0110 - 051-0-0112 TWDS MT WORK SHOP 200 PRAW 30.00 0,0 0,000 0 0

051-0-0111 - 051-0-0113 TWDS MT WORK SHOP 200 PRAW 81.49 0,0 0,000 0 0

051-0-0112 - 051-0-0111 TWDS MT WORK SHOP 200 PRAW 21.70 0,0 0,000 0 0

051-0-0113 - 051-0-0114 TO MT WORK SHOP 200 PRAW 189.51 0,0 0,000 0 0

051-0-0115 - 051-0-0092 TO 701LG100X11 300 LRBW 261.23 0,3 19,346 56 5

051-0-0116 - 051-0-0115 TO 701LG100EX14 300 LRBW 3.57 0,0 19,346 56 5

051-0-0117 - 051-0-0116 TO 701LG100EX08/701LG100X12 300 LRBW 185.73 0,0 18,816 50 4

051-0-0118 - 051-0-0117 TO 701LG100EX15 300 LRBW 172.97 0,0 18,816 50 4

051-0-0119 - 051-0-0029 TWDS 401LG200X14 600 LRBW 18.02 0,3 44,153 70 18

051-0-0120 - 051-0-0121 TO 401LG200EX16 200 LRBW 20.86 0,0 1,535 11 1

051-0-0121 - 051-0-0094 TWDS 401LG200X17 200 LRBW 43.74 0,0 1,535 11 1

051-0-0122 - 051-0-0018 TWDS 511 DEPT. 200 LRBW 20.71 0,0 4,146 26 2

051-0-0123 - 051-0-0096 TWDS 511 CONVEYOR 200 LRBW 16.72 0,0 1,830 23 3

051-0-0124 - 051-0-0125 TO 101LG400X24 200 LRBW 2.50 0,0 1,830 23 3

051-0-0125 - 051-0-0026 TWDS 101LG400X25 200 LRBW 20.85 0,0 1,430 16 2

051-0-0129 - 051-0-0055 TWDS 391 SUBSTATION 600 (x2) LRBW 2.00 0,0 75,855 62 25

051-0-0130 - 051-0-0072 TO 801LG300EX05/801LG300EX07 300 LRBW 5.00 0,0 21,100 56 9

051-0-0131 - 051-0-0132 TWDS Fire Truck HSE OFFICE 200 PRAW 115.53 0,0 0,000 0 0

051-0-0132 - 051-0-0133 TO Fire Truck HSE OFFICE 200 PRAW 39.05 0,0 0,000 0 0

051-0-0134 - 051-0-0135 TO 953 Canteen/PRAYER ROOM 200 PRAW 48.15 0,0 0,000 0 0

051-0-0141 - 051-0-0142 TO 951 WEIGH BRIDGE 200 PRAW 10.45 0,0 0,000 0 0

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044938 08.5


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0143 - 051-0-0144 TO 955 MAIN GATE 200 PRAW 46.20 0,9 0,000 0 0

051-0-0145 - 051-0-0146 TO Truck Stand El. Room 200 PRAW 44.30 0,0 0,000 0 0

051-0-0172 - 051-0-0173 TO Raw Storage 200 PRAW 53.00 0,0 0,000 0 0

051-0-0174 - 051-0-0175 TWDS G.H/off.Hostels/El. Room 200 PRAW 140.43 4,2 0,000 0 0

051-0-0175 - 051-0-0176 TWDS G.H/off.Hostels/El. Room 200 PRAW 22.52 0,0 0,000 0 0

051-0-0176 - 051-0-0177 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.99 0,0 0,000 0 0

051-0-0177 - 051-0-0178 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.16 6,9 0,000 0 0

051-0-0178 - 051-0-0179 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.07 0,0 0,000 0 0

051-0-0179 - 051-0-0180 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.99 0,0 0,000 0 0

051-0-0180 - 051-0-0181 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.07 4,5 0,000 0 0

051-0-0181 - 051-0-0182 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.99 0,0 0,000 0 0

051-0-0182 - 051-0-0183 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.99 0,0 0,000 0 0

051-0-0183 - 051-0-0184 TWDS G.H/off.Hostels/El. Room 200 PRAW 21.63 1,9 0,000 0 0

051-0-0184 - 051-0-0185 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.82 1,2 0,000 0 0

051-0-0185 - 051-0-0186 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.68 3,8 0,000 0 0

051-0-0186 - 051-0-0187 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.50 2,3 0,000 0 0

051-0-0187 - 051-0-0188 TWDS G.H/off.Hostels/El. Room 200 PRAW 24.98 2,4 0,000 0 0

051-0-0188 - 051-0-0189 TWDS G.H/off.Hostels/El. Room 200 PRAW 20.65 -0,3 0,000 0 0

051-0-0189 - 051-0-0190 TWDS G.H/off.Hostels/El. Room 200 PRAW 15.28 -0,5 0,000 0 0

051-0-0190 - 051-0-0191 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.18 -1,1 0,000 0 0

051-0-0191 - 051-0-0192 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.87 0,5 0,000 0 0

051-0-0192 - 051-0-0193 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.07 4,3 0,000 0 0

051-0-0193 - 051-0-0194 TWDS G.H/off.Hostels/El. Room 200 PRAW 19.88 -3,7 0,000 0 0

051-0-0194 - 051-0-0195 TWDS G.H/off.Hostels/El. Room 200 PRAW 19.99 -1,0 0,000 0 0

051-0-0195 - 051-0-0196 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.99 0,0 0,000 0 0

051-0-0196 - 051-0-0197 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.99 0,0 0,000 0 0

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044938 08.6


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0197 - 051-0-0198 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.04 3,3 0,000 0 0

051-0-0198 - 051-0-0199 TWDS G.H/off.Hostels/El. Room 200 PRAW 22.81 2,7 0,000 0 0

051-0-0199 - 051-0-0200 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.00 0,9 0,000 0 0

051-0-0200 - 051-0-0201 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.64 0,0 0,000 0 0

051-0-0201 - 051-0-0202 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.05 0,0 0,000 0 0

051-0-0202 - 051-0-0203 TWDS G.H/off.Hostels/El. Room 200 PRAW 29.97 0,0 0,000 0 0

051-0-0203 - 051-0-0204 TWDS G.H/off.Hostels/El. Room 200 PRAW 30.02 0,0 0,000 0 0

051-0-0204 - 051-0-0205 T0 G.H/off.Hostels/El. Room 200 PRAW 75.02 0,0 0,000 0 0

051-0-0212 - 051-0-0045 TO 401LG100EX17 600 (x2) LRBW 1.60 0,0 62,993 50 23

051-0-0213 - 051-0-0129 TO 401LG100X18 600 (x2) LRBW 7.01 0,0 75,855 62 25

051-0-0214 - 051-0-0003 TO 691 DEPT. 200 LRBW 84.09 0,0 1,535 11 1

051-0-0215 - 465-1-0001 TWDS 465BL580M01/465BV590Y01 600 LRBW 2.56 90,0 33,870 62 13

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044938 08.7


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


09 H Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 09.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 09.1

Title: Document: Page:

H Tray Segment Quantities & Fill Area - Table of Contents 80044938 09.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0001 - 051-0-0002 TO 891 ENTRY 600 (x4) LRBH 15.37 0,0 187,350 65 62

051-0-0001 - 891-1-0001 TO 891 ENTRY 600 (x4) LHBH 1.70 60,1 211,790 65 62

051-0-0002 - 051-0-0004 TWDS 591 SUBSTATION 600 (x4) LRBH 10.63 0,0 181,500 62 61

051-0-0002 - 051-0-0120 TO 401LG200EX09/401LG200X 300 LRBH 2.47 0,0 5,850 19 1

051-0-0004 - 051-0-0005 TWDS 591 SUBSTATION 600 LRBH 45.92 0,0 52,350 68 16

051-0-0004 - 051-0-0119 TO 401LG200X15 600 (x3) LRBH 45.55 0,0 147,480 61 45

051-0-0005 - 051-0-0006 TO 591 SUBSTATION 600 LRBH 25.78 0,0 46,500 58 15

051-0-0005 - 051-0-0118 TO 401LG200X18 300 LRBH 2.85 0,0 5,850 19 1

051-0-0011 - 791-1-0001 TWDS 791 SS ENTRY 300 LHBH 3.29 35,3 5,850 19 1

051-0-0016 - 051-0-0122 TO 101LG400EX08 600 (x3) LRBH 2.00 0,0 205,680 63 41

051-0-0016 - 891-1-0019 TWDS 891 DEPT 600 (x3) LRBH 1.81 62,0 205,680 63 41

051-0-0017 - 143-1-0264 TWDS 143 DEPT 300 LRBH 3.40 90,0 5,850 19 1

051-0-0018 - 051-0-0017 TO 511 DEPT CONVEYOR 200 PRAH 25.58 0,0 5,850 8 1

051-0-0018 - 051-0-0019 TWDS 194 SUBSTATION 600 (x3) LRBH 3.16 0,0 199,830 60 40

051-0-0019 - 051-0-0020 TO 101LG400EX19 600 (x3) LRBH 2.63 0,0 199,830 60 40

051-0-0020 - 051-0-0123 TO 101LG400X23 600 (x3) LRBH 3.00 0,0 199,830 60 40

051-0-0026 - 051-0-0126 TO 101LG400X25 600 (x3) LRBH 67.70 0,0 199,830 60 40

051-0-0029 - 051-0-0032 TO 401LG200X14 600 (x3) LRBH 128.90 0,0 147,480 61 45

051-0-0032 - 051-0-0033 TO 401LG200EX08/401LG200EX15 600 (x3) LRBH 7.12 0,0 147,480 61 45

051-0-0033 - 492-1-0098 TWDS 492 DEPT ENTRY 600 (x3) LRBH 2.71 44,3 147,480 61 45

051-0-0034 - 051-0-0036 TO 441 DEPT 300 LRBH 42.82 0,0 11,700 38 2

051-0-0034 - 492-1-0007 TWDS 492 DEPT ENTRY 300 LHBH 4.94 22,6 11,700 38 2

051-0-0036 - 441-1-0001 TWDS 401LG201EX07 300 LHBH 3.64 77,0 11,700 38 2

051-0-0038 - 051-0-0043 TO 493 SUBSTATION 600 (x2) LRBH 67.73 0,0 116,770 71 37

051-0-0038 - 492-1-0107 TWDS 492 DEPT ENTRY 600 (x2) LHBH 2.01 70,6 116,770 71 37

051-0-0043 - 051-0-0088 TWDS 491 SUBSTATION 600 (x2) LRBH 1.54 0,0 116,770 71 37

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044938 09.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0044 - 051-0-0212 TO 401LG100X19/401LG100EX09 600 (x2) LRBH 14.26 0,0 103,870 61 31

051-0-0045 - 491-1-0001 TWDS 491 DEPT ENTRY 600 (x2) LHBH 2.58 42,7 103,870 61 31

051-0-0054 - 051-0-0213 TO 401LG100EX08 600 (x2) LRBH 2.00 0,0 73,870 40 19

051-0-0054 - 491-1-0151 TWDS 491 DEPT ENTRY 600 (x2) LHBH 1.87 69,0 73,870 40 19

051-0-0055 - 051-0-0058 TO 391 SUBSTATION 600 (x2) LRBH 21.22 0,0 73,870 40 19

051-0-0058 - 051-0-0059 TWDS 321 DEPT 600 (x2) LRBH 15.10 0,0 73,870 40 19

051-0-0059 - 051-0-0060 TWDS 133 DEPT CONVEYOR 600 (x2) LRBH 1.55 0,0 73,870 40 19

051-0-0060 - 051-0-0062 TWDS 133 DEPT CONVEYOR 300 LRBH 41.84 0,0 15,150 42 4

051-0-0062 - 051-0-0063 TWDS 133 DEPT CONVEYOR 300 LRBH 23.23 0,0 15,150 42 4

051-0-0063 - 051-0-0064 TO 133 DEPT CONVEYOR 300 LRBH 28.14 0,0 15,150 42 4

051-0-0064 - 143-1-0283 TO 311 DEPT 300 LRBH 6.94 89,1 15,150 42 4

051-0-0065 - 051-0-0068 TWDS 801 CCR BUILDING 300 LRBH 14.38 0,0 11,700 38 2

051-0-0068 - 051-0-0069 TWDS 801 CCR BUILDING 300 LRBH 28.51 0,0 11,700 38 2

051-0-0069 - 051-0-0070 TWDS 801 CCR BUILDING 300 LRBH 45.53 0,0 11,700 38 2

051-0-0070 - 051-0-0071 TO WORKSHOP 200 PRAH 91.16 0,0 5,850 8 1

051-0-0070 - 051-0-0130 TO 801LG300X04 300 LRBH 33.31 0,0 5,850 19 1

051-0-0070 - 051-0-0131 TO Main canteen 200 PRAH 97.37 1,1 0,000 0 0

051-0-0071 - 051-0-0172 TO Main Store 200 PRAH 39.79 2,6 0,000 0 0

051-0-0072 - 801-1-0001 TWDS 801 DEPT ENTRY 300 LHBH 0.39 14,9 5,850 19 1

051-0-0075 - 051-0-0076 TO 112 DEPT 200 PRAH 8.39 0,0 5,850 8 1

051-0-0075 - 291-1-0001 TWDS 291 SS ENTRY 300 LHBH 6.82 11,0 5,850 19 1

051-0-0076 - 112-3-0001 TWDS 112BF430A01 300 LRBH 4.08 90,0 5,850 19 1

051-0-0079 - 051-0-0080 TWDS 133 DEPT 200 PRAH 24.95 0,0 15,150 25 4

051-0-0079 - 193-1-0003 TWDS 193 DEPT 300 LHBH 2.62 45,2 15,150 42 4

051-0-0080 - 051-0-0081 TO 133 DEPT 200 PRAH 29.72 0,0 15,150 25 4

051-0-0081 - 131-1-0198 TO 131 DEPT ENTRY 300 LRBH 3.12 90,0 15,150 42 4

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044938 09.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0082 - 051-0-0083 TO 133 DEPT 200 PRAH 17.49 0,0 15,150 25 4

051-0-0082 - 193-1-0001 TWDS 193 DEPT 300 LHBH 4.91 22,2 15,150 42 4

051-0-0084 - 051-0-0085 TWDS 131 DEPT CENTRE PIT 200 PRAH 55.79 0,0 5,850 8 1

051-0-0084 - 131-1-0099 TWDS 891 DEPT 300 LHBH 0.84 72,8 5,850 19 1

051-0-0086 - 051-0-0087 TO 111 DEPT 600 LRBH 10.09 0,0 26,850 40 6

051-0-0086 - 191-1-0001 TWDS 191 DEPT ENTRY 600 LHBH 2.70 44,6 26,850 40 6

051-0-0087 - 111-1-0144 TO 111DEPT ENTRY 600 LHBH 3.09 69,4 26,850 40 6

051-0-0088 - 051-0-0044 TWDS 491 SUBSTATION 600 (x2) LRBH 18.25 0,0 116,770 71 37

051-0-0092 - 051-0-0011 TO 701LG100EX07/701LG100EX13 300 LRBH 2.55 0,0 5,850 19 1

051-0-0092 - 051-0-0106 TWDS MT WORK SHOP 200 PRAH 270.00 0,4 0,000 0 0

051-0-0094 - 051-0-0095 TWDS 401LG200X17 300 LRBH 18.00 0,0 5,850 19 1

051-0-0095 - 051-0-0214 TWDS 401LG200X17 300 LRBH 10.66 0,0 5,850 19 1

051-0-0096 - 051-0-0097 TO 511 CONVEYOR 200 PRAH 6.71 0,0 0,000 0 0

051-0-0096 - 051-0-0098 TWDS 101LG400EX09/101LG400EX20 600 (x3) LRBH 166.53 0,0 199,830 60 40

051-0-0098 - 051-0-0099 TWDS 101LG400EX09/101LG400EX20 600 (x3) LRBH 41.51 0,0 199,830 60 40

051-0-0099 - 051-0-0124 TO 101LG400EX09/101LG400EX20 600 (x3) LRBH 29.17 0,0 199,830 60 40

051-0-0100 - 051-0-0101 TWDS CANTEEN/PRAYER ROOM 600 (x3) LRBH 99.25 0,0 193,380 58 37

051-0-0100 - 051-0-0141 TWDS 955 MAIN GATE 200 PRAH 183.00 0,3 6,450 14 3

051-0-0101 - 051-0-0102 TWDS POWER GRID 600 (x3) LRBH 22.56 0,0 187,530 55 36

051-0-0101 - 051-0-0134 TWDS 952 MAIN GATE 200 PRAH 172.80 0,6 5,850 8 1

051-0-0102 - 051-0-0028 TO POWER GRID 600 (x3) LRBH 41.49 0,0 187,530 55 36

051-0-0102 - 051-0-0128 TO REST ROOMS/OFFICE 200 PRAH 29.30 3,5 0,000 0 0

051-0-0104 - 051-0-0103 TO 465 DEPT 200 PRAH 3.71 0,0 0,000 0 0

051-0-0106 - 051-0-0107 TWDS MT WORK SHOP 200 PRAH 30.20 0,0 0,000 0 0

051-0-0107 - 051-0-0108 TWDS MT WORK SHOP 200 PRAH 60.00 0,0 0,000 0 0

051-0-0108 - 051-0-0109 TWDS MT WORK SHOP 200 PRAH 25.07 0,0 0,000 0 0

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044938 09.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0109 - 051-0-0110 TWDS MT WORK SHOP 200 PRAH 22.05 0,0 0,000 0 0

051-0-0110 - 051-0-0112 TWDS MT WORK SHOP 200 PRAH 30.00 0,0 0,000 0 0

051-0-0111 - 051-0-0113 TWDS MT WORK SHOP 200 PRAH 81.49 0,0 0,000 0 0

051-0-0112 - 051-0-0111 TWDS MT WORK SHOP 200 PRAH 21.70 0,0 0,000 0 0

051-0-0113 - 051-0-0114 TO MT WORK SHOP 200 PRAH 189.51 0,0 0,000 0 0

051-0-0115 - 051-0-0092 TO 701LG100X11 300 LRBH 261.23 0,3 5,850 19 1

051-0-0116 - 051-0-0115 TO 701LG100EX14 300 LRBH 3.57 0,0 5,850 19 1

051-0-0117 - 051-0-0116 TO 701LG100EX08/701LG100X12 300 LRBH 185.73 0,0 5,850 19 1

051-0-0118 - 051-0-0117 TO 701LG100EX15 300 LRBH 172.97 0,0 5,850 19 1

051-0-0119 - 051-0-0029 TWDS 401LG200X14 600 (x3) LRBH 18.02 0,3 147,480 61 45

051-0-0120 - 051-0-0121 TO 401LG200EX16 300 LRBH 20.86 0,0 5,850 19 1

051-0-0121 - 051-0-0094 TWDS 401LG200X17 300 LRBH 43.74 0,0 5,850 19 1

051-0-0122 - 051-0-0018 TWDS 511 DEPT. 600 (x3) LRBH 20.71 0,0 205,680 63 41

051-0-0123 - 051-0-0096 TWDS 511 CONVEYOR 600 (x3) LRBH 16.72 0,0 199,830 60 40

051-0-0124 - 051-0-0125 TO 101LG400X24 600 (x3) LRBH 2.50 0,0 199,830 60 40

051-0-0125 - 051-0-0026 TWDS 101LG400X25 600 (x3) LRBH 20.85 0,0 199,830 60 40

051-0-0126 - 051-0-0127 TO 101LG400EX21 600 (x3) LRBH 20.98 0,0 199,830 60 40

051-0-0127 - 051-0-0100 TWDS WEIGH BRIDGE 600 (x3) LRBH 6.40 0,0 199,830 60 40

051-0-0129 - 051-0-0055 TWDS 391 SUBSTATION 600 (x2) LRBH 2.00 0,0 73,870 40 19

051-0-0130 - 051-0-0072 TO 801LG300EX05/801LG300EX07 300 LRBH 5.00 0,0 5,850 19 1

051-0-0131 - 051-0-0132 TWDS Fire Truck HSE OFFICE 200 PRAH 115.53 0,0 0,000 0 0

051-0-0132 - 051-0-0133 TO Fire Truck HSE OFFICE 200 PRAH 39.05 0,0 0,000 0 0

051-0-0134 - 051-0-0135 TO 953 Canteen/PRAYER ROOM 200 PRAH 48.15 0,0 0,000 0 0

051-0-0134 - 051-0-0136 TWDS 952 MAIN GATE 200 PRAH 25.35 0,0 5,850 8 1

051-0-0136 - 051-0-0137 TWDS 952 MAIN GATE 200 PRAH 22.40 0,0 5,850 8 1

051-0-0137 - 051-0-0138 TWDS 952 MAIN GATE 200 PRAH 17.55 0,0 5,850 8 1

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044938 09.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0138 - 051-0-0139 TWDS 952 MAIN GATE 200 PRAH 18.81 0,0 5,850 8 1

051-0-0139 - 051-0-0140 TO 952 MAIN GATE 200 PRAH 165.40 0,0 5,850 8 1

051-0-0141 - 051-0-0142 TO 951 WEIGH BRIDGE 200 PRAH 10.45 0,0 0,000 0 0

051-0-0141 - 051-0-0143 TWDS 955 MAIN GATE 200 PRAH 53.00 0,0 6,450 14 3

051-0-0143 - 051-0-0144 TO 955 MAIN GATE 200 PRAH 46.20 0,9 0,000 0 0

051-0-0143 - 051-0-0145 TWDS Truck Stand El. Room 200 PRAH 111.25 -0,3 6,450 14 3

051-0-0145 - 051-0-0146 TO Truck Stand El. Room 200 PRAH 44.30 0,0 0,000 0 0

051-0-0145 - 051-0-0147 TWDS Staff Hostel EL.ROOM 200 PRAH 28.66 0,0 6,450 14 3

051-0-0147 - 051-0-0148 TO Staff Hostel EL.ROOM 200 PRAH 119.99 0,0 12,300 35 4

051-0-0147 - 051-0-0149 TWDS ICPL Staff Residence EL.R 200 PRAH 28.63 0,0 5,850 8 1

051-0-0149 - 051-0-0150 TWDS ICPL Staff Residence EL.R 200 PRAH 30.00 0,0 5,850 8 1

051-0-0150 - 051-0-0151 TWDS ICPL Staff Residence EL.R 200 PRAH 29.99 0,0 5,850 8 1

051-0-0151 - 051-0-0152 TWDS ICPL Staff Residence EL.R 200 PRAH 29.99 0,0 5,850 8 1

051-0-0152 - 051-0-0153 TWDS ICPL Staff Residence EL.R 200 PRAH 29.74 0,0 5,850 8 1

051-0-0153 - 051-0-0154 TWDS ICPL Staff Residence EL.R 200 PRAH 29.98 0,0 5,850 8 1

051-0-0154 - 051-0-0155 TWDS ICPL Staff Residence EL.R 200 PRAH 29.99 0,0 5,850 8 1

051-0-0155 - 051-0-0156 TWDS ICPL Staff Residence EL.R 200 PRAH 30.00 0,0 5,850 8 1

051-0-0156 - 051-0-0157 TWDS ICPL Staff Residence EL.R 200 PRAH 29.68 0,0 5,850 8 1

051-0-0157 - 051-0-0158 TWDS ICPL Staff Residence EL.R 200 PRAH 30.02 0,0 5,850 8 1

051-0-0158 - 051-0-0159 TWDS ICPL Staff Residence EL.R 200 PRAH 29.76 0,0 5,850 8 1

051-0-0159 - 051-0-0160 TWDS ICPL Staff Residence EL.R 200 PRAH 30.35 0,0 5,850 8 1

051-0-0160 - 051-0-0161 TWDS ICPL Staff Residence EL.R 200 PRAH 30.00 0,0 5,850 8 1

051-0-0161 - 051-0-0162 TWDS ICPL Staff Residence EL.R 200 PRAH 30.00 0,0 5,850 8 1

051-0-0162 - 051-0-0163 TWDS ICPL Staff Residence EL.R 200 PRAH 29.99 0,0 5,850 8 1

051-0-0163 - 051-0-0164 TWDS ICPL Staff Residence EL.R 200 PRAH 29.99 0,0 5,850 8 1

051-0-0164 - 051-0-0165 TWDS ICPL Staff Residence EL.R 200 PRAH 30.16 0,0 5,850 8 1

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044938 09.5


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0165 - 051-0-0166 TWDS ICPL Staff Residence EL.R 200 PRAH 29.77 0,0 5,850 8 1

051-0-0166 - 051-0-0167 TWDS ICPL Staff Residence EL.R 200 PRAH 29.45 0,0 5,850 8 1

051-0-0167 - 051-0-0168 TWDS ICPL Staff Residence EL.R 200 PRAH 29.45 0,0 5,850 8 1

051-0-0168 - 051-0-0169 TWDS ICPL Staff Residence EL.R 200 PRAH 29.45 0,0 5,850 8 1

051-0-0169 - 051-0-0170 TWDS ICPL Staff Residence EL.R 200 PRAH 29.46 0,0 5,850 8 1

051-0-0170 - 051-0-0171 TO ICPL Staff Residence EL.ROO 200 PRAH 28.00 0,0 5,850 8 1

051-0-0172 - 051-0-0173 TO Raw Storage 200 PRAH 53.00 0,0 0,000 0 0

051-0-0174 - 051-0-0175 TWDS G.H/off.Hostels/El. Room 200 PRAH 140.43 4,2 5,850 8 1

051-0-0174 - 131-1-0292 TWDS G.H/off.Hostels/El. Room 300 LRBH 7.43 57,9 5,850 19 1

051-0-0175 - 051-0-0176 TWDS G.H/off.Hostels/El. Room 200 PRAH 22.52 0,0 5,850 8 1

051-0-0176 - 051-0-0177 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.99 0,0 5,850 8 1

051-0-0177 - 051-0-0178 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.16 6,9 5,850 8 1

051-0-0178 - 051-0-0179 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.07 0,0 5,850 8 1

051-0-0179 - 051-0-0180 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.99 0,0 5,850 8 1

051-0-0180 - 051-0-0181 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.07 4,5 5,850 8 1

051-0-0181 - 051-0-0182 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.99 0,0 5,850 8 1

051-0-0182 - 051-0-0183 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.99 0,0 5,850 8 1

051-0-0183 - 051-0-0184 TWDS G.H/off.Hostels/El. Room 200 PRAH 21.63 1,9 5,850 8 1

051-0-0184 - 051-0-0185 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.82 1,2 5,850 8 1

051-0-0185 - 051-0-0186 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.68 3,8 5,850 8 1

051-0-0186 - 051-0-0187 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.50 2,3 5,850 8 1

051-0-0187 - 051-0-0188 TWDS G.H/off.Hostels/El. Room 200 PRAH 24.98 2,4 5,850 8 1

051-0-0188 - 051-0-0189 TWDS G.H/off.Hostels/El. Room 200 PRAH 20.65 -0,3 5,850 8 1

051-0-0189 - 051-0-0190 TWDS G.H/off.Hostels/El. Room 200 PRAH 15.28 -0,5 5,850 8 1

051-0-0190 - 051-0-0191 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.18 -1,1 5,850 8 1

051-0-0191 - 051-0-0192 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.87 0,5 5,850 8 1

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044938 09.6


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

051-0-0192 - 051-0-0193 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.07 4,3 5,850 8 1

051-0-0193 - 051-0-0194 TWDS G.H/off.Hostels/El. Room 200 PRAH 19.88 -3,7 5,850 8 1

051-0-0194 - 051-0-0195 TWDS G.H/off.Hostels/El. Room 200 PRAH 19.99 -1,0 5,850 8 1

051-0-0195 - 051-0-0196 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.99 0,0 5,850 8 1

051-0-0196 - 051-0-0197 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.99 0,0 5,850 8 1

051-0-0197 - 051-0-0198 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.04 3,3 5,850 8 1

051-0-0198 - 051-0-0199 TWDS G.H/off.Hostels/El. Room 200 PRAH 22.81 2,7 5,850 8 1

051-0-0199 - 051-0-0200 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.00 0,9 5,850 8 1

051-0-0200 - 051-0-0201 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.64 0,0 5,850 8 1

051-0-0201 - 051-0-0202 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.05 0,0 5,850 8 1

051-0-0202 - 051-0-0203 TWDS G.H/off.Hostels/El. Room 200 PRAH 29.97 0,0 5,850 8 1

051-0-0203 - 051-0-0204 TWDS G.H/off.Hostels/El. Room 200 PRAH 30.02 0,0 5,850 8 1

051-0-0204 - 051-0-0205 T0 G.H/off.Hostels/El. Room 200 PRAH 75.02 0,0 5,850 8 1

051-0-0212 - 051-0-0045 TO 401LG100EX17 600 (x2) LRBH 1.60 0,0 103,870 61 31

051-0-0213 - 051-0-0129 TO 401LG100X18 600 (x2) LRBH 7.01 0,0 73,870 40 19

051-0-0214 - 051-0-0003 TO 691 DEPT. 300 LRBH 84.09 0,0 5,850 19 1

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044938 09.7


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Table of Contents Page


10 Cable Tray & Ladder Installation ............................................................. .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 10.0.1
Cable Tray & Ladder Code .................................................................... .................................. ( 1 04/10/2016)..... 10.1
Routing Symbols & Cable Code ................................................................ .................................. ( 1 04/10/2016)..... 10.2
Guidelines for Node Numbers ................................................................. .................................. ( 1 04/10/2016)..... 10.3
Guidelines for Laying Cables ................................................................ .................................. ( 1 04/10/2016)..... 10.4

Title: Document: Page:

Cable Tray & Ladder Installation - Table of Contents 80044938 10.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Cable Tray & Ladder Code 80044938 10.1
PIC1_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Routing Symbols & Cable Code 80044938 10.2
PIC2_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Guidelines for Node Numbers 80044938 10.3
PIC3_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 051 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Main Cable Route Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Guidelines for Laying Cables 80044938 10.4
PIC4_UK_B.RPT