2D-Example
Introduction
80 Kpa
Uniform Pressure
12 m × 0.8
30 m
30 m
Figure 1.
Aim
Geometry
Type L W
Soil 30 m 30 m
Raft 12 m 0.8 m
Figure 2.
Figure 3.
Enter (-15,-15) for the first corner and (15,15) for the second and close corner .
Continue to the next part and select (raft )with the same steps and enter new
coordinate (9,30) ( 21,30.5) for the first and second rectangular dimension
respectively and the final raft shape as shown in figure 4 below .
Figure 4.
Property
In this example two types of material were used the input parameter for these
material were listed in table below :
figure 5.
The same steps are followed for the elastic part (raft) when defining the material
behavior which considered as concrete as shown in figure 6.
figure 6.
at this moment the two part need to create a section and assigned
these steps are presented by firstly create section with Solid and type
Homogeneous type for soil and raft concrete. Finally, select the material for each
type.
figure 7-.
Upon clicking and finishing the creation of the two sections the user may assign
these sections for each part -For Soil Part-
The user should notice that color of original material will change to green by the
end of this process as an indication of material assignment .