Project: PEGAS NONWOVENS Production Plant in 6th October City, Egypt page 1/2

APPENDIX : 05 TENDER BoQ


PEGAS NONWOVENS TEXTILE PRODUCTION
PLANT, EGYPT
A ZO 08 SHELTER FOR WASTE
General Note: The Contractor (Bidder) carefully studied related documentation and conditions of tender and submitted prices are based on Tender base.

The Contractor (Bidder) is aware that prices and its breakdown take into account all the work necessary for the proper execution of the work subject that are obvious and
/ or which may be appropriately qualified and competent contractor shall predict. All utility work and incidental expenses, unless specifically provided, shall be included
in the cost of the work. These rates include labor cost, manpower, materials, machinery equipment, the cost of organization and management work, temporary works, as
well as any incidental costs necessary for the proper execution of work and a reasonable profit.

No. Scope of Work Unit Quantity Unit Price Total Price note
without VAT without VAT
1 EARTHWORKS 0.00

1.1.
Excavation of soil, loading, removing and reloading to m3 180 0.00
stock pile,stock pile levelling and spreding, up to 5 km
1.2. Excavation of rock and removing to stock pile up to 5km. m3 0 0.00

Backfiling holes, pits or grooves around objects with new 81 0.00


1.3. m3
sand including compaction 95% and levelling

Soil replacement with gravel-sand (3:2) under foundations


1.4.
(acc. gen. notes), including levelling and required m3 72 0.00
compaction tests
2 FOUNDATION 0.00

Concrete bed, plain concrete C16/20, under footings,


2.1
beams and found. slab, including formwork and all m3 4 0.00
submaterial.

Footings made of reinforced concrete C20/25 ,


2.2 reinforcement ratio 80kg/m3, fy=360MPa, m3 5 0.00
including formwork and reinforcement, embedded items
and all submaterial. And including bitumenous coat acc.
general notes

Strip foundation from reinforced concrete C20/25 ,


2.3 reinforcement ratio 70kg/m3, fy=360MPa, m3 18 0.00
including formwork and reinforcement, embedded items
and all submaterial. And including bitumenous coat acc.
general notes

Foundation slab from reinforced concrete C25/30 ,


2.4 reinforcement ratio 95kg/m3, fy=360MPa, m3 36 0.00
including formwork and reinforcement, embedded items
and all submaterial. And including bitumenous coat acc.
general notes

Unit price of 1kg reinforcement / 1m3 of concrete C20/25,


2.5
fy=360MPa. This Item will be used in case of changing 1kg / m3 0 0.00
reinforcement ratio.
3 CONCRETE STRUCTURES 0.00
Ceiling slab made of reinforced fair-face concrete C25/30 ,
3.1
reinforcement ratio 110kg/m3, fy=360MPa, m3 3 0.00
incl. formwork, and all submaterial.

Unit price of 1kg reinforcement / 1m3 of concrete C25/30,


3.2
fy=360MPa. This Item will be used in case of changing 1kg / m3 0 0.00
reinforcement ratio.
4 STEEL STRUCTURES 0.00
4.1. Shop drawings set 1 0.00

Roof steel structure, steel exchanges - sandblasted,


painted RAL 9010 (undercoat 60 µm, topcoat 60 µm) or
4.2.
hot dip galvanized (exterior), delivery, assembly, including kg 10100 0.00
all submaterial (welding, high strenght screws, nuts etc.),
coating repair after assembly and all necessary
certificates.

5 ROOFING SYSTEM 0.00

Roof made from corrugated steel sheet 50/250/0,5mm,


internal coating RAL 9010, vapour barrier PVC foil,
5.1. ROCKWOOL insulation th.150mm, density 175 kg/m3, PVC m2 210 0.00
mebrane th.1,5 mm on top (Mapeplan M) and all sub
materials, screws, sealant and scaffolding.

part of
Flashing of all openings, internal coating RAL 9010, 0 incl. incl.
5.2. roof
reinforcing, screws, sub profiles sealant and scaffolding. delivery
6 FACADE - CLADDING 0.00

PSG International, a.s. 06/19/2019


Project: PEGAS NONWOVENS Production Plant in 6th October City, Egypt page 2/2

APPENDIX : 05 TENDER BoQ


PEGAS NONWOVENS TEXTILE PRODUCTION
PLANT, EGYPT
A ZO 08 SHELTER FOR WASTE
General Note: The Contractor (Bidder) carefully studied related documentation and conditions of tender and submitted prices are based on Tender base.

The Contractor (Bidder) is aware that prices and its breakdown take into account all the work necessary for the proper execution of the work subject that are obvious and
/ or which may be appropriately qualified and competent contractor shall predict. All utility work and incidental expenses, unless specifically provided, shall be included
in the cost of the work. These rates include labor cost, manpower, materials, machinery equipment, the cost of organization and management work, temporary works, as
well as any incidental costs necessary for the proper execution of work and a reasonable profit.

No. Scope of Work Unit Quantity Unit Price Total Price note
without VAT without VAT

Sandwich panels th.100mm with IPN core (Kingspan


Izopoli - SUPERLAMBRI), internal coating RAL 9010, 213 0.00
6.1. m2
external coating RAL 9006, include all necessary incidental
items, connection accesories, scaffolding and others.

Flashing of all edges, external coating RAL 9006, internal part of


6.2. coating RAL 9010, reinforceing, screws, sub profiles facade 1 incl. incl.
sealant and scaffolding. delivery
7 OTHERS 0.00
7.1. Brick or concrete block masonry th.300mm m2 37 0.00
7.2. Exterior cement plaster painted RAL 9006 m2 72 0.00
7.3. Concrete screed th. 100-220mm - road concrete m3 30 0.00

7.4.
Pedestal made of bricks 120mm, plastered, painted RAL m2 16 0.00
7035
7.5. Item 08/001 - galvanized gate + fence pcs 1 0.00
7.6. Portable fire extinguisher - powder pcs 4 0.00
TOTAL PRICE without SALE TAXES 0.00 Euro

The Contractor (Bidder)

..............................
.............................. .............................. Date
Company Name Name and Signature

PSG International, a.s. 06/19/2019


Contractor´s name - fulfil
S/N Building Zone
1 Earthworks ZO 01.8
2 Foundation ZO 01.8
3 Concrete structures ZO 01.8
4 Steel structures ZO 01.8
5 Roofing system ZO 01.8
6 Facade - cladding ZO 01.8
7 Others ZO 01.8
S/C
SALE TAX
SOCIAL INSURANCE

MATERIAL sales tax

TOTAL EUR
ulfil
Total EUR
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Excluded
Excluded
INCLUDED
0.00