P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
1 ESPACIO PUBLICO
1.1 LOCALIZACION Y REPLANTEO ARQUITECTURA (M2) m2 51,484.42 2,327.00 119,804,245.34 9.1.5
DEMOLICION ANDEN, PLACAS, SARDINEL=0.07 M
1.2 (INCLUYE CARGUE MANUAL Y TRANSPORTE DE m3 1,945.89 261,381.00 508,617,628.57 9.3.12
ESCOMBROS 5 KM)
DESMONTE REJA MALLA Y CERRAMIENTO (INCLUYE
1.3 m2 2,771.88 15,307.00 42,429,167.16 9.4.4
CARGUE MANUAL Y TRANSPORTE DE ESCOMBROS 5 KM)
DEMOLICION MURO 0.15M (INCLUYE CARGUE MANUAL Y
1.4 m2 1,385.94 8,336.00 11,553,195.84 9.3.16
TRANSPORTE DE ESCOMBROS 5 KM)
EXCAVACION MANUAL EN CONGLOMERADO SECO
1.5 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 19,070.80 54,038.00 1,030,547,620.21 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
1.6 m3 17,712.68 65,495.00 1,160,091,976.60 20.2.2
(5 km)
1.7 AFINADO PISOS MORTERO 1:4, E= 70 MM m2 19,070.80 38,335.00 731,078,926.33 25.3.3
1.8 LOSETA A-40; 600X200X600 MM m2 19,070.80 104,373.00 1,990,476,086.54 25.2.6
PLACA DE CONTRAPISO ESTAMPADA CON MOLDE Y
1.9 M2 19,070.80 133,215.00 2,540,515,955.93
ACABADO EN COLOR E = 0.10 M, 20.7 MPA (3000 PSI)
1.10 MALLA ELECTROSOLDADA FY=5000 KG/CM2, 500 MPA kg 35,662.39 4,572.00 163,048,431.76 13.1.4
CONCRETO 20.7 MPA (3000 PSI) BOX, ALETAS, MUROS
1.11 m3 1,132.54 690,838.00 782,400,286.84 4.3.2
ARMADOS
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
1.12 kg 30,019.81 4,686.00 140,672,816.79 13.1.1
G60)
1.13 SUMINISTRO E INSTALACION DE TIERRA NEGRA m3 4,634.68 146,305.00 678,076,784.25 20.2.7
1.14 SUMINISTRO Y SIEMBRA FLORES IXORA ROJA H=0,30MT und 1,158.67 16,024.00 18,566,526.08 31.3.7
1.15 SUMINISTRO Y SIEMBRA FLORES CAMARON H=0,40MT und 1,158.67 17,560.00 20,346,243.01 31.3.8
1.16 SUMINISTRO Y SIEMBRA DURANTA H=0.3MT und 1,158.67 11,032.00 12,782,446.06 31.3.9
1.17 SUMINISTRO Y SIEMBRA DE ARBOL DE OCOBO H=1,8MT und 171.00 62,461.00 10,680,831.00 31.3.13
SUBTOTAL ESPACIO PUBLICO 9,961,689,168.29
2 PARQUEADEROS -
EXCAVACION MANUAL EN CONGLOMERADO SECO
2.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 3,433.86 54,038.00 185,558,656.49 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
2.2 m3 506.88 65,495.00 33,197,909.12 20.2.2
(5 km)
LOSA DE CONCRETO MR-4.0 INCLUYE FUNDIDA,
FORMALETEADO, BARRAS (TRANSFERENCIA/AMARRE),
2.3 m3 1,030.16 798,571.00 822,653,106.36 5.2.2
VIBRADO, TEXTURIZADO, CURADO Y JUNTAS. NO
INCLUYE MALLA DE REFUERZO LOSA.
2.4 MALLA ELECTROSOLDADA FY=5000 KG/CM2, 500 MPA kg 25,685.24 4,572.00 117,432,896.25 13.1.4
LINEA DE DEMARCACIÓN VÍAL CON PINTURA EN FRÍO
2.5 (ML) E=0.12 M. INCLUYE SUMINISTRO, MICROESFERAS Y ml 1,505.00 3,527.00 5,308,135.00 8.2.3
APLICACIÓN CON EQUIPO
SUBTOTAL PARQUEADEROS 1,164,150,703.22
3 ESCENARIO DEPORTIVO "PISTA BMX" -
EDIFICIO PRINCIPAL (PROFESIONAL Y
CHALLENGER)
EXCAVACION MANUAL EN CONGLOMERADO SECO
3.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 51.36 54,038.00 2,775,607.83 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
3.2 m3 20.55 65,495.00 1,345,634.07 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
3.3 m3 1.55 404,665.00 628,040.08 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.4 m3 15.52 596,646.00 9,259,945.92 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
3.5 m3 14.35 645,417.00 9,261,733.95 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
3.6 m3 22.53 921,560.00 20,762,746.80 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
3.7 kg 8,683.26 4,686.00 40,689,756.36 13.1.1
G60)
3.8 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 238.00 61,466.00 14,628,908.00 20.1.4
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
3.9 kg 117,620.32 14,122.00 1,661,034,159.04 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
3.10 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 568.00 113,149.00 64,268,632.00
MALLA ELECTROSOLDADA
MURO EN BLOQUE FLEXA No. 4 0.10X0.20X0.30
3.11 m2 614.15 39,631.00 24,339,180.50 15.3.2
M(MORTERO TIPO S 1 3)
PAÑETE MURO EXTERIOR Y CULATAS MORT 1:4
3.12 m2 588.06 28,396.00 16,698,551.76 23.1.2
IMPERMEABILIZADO
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
3.13 m2 614.15 21,223.00 13,033,999.34 23.1.3
DILATAC
3.14 ESTUCO PLÁSTICO m2 1,202.21 13,172.00 15,835,444.26 26.2.8
3.15 PINTURA VINILO TIPO 1 S/MURO (ALTA CALIDAD m2 1,202.21 8,971.00 10,784,981.06 26.2.2
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
SUMINISTRO E INSTALACIÓN CUBIERTA TIPO SANDWICH
3.16 333C CAL, 26 PREPINTADA, INCLUYE FIBRA DE VIDRIO O m2 249.87 134,228.00 33,539,550.36 14.2.5
MATERIAL SIMILAR. NO INCLUYE ESTRUCTURA
SUMINISTRO E INSTALACIÓN DIVISIONES EN COLD
3.17 m2 37.80 312,203.00 11,801,273.40 21.2.1
ROLLED CAL. 18
SUMINISTRO E INSTALACIÓN PUERTA ALUMINIO
3.18 m2 23.04 297,213.00 6,847,787.52 22.1.1
CORREDIZA, CON VIDRIO 4 MM
SUMINISTRO E INSTALACIÓN VENTANA ALUMINIO
3.19 m2 7.00 295,178.00 2,066,246.00 22.2.5
SISTEMA PERSIANA FIJA 3"
3.20 PISO EN CERAMICA LISO 0.32X0.32 LINEA FORTALEZA m2 105.92 55,586.00 5,887,669.12 25.1.3
3.21 PISO BALDOSA GRANO MARMOL 0.30X0.30 m2 158.88 103,109.00 16,381,957.92 25.1.6
SUMINISTRO E INSTALACIÓN PUERTA TABLERO CORRIDO,
3.22 INCLUYE MARCO, CERRADURA LAMINA COLLROLLED CAL und 15.00 443,866.00 6,657,990.00 21.1.3
20; 2 X 0.90 M
ESCALERA -
EXCAVACION MANUAL EN CONGLOMERADO SECO
3.23 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 3.26 54,038.00 176,380.03 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
3.24 m3 1.31 65,495.00 85,510.27 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
3.25 m3 0.37 404,665.00 149,726.05 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.26 m3 2.22 596,646.00 1,324,554.12 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
3.27 m3 0.50 645,417.00 322,708.50 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
3.28 m3 3.96 921,560.00 3,649,377.60 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
3.29 kg 905.27 4,686.00 4,242,095.22 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
3.30 kg 6,044.39 14,122.00 85,358,875.58 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
BARANDA METALICA TUBERIA GALVANIZADA 2 1/2" - 4"
3.31 ml 28.02 593,295.00 16,624,125.90 8.3.14
INCLUYE SUMINISTRO, INSTALACIÓN Y PINTURA
PLAQUETA GRAD E-0.10,A-0.65M 4d 5/8 Y 1/2 CONCRETO
3.32 ml 60.00 148,976.00 8,938,560.00 12.4.2
20.7 MPA (3000 PSI)
RAMPA -
EXCAVACION MANUAL EN CONGLOMERADO SECO
3.33 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 13.73 54,038.00 741,833.66 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
3.34 m3 5.49 65,495.00 359,646.14 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
3.35 m3 0.32 404,665.00 129,492.80 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.36 m3 7.61 596,646.00 4,540,476.06 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
3.37 m3 3.83 645,417.00 2,471,947.11 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
3.38 m3 21.12 921,560.00 19,463,347.20 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
3.39 kg 5,051.23 4,686.00 23,670,063.78 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
3.40 kg 26,496.07 14,122.00 374,177,500.54 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
3.41 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 183.00 113,149.00 20,706,267.00
MALLA ELECTROSOLDADA
BARANDA METALICA TUBERIA GALVANIZADA 2 1/2" - 4"
3.42 ml 100.15 593,295.00 59,418,494.25 8.3.14
INCLUYE SUMINISTRO, INSTALACIÓN Y PINTURA
PISTA -
ARENA LAVADA DE RIO INCLUYE SUMINISTRO
3.43 m3 2,181.20 96,577.00 210,653,462.67 20.2.5
TRANSPORTE E INSTALACION. (5 km)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
3.44 m3 1,018.67 65,495.00 66,717,529.67 20.2.2
(5 km)
3.45 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 336.18 61,466.00 20,663,424.75 20.1.4
PARTIDOR PROFESIONAL -
EXCAVACION MANUAL EN CONGLOMERADO SECO
3.46 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 17.05 54,038.00 921,455.98 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
3.47 m3 6.82 65,495.00 446,728.30 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
3.48 m3 0.32 404,665.00 129,492.80 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.49 m3 7.37 596,646.00 4,397,281.02 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
3.50 m3 6.84 645,417.00 4,414,652.28 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
3.51 m3 13.31 921,560.00 12,265,963.60 12.2.4
INCLUYE HIERRO.
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
3.52 kg 4,082.70 4,686.00 19,131,532.20 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
3.53 kg 12,939.42 14,122.00 182,730,489.24 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
3.54 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 166.40 113,149.00 18,827,993.60
MALLA ELECTROSOLDADA
PARTIDOR CHALLENGER
EXCAVACION MANUAL EN CONGLOMERADO SECO
3.55 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 18.01 54,038.00 973,332.46 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
3.56 m3 7.20 65,495.00 471,878.38 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
3.57 m3 0.32 404,665.00 129,492.80 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.58 m3 7.26 596,646.00 4,331,649.96 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
3.59 m3 7.75 645,417.00 5,001,981.75 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
3.60 m3 13.31 921,560.00 12,265,963.60 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
3.61 kg 4,854.63 4,686.00 22,748,796.18 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
3.62 kg 11,306.28 14,122.00 159,667,286.16 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
3.63 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 168.00 113,149.00 19,009,032.00
MALLA ELECTROSOLDADA
SUBTOTAL ESCENARIO BMX 3,380,980,196.48
4 GRADERIAS
EXCAVACION MANUAL EN CONGLOMERADO SECO
4.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 396.20 54,038.00 21,409,747.52 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
4.2 m3 158.48 65,495.00 10,379,595.20 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
4.3 m3 26.24 404,665.00 10,616,386.28 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
4.4 m3 157.41 596,646.00 93,918,046.86 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
4.5 m3 73.98 645,417.00 47,747,949.66 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
4.6 m3 66.15 921,560.00 60,961,194.00 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
4.7 kg 24,023.52 4,686.00 112,574,214.72 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
4.8 kg 125,031.33 14,122.00 1,765,692,442.26 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
4.9 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 933.12 113,149.00 105,581,594.88
MALLA ELECTROSOLDADA
SUBTOTAL GRADERIAS 2,228,881,171.39
5 ESTADIO
FACHADA FLOTANTE
EXCAVACION MANUAL EN CONGLOMERADO SECO
5.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 1,250.83 54,038.00 67,592,459.62 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
5.2 m3 500.33 65,495.00 32,769,296.74 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
5.3 m3 56.86 404,665.00 23,007,633.24 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
5.4 m3 568.56 596,646.00 339,229,049.77 11.3.1
HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
5.5 m3 242.05 921,560.00 223,063,598.00 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
5.6 kg 65,196.03 4,686.00 305,508,596.58 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
5.7 kg 275,364.58 14,122.00 3,888,698,528.15 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
SUMINISTRO E INSTALACIÓN CUBIERTA TIPO SANDWICH
5.8 333C CAL, 26 PREPINTADA, INCLUYE FIBRA DE VIDRIO O m2 3,160.64 134,228.00 424,246,385.92 14.2.5
MATERIAL SIMILAR. NO INCLUYE ESTRUCTURA
5.9 CORTASOL HUNTER DOUGLAS m2 4,921.07 350,000.00 1,722,374,500.00
ACCESO PEATONAL - TAQUILLAS
EXCAVACION MANUAL EN CONGLOMERADO SECO
5.10 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 95.47 54,038.00 5,159,115.94 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
5.11 m3 38.19 65,495.00 2,501,175.46 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
5.12 m3 2.88 404,665.00 1,165,435.20 11.1.1
LIMPIEZA
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
5.13 m3 17.28 596,646.00 10,310,042.88 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
5.14 m3 62.28 645,417.00 40,196,570.76 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
5.15 m3 37.98 921,560.00 35,000,848.80 12.2.4
INCLUYE HIERRO.
5.16 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 248.40 61,466.00 15,268,154.40 20.1.4
VIGA AEREA CONCRETO 20.7 MPa (3000 PSI) NO INCLUYE
5.17 m3 114.84 860,618.00 98,833,371.12 12.3.6
HIERRO
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
5.18 kg 39,514.55 4,686.00 185,165,181.30 13.1.1
G60)
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
5.19 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 248.40 113,149.00 28,106,211.60
MALLA ELECTROSOLDADA
ACCESO VEHICULAR -
EXCAVACION MANUAL EN CONGLOMERADO SECO
5.20 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 8.35 54,038.00 451,325.38 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
5.21 m3 3.34 65,495.00 218,805.70 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
5.22 m3 0.32 404,665.00 129,492.80 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
5.23 m3 2.03 596,646.00 1,211,191.38 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
5.24 m3 4.93 645,417.00 3,181,905.81 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
5.25 m3 3.84 921,560.00 3,538,790.40 12.2.4
INCLUYE HIERRO.
5.26 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 33.70 61,466.00 2,071,404.20 20.1.4
VIGA AEREA CONCRETO 20.7 MPa (3000 PSI) NO INCLUYE
5.27 m3 8.39 860,618.00 7,220,585.02 12.3.6
HIERRO
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
5.28 kg 3,173.66 4,686.00 14,871,770.76 13.1.1
G60)
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
5.29 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 33.70 113,149.00 3,813,121.30
MALLA ELECTROSOLDADA
CUBIERTA BAJO GRADERIA -
5.30 Acero Estructural A-500 Kg 3,705.80 14,122.00 52,333,307.60
ACABADOS DEL ESTADIO (LOCALES - TIENDA)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
5.31 m2 5,856.00 21,223.00 124,281,888.00 23.1.3
DILATAC
5.32 ESTUCO PLÁSTICO m2 5,856.00 13,172.00 77,135,232.00 26.2.8
5.33 PINTURA VINILO TIPO 1 S/MURO (ALTA CALIDAD m2 5,856.00 8,971.00 52,534,176.00 26.2.2
5.34 CIELO RASO PLACA SUPERBOARD 6 MM INC PINTURA m2 2,984.00 75,200.00 224,396,800.00 27.3.2
5.35 PISO EN GRANITO PULIDO m2 2,056.00 155,790.00 320,304,240.00 25.3.19
SUMINISTRO E INSTALACIÓN PUERTA ALUMINIO
5.36 m2 270.00 297,213.00 80,247,510.00 22.1.1
CORREDIZA, CON VIDRIO 4 MM
SUMINISTRO E INSTALACIÓN PUERTA TABLERO CORRIDO,
5.37 INCLUYE MARCO, CERRADURA LAMINA COLLROLLED CAL und 170.00 443,866.00 75,457,220.00 21.1.3
20; 2 X 0.90 M
SUMINISTRO E INSTALACIÓN DIVISIONES EN COLD
5.38 m2 405.00 312,203.00 126,442,215.00 21.2.1
ROLLED CAL. 18
5.39 ESPEJO 4MM m2 90.00 108,382.00 9,754,380.00 28.1.3
5.40 PISO EN CERAMICA LISO 0.32X0.32 LINEA FORTALEZA m2 928.00 55,586.00 51,583,808.00 25.1.3
REFORZAMIENTO ESTRUCTURAL ESTADIO
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUYE
5.41 kg 250,461.46 14,122.00 3,537,016,684.47
SUMINISTRO MONTAJE Y PINTURA)
ACERO ESTRUCTURAL T ASTM A36 INCLUYE SUMINISTRO
5.42 kg 35,416.20 13,491.00 477,800,000.59
MONTAJE Y PINTURA)
SUBTOTAL ESTADIO 12,694,192,009.87
6 PARADEROS
EXCAVACION MANUAL EN CONGLOMERADO SECO
6.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 7.00 54,038.00 378,374.08 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
6.2 m3 4.20 65,495.00 275,157.59 20.2.2
(5 km)

CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE


6.3 m3 0.65 404,665.00 263,032.25 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
6.4 m3 3.90 596,646.00 2,326,919.40 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
6.5 m3 0.96 645,417.00 619,600.32 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
6.6 m3 2.70 921,560.00 2,488,212.00 12.2.4
INCLUYE HIERRO.
6.7 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 62.40 61,466.00 3,835,478.40 20.1.4
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
6.8 kg 628.41 4,686.00 2,944,729.26 13.1.1
G60)
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
6.9 kg 6,295.83 14,122.00 88,909,711.26 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
SUBTOTAL PARADEROS 102,041,214.56
7 ESCENARIO DEPORTIVO "TIRO CON ARCO"
CUBIERTA PRINCIPAL
EXCAVACION MANUAL EN CONGLOMERADO SECO
7.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 13.33 54,038.00 720,434.62 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
7.2 m3 5.33 65,495.00 349,271.74 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
7.3 m3 0.68 404,665.00 273,148.88 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
7.4 m3 4.05 596,646.00 2,416,416.30 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
7.5 m3 7.06 645,417.00 4,556,644.02 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
7.6 m3 4.00 921,560.00 3,686,240.00 12.2.4
INCLUYE HIERRO.
7.7 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 155.00 61,466.00 9,527,230.00 20.1.4
VIGA AEREA CONCRETO 20.7 MPa (3000 PSI) NO INCLUYE
7.8 m3 10.54 860,618.00 9,070,913.72 12.3.6
HIERRO
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
7.9 kg 4,531.18 4,686.00 21,233,109.48 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
7.10 kg 7,343.20 14,122.00 103,700,670.40 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
CUBIERTA AUXILIAR
EXCAVACION MANUAL EN CONGLOMERADO SECO
7.11 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 4.70 54,038.00 254,194.75 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
7.12 m3 1.88 65,495.00 123,235.39 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
7.13 m3 0.32 404,665.00 129,492.80 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
7.14 m3 3.05 596,646.00 1,819,770.30 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
7.15 m3 0.87 645,417.00 561,512.79 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
7.16 m3 3.30 921,560.00 3,041,148.00 12.2.4
INCLUYE HIERRO.
7.17 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 15.00 61,466.00 921,990.00 20.1.4
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
7.18 kg 852.68 4,686.00 3,995,658.48 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
7.19 kg 957.80 14,122.00 13,526,051.60 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
MURO
EXCAVACION MANUAL EN CONGLOMERADO SECO
7.20 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 25.31 54,038.00 1,367,755.82 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
7.21 m3 10.12 65,495.00 663,097.58 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
7.22 m3 2.54 404,665.00 1,028,523.54 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
7.23 m3 15.25 596,646.00 9,098,851.50 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
7.24 m3 2.03 645,417.00 1,310,196.51 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
7.25 m3 8.93 921,560.00 8,229,530.80 12.2.4
INCLUYE HIERRO.
7.26 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 36.00 61,466.00 2,212,776.00 20.1.4
VIGA AEREA CONCRETO 20.7 MPa (3000 PSI) NO INCLUYE
7.27 m3 5.11 860,618.00 4,397,757.98 12.3.6
HIERRO
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
7.28 kg 4,129.53 4,686.00 19,350,977.58 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
7.29 kg 4,458.83 14,122.00 62,967,597.26 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
EDIFICACION Y CERRAMIENTO
EXCAVACION MANUAL EN CONGLOMERADO SECO
7.30 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 16.00 54,038.00 864,716.08 10.1.1
KM)
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
7.31 m3 16.00 645,417.00 10,327,962.83 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
7.32 m3 4.50 921,560.00 4,147,020.00 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
7.33 kg 3,433.06 4,686.00 16,087,334.16 13.1.1
G60)
MURO EN BLOQUE FLEXA No. 4 0.10X0.20X0.30
7.34 m2 550.10 39,631.00 21,801,013.10 15.3.2
M(MORTERO TIPO S 1 3)
PAÑETE MURO EXTERIOR Y CULATAS MORT 1:4
7.35 m2 726.10 28,396.00 20,618,335.60 23.1.2
IMPERMEABILIZADO
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
7.36 PINTURA VINILO TIPO 1 S/MURO (ALTA CALIDAD m2 1,009.51 8,971.00 9,056,314.21 26.2.2
SUMINISTRO E INSTALACIÓN MODULOS EN MALLA
7.37 m2 250.00 103,787.00 25,946,750.00 21.3.10
ESLABONADA CORR TUBO GALVANIZADO (L), TAPAS, < PL
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.38 m2 283.41 21,223.00 6,014,810.43 23.1.3
DILATAC
7.39 ESTUCO PLÁSTICO m2 283.41 13,172.00 3,733,076.52 26.2.8
SUMINISTRO E INSTALACIÓN DIVISIONES EN COLD
7.40 m2 13.50 312,203.00 4,214,740.50 21.2.1
ROLLED CAL. 18
SUMINISTRO E INSTALACIÓN PUERTA ALUMINIO
7.41 m2 12.00 297,213.00 3,566,556.00 22.1.1
CORREDIZA, CON VIDRIO 4 MM
SUMINISTRO E INSTALACIÓN VENTANA ALUMINIO
7.42 m2 16.00 295,178.00 4,722,848.00 22.2.5
SISTEMA PERSIANA FIJA 3"
7.43 PISO EN CERAMICA LISO 0.32X0.32 LINEA FORTALEZA m2 34.58 55,586.00 1,922,163.88 25.1.3
7.44 PISO BALDOSA GRANO MARMOL 0.30X0.30 m2 64.70 103,109.00 6,671,152.30 25.1.6
SUMINISTRO E INSTALACIÓN PUERTA TABLERO CORRIDO,
7.45 INCLUYE MARCO, CERRADURA LAMINA COLLROLLED CAL und 6.00 443,866.00 2,663,196.00 21.1.3
20; 2 X 0.90 M
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
7.46 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 104.64 113,149.00 11,839,911.36
MALLA ELECTROSOLDADA
SUBTOTAL ESCENARIO DEPORTIVO "TIRO CON ARCO" 444,732,098.79
8 ESCENARIO DEPORTIVO "TEJO"
CUBIERTA PRINCIPAL
EXCAVACION MANUAL EN CONGLOMERADO SECO
8.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 75.12 54,038.00 4,059,334.56 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
8.2 m3 30.05 65,495.00 1,967,993.76 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
8.3 m3 2.50 404,665.00 1,011,662.50 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
8.4 m3 20.00 596,646.00 11,932,920.00 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
8.5 m3 28.78 645,417.00 18,575,101.26 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
8.6 m3 35.26 921,560.00 32,494,205.60 12.2.4
INCLUYE HIERRO.
8.7 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 720.00 61,466.00 44,255,520.00 20.1.4
CONTRAPESOS CONCRETO SIMPLE 20.7 MPA (3000 PSI)
8.8 m3 13.82 595,544.00 8,230,418.08 12.1.9
NO INCLUYE HIERRO
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
8.9 kg 13,182.60 4,686.00 61,773,663.60 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
8.10 kg 98,919.35 14,122.00 1,396,939,060.70 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
CAFETERIA Y BAÑOS -
EXCAVACION MANUAL EN CONGLOMERADO SECO
8.11 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 12.11 54,038.00 654,292.10 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
8.12 m3 4.84 65,495.00 317,205.38 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
8.13 m3 0.70 404,665.00 283,265.50 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
8.14 m3 4.20 596,646.00 2,505,913.20 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
8.15 m3 4.84 645,417.00 3,123,818.28 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
8.16 m3 4.45 921,560.00 4,100,942.00 12.2.4
INCLUYE HIERRO.
8.17 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 104.60 61,466.00 6,429,343.60 20.1.4
VIGA AEREA CONCRETO 20.7 MPa (3000 PSI) NO INCLUYE
8.18 m3 6.30 860,618.00 5,421,893.40 12.3.6
HIERRO
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
8.19 kg 3,631.52 4,686.00 17,017,302.72 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
8.20 kg 627.60 14,122.00 8,862,967.20 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
MURO EN BLOQUE FLEXA No. 4 0.10X0.20X0.30
8.21 m2 118.40 39,631.00 4,692,389.66 15.3.2
M(MORTERO TIPO S 1 3)
PAÑETE MURO EXTERIOR Y CULATAS MORT 1:4
8.22 m2 75.87 28,396.00 2,154,390.32 23.1.2
IMPERMEABILIZADO
8.23 PINTURA VINILO TIPO 1 S/MURO (ALTA CALIDAD m2 236.80 8,971.00 2,124,368.68 26.2.2
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
8.24 m2 160.93 21,223.00 3,415,512.89 23.1.3
DILATAC
8.25 ESTUCO PLÁSTICO m2 160.93 13,172.00 2,119,829.23 26.2.8
SUMINISTRO E INSTALACIÓN DIVISIONES EN COLD
8.26 m2 16.20 312,203.00 5,057,688.60 21.2.1
ROLLED CAL. 18
SUMINISTRO E INSTALACIÓN PUERTA ALUMINIO
8.27 m2 3.00 297,213.00 891,639.00 22.1.1
CORREDIZA, CON VIDRIO 4 MM
8.28 PISO EN CERAMICA LISO 0.32X0.32 LINEA FORTALEZA m2 36.26 55,586.00 2,015,548.36 25.1.3
8.29 PISO BALDOSA GRANO MARMOL 0.30X0.30 m2 36.84 103,109.00 3,798,535.56 25.1.6
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
SUMINISTRO E INSTALACIÓN PUERTA TABLERO CORRIDO,
8.30 INCLUYE MARCO, CERRADURA LAMINA COLLROLLED CAL und 6.00 443,866.00 2,663,196.00 21.1.3
20; 2 X 0.90 M
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
8.31 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 102.66 113,149.00 11,615,876.34
MALLA ELECTROSOLDADA
SUBTOTAL ESCENARIO DEPORTIVO "TEJO" 1,670,505,798.10
9 ESCENARIO DEPORTIVO SOFTBALL
CAMERINOS - BAÑOS
EXCAVACION MANUAL EN CONGLOMERADO SECO
9.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 5.08 54,038.00 274,296.89 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
9.2 m3 3.05 65,495.00 199,471.57 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
9.3 m3 0.58 404,665.00 233,356.82 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
9.4 m3 3.46 596,646.00 2,064,395.16 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
9.5 m3 0.77 645,417.00 496,971.09 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
9.6 m3 15.30 921,560.00 14,099,868.00 12.2.4
INCLUYE HIERRO.
9.7 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 79.00 61,466.00 4,855,814.00 20.1.4
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
9.8 kg 1,580.88 4,686.00 7,408,003.68 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
9.9 kg 5,804.69 14,122.00 81,973,832.18 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
MURO EN BLOQUE FLEXA No. 4 0.10X0.20X0.30
9.10 m2 296.43 39,631.00 11,747,817.33 15.3.2
M(MORTERO TIPO S 1 3)
PAÑETE MURO EXTERIOR Y CULATAS MORT 1:4
9.11 m2 205.83 28,396.00 5,844,748.68 23.1.2
IMPERMEABILIZADO
9.12 PINTURA VINILO TIPO 1 S/MURO (ALTA CALIDAD m2 592.86 8,971.00 5,318,547.06 26.2.2
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
9.13 m2 387.03 21,223.00 8,213,937.69 23.1.3
DILATAC
9.14 ESTUCO PLÁSTICO m2 592.86 13,172.00 7,809,151.92 26.2.8
SUMINISTRO E INSTALACIÓN DIVISIONES EN COLD
9.15 m2 34.92 312,203.00 10,902,128.76 21.2.1
ROLLED CAL. 18
SUMINISTRO E INSTALACIÓN PUERTA ALUMINIO
9.16 m2 2.00 297,213.00 594,426.00 22.1.1
CORREDIZA, CON VIDRIO 4 MM
SUMINISTRO E INSTALACIÓN VENTANA ALUMINIO
9.17 m2 19.70 295,178.00 5,815,006.60 22.2.5
SISTEMA PERSIANA FIJA 3"
9.18 PISO EN CERAMICA LISO 0.32X0.32 LINEA FORTALEZA m2 68.00 55,586.00 3,779,848.00 25.1.3
9.19 PISO BALDOSA GRANO MARMOL 0.30X0.30 m2 68.00 103,109.00 7,011,412.00 25.1.6
SUMINISTRO E INSTALACIÓN PUERTA TABLERO CORRIDO,
9.20 INCLUYE MARCO, CERRADURA LAMINA COLLROLLED CAL und 12.00 443,866.00 5,326,392.00 21.1.3
20; 2 X 0.90 M
PLACA LOSA ENTREPISO EN LAMINA COLABORANTE 2"
9.21 TIPO METALDECK E=0.10 M CONCRETO 3,000 PSI INCLUYE m2 158.08 113,149.00 17,886,593.92
MALLA ELECTROSOLDADA
SUBTOTAL ESCENARIO DEPORTIVO "SOFTBALL" 201,856,019.35

12 CAFETERIA TIPO
EXCAVACION MANUAL EN CONGLOMERADO SECO
12.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 27.88 54,038.00 1,506,687.52 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
12.2 m3 16.73 65,495.00 1,095,678.95 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
12.3 m3 1.73 404,665.00 700,070.45 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
12.4 m3 10.38 596,646.00 6,193,185.48 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
12.5 m3 10.26 645,417.00 6,621,978.42 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
12.6 m3 6.06 921,560.00 5,584,653.60 12.2.4
INCLUYE HIERRO.
12.7 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 237.00 61,466.00 14,567,442.00 20.1.4
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
12.8 kg 4,424.10 4,686.00 20,731,332.60 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
12.9 kg 17,453.34 14,122.00 246,476,067.48 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
MURO EN BLOQUE FLEXA No. 4 0.10X0.20X0.30
12.10 m2 440.55 39,631.00 17,459,437.05 15.3.2
M(MORTERO TIPO S 1 3)
PAÑETE MURO EXTERIOR Y CULATAS MORT 1:4
12.11 m2 367.20 28,396.00 10,427,011.20 23.1.2
IMPERMEABILIZADO
12.12 PINTURA VINILO TIPO 1 S/MURO (ALTA CALIDAD m2 881.10 8,971.00 7,904,348.10 26.2.2
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
12.13 m2 513.90 21,223.00 10,906,499.70 23.1.3
DILATAC
12.14 ESTUCO PLÁSTICO m2 881.10 13,172.00 11,605,849.20 26.2.8
SUMINISTRO E INSTALACIÓN DIVISIONES EN COLD
12.15 m2 15.12 312,203.00 4,720,509.36 21.2.1
ROLLED CAL. 18
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
SUMINISTRO E INSTALACIÓN PUERTA ALUMINIO
12.16 m2 9.00 297,213.00 2,674,917.00 22.1.1
CORREDIZA, CON VIDRIO 4 MM
SUMINISTRO E INSTALACIÓN VENTANA ALUMINIO
12.17 m2 40.28 295,178.00 11,888,293.95 22.2.5
SISTEMA PERSIANA FIJA 3"
12.18 PISO EN CERAMICA LISO 0.32X0.32 LINEA FORTALEZA m2 46.80 55,586.00 2,601,424.80 25.1.3
12.19 PISO BALDOSA GRANO MARMOL 0.30X0.30 m2 164.40 103,109.00 16,951,119.60 25.1.6
SUMINISTRO E INSTALACIÓN PUERTA TABLERO CORRIDO,
12.20 INCLUYE MARCO, CERRADURA LAMINA COLLROLLED CAL und 18.00 443,866.00 7,989,588.00 21.1.3
20; 2 X 0.90 M
SUMINISTRO E INSTALACIÓN CUBIERTA TIPO SANDWICH
12.21 333C CAL, 26 PREPINTADA, INCLUYE FIBRA DE VIDRIO O m2 465.00 134,228.00 62,416,020.00 14.2.5
MATERIAL SIMILAR. NO INCLUYE ESTRUCTURA
SUBTOTAL CAFETERIA TIPO 471,022,114.46
13 PORTERIA -
EXCAVACION MANUAL EN CONGLOMERADO SECO
13.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 22.91 54,038.00 1,238,118.66 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
13.2 m3 13.75 65,495.00 900,372.86 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
13.3 m3 1.33 404,665.00 539,553.33 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
13.4 m3 8.00 596,646.00 4,773,168.00 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
13.5 m3 5.76 645,417.00 3,717,601.92 11.4.1
INCLUYE HIERRO
VIGA AEREA CONCRETO 20.7 MPa (3000 PSI) NO INCLUYE
13.6 m3 4.20 860,618.00 3,614,595.60 12.3.6
HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
13.7 m3 41.56 921,560.00 38,300,033.60 12.2.4
INCLUYE HIERRO.
13.8 PLACA DE CONTRAPISO E = 0.10 M, 20.7 MPA (3000 PSI) m2 268.00 61,466.00 16,472,888.00 20.1.4
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
13.9 kg 8,128.16 4,686.00 38,088,557.76 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
13.10 kg 9,966.32 14,122.00 140,744,371.04 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
SUMINISTRO E INSTALACIÓN CUBIERTA TIPO SANDWICH
13.11 333C CAL, 26 PREPINTADA, INCLUYE FIBRA DE VIDRIO O m2 503.62 134,228.00 67,600,549.65 14.2.5
MATERIAL SIMILAR. NO INCLUYE ESTRUCTURA
SUBTOTAL PORTERIA 315,989,810.43
14 CERRAMIENTO -
EXCAVACION MANUAL EN CONGLOMERADO SECO
14.1 (INCLUYE CARGUE MANUAL Y RETIRO DE ESCOMBROS 5 m3 91.88 54,038.00 4,964,741.25 10.1.1
KM)
RELLENO MAT.TAM MAX 2", INCLUYE COMPACT MANUAL
14.2 m3 55.13 65,495.00 3,610,411.88 20.2.2
(5 km)
CONCRETO 13.8 MPA (2000 PSI) SOLADO, CONCRETO DE
14.3 m3 7.88 404,665.00 3,186,736.88 11.1.1
LIMPIEZA
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
14.4 m3 47.25 596,646.00 28,191,523.50 11.3.1
HIERRO
CONCRETO VIGA CIMENTACION 20.7 MPA(3000 PSI) NO
14.5 m3 17.50 645,417.00 11,294,797.50 11.4.1
INCLUYE HIERRO
COLUMNA EN CONCRETO 20.7 MPA (3000 PSI) NO
14.6 m3 12.53 921,560.00 11,547,146.80 12.2.4
INCLUYE HIERRO.
ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2,
14.7 kg 6,826.12 4,686.00 31,987,198.32 13.1.1
G60)
ACERO ESTRUCTURAL ASTM A-500 G.C. (INCLUY
14.8 kg 3,517.50 14,122.00 49,674,135.00 13.1.2
SUMINISTRO MONTAJE Y PINTURA)
SUBTOTAL CERRAMIENTO 144,456,691.12
CANCHA EN GRAMA NATURAL DEL ESTADIO DE
15
FUTBOL ONCE
ACTIVIDADES PRELIMINARES
LOCALIZACIÓN, REPLANTEO Y SEGUIMIENTO EN TODAS
15.1 LAS ETAPAS DE LA OBRA CON EQUIPO TOPOGRÁFICO M2 8,261.00 2,327.00 19,223,345.37 9.1.5
INCL. ENTREGA DE PLANOS DEFINITIVOS
EXCAVACIONES Y FILTROS -
EXCAVACIÓN MANUAL SIN CLASIFICAR - TODO FACTOR -
15.2 M3 13.20 54,038.00 713,301.60 10.1.1
INCL. RETIRO A SITIO AUTORIZADO
DESMONTE, DESCAPOTE Y LIMPIEZA a máquina, e=0.15m.
Incluye cargue, transporte y botada de escombros material
15.3 M2 8,261.00 12,408.00 102,502,479.31 2.1.3
vegetal en botaderos oficiales o donde indique la
interventoría. Su medida será en sitio.
EXCAVACION MECANICA PARA CAJAS VIAS.(INCLUYE
CARGUE Y RETIRO DE MATERIAL 5KM). Cajeo a maquina
hasta una profundidad de 30 cm, despues de ejecutada la
15.4 M3 2,478.30 32,132.00 79,632,728.85 3.2.5
actividad de descapote. Incluye cargue, transporte y botada
de tierra en botaderos oficiales o donde la intervenotría lo
indique.
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
Nivelacion y compactacion al 90% del proctor modificado del
terreno natural. En esta etapa se deberá realizar el ensayo
15.5 de permeabilidad del suelo para aprobar el diseño o M2 8,261.00 2,042.76 16,875,262.84
rediseñar elsistema de filtración adecuado al tipo de terreno
y al manejo de aguas subterráneas

Construcción de filtro lateral de 0.60 m x 4.0 m. Incluye el


suministro, transporte y colocación de Geotextil NT 1600,
tubería para filtro Geodren con un diámetro de 10", Piedra
de canto rodado de poros abiertos, de curva granulometrica
continua, donde un tamaño inferior 0,063mm no debe
15.6 superar el 5% y un tamaño no superior a 1.1/2", de tal ML 373.48 181,424.20 67,758,309.84
manera que cumpla con índice de permeabilidad KF a LK
100 debe ser superior a 3 mm/min. (180 mm/h) e inferior a
30 mm/min. (1800 mrn/h). y todos los elementos
necesarios para su correcta construcción y funcionamiento.
Según diseño. Incluye la excavación.
CAJA INSPECCION 1x1 X 1 M 20.7 MPA, (3000 P3I)
500.10 M, re/ 3/6" 00.15 M. Construcción de cajas de
registro de 100 x 100 x altura hasta 120 cm. en concreto de
15.7 21Mpa, incluye malla electrosoldada. Incluye suministro, UND 6.00 623,757.00 3,742,542.00 16.1.9
transporte e instalación de los materiales y todos los demás
elementos necesarios para su correcta instalación y
funcionamiento.
GRAVA 1-1/2' INCLUYE SUMINISTRO TRANSPORTE E
INSTALACION. Suministro e instalación de material granular
seleccionado para capa filtrante del campo de juego. En
Piedra de canto rodado de poros abiertos, de curva
15.8 granulometrica continua, donde un tamaño inferior M3 1,239.15 70,117.00 86,885,480.55 20.2.10
0,063mm no debe superar el 5% y un tamaño no superior a
1.1/2", de tal manera que cumpla con índice de
permeabilidad KF a LK 100 debe ser superior a 3 mm/min.
(180 mm/h) e inferior a 30 mm/min. (1800 mrn/h).

SUMINISTRO E INSTALACION DE GEODREN PLANAR H=1.0


15.9 ML 2,008.04 30,910.00 62,068,516.40 6.3.17
M. CONSTRUCCION DRENAJES DIAM. Tipo Planar 12"
CESPED NATURAL -
Suministro e Instalación de GEOTEXTIL NT 1600. para filtro
o equivalente. Incluye suministro y transporte de los
15.10 materiales, traslapos y todos los elementos necesarios para M2 8,261.00 4,429.00 36,587,965.90 6.3.4
su correcta instalación y funcionamiento. Según diseño del
filtro.
SUMINISTRO E INSTALACION DE GEOTEXTIL T 2100
15.11 M2 8,261.00 10,098.00 83,419,570.93 6.3.15
RESIST. ULTIMA (TIRA ANCHA)=60 kN/m
Suministro, extendido y nivelacion de arena de rio lavada
15.12 M3 1,652.20 96,577.00 159,564,519.40 20.2.5
E=0,20m
SIEMBRA CESPEDON GRAMA E=0.05 M, CAPA TIERRA
NEGRA E=0.07 M, tipo bermuda Ref. 419 de alto trafico o
similar en TEPE, que se adapten a suelos arcillosos a
15.13 arenosos con PH desde 5,5 a 8,5. se deberá hacer como M2 8,261.00 40,541.00 334,909,172.62 8.3.15
mínimo tres riegos con fertilizantes y regado con agua
hasta su total prendimiento, se deberá utilizar todo lo
necesario para su correcta instalación.
SISTEMA DE DESAGUE -
SUMINISTRO E INSTALACION DE TUBERIA DE 16"
15.14 SANITARIA NOVAFORT; SELLO MECANICO; INCLUYE ML 5.00 112,635.00 563,175.00
ACCESORIOS DE INSTALACION.
SISTEMA DE RIEGO -
Aspersores pop up turbo T - 3, incluye Swing joint
15.15 UND 24.00 491,889.68 11,805,352.30
Articulado
15.16 Electrovalvula de cierre selenoide de 2" UND 6.00 855,669.04 5,134,014.23
15.17 programador de 7 estaciones UND 1.00 717,922.60 717,922.60
15.18 cajas para valvulas UND 6.00 295,969.04 1,775,814.23
15.19 Tuberia pvc de 3" rde 26 ML 180.64 43,193.81 7,802,529.40
15.20 Tuberia pvc de 2" rde 26 ML 358.13 24,996.13 8,951,863.95
15.21 Tuberia pvc 1" rde 26 ML 344.18 17,096.90 5,884,412.35
Equipo de bombeo completo, incluye motobomba de alta
presión 2"x2" 12 HP 20H con arrancador, multiple de
15.22 UND 1.00 39,379,845.19 39,379,845.19
succión y descarga de 2", accesorios, acometida electrica e
instalación electrico y puesta en marcha.
SUBTOTLA CANCHA CESPED NATURAL 1,135,898,124.87
16 CANCHA CESPED SINTETICO
ACTIVIDADES PRELIMINARES
LOCALIZACIÓN, REPLANTEO Y SEGUIMIENTO EN TODAS
16.1 LAS ETAPAS DE LA OBRA CON EQUIPO TOPOGRÁFICO M2 7,813.61 2,327.00 18,182,269.31 9.1.5
INCL. ENTREGA DE PLANOS DEFINITIVOS
DESINSTALACION Y REINSTALACION DE ARCOS DE CAMPO
16.2 UND 1.00 517,488.56 517,488.56
DE FUTBOL
CIMENTACION -
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
EXCAVACIÓN MANUAL SIN CLASIFICAR - TODO FACTOR -
16.3 M3 50.68 54,038.00 2,738,559.38 10.1.1
INCL. RETIRO A SITIO AUTORIZADO
EXCAVACIÓN MECÁNICA RETROCARGARDOR Y VOLQUETA
16.4 M3 2,734.76 24,685.00 67,507,632.68 10.2.1
- TODO FACTOR - INCL. RETIRO A SITIO AUTORIZADO
SUB BASE GRANULAR BG-1 INVIAS. SUMINISTRO,
EXTENDIDO, NIVELACIÓN, HUMEDECIMIENTO Y
COMPACTACIÓN CON VIBROCOMPACTADOR (INCLUYE
16.5 M3 1,953.40 98,623.00 192,650,402.43 6.1.2
TRANSPORTE 5 KM) BASE GRANULAR B 600 PM 95%
(suministro, extendido, nivelación, humedecimiento, y
compactación)
16.6 NIVELACIÓN Y COMPACTACIÓN MECÁNICA SUBRASANTE M2 7,813.61 2,042.76 15,961,351.56
CESPED SINTETICO -
DESINSTALACION Y REINSTALACION DE GRAMA
SINTETICA DEL ESTADIO, INLCUYE: TRANSPORTE, MANO
16.7 DE OBRA, PEGANTE, GRAMA SINTETICA, CINTAS DE M2 7,705.15 38,189.13 294,253,077.86
UNION Y RELLENO CON ARENA SILICE Y CAUCHO
GRANULADO.
SUMINISTRO, TRANSPORTE E INSTALACION DE
ALMOHADILLA DE CHOQUE AMORTIGUANTE "SHOCKPAD"
EN MATERIAL CAUCHO 100% RECICLADO NR DE MINIMO
20 MM DE ESPESOR, BAJA ABRASION, GARANTIA MINIMA
16.8 M2 7,705.15 64,136.41 494,180,864.73
DE 5 AÑOS. INCLUYE: Suministro, transporte e instalación
de plástico calibre 7 y todo lo necesario para su correcta
instalación y funcionamiento. según diseño e indicaciones de
interventoría.
PLASTICO NEGRO CALIBRE 7 PARA SEPARACIÓN
16.9 M2 7,705.15 8,824.56 67,994,612.49
SUBRASANTE/SHOCKPAD (incluye suministro e instalación)
SISTEMA DE DESAGUE -
CARCAMO TIPO CAJÓN EN CONCRETO 3.000 PSI E= 0,3M ,
ANCHO ; 0,5M, 0,3<H1,5 SEGÚN DISEÑO, TAPA
CÓNCAVA PREFABRICADA CON PERFORACIONES DE
16.10 ML 362.72 87,011.11 31,560,669.59
Ø3/8", INCLUYE FORMALETA Y TODO LO NECESARIO PARA
SU CORRECTO FUNCIONAMIENTO; INCLUYE MALLA
ELECTRO SOLDADA
RECÁMARA DE 0,6*0,6*0,6 EN CONCRETO DE 3.000 PSI
16.11 UND 4.00 371,954.06 1,487,816.24
E=0,06M; INCLUYE MALLA ELECTROSOLDADA
SUMINISTRO E INSTALACION DE TUBERIA DE 16"
16.12 SANITARIA NOVAFORT; SELLO MECANICO; INCLUYE ML 5.00 112,635.00 563,175.00
ACCESORIOS DE INSTALACION.
SUBTOTAL CANCHA CESPED SINTETICO 1,187,597,919.82
17 INSTALACIONES ELECTRICAS
PRELIMINARES
17.1 Localización y Replanteo, incluye Topógrafo KM 5.00 263,102.00 1,315,510.00
DESMONTE RED EXISTENTE DE MEDIA TENSION 34,5 KV - -
Desmonte de red MT aérea (34,5 KV) incluye cable de
17.2 ML 242.00 5,093.00 1,232,506.00
guarda
17.3 Desmonte de estructura IPSE o ICEL para 34,5 KV UN 4.00 203,242.00 812,968.00
17.4 Desmonte de templete completo media tensión 34,5kV UN 1.00 119,381.00 119,381.00
17.5 Desmonte de poste de 14 metros UN 4.00 207,735.00 830,940.00
DESMONTE RED EXISTENTE DE MEDIA TENSION 13,2 KV - -
17.6 Desmonte de red de media tensión aérea 3 hilos ML 450.00 3,495.00 1,572,750.00
17.7 Desmonte de estructura tipo ICEL 13,2kV UN 8.00 119,382.00 955,056.00
17.8 Desmonte de templete completo media tensión13,2 kV UN 2.00 65,043.00 130,086.00
17.9 Desmonte de poste de12 metros UN 8.00 366,209.00 2,929,672.00
17.10 Desmonte de transformador hasta 112.5 KVA UN 1.00 366,176.00 366,176.00
DESMONTE RED EXISTENTE DE BAJA TENSION - -
17.11 Desmonte de red de baja tensión abierta hasta 5 hilos ML 300.00 3,695.00 1,108,500.00
17.12 Desmonte de red de alumbrado publico ML 500.00 2,495.00 1,247,500.00
Desmonte de estructura tipo CODENSA, ICEL o IPSE Baja
17.13 UN 20.00 57,317.00 1,146,340.00
Tensión
17.14 Desmonte de templete completo baja tensión UN 5.00 65,043.00 325,215.00
17.15 Desmonte de luminaria de 70W a 400W UN 20.00 42,945.00 858,900.00
17.16 Desmonte de poste de hasta 10 metros UN 20.00 243,945.00 4,878,900.00
SUBTERRANIZACION DE LA RED DE 34,5 KV - -
Maniobra en línea viva para hincada de potería y otros
17.17 HR 10.00 933,437.00 9,334,370.00
trabajos
17.18 Suministro e instalación de poste de 14 metros de 1350 kg UN 2.00 2,441,000.00 4,882,000.00
Suministro e instalación de nueva estructura 550 para red
17.19 UN 2.00 865,257.00 1,730,514.00
34,5 KV
Estructura de transición a circuito subterráneo de MT tipo
17.20 UN 2.00 2,688,541.00 5,377,082.00
CODENSA LA 218 para red de 34,5kV
Suministro e instalación de puesta a tierra para aterrizaje de
17.21 UN 2.00 226,914.00 453,828.00
cable de guarda
Afloramientos para red MT CS400 - Tubo Galvanizado IMC
17.22 UN 2.00 949,915.00 1,899,830.00
de 4"x 6 metros, con capacete, curva y fijación al poste
17.23 Cimentación poste de concreto de 14 metros UN 2.00 250,000.00 500,000.00
17.24 Templete de media tensión para 34,5kV UN 2.00 411,025.00 822,050.00
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
17.25 Suministro e instalación de cable tripolar N° 4/0 XLPE 35 KV ML 272.00 197,479.00 53,714,288.00
SUBTERRANIZACION DE LA RED DE 13,2 KV - -
Maniobra en línea viva para hincada de potería y otros
17.26 HR 10.00 933,437.00 9,334,370.00
trabajos
Suministro e instalación de poste de concreto reforzado de
17.27 UN 5.00 1,545,039.00 7,725,195.00
12 m 1050kg
Suministro e instalación de estructura tipo ICEL 550 - para
17.28 UN 5.00 576,838.00 2,884,190.00
red de 13,2kV
Estructura de transición a circuito subterráneo de MT con
17.29 seccionadores tipo cuchilla tipo CODENSA LA 218 para red UN 5.00 3,422,403.00 17,112,015.00
de 13,2kV
Afloramientos para red MT CS400 - Tubo Galvanizado IMC
17.30 UN 5.00 949,915.00 4,749,575.00
de 4"x 6 metros, con capacete, curva y fijación al poste
17.31 Cimentación poste de concreto de 12 metros UN 5.00 200,000.00 1,000,000.00
17.32 Templete de media tensión para 13,2kV UN 5.00 274,017.00 1,370,085.00
17.33 Suministro e instalación de cable tripolar N° 2/0 XLPE 15 KV ML 997.50 140,545.00 140,193,637.50
Reconectador 15 kV trifásico en SF6. Tensión nominal 15kV,
bloqueo eléctrico y mecánico, contador de operaciones en el
tanque. Aisladores poliméricos, tipo antivandalico. Palanca
para apertura o bloqueo con pértiga. Cuatro (4) grupos de
17.34 UN 1.00 88,812,414.00 88,812,414.00
protección seleccionables de forma local o remota. Seis (6)
sensores de tensión, tres (3) transformadores de corriente
2A - 16000A, protección contra sobrecorrientes de fase y a
tierra
Transformador para servicios auxiliares y/o control de
17.35 reconectadores de 34,5 KV/120V 2KVA en aceite, incluye UN 1.00 6,518,255.00 6,518,255.00
cortacircuitos
SUBTERRANIZACION DE LA RED DE BAJA TENSION - -
Suministro e instalación de estructura de transición a circuito
17.36 UN 1.00 1,031,466.00 1,031,466.00
subterráneo de BT tipo CODENSA LA 326
Suministro e instalación de templete completo para baja
17.37 UN 1.00 257,511.00 257,511.00
tensión
Suministro e instalación de acometida de baja tensión
17.38 UN 2.00 735,538.00 1,471,076.00
trifásica en cable de cobre no 6 AWG por regata.
Suministro e instalación de acometida de baja tensión
17.39 UN 2.00 631,916.00 1,263,832.00
bifásica en cable de cobre no 6 AWG por regata.
Suministro e instalación de acometida de baja tensión
17.40 UN 2.00 303,541.00 607,082.00
monofásica en cable de cobre no 8 AWG por regata.
17.41 Cimentación poste de concreto de 8 metros UN 1.00 150,000.00 150,000.00
SISTEMA DE CAJAS DE INSPECCIÓN Y DUCTERIA - -
Canalización en anden 2 ductos de 3", de acuerdo a norma
17.42 ML 2,650.00 107,561.00 285,036,650.00
CODENSA CS 207
Canalización en anden 2 ductos de 4", de acuerdo a norma
17.43 ML 1,800.00 134,452.00 242,013,600.00
CODENSA CS 208
Canalización en anden 4 ductos de 4", de acuerdo a norma
17.44 ML 500.00 168,065.00 84,032,500.00
CODENSA CS 209
Canalización en anden 6 ductos de 4", de acuerdo a norma
17.45 ML 450.00 210,081.00 94,536,450.00
CODENSA CS 210
Canalización en anden 9 ductos de 4", de acuerdo a norma
17.46 ML 230.00 262,601.00 60,398,230.00
CODENSA CS 211
17.47 Caja de inspección de acuerdo a norma CODENSA CS 274 UN 440.00 727,698.00 320,187,120.00

17.48 Caja de inspección de acuerdo a norma CODENSA CS 275 UN 608.00 958,087.00 582,516,896.00 33.14.2

17.49 Caja de inspección de acuerdo a norma CODENSA CS 276 UN 103.00 1,573,894.00 162,111,082.00 33.14.3

17.50 Caja de inspección de acuerdo a norma CODENSA CS 277 UN 1.00 2,502,490.00 2,502,490.00

17.51 Caja de inspección de acuerdo a norma CODENSA CS 280 UN 8.00 4,276,207.00 34,209,656.00

17.52 Caja de inspección de acuerdo a norma CODENSA CS 281 UN 2.00 3,147,788.00 6,295,576.00

17.53 Caja de inspección de acuerdo a norma CODENSA CS 290 UN 4.00 2,983,106.00 11,932,424.00
Suministro e instalación de drenaje para caja de inspección
17.54 UN 1,166.00 85,854.00 100,105,764.00
en geotextil y gravilla de 1 1/2"
EQUIPOS OCASIONALMENTE SUMERGIBLES, ACCESORIOS PREMOLDEADOS- Y PUESTAS A TIERRA -
Suministro e instalación de transformador ocasionalmente
17.55 UN 1.00 72,927,839.00 72,927,839.00
sumergible de 225 KVA, incluye accesorios de conexión.
Suministro e instalación de transformador ocasionalmente
17.56 UN 1.00 59,976,000.00 59,976,000.00
sumergible de 150 KVA, incluye accesorios de conexión.
Suministro e instalación de transformador ocasionalmente
17.57 UN 3.00 28,560,000.00 85,680,000.00
sumergible de 15 KVA, incluye accesorios de conexión.
Suministro e instalación de sistema de maniobras
17.58 ocasionalmente sumergible de una entrada tres salidas UN 1.00 86,975,723.00 86,975,723.00
600a, 15 KV incluye accesorios de conexión.
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
Suministro e instalación de barraje preformado para media
17.59 UN 5.00 4,315,410.00 21,577,050.00
tensión de 600 a 15 KV, 4 puertos.
Suministro e instalación de tapón protector aislado 600 a
17.60 UN 6.00 959,772.00 5,758,632.00
15KV.
Suministro e instalación de terminal tipo codo de 600 a
17.61 UN 15.00 1,381,644.00 20,724,660.00
15KV.
Suministro e instalación de barraje preformado de baja
17.62 UN 5.00 357,952.00 1,789,760.00
tensión sumergible de 500 a 600 v
Suministro e instalación de empalme de derivación en gel
17.63 GHFC - 1 rango de aplicación de cable 6 a 2 y derivación de UN 10.00 51,414.00 514,140.00
14 a 8.
Suministro e instalación de terminal premoldeado tipo
17.64 UN 5.00 879,129.00 4,395,645.00
exterior para cable XLPE N° 2/0 (juego x 3 )
Suministro e instalación de sistema de puesta a tierra para
17.65 UN 5.00 393,075.00 1,965,375.00
barrajes de baja tensión
Suministro e instalación de sistema de puesta a tierra para
17.66 UN 5.00 613,844.00 3,069,220.00
barrajes de MT
Suministro e instalación de malla de puesta a tierra
17.67 transformadores y cajas de maniobra, incluye 4 varillas de UN 5.00 2,371,298.00 11,856,490.00
cobre de 2,4 metros y cable de cobre desnudo No 2/0.
Suministro e instalación de cinta tipo scoth 700 para uso en
17.68 UN 5.00 13,068.00 65,340.00
MT y BT
Suministro e instalación de cinta tipo scoth 23 para uso en
17.69 UN 5.00 36,300.00 181,500.00
MT
SUMINISTRO E INSTALACIÓN DE CABLE PARA ALIMENTADORES DE BAJA TENSIÓN - -
Tendido y conexión de Alimentador en cable de cobre
17.70 ML 1,334.00 74,850.00 99,849,900.00
3F(1/0AWG) + 1N(2AWG) + 1T (6AWG)
Tendido y conexión de Alimentador en cable de cobre
17.71 ML 9,000.00 16,811.00 151,299,000.00
3F(8AWG) + 1N(8AWG) + 1T (10AWG)
Tendido y conexión de Alimentador en cable de cobre
17.72 ML 1,334.00 102,116.00 136,222,744.00
3F(2/0AWG) + 1N(1/0AWG) + 1T (6AWG)
Tendido y conexión de Alimentador en cable de cobre
17.73 ML 100.00 1,385,595.00 138,559,500.00
3F(4x500mcm) + 1N(4x350mcm) + 1T (1x250mcm)
MÁSTILES Y LUMINARIAS TIPO LED PARA ILUMINACIÓN EXTERIOR - -
Suministro e instalación de equipo de medida para AP,
17.74 incluye caja tipo intemperie, medidor bifásico, tubería UN 5.00 1,699,115.00 8,495,575.00
galvanizada y demás accesorios para conexión y montaje
Suministro e instalación de mástil metálico de 6m ,
galvanizado con dos brazos para montaje de luminarias
17.75 UN 4.00 1,808,747.00 7,234,988.00
(según diseño), totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
Suministro e instalación de mástil metálico de 6m ,
galvanizado con un brazo para montaje de luminarias
17.76 UN 17.00 1,728,747.00 29,388,699.00
(según diseño), tot totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
Suministro e instalación de mástil metálico de 8m ,
galvanizado con dos brazos para montaje de luminarias
17.77 UN 12.00 2,020,192.00 24,242,304.00
(según diseño), tot totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
Suministro e instalación de mástil metálico de 8m ,
galvanizado con un brazo para montaje de luminarias
17.78 UN 16.00 1,920,192.00 30,723,072.00
(según diseño), tot totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
Suministro e instalación de mástil metálico de 10m ,
galvanizado con dos brazos para montaje de luminarias
17.79 UN 21.00 2,449,621.00 51,442,041.00
(según diseño), tot totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
Suministro e instalación de mástil metálico de 10m ,
galvanizado con un brazo para montaje de luminarias
17.80 UN 7.00 2,349,621.00 16,447,347.00
(según diseño), tot totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
Suministro e instalación de mástil metálico de 12m ,
galvanizado con un brazo para montaje de luminarias
17.81 UN 5.00 2,659,665.00 13,298,325.00
(según diseño), tot totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
Suministro e instalación de mástil metálico de 18m ,
galvanizado con un brazo para montaje de luminarias
17.82 UN 17.00 6,649,162.00 113,035,754.00
(según diseño), tot totalmente galvanizado en caliente,
fabricado en 4", flange d e 40 x 40 en 1/2",
GL2 Compact 5 80LEDs 5102 NW 700mA 180W 21.800Lm
17.83 UN 18.00 3,086,765.00 55,561,770.00
17.84 Teceo 1 16LEDs 5102 NW 700mA 36W 4.600Lm UN 25.00 1,753,298.00 43,832,450.00
17.85 Teceo 1 24LEDs 5139 NW 700mA 55W 6.900Lm UN 40.00 1,997,201.00 79,888,040.00
17.86 Teceo 2 144LEDs 5121 NW 500mA 221W 30.600Lm UN 4.00 4,774,090.00 19,096,360.00
17.87 Teceo 2 72LEDs 5121 NW 700mA 157W 19.800Lm UN 17.00 3,292,682.00 55,975,594.00
Omnistar 144LEDs 5120 NW 1000mA 463W 52.500Lm
17.88 Incluye: Cable conexión cofre- proyector / Fijación Tipo U UN 7.00 8,036,784.00 56,257,488.00
basculante / Cofre
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
Omnistar 144LEDs 6294 NW 1000mA 463W 50.700Lm
17.89 Cable conexión cofre-proyector / Fijación Tipo U basculante UN 227.00 8,036,784.00 1,824,349,968.00
/ Cofre
Omnistar 144LEDs 2261 NW 1000mA 463w 50.700Lm Cable
17.90 conexión cofre-proyector / Fijación Tipo U basculante / UN 66.00 8,036,784.00 530,427,744.00
Cofre
Pilona - Baliza de 80cm de altura y 95mm de diámetro, tipo
17.91 LED 3W,hierro con anillo en acero inoxidable, con acabado UN 150.00 517,548.00 77,632,200.00
en color negro forja, difusor matacrliato glaseado
Luminaria TIPO LED, SculpFlood , hasta 120W, con grado
17.92 UN 78.00 3,860,151.00 301,091,778.00
de protección IP67, 15400 lumens
Reflector RGB TIPO LED, empotrada, hasta 30W, con grado
17.93 de protección IP66, IK07, en aluminio anodizado, con bloque UN 50.00 1,197,239.00 59,861,950.00
óptico en vidrio templado
Construcción Base en concreto para postes metálicos según
17.94 norma CODENSA AP-802 en concreto 2500psi UN 150.00 136,840.00 20,526,000.00
(1100x450x450)mm, para Pilonas de 80cm de altura
Construcción Base en concreto para postes metálicos según
17.95 norma CODENSA AP-802 en concreto 2500psi UN 99.00 172,414.00 17,068,986.00
(1100x450x450)mm, para Mástil Metálico
Suministro e instalación de barraje preformado de baja
17.96 UN 5.00 333,606.00 1,668,030.00
tensión sumergible de 500 a 600 v
Suministro e instalación de empalme de derivación en gel
17.97 GHFC - 1 rango de aplicación de cable 6 a 2 y derivación de UN 404.00 23,143.00 9,349,772.00
14 a 6.
Suministro e instalación de sistema de puesta a tierra para
17.98 barrajes de baja tensión, luminarias Metálicas y finales de UN 99.00 210,147.36 20,804,588.64
circuito
Suministro e instalación de cable de cobre aislado 600 V
17.99 THW N°12 AWG, desde el circuito alimentador hasta la ML 4,040.00 6,830.00 27,593,200.00
luminaria, 3F+1N+1T
SISTEMA DE CABLEADO ESTRUCTURADO - -
Salida de Voz o Datos en Cable UTP categoría 6 incluye
17,100 marquillas, sistema de fijación para salida, facePlate y UN 188.00 186,201.00 35,005,788.00
tracjack
SUMINISTRO, INSTALACIÓN Y CONFIGURACIÓN DE
Gabinete de 27 UR , puerta en malla o acrílico - para
ubicación de EQUIPOS ACTIVOS. Incluye barraje de puesta
17,101 UN 61.00 7,638,235.00 465,932,335.00
a tierra con aisladores, Pach panel para 24 puertos categoría
6 1G, organizadores frontal trasero, vertical, marquillas,
certificación de puntos, multitoma
SUMINISTRO, INSTALACIÓN Y CONFIGURACIÓN DE Planta
modular para voz IP para telefonía, mensajería, redes.
Soporta módulos de expansión llamadas en conferencia,
17,102 UN 1.00 43,956,375.00 43,956,375.00
gestión de clientes y comunicaciones unificadas, hasta 8
conexiones T1/PRI/E1 (192 canales T1/PRI o 240 canales
E1). Incluye veinte salidas para VOZIP. Incluye Software.
SUMINISTRO, INSTALACIÓN Y CONFIGURACIÓN DE
17,103 Teléfonos para voz IP, con pantalla line x 29 Carácter LCD, UN 15.00 718,368.00 10,775,520.00
100 registros de llamadas
17,104 Fibra óptica Multimodo 50/125UM 12 HILOS Interior/Exterior ML 930.00 28,067.00 26,102,310.00

Sistema de conexión a internet WIFI, con radio de cobertura


17,105 UN 5.00 55,250,000.00 276,250,000.00
de 100 metros sin obstáculos, caja tipo intemperie
RED NORMAL Y RED REGULADA - CON SISTEMA DE UPS - -
Salida toma monofásica doble con polo a tierra. Incluye
17,106 cable de cobre 12F AWG+ 12N AWG 14T, soportes, cajas y UN 188.00 96,592.00 18,159,296.00
accesorios
Salida toma monofásica doble con polo a tierra - regulada,
17,107 con tierra aislada. Incluye cable de cobre 12F AWG+ 12N UN 188.00 106,592.00 20,039,296.00
AWG 12T, soportes, cajas y accesorios
UPS de 6KVA para respaldo de los puestos de trabajo. UPS
17,108 VT 6kVA 208V 3PH Batt Mod Exp to 4, Start-Up 5X8, Int UN 1.00 11,444,802.00 11,444,802.00
Maint Bypass, Parallel Capable (208 3PH, 120, 208)
Salida toma bifásica 30A PVC, Incluye cable de cobre
17,109 UN 1.00 401,533.00 401,533.00
10x2F AWG+ 10T, soportes, cajas y accesorios
Salida toma trifásica 30A PVC, Incluye cable de cobre
17,110 UN 1.00 535,032.00 535,032.00
10x3F AWG+ 10N AWG 10T, soportes, cajas y accesorios
SISTEMA DE TABLEROS DE ENERGÍA - -
Tablero Parcial 18 circuitos, con puerta y espacio para
17,111 UN 5.00 785,508.00 3,927,540.00
totalizador. Incluye totalizador trifásico
Tablero Parcial 12 circuitos, con puerta y espacio para
17,112 UN 15.00 683,106.00 10,246,590.00
totalizador. Incluye totalizador
Tablero Parcial 8 circuitos, con puerta y espacio para
17,113 UN 70.00 597,694.00 41,838,580.00
totalizador. Incluye totalizador
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
Tablero GENERAL en lamina cold rolled de 2100x800x450
17,114 UN 1.00 32,346,738.00 32,346,738.00
mm. Pintura electrostática color RALI 7032.
AMARIO PARA CUENTAS TRIFASICA SEGÚN DISEÑO EN
LAMINA COLD ROLL CALIBRE 16, PARA MEDIDA
17,115 UN 5.00 10,352,564.00 51,762,820.00
INDIRECTA TRATAMIENTO CON PINTURA
ELECTROSTATICA
Medidor trifasico electronico, incluye caja con proteccion
17,116 UN 10.00 1,035,000.00 10,350,000.00
termomagnetica, y sistema de puesta a tierra
SISTEMA DE PUESTA A TIERRA COMPUESTO POR NUEVE
(09) VARILLAS COBRE-COBRE 99% DE 5/8”X2.4M Y MALLA
17,117 UN 3.00 3,212,794.00 9,638,382.00
DE 5X5M, Y CUADRICULAS DE 2,5X2,5M. SE USARA
SOLDADURA EXOTÉRMICA.
SISTEMA INTEGRAL DE PROTECCIÓN CONTRA RAYOS - -
Sistema integral de Protección Contra Rayos acorde a la
norma NTC4552-1-2-3, con sistema de prevención y
señalización, terminales de captación, bajantes, sistema de
17,118 puesta a tierra y DPS. Conectores deben cumplir con la UN 10.00 24,186,789.00 241,867,890.00
norma NTC 4628 o la IEEE-837 y EN-50164 Lightning
Protección Component part 1,2,3. Deben evitar la corrosión
galvánica.
Sistema integral de Protección Contra Rayos para mastiles
acorde a la norma NTC4552-1-2-3, con sistema de
prevención y señalización, terminales de captación,
17,119 bajantes, sistema de puesta a tierra y DPS. Conectores UN 99.00 2,031,131.00 201,081,969.00
deben cumplir con la norma NTC 4628 o la IEEE-837 y EN-
50164 Lightning Protección Component part 1,2,3. Deben
evitar la corrosión galvánica.
SISTEMA DE GENERACIÓN DE ENERGÍA - EMERGENCIA - -
Generador Diésel de 225kW, sistema trifásico, con motor
17,120 UN 1.00 140,750,629.00 140,750,629.00
diésel 1800 rpm, alternador con control digital
Transferencia automática, con contactores trifásicos de 630A
17,121 UN 1.00 23,313,360.00 23,313,360.00
en AC3, a 208 V, con sistema de selección manual
Generador Diésel de 150kW, sistema trifásico, con motor
17,122 UN 1.00 100,750,629.00 100,750,629.00
diésel 1800 rpm, alternador con control digital
Transferencia automática, con contactores trifásicos de450A
17,123 UN 1.00 19,313,360.00 19,313,360.00
en AC3, a 208 V, con sistema de selección manual
Generador Diésel de 15kW, sistema trifásico, con motor
17,124 UN 3.00 35,075,062.00 105,225,186.00
diésel 1800 rpm, alternador con control digital
Transferencia automática, con contactores trifásicos de50A
17,125 UN 3.00 12,313,360.00 36,940,080.00
en AC3, a 208 V, con sistema de selección manual
ILUMINACIÓN INTERIOR - -
Suministro e instalación LUMINARIA LED PANEL <24W,
2880-4000 lumenes, eficiencia <90 lm/W, temperatura del
17,126 color 2700-6500K, vida util 35000 horas, tension de UN 509.00 118,297.00 60,213,173.00
operación 85V-265V, factor de potencia >0,9, IP20.
Cuadrada 60x60 cm, Debe terner certificado RETILAP
Suministro e instalación LUMINARIA LED HERMETICA
<40W, 3400 lumenes, eficiencia <90 lm/W, temperatura
17,127 del color 2700-6500K, vida util 35000 horas, tension de UN 164.00 289,741.00 47,517,524.00
operación 85V-265V, factor de potencia >0,9, IP65.
Rectangular 120x11x7 cm, Debe terner certificado RETILAP
Suministro e instalación LUMINARIA Panel LED <20W,
angulo de apertura 120º, 1799 lumenes, eficiencia 72 lm/W,
temperatura del color 3000-6000K, vida util 35000 horas,
17,128 UN 82.00 136,707.00 11,209,974.00
tension de operación 100V-240V, factor de potencia >0,9,
IP20. Redonda diametro 30 cm. Debe terner certificado
RETILAP
Suministro e instalación LETRERO DE SALIDA LED, color
verde, vida util 35000 horas, tension de operación 110V-
17,129 UN 75.00 94,798.00 7,109,850.00
130V, factor de potencia >0,9, Cuadrada 18x290x4.5.
Autonomia 90minutos. Debe terner certificado RETILAP
Suministro e instalación LUMINARIA LED EMERGENCIA
<3.2W, temperatura del color 6000-6500K, vida útil 35000
17,130 horas, tensión de operación 120V-277V, factor de potencia UN 100.00 94,798.00 9,479,800.00
>0,9. Autonomía 90 minutos. IP20. Rectangular 30x13x6
cm, Debe tener certificado RETILAP
SALIDA PARA ILUMINACIÓN, INCLUYE TUBERÍA EMT,
PROPORCIONAL CAJAS, INTERRUPTOR, ACCESORIOS DE
17,131 UN 930.00 106,590.00 99,128,700.00
CONEXIÓN Y SISTEMA DE FIJACION CON VARILLA
ROSCADA Y RIEL OMEGA
TOMAS - -
17,132 TOMA MONOFÁSICA DOBLE CON POLO A TIERRA UN 327.00 96,592.00 31,585,584.00
SALIDA DE TOMA PARA ILUMINACION DE EMERGENCIA -
17,133 UN 175.00 99,134.00 17,348,450.00
TUBERIA INDEPENDIENTE
P R E S U P U E S TO G E N E R A L

CONSTRUCCIÓN Y MEJORAMIENTO DE LA VILLA OLÍMPICA Y REFORZAMIENTO ESTRUCTURAL DEL ESTADIO MACAL EN EL MUNICIPIO DE
VILLAVICENCIO, META

ITEM DESCRIPCION UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL N° REF PRECIOS AIM
TOMAS GFCI MONOFÁSICA DOBLE CON POLO A TIERRA
17,134 UN 105.00 140,725.00 14,776,125.00
CON TUBERIA
17,135 TOMA BIFÁSICA 30A CON TUBERIA UN 20.00 147,442.00 2,948,840.00
17,136 TOMA TRIFÁSICA 30A CON TUBERIA UN 3.00 185,425.00 556,275.00
SUBTOTAL OBRA ELECTRICA 9,007,416,380.14
INSPECCIONES, CERTIFICACIONES REGLAMENTARIAS Y DIVULGACION - -
Inspección red de media y/o baja tensión y certificación
17,137 KM 5.00 1,789,228.00 8,946,140.00
RETIE , incluye I.V.A.
17,138 Inspección y certificación RETILAP, incluye I.V.A. UN 1,334.00 95,000.00 126,730,000.00
Inspección y certificación transformadores y cajas de
17,139 UN 5.00 797,703.00 3,988,515.00
maniobra
17,140 Estudio y aprobación diseño x EMSA, incluye I.V.A. UN 2.00 2,564,321.00 5,128,642.00
17,141 Inspección y certificación EMSA, incluye I.V.A. UN 2.00 2,793,954.00 5,587,908.00
SUBTOTAL CERTIFICACIONES 150,381,205.00
IVA 19% 28,572,428.95
TOTAL CERTIFICACIONES 178,953,633.95
18 INSTALACIONES HIDROSANITARIAS 1,800,000,000.00
COSTO DIRECTO 45,911,409,420.89
AIU 31% 14,232,536,920.48
VALOR TOTAL 60,322,899,975.31

INTERVENTORIA (7%) 4,222,602,998.27

TOTAL PROYECTO 64,545,502,974.00

_____________________________________________
MARIA ANGELICA BUITRAGO AMAYA
Ingeniera Civil
Contratista