Académique Documents
Professionnel Documents
Culture Documents
PART 3
PART 1 PART 2 N
NOTES
8. SUPPLY AIR, RETURN AIR, FRESH AIR & EXHAUST AIR IN AIR CONDITIONING
DUCT INSULATION SHALL BE 25MM.
9. SUPPLY AIR, RETURN AIR, FRESH AIR & EXHAUST AIR IN BASEMNT, OUTSIDE &
SHAFT DUCT INSULATION SHALL BE 50MM.
10. SUPPLY & RETURN AIR DIFFUSER, SUPPLY AIR GRILL, RETURN AIR GRILL SIZE
SELECTED NOT EXCEED 25 NC LEVEL.
BALCONY BALCONY
BALCONY
LAWN
LEGEND :-
FD
+13.20
P.E. TG TRANSER GRILL
F.F.L.
CORRIDOR CORRIDOR
+13.20 TERRACE SOUND ATTENUATOR GV GATE VALVE
BEDROOM M.BEDROOM
F.F.L.
LIVING/DINING CORRIDOR BEDROOM +13.20
BEDROOM LIVING/DINING FD FIRE DAMPER
FCU 02 LIVING/DINING F.F.L.
@ 152 L/s SUPPLY AIR DIFFUSER
T
T BOU 2750 CAV CONSTANT AIR VOLUME
T
T
T T
KITCHEN KITCHEN RETURN/EXHAUST AIR DIFFUSER
VAV VARIABLE AIR VOLUME
KITCHEN BATHROOM BATHROOM BATHROOM
VP
VP
FCU 02 FCU 03
VP
GUEST @ 152 L/s @ 206 L/s T
FCU FAN COIL UNIT
FCU 05 CHILLED WATER SUPPLY PIPE
T
VP VP
GUEST TOILET BOU 2750 BOU 2750
VP
@ 313 L/s TOILET GUEST FCU 05
BOU 2750 @ 313 L/s GUEST FCU 02
TOILET
LAUN. BOU 2750 FCU 04 @ 255 L/s TOILET @ 152 L/s M.BATHROOM
CHILLED WATER RETURN PIPE FCL FALSE CEILING
BOU 2750 LAUN. BOU 2750 FCU 02
LAUN. T BATHROOM @ 152 L/s
T
T VP VP BOU 2750 VP VALVE PACKAGE STL SAND TRAP LOUVER
FCU 03 @ 206 L/s T
BOU 2750 FCU 04 @ 255 L/s CORRIDOR
T ST. -3 VP BATHROOM
BOU 2750 FCU 02
@ 152 L/s SAT SOUND ATTENUATOR
KITCHEN AHU AIR HAINDLING UNIT
VP
ENT.
KITCHEN BOU 2750
BATHROOM SERVICE LIFT FCU 05
@ 313 L/s GUEST GUEST LAUN. MAID RM. SLSD SUPPLY LINEAR SLOT DIFFUSER
VP LOBBY -2
BOU 2750 TOILET FCU 08 @ 476 L/s KITCHEN BATHROOM AD ACCESS DOOR
LAUN.
BOU 2750
LAUN. ENT. ENT. ENT. ENT. ENT.
FCU 13 @ 255 L/s LIFTS' VP
BOU 2750 LOBBY -2
VP
F.H.C. BOD BOTTOM OF DUCT SAD SUPPLY AIR DUCT
BTU
BTU
BTU
BTU
DISTRIBUTION CORRIDOR -2 +13.20 DISTRIBUTION CORRIDOR
BTU BTU ST. -4
FCU 13 @ 255 L/s RLSD RETURN LINEAR SLOT DIFFUSER
F.F.L. +13.20 BOU 2750
BOP BOTTOM OF PIPE
+13.20
F.F.L. F.F.L.
GUEST BTU BRITISH THERMAL UNIT RAD RETURN AIR DUCT
BTU
BTU
BTU
VP BTU
BATHROOM
FD
FD
FD
FD
FCU 06 @ 313 L/s F.H.C. FCU 02 @ 152 L/s GARB. STORE
BOG BOTTOM OF GRILL L/s LITER PER SECOND
W.M.C. ENT. FCU 07 @ 425 L/s ENT.
BOU 2750 BOU 2750
POOL RM. LAUN.
ENTRANCE
BOU 2750
LAUN. FCU 05 @ 313 L/s STORE UC UNDER CUT
STORE TEL. RM.
BOU 2750 VP FCUELEC.
02 @ 152 L/s
RM. BOU BOTTOM OF UNIT
GUEST ENT. KITCHEN T
SECURITY GUEST BOU 2750
VP
BATHROOM RM. BATHROOM M.BATHROOM
FCU 06 @ 313 L/s IV ISOLATION VALVE
BOU 2750 KITCHEN LAUN.
CHWS CHILLED WATER SUPPLY PIPE
KITCHEN VP VP
T VP
CHWR CHILLED WATER RETURN PIPE DRV DOUBLE REGULATING VALVE
VP VP
H.C.TOILET CORRIDOR
CORRIDOR
VP
M.BATHROOM CORRIDOR T
FCU 02 FCU 03 @ 206 L/s
BALCONY
VP
FCU 03 @ 206 L/s @ 152 L/s BOU 2750
BOUBATHROOM
2750 M.BATHROOM M.BEDROOM
VP
BALCONY BALCONY BOU 2750
VP
+13.20
VP
T
T FCU 02 F.F.L.
@ 152 L/s T T
FCU 02
FCU 02 BATH @ 152 L/s
BOU 2750
T
BATHROOM @ 152 L/s BATHROOM ROOM BOU 2750
BOU 2750 T
T T
+13.20
+13.20 LIVING/DINING
+13.20 BEDROOM F.F.L.
F.F.L. BALCONY
BALCONY F.F.L. +13.20
BALCONY LIVING/DINING LIVING/DINING
LIVING/DINING F.F.L.
BEDROOM
BEDROOM CHANGE
RM. +13.20
CORRIDOR
M.BEDROOM +13.20 F.F.L. BEDROOM
P.E. BEDROOM F.F.L. CHANGE M.BEDROOM
+13.20 +13.20 BEDROOM
+13.20 LIVING/DINING BEDROOM LIVING/DINING RM.
F.F.L. F.F.L. LIVING/DINING
F.F.L. +13.20
BEDROOM F.F.L. BEDROOM CHANGE GATE
M.BEDROOM RM. ACCESS
LIVING/DINING BEDROOM LIVING/DINING
FCU 05
CORRIDOR
CORRIDOR
@ 313 L/s
CORRIDOR
BOU 2750
T T T T T
OPEN TO SKY
T
KITCHEN LIMIT OF BALCONY LAWN DWG NO. DWG.DESCRIPTION
KITCHEN LIVING/DINING
F.H.R. ABOVE TERRACE
T
BATHROOM BATHROOM KITCHEN TERRACE
BATHROOM M422 FIRST FLOOR PLAN PART - 1 AIR CONDITIONING LAYOUT
VP
FCUBATHROOM
01
VP
VP
BOU 2750 VP
@ 206 L/s @ 152 L/s M424 FIRST FLOOR PLAN PART - 2 AIR CONDITIONING LAYOUT
VP
GUEST BOU 2750 BOU 2750 GUEST
T
FCU 02 @ 152 L/s TOILET FCU 04 FCU 05 GUEST TOILET
VP
FCU 03 @ 206 L/s BOU 2750 @ 255 L/s @ 313 L/s LAUN.
TOILET LAUN. M426 FIRST FLOOR PLAN PART - 3 AIR CONDITIONING LAYOUT
CORRIDOR BOU 2750 BOU 2750
BOU 2750 LAUN.
T
M.BATHROOM T
CORRIDOR T T T
A109 FIRST FLOOR PLAN PART - 1
VP
VP POOL DECK
BATHROOM VP VP ST. -2 FCU 04 @ 255 L/s BATHROOM A110 FIRST FLOOR PLAN PART - 2
BOU 2750
VP
GUEST FCU 02 @ 152 L/s ENT. ENT. FCU 02 @ 152 L/s
KITCHEN SERVICE LIFT
BATHROOM BOU 2750 GUEST
LOBBY -1 BOU 2750 A112 FIRST FLOOR PLAN PART - 3
KITCHEN BATHROOM KITCHEN
VP
STORE ENT. GUEST
LAUN. FCU 05 TOILET A154 FIRST FLOOR REFLECTED CEILING PLAN PART -1
LAUN. @ 313 L/s
ENT. FCU 07 @ 425 L/s ENT. BOU 2750 ENT.
BOU 2750 F.H.C OUTDOOR A155 FIRST FLOOR REFLECTED CEILING PLAN PART -2
LIFTS' LOBBY -1 SHOWER
FD
BTU
DISTRIBUTION +13.20 DISTRIBUTION CORRIDOR
+13.20
BTU
CORRIDOR -1 +13.20
F.F.L. F.F.L. +13.20 GATE
BTU
BTU
BTU
F.F.L.
BTU
VP VP
ST. -1 BTU
FD
FD
FD
FD
F.H.C. FCU 07 @ 425 L/s
W.M.C. GARB.
RM. ENT. BOU 2750 LAUN. ENT.
ENT. LAUN. ENT. LAUN.
LAUN.
TEL. RM. GUEST ELEC. ROOM
GUEST FCU 06 STORE KITCHEN
BATHROOM KITCHEN GUEST FCU 08 @ 476 L/s
FCU 08 @ 476 L/s BATHROOM STORE GUEST @ 313 L/s
STR. KITCHEN STORE BATHROOM BOU 2750
BOU 2750 BATHROOM BOU 2750
KITCHEN
FCU 02 FCU 02
@ 152 L/s @ 152 L/s VP VP VP
CORRIDOR BOU 2750 BOU 2750 FCU 02 FCU 02 CORRIDOR M.BATHROOM CORRIDOR
VP
VP
VP
@ 152 L/s
T T
CORRIDOR @ 152 L/s
T T
VP VP
BOU 2750
M.BATHROOM BOU 2750
M.BATHROOM M.BATHROOM
VP
VP
VP
VP
FCU 02
@ 152 L/s
BOU 2750 FCU 02 FCU 01
T BATHROOM T T @ 152 L/s T @ 95 L/s SWIMMING POOL
T
BATHROOM BATHROOM BOU 2750 BOU 2750 BATHROOM
T T T
KIDS' POOL
FCU 02 @ 152 L/s
BOU 2750
+13.20 M.BEDROOM BEDROOM
F.F.L. LIVING/DINING
LIVING/DINING 00 ISSUED FOR APPROVAL 04.09.2018
+13.20 M.BEDROOM BEDROOM LIVING/DINING BEDROOM M.BEDROOM
F.F.L. M.BEDROOM +13.20
+13.20 F.F.L.
REV. DESCRIPTION DATE
LIVING/DINING BEDROOM F.F.L.
CLIENT
TERRACE
LAWN
LAWN
LAWN
CONSULTANT
MAIN CONTRACTOR
GHANTOOT TRANSPORT
& General Contracting LLC
(Building Division)
MEP SUB-CONTRACTOR
GHANTOOT TRANSPORT
& General Contracting LLC
(MEP Division)
PROJECT TITLE
BLOCK
SHOP DRAWING
A115 1:150 A0 1 of 1
DRAWING NUMBER SUBMISSION DATE REV.
GTGC/A115/MEP/AC-003 04.09.2018 00